Bus Tenders

Bus Tenders

Department of Health in Bus Source Tender

Poland
Purchaser Name: Department of Health in Bus Source | "O Zmianie Umowy Dostawa Articles of the Mleczarskie Dołu Żyieniauki Zdrovotnej W Busku-zdrojudrojudrojudrojski Dołużskich doału Żyutki" (in Polish)
Closing DateNA
Tender AmountNA 

Department of Health in Bus Source Tender

Poland
Purchaser Name: Department of Health in Bus Source | Delivery of Fruits and Vegetables to the Nutrition Department of the Health Care Team in Busko-Zdroj. Zoz/do/om/zp/44/2024
Closing Date15 Nov 2024
Tender AmountRefer Documents 

Department Of Social Welfare And Development Region X Tender

Automobiles and Auto Parts
Philippines
Details: Description Invitation To Bid For Supply And Delivery Of Motor Vehicles For Rrcy (early Procurement Activity) 1. The Department Of Social Welfare And Development Field Office X Through The Short Of Award - Trust Fund Intends To Apply The Sum Of Six Million Five Hundred Ninety Thousand Pesos (php 6,590,000.00) Only Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply And Delivery Of Motor Vehicles For Rrcy (early Procurement Activity) Under Ib No. 2025-10-05-epa. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. Lot 1 – Supply And Delivery Of One (1) Unit Mini Bus (early Procurement Activity) Php 4,475,000.00 Lot 2 – Supply And Delivery Of One (1) Unit Van (early Procurement Activity) Php 2,115,000.00 Total Php 6,590,000.00 2. The Dswd Fo X Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Shall Be In Accordance With Section Vi (schedule Of Requirements). Prospective Bidders Must Have Completed A Similar Contract Within The Preceding Two (2) Years, A Single Contract Equivalent To At Least Fifty Percent (50%) Of The Approved Budget Cost Per Lot To Be Bid. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. (i) Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Dswd Fo X Bac Secretariat And Inspect The Bidding Documents At The Address Given Below During Weekdays (except Holidays) From 8:00 Am - 5:00 Pm Starting 26 October 2024. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On The Given Address And Website/s Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person Or Through E-mail During The Conduct Of Bid Opening. Lot No Abc (in Php) Cost (in Php) Lot 1 4,475,000.00 5,000.00 Lot 2 2,115,000.00 5,000.00 6. The Dswd Fo X Will Hold A Virtual Pre-bid Conference Through Videoconferencing Via Google Meet (https://meet.google.com/ies-pqay-gxe) On 04 November 2024, 09:30 Am Onwards, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before 18 November 2024, 09:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Virtual Bid Opening Through Videoconferencing Via Google Meet Shall Be On 11 November 2024, 01:00 Pm. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. The Links Will Be Provided Upon Submission Of Bid Documents. 10. Each Bidder Shall Submit One (1) Original And Two (2) More Duplicate Copies Of Its Bid, Which Shall Be Properly Sealed And Marked, To Wit:  Original Bid (blue Envelope) Enclose The Original Eligibility And Technical Documents In One Sealed Envelope Marked “original – Technical Component” And The Original Financial Component In Another Sealed Envelope Marked “original – Financial Component”. Seal Both Envelopes In An Outer Envelope Marked “original Bid”  Copy 1 (red Envelope) Enclose The Certified True Copies Of Eligibility And Technical Documents In One Sealed Envelope Marked “copy 1 – Technical Component” And The Certified True Copies Of Financial Component In Another Sealed Envelope Marked “copy 1 – Financial Component”. Seal Both Envelopes In An Outer Envelope Marked “copy 1”.  Copy 2 (yellow Envelope) Enclose The Certified True Copies Of Eligibility And Technical Documents In One Sealed Envelope Marked “copy 2 – Technical Component” And The Certified True Copies Of Financial Component In Another Sealed Envelope Marked “copy 2 – Financial Component”. Seal Both Envelopes In An Outer Envelope Marked “copy 2”. The Original Bid, Copy 1, And Copy 2 Envelopes, Shall Then Be Contained In One Envelope (overall Bid Component Envelope) Duly Marked And Sealed. All Envelopes Shall:  Be Addressed To: The Chairperson Bids And Awards Committee Department Of Social Welfare And Development Fo X Masterson Ave., Upper Carmen, Cagayan De Oro City  Bear A Warning “do Not Open Before: ……” Stating The Date & Time For Opening Of Bids In Accordance With The Itb  Prospective Bidder Is Requested To Indicate A Label Or Tab Marking On Each Technical And Financial Documents Required To Be Submitted. Note: The Prospective Bidder May Opt To Submit One Set (1 Original And 2 Duplicate Copies) Of Technical Documents, Provided That Each Lot Is Specified In The Technical Documents To Be Submitted. Submission Of Financial Documents Shall Be Per Lot To Be Bid. Non-conformity To The Foregoing Shall Be A Ground For Disqualification. 11. To Resolve Cases Where There Is An Occurrence Of A Tie Among Bidders, I.e., Two Or More Of The Bidders Have Been Post-qualified As The Lowest Calculated Responsive Bid (lcrb), The Dswd Fo X Shall Resort To A Non-discretionary And Non-discriminatory Measure Such That The Same Is Based On Sheer Luck Or Chance As Per Gppb Circular No. 06-2005 "tie-breaking Method". 12. After The Opening And Evaluation Of Bids, The Bac, Its Staff And Personnel, The Secretariat And Technical Working Group (twg), As Well As Observers, Are Prohibited From Communicating In Any Way With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of A Notice Of Award (noa). However, The Bac, Through Its Secretariat, May Ask In Writing The Bidder For Clarification Of Its Request. Requests For Clarification Shall Be Addressed In Writing At All Times. 13. The Dswd Fo X Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 14. For Further Information, Please Refer To: Atty. Justine Phillip O. Tadeo Head, Bac Secretariat Dswd Field Office X Masterson Avenue, Upper Carmen, Cagayan De Oro City Mobile No. 09762461169 Bac.fo10@dswd.gov.ph 15. You May Visit The Following Websites For Downloading Of Invitation To Bid: Www.philgeps.gov.ph Or Https://fo10.dswd.gov.ph/ 25 October 2024 Glofelia J. Uayan Chairperson, Bids And Awards Committee
Closing Date18 Nov 2024
Tender AmountPHP 6.5 Million (USD 113.1 K)

Punjab State Bus Stand Management Company Limited Tender

Auction
MSTC
India
Purchaser Name: Punjab State Bus Stand Management Company Limited | Auction Sale Of Lot No : Adda Fees Lot Name : Adda Fees(while Bidding, Bidders Have To Bid For Adda Fee Per Month) , Lot No : Parking Lot Name : Parking (while Bidding, Bidders Have To Bid For Parking Per Month) , Lot No : Bathroom Lot Name : Bathroom (while Bidding, Bidders Have To Bid For Bathroom Per Month) , Lot No : M-7 Lot Name : Shop No. M-7(while Bidding, Bidders Have To Bid For Shop Per Month) , Lot No : M-14 Lot Name : Shop No. M-14(while Bidding, Bidders Have To Bid For Shop Per Month) ,
Closing Soon10 Nov 2024
Tender AmountRefer Documents 

Punjab State Bus Stand Management Company Limited Tender

Auction
MSTC
India
Purchaser Name: Punjab State Bus Stand Management Company Limited | Auction Sale Of Lot No : Shop No: 1 Lot Name : Shop No: 1 (while Bidding, Bidders Have To Bid For Shop Per Month) , Lot No : Shop No: 2 Lot Name : Shop No: 2 (while Bidding, Bidders Have To Bid For Shop Per Month) , Lot No : Shop No: 3 Lot Name : Shop No: 3 (while Bidding, Bidders Have To Bid For Shop Per Month) , Lot No : Shop No: 4 Lot Name : Shop No: 4 (while Bidding, Bidders Have To Bid For Shop Per Month) , Lot No : Shop No: 5 Lot Name : Shop No: 5 (while Bidding, Bidders Have To Bid For Shop Per Month) ,
Closing Soon13 Nov 2024
Tender AmountRefer Documents 

