Battery Tenders

Battery Tenders

Department Of Agriculture Tender

Electrical Goods and Equipments...+2Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 14.4 Million (USD 245.8 K)
Details: Description Invitation To Bid For The Procurement Of 4 Units Recirculating Dryer Under Rice Program Fy 2025 1. The Department Of Agriculture Regional Field Office Iva Through The Rice Program Intends To Apply The Sum Of Fourteen Million Four Hundred Thousand Pesos (ᵽ 14,400,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Procurement Of 4 Units Recirculating Dryer Under Rice Program Fy 2025 With Project Identification No.: Itb-2025-12-057. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Department Of Agriculture Regional Field Office Iva Now Invites Bids For The Above Procurement Project. 4 Units Recirculating Dryer I. Design And Performance Type: Batch Type, Recirculating, Stationary Drying Rate: 0.8% Per Hour, Minimum (batch Type) Drying Efficiency: Minimum, 75% Moisture Gradient: Maximum, 2% Drying Loss/spillage: 1% Maximum Product Quality: A. Cracked Grain, % Increase: 3% Maximum B. Head Rice, % Decrease: 5% Maximum C. Hulled/damaged Grain, % Increase: 2% Maximum With Programmable In-line Monitoring System For Moisture Content, Temperature And Can Control Heating System And Shutdown The Drying Operation When The Grain Is Already Dried. Material Of Construction: Parts Of The Dryer With Direct Contact With The Grains Shall Be Made By Non-corrosive And Food Grade Material Eg. Stainless Steel 304. Power Requirement: Single-phase Electrical Connection, Maximum Of 5kw Rated Power Of All Electric Motors Provision Of Built-in Automatic Moisture Meter Ii. Heating System Requirement 1. Heating System 1 (petroleum Based Fuel) Petroleum Based Fuel: Direct-fired Heating System Efficiency: 90%, Minimum With The Following Components And Accessories: - Flame Sensor - Electronic Ignition System - Automatic Fuel Shut-off - Adjustable Fuel Vaporizer - Automatic Temperature Control - Elevated Non-corrosive And Heat-resistant Fuel Container At Least 200 Liters Capacity - Compatible Single-phase Electric Motor For The Heating System 2. Heating System 2 (biomass Fuel) Biomass Fuel: Indirect-fired Heating System Efficiency: 50%, Minimum With The Following Components And Accessories: - Heat Exchanger: Stainless (ss 201/ss 304, 1.2mm, Minimum) / Fire Tubes (5mm Seamless, Minimum) - Burning Chamber: Made Of Refractory Bricks - Automatic Fuel Feeder: Auger Type - Temperature Control - Compatible Electric Motor For The Heating System Iii. Other Dryer Components And Accessories 1. Pre-cleaner Input Capacity: 4-6 Ton/hr, Minimum Sieve Mechanism: All Parts That Come In Contact With Grain Must Be Made Of Non-corrosive And Food Grade Material Eg., Stainless Steel 304 Capable Of Removing Large Impurities And Unthreshed Paddy With Compatible Electric Motor" 2. Provision Of Ducting To Divert Heat Source From Heating System 1 Or Heating System 2, Made Of Stainless Steel Or Primer Painted And Powder Coated B.i. Or G.i. Sheet. Insulator Material For The Ducting Shall Be Made If Ceramic Blanket. 3. Dust Collection System Consists Of Cyclone Separator / Collector And Suction Blower. All Ducting Shall Be Fabricated From Sheet Metal And The Connectors Must Be Airtight. 4. Generator Set Rated Power/kva: Minimum 15 Kva Voltage Requirement Compatible To The System Power Supply / Generating System Should Be Brand New And Not Refurbished. At Least Three (3) Years From The Date Of Manufacture To The Date Of Opening Of Bids And With Engrave Serial Number. Provided With Mechanical Transfer Switch (mts) The Electrical Wire, Wire Accessories And Piping To Connect The Power Generating Unit To The Mts And The Dryer Control Panel / System Shall Be Provided By The Bidder With Thermal Insulation And Noise Suppressor. Noise Level: 92db Maximum, If Exceeded, Earmuffs Shall Be Provided For Each Unit. With Protection Or Covering Against Rat Entry (as Per Manufacturer’s Specification) 5. Portable Handheld Moisture Meter Grain: Applicable To Paddy/rough Rice And Milled Rice Type: Capacitance Moisture Range: 12-15% Or Wider Accuracy: ±0.5% Or Better Lcd/led Display Battery Operated With Product Brochure Written In English 6. Standard Heavy-duty Tools, Made Of Tempered Steel And Chrome Vanadium Which Shall Include But Not Limited To The Following: - One Set Socket Wrench (no. 8, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 22, 23, 24, 27, 30, 32, Minimum) - One Set Combination Wrench (open And Box, 10pcs - Size Appropriate To The Drying System) - Electrical Plier: 200mm, Minimum - Screw Driver,: Philips And Flat Head, 300mm Minimum - Grease Gun: 250mm Cylinder Length, Minimum - Mechanical Pliers: 200mm, Minimum - Heavy Duty Toolbox And Roll Up Tools Holder (can Accommodate All Tools) 7. Air Compressor For Cleaning, Heavy Duty, At Least 120 Psi, 5m Air Hose 8. One (1) Unit Fire Extinguisher, Dry Chemical, Stored Pressure Type, 6 Kg Minimum 9. Provision Of Disposal Cart For The Ashes 10. With Portable, Heavy-duty Weighing Scale, Minimum 150 Kg Weighing Capacity 11. With Collapsible Cover (trapal), Thickness: S200 12. With Bagging Bin With Minimum Capacity Appropriate To The System 13. Non-stainless Material Of The Dryer Shall Be Painted Finish With Rust-proofing Primer And Final Paint Color. Iv. Other Requirements 1. Certification That The Bidder Will Submit A Duly Signed Electrical Plan Of The Drying System Offered (electrical Layout, Schedule Of Loads, General Notes And Specification, And Legends/symbols) By A Registered Professional Engineer As A Condition For Payment 2. Copy Of Equipment Manufacturer Manual Of Drying Unit, Biomass Furnace, Generator Set And Portable Handheld Moisture Meter Written In English/filipino/vernacular To Be Presented During Post-qualification Evaluation 3. Copy Of The Brochures For The Drying Unit, Generator Set, Weighing Scale, Portable Handheld Moisture Meter And Air Compressor Are To Be Presented During The Post-qualification Evaluation. 4. With Laminated Reflectorized Vinyl Sticker "da-calabarzon" Logo (254 Mm X 254mm) For The Prescribed Part Of The Dryer And Generator Set, Sticker Specifications: 140 Gsm And Thickness Of 175 Microns, Minimum 5. Manufacturer's Nameplate (engraved In A Metal Sheet) With The Serial Number Of The Machine And Serial Number Of The Power Generating Unit 6. With Valid Amtec Test Result That Conforms To The Pns-paes 201:2015-agricultural Machinery-heated-air Mechanical Dryer-specifications. Separate Amtec Test Report For Both Heating Systems Should Be Provided. 7. Conduct Of Acceptance Testing Of All Units After Complete Installation Is Required Prior To Acceptance And 100% Payment Of The Winning Bidder. 8. Certification From The Bidder That They Shall Provide All Fuel, Raw Materials (palay) And Technician/operator Needed During Acceptance Testing. 9. Certification From The Bidder That The Offered Unit Is Brand New, Latest Model And Not Rebranded 10. Conformity As To The Technical Specifications Of The Procuring Entity Signed And Sealed By An Agricultural And Biosystems Engineer As Prescribed By The Section 27.1 Of The Ra 10915 11. With National Agricultural And Fisheries Machinery Assemblers, Manufacturers, Importers, Distributors And Dealers Accreditation And Classification (namdac) Certificate Of Accreditation 12. With Permit To Operate And Certificate Of Conformity Issued By Da-bafe As Per Memorandum Circular No. 30 Series Of 2020 13. Provision Of After Sales Services: •with One Year Warranty For Major Parts And Service From The Date Of Acceptance Of The Beneficiary •valid Certificate Of Dealership / Distributorship / Authority To Sell And Commitment To Supply Directly Issued By The Dryer Manufacturer Or Distributor To The Bidder •certification From The Supplier That They Will Repair Or Replace The Defective Parts Or Components And Provide After-sales Service Within 72 Hours (3 Days) Upon Receipt Of Complaints (pns/bafs/paes 192:2024) •certification That The Bidder Will Provide Training On The Proper Handling, Operation And Maintenance Of The Dryer And Generator Set For At Least Two (2) Operators Per Beneficiary. 14. Notarized Certificate Of Stock Availability Or Stock Allocation From The National Distributor Or Manufacturer Specifying The Name Of The Project 15. Certification Of Guaranteed Spare Parts Availability For At Least Five (5) Years 16. With Certification Of Very Satisfactory Performance Of The Supplier From At Least Three (3) Clients, With Full Address And Telephone Numbers, Within The Last Two (2) Years. V. Terms Of Payment 85 % Upon Complete Installation And 15% Upon Testing/commissioning And Acceptance Of Recipient Vi. Contract Duration And Delivery Place: Days To Complete Supply, Delivery, Installation And Testing: 120 Calendar Days Delivery Place: Laguna, Rizal And Quezon Delivery Of The Goods Is Required Of 120 Calendar Days Upon Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Two (2) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). I. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Ii. Prospective Bidders May Obtain Further Information From Department Of Agriculture Regional Field Office Iva, 8:00 Am To 3:00 Pm Mondays Thru Fridays Except On The Scheduled Time Of Pre-bid Conference And Inspect The Bidding Documents At The Address Given Below: Department Of Agriculture Regional Field Office Iv-a Bac Secretariat Office / Arturo R. Tanco Training Hall Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Iii. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On The Address Given Above Mondays Thru Fridays 8:00 Am To 3:00 Pm Except On The Scheduled Time Of Pre-bid And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five Thousand Pesos (ᵽ 25,000.00). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, Or Through Electronic Means. 6. The Department Of Agriculture Regional Field Office Iva Will Hold A Pre-bid Conference On December 26, 2024 10:40 Am (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity. Furthermore, Bidders Are Required To Provide Their Company Id And Another Valid Id, And Authorization Letter From The Company They Represent.) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas On Or Before January 7, 2025, 9:00 Am. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 7, 2025, 10:40 Am (bidders Must Be Present At The Venue One (1) Hour Before The Scheduled Bidding Activity. Time Schedule Is Subject To Adjustment Depending On The Flow Of Bidding Activity. Furthermore, Bidders Are Required To Provide Their Company Id And Another Valid Id, And Authorization Letter From The Company They Represent.) At Department Of Agriculture Regional Field Office Iv-a Stiarc Conference Room, Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Department Of Agriculture Regional Field Office Iv-a Does Not Condone Any Form Of Solicitation On Any Prospective Winning And Losing Bidders By Any Of Our Staff/employees Or Any Other Party. Any Sort Of This Kind Shall Be Reported Immediately To The Office Of The Secretary Or The National Bureau Of Investigation (nbi) For Entrapment And Proper Investigation 11. The Department Of Agriculture Regional Field Office Iva Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Engr. Ernie N. Rabusa Chairperson, Bids And Awards Committee Secretariat Department Of Agriculture Regional Field Office Iv-a Lipa Agricultural Research And Experiment Station (lares), Brgy. Marawoy, Lipa City, Batangas Contact No.: (02) 8273-24-74 (local 4487) Email Address: Bacsecretariat@calabarzon.da.gov.ph 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: [https://notices.philgeps.gov.ph; Https://calabarzon.da.gov.ph/invitation-to-bid-page/] Date Of Issue: December 17, 2024 _____________________________________ (sgd) Engr. Romelo F. Reyes Chairperson, Bids And Awards Committee

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Closing Date21 Jan 2025
Tender AmountRefer Documents 
Details: This Is A Combined Synopsis/solicitation For Commercial Products Prepared In Accordance With The Format In Federal Acquisition Regulation (far) Subpart 12.6, Streamlined Procedures For Evaluation And Solicitation For Commercial Products, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation; Quotes Are Being Requested, And A Written Solicitation Document Will Not Be Issued. this Is A Brand Name Or Equal To Request For Quote (rfq), And The Solicitation Number Is 36c26025q0188. The Government Anticipates Awarding A Firm-fixed Price Supply Order From This Solicitation. this Is A Solicitation For Centrella Beds With Accessories. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular (fac) 2025-02 Effective January 03, 2025. this Solicitation Is 100% Set-aside For Small Business. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 339113, With A Small Business Size Standard Of 800 Employees, And The Psc Is 6530. all Interested Companies Shall Provide Quotations That Are Brand Name Or Equal To Hillrom Centrella For The Following: equipment Needed: items: Brand Name Or Equal To Hillrom Centrella item # description/part Number* qty Price Extended Amount 1 centrella Bed With Pro Surface cnt 255 3 2 centrella Smart+ Bed With Max Air Surface And Blower cnt 355 8 3 bed Base cnt Base 11 4 nurse Call In Siderail 11 5 accessory Outlet 11 6 patient Helper Bracket 11 7 osi Patient Helper Sleeve 11 8 pro Surface For 36 Inch Frame 3 9 safeview With Illumiguide 3 10 second Lcd Touchscreen 3 â  Subtotal (products) â  salient Characteristics max Air Feature Must Have Powered Air Mattress That Operates Continuously To Decrease Localized Heat And Moisture Buildup. Allows For Continuous Full-body Pressure Redistribution For Patients 70 To 500 Pounds, Automatically Adjusts The Air System To Accommodate Changes Weight Distribution. ability To Override And Increase Firmness For Patient Transfers Or Adjust Patient Position. ability To Adjust For Patient Comfort, With 2 Zones, Which Can Be Adjusted Separately. gci Touchscreen Must Be Located On The Outside Of The Head Rails For Quick Caregiver Access To Patient And Bed Status As Well As Other Bed Controls. Approximate Size 4x5 Inches must Include Bed Exit Silence Alarm Exit Alarm Settings To Include Silence, Auto Reset, And Visual And Audible Safety Prompts. brake Not Set Alarm Must Have Option For Spoken Verbal Safety Alert To Caution Caregiver And Patient In A Non-alarming Manner. one Button Chair One Button Control To Convert A Flatbed Into A Cardiac Chair. must Include Battery Backup - 12 Volt, 7 Mil Amp Hour Batteries X 2 digital Angle Indicator Digital Angle Indicator Gives The Specific Reading Of The Angle Of Bed If Trendelenburg Or Reverse Trendelenburg Positioning Is Needed. Must Reach 18 Degrees. must Have Built In Line And Cord Management - Cutouts For Electrical Cord Or Monitor Cable Management For Use During Transporting. Must Be Located Within The Head And Footboards Or Alternative Built-in To The Bed, Not Hanging. must Have 4 Iv Pole Sockets - Sized For Standard Hospital Iv Poles. 