Tenders of Bureau Of Reclamation Usa
Tenders of Bureau Of Reclamation Usa
BUREAU OF RECLAMATION USA Tender
United States
Closing Date26 Jan 2024
Tender AmountUSD 42.1 K This is an estimated amount, exact amount may vary.
Sjc Debris Removal Equipment Services
BUREAU OF RECLAMATION USA Tender
Consultancy Services
United States
Closing Date2 Feb 2024
Tender AmountUSD 17.1 K This is an estimated amount, exact amount may vary.
J--wcao M9 River Surveyor Repair
BUREAU OF RECLAMATION USA Tender
Environmental Service
United States
Closing Date29 Jan 2024
Tender AmountUSD 165.1 K This is an estimated amount, exact amount may vary.
Trinity River Restoration Program (trrp) Science A
BUREAU OF RECLAMATION USA Tender
Machinery and Tools
United States
Closing Date11 Jan 2024
Tender AmountUSD 2.8 Million This is an estimated amount, exact amount may vary.
53--grand Valley Irrigation Traveling Screens
BUREAU OF RECLAMATION USA Tender
Aerospace and Defence
United States
Closing Date19 Jan 2024
Tender AmountUSD 54.7 K This is an estimated amount, exact amount may vary.
B--bgndrf Pfas Testing
BUREAU OF RECLAMATION USA Tender
United States
Closing Date29 Jan 2024
Tender AmountUSD 14.6 K This is an estimated amount, exact amount may vary.
Ncao - Keswick Office It Building Doors & Windows
BUREAU OF RECLAMATION USA Tender
Consultancy Services
United States
Closing Date7 Mar 2024
Tender AmountUSD 224.9 K This is an estimated amount, exact amount may vary.
California Great Basin Regional Office 400 Parcelq
BUREAU OF RECLAMATION USA Tender
Environmental Service
United States
Closing Date12 Mar 2024
Tender AmountRefer Documents
Waterfall Bpa - Call Order 6
BUREAU OF RECLAMATION USA Tender
Civil And Construction...+1Civil Works Others
United States
Closing Date23 Feb 2024
Tender AmountUSD 50.4 K This is an estimated amount, exact amount may vary.
Yuma Meadows Conservation Area (ymca) Fence Repair, Yuma, Az The Purpose Of This Amendment Is Post The Revised Statement Of Work, Price Schedule, Sign In Sheet & Questions (including Responses) During Site Visit.
BUREAU OF RECLAMATION USA Tender
Electrical Goods and Equipments...+1Electrical and Electronics
United States
Closing Date27 Mar 2024
Tender AmountRefer Documents
Request For Information (rfi): Electrical Equipment. This Is A Request For Information (rfi) Notice Only. This Is Not A Request For Proposals (rfp). No Solicitation Is Available At This Time. The Government Does Not Intend To Pay For Information Received In Response To This Rfi. The Naics Code For This Project Is Assumed As 335313 (apparent Most Compatible Naics For Main Notice) Switchgear And Switchboard Apparatus Manufacturing; Including Three Other Six-digit Subcategories Which Are 335311, 335312, And 335314. 335311 Power, Distribution And Specialty Transformer Manufacturing, Size Standard 800; 335312 Motor And Generator Manufacturing, Size Standard 1,250;335313 Switchgear And Switchboard Apparatus Manufacturing, Size Standard 1,250; And 335314 Relay And Industrial Control Manufacturing, Size Standard 750.background:the Navajo Gallup Water Supply Project (ngwsp) Is A Major Infrastructure Project That Once Constructed, Will Convey A Reliable Municipal And Industrial Water Supply From The San Juan River To The Eastern Section Of The Navajo Nation, Southwestern Portion Of The Jicarilla Apache Nation, And The City Of Gallup, New Mexico Via 300 Miles Of Pipeline, 19 Pumping Plants, And Two Water Treatment Plants. Objective: The U.s. Bureau Of Reclamation, Upper Colorado (uc) Region, Four Corners Construction Office (fcco), Is Requesting For Information (rfi) To Determine The Availability Of Major Electrical Equipment And Lead Times For A Contemplated Time-sensitive Construction Project.technical Characteristics:below Is A List Of The Major Electrical Equipment That Is Anticipated For This Project. The Ratings And Quantity Of Equipment Are Estimations Only And Based Off A 60% Final Design Package. A. medium Voltage Switchgear1.) service Entrance, Outdoor, Metal-clad Switchgear2.) 