Punjab State Bus Stand Management Company Limited Tender

Auction
MSTC
India
Purchaser Name: Punjab State Bus Stand Management Company Limited | Auction Sale Of Lot No : 1 Lot Name : Black Oil With Drum , Lot No : 2 Lot Name : Tyres, Tubes And Flaps , Lot No : 3 Lot Name : Empty Drum , Lot No : 4 Lot Name : Condemned Spare Parts Etc As Per Lot Annexure ,
Closing Date20 Nov 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Corrigendum : Closing Date Modified
United States
Details: (please See Latest Baa Announcement Within, Posted02april 2020) this Is A Modification To The Broad Agency Announcement (baa) N00024-19-r-4145 To Extend The Date For Receipt Of White Papers And Full Proposals To 6 February 2028 And Correct Some Administrative Information. Any White Papers That Have Already Been Submitted Do Not Need To Be Resubmitted. Included In This Modification To The Baa Is Revision To The Power Controls Section To Augment The Desired Technology Interests. Included In This Modification To The Baa Is The Identification Of An Electronic Mail Submission Address For White Papers. Included In This Modification To The Baa Is Also A Change To The Identified Procuring Contracting Officer And Contract Specialist. The Navsea 0241 Points Of Contact (poc) Are Changed As Follows: The Primary Point Of Contact Remains Ms. Sakeena Siddiqi, Procuring Contracting Officer, Sakeena.s.siddiqi.civ@us.navy.mil And Secondary Point Of Contact Shall Be Mr. Tyler Pacak, Tyler.pacak@navy.mil. all Other Information Contained In The Prior Announcements Through Apr 02, 2020 Remain Unchanged. (please See Latest Baa Announcement Within, Posted 04 June 2019) i. Administrative Information this Publication Constitutes A Broad Agency Announcement (baa), As Contemplated In Federal Acquisition Regulation (far) 6.102(d)(2). A Formal Request For Proposals (rfp), Solicitation, And/or Additional Information Regarding This Announcement Will Not Be Issued Or Further Announced. This Announcement Will Remain Open For Approximately One Year From The Date Of Publication Or Until Extended Or Replaced By A Successor Baa. Initial Responses To This Announcement Must Be In The Form Of White Papers. Proposals Shall Be Requested Only From Those Offerors Selected As A Result Of The Scientific Review Of The White Papers Made In Accordance With The Evaluation Criteria Specified Herein. White Papers May Be Submitted Any Time During This Period. Awards May Take The Form Of Contracts, Cooperative Agreements, Or Other Transactions Agreements. the Naval Sea Systems Command (navsea) Will Not Issue Paper Copies Of This Announcement. Navsea Reserves The Right To Select For Proposal Submission All, Some, Or None From Among The White Papers Submitted In Response To This Announcement. For Those Who Are Requested To Submit Proposals, Navsea Reserves The Right To Award All, Some, Or None Of The Proposals Received Under This Baa. Navsea Provides No Funding For Direct Reimbursement Of White Paper Or Proposal Development Costs. Technical And Cost Proposals (or Any Other Material) Submitted In Response To This Baa Will Not Be Returned. It Is The Policy Of Navsea To Treat All White Papers And Proposals As Competition Sensitive Information And To Disclose Their Contents Only For The Purposes Of Evaluation. white Papers Submitted Under N00024-10-r-4215 That Have Not Resulted In A Request For A Proposal Are Hereby Considered Closed-out And No Further Action Will Be Taken On Them. Unsuccessful Offerors Under N00024-10-r- 4215 Are Encouraged To Review This Baa For Relevance And Resubmit If The Technology Proposed Meets The Criteria Below. Contract Awards Made Under N00024-10-r-4215 And Under This Baa Will Be Announced Following The Announcement Criteria Set Forth In The Far. ii. General Information 1. Agency Name naval Sea Systems Command (navsea) 1333 Isaac Hull Ave Se washington, Dc 20376 2. Research Opportunity Title research And Development Of Naval Power And Energy Systems 3. Response Date this Announcement Will Remain Open Through The Response Date Indicated Or Until Extended Or Replaced By A Successor Baa. White Papers May Be Submitted Any Time During This Period. 4. Research Opportunity Description 4.1 Summary navsea, On Behalf Of The Electric Ships Office (pms 460, Organizationally A Part Of The Program Executive Office Ships) Is Interested In White Papers For Long And Short Term Research And Development (r&d) Projects That Offer Potential For Advancement And Improvements In Current And Future Shipboard Electric Power And Energy Systems At The Major Component, Subsystem And System Level. The Mission Of Pms 460 Is To Develop And Provide Smaller, Simpler, More Affordable, And More Capable Ship Power Systems To The Navy By Defining Open Architectures, Developing Common Components, And Focusing Navy, Industry, And Academia Investments. Pms 460 Will Provide Leadership Of The Developments Identified As Part Of This Baa, Will Direct The Transition Of Associated Technologies Developed By The Office Of Naval Research (onr), And Will Manage The Technology Portfolio Represented By Program Element (pe) 0603573n (advanced Surface Machinery Systems) For Transition Into Existing And Future Navy Ships. 4.2 Naval Power And Energy Systems Technology Development Roadmap naval Power And Energy Systems Are Described In Detail In The 2019 Naval Power And Energy Systems Technology Development Roadmap (npes Tdr). The Npes Tdr Focuses And Aligns The Power System Investments For The Navy, Defense Department, Industry And Academia To Guide Future Research And Development Investments To Enable The Navy To Leverage These Investments To Meet Its Future Needs More Affordably. Included In The Npes Tdr Are Specific Recommendations And Opportunities For Near, Mid And Long Term Investments, With A Renewed Focus On Energy Management. These Opportunities Range From An Energy Magazine To Support Advanced Weapons And Sensors To The Development Of An Integrated Power And Energy System (ipes). The Npes Tdr Aligns Electric Power System Developments With War Fighter Needs And Enables Capability-based Budgeting. The Npes Tdr Is Responding To The Emerging Needs Of The Navy, And While The Plan Is Specific In Its Recommendations, It Is Inherently Flexible Enough To Adapt To The Changing Requirements And Threats That May Influence The 30-year Ship Acquisition Plan. The First Section Of The Roadmap Establishes Why Npes Are A Critical Part Of The Kill Chain Based On The Capabilities Desired By The Navy In The Near Term, As Well As Supporting Future Platforms In The Navys 30-year Shipbuilding Plan. The Second Section Of The Roadmap Presents Power And Energy Requirements That Are Derived From Mission Systems Necessary To Support Future Warfighting Needs. The Third Section Describes Required Initiatives Based On Capabilities And The Projected Electrical Requirements Of The Future Ships. 4.3 Focus Areas the Areas Of Focus For This Baa Include, But Are Not Limited To, The "fydp/near-term" Activities As Described Throughout The Npes Tdr; The Analysis, Development, Risk Reduction And Demonstration Of Future Shipboard (both Manned And Unmanned) Electric Power Systems And Components, Emphasizing Shipboard Power Generation, Electric Propulsion, Power Conversion, Energy Storage, Distribution And Control; Power Quality, Continuity, And System Stability; Electric Power System And Component Level Modeling And Simulation; Energy Storage Technologies; Electrical System Survivability; And Power System Simplicity, Upgradeability, Flexibility, And Ruggedness. The Integrated Power And Energy System (ipes) Architecture Provides The Framework For Partitioning The Equipment And Software Into Modules And Defines Functional Elements And The Power/control And Information Relationships Between Them. For Power Generation, High Power Distribution, Propulsion, And Large Loads, The Architecture Includes Medium Voltage Ac Power (with Emphasis On Affordability), And Medium Voltage Dc Power (with Emphasis On Power Density And Fault Management). For Ship Service Electrical Loads, The Architecture Includes Zonal Electrical Distribution Which May Be Either Ac Or Dc, Depending Upon The Specific Application. Also Of Particular Interest Are Technologies That Result In Significant Energy Efficiency, Power Density Improvements And/or Carbon Footprint Improvements Over Existing Propulsion And Power System Technologies. The Npes Tdr Partitions The Power System In To Functional Areas That Include The Following. 