2-4 Bag Capacity. must Include Integrated Restraint Holders - Sized For Standard Belt Restraints. must Have Lockout Controls Ability To Lock Controls. must Have Drainage Bag Holder Ability To Hold Up To 20 Pounds. must Have Smart Bed Ready (sidecom Req) - Up To 32 Patients Safety And Bed Matrices To Be Transmitted To Caregiver Devices (such As Smart Phones, Vocera, Etc) And/or Vista Or Cerner Emr must Have Wi-fi Module must Have Enhanced 3-mode Bed Exit - Includes Silence, Auto Reset And Visual And Audible Safety Prompts. must Have Motion Activated Nightlight must Include Stand Assist - Height Adjust Buttons To Aid In Safely Lifting The Patient Onto Their Feet advanced Slideguardâ® Feature - Reduces Patient Migration In Bed When The Head Of The Bed Is Raised must Include Foley Position Limit - Monitors And Alerts If A Foley Bag Is Touching The Floor patient Hob Angle Display - Digital Head Of Bed Angle Indicator Gives The Specific Reading Of The Angle Of The Head trend/rev Trendelenburg Ranges From 0-18 Degrees. 18 Degrees Required. dampened Emergency Cpr - Ability To Quickly And Safely Lower The Head Section To A Flat Position In Case Of A Code. Ability To Access From Both Sides Of The Bed. must Have Patient Storage In Siderail - Sized To Hold Items Such As Smart Phone, Reading Glasses, Books/magazines. must Have Integrated Urinal Holders Ability To Hold Any Sized Urine Collection Bottle That Is Filled. flexafoot Powered Bed Extend Must Have Powered Bed Length Extension. must Have Steer Caster Font Left Caster Can Be Locked For Steering 36 Inch Frame Width Required in-bed Scale Must Have Ability To Weight Up To 500 Pounds usb Charger Required 2nd Lcd Touchscreen Required patient Pendant - Moveable Bed Control That Allows The Patient Easy Access To Adjust The Bed S Head And Foot Sections. Approx. Size Is 3 X 5 . removable Iv Pole must Have Verbal Alerts Verbal Safety Alerts Such As Brake Not Set, Your Care Team Has Been Called, Please Don T Get Up, Etc. Able To Set 6 Different Languages. additional Information Sought: warranty Please Describe The Offered Warranty. place Of Manufacture Please Provide The Place Of Manufacture. 52.211-6â brand Name Or Equal. as Prescribed Inâ 11.107(a), Insert The Following Provision: brand Name Or Equalâ (aug 1999) (a)â if An Item In Thisâ solicitationâ is Identified As "brand Name Or Equal," The Purchase Description Reflects The Characteristics And Level Of Quality That Will Satisfy The Government S Needs. The Salient Physical, Functional, Or Performance Characteristics That "equal"â productsâ mustâ meet Are Specified In Theâ solicitation. (b)â to Be Considered For Award,â offersâ of "equal"â products, Including "equal"â productsâ of The Brand Name Manufacturer,â must- (1)â meet The Salient Physical, Functional, Or Performance Characteristic Specified In Thisâ solicitation; (2)â clearly Identify The Item By- (i)â brand Name, If Any; And (ii)â make Or Model Number; (3)â includeâ descriptive Literatureâ such As Illustrations, Drawings, Or A Clear Reference To Previously Furnished Descriptive Data Or Information Available To Theâ contracting Officer; And (4)â clearly Describe Any Modifications Theâ offerorâ plans To Make In A Product To Make It Conform To Theâ solicitationâ requirements. Mark Any Descriptive Material To Clearly Show The Modifications. (c)â theâ contracting Officerâ will Evaluate "equal"â productsâ on The Basis Of Information Furnished By Theâ offerorâ or Identified In Theâ offerâ and Reasonably Available To Theâ contracting Officer. Theâ contracting Officerâ is Not Responsible For Locating Or Obtaining Any Information Not Identified In Theâ offer. (d)â unless Theâ offerorâ clearly Indicates In Itsâ offerâ that The Product Being Offered Is An "equal" Product, Theâ offerorâ shallâ provide The Brand Name Product Referenced In Theâ solicitation. (end Of Provision) delivery Fob Destination Is Preferred, 30 Days After Receipt Of Order. All Deliveries Will Be Coordinated With The Portland Va Medical Center Point Of Contact. place Of Delivery: department Of Veterans Affairs portland Va Medical Center community Living Center 1601 E 4th Plain Blvd vancouver, Wa 98661 the Full Text Of Far Provisions Or Clauses May Be Accessed Electronically At Http://acquisition.gov/comp/far/index.html http://www.va.gov/oal/library/vaar/index.asp the Following Solicitation Provisions Apply To This Acquisition: far 52.212-1, Instructions To Offerors Commercial Products addendum To Far 52.212-1 Instructions To Offerors Commercial 52.204-7 system For Award Management (oct 2018) 52.204-16 commercial And Government Entity Code Reporting (aug 2020) 52.204-20 predecessor Of Offeror (aug 2020) 52.204-24 representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) 52.211-6 brand Name Or Equal (aug 1999) 52.212-3 offeror Representations And Certifications-commercial Products And Commercial Services (may 2024) 52.222-50 combatting Trafficking In Persons (nov 2021) 52.225-3 buy American-free Trade Agreements-israeli Trade Act (nov 2023) 52.225-18 place Of Manufacture (aug 2018) 52.252-1 provisions Incorporated By Reference (feb 1998) vaar Provisions: 852.239-75 information And Communication Technology Accessibility Notice (feb 2023) (a) Gray Market Items Are Original Equipment Manufacturers (oem) Goods Sold Through Unauthorized Channels In Direct Competition With Authorized Distributors. This Procurement Is For New Oem Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment (i.e., Replacement Parts) For Va Medical Centers. No Remanufactures Or Gray Market Items Will Be Acceptable. (b) Offeror Shall Be An Oem, Authorized Dealer, Authorized Distributor Or Authorized Reseller For The Proposed Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment (i.e., Replacement Parts), Verified By An Authorization Letter Or Other Documents From The Oem, Such That The Oem S Warranty And Service Are Provided And Maintained By The Oem. All Software Licensing, Warranty And Service Associated With The Medical Supplies, Medical Equipment And/or Services Contracts For Maintenance Of Medical Equipment Shall Be In Accordance With The Oem Terms And Conditions. (c) The Delivery Of Gray Market Items To The Va In The Fulfillment Of An Order/award Constitutes A Breach Of Contract. Accordingly, The Va Reserves The Right Enforce Any Of Its Contractual Remedies. This Includes Termination Of The Contract Or, Solely At The Va S Election, Allowing The Vendor To Replace, At No Cost To The Government, Any Remanufactured Or Gray Market Item(s) Delivered To A Va Medical Facility Upon Discovery Of Such Items. (d) Any Award Made As A Result Of This Solicitation Will Be Made On An All Or Nothing Basis. (e) Offerors Are Warned Against Contacting Any Va Personnel Other Than The Contracting Officer And Contract Specialist Prior To Placement Of Any Award Made Resulting From This Rfq. If Such Contact Occurs And Found To Be Prejudicial To Competing Contractors, The Offeror Making Such Contact May Be Excluded From Award Considerations. (f) All Proprietary Information Shall Be Clearly And Properly Marked. If The Offeror Submits Annexes, Documentation, Attachments, Or The Like, Not Specifically Required By This Solicitation, Such Will Count Against The Offeror S Page Limitations Unless Otherwise Indicated In The Specific Volume Instructions Below. (g) All Information Shall Be Confined To The Appropriate File. The Offeror Shall Confine Submissions To Essential Matters, Sufficient To Define The Quote And Provide An Adequate Basis For Evaluation. Offerors Are Responsible For Including Sufficient Details, In A Concise Manner, To Permit A Complete And Accurate Evaluation Of Each Quote. (end Of Addendum To 52.212-1) far 52.212-2, Evaluation-commercial Items : The Government May Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, Price And Other Factors Considered. In Accordance With Far 9.104-2, The Special Standards Of Responsibility Described Below Apply To This Procurement. Offerors Who Fail To Meet Any Special Standards Of Responsibility Will Not Be Eligible To Receive Contract Award. The Following Factors Shall Be Used To Evaluate Offers: special Standards Of Responsibility: (per Far 9.104-2) The Following Special Standards Of Responsibility Apply To This Procurement: sp1: Offeror Must Be A Manufacturer Authorized Provider For The Items Provided. A Letter From The Manufacturer Stating Such Must Be Included With Any Response To This Solicitation. price (a) A Written Notice Of Award Or Acceptance Of An Offer, Mailed Or Otherwise Furnished To The Successful Offeror Within The Time For Acceptance Specified In The Offer, Shall Result In A Binding Contract Without Further Action By Either Party. Before The Offeror's Specified Expiration Time, The Government May Accept An Offer (or Part Of An Offer), Whether Or Not There Are Negotiations After Its Receipt, Unless A Written Notice Of Withdrawal Is Received Before Award. far 52.213-3 Offerors Are Advised To Include A Completed Copy Of The Provision At 52.212-3, Offeror Representations And Certifications -- Commercial Items, With Its Offer If Has Not Been Completed On Sam.gov. Offerors Must Complete Annual Representations And Certifications Electronically Via The System For Award Management (sam) Website Located At Https://www.sam.gov/portal In Accordance With Far 52.212-3, Offerors Representations And Certifications Commercial Items. If Paragraph (j) Of The Provision Is Applicable, A Written Submission Is Required. all Service-disabled Veteran Owned Businesses Or Veteran Owned Businesses Must Be Registered/certified With The U.s Small Business Administration At Veteran Small Business Certification Veteran Small Business Certification (sba.gov). the Following Contract Clauses Apply To This Acquisition: far 52.212-4, Contract Terms And Conditions Commercial Products (oct 2018) addendum To Far 52.212-4 The Following Clauses Are Included As A Part Of The Addendum: http://www.acquisition.gov/far/index.html (far) http://www.va.gov/oal/library/vaar/index.asp (vaar) 52.204-13 system For Award Management Maintenance (oct 2018) 52.204-18 commercial And Government Entity Code Maintenance (aug 2020) 52.225-4 buy American-free Trade Agreements-israeli Trade Act Certificate (nov 2023) 52.232-40 providing Accelerated Payments To Small Business Subcontractors (dec 2013) 52.252-2 clauses Incorporated By Reference (feb 1998) vaar Clauses: 852.203-70 commercial Advertising (may 2018) 852.212-71 gray Market Items (nov 2018) 852.232-72 electronic Submission Of Payment Requests (nov 2018) 852.239-76 information And Communication Technology Accessibility (feb 2023) 852.242-71 administrative Contracting Officer (oct 2020) 852.246-71 rejected Goods (oct 2018) 852.247-71 delivery Location (oct 2018) 852.247-73 packing For Domestic Shipment (oct 2018) far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders Commercial Products (may 2024) (a) The Contractor Shall Comply With The Following Federal Acquisition Regulation (far) Clauses, Which Are Incorporated In This Contract By Reference, To Implement Provisions Of Law Or Executive Orders Applicable To Acquisitions Of Commercial Products And Commercial Services: (1) 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements (jan 2017) (section 743 Of Division E. Title Vii, Of The Consolidated And Further Continuing Appropriations Act, 2015 (pub. L. 113-235) And Its Successor Provisions In Subsequent Appropriations Acts (and As Extended In Continuing Resolutions)). (2) 52.204-23, Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kapersky Lab Covered Entities (dec 2023) (section 1634 Of Pub. L. 115-91). (3) 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (nov 2021) Section 889(a)(1)(a) Of Pub. L. 115-232). (4) 52.209-10, Prohibition On Contracting With Inverted Domestic Corporations (nov 2015). (5) 52.232-40, Providing Accelerated Payments To Small Business Subcontractors (mar 2023) (31 U.s.c. 3903 And 10 U.s.c. 3801). (6) 52.233-3, Protest After Award (aug 1996) (31 U.s.c. 3553). (7) 52.233-4, Applicable Law For Breach Of Contract Claim (oct 2004) (public Laws 108-77 And 108-78) (19 U.s.c. 3805 Note)). the Following Subparagraphs Of Far 52.212-5 Are Applicable And Incorporated By Reference: 52.203-17 52.204-10 52.204-27 contractor Employee Whistleblower Rights (nov 2023) reporting Executive Compensation & First-tier Subcontract Awards (jun 2020) (pub. L. 109-282) (31 U.s.c. 6101 Note) prohibition On A Bytedance Covered Application (jun 2023) (section 102 Of Division R Of Pub. L. 117-328) 52.209-6 protecting The Government S Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment (nov 2021) (31 U.s.c. 6101 Note) 52.219-6 52.219-28 notice Of Total Small Business Set-aside (noiv 2020) post Award Small Business Program Representation (feb 2024) (15 U.s.c 632(a)(2)) 52.222-3 52.222-19 convict Labor (jun 2003) (e.o. 11755) child Labor Cooperation With Authorities And Remedies (feb 2024) (e.o. 13126) 52.222-21 prohibition Of Segregated Facilities (apr 2015) 52.222-26 52.222-35 equal Opportunity (sep 2016) (e.o. 11246) equal Opportunity For Veterans (jun 2020) 52.222-36 52.222-37 equal Opportunity For Workers With Disabilities (jun 2020) (29 U.s.c. 793) employment Reports On Veterans (jun 2020) 52.222-50 combating Trafficking In Persons (nov 2021) (22 U.s.c. Chapter 78 And E.o. 13627) 52.225-3 buy American-free Trade Agreements-isreali Trade Act (nov 2023) 52.225-13 restrictions On Certain Foreign Purchases (feb 2021) (e.o.'s, Proclamations, And Statutes Administered By The Office Of Foreign Assets Control Of The Department Of The Treasury) 52.226-8 52.232-33 encouraging