15kv Rated (for Bil Purposes) 3.) utilization Voltage 4.16kv, 800a (minimum)4.) main Breaker, 800a (qty: 1)5.) feeder Breakers, 800a (qty: 2)6.) protective Relays (two Sel-751a Relays And One Sel-787 Relay Or Equal)7.) potential Transformer 1 Set For Input Breaker Relay8.) current Transformers (1 Set Per Breaker For Protection)9.) surge Arrestersb. medium Voltage Transformer1.) 4.16kv To 277/480v, Delta-wye2.) 500kva3.) onan4.) insulating Material: Ester Fluid5.) outdoor Pad Mountedc. medium Voltage Motor Control Equipment1.) 5kv Class, 800a Minimum, Indoor2.) power Monitor Device For Monitoring Main Feed Including Current Transformer And Potential Transformer 3.) seven Compartments For 7 Motor Starters A. 200 Hp Motor, Qty:1b. 600 Hp Motor, Qty: 64.) each Feeder Compartment Equipped With:a. non-load Break Disconnect Switchb. reduced Voltage Soft Starterc. power Fusesd. isolation Contactor, Bypass Contactore. motor Protective Relay (sel-710 Or Equal)f. control Power Transformerg. independent 120v Control Power Feed (receptacle/plug) For Testing Motor Starter Without 4160v Supplied.h. current Transformers (phase And Ground)i. power Factor Capacitor (may Be In A Separate Cubical In The Associated Lineup.)d. switchboard1.) 480v, 800a, Main Lug Only2.) section 1: A. main Breaker (800a)b. power Monitorc. current Transformers For Differential Protection3.) section 2: 480v, 225a Panelboard4.) section 3: 480v, 400a Panelboard5.) section 4: 480v, 400a Automatic Transfer Switch6.) section 5: 480v, 400a Panelboard (fed From Automatic Transfer Switch)e. engine Generator1.) 480v, 250kw2.) diesel With Subbase Fuel Tank3.) sound Attenuated Enclosurerequested Information:1.) what Is The Anticipated Lead Time For Each Piece Of Equipment Listed? Please Specify If The Time Frame Is Measured From Approval Of Submittals To Delivery To The Site Or From Award Of Contract To Delivery To The Site Or A Different Time Frame? This Site Is Located Near Farmington, New Mexico.2.) are There Any Equipment Or Devices That Are At Risk Of Increased Lead Times Due To Supply Chain Issues Or Other Issues?3.) describe Any Suggestions For Reducing The Lead Time Of Equipment Or Devices In The Equipment. If There Are Specialized Or Custom Components That Lead To Longer Lead Times, Please List These And Provide Suggested Alternatives For Us To Consider.4.) if Equipment Was Procured Through A Supply Contract And Installed By A Contractor Under A Separate Contract,a. when Would The Standard Warranty Period Start And Stop?b. what Are The Options For Extended Warranty?c. what Suggestions Or Testing Would The Manufacturer Or Contractor Recommend For:i. acceptance Of The Supply Equipment?ii. transfer From Government To The Installing Contractor?5.) describe Your Companies Experience And Success At Navigating A Stand-alone Supply Contract And A Future Installation Contract. A. what Contributed To A Success Project?b. what Caused Issues?please Include The Following Non-technical Information:1) business Name And Address; 2) name Of Company Representative And Their Business Title; 3) type Of Small Business (if Applicable); 4) unique Entity Identifier (uei) And/or Cage Code; 5) your Contract Vehicles That Would Be Available To The Government For The Procurement Of The Products To Include General Service Administration (gsa), Federal Supply Schedules (fss) (including Applicable Sin(s)), Or Any Other Government Agency Contract Vehicle That Allows For Decentralized Ordering. (this Information Is For Market Research Only And Does Not Preclude Your Company From Responding To This Notice.)submit To: Responses To This Request For Information Should Be Received No Later Than 3:00 Pm Mt On March 27, 2024. Submit Responses By Email To The Attention Of Philoma Singer, Contract Specialist: Email ¿ Psinger@usbr.gov And Ashton Jones, Contracting Officer: Email ¿ Ajones@usbr.gov.
521-530 of 548 archived Tenders