4.3.1 Energy Storage energy Storage Modules May Support Short Duration To Long Duration Energy Storage Applications, Which Utilize A Combination Of Technologies To Minimize Power Quality And Continuity Impacts Across The System. For The Short Duration Energy Storage Applications, The Module Should Provide Hold-up Power To Uninterruptible Loads For Fault Clearing And Transient Isolation, As Well As Load Leveling For Pulse Power Loads. For The Mid Duration, The Module Should Provide Up To Approximately 3mw (100 - 150 Kw-hr) Of Standby Power For Pulse Power Loads While Also Providing Continuity Of Operations For A Subset Of Equipment Between Uninterruptible And Full Ships Load (including Emergency Power Generation Starting In A Dark Ship Condition). For Long Duration Applications, Energy Storage Modules Should Provide The Required Power As An Emergency Backup System Or To Provide Increased Stealth For Specialty Equipment. The Required Duration For This Type Of Application May Extend Up To Days Or Longer, And May Be Intermittent Or Continuous. A Number Of Energy Storage Technologies For Future Ship Applications Are Of Interest To The Navy, Including Various Electrochemical, Capacitor-based, Or Rotating Discussed Below: a. Capacitor: Electrochemical Capacitor Improvements Continue To Focus On Improving Energy Density While Maintaining Inherently High-power Density. Design Improvements Include Development And Integration Of Higher Temperature Films, Advanced Electrolytes, Advanced Electrode Materials, And Minimizing Equivalent Series Resistance (esr). b. Rotating: The Navy Has Interest In The Investment From The Transportation Industry In Flywheel Systems That Can Handle Gyroscopic Forces Continues To Support Flywheel Usage In Commercial Rail And Ground Transportation. Additional Factors Of Interest To The Navy Include Safety, Recharge/discharge Rates, Ship Motion Impacts, Environmental Impacts And Control. c. Electrochemical: Factors Of Interest To The Navy With Respect To Electrochemical Energy Storage Include The Ability To Maintain State Of Charge When Not In Use; Change In Voltage Versus State Of Charge; Charge And Discharge Capability; The Temporary Or Permanent Loss Of Capacity Due To Repeated Shallow Discharges; The Ability To Shallow Charge And Discharge Or Partially Charge Intermittently During A Discharge; Battery Life Considerations Such As Service-life, Cycle Life, And Shelf-life; Off-gas Properties That Affect The Level Of Ventilation And Associated Auxiliary Systems; And Safety Enhancements To Support Qualification For Use Onboard Us Navy Ships. near Term Navy Interests Are In The Area Of Common And Scalable Hardware And Software Elements Which Enable Advanced Weapons And Sensors And In Understanding The Sizing Algorithms For How To Optimize Energy Storage Sizing Against Various Competing System Requirements (short Duration/high Power Vs. Long Duration/low Power, For Example. The Specific Design Issues To Be Considered Include Reliability, Volumetric And Gravimetric Power And Energy Densities, Differentiating Between High Levels Of Stored Energy And High Energy Density. The Relevant Information Required For Characterizing Technology Performance Include: Technology Readiness Level (trl) Of Components And Systems; Production Capability; Safety Evaluation And Qualifications Performed On Relevant Subsystems Or Components (any Hazard Analyses Of Systems Designs As Relevant To Notional Applications); Other Military Application Of The Devices; Energy Storage Management System Approach; Thermal Characteristics, Constraints, And Cooling Requirements; Auxiliary Requirements (load); Device Impedance (heat Generation Characteristics); And Device Efficiency (discharge/recharge). 4.3.2 Power Conversion industry Continues To Drive Towards Increased Power Density, Increased Efficiency, Higher Switching Frequencies, And Refined Topologies With Associated Control Schemes. Innovation In Power Conversion From The Development And Implementation Of Wide-bandgap Devices, Such As Silicon Carbide (sic), Promise Reduction In Losses Many Times Over Silicon. The Use Of High Frequency Transformers Can Provide Galvanic Isolation With Reduced Size And Weight Compared To Traditional Transformers. Advances In Cooling Methods Will Be Required To Handle Larger Heat Loads Associated With Higher Power Operation. a Typical Navy Power Conversion Module Might Consist Of A Solid State Power Converter And/or A Transformer. Advanced Topologies And Technologies, Such As The Application Of Wide Band Gap Devices, Are Of Particular Interest. Navy Interests Are In The Area Of Innovative Approaches To Address Converting High Voltage Ac/dc To 1000 Vdc With Power Levels On The Order Of 3mw Or Larger. The Specific Design Issues To Be Considered Include Modularity, Open Architecture (focusing On Future Power System Flexibility And The Ability Of A Conversion Module Within A Ships Power System To Be Replaced/ Upgraded In Support Of Lifecycle Mission System Upgrades), Reliability, Cost, And Conversion Efficiency. Areas Of Interest Include More Power-dense Converters Supporting Advanced Mission Systems And Prototyping Of Full Scale Conversion Based On Second Generation Wide-bandgap Devices. 4.3.3 Power Distribution power Distribution Typically Consists Of Bus Duct/ Bus Pipe, Cables, Connections, Switchgear And Fault Protection Equipment, Load Centers, And Other Hardware Necessary To Deliver Power From Generators To Loads. Industry Has Used Medium Voltage Dc (mvdc) Transmission As A Method To Reduce Losses Across Long Distances. Complementarily, Industry Is Developing Mvdc Circuit Protection For Use In Mvdc Transmission Variants Of Approximately 50, 100, And 150 Megawatts (mw) At Transmission Voltages Of 20 To 50 Kvdc. Analysis Includes Modeling And Simulation To Determine Methods For Assessing The Benefits Of Dc Vs Ac Undersea Transmission And Distribution Systems For Offshore Oil And Gas. Industry And Academia Continue To Invest Resources In Advanced Conductors That Have Applications In Power Distribution, Power Generation, And Propulsion. Research Is Focused On Using Carbon Nanotubes. The Development Of A Room Temperature, Lightweight, Low Resistance Conductor Is Of Great Interest To The Navy. areas Of Interest Include Development Of An Mvdc Distribution System Up To 12 Kvdc To Meet Maximum Load Demands; Design Of An Appropriate In-zone Distribution System Architecture; Development Of High Speed 1 Kvdc And 12 Kvdc Solid State Circuit Protection Devices That Are Ship Ready, And Advanced Conductors Capable Of Supporting Power Distribution. 4.3.4 Prime Movers (including Power Generation) power Generation Converts Fuel Into Electrical Power. A Typical Power Generation Module Might Consist Of A Gas Turbine Or Diesel Engine (prime Mover), A Generator (see Rotating Machine Discussion Below), A Rectifier (either Active Or Passive), Auxiliary Support Sub-modules And Module Controls. Other Possible Power Generation Technologies Include Propulsion Derived Ship Service (pdss), Fuel Cells, Or Other Direct Energy Conversion Concepts. Power Generation Concepts Include 60 Hz Wound Rotor Synchronous Generator Driven Directly By A Marine Gas Turbine (up To 30 Mva Rating); Commercially Derived Or Militarized Design Variants Of The Above; And Higher Speed, Higher Frequency, High Power Density Variants Of The Above With High Speed Or Geared Turbine Drive. Npes Dc Technologies Permit Prime Movers And Other Electrical Sources (such As Energy Storage) To Operate At Different, Non-60hz Electrical Frequency Speeds, Improving Survivability, Resiliency, And Operational Availability. Energy Storage That Is Fully Integrated With The Power Generation Can Enable Uninterrupted Power To High Priority Loads, Mission Systems That Reduce Susceptibility, And Damage Control Systems To Enable Enhanced Recoverability. the Specific Design Issues To Be Considered Include Fuel Efficiency, Module Level Power Density, Machine Insulation System Characteristics, Size, Weight, Cost, Maintainability, Availability, Harmonic Loading, Voltage, Power, System Grounding Approaches, Fault Protection, Response To Large Dynamic (step) Or Pulse Type Loading Originated From Ship Propulsion Or Directed Energy/electromagnetic Weapons, Interface To Main Or Ship Service Bus, Autonomy, Limited Maintenance, And Commercial Availability. Navy Interests Are In The Area Of Innovative Approaches To Power Generation In The 5 To 30 Mw Range, Utilizing Gas Turbines, Diesel Engines And Other Emerging Power Technologies That Address Challenges Associated With Achieving Reduced Fuel Consumption, Decreased Life Cycle And Acquisition Cost, Support Of Ship Integration, Enable Flexibility, Enable Power Upgrades, And