Tenders of Bgis Pwgsc Rp1

Tenders of Bgis Pwgsc Rp1

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Pipe Line Project
Canada
Closing Date12 Jun 2024
Tender AmountNA 
Piping Replacement and Fixes for Several Heating Components

Bgis Pwgsc Rp1 Tender

Energy, Oil and Gas
Canada
Closing Date21 Jun 2024
Tender AmountRefer Documents 
Contractor - New Generator Installation - Windsor Airport

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Canada
Closing Date21 Jun 2024
Tender AmountRefer Documents 
Bgis Delivered – Accessibility Assessment Implementation

Bgis Pwgsc Rp1 Tender

Others
Canada
Closing Date20 Jun 2024
Tender AmountNA 
Rfq For Fume Hood Maintenance Services - Rp1 West (mb)

Bgis Pwgsc Rp1 Tender

Others
Canada
Closing Date20 Jun 2024
Tender AmountRefer Documents 
Rfq For Fume Hood Maintenance Services - Rp1 West (mb)

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Building Construction
Canada
Closing Date25 Jun 2024
Tender AmountRefer Documents 
Divide The Current Space Into A Separate Room For High Density Storage, Which Will Include Extension Of Drywall From One Side To The Wall With Exterior Facing Window. Provide And Install Doors For Access Into The Space, With An Additional Vestibule For Security Purposes. Existing Windows In The Current Space To Be Covered Up With Drywall And Finished To Blend It With Existing Wall For Privacy. The Room Will Include Two Rows Of High-density Storage With Enough Access Clearance In The Space Supplied By Bidder. No Structural Modifications Are Required For This Option As The Hds Installations Can Be Accommodated With The Existing Slab-on-grade Structure. Hvac System Modification Is To Relocate A Minimum Of 4 Supply Air Diffusers To Accommodate The Layout. The Relocation Of Diffusers Will Require Re-balancing In Affected Portion Of The System. The New Partition Walls Of The Storage Room Will Be Of Full Height And Fire Rated, Fire Rated Dampers Will Be Required In The Supply Ducts That Pass Through The Partition. The Existing Thermostat Would Be Required To Be Relocated Outside The Storage Room Back Into The Corridor. Return Air From The Space Back To The Unit Will Be Via A Return Air Transfer Above The T-bar Ceiling Complete With A Fire Damper. Security Measure Installation Within Ductwork As Necessary. Relocate The Existing Lighting Fixtures. Provide New 2’x2’ Led Lighting Fixtures On The New Corridor, And Revise The Lighting Switching To Accommodate The Proposed Layout. Provide New Exit Sign, Battery Unit C/w Remote Head, Remote Head. Provide New Power/data As Indicated On The Drawings. Provide New Conduit, Wiring, Junction Boxes For Both Cctv And Access Control System. Supply, Install, Provide All The Elements Indicated On The Drawings For New Doors D1 And D2. The Existing Power Poles And Existing Outlets Will Be Removed, The Wiring Will Be Pulled Back To Respective Panel And Made Safe. Anticipated Award Date: July 15, 2024      Anticipated Construction End Date: November 18, 2024

Bgis Pwgsc Rp1 Tender

Civil And Construction...+3Others, Civil Works Others, Furnitures and Fixtures
Canada
Closing Date28 Jun 2024
Tender AmountRefer Documents 
Door Replacement - Construction Services

Bgis Pwgsc Rp1 Tender

Energy, Oil and Gas...+3Electrical Goods and Equipments, Electrical and Electronics, Electrical Works
Canada
Closing Date27 Jun 2024
Tender AmountNA 
Evcs National Program - Design And Contract Administration

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Canada
Closing Date27 Jun 2024
Tender AmountNA 
Decommission And Clear Out Abandoned Kitchen And Elevator

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Civil Works Others, Security and Emergency Services
Canada
Closing Date2 Jul 2024
Tender AmountRefer Documents 
The Project Aims To Provide A Long-term Solution That Repairs The Deficiencies In The Existing Identified Fire Separations Located Throughout Each Level In Accordance With The National Fire Code Of Canada – 2015 Section 2.2 Fire Separations. This Section States That Where Fire Separations Are Damaged And The Integrity Of Their Fire-resistance Rating Is Compromised, They Are Required To Be Repaired To Maintain The Integrity Of The Fire Separation. The Existing Fire Separations Are Also Not Compliant With The National Building Code 2015 And National Fire Code - 2015 As Per Section 3.3 Safety Within Floor Areas (nbc 2015). Fire Separations Help To Protect Occupants Within The Building And Is Also A Method For Protecting Buildings From The Spread Of Fire Into Adjoining Areas For Designated Time Periods.
61-70 of 866 archived Tenders