Contractor Policies To Ban Text Messaging While Driving (may 2024) payment By Electronic Funds Transfer System For Award Management (oct 2018) (31 U.s.c. 3332) all Quoters Shall Submit According To The Following: quotes Must Be Emailed To Maureen.sundstrom@va.gov And Received No Later Than 3:00 Pm Pst On 01/21/2025. Quotes May Be Submitted On This Document Or The Vendor S Own Form And Must Include The Completed Buy American Certificate 52.225-4 Available Below, And, If Not The Manufacturer, An Authorized Distributor Letter. Any Offer That Does Not Provide The Following Supporting Documentation May Be Considered Non-responsive. Required Supporting Documentation And Information: buy American Certificate authorized Distributor Letter If Not The Manufacturer certification That Equipment Meets/exceeds The Salient Characteristics Of The Desired Brand Above delivery Date the Government Intends To Make Award Without Discussions. for Information Regarding The Solicitation, Please Contact Maureen Sundstrom At Maureen.sundstrom@va.gov. a.1 52.225-4 Buy American-free Trade Agreements-israeli Trade Act Certificate (nov 2023) (a)â (1)â theâ offerorâ certifies That Eachâ end Product, Except Those Listed In Paragraph (b) Or (c)(1) Of This Provision, Is A Domesticâ end Productâ and That Each Domesticâ end Productâ listed In Paragraph (c)(2) Of This Provision Contains A Criticalâ component. (2)â the Terms "bahraini, Moroccan, Omani, Panamanian, Or Peruvianâ end Product," "commercially Available Off-the-shelf (cots) Item," "criticalâ component," "domesticâ end Product," "end Product," "foreignâ end Product," "free Trade Agreement Country," "free Trade Agreement Countryâ end Product," "israeliâ end Product," And "united States" Are Defined In The Clause Of Thisâ solicitationâ entitled "buy American-free Trade Agreements-israeli Trade Act." (b)â theâ offerorâ certifies That The Followingâ suppliesâ are Free Trade Agreement Countryâ end Productsâ (other Than Bahraini, Moroccan, Omani, Panamanian, Or Peruvianâ end Products) Or Israeliâ end Productsâ as Defined In The Clause Of Thisâ solicitationâ entitled "buy American-free Trade Agreements-israeli Trade Act": free Trade Agreement Countryâ end Productsâ (other Than Bahraini, Moroccan, Omani, Panamanian, Or Peruvianâ end Products) Or Israeliâ end Products: line Item No. country Of Origin [list As Necessary] (c)â (1)â theâ offerorâ shallâ list Thoseâ suppliesâ that Are Foreignâ end Productsâ (other Than Those Listed In Paragraph (b) Of This Provision) As Defined In The Clause Of Thisâ solicitationâ entitled "buy American-free Trade Agreements-israeli Trade Act." Theâ offerorâ shallâ list As Other Foreignâ end Productsâ those Endâ productsâ manufactured In Theâ united Statesâ that Do Not Qualify As Domesticâ end Products. For Those Foreignâ end Productsâ that Do Not Consist Wholly Or Predominantly Of Iron Or Steel Or A Combination Of Both, Theâ offerorâ shallâ also Indicate Whether These Foreignâ end Productsâ exceed 55 Percent Domestic Content, Except For Those That Are Cots Items. If The Percentage Of The Domestic Content Is Unknown, Select No .â other Foreignâ end Products: line Item No. country Of Origin exceeds 55% Domestic Content (yes/no) [list As Necessary] (2)â theâ offerorâ shallâ list Theâ line Item Numbersâ of Domesticâ end Productsâ that Contain A Criticalâ componentâ (see Farâ 25.105). line Itemâ no.â ___ [list As Necessary] (d)â the Government Will Evaluateâ offersâ in Accordance With The Policies And Procedures Ofâ partâ  25â of The Federalâ acquisitionâ regulation. (end Of Provision) mandatoryelectronicinvoicing va Published The Final Rule Requiring Vendors To Submit Invoices Electronically To The Financial Services Center (fsc) In The November 27, 2012 Federal Register. The Rule Became Effective December 27, 2012. The Rule Includes A New Contract Clause To Be Inserted In All Solicitations And Contracts By The Contracting Officer (vaar 852.232-72). Vendors Can Comply With The Rule By Using Either Of The Two Methods Below: facsimile, E-mail, And Scanned Documents Are Not Acceptable Forms Of Submission For Payment Requests. Electronic Form Means An Automated System Transmitting Information Electronically According To The Accepted Electronic Data Transmission Methods Below: va S Electronic Invoice Presentment And Payment System The Fsc Uses A Third-party Contractor, Tungsten, To Transition Vendors From Paper To Electron Icinvoice Submission. Please Go To This Website:http://www.tungsten-network.com/us/en/veterans-affairs/ To Begin Submitting Electronic Invoices, Free Of Charge. a System That Conforms To The X12 Electronic Data Interchange (edi) Formats Established By The Accredited Standards Center (asc) Chartered By The American National Standards Institute (ansi). The X12 Edi Web Site (http://www.x12.org). vendor E-invoice Set-up Information: please Contact Tungsten At The Phone Number Or Email Address Listed Below To Begin Submitting Your Electronic Invoices To The Va Financial Services Center For Payment Processing, Free Of Charge. If You Have Question About The E-invoicing Program Or Tungsten, Please Contact The Fsc At The Phone Number Or Email Address Listed Below: tungsten E-invoice Set Up Information:1-877-489-6135 tungsten E-invoice Email:va.registration@tungsten-network.com fsc E-invoice Contact Information:1-877-353-9791 fsc E-invoice Email:vafsccshd@va.gov

Toušice village Tender

Others
Czech Republic
Closing Date24 Jan 2025
Tender AmountCZK 2.4 Million (USD 99.3 K)
Details: Installation of PV on Public Buildings - Municipality of Toušice. Bidders shall prepare a bid according to the specified documents for calculating the price. The bid price for each action shall be indicated in Annex No. 2, and also in Annex No. 4, the competitive bid price is then the sum of all 5 prices of individual actions 1) to 5). The competitive price shall contain the contract implementation documentation prepared by the supplier. At the same time, the contracting authority recommends a visit to the place of performance, which it offers only individually in the call. Important!!!!! Within the framework of the Resiii/2022 call, the usable value of the battery was defined for the batteries, not the nominal one, we ask the participants to respect this condition. The contract includes the so-called. "preparatory work" - See below: - For the avoidance of doubt and to avoid any questions regarding the clarification of this tender documentation, the contracting authority emphasizes that this public contract is awarded with reference to the Design and Build form. - The tenderers are obliged to state their bid price in Annex No. 4 - Cover sheet of the tender, which will be part of their tender. - Annex No. 3 - Study - Basis for preparing the tender for actions 1) to 5) is with reference to the Design and Build form (design and build) the entire scope of the public contract documentation for construction works and the list of construction works, supplies and services for the preparation of the implementation documentation

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Security and Emergency Services
United States
Closing Date30 Jan 2025
Tender AmountRefer Documents 
Details: This Request For Information (rfi)/sources Sought disclaimer this Rfi Is Issued Solely For Information And Planning Purposes Only And Does Not Constitute A Solicitation. All Information Received In Response To This Rfi That Is Marked As Proprietary Will Be Handled Accordingly. Responses To This Notice Are Not Offers And Cannot Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi. the Submission Of Pricing, Capabilities For Planning Purposes, And Other Market Information Is Highly Encouraged And Allowed Under This Rfi In Accordance With (iaw) Far Part 15.201(e). sources Sought Description this Is Not A Solicitation Announcement. This Is A Rfi/sources Sought Only. The Purpose Of This Sources Sought/rfi Is To Gain Knowledge Of Potential Qualified Sources And Their Size Classification Relative To Naics 561621. Responses To This Sources Sought Will Be Used By The Government To Make Appropriate Acquisition Decisions. After Review Of The Responses To This Sources Sought, A Solicitation Announcement May Be Published. Responses To This Sources Sought Synopsis Are Not Considered Adequate Responses For A Solicitation Announcement. the Department Of Veterans Affairs (va), Visn 15 Network Contracting Office, Is Seeking Sources That Can Provide The Following: contractor Shall Provide The Maintenance Of The Va Police Security System And Repair The Security System As Required By The Statement Of Work (sow) At The Va Medical Center, St. Louis, Missouri (herein After Referred To As Vamc). the Vamc St. Louis Has Two Divisions Located As Follows: John Cochran Division (jc), 915 North Grand Blvd., St. Louis, Mo 63106 And Jefferson Barracks Division (jb), #1 Jefferson Barracks Drive, St. Louis, Mo 63125. it Is The Responsibility Of The Interested Source To Demonstrate To The Government That The Interested Parties Can Provide The Supplies/services That Fulfill The Brand Name. if You Are Interested And Are Capable Of Providing The Sought-out Services, Please Provide The Requested Information As Well As The Information Indicated Below. Response To This Notice Should Include Company Name, Address, Point Of Contact, Size Of Business Pursuant To The Following Questions: please Indicate The Size Status And Representations Of Your Business, Such As But Not Limited To: Service Disabled Veteran Owned Small Business (sdvosb), Veteran Owned Small Business (vosb), Hubzone, Woman Owned Small Business (wosb), Large Business, Etc.)? is Your Company Considered Small Under The Naics Code Identified Under This Rfi? are You The Manufacturer, Distributor, Or An Equivalent Solution To The Items Being Referenced Above? if You Re A Small Business And You Are An Authorized Distributor/reseller For The Items Identified Above Or An Equivalent Solution, Do You Alter; Assemble; Modify; The Items Requested In Any Way? If You Do, State How And What Is Altered; Assembled; Modified? does Your Company Have An Fss Contract With Gsa, Va Nac, Nasa Sewp, Or Any Other Federal Contract, That Can Be Utilized To Procure The Requirement Listed Above? If So, Please Provide The Contract Number. please Submit Your Capabilities That Show Clear, Compelling, And Convincing Evidence That You Can Meet The Requirement Described Above. please Provide Your Uei Number. responses To This Notice Shall Be Submitted Via Email To James Hogue At James.hogue@va.gov. Telephone Responses Shall Not Be Accepted. Responses Must Be Received No Later Than Wednesday, February 5th At 1700 Cst. If A Solicitation Is Issued It Shall Be Announced At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Responses To This Sources Sought. Responses To This Sources Sought Notice Are Not A Request To Be Added To A Prospective Bidders List Or To Receive A Copy Of The Solicitation. statement Of Work security System Maintenance i. Description this Service Contract Requires The Furnishing Of All Labor, Material, Equipment, Supervision, Management, Tools, Transportation, And Supplies For The Complete Maintenance And Corrective Maintenance Services To The Security System At The John Cochran (jc) Division And Jefferson Barracks (jb) Division Of The Va Medical Center (vamc), St. Louis, Missouri. a. Contractor Shall Furnish All Labor For Normal, Routine And Emergency Maintenance, 24 Hours Per Day, 365 Days A Year. b. The Contractor Is Responsible For Providing Field Updates To As-built Drawings And Associated Documentation As Tests And Maintenance Is Performed. The As-built Drawings Will Be Provided By The Vamc For The Entire Security Alarm System For The Equipment Listed In Table Nos. 1 Through 31 Of This Document. c. All Material Used In The Course Of Normal, Routine And Emergency Corrective Maintenance, Testing And Inspections Are Included; Except See Vandalism, Paragraph Iii. All Parts Shall Be Of Current Manufacturer And Shall Have Full Versatility/compatibility With Presently Installed Equipment. All Replacement Parts For Access Control Must Be Fips 201 Compliant. Stl Va Is Currently Using A 75-bit Card For The Va Piv Credential. d. Any Material Provided Outside This Contract For Adds, Moves, Changes, Act Of God, Etc., Will Be Provided To The Vamc At The Contractor S Preferred Customer Rate For Labor And Materials. e. In Addition; The Contractor Is Required To Provide The Below Listed Administrative Duties For The St Louis Medical Center: (1) Create C*cure Reports Requested By The Various Services. Update Schedules Of Reports And Report Parameters. Update Reports As Equipment Is Added Or Deleted. Approximately 3 Hours Per Month. (2) Add And Delete C*cure Operators As Needed. Minimal Amount Of Time (maybe Once Every Three Months) (3) Manage Active Directory To Include Adding And Deleting Users And Resetting Passwords. Minimal Amount Of Time (maybe Once Every Three Months) (4) Maintain Cisco Equipment For Campus Interconnection. (5) Provide Preventative Maintenance On Access Control, Video And Intercom System To Reduce Downtime Of Same. Minimum Of 16 Hours Per Week. (6) Will Be Required To Maintain A Bench Stock Of Spare Parts Provided By The Va Medical Center To Be Used In Emergency Situations (7) Will Be Required To Maintain Four Client Pcs And Four Servers, Including Keyboards, Mice And Speakers. (8) As New Buildings Come Online Under The Jb And Jc Major Construction Projects The Contractor Will Be Responsible For The Initial Entry Of All The Security Related Hardware (to Include Istars, Card Readers, Receivers, Relays, Duress Buttons Etc.) In The Master Application Server And The Satellite Server. In Addition; The Contractor Will Be Responsible For Adding All The New Video Surveillance Equipment Into The March Networks System ii. Quality Control: all Employees Of Vendor And Subcontractors Working On Site Shall Comply With Va Security Management Program And Obtain Permission Of The Va Police, Be Identified By Project And Employer, And Restricted From Unauthorized Access. All Contractors Who Work On Site Must Have A Photo Id Badge Issued By The Va Police. Applicants For An Id Badge Will Be Required To Provide Personal Data And Undergo A Background Check. contractor S Service Technicians Used