Improved Environmental Compliance. Near Term Navy Interest Includes 10-30 Mw (nominally 25 Mw) Output Power Rating And The Power Generation Source Able To Supply Two Independent Electrical Buses (where Abnormal Conditions, Including Pulsed/stochastic Loads, On One Bus Do Not Impact The Other Bus) At 12 Kvdc (while Also Considering 6kvdc, 18kvdc, And 1 Kvdc). Enhanced Fuel Injection, Higher Operating Temperatures And Pressures, And Optimized Thermal Management Are Critical For Future Prime Movers. Advanced Controls For Increased Efficiency, Reduced Maintenance, And Increased Reliability Include Implementation Of Digital Controls; Autonomous And Unmanned Power Control; Enhanced Engine Monitoring, Diagnostics, And Prognostics; And Distributed Controls. Advanced Designs For Increased Efficiency Include New Applications Of Thermodynamic Cycles Such As Humphrey/atkinson Cycle For Gas Turbines And Diesels And Miller Cycle For Diesel. the Navy Is Interested In Developing A Knowledge Bank Of Information On Potential Generator Sets, Generator Electrical Interface Requirements, And The Impacts Of Those Requirements On Generator Set Performance And Size, As A Logical Next Step From The Request For Information Released Under Announcement N00024-16-r-4205. A Long-term Goal For This Effort Is To Maximize Military Effectiveness Through Design Choice And Configuration Option Flexibility When Developing Next-generation Distribution Plants. The Power Generation Source Should Fit Within The Length Of A Typical Engine Room (46 Feet, Including Allowances For Any Needed Maintenance And Component Removal). The Power Generation Source Is Expected To Have The Ability To: Control Steady-state Voltage-current Characteristic For Its Interface; To Maintain Stability; And To Adjust Control Set-points From System Level Controllers. For Any Proposed Design Approach, Initial Efforts Would Include Conceptual Design Trade Studies That Inform The Performance Level That Can Be Achieved. Trade Studies May Address Pulsed Load Capability (generator/rectifier Design To Increase Pulse Load Capability, Engine Speed Variation Limits, And Impact Of Cyclic Pulse Load On Component Life); Power Density (cost Vs. Benefits Of High Speed Or High Frequency, Mounting On Common Skid, And Advanced Cooling Concepts); Single Vs. Dual Outputs (continuous Vs. Pulse Rating For Each Output, Voltage Regulation With Shared Field, And Control Of Load Sharing); Efficiency (part Load Vs. Full Load Optimization, Flexible Speed Regulation, Impact Of Intake And Exhaust Duct Size/pressure Drop On Engine Efficiency); Power Quality (voltage Transient, Voltage Modulation For Step, Pulse Loads, Impact Of Voltage And Current Ripple Requirements, And Common Mode Current); Pgm Controls (prime Mover Speed Vs. Generator Field Vs. Rectifier Active Phase Angle Control, And Pulse Anticipation); Stability When Operating In Parallel With Other Sources; Short Circuit Requirements; And Dark Ship Start Capability (self-contained Support Auxiliaries). Trade Studies May Also Address How Rotational Energy Storage Can Be Built Into The Design Of The Generator Or Added To The Generator And What Parameters Need To Be Defined In Order To Exploit This Capability. Development Of Advanced Coatings And Materials That Support High Temperature Operations Of A Gas Turbine Is Also Of Interest. Energy Harvesting To Convert Heat Energy And Specifically Low Quality Heat Energy To Electricity Using Solid State Components Is Also Of Interest To The Navy. 4.3.5 Rotating Machines (including Generators And Propulsion Motors) recent Trends In Electrical Machines Include Neural Networks; Artificial Intelligence; Expert System; Fiber Communications And Integrated Electronics; New Ceramic Conducting And Dielectric Materials; And Magnetic Levitation. High Temperature Superconducting Rotors Have Higher Power Density Than Their Induction And Synchronous Rotor Counterparts. Wind Power Generators Eliminate Excitation Losses Which Can Account For 30% Of Total Generator Losses. The Offshore Wind Power Industry Is Moving To Larger Power Wind Tower Generators In The 10mw Class. Advanced Low Resistance Room Temperature Wire And Hts Shows Promise For These Higher Power Levels Because Of Low Excitation Losses And Low Weight Due To Reduction In Stator And Rotor Iron. Hts Motors May Be Up To 50% Smaller And Lighter Than Traditional Iron-core And Copper Machines. They Have Reduced Harmonic Vibrations Due To Minimization Of Flux Path Iron And Have Mitigated Thermal Cycling Failures Due To Precision Control Of Temperature. propulsion Motor Concepts Of Interest To The Navy Include Permanent Magnet Motors (radial Air Gap, Axial Air Gap, Or Transverse Flux), Induction Motors (wound Rotor Or Squirrel Cage), Superconducting Field Type (homopolar Dc Or Synchronous Ac). The Drivers And Issues Associated With These Designs Include Acoustic Signature, Noise (requirements, Limitations, Modeling, Sources, And Mitigation Methods), Shock, Vibration, Thermal Management, Manufacturing Infrastructure, Machine Insulation System Characteristics, Commercial Commonality, Platform Commonality, Cost, Torque, Power, Weight, Diameter, Length, Voltage, Motor Configuration, And Ship Arrangements Constraints. Motor Drives That May Be Explored Include Cyclo-converter (with Variations In Control And Power Device Types), Pulse Width Modulated Converter/inverter (with Many Variations In Topology), Switching (hard Switched, Soft Switched), And Matrix Converter (with Variations In Control, Topology, Cooling, Power Device Type). Technologies For Drives And Rotating Machines Which Allow The Ability To Operate As A Motor And A Generator To Facilitate A Pdss Installation Or On A Fully Integrated Power System To Leverage The Inherent Energy Storage In The Ship's Motion May Be Explored. Integrated Motor/propulsor Concepts May Be Considered Either As Aft-mounted Main Propulsion Or As A Forward Propulsor Capable Of Propelling A Ship At A Tactically Useful Speed. Areas Of Interest For Future Rotating Machines Include Increased Magnetic Material Flux Carrying Or Flux Generation Capacity; Improved Electrical Insulation Material And Insulation System Dielectric Strength; Increased Mechanical Strength, Increased Thermal Conductivity, And Reduced Sensitivity To Temperature; Improved Structural Materials And Design Concepts That Accept Higher Torsional And Electromagnetically Induced Stress; Innovative And Aggressive Cooling To Allow Improved Thermal Management And Increased Current Loading; Increased Electrical Conductor Current Carrying Capacity And Loss Reduction. 4.3.6 Cooling And Thermal Management as The Demand And Complexity Of High Energy Loads Increases, So Does The Demand And Complexity Of Thermal Management Solutions. Assessing And Optimizing The Effectiveness Of A Thermal Management System Requires The Analysis Of Thermal Energy Acquisition, Thermal Energy Transport, And Thermal Energy Rejection, Storage, And Conversion. The Design Of The Thermal Management System Aims To Transfer The Thermal Energy Loads At The Sources To The Sinks In The Most Efficient Manner. areas Of Interest To The Navy With Respect To Cooling And Thermal Management Include The Application Of Two Phased Cooling And Other Advanced Cooling Techniques To Power Electronics And Other Npes Components And Innovative Approaches To Manage Overall Ship Thermal Management Issues Including Advanced Thermal Architectures, Thermal Energy Storage Systems, Increases In Efficiency, And Advanced Control Philosophies. 