Tenders of Bgis Pwgsc Rp1

Bgis Pwgsc Rp1 Tender

Electrical and Electronics...+1Electrical Works
Canada
Goc5599898 - Ct Fan Coil Motors Replacement And Alarm Installation To Bas
Closing Date24 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Others
Canada
Pressure Washing & Line Painting At Fmz10
Closing Date25 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Building Construction
Canada
The Project Aims For The Modernization Of The Existing Workplace Through A Light Fit-up With Maximum Reuse Of Furniture And Existing Layouts/enclosed Spaces. Some Light Base Building Work Is Expected To Accommodate The New Layouts (e.g., Some Addition Or Removal Of Walls, Design Changes Requiring Hvac/electrical Modifications, Some Millwork, Egress/ingress Emergency Redesign, Etc.). The Client’s Special Purpose Space (sps) Requirements Will Also Be Met.
Closing Date19 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Healthcare and Medicine
Canada
Correctifs Suite À L’étude Goc5093482- Conformité Des Systèmes De Ventilation
Closing Date26 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Furnitures and Fixtures
Canada
30 Rue Victoria - Elections Canada Wtp
Closing Date30 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Environmental Service
Canada
Scope Of Work/overview: "development Of Written Instructions That Set-out The Operation, Inspection, Cleaning, Maintenance, Testing And Verification Requirements Of Hvac And Mechanical Systems, And The Calibration Procedures For All Sensors, Probes And Gauges On Which The Systems Depend For Efficient Operation. Hvac Sops For Systems Containing Halocarbon Shall Include Specific Procedures That Seek To Prevent The Inadvertent Release Of Halocarbon. The Consultant Shall Use The Scope Of Work And Checklist Template Provided By The Project Manager For Developing And Creating The Sop. As Well As Providing The Sequence Of Operations Of Each Of The Hvac And Mechanical Systems In The Building, As Applicable. To Develop The Required Sop, The Consultant Shall: 1. Review And Verify The Cmms Inventory Ensuring All Equipment Within The Building That Forms Part Of The Sop Is Captured, If Not The Consultant Is To Notify The Project Manager To Have A Cmms Completed And Submitted Updating The Overall Inventory List. 2. Use The Scope Of Work And The Study Checklist Provided By The Project Manager For Developing And Creating The Sop. 3. Take Into Account Csa Guideline Z204-94, Entitled Guideline For Managing Air Quality In Office Buildings, And Follow The Instructions' Requirements Per Section 2.24 Of Div Iii Of The Canadian Occupational Health And Safety Regulations.
Closing Date27 Jun 2025
Tender AmountNA 

Bgis Pwgsc Rp1 Tender

Others
Canada
Hvac Sop Updates- Consulting Services
Closing Date7 Jul 2025
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+4Electrical Goods and Equipments, Building Construction, Construction Material, Electrical and Electronics
Canada
Goc6509534 - Ct Chiller #1 Replacement
Closing Date7 Jul 2025
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+2Consultancy Services, Civil And Architectural Services
Canada
Cooling Tower Basin Remediation
Closing Date16 Jul 2025
Tender AmountRefer Documents 

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Goc6647267 - Cs - Exterior Entrance Upgrade
Closing Date11 Jul 2025
Tender AmountRefer Documents 
121-130 of 349 archived Tenders