To Meet The Requirements Of A-e Below Shall Reside Within A 1.25-hour Radius Of The Spot Located Directly Between The Two Locations: a. Contractor Shall Be Capable Of Providing At Least Six (6) Employees Factory Trained And Certified In The Software House Ccure 9000, And No Less Than Three (2) Employees Who Have Successfully Passed The Software House Ccure 9000 Advanced Integrator Certification. b. Contractor Must Have One (1) Or More Software House Ccure 9000 Enterprise Architecture Certified Technicians, Competent In The Commissioning, Programming And Maintenance Of A Ccure 9000 Mas/sas Configuration. c. Contractor Shall Be Capable Of Providing At Least Six (6) Employees Who Are Factory Trained And Certified In The March Networks R5 Platforms. d. Contractor Shall Have At Least One Employee Who Is Factory Certified In The Stentofon Alphacom Intercom System. e. The Contractor Shall Have At Least Two Employees Who Are Factory Certified On The Salto Locking Computer Software Program, And The Associated Hardware Installed. f. The Contractor Shall Insure That They Have At Least One Certified Technician Available 24/7 365 Days A Year That Lives Within A 1.25 Hours Radius Of Both The Jc And Jb Campus . iii. General Maintenance Requirements: system Components: the System Includes Components Of The System, Both Audio And Visual, Including But Not Limited To Motion Detectors, Wiring, Circuitry, Duress Buttons, Electronic Cameras, Monitors, Nvr S, Switches, Alarms, Card Readers, Computers, Boards, Intercoms, Equipment For Data Transmission And Storage And Other Items Described Herein At The Jc And Jb Divisions Of The Va Medical Center. all Components And Accessories Of The System Will Be Covered Under This Service Contract. all Systems Shall Be Left Functional At The Close Of Each Workday. a. Network all Devices Supported As Part Of This Contract Reside On The Security Network. This Includes But Is Not Limited To Fiber Optics Converters, Switches, Ups S, Csu/dsu S And All Other Devices To Make A Complete And Working, Full Gigabit Backbone, Security Network. The Network Includes The Link Between Campus Dedicated To Use By The Security Systems. b. Access Control System the Access Control System Is A Ccure 9000. this Includes, But Is Not Limited To: Access Control Panel, Panel Power Supplies, Lock Power Supplies, Card Reader, Request To Exit Devices, Door Position Switches And Electronic Locking Hardware. electronic Locking Hardware Including Maglocks, Electric Strikes, Electrified Locksets, Delayed Egress Hardware, Electric Latch Retraction, And Electric Trim Devices. the System Is Used To Monitor Certain Alarms. Devices To Monitor These Alarms Include Wireless Receivers, Transmitters, Specialized Contacts And Motion Detectors. the Contractor Will Be Required To Keep The Ccure 9000 System Properly Licensed And Under A Software Support Agreement With The Factory, Maintaining At Least The Current Level Of Licensure. A Copy Of The License Details Is Available Upon Request. The System Includes A Configuration Of One Mas And Two Sas S Both With Bidi Interface. This Will Require License Renewal On An Annual Basis. c. Cctv System: coverage Of The March Network Cctv System Shall Be Part Of This Agreement. This Includes The Network Video Recorders (nvrs), Encoders, Wireless Transmission Equipment, Ethernet Transmission And Extenders, Switches, Camera Power Supplies, And Camera. cameras Consist Of Indoor, And Outdoor, Fixed And Ptz, As Well As Analog And Ip. d. Intercom there Are Four Different Intercom Systems In Use That Will Be Covered Under This Maintenance Agreement. A Bogen Intercom System Covering Seven Doors At Jc, Six Aiphone Door Intercom Systems (total For Both Campuses), A Stentofon All Ip Intercom System With Six Intercom Stations, And Six Emergency Phone Intercom Stations. e. Security Servers And Workstations multiple Pcs And Servers Make Up The Security System. These Include Three High Availability Enterprise Servers Built And Tuned Specifically For Operation With Ccure 9000. These Servers Include Raid Redundancy, Dual Power Supplies And All Required Windows Server And Sql Licensing. Two High End Workstations Are Used For The Dispatch Function And Are Each Capable Of Driving Up To Eight High Resolution Large Format Monitors. Two Badging Workstations With Associated Cameras And Pvc Card Printers Are Also A Part Of The System. As A Part Of The Servers And Workstations, Lcd/led/plasma Monitors Are In Use. Of Particular Note Are The Eight Large Format Monitors; Five At Jc And Four At Jb. the Contractor Will Be Responsible For Providing Their Own Service Workstations As Desired; However, At A Minimum, At Least One Service Workstation Shall Be Provided For The Jb Campus (this Workstation To Remain The Property Of The Contractor). g. Stand Alone Locking System a Salto Hotel Style Access Control System Is Used In The Fisher House Bldg.#59 And The Domiciliary Bldg.#3 At The Jb Campus. Salto Readers Are Battery Operated And Requires To Be Monitored And Batteries Need To Be Replaced Approximately At The 2/3 Of The Rated Duty Cycle. Full Support Of The System Must Be Included. i. As-builts (record) Drawings: After Contract Award, The Contractor Will Be Provided With The Vamc As-built Drawings For The Entire Security Alarm System For The Equipment Listed In Table Nos. 1 Through 28. Engineering Service Will Provide The Initial Computer Disk Of As-built Drawings For The Contractor To Maintain And Update. These Drawings Are Not Completely Accurate. The Contractor Is Responsible For Providing Field Updates To The Drawings As Tests And Maintenance Is Performed. Up To Date As-builts Shall Be Submitted Every Four (4) Months On Autocad Version 12 To The Contracting Officer Representative (cor). ii. Maintenance Manuals: Maintenance Manuals Shall Be Provided And Include Original Manufacturer S Catalog Cuts On All Equipment Installed, Internal Wiring Diagrams Showing Points Of Connection, Terminal Points Wiring Color Code And Tag Notation, As Well As Instructions For Troubleshooting The System In The Event Of A Malfunction. In Addition To The Operating And Maintenance Manuals, A Complete Materials List Of Systems, Including The Address And Phone Numbers Of The Local Supplier Of Each Item Shall Be Provided. The Maintenance Manuals Shall Be Submitted To The Cor Every Four (4) Months Along With The As-builts. iii. Vandalism: Vandalism Is Defined As Renewals Or Corrective Maintenance Necessitated By Reasons Of Negligence Of Misuse Of The Equipment By Persons Other Than The Contractor, His Representatives And Employees, Or By Reason Of Any Other Cause Beyond The Control Of The Contractor, Except Normal Wear And Tear. Claims For Additional compensation For Repair Of Vandalism Will Be Considered Upon Presentation Of Satisfactory Evidence That Vandalism Has Occurred. During Normal Working Hours, The Contractor Shall Contact The Cor Or His Designee And Have Them Verify The Damage Prior To Repair Of Vandalism. During Off-duty Hours, The Contractor Shall Contact Police Service To Verify That The Damage Will Be Noted On The Service Ticket As Repair Of Vandalism. All Parts Replaced Due To Vandalism Shall Be Returned To The Government. If The Contractor Is Called To Make Corrective Maintenance Identified As Vandalism And So Noted, Billing Will Be For Time Spent At The Vamc Only. Travel Time And Expenses Will Be Charged. iv. Acts Of God. Corrective Maintenance Necessitated By Reason Of Acts Of God Will Be Processed In The Same Manner As For Vandalism. v. Malfunctions: All Malfunctions Located During Inspection/maintenance And Repair Shall Be Reported To The Cor. The Report Shall Include A Narrative Of Malfunction And The Recommended Method Of Correction. The Government Requires Problems To Be Corrected Within Twenty-four (24) Hours Of Being Identified In Addition To The Required Documentation. vi. Report Of Services 1. During Normal Working Hours, 8:00 To 4:30 P.m., Monday Through Friday, The Contractor Shall Report To Va Police Operations Center At The Jc Division And The Officer S Work Area Bldg. #1 Jb Division To Sign In And Out. Contractor Shall Then Notify The Cor, Police Service As To The Repair Being Made Or Maintenance Performed. Contractor Shall Also Notify Them Before Leaving, And Advise The Cor On The Status Of System. 2. During Off-duty Hours, 4:30 P.m. Through 8:00 A.m., Monday Through Friday, Holidays And Weekends, The Contractor Shall Report To The Va Police Operations Center At Jc Division And Va Police Officer S Work Area, Bldg. #1 At Jb Division To Sign In And Out. Contractor Shall Then Notify Police Service (on-duty Supervisor) As To The Repair Being Made Or Maintenance Performed. Contractor Shall Also Notify Police Service (on-duty Supervisor) Before Leaving, And Advise Supervisor On The Status Of System. 3. Failure Of The Contractor To Report Before And After Performing A Repair Or Maintenance Work Shall Be Cause For The Va To Withhold Monthly Payments. iv. Maintenance/corrective Maintenance: a. Maintenance Services: Maintenance Is To Be Provided To All Equipment And Components Listed Herein: 1. The Contractor Shall Make Thorough Technical Inspections Of Equipment And Perform Necessary Maintenance In Accordance With Manufacturer S Recommendations And Commercial Practices Governing Maintenance For This Type Of Equipment. 2. All Equipment Including All Components And Accessories Shall Be Cleaned, Inspected, Adjusted, Calibrated, And Tested Prior To The Inspection Scheduled For Sixty (60) Days From Date Of Contract Award. 3. After The Initial Servicing Sixty (60) Days From Contract Award, All Equipment Will Be Cleaned, Inspected, Calibrated And Tested Once Every Twelve (12) Months, With The Exception Of The Pan Tilt Zoom Cameras Which Will Be Cleaned, Inspected, Calibrated And Tested Once Every Six (6) Months. Prior To The Commencement Of Work, The Contractor Shall Submit To The Cor, A Preventive Maintenance Schedule For All Devices Along With Procedures. b. Inspection: 1. Va Medical Center Representatives (police Service) And A Representative Of The Contractor Will Jointly Inspect The Security System And All Components To Verify That All Systems Have Been Properly Maintained And Are Functioning In The Manner For Which They Are Intended. This Inspection Will Take Place In The First Month Of Performance Of This Contract And The Anniversary Month In Subsequent Years. The Contractor Shall Demonstrate At This Time That All Components Of The System Are Functioning Properly And State The Type Of Preventive Maintenance That Has Been Performed On The Equipment. 2. Within Ten (10) Calendar Days After Inspection Conclusion, The Contractor Shall Submit A Written Report (original And One Copy) To The Cor Citing The Components Inspected, Working Condition And Preventive Maintenance Performed To Date. The Report Will Be Completed In Accordance With The Provisions Of Paragraph Iv, Subparagraph D., Reporting. 3. When A Problem Has Been Identified As Caused By Lack Of Training Or System Knowledge Of The Vamc Staff, Contractor Shall Furnish Appropriate Information In Writing Or Verbally To Educate User Or Users As To Appropriate Procedures To Follow To Prevent Reoccurrence. Training For User Error And Technical Advice That Is Provided By Phone, Correspondence Or Personal Instructions Are Considered Part Of This Service Contract. 4. Reprogramming Of Software Due To Memory Loss, Software, And Firmware Updates Are Considered Part Of This Contract. 5. Time Spent By Service Contractor In Travel And Diagnostic Time For Assessing Cause Of System Failure Or Problem Is Considered Part Of This Service Contract. Once It Is Determined That The Problem Is Outside The Contract, Time And Material Spent To Repair Or Replace Components Of System Are Considered Additional Billable Items. A Quick And Accurate Diagnosis Is In Everyone S Best Interest. Proper Authorization Will Be Required. No Work Can Proceed Until A Purchase Order (p.o.) Number Is Issued. 6. If Door, Hardware, Or Other Component That Is Not Part Of Security System Needs Adjustment Or Replacement, Contractor Shall Have To State Corrective Action Needed To The Cor. The Necessary Security System Corrective Maintenance Shall Be Accomplished After Medical Center Personnel Have Completed Their Repair Work (diagnostic Time Is Part Of The Contract). 7. Assistance At The Head End Equipment Will Be Provided By The Va Police Supervisor While Preventive Maintenance Is Being Provided By The Contractor. Assistance Of The Va Police Supervisor Must Be Prearranged And Coordinated By The Contractor. c. Response To Calls For Repair Service 1. Emergency Corrective Maintenance: A Repair Person Shall Be On The Premises And Provide Corrective Maintenance /trouble Shooting Initiated Within Two (2) Hours After Receipt Of An Emergency Call. 2. The Alarms For The Following Facilities/areas Have Been Assigned A Security Classification Of Critical/highly Sensitive. Trouble Alarms In Either Of These Categories Require A Two (2) Hour Response Time As Specified In C.1. jc Division (a) Methadone Dispensing Area Bell Street Clinic (b) Agent Cashier Area Room B102f Bldg. 1 (c) Canteen Safe Area Room C303 Bldg. 1 (d) Bldg. 3, Irm Area 1st Floor Bldg. 3 (e) Inpatient Pharmacy Room B405 Bldg. 1 (f) Pharmacy Cache 2nd Floor Bldg. 1 (g) Emergency Room Doors Er Bldg. 1 (h) More Than 3 Istar Failures Bldg. #1 (patient Care Areas) (i) C*cure Computer Failure Room C106 Bldg. 1 jb Division (a) Pharmacy Outpatient Room 1c22 Bldg. 55 (b) Pharmacy Cache Room 1c35 Bldg. 55 (c) Agent Cashier Room 1b105 Bldg. 55 (e) Canteen Retail Office Section Room G010 Bldg. 24 (f) Pharmacy Bldg. 55 (g) Mental Health Sally Port Doors Wards N1, N3 West Bldg. 51 (h) C*cure Computer Failure Room 1e08 Bldg. 1 (i) Failure Of The Mas Or Sas Room 1e11a Bldg.1 3. Non-emergency (routine) Corrective Maintenance: All Other Areas Not Classified As Critical/highly Sensitive When Reported, Shall Be Considered Non-emergency (routine) corrective Maintenance. A Repair Person Shall Be On The Premises And Initiate Repair/trouble Shooting Within One (1) Working Day After Receipt Of A Routine Maintenance Call. In No Instance Should Any Component Remain In A Fault/non-operational Status Exceeding Two (2) Working Days. 4. Failure Of The Contractor To Respond To The Requirements Of Emergency Call Back Period Within Two (2) Hours And To Non-emergency Corrective Maintenance Within One (1) Working Day, May Be Cause For Termination Of This Contract For Cause When Two (2) Occasions Of Non-compliance Occur. 