4.3.7 Power Controls controls Manage Power And Energy Flow Within The Ship To Ensure Delivery To The Right Load In The Right Form At The Right Time. Supervisory Power System Control Typically Resides On An External Distributed Computer System And Therefore Does Not Include Hardware Elements Unless Specialized Hardware Is Required. The Challenge To Implement Tactical Energy Management (tem) Is To Integrate Energy Storage, Power Generation, And Interfaces With Advanced Warfighting Systems And Controls. Tem Is Critical To Enabling Full Utilization Of The Capabilities Possible From Technologies Under Development. The State Complexity And Combat Engagement Timelines For Notional Future Warfighting Scenarios Are Expected To Exceed The Cognitive Capacity And Response Times Of Human Operators To Effectively Manage The Electric Plant Via Existing Control System Schema In Support Of Executing Ship Missions. The Survivability Requirements For Military Ships Combined With The Higher Dynamic Power Characterisitics (pulse Load) Characteristics Of Some Mission Systems Will Require More Sophisticated Control Interfaces, Power Management Approaches, And Algorithms Than Are Commercially Available. The Navy Is Pursuing A Long Term Strategy To Create A Unified, Cyber Secure Architecture For Machinery Control Systems That Feature A Common, Reusable, Cyber Hardened Machinery Control Domain Specific Infrastructure Elements; A Mechanism For Transitioning New Technology From A Variety Of Sources In An Efficient And Consistent Manner; And A Mechanism To Provide Life Cycle Updates And Support In A Cost Effective And Timely Manner.tem Controls Will Be Expected To Maintain Awareness Of The Electric Plant Operating State (real Time Modeling); Interface With Ship Mission Planning (external To The Electric Plant Control Systems) For Energy Resource Prioritization, Planning, And Coordination Towards The Identification Of Resource Allocation States That Dynamically Optimize Mission Effectiveness; Identify And Select Optimal Trajectories To Achieving Those Optimal Resource Allocation States; And Actuate The Relevant Electric Plant Components To Move The Electric Plant State Along Those Optimized Trajectories Towards The Optimal Resource Allocation State. Tem Controls Would Enable Reduced Power And Energy System Resource Requirements For A Given Capability (or Improved Capability For A Given Set Of Resources); Increased Adaptability Of The Navy’s Power And Energy System Design To Keep Pace With An Evolving Threat Environment; And Maximized Abilities To Execute The Ship’s Mission. the Navy Is Interested In Potential Applications Of Distributed Control Architectures That Have Led To The Development Of Intelligent Agents That Have Some Autonomous Ability To Reason About System State And Enact Appropriate Control Policies. A Simple Example Of These Agents In A Control System Is The Use Of Autonomous Software Coupled With Smart Meters In A Smart Grid Implementation. The Agents, Smart Meters In This Example, Can Temporarily Shut Off Air Conditioning But Not The Refrigerator In Residences During Grid Peak Power Usage Times When The Cost Per Watt Is Highest On Hot Days. The Agent Software Acts Autonomously Within Its Authority To Comply With Programmed Customer Desires. The Navy Is Interested In Tem Controls Within A Modular Open Systems Architecture Framework Such That They Are Agnostic Of, But Affordably Customizable To, Specific Ship Platforms And Power System Architectures. Tem Controls May Reside Between (i.e. Interface With) Embedded Layers Within Individual Power System Components, Ships’ Supervisory Machinery Control Systems, And Ships’ Mission Planning Systems. Initial Or Further Development Or Modification Of These Interfaces May Be Required To Achieve Desired Performance Behaviors And Characteristics. Tem Controls Are Expected To Develop Within A Model-based System Engineering And Digital Engineering Environment And Will Be Initially Evaluated In A Purely Computational Environment, Representing Navy-developed Shipboard-representative Power And Energy System Architecture(s), But Will Be Progressively Evaluated On Systems With Increasing Levels Of Physical Instantiation (i.e., Controller-hardware-in-loop And Power-hardware-in-loop With Progressive Levels Of Representative Power System Components Physically Instantiated). When Implementing A Tem Based Control Scheme, The Overall Power System Should Increase Installed Power Generation Available To Mission And Auxiliary Loads; Reduce Power System Design Margins; Hone The Installed Stored Energy Required For Mission Critical Capability; And Allow Higher Power Transients (ramp Rates And Step Loads). Other Areas Of Interest To The Navy With Respect To Controls Include Improvements To Traditional Machinery Control And Automation, Advanced Power Management, Cyber Security, And Advanced Controls For Distributed Shared Energy Storage And Maintaining Electrical System Stability. The Navy Is Also Interested In Non-intrusive Load Monitoring, Power System Data Analytics, Real Time System Monitoring And Onboard Analysis And Diagnostics Capabilities. 4.3.8 System Interplay, Interfacing, And Integration increasingly, The Navy Is Recognizing The Need For Incorporating Flexibility And Adaptability Into Initial Ship Designs And Recognizing That The Integration Of New Systems And The Ability To Rapidly Reconfigure Them Will Be An Ongoing Challenge Throughout A Platform's Life Cycle In Order To Maintain Warfighting Relevancy. The Ability To Support Advanced Electrical Payload Warfighting Technologies Requires Not Only Power And Energy Systems Delivered With The Flexibility And Adaptability To Accommodate Them, But A Npes Engineering Enterprise With The Capability And Capacity (knowledge, Labor, And Capital) For Continuous Systems Integration. The Navy Can More Affordably Meet This Challenge By Shifting As Much Effort As Possible Into The Computational Modeling And Simulation Regime. an Integrated Power System (ips) Provides Total Ship Electric Power Including Electric Propulsion, Power Conversion And Distribution, Energy Storage, Combat System Support And Ship Mission Load Interfaces To The Electric Power System. Adding Energy Storage And Advanced Controls To Ips Results In An Integrated Power And Energy System (ipes) In Order To Accommodate Future High Energy Weapons And Sensors. The Ipes Energy Magazine Is Available To Multiple Users, And Provides Enhanced Power Continuity To The Power Distribution System. The Flexibility Of Electric Power Transmission Allows Power Generating Modules With Various Power Ratings To Be Connected To Propulsion Loads And Ship Service In Any Arrangement That Supports The Ships Mission At The Lowest Total Ownership Cost (toc). systems Engineering In Ips/ipes Is Focused On Increasing The Commonality Of Components Used Across Ship Types (both Manned And Unmanned) And In Developing Modules That Will Be Integral To Standardization, Zonal System Architectures, And Generic Shipbuilding Strategies With Standard Interfaces That Are Navy-controlled. Ipes Offers The Potential To Reduce Signatures By Changing The Frequency And Amplitude Of Acoustic And Electromagnetic Emissions. Integrated Energy Storage Can Reduce Observability By Enabling The Reduction And Elimination Of Prime Movers, Thereby Reducing Thermal And Acoustic Signatures. The Modules Or Components Developed Will Be Assessed For Applicability Both To New Construction And To Back-fit Opportunities That Improve The Energy Efficiency And Mission Effectiveness. areas Of Navy Interest Are To Continuously Improve Ips/ipes By Performing Analysis, Modeling And Simulation, Life Cycle Cost Analysis, Producibility Studies, Module Development, Ship Integration Studies, Architecture Design, Ship Electric Architectures And Support For High Power Weapons Systems Requirements, And Related Efforts. High Level Power System Architectures Are Based On Mvac And Mvdc Power With Attributes Of Power Density, Fault Management, Capability And Affordability. For Ship Service Electrical Loads, The Architecture Includes Zonal Electrical Distribution Which May Be Either Ac Or Dc, Depending Upon The Specific Application. In Addition To A Full Ipes Or Ips Implementation, Hybrid Electric Drive (hed) Where Mechanical Propulsion Is Augmented By Rotating Electric Machinery, Or Additional Power Generation Or Energy Storage May Be Of Interest. The Navy Desires To Understand The Performance And Cost Trade Space That Is Available For The Various Options Of Architecture; Component, System And Controls Technologies; Functional Allocations; And Interfaces. Also Of Interest Are Technologies That Result In Significant Energy Efficiency, Thermal Improvements, Power Density Improvements And/or Carbon Footprint Improvements Over Existing Propulsion And Power System Technologies. Another Area Of Interest For The Navy Is The Interface Definition Between Unique Electrical Loads And The Power System, And The Provision Of Specialty Power To Optimize That Load Interface. Among The Special Load Interfaces That Might Require Development Are Support For Pulsed Power Weapons And Sensors Such As Radar Power Supplies, Electromagnetic Launchers (for Example Electromagnetic Railgun), And Advanced Laser Systems, All Of Which Would Benefit From Optimized Integration With The Shipboard Power System. the Approach To Prototype Hardware Developed Under This Baa Is That It Fosters Modularity And Scalability (so That Families Of Products May Be Leveraged To Multiple Potential Applications) And Shall Accommodate An Open System Architecture Where Interfaces Are Well Defined And Mutually Accepted. The Navy Is Interested