5. If This Contract Is Terminated Because Of Contractor S Failure To Provide Services In Accordance With Contract Requirements, Payment Will Be Made For The Contractor S Services That Have Been Provided Through The Termination Date. No Payment Will Be Made For Any Scheduled Maintenance Services That Have Not Been Provided By The Contractor Prior To Termination Of This Contract. d. Reporting 1. At The Completion Of Each Test, Repair And Maintenance Service, The Contractor Shall Provide A Verbal Report To The Cor Or His Designee On Duty Of Any Devices Or Systems That Were Found Not To Operate Properly Before Leaving The Medical Center. This Includes Location, Problems That The Malfunctioning Device May Cause, And Date When Corrective Maintenance Will Be Completed. 2. Written Reports: On Completion Of Each Inspection And Maintenance Service, The Contractor Shall Furnish A Written Report, Within Ten (10) Calendar Days Of Completion Of The Maintenance Or Inspection. Report Shall Be Legible And Provide, As A Minimum, The Following Information: date Of Service location Of Service exact Component type Of Service service Performed (t-test, C-clean, A-adjust, Cal-calibrate, L-lubricate). final Condition Of Device (wp-working Properly, Mal-malfunctioning, Etc.) inspector Or Inspectors Initials 3. Failure Of The Contractor To Report Before And After Performing A Repair Or Maintenance Work Shall Be Cause For The Va To Withhold Monthly Payments. 4. Statement Of Power Related Problems By The Contractor Shall Be Substantiated By Documentation Utilizing The Appropriate Power Recording Equipment. The Contractor Must Also Present Information From The Manufacturer That The Recorded Conditions Would Cause Problems With The Equipment Before It Is Determined That Corrective Maintenance Is Not Covered By The Contract. e. Acceptance By Contractor: Contractor Shall Accept The Existing Security System, All Accessories And Components, Listed Herein, In Its Present Condition And Shall Maintain Such System In Strict Conformance With The Specification Requirements. The Following List Of Components Is Intended As A Guide To The Equipment Covered Under This Contract. Note That These Quantities May Be In Error By As Much As + Or 10%. The Specific Location Of Each Device Is Listed In Table Nos.1 Through 28 Of This Document. v. Emergency Calls: Contractor Shall Be Required To Have An Answering Service To Relay And Dispatch Emergency Calls. No Separate Phone Numbers Or Beeper Numbers Other Than The Main Company Number Will Be Accepted For Service Requirements. vi. Quality And Performance Standards: All Performance Under This Contract Must Be Of High Standards And Must Conform To Good Trade Practices. All Service Under This Contract Shall Be Rendered Promptly And Efficiently Upon Receipt Of An Official Order. All Work To Be Performed Under This Contract Is Subject To Inspection By The Va To Insure Compliance With All Terms And Conditions Of This Contract. vii. List Of Tables: See Section D Attachments. table No. Description 1 John Cochran Building #1 2 John Cochran Building #2, 2a, 2b 3 John Cochran Building #3 4 John Cochran Building #4 5 John Cochran Building #6 6 John Cochran Building #7 7 John Cochran Building #5t 8 John Cochran Building #1t 9 Jefferson Barracks Building #1 10 Jefferson Barracks Building #24 11 Jefferson Barracks Building #23 12 Jefferson Barracks Building #51 13 Jefferson Barracks Building #52 14 Jefferson Barracks Building #53 15 Jefferson Barracks Building #18 16 Jefferson Barracks Building #3 17 Jefferson Barracks Building #3t 18 Jefferson Barracks Building #56 19 Jefferson Barracks Building #25 20 Jefferson Barracks Building #75 21 Jefferson Barracks Building #55 22 Jefferson Barracks Building #54 23 Jefferson Barracks Building #57 24 Jefferson Barracks Building #58 25 Jefferson Barracks Building #60t 26 Jefferson Barracks Building #60 27 Jefferson Barracks Building #55 28 Jefferson Barracks Fisher House #59 29 Jefferson Barracks Building #2

Municipality Of Sibunag, Guimaras Tender

Others
Philippines
Closing Date30 Jan 2025
Tender AmountPHP 461.1 K (USD 7.8 K)
Details: Description Republic Of The Philippines Province Of Guimaras Municipality Of Sibunag Bids And Awards Committee Invitation To Bid For Bid No. 2025-009– Purchase Of Office Supplies For Mayor’s Office & Municipal Budget Office The Municipality Of Sibunag Through The 2025 Mo-mooe (mo Office Supplies) Intends To Apply The Sum Of Four Hundred Five Thousand One Hundred Fifteen Pesos (405,115.00) & Mbo Office Supplies Intends To Apply The Sum Of Fifty-six Thousand Twenty-seven Pesos (56,027.00) With Total Abc (461,142.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Bid No. 2025-009– Purchase Of Office Supplies For Mayor’s Office Municipal Budget Office. Bids Received In Excess Of The Abc Shall Be Automatical-ly Rejected At Bid Opening. 1. The Municipality Of Sibunag Now Invites Bids For Bid No. 2025-009– Purchase Of Office Supplies For Mayor’s Office Municipal Budget Office. Delivery Of The Goods Is Required 30 Calendar Days. Bidders Should Have Completed, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Re-public Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. 3. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Interested Bidders May Obtain Further Information From Municipality Of Sibunag And Inspect The Bid-ding Documents At The Address Given Below From 8:00 Am To 4:30 Pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On January 20-30, 2025 From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of Five Hundred Pesos (p500.00). 6. Bids Must Be Duly Received By The Bac Secretariat At The Address Below On Or Before 1:00 Pm Of Janu-ary 30, 2025. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 7. Bid Opening Shall Be On 1:15 Pm Of January 30, 2025 At Assessor’s Office, Sibunag Municipal Hall, Dasal, Sibunag, Guimaras. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 8. The Municipality Of Sibunag Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. For Further Information, Please Refer To: Engr. Zaldy C. Domalina Bac Chairperson Municipality Of Sibunag Dasal, Sibunag, Guimaras Cp # 09207155768 Engr. Zaldy C. Domalina Bac Chairperson Republic Of The Philippines Province Of Guimaras Municipality Of Sibunag Bids And Awards Committee -ooo- Subject: Bid Proposal Project: Purchase Of Office Supplies For Mayor’s Office & Municipal Budget Office Project Location: Municipal Site, Dasal, Sibunag, Guimaras Date/time Of Bidding: January 30, 2025, 1:00 Pm Item # Description Unit Qty Unit Cost Total Cost Project I- Mo, Abc=405,115.00 1 Double Sided Tape, 1 Inch, 10m Pcs 20 2 Battery Aa, Rechargeable 2/pack Packs 20 3 Packing Tape , 2 Inches, 300m Pcs 10 4 Clear Tape 1" 300m Pcs 15 5 Bondpaper, Short, Subs.20, Gsm 70 Reams 200 6 Bondpaper, Long, Subs.20, Gsm 70 Reams 100 7 Bondpaper, A4, Subs.20, Gsm 70 Reams 20 8 Bathroom Tissue, 2 Ply Rolls 300 9 Black Out Curtain, Fabric (plain) Roll 1 10 Correction Tape, Big, 5mm X 8m Pcs 25 11 Coffee Stick, 1.9g, 36's/pack Packs 30 12 Sugar, Brown Kilos 5 13 Calculator, 12 Digits Pcs 5 14 Computer Ink, Compatible For Epson L14150, Cyan 001 Bot 10 15 Computer Ink, Compatible For Epson L14150, Black 001 Bot 5 16 Computer Ink, Compatible For Epson L14150, Magenta 001 Bot 5 17 Computer Ink, Compatible For Epson L14150, Yellow 001 Bot 5 18 Computer Ink, Compatible For Epson L5290, (003)cyan Bot 5 19 Computer Ink, Compatible For Epson L5290, (003) Black Bot 5 20 Computer Ink, Compatible For Epson L5290, (003) Magenta Bot 5 21 Computer Ink, Compatible For Epson L5290 (003) Yellow Bot 5 22 Computer Ink, Compatible For Brother, Black D60bk Bot 5 23 Construction Paper, Assorted Color Packs 10 24 Door Mat 18"x30" Pcs 20 25 Dipper Pcs 10 26 Detergent Powder, Sachet, 65g Dozens 30 27 Dustpan, Plastic, Good Quality Pcs 10 28 Dishwashing Liquid, Liters 10 29 Estension Cord, 10 Meters, W/socket, Good Quality, 3 Gangs Pcs 10 30 Extension Cord, 10 Meters, W/socket, Good Quality, 3 Gangs Pcs 10 31 Envelope, Letter/mailing, Long Pcs 1000 32 Envelope, Letter/mailing, Short Pcs 1000 33 Expanded Plastic Envelop Without Handle Long, Good Quality Pcs 100 34 Expanded Envelop, Long, Blue Pcs 100 35 Fabric Conditioner, 24 Ml Dozen 50 36 Flash Drive, 64 Gb Pcs 5 37 Folder White, Long, Good Quality Pcs 200 38 Folder White, Short, Good Quality Pcs 200 39 Folder Expanded, Long, Good Quality, Yellow Green & Red Pcs 200 40 Gun Tacker T-50 Heavy Duty 3 Way Staple & Nail Gun Pcs 3 41 Gun Tacker Wire T-50 3/8" 10mm Box 20 42 Gun Tacker Wire T-30 1/4" 6mm Box 20 43 Glue Glun (big), Good Quality Pcs 10 44 Glue Stick Big, Transparent Pcs 500 45 Glue Stick Small, Transparent Pcs 200 46 Ink Of Copier (duplo) Pc 10 47 Internal Hard Drive 2 Tb Pcs 3 48 Marker, Fluorescent, Assorted Color Pcs 10 49 Photo Paper, Matte, Long, 20's/pack Packs 25 50 Specialty Paper, Short, Ivory 20's Packs 100 51 Specialty Paper, Long, Ivory 20's Packs 100 52 Sponge Pcs 20 53 Sticker Paper, A4, Matte 20's Packs 20 54 Signpen, 0.5mm, Blue, 12's/box Boxes 20 55 Signpen, 0.5mm, Black, 12's/box Boxes 10 56 Signpen, 0.7mm, Blue, 12's/box Boxes 20 57 Signpen, 0.7mm, Black, 12's/box Boxes 10 58 Sticky Note Pad, Assorted Color 3x3 Pads 15 59 Sticky Note Strips, Assorted Color 3 X 1/2 Packs 15 60 Scissors, Good Quality 6" Pcs 10 61 Stapler With Remover, Big, Good Quality Pc 10 62 Staple Wires, #35 Boxes 5 63 Sd Card 512 Pc 2 64 Toilet Bowl Cleaner, 500ml Bottles 20 65 Toilet Brush Pcs 10 66 Toilet Plunger Pcs 10 67 Trash Bags, Plastic, 10's, Xxl Packs 20 68 Softbroom, Good Quality Pcs 10 69 Trash Bin, Medium Size Good Quality Pcs 10 70 Mop, Spin, Good Quality Pcs 10 71 Glue, 1,010g Liters 1 Sub-total 72 Glue 130g Pcs 5 73 Pail (5 Liters) Pcs 10 74 Spoon, Stainless, Good Quality Dozen 2 Total 75 Fork Stainless, Good Quality Dozen 2 76 Plate 10" Ceramic, Good Quality Dozen 2 77 Coffee Mugs, Ceramic, Good Quality Dozen 2 78 White Board Marker, Black 25 Ml Pcs 10 79 Stamp Pad Ink, Blue 30ml Pcs 10 80 Facsimile Stamp Pcs 5 81 Certified True Copy Stamp Pcs 5 82 Received Stamp Pcs 5 83 Customized Stamp (mayor's Name & Designation) Pcs 2 84 Ruler Steel 2ft Pcs 5 85 Molar File With Blue Color Pcs 30 86 White Borad 2x4 Ft Pcs 2 87 Whiteboard 4x8 Ft Pcs 2 88 Scotch Tape Dispenser Pcs 2 89 Hand Towel, Microfiber 16x24 Inches Dozen 2 90 Black Out Ring Curtain 7ft (plain) Pcs 10 91 Hi-techpoint Pen 0.7 (black And Blue) Pcs 12 92 Hi-techpoint Pen 0.5 (black And Blue) Pcs 12 Project Ii-mbo, Abc=56,027.00 1 Epson Ink 664, Cyan, 70 Ml Bottles 2 2 Epson Ink, Magenta 664, 70 Ml Bottles 2 3 Epson Ink, Yellow 664, 70 Ml Bottles 2 4 Epson Ink, Black 664, 70 Ml Bottles 5 5 Canon Ink G3010, Gi-790 Cyan Bottle 2 6 Canon Ink G3210, Gi-790 Yellow Bottle 2 7 Canon Ink G3010, Gi-790 Magenta Bottle 2 8 Canon Ink G3010, Gi-790 Black Bottle 5 9 Plastic Folder Thick (long) Green, Red Dozens 12 10 Plastic Folder Thick (short) White Dozens 15 11 File Folder, 14pts, White, Legal, 100s/ Bundle Bundle 3 12 File Folder, 14pts, White, Letter, 100s/ Bundle Bundle 2 13 Brown Envelope (long) Dozens 3 14 Brown Envelope (short) Dozens 3 15 Bond Paper (short) Subs.20, Letter, 8 ½” X 11 Reams 35 16 Bond Paper (long) Subs.20, Legal, 8 ½” X 13 Reams 10 17 Bond Paper A4 Size , Subs 20, 500 Sheets Reams 5 18 Sign Pen .07 Pcs 24 19 Pentel Pen Black (broad) Pcs 3 20 Pentel Pen Blue (broad) Pcs 3 21 Comb Ring ¾ “x 44” Long Plastic ½ Wide Pcs 20 22 Alcohol 1000 Ml 99.9% Germ Kill Bottle 5 23 Metal Triangular Scale Ruler (30cm) Pcs 2 24 Correction Tape (big) Pcs 10 25 Calculator 12 Digits (two Way Power) Big Pcs 2 26 Paper Clips (vinyl Coated) Boxes 6 27 Paper Clamp, Big Pcs 15 28 Scotch Tape 2” Pcs 5 29 Packing Tape Pcs 2 30 Paper Fastener (plastic) Vinyl Coated, Big Boxes 4 31 Staple Wire # 35, Boxes 4 32 White Board Marking Pen (black) Pcs 2 33 Double Sided Tape (big) Pcs 12 34 Hard Drive, Usb 64gb Pcs 1 35 Cutter Big Pcs 3 36 Colored Marker Highlighter, Red, Green, Violet Pcs 1 37 Ballpen, Black, 0.5, Smooth Ink Dozens 5 38 Stamp Pad (big) Pcs 1 39 Pencil #2, Lead W/ Eraser, 1 Doz/box Boxes 2 40 Sticker Paper (white, Green, Orange) Packs 12 41 Specialty Paper Packs 3 42 White Ordinary Mailing Envelope, Long Pcs 50 43 Thumb Tacks, 100pcs/box Boxes 3 44 Photo Paper, Long 20 Pcs/pack Pack 5 45 Scissor, Big Pcs 2 46 Stapler #35, With Staple Wire Remover (big) Pcs 2 47 Masking Tape 1: Wide 50 Meters Long (big) Pcs 2 48 Push Pin Boxes 2 49 Feather Duster W/ Handle Plastic Pcs 1 50 Computer Mouse, Wireless Pcs 1 51 Soft Broom, Tiger Grass, Good Quality Pcs 1 52 Detergent Powder, Sachet, 57g Doz. 1 53 Trash Bag, Black, Large Pack 2 54 Board Paper White Short Pack 6 55 Air Freshener, Spray, 320/bottle Bottle 2 56 Bath Soap, Anti Bacteria, Big Pc 2 57 Dishwashing Liquid, Refill Pouch, 600 Ml Bot 1 58 Fabric Conditioner Dozen 1 59 Pencil Sharpener (office Stationary) Pcs 1 60 Molar File Pcs 21 61 Trash Can With Cover (big) Pc. 1 62 Expanded Folder ( Long) Pcs 75 63 Facsimile ( Certified True Copy) Pc 1 64 Highlighter ( Green & Blue) Pcs 2 75total Bid Amount: In Words: Prepared And Submitted By: ____________________________________ ___________________________ Signature Over Printed Name Name Of Firm ___________________________ Date Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Be: The Name Of The Contract Is Purchase Of Office Supplies For Mayor’s Office & Municipal Budget Office The Identification Number Of The Contract Is Bid No. 2025-009 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: The Amount Of Not Less Than Twenty-three Thousand Fifty-seven Pesos And 10/100 (23,057.10) If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or The Amount Of Not Less Thirteen Thousand Eight Hundred Thirty-four Pesos And 26/100 (13,834.26) If Bid Security Is In Surety Bond. 19.3 In All Cases, The Nfcc Computation, If Applicable, Must Be Sufficient For All The Lots Or Contracts To Be Awarded To The Bidder. 20.2 Bidders Shall Submit License As Office Supplies 21.2 Additional Contract Documents Relevant To The Project That May Be Required By Existing Law And/or The Procuring Entity.

DEPT OF THE ARMY USA Tender

Electrical Goods and Equipments...+1Electrical and Electronics
United States
Closing Date31 Jan 2025
Tender AmountRefer Documents 
Details: Request For Information (rfi) subject: Inspection, Preventive Maintenance And Emergency Repairs/replacement Services For The Emergency Power Supply Systems (epss) For The Chemical Biological Center (cbc) Located At Aberdeen Proving Ground - Edgewood Area, Md, 21010 this Is A Request For Information (rfi) Only – This Rfi Is Issued Solely For Information And Planning Purposes. This Is Not A Request For Proposals (rfp) Or A Request For Quotations (rfq); It Is Strictly A Rfi. Neither Unsolicited Proposals Nor Any Other Kinds Of Offers Will Be Considered In Response To This Rfi. No Contract Will Be Awarded Pursuant To This Announcement. This Notice Does Not Constitute A Commitment By The United States Government To Contract For Any Supply Or Service Whatsoever. All Information Submitted In Response To This Announcement Is Voluntary; The United States Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The United States Government. Not Responding To This Rfi Does Not Preclude Participation In Any Future Rfp Or Rfq, If Any Is Issued. 1.0 Disclaimer: This Rfi Is Issued Solely For Market Research Information And Planning Purposes And Does Not Constitute A Solicitation. Neither Unsolicited Proposals Nor Any Other Kind Of Offers Will Be Considered In Response To This Rfi. Responses To This Notice Are Not Offers And Will Not Be Accepted By The Government To Form A Binding Contract. Responders Are Solely Responsible For All Expenses Associated With Responding To This Rfi. All Information Received In Response To This Rfi That Is Marked Proprietary Will Be Handled Accordingly. Responses To The Rfi Will Not Be Returned. At This Time, Questions Concerning The Composition And Requirements For A Future Rfp Will Not Be Entertained. 2.0 Subject: The Cbc Is Conducting Market Research To Assess The Commercial Availability Of Inspection, Preventive Maintenance And Emergency Repairs/replacement Services For Their Epss’. the Anticipated North American Industry Classification System Code (naics Code) Is 811210 (electronic And Precision Equipment Repair And Maintenance). in Response To This Sources Sought Notice, Please Provide The Following: do You Have The Capabilities To Perform The Work Required For This Effort? is Your Company Classified As A Large Or A Small Business? are There Any Concerns You Foresee With This Requirement? responses To This Notice Shall Be Submitted Via Email To Michele A. Connolly At Michele.a.connolly.civ@army.mil. Telephone Responses Will Not Be Accepted. Responses Must Be Received No Later Than Friday, January 31, 2025, At 4:30pm Est. If A Solicitation Is Issued, It Shall Be Announced At A Later Date, And All Interested Parties Must Respond To That Solicitation Announcement Separately From The Responses To This Sources Sought. Responses To This Sources Sought Notice Are Not A Request To Be Added To A Prospective Bidders List Or To Receive A Copy Of The Solicitation. 3.0 Description: This Is A Non-personal Services Contract To Provide Routine Inspections, Maintenance, Operational Testing, Repairs, Replacement And Emergency Service Response For The Emergency Power Supply Systems (epss) At Combat Capabilities Development Command (devcom), Chemical Biological Center (cbc) Aberdeen Proving Ground, Md. The Contractor Will Provide All Services In Accordance With (iaw) National Fire Protection Association (nfpa) 110, Most Recent Version, For Level 1, 2 And 3 Equipment, Tm 5-685, National Electrical Code (nec)/nfpa 70 And Manufacturer’s Published Procedures. A Current List Of All Equipment To Be Maintained As Part Of The Epss Is Included In Attachment A – Master Generator Equipment Listing. There Are Currently (35) Systems In Place Requiring Service. 3.1general Requirements: The Contractor Shall Perform Provide Routine Inspections, Maintenance, Operational Testing, Repairs, Replacement And Emergency Service Response This Includes All Labor, Materials, Consumables, And Equipment Necessary To Accomplish The Contract Requirements Required To Successfully Complete The Inspection, Maintenance And Repairs, For The Continued Operation Of Cbc’s Epss’. ​​​​​​​3.2technical Qualifications. The Contractor Shall Be Qualified In The Maintenance And Repair Of The Types Of Emergency Power Supply Systems (epss) Used In Research Laboratories, Hospitals Or Large-scale Medical Facilities, Specifically All Makes/models Listed In Attachment A – Master Generator Equipment Listing. The Contractor Shall Have The Ability To Provide Twenty-four (24) Hour Service And Have A Response Time For Emergency Calls Of No Less Than 2 Hours . The Contractor Shall Provide Proposed Communication Procedures With Phone Numbers And Emails Of Both Primary And Secondary Contacts And Answering Machines With Instructional Messages/ Voicemail Will Not Be Acceptable. The Contractor Shall Submit Satisfactory Manufacturer Or General Certification Of Personnel Training For Manufacturers Listed In Attachment A – Master Generator Equipment Listing. All Technicians Performing Services On This Contract Must, At A Minimum, Maintain The Apprenticeship Level Certification Provided By The Electrical Generating Systems Association (egsa). All Journeyman Level Technicians Shall Maintain Journeyman Certification Obtained Through The Egsa, Have At Least Five (5) Years Of Experience On Any Of The Following Generators: Katolight, Kohler, Caterpillar, Cummins And/or Similar Commercial Generators And Shall Be Proficient In Programming And Troubleshooting Of Electronic Programmable Logic Controllers. At A Minimum, One Qualified Journeyman Must Be Onsite At All Times During Performance Of Pws Requirements. 3.3 Quality Assurance: The Government Will Evaluate The Contractor’s Performance Under This Contract In Accordance With The Quality Assurance Surveillance Plan (qasp). This Plan Primarily Focuses On What The Government Must Do To Ensure That The Contractor Has Performed In Accordance With Designated Performance Standards. The Qasp Defines How The Performance Standards Will Be Applied, The Frequency Of Surveillance, And The Minimum Acceptable Defect Rate(s). 3.3.1 Quality Control Plan (qcp) - Contractor Shall Develop And Maintain A Qcp To Ensure Services Are Performed In Accordance With (iaw) This Pws. The Contractor Shall Develop And Implement Procedures To Identify, Prevent, And Ensure Non-recurrence Of Defective Services. The Contractor's Qcp Is The Means By Which It Assures That The Work Provided Complies With The Requirements Of The Contract. The Qcp Shall Be Submitted To The Contracting Officer (ko) And Contracting Officer’s Representative (cor) Within 30 Days Of Contract Award. 3.4 Hours Of Operation. The Contractor Must Perform All Scheduled Work Under This Contract (including Meetings) During Normal Business Hours (0700 – 1630), Unless Requested By The Cor. . These Hours Can Be Augmented Or Adjusted As Required To Accommodate Scheduled System Outages During Low Demand Hours For Maintenance, Or To Make Repairs In The Event Of An Unscheduled Service Interruption. The Government Reserves The Right To Change Hours Of Operation Or Restrict Contractor Access. 3.5 Contractors Accessing A Dod Facility Or Installation. The Contractor Shall Ensure That All Personnel (including Subcontractors) Assigned To Perform Work Associated With The Tasks Described In This Pws Have Been Screened Through Standard Employment Background Checks. Contractor And All Associated Sub-contractors Employees Shall Comply With Adjudication Standards And Have A -tier I Investigation With Favorable Results. The Contractor Shall Provide Proof Of These Screenings Upon Request By The Cor. Some Epss’ May Be Located In A Secure Area That Requires Escort. 4.0 Performance Requirements. 4.1 Inspection, Preventative Maintenance And Operational Testing. All Routine Maintenance And Operational Testing Shall Be Performed In Accordance With The Standards Of Nfpa 110 As Well As Manufacturer’s Recommendations, Instruction Manuals And The Authority Having Jurisdiction. A Maintenance Schedule For All Epss Equipment Included In This Contract Is In Attachment B – Epss Schedule. This Document Details All Requirements To Be Completed During Inspection, Preventative Maintenance And Operational Testing For All Epss’. Maintenance Schedules Shall Be Adhered To And Shall Follow The Published Intervals For Level 1 And 2 Equipment, To Include Monthly, Quarterly, Semi-annual And/or Annual Work. 4.1.1 Exercising Under Load. All Epss’s In Service Shall Be Exercised For A Minimum Of (30) Minutes, Using One Of The Following Methods: 4.1.1.1 Loading That Maintains The Minimum Exhaust Gas Temperatures As Recommended By The Manufacturer. 4.1.1.2 Under Operating Temperature Conditions And At Not Less Than 30 Percent Of The Eps Standby Nameplate Kw Rating Equivalent Loads (load Banks) Used For Testing Shall Be Automatically Replaced With The Emergency Loads In Case Of Failure Of The Primary Source. 4.1.2 Transfer Switches (ats). Transfer Switches Shall Be Operated Monthly Iaw Nfpa 110, 8.4.6.1. The Contractor Shall Also Perform Semi-annual Maintenance And Testing Of The Ats To Include The Following Operations: 4.1.2.1 Checking Of Connections 4.1.2.2 Inspection Of Testing For Evidence Of Overheating And Excessive Contact Erosion 4.1.2.3 Removal Of Dust And Dirt 4.1.2.4 Replacement Of Contacts, When Required. 4.2 Repairs, Emergency Service And Replacement Parts. The Contractor Shall Be Responsible For Any Repairs Needed On Any Piece Of Equipment Listed In Attachment A Throughout The Period Of Performance Of This Contract. All Repair Work Must Be Done Iaw Nfpa 110 For Level 1, 2 And 3 Equipment, Tm 5-685, Nec/nfpa 70, And Manufacturer Recommendations. Any Repair/replacement Required Outside Of The Normal Maintenance And Repair Identified In Attachment B Epss Maintenance Schedule, Must Be Submitted To And Approved By The Contracting Officer’s Representative (cor), Via A Quote, In Advance Of Any Work Being Executed. 4.3 Unscheduled Service And Repair Calls. These Calls Are Generally Routine Calls That Consist Of Correcting Failures, Which Do Not Immediately Impact Daily Operations. The Contractor Shall Be On Site To Troubleshoot And Diagnose The Problem Within (12) Hours Of Notification. 4.4 Emergency Service And Repair Calls. Emergency Calls Consist Of A Failure During An Exercise Or During An Actual Utility Power Outage. Failures Will Impact Daily Operations And/or Critical Mission Requirements, And The Contractor Shall Be On Site To Troubleshoot And Diagnose The Problem Within (2) Hours Of Emergency Notification. 4.5 Emergency Re-fueling And Delivery. In An Emergency Situation, Such As During A Weather Event Or If Apg Department Of Public Works (dpw) Supply Is Depleted Or Cannot Provide Fuel In Time To Keep Equipment Running, The Contractor Shall Provide All Necessary Services, Equipment, Personnel, Delivery Services And Materials Required To Provide Diesel Fuel Delivery. These Services Can Occur 24x7 During Normal Business Periods And During Catastrophic Or National Disasters. 4.6 Backup Generators. The Contractor Must Have At Least (2) Portable Generators Available At All Times, To Use As Temporary Replacements Should An Epss Included On This Contract Be Placed Out Of Service. 