In Both Near Term Solutions That Have The Potential For Rapid Transition To A High Technology Readiness Level (trl) As Well As Longer Term Technology Pushes That Advance The Science And Would Enable A Future Compact Shipboard System. Risk Reducing Technology Prototype Demonstrations In The Near Term Are Encouraged. An Evaluation Of Emerging Technologies For Ship Applications (such As Energy Storage, Support For High Energy Weapons, Support For High Power Radars, High-speed Generators, And Advanced Power Electronics) To Determine Future Feasibility And Development Requirements Is Also Of Great Interest. Development Of Advanced Design Tools And Power System Specifications And Standards Is Also Key To Ensuring New Power Systems Will Integrate Aboard Ship. The Navy Is Interested In A Model-based Approach To Power System Engineering, From Early Concept System Architecture Trade Studies And Trade-space Exploration, To Production-ready Performance Specifications For Component And Systems Acquisitions. Particular Technologies And System Concepts Will Need To Be Evaluated In A Common Set Of Modeling Contexts And Environments Standardized Across The Navy Power System Engineering Enterprise. Modeling-enabled Evaluation Of Technology Alternatives And Performance Of System-level Trade Studies Requires That Models Be Delivered With A Sufficient Pedigree Supported By Analysis, Verification, And Validation (e.g., By Subscale Hardware Demonstrations) To Prove The Applicability Of The Models For The Standardized Modeling Contexts And Environments (model Based System Engineering). 5. Point(s) Of Contact all White Papers Shall Be Submitted To All Parties Identified Below: pms 460 Technical Poc: Josh Cushenette joshua.j.cushenette.civ@us.navy.mil navsea 0241 Poc: ms. Sakeena Siddiqi, Procuring Contracting Officer sakeena.s.siddiqi@us.navy.mil mr. Tyler Pacak, Contracting Specialist tyler.pacak@navy.mil iii. Award Information the Amount And Period Of Performance Of Each Selected Proposal Will Vary Depending On The Research Area And The Technical Approach To Be Pursued By The Selected Offeror. iv. Eligibility Information all Responsible Sources From Academia And Industry May Submit White Papers Under This Baa. Awards Under This Baa Will Likely Be Cost Plus Fixed Fee (cpff) And Thus Offerors Are Required To Have A Defense Contract Management Agency (dcma) / Defense Contract Audit Agency (dcaa) Approved Accounting System To Be Eligible For Award Or Evidence That A Pre-award Survey Has Been Initiated With Dcma/dcaa. v. Application And Submission Information 1. Application And Submission Process "white Papers" Are Desired By Navsea In Response To This Solicitation.all White Papers Shall Be Submitted Tonavseavia Email To The Following Address: Joshua.j.cushenette.civ@us.navy.mil. Hard Copy Submissions Are Not Accepted. Those Offerors With White Papers Considered To Have Merit Will Be Requested To Prepare Full Proposals For The Planned Effort As Specified Below. Receipt Of All White Papers Will Be Acknowledged By The Technical Point Of Contact Listed Above. White Papers Will Be Retained By The Navy And, Should An Application And Associated Funding Be Identified For The Concept Proposed, Additional Responses Will Be Requested Of The Offeror. 2. General Information For White Papers/full Proposals the White Papers And Proposals Submitted Under This Baa Are Expected To Be Unclassified. White Paper And Proposal Submissions Will Be Protected From Unauthorized Disclosure In Accordance With Far 15.207, Applicable Law, And Department Of Defense (dod)/department Of Navy (don) Regulations. Offerors Are Expected To Appropriately Mark Each Page Of Their Submission That Contains Proprietary Information. 2.1. White Papers 2.1.1 White Paper Format paper Size Shall Be No Larger Than 8.5" X 11" Paper With No Less Than 1" Margins On All Sides. The Font Shall Not Be Less Than 12 Point. The Format Of The Submission Shall Be One Electronic Copy In Microsoftword Or Excel Compatible Or .pdf Format. The Page Limit For White Papers Shall Be No Longer Than Twenty-five (25) Pages And Only Contain Information Necessary To Describe The Proposed Technical Concept And Comply With Content Requirements For The White Papers Stated Herein. 2.1.2 White Paper Content 2.1.2.1 Cover Page the Cover Page Shall Be Labeled "white Paper," And Shall Include The Baa Number, Proposed Title, Thecompany Technical/administrative Points Of Contact With Telephone Numbers And E-mail Addresses, The Company Commercial And Government Entity (cage) Code, Which Module Or Modules The White Paper Is Relevant To From The Research Opportunity Section Above (section Ii Paragraph 4), And The Names And Contact Information (if Known) Of The Assigned Dcma Administrative Contracting Officer (aco). 2.1.2.2 Technical Concept/naval Relevance the Technical Concept Shall Include A Description Of The Technology Innovation And Associated Technical Risk Areas. This Section Also Includes A Description Of The Potential Naval Relevance And Contributions Of The Proposed Effort To Improvement In The Performance Of Npes As Defined In The Npes Tdr. This Section May Include A Plan For Demonstrating And Evaluating The Operational Effectiveness Of The Offeror's Proposed Products Or Processes In Field Experiments And/or Tests In A Simulated Environment. 2.1.2.3 Capabilities; Related Experience And Past Performance, And Facilities the Capabilities Section Shall Describe Past Experience And Facilities That Demonstrate Yourcompany Ability To Complete The Scope Identified In The White Paper. This Section Shall Include Evidence Of The Company's Capabilities To Demonstrate The Technology Innovation Proposed. Offerors Shall Provide All Relevant Past Performance For Similar Or Related Work Under Contracts Currently Being Performed Or Completed During The Last Three (3) Years. The Offeror May Include Federal, State And Local Government And Private Sector Contracts. Offerors That Represent Newly Formed Entities, Without Prior Contract Experience, Should Identify Previous Contract And Subcontract Experience For All Principal Investigators Identified In The Proposal. This Section Will Not Be Counted Against The Page Limits Noted In Paragraph 2.1.1 Above. The Following Information For Each Such Contract Shall Be Provided: a. Contract Number b. Customer/agency c. Contracting Officer And Technical Point Of Contact (names And Phone Numbers) d. Brief Description Of Scope Of Work And Deliverables e. Contract Type f. Award Price/final Price g. Period Of Performance 2.1.2.4 Cost And Development Schedule the White Paper Should Identify The Total Estimated Cost And The Notional Development Timeline Of The Effort Proposed In The White Paper And A Brief Rational For How You Established This Rough Order Of Magnitude (rom) Cost Estimate. The Page Limit For The Estimated Cost And Schedule Information Shall Not Exceed One (1) Page; No Larger Than 8.5" X 11" When Printed On Paper With No Less Than 1" Margins On All Sides; And The Font Shall Not Be Less Than 12 Point. The Estimated Cost And Schedule Section Will Not Be Counted Against The Page Limits Noted In Paragraph 2.1.1 Above. For Planning Purposes, Depending Upon The Nature Of The Technology Being Proposed, A Contract That May Result From The White Paper Could Be Staged Using Multiple Phases, Starting With Concept Exploration And Technology Characterization. Should The Concept Prove Meritorious, Options May Be Included To Take The Technology/approach Through A Design And Prototype/software Build. The Total Potential Contract Period Of Performance Cannot Exceed Five (5) Years. 2.1.2.5 Assertion Of Data Rights include Here A Summary Of Any Proprietary Rights (limited/restricted) To Pre-existing Results, Prototypes, Or Systems Supporting And/or Necessary For The Use Of The Research, Results, And/or Prototype. If There Are Proprietary Rights, The Offeror Must Explain How These Affect Its Ability To Deliver Subsystems For Integration. Additionally, Offerors Must Explain How The Program Goals Are Achievable In Light Of These Proprietary And/or Restrictive Limitations. If There Are No Claims Of Proprietary Rights In Pre-existing Data, This Section Shall Consist Of A Statement To That Effect. In Order For A Data Rights Assertions List To Be Accepted By The Government And Included As An Attachment To A Contract, The Dfars (252.227-7013 And 252.227-7014) Requires That The Information Be Listed In A Table Having Four Columns. In The First Column, Technical Data To Be Furnished With Restrictions, For Non-commercial Technical Data Items, Both The Item And The Technical Data Pertaining To That Item Must Be Listed. Also, The Assertion Must Be Made At The Lowest Component Level. And Since Technical Data Is Defined As "recorded Information Of A Scientific Or Technical Nature", A Document Where The Technical Data Is Recorded Must Also Be Listed. This Is Usually, But Not Always, A Drawing Number. Non-commercial Computer Software Items Should Similarly Be Listed At The Lowest Practicable Subroutine Level And Should Also List A Version Number. 