4.7 Emergency Replacement Of Existing Generators. The Contractor Should Supply And Install All Components, Materials, And Labor Required To Replace Any Of The Existing Generators Covered Throughout This Pws, As Needed Should It Be Deemed Irreparable. This Includes Automatic Transfer Switches, Backup Emergency Generators And Fuel Tanks. This Includes All Electrical Mechanical, Civil And Permitting Work Needed To Properly Install The Generator According To State And Local Codes. Equipment Shall Be Installed According To Manufacturer's Instructions. Installation Of The Unit Shall Be Performed By Licensed Electricians And Other Certified Installers. The Contractor Shall Make All Connections To The Building's Panel Boxes, Required Interfaces With The Electrical Company And Provide Any/all Enhancements Or Updates To The Electrical Lines. The Proposed Installation Must Comply With Local, State, And Federal Regulations For Permanent Mount Emergency Generators And Adhere To All Applicable National Electrical Codes ("nec"), And National Fire Protection Association ("nfpa") Codes. The Contractor Must Also Coordinate With Local Power Company, Currently City, Light & Power For All Outages Needed To Complete The Work. 4.7.1 The Contractor Shall Provide All Labor And Materials Necessary To: (a) Remove And Reconnect Feeder For Temporary Generator And Prepare For New Generator. This Shall Include Supplying And Hooking Up Emergency Power Generator For Temporary Connection Until Completion Of Installation And Satisfactory Load Bank Run Of New Generator. (b) Remove Old Generator And Appurtenances To Include Removal Of The Existing Concrete Slab And Appurtenances If Existing Site Is Determined To Not Be Reuseable. (c) In The Instance Where The Current Pad Site Is Determined To Be Unusable For Direct Replacement, The Contractor Shall Install A New Concrete Pad To Accommodate The New Generator Per Set Manufacturer’s Specifications. The Contractor Shall Follow All Local And Installation Permitting Requirements To Obtain All Required Permits. (d) The Contractor Will Install The New Generator And Set-up Mounting(s) Per Manufacturer’s Specifications. The Contractor Shall Connect Generator Start Circuit, Battery Charger And Sump Heater, As Applicable, To Nearest Available Power Supply; Connect Fuel Supply To New Generator; Verify Installation And Perform Start-up Checks, Transfer And Load Bank Testing To Ensure Proper Operation Of All Electrical And Mechanical Components. Contractor Is Responsible For Clearing All Work Debris And Material From Removal/installation Sites And Disposing It Properly. (e) If Applicable, The Contractor Will Install And Disconnect Any Government Furnished Temporary Emergency Generator. The Contractor Shall Include The Cost Of Connection/disconnection Of A Temporary Furnished Generator. Generator Shall Be Set Up And Tied Into Existing Emergency Feeds And Automatic Start Circuit. 4.7.2 Excavation Clearances: Contractor Shall Obtain An Excavation Permit (ep) From The Construction Branch Of Dpw Before Starting Any Excavation Work. The Contractor Shall Initiate The Permit Process By Filling Out The “excavator Section” Of The Ep, And Submit Through Inframap Located In The Basement Of Building 4304. Processing Will Normally Require Ten (10) Working Days. The Contractor Shall Also Obtain Digging Clearance Through “miss Utility” To Check For The Existence Of Private Commercial Utilities Prior To Any Excavation. 4.8 Installation Of Green Strobe Generator Status Lights. The Contractor Shall Supply And Install A Green Strobe Light That Signals The Generator’s Operating Status Near Or On Each Individual Generator That Indicates The Generator Is Operational. These Installations Shall Be Completed Using A Phased Approach Approved By The Government Cor During The Base Year Of This Contract. The Contractor Shall Submit Their Phased Installation Plan To The Cor For Approval Within 30 Days Of Contract Award. 4.9 Records. The Contractor Shall Provide And Maintain All Records Both Electronically And On-site, With Log Books At Each System That Are Updated Once Any Actions Are Taken, E.g. Inspections, Operational Tests, Exercising, Repairs, And Modifications. If Required, Repair Or Replacement Quotes Shall Be Submitted Within Five (5) Business Days To The Cor Upon Discovery Of Need. 4.10 Quotes: Any Repair/replacement Beyond What Is Covered In The Standard Maintenance And Repair Sections Of This Contract Require A Quote Be Submitted And Pre-approved By The Cor, Prior To Commencement Of Any Work Being Performed. if A Repair/replacement Part Is Required And Has The Ability To Impact Mission, The Cor Shall Be Provided A Quote For The Total Cost Broken Down By Labor Time, Parts And Materials Within (8) Hours Of The Discovered Issue. In The Event That A Repair/replacement Part Is Required, And It Will Not Impact Mission, The Cor Must Be Provided A Total Quote For Time And Materials Within (48) Hours Of The Discovered Issue. 4.11 Record Of Maintenance, Repair And/or Operational Testing. Records Are Required To Be maintained Via A Digital Logbook Maintained By The Contractor. The Digital Log And Copies Of Inspection Maintenance Sheet(s) Shall Be Submitted By The 10th Of Each Month To The Cor. 4.12 Operational Readiness Report. Contractor Shall Provide A Monthly Operational Readiness Report Stating The Current Condition Of Each Emergency Power Supply System (epss) Included In The Contract. Report Shall Be Submitted By The 10th Of Each Month And Shall Be Furnished To The Cor And Building Facility Managers. A Full List Of Building Facility Managers Will Be Provided Upon Task Order Award.

City Of Koronadal Water District Tender

Others...+1Electrical and Electronics
Philippines
Closing Date6 Jan 2025
Tender AmountPHP 3.7 Million (USD 63.7 K)
Details: Description Item No. Specification Statement Of Compliance “comply” Or “not Comply” 1 Supply, Delivery, Installation, Testing And Commissioning Of Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market Water Supply System A. General 1. Scope A. The Scope Of Work Shall Be To Supply, Install, Test And Commission The Supervisory Control And Data Acquisition (scada) System For Koronadal Public Market. All The Required Parameters Shall Be Transmitted To City Of Koronadal Water District Main Office As The Central Command Center. B. The Scada System, In General, Performs The Following Tasks But Not Limited For Specified Parameters: I. Monitoring Functions Ii. Controlling Functions Iii. Graphical Displaying Functions Iv. Reporting Functions V. Alarming Functions Vi. Trending Functions Vii. Data Storage Viii. Other Related Functions That May Be Required By The Ckwd Not Stated Herein. 2. Conditions A. The System And Instruments Should Be Brand-new Specifically The Programmable Automation Controllers, Sensors, Variable Frequency Drives (vfd), Pumps, Motors, Electromagnetic Flowmeters, And Scada Software. B. The Supplier Shall Furnish All Labor, Materials, Tools, Equipment, Transport, Supplies And Other Services To Complete The Scada System And Shall Be Responsible For The Proper Installation Of The Supplied Equipment And Software. C. The Supplier Shall Install The Equipment And System Within One Hundred Twenty Days (120) Days After Signing Of Notice To Proceed (ntp). The 15-day Time Frame Shall Be Allotted In Order To Check The Proper Alignment Of The Pump/ Motor Assembly And Make Necessary Corrections Of Both Mechanical And Electrical Failures Found During Installation And Construction. The Supplier Shall Inform The Ckwd Measures And Proper Procedures On Its Operation To Guarantee A Smooth And Proper Function Of The Newly Installed Units And System. D. Field-testing Shall Be Made Once The Mounted Equipment Is Ready For Operation And When Both The Ckwd And Supplier Have Finished Their Scopes Of Work On The Installed Unit. During The Installation And Commissioning Of The Scada System, The Supplier Is Required To Assign A Technician Responsible For Overseeing The Commissioning Process. All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier. E. The Supplier Shall Be Liable For Any Damages To Materials, Electro-mechanical Equipment’s Such As But Not Limited To Pumps And Motors, Variable Frequency Drive (vfd), Flowmeter, Level And Other Electro-mechanical Devices During Testing And Commissioning Of The Scada Project And Shall Be Required To Replace Immediately To Any Incur Defects Without Cost To Ckwd. All Incidental Expenses Including The Pulling Out And Transporting Of The Unit Shall Be Borne By The Supplier. F. In Accordance With The Electricity Safety Regulations, Supplier Is Strictly Prohibited From Connecting, Or Allowing To Remain Connected, Any Wiring Or Equipment In Unsafe Conditions To An Electrical Installation Or Power Supply. Additionally, To Control Hazardous Energy Sources, Standard Regulations Require That Machinery And Equipment Be Isolated From Their Energy Sources And Secured With A Lockout Or Tagout System Before Any Servicing Or Maintenance Is Performed. G. The Supplier Shall Provide A Comprehensive Warranty Covering All Parts And Labor For A Minimum Period Of One Year From The Date Of Delivery And Installation Of The Equipment And System. H. In Case Of Any Malfunction, Defect, Or Failure Of The Equipment And System During The Warranty Period, The Supplier Shall Offer Repair Services At No Additional Cost To The Buyer. I. The Supplier Must Respond To A Warranty Repair Request Within 24 Hours Of Notification By The Buyer. The Supplier Is Required To Complete The Repair Or Provide A Replacement Within A Maximum Lead Time Of 1 Week From The Time Of Notification. This Includes The Time For Diagnostics, Shipping Of Parts, And On-site Or Off-site Repair As Necessary. J. If The Repair Cannot Be Completed Within The 1-week Lead Time, The Supplier Must Provide A Temporary Replacement Of Equivalent Specifications At No Extra Cost To The Buyer, Until The Original Equipment Is Repaired And Returned To Full Working Condition. K. The Supplier Is Required To Maintain High Standards Of Housekeeping Throughout The Entire Project Duration. They Shall Be Fully Responsible For Managing And Securing Their Own Materials, Equipment, And Tools To Prevent Any Potential Accidents Or Safety Hazards In The Workplace. L. All Equipment/ Materials Must Be Brand New. 3. Location The Assembly Shall Be Installed At Koronadal Public Market, Purok Kaunlaran, Brgy. Zone I, City Of Koronadal. 4. List Of Major Components Item No. Item Quantity 4.a Programmable Logic Controller 1 4.b Human Machine Interface (hmi) 1 4.c Scada Software 1 4.d Workstation Pc 1 4.e Ethernet Switch 2 4.f Un-interruptible Power Supply 1 4.g Monitor 55" 1 4.h Wireless Antena (tx/rx) With Pole 2 4.i Variable Frequency Drive 2 4.j Pumps & Motors 2 4.k Water Level Monitoring Transmitter 4 4.l Electromagnetic Flowmeter 1 4.m Power Meter 1 4.n Fabricated Coated Panels W/ Complete Assembly 1 4.o Surge Protection Device 1 4.p Butterfly Valve With Actuators 2 4.q Pressure Transmitter 2 5. Major Components Specifications It Shall Meet The Following Operating Requirements: Description Specifications 5.a Programmable Logic Controller Digital Input 28 24 Vdc/vac Inputs, Up To 6 High Speed Counter Channels Relay Output 20 Relay Output Power Supply 24 Vdc Communication Embedded Usb Programming Port, Ethernet Port, Non-isolated Rs232/485 Serial Port Plug-in Ports 5 Plug-in Ports, Up To 4 Expansion Modules 5.b Human Machine Interface (hmi) Display 10.4 In. Display, Aluminum Panel With Resistive Touch Resolution 800x600 Or Higher Case Zinc-coated Skin Pass Steel Power Supply 24vdc (9 - 32vdc) Isolated Interface Ethernet: 2x Gigabit Ethernet (rj45), Usb: 2x Usb 3.0 (type-a / Host) Serial: 1x Rs232/422/485 (db9m) Isolated Operating Temperature 0° - 50°c Approvals Ce, Culus Listed, Ukca, Atex, Kc, Rcm 5.c Scada Software Scada Should Support Unlimited Displays, Unlimited Web Clients And Tags To Accommodate Future Integration With Our Pumping Stations. For Future Expansion, Scada System Shall Have Dual Monitor Capability To Provide Enhanced Visibility And Operational Efficiency. Data Logging To Odbc-compliant Database Such As Microsoft Sql Server Or Historian. 5.d Workstation Pc Cpu At Least 12th Gen Or Higher Intel Core I5 Storage (os) 256gb M.2 Gen 4 Nvme Ssd Storage (data) 2x1 Tb 7200 Rpm Hdd Or Higher Raid 0, 1, 5 Support Operating System Windows 10 Pro Or 11 Pro Memory 8gb Non-ecc Ddr5 Or Higher Display Output 2 X Displayport 1.4a Hbr2 Ports Ethernet Port Rj45 (1 Gbe) Ethernet Port Chassis/form Factor Tower 5.e Ethernet Switch Type Managed Switch Rj45 Ports Minimum 5x10/100baset Operating Temp -20 ~60 Deg. C Vlans Supported Secure Connectivity With Ssh And Https Supported 5.f Un-interruptible Power Supply Supplied Scada Product Must Have The Capacity/facility To Contain Battery-backed Memory For The Duration Of At Least One (1) Day Dedicated For The Plc's Programming And Configuration. System Must Be Able To Send Alerts For Power Outages. An Industrial Type Uninterruptible Power Supply (ups) Must Be Present For Plc Back-up For At Least Fifteen (15) Minutes. It Must Also Support Local And Remote Firmware Upgrade. 