2.1.2.6 Accounting System Documentation the White Paper Shall Include Evidence Of An Approved Accounting System Or Evidence That A Pre-award Survey Has Been Initiated With Dcma/dcaa For An Approved Accounting System. 2.2 Full Proposals Format And Content once A White Paper Topic Has Been Selected To Proceed To The Next Step, The Contracting Officer Will Issue A Request For Proposal (rfp) Letter With Additional Detail On The Required Content Of The Proposal, Page Limitations, And Due Dates. The Rfp Letter Will Also Provide Details Of The Notional Statement Of Work For The Effort, Including A Level Of Effort For Related Engineering Services As Described Above; Any Optional Phases; A Description Of The Required Deliverable Data; And The Required Contents And Details Of The Cost Volume. 2.2.1 Associated Engineering Services the Potential Contract, At The Option Of The Government, May Also Include The Services Of Qualified Engineers/technicians And Management Functions To Perform Engineering Support For Follow-on Investigations, Additional Trade Studies, Participation In Navy Directed Interface Working Groups (iwg) To Assess The Technology Implementation In Shipboard Applications, And Hardware Evaluations To Determine The Effectiveness Of The New Technologies Developed Under The Basic Effort. This Level Of Effort Shall Not Be Included In The White Paper Submission, But May, At The Option Of The Government, Be Included In Any Resultant Contract. The Nature Of The Services To Be Performed Shall Be Integrally Related To The Core Scope Of The Contract, Shall Form A Logical Extension Of The Work Otherwise Performed (such As Completion Of Testing Of Articles Developed Or Extending The Performance Capability Of The Articles Developed), Or Shall Provide Amplifying Details Of The Articles Or Technologies Beyond That Otherwise Required And Shall Result In A Specific End-product, Such As A Report. Funding For Engineering Services May Be From R&d, Ship Construction, Operation & Maintenance; Or Other Procurement Sources As May Be Appropriate For The Follow-on Activity Required, But Shall Not Be Used For Production Of Any Technology Proposed. vi. Evaluation Information 1. Evaluation Criteria 1.1 White Papers evaluation Of The "white Papers" Will Be Based On A Competitive Selection Resulting From A Scientific Review Using The Following Evaluation Criteria: criteria 1: Overall Scientific And Technical Merits Of The Concept Proposed And The Potential Naval Relevance And Contributions Of The Effort To The Improved Performance Of Npes Modules And Architectures Within A Reasonable Development Schedule. criteria 2: Potential Risks To The Development And Future Acquisition Associated With The Assertion Of Data Rights. criteria 3: Capabilities; Related Experience And Past Performance; And Facilities criteria 4: Potential Risks To The Development Associated With The Length Of The Development Schedule And The Availability Of Funds To Complete All Proposed Tasks. selection Of The Offeror(s) From Which Rfps Will Be Issued Will Be Based Upon Thegovernments Assessment Of The Criteria Above And The Availability Of Funds To Accomplish The Proposed Effort. White Papers Submitted Under This Baa Will Be Protected From Unauthorized Disclosure In Accordance With Far 3.104-5 And 15.207. The Cognizant Government Experts Will Perform The Evaluation Of Technical Proposals. 1.2 Ratings Used For Scientific Review 1.2.1 Criteria 1 overall Scientific And Technical Merits And Potential Naval Relevance Of The Concept. rating = Excellent: Research Proposal Demonstrates High Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Developmental Risk. Research Proposal Demonstrates High Potential For Direct Application To A Future Npes Ship And/or Will Significantly Improve The Performance Of Npes Modules And/or Architectures. rating = Good: Research Proposal Demonstrates Moderate Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Development Risk. Research Proposal Demonstrates Moderate Potential For Direct Application To A Future Npes Ship And/or Will Probably Improve The Performance Of Npes Modules And/or Architectures. rating = Poor: Research Proposal Demonstrates Low Potential For Providing Technological Advancement Relative To The Baselines Described In The 2019 Npes Tdr With A Reasonable Amount Of Development Risk And/or Have An Unreasonable Amount Of Development Risk. Research Proposal Demonstrates Low Potential For Direct Application Of A Future Npes Ship And/or Will Not Significantly Improve The Performance Of Npes Modules And/or Architectures. 1.2.2. Criteria 2 potential Risks To The Development And Future Acquisition Associated With The Assertion Of Data Rights. rating = Excellent: There Is Low Or No Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. rating = Good: There Is Moderate Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. rating = Poor: There Is High Risk That The Level Of Data Rights Proposed Would Limit Thegovernments Ability To Use The Technical Data Generated During The Performance Of The Contract As Part Of A Technical Data Package For Future Competitive Development Or Production Efforts. 1.2.3 Criteria 3 capabilities; Related Experience And Past Performance; Facilities; Techniques; And Qualifications, Capabilities And Experience Of The Proposed Principal Investigator / Team Leader. rating = Acceptable: Based On The Offerors Performance Record, The Government Has A Reasonable Expectation That The Offeror Will Successfully Perform The Required Effort, Or The Offeror's Performance Record Is Unknown. In The Case Of An Offeror Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Or So Sparse That No Meaningful Past Performance Rating Can Be Reasonably Assigned, The Offeror May Not Be Evaluated Favorably Or Unfavorably On Past Performance (see Far 15.305 (a)(2)(iv)). Therefore, The Offeror Shall Be Determined To Have Unknown (or "neutral") Past Performance. In The Context Of Acceptability/unacceptability, A Neutral Rating Shall Be Considered "acceptable." rating = Unacceptable: Based On The Offerors Performance Record, The Government Does Not Have A Reasonable Expectation That The Offeror Will Be Able To Successfully Perform The Required Effort. 1.2.4. Criteria 4 potential Risks To The Development Associated With The Length Of The Development Schedule And The Availability Of Funds To Complete All Proposed Tasks. rating = Excellent: There Is Low Or No Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. rating = Good: There Is Moderate Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. rating = Poor: There Is High Risk That The Technology Development Timelines And The Availability Of Funds Necessary To Conduct The Development Would Not Support The Governments Ability To Transition The Technology Development For Future Competitive Development Or Production Efforts. vii. Security Classification in Order To Facilitate Intra-program Collaboration And Technology Transfer, The Government Will Attempt To Enable Technology Developers To Work At The Unclassified Level To The Maximum Extent Possible. If Access To Classified Material Will Be Required At Any Point During Performance, The Offeror Must Clearly Identify Such Need Prominently In Their Proposal. If Offerors Use Unclassified Data In Their Deliveries And Demonstrations Regarding A Potential Classified Project, They Should Use Methods And Conventions Consistent With Those Used In Classified Environments. Such Conventions Will Permit The Various Subsystems And The Final System To Be More Adaptable In Accommodating Classified Data In The Transition System. contracting Office Address: n00024 Naval Sea Systems Command, Dc 1333 Isaac Hull Avenue S.e. Washington Navy Yard, Dc contracting Office Address: sea 02 1333 Isaac Hull Avenue Se washington Navy Yard, District Of Columbia 20376 United States place Of Performance: tbd united States primary Point Of Contact: ms. Sakeena Siddiqi, Procuring Contracting Officer sakeena.s.siddiqi.civ@us.navy.mil secondary Point Of Contact: mr. Tyler Pacak, Contract Specialist tyler.pacak@navy.mil
Closing Date6 Feb 2028
Tender AmountRefer Documents 