5.g Monitor Size: At Least 55" Mounting: Wall Mounted, Inclusive Of Installation 5.h Wireless Antenna (tx/rx) With Pole (communication Complete Set) Power Supply 24v, 0.3a Gigabit Poe Adapter Max. Power Consumption 7w Power Method Passive Poe Gain 23 Dbi Networking Interface (1) 10/100/1000 Ethernet Port Wind Survivability 200 Km/h Security Wpa2 Long-range Point-to-point (ptp) Link Mode 5.i Variable Frequency Drive Motor Power, Hp [kw] 1 Step Higher For 10hp Motor Ac Voltage Range 380v – 500v Voltage % Tolerance +10%, -15% Supply Number Of Phase 3 Phase Total Harmonic Current Distortion (thdi) 30 – 45% Prospective Short Circuit Current (kaic Rating) 65ka Nominal Current 52a Enclosure Rating Ip55 Local Control Panel W/mobile Phone Bluetooth Connectivity And Clear Display Vfd Features Motor Pre-heating Function Built-in Pid Control Built-in Safe Torque Off (sto) Function Full-text Diagnostic Display Dtc Control For Precise Torque Control And Enhance Energy Efficiency Removable Memory Unit For Faster Drive Replacement Digital Variable Frequency Drive That Is Scada Ready And Has Integrated Emc Filter. Complete Protection Against Over/under Voltage, Thermal Overcurrent, Lock Rotor, Ground Fault, Under Current, Definite Time Overcurrent. Digital Monitoring Of Voltage, Current, Frequency, Energy, Kw, And Fault History The Vfd Will Be Controlled Via Fieldbus. Status Updates, Diagnostic Faults, And Alarms Will Be Visible On Both The Hmi And Scada System. 5.j Pumps & Motors Number Of Pump And Motor 2 Units Pump Type Vertical In-line Maximum System Pressure 120 Psi Actual Calculated Flow 3.5 Liters Per Second Maximum Flow 5.0 Liters Per Second Mains Supply 230v Resulting Head Of Pump 35 Meters Head (maximum) 50 Meters Manifold Sizes (inlet And Outlet) 100 Mm Pump Parts In Contact With The Pump Liquid Made Of Stainless Steel Pump Bases And Heads Made Of Cast Iron; Other Vital Parts Are Made Of Stainless Steel Motor Rating 5 Hp, 230v, 3 Phase, 60 Hz 5.k Water Level Monitoring Transmitter Principle Radar Sensor Range Up To 8 Meters Output 4-20ma Beam Angle 8° Operating Voltage 12 - 35 V Dc Protection Rating Ip66 Or Higher Maintenance-free Operation Due To Non-contact 80 Ghz Radar Technology 5.l Electromagnetic Flowmeter Sensor Size Mm (in): 150 (6) Environment Protection Rating: Ip67/nema 6 Accuracy: ±0.2% Qmax (m3/hr): 700 Or Higher Qnominal (m3/hr): 600 Or Higher Qtransitional (m3/hr): 5 Qmin (m3/hr): 3.5 Or Lower Cable: 20 Meters (capable Upto 100m Or Higher) Flange Type Connection: Pn16 Lining Material: Elastomer Flange Material: Carbon Steel Housing Material: Carbon Steel Measurements: Direct/inverse Flow Transmitter Transmitter Mounting: Remote Power Supply: 85 To 265 V Ac Current Output: 4 To 20 Ma Security: Read-only Switch And Ultra-secure Service Password Digital Outputs: Three (3) Configurable Pulse/frequency And Alarm Outputs Fit-and-flow Data Storage Inside The Flow Meter Which Eliminates The Need To Match Sensor When Replace Self-calibrating Capabilities 5.m Power Meter Data Port Ethernet Interface Modbus Tcp Or Its Equivalent Supply Voltage 95-240v Ac; 110-340v Dc Digital Input 1 Or Higher Digital Output 1 Or Higher Degree Of Protection Ip65 Or Higher 5.n Fabricated Coated Panels W/ Complete Assembly Shall Provide Newly Fabricated Powder Coated Panels With A Complete Set Of Wiring Consumables For Network And Monitoring Of All Required Parameters. - Programmable Logic Controller - Human Machine Interface (hmi) - Io Modules - Circuit Breaker Protection - Power Meter - Surge Protection Device - Uninterruptible Power Supply - Exhaust Fan Shall Be Installed Inside The Control House And Shall Be Properly Ventilated 5.o Surge Protection Device Protection Performance Maximum Of 30 Microsecond Radius Of Protection 72 Meters Minimum 5.p Butterfly Valve With Actuators Size In (mm) 6” (150) Butterfly Valve Body Material Cast Iron Butterfly Disc Stainless Steel 304 Or 316 5.q Pressure Transmitter Measuring Range 0 To 16 Bar G (0 To 232 Psi G) Or 0 To 25 Bar G (0 To 363 Psi G) Current Output Signal 4-20 Ma Degree Of Protection Ip65 Or Higher 6. List Of Human Machine Interface (hmi) Alarms Item No. Alarm Descriptions 6.a Under Voltage 6.b Over Voltage 6.c Over Current 6.d Water Level Reservoir (cistern) Low Level 6.e Water Level Reservoir (cistern) High Level 6.f Water Level Right Building Low Level 6.g Water Level Right Building High Level 6.h Water Level Left Building Low Level 6.i Water Level Left Building High Level 6.j Discharge Line High Pressure 6.k Discharge Line Low Pressure 6.l Low/high Flowrate 6.m Submersible Motor Tripped 6.n Motor Control Panel High Temperature 6.o Motorized Valve (on/off Status) 6.p Vfd Alarms 7. System Architecture 8. Personnel Requirements The Contractor Shall Provide The Minimum Number Of Personnel For The Project, As Detailed In The Table Below. These Roles And Responsibilities Ensure Thorough Coverage Of All Project Aspects. Quantity Description 1 Project Engineer (pee) 2 Technical Engineers (electronics And Communications Engineer) 2 Technical Engineers (registered Electrical Engineer) To Ensure Qualified Personnel, All Professionals Must Have A Valid Unexpired Prc License. 9. Schedule Of Payment The Contract Duration Is One Hundred Twenty (120 Cd) Calendar Days Starting Upon Receipt Of Notice To Proceed. All Reports And Related Documents Must Be Submitted To The City Of Koronadal Water District Project Engineer And Should Be Officially Acknowledge Monthly. The Following Are The Schedule Of Payments: Payment Description Percentage Of Contract Price Remarks First Payment Upon Completion Of Item Orders 10% Must Submit Certification That All Components Are Ordered, Attached Proof Of Order From Suppliers Second Payment Upon Delivery Of All Items At Ckwd Facility 30% Must Compile And Submit All The Delivery Receipt Acknowledge By Ckwd Personnel Third Payment Upon Reaching 40% Of Project Accomplishment 30% Must Submit Certification That The Project Reached 40% Of Its Completion And Approved By The Ckwd Project Engineer Final Payment Upon Project Completion And Acceptance 30% With 5% Retention Upon Completion Total 100% B. Additional Requirements (compliance Upon Submission Of Bid) 1. Must Submit Original Catalog / Brochure For Vfd, Pump And Motor, Flowmeter, And Valve (please Specify Offered Product). 2. The Manufacturer Should Have Iso 9001:2015 Certificate Or Any Proof Of Renewal If Expired. 3. Minimum Manufacturer's Warranty Of One (1) Year. 4. Certification On Compliance To The Following: A. Reports: Indicate All The Fault Alarms From Vfd, Pressure, Flow, Level, And Other Protective Devices To Command Center. B. Trends And Data Logging: That Ckwd Will Provide The List Of Variables To Be Included In The Trend And Shall Be Logged Continuously In The Hard Drive For Historical Trending With Reference To The Monitoring Requirements. C. After Sales Service: After The Final Acceptance, The Contractor Shall Conduct A Monthly Site Visit Within The Warranty Period. The Contractor Shall Have 24/7 Availability Of Technical Engineers Within Mindanao Island. Must Submit Notarized Statement Of Undertaking Stipulating Availability Of Skilled Personnel Within Mindanao. D. Site Visit: The Bidder Shall Conduct A Site Visit/survey On Or Before The Pre-bid Conference Schedule To Ensure That They Know The Status/set Up Of The Project Site. Must Submit Certification Signed By Ckwd Project Engineer In-charge. E. Warranty: All Components Shall Be Guaranteed Against Defects In Workmanship And Materials For A Period Of One (1) Year From The Date Of Project Completion. Defective Components Or Parts Discovered Within The Warranty Period Shall Be Replaced Without Charge Or Additional Cost To Ckwd. 5. Bidders Qualifications: A. Must Submit Certification Or Any Document That The Bidder Has A Regional Presence Or A Regional Service/support Partner/center Within Mindanao. B. Bidder Must Be An Authorized Distributor From Manufacturer. Must Submit Certificate Of Distributorship. C. Bidder Must Have A Pcab License. D. Bidder Must Have An Experience Of Having Completed At Least Three (3) Contracts That Is Similar To The Contract To Be Bid. (indicate In The Form Of Statement Of All On-going Government & Private Contracts Including Contract Awarded But Not Yet Started.) E. Bidder Must Have Been In The Business For At Least Five (5) Years Of Providing Scada System Solution And Services In Government Or Private Sectors. Must Submit Dti Or Sec Registration. C. Additional Requirements (compliance Upon Delivery) 1. The Supplier’s Technical Representative Shall Be Present During Installation And Commissioning For Final Testing. 2. Must Submit Comprehensive Documentation, Including But Not Limited To Operation Manuals, Datasheets, And Manufacturers’ Certificates For All Electrical And Mechanical Components. 3. Trainings/transfer Of Technology: The Winning Bidder Shall Provide Inhouse Training On The Following Working Subject Matters: A. Plc And Scada Software Programming B. Installation C. Configuration D. Calibration E. Troubleshooting/operations And Maintenance All Associated Costs, Including Transportation, Accommodation, Allowances, And Other Incidental Expenses, Shall Be Covered By The Supplier.

City Of Bais Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Closing Date28 Jan 2025
Tender AmountPHP 1 Million (USD 18.1 K)
Details: Description Republic Of The Philippines City Of Bais -o0o- Bids And Awards Committee Invitation To Apply For Eligibility And To Bid The City Government Of Bais Invites Interested Bidders To Apply For Eligibility And To Bid For Various Improvement Of Operation Center, City Disaster Risk Reduction Management Office, Viz: Item Approved Budget For The Contract (abc) Pr No. 717-24 Php 1,065,020.00 1 15 Lgth Angle 40mm X 40mm X 5mm Thk X 6.0m Lgth 2 15 Lgth Angle 50mm X 50mm X 5mm Thk X 6.0m Lgth 3 20 Lgth Pipe, Gi, Nps 50mm Ø (2" Ø) X 6.0m Lgth S40 4 8 Lgth Steel Plate, Galvanize, 4' X 8' Gauge 14 5 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M10 X 70mm 6 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M6 X 60mm 7 50 Pcs Stainless Steel Bolt Nut Flat And Lock Washer Set, M6 X 20mm 8 50 Pcs Bolt Expansion Screw Shell Anchor Expansion Bolt, M8 X 70mm 9 10 Pcs Grinding Disc For Metal, Depressed Center, Aluminum-oxide, 100 Mm Ø 10 75 Kilo Welding Electrode, 1/8" Ø, E6013 11 8 Can Roofing Sealant, High Grade, 1/2l/can 12 8 Set Marine Epoxy, 1/2l/can 13 4 Roll Galvanized Cyclone Wire Ga8, 5 Feet X 6m (2 Inch Opening) 14 50 Meter Chain Hot Dipped Galvanized, Heavy Duty 8mm 15 10 Pcs Laminated Padlock 40mm/50mm Keyed Pad Lock Security Lock Solid Anti-theft, Made Up Of Multiple Layers Of Laminated Steel 16 20 Pcs Hacksaw Carbon Steel Blade Hd (12") 17 800 Pcs Chb 4" 18 100 Bags Portland Cement 19 30 Cu.m. Fine Aggregate (sand), 4.75mm Ø Max Size 20 150 Lgth Deformed Bar, 10mm Diameter X 6.0m Length 21 20 Kilo Gi Tie Wire, #16 22 200 Pcs Polished Tile, 600mm X 600mm Beige 23 10 Sheet Marine Plywood, 4' X 8', 1/2" Thk 24 10 Sheet Marine Plywood, 4' X 8', 1/4" Thk 25 20 Pair Soft Close Drawer Guide Heavy Duty, 18 Inch 26 6 Pcs Tile Cutter Wheel (dry) 100mm Ø 27 4 Pack Tile Grout (2 Kilo/pack) Beige 28 8 Gallon Paint, Flat Wall Enamel, Alkyd-based 29 10 Can Paint Thinner (3l/can) 30 10 Gallon Paint, Acrylic Semi-gloss, Water-based Paint (white Wash/tulle White) 31 10 Gallon Paint, Acrylic Semi-gloss, Water-based Paint (white) 32 8 Gallon Paint, Single Complonent Zinc Phosphate, Anti-corrosive Metal Primer 33 10 Gallon Paint, Odourless Qde, Water-based (suede/light Tan) 34 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (red) 35 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (orange) 36 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (yellow) 37 10 Gallon Paint, Quick Dry Enamel, Alkyd-based (white) 38 8 Can Acrytex Primer 39 8 Can Acrytex Cast 40 8 Can Acrytex Reducer 41 10 Pcs Paint Brush, 2" 42 10 Pcs Paint Brush, 4" 43 8 Set Paint Roller 7-inch With Pan 44 100 Pcs Sand Paper Waterproof # 120 45 100 Pcs Sand Paper Waterproof # 160 46 75 Box Acoustic Foam Panels Self-adhesive Fireproof Sound Proof Treatment Wall, 300mm X 300mm X 8mm, Polyester Fiber, 0.9 Sound Absorption, (12 Pcs/box) 47 20 Pcs Rubber Cement, (360cc/bottle) 48 15 Pcs All Purpose Silicon Sealant (black) 49 5 Rolls Tw Copper Wire # 10 Awg (5.5 Mm²) 50 3 Rolls Tw Copper Wire # 12 Awg (3.5 Mm²) 51 4 Rolls Tw Copper Wire # 14 Awg (2.0 Mm²) 52 10 Pcs Utility Box, 2" X 4" 53 15 Pcs Junction Box W/ Cover & Screws 54 6 Rolls Flexible Hose Pvc, 1/2" X 100m 55 10 Pcs Circuit Breaker W/ Inclosure, 30a 56 10 Pcs Circuit Breaker W/ Inclosure, 20a 57 15 Pcs Led Exit Signage Emergency Acrylic 3 Watts