PUBLIC BUILDINGS SERVICE USA Tender

United States
Details: This Is A Special Notice – For Informational Purposes Only. the Purpose Of This Special Notice Is To Share With Industry An Upcoming Land Port Of Entry Project In Region 05, Located In International Falls, Minnesota. this Special Notice Is For Informational Purposes Only And Shall Not Be Construed As A Solicitation Or As An Obligation Or Commitment By The Government. Depending On Market Research And Other Influences, Gsa Anticipates Issuing A Solicitation For This Project Around Spring 2025. this Is Not A Request For Offers Or Proposals. The Government Does Not Intend To Award A Contract Based On Responses And The Government Is Not Obligated To And Will Not Pay For Information Received As A Result Of This Special Notice. project Location: international Falls, Land Port Of Entry 2 Second Ave international Falls, Mn 56649 project Description: the Anticipated Project Is A New Land Port Of Entry Facility On The Northern Border In Minnesota. The Proposed Site Is In International Falls, Adjacent To An Existing Land Port Of Entry. This New Project Will Be A Gateway To Our Country And Will Transform An Obsolete Border Facility Into A State-of-the-art Commercial Port Of Entry, Which Will Improve Safety And Security For Both Vehicular And Pedestrian Traffic. It Shall Make A Distinct Architectural Statement That Is Responsive To The Efficient Movement Of Trade And Commerce, The Security Requirements Of Law Enforcement Agencies, And The Welcoming Of Visitors And Citizens To The United States Of America. The Intended Delivery Method Is Design-bid-build With A Lump Sum Firm-fixed Price. the Department Of Homeland Security (dhs) - Customs And Border Protection (cbp) Is The Current Tenant, And The Department Of Agriculture Plant Protection And Quarantine (usda) And U.s. Food And Drug Administration (fda) Will Be Joining Cbp As New Tenants At The New Lpoe. The Existing Facility Was Constructed In 1993, And Operates 24 Hours A Day, 7 Days Per Week. Although The Existing Land Port Of Entry Is Only Roughly 30 Years Old, It Was Designed And Constructed Several Years Before The Creation Of Dhs Which Resulted In Significant Changes To The Way Business Operations Occur At The Border. This Project Represents An Opportunity To Support The Supply Chain; International Falls Has The Highest Traffic Volume Of Any Port In Minnesota. In 2021, The Port Facilitated Over $12 Billion Worth Of Trade. By Redesigning And Expanding The Port’s Infrastructure, The Port Will Be Able To Accommodate Higher Volumes Of Trade. the Project Will Achieve Leed Gold Certification Or Higher. To Achieve That Sustainability Goal, The Project Intends To Specify Energy Efficient Products/systems, Use Environmentally Preferable Products, Protect And Conserve Water, Enhance Indoor Air Quality, And Other Scope Elements That Apply To Various Leed Credits. The Newly Designed Port Will Increase Vehicle And Pedestrian Processing Efficiency And Capacity; Reduce Traffic Queues And Delays In Both Directions; Minimize Conflict Points Among Passenger Vehicles, Commercial Vehicles, Trains, Buses, And Pedestrians; Add A Functional Secondary Inspection Area For Commercial Vehicles; And Accommodate Safety, Security, Technology, And Future Demand. The Site Expansion Will Also Provide Area For Additional Customer Tenant Agencies, Including The U.s. Department Of Agriculture (usda)and The Food And Drug Administration (fda). for Additional Information, Please Visit: Https://www.gsa.gov/real-estate/gsa-properties/land-ports-of-entry-and-the-bil/bipartisan-infrastructure-law-construction-project/minnesota to Keep Up To Date With This Project, Please Select “follow” At The Top Of This Page. for Any Other Questions Or Concerns, Please Contact Contracting Officer Anna Vanko At Anna.vanko@gsa.gov. follow Gsa Region 5: gsa Great Lakes Facebook -https://www.facebook.com/gsa gsa Great Lakes “x”/twitter -https://x.com/usgsa delivery Method design-bid-build scope Summary the General Construction (gc) Scope Of Work Includes All Labor And Materials Required To Provide Construction Services For The International Falls Land Port Of Entry Project. The Services Requested Of The Gc Shall Cover A Wide Range Of Construction Activities As Defined Below. the Gc Shall Be A Member Of The Project Team Throughout Construction And Turnover/closeout Stages. The Gc Selected For This Project Shall Work In Alignment With The Gsa And Gsa’s Selected Team, Including The Architect And Engineer (a/e) Firm And The Construction Manager As Agent (cma). The Services Requested Of The Gc Will Cover A Wide Range Of Activities During Construction And Turnover/closeout Stages, Such As Work Phasing Reviews, Scheduling, Coordinating The Work Of Subcontractors, And General Construction Services. The Gc Shall Be Responsible For The Administration Of All Construction And Closeout Stages. the Design For The Project Will Conform To The Federal Building Design Standards, 2021 Facilities Standards For The Public Buildings Service P-100, And Other Building Codes And Standards As Applicable To This Project. Design Services Will Be Accomplished Through A Separate Contract, Will Be Necessary To Meet The Functional Requirements Of Prospective Tenants, Fulfill Policy And Regulatory Criteria, And Provide State Of The Art Workplaces That Help Define Interior Design Standards For The Building. Designed Solutions Shall Be Consistent With The Latest Objectives Of Gsa, Prospective Tenants, And Best Practices In Architectural Planning And Design. the Project Is Funded Under The Bipartisan Infrastructure Law (bil) And The Inflation Reduction Act (ira). this Is Not A Request For Proposal
Closing Date30 Sep 2025
Tender AmountRefer Documents 

Rizal Technological University Tender

Civil And Construction...+2Others, Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Details: Description Note: For The Complete Details/specifications Of The Project To Be Bid, Please Refer To The Attached Tor/technical Specifications In The Associated Components. All Particulars Relative To Eligibility Check And Screening, Bid Security, Performance Security, Pre-bidding Conference/s, Evaluation Of Bids, Post Qualification And Award Of Contract Shall Be Governed By The Pertinent Provisions Of R.a. 9184 And Its Implementing Rules And Regulations (irr). Interested Bidders May Submit Their Letter Of Intent (loi) From October 15, 2024 To November 11, 2024 Before 10:00am At The Bac Office Thru This Email: Rtu_bac@rtu.edu.ph. Furthermore, The Loi Should State The Name Of The Company And The Name Of Its Authorized Representative Who Will Join The Pre-bidding Conference On October 23, 2024 At 10:00am. The Last Day Of Submission As Well As The Opening Of Bids Will Be On November 11, 2024 At 10:00am. All Bids Must Be Submitted Before The Prescribed Time. All Queries Regarding The Project Should Be Addressed To The Bac In The Abovementioned Email Address. Bid Documents Will Be Available Online But Only Those Who Paid The Non-refundable Amount Of Php 5,000.00 Bid Documents Fee At The Rtu Cashier Can Join The Bidding. Rtu Reserves The Right To Accept Or Reject Any Bid, To Declare The Bidding A Failure, Not To Award The Contract, To Annul The Bidding Process And To Reject All Bids Prior To Contract Award Without Thereby Incurring Any Liability To The Affected Bidders. Furthermore, Rtu Reserves The Right To Waive Any Minor Defects Of Formality And To Accept The Proposal Most Advantageous To Rtu. Rationale: The Rizal Technological University Intends To Conduct Its Student Leader Congress For Sy 2024-2025 In A More Appropriate Venue To Maximize The Attainment Of The Objectives Of The Activity. For This Purpose, An External Service Provider Will Be Contracted To Provide Activity Areas, Meals, And Accommodation. Scope Of Work The Service Provider For The Venue Shall Provide The Function Rooms, Facilities, Accommodation, And Meals With The Following Specifications: General Requirements • Price Quotation For Three (3) Days And Two (2) Nights • Event Date: Thursday To Saturday (december 5 To 7, 2024) • Prepared Location Is 2 To 3 Hours Travel From The University • Guaranteed Number Of Participants: 300 • Accommodation, Meals, Use Of Function Rooms, And Other Facilities/amenities. • Price Quotation Shall Be In Philippine Peso And Inclusive Of All Applicable Government Taxes And Service Charges. • Accessibility Of The Venue Directly Via The Main Thoroughfare By Public And/or Private Transport, Provision For Tarpaulin. Location And Site Condition • Accessibility Of The Venue Directly Via The Main Thoroughfare By Public And/or Private Transport. • Free Parking Space For 6 Buses And 3 Cars. Sanitation And Health Conditions • The Venue Must Be In A Sanitary And Healthy Environment Connectivity • The Venue Must Provide Unlimited Wi-fi During The Entire Period Of The Event Room Accommodation • Room Sharing According To The Proposed Number Of Occupants. This Consists Of The Following: Advance Party-accommodation For 15 Pax Executive Suite Penthouse, 15-20 Pax, Air-conditioned, Wifi Access, Tv, Cr, Kitchen (two) Family Suite, 15-20 Pax (total Of 30-40 Pax), Air-conditioned, Wifi Access, Tv, Cr, Kitchen Standard Room 8 Pax, With Cr Inside (three) Deluxe Room, 5 Pax (total Of 15 Pax), Air-conditioned, Wifi Access, Common Cr (three Cabin Room, 6 Pax, (total Of 18 Pax), Air-conditioned, Wifi Access, Common Cr (fifty) Tents, 4 Pax (total 200 Pax With Mattress, Pillow And Blanket • With Beddings (pillows And Blankets) For Each Pax • With Hot & Cold Shower For Each Pax • Clean Bath Towel Meals Meal Requirements For 300 Of Participants. • Meal Schedule: 1. Day 0 – Pm Snacks, And Buffet Dinner 2. Day 1 – Buffet Lunch, Pm Snacks, Buffet Dinner 3. Day 2 – Buffet Breakfast, Am Snacks, Buffet Lunch, Pm Snacks, Buffet Dinner 4. Day 3 – Buffet Breakfast, Am Snacks, Buffet Lunch • All Meals Are Inclusive Of Flavored Drinks And Drinking Water. • Free Overflowing Brewed Coffee And Drinking Water Throughout The Congress From 08:00 Am Up Until 08:0 Pm • Buffet Station Set-up • Preferred Menu Is Composed Of Rice (either Steamed Or Fried Rice During Breakfast), Brewed Coffee, Pasta, Bread, Drinks, Soup, Appetizer, Salad, Pasta, Chicken Or Pork, Beef, Vegetable Dish, And Dessert. • The Proposal Menu Shall Be Submitted As Part Of Its Proposal.
Closing Soon11 Nov 2024
Tender AmountPHP 1.8 Million (USD 30.9 K)

Gmina Miasto Gniezno Tender

Transportation and Logistics
Poland
Poland-gniezno: Public Road Transport Services
Closing Date26 Jan 2025
Tender AmountRefer Documents 
3001-3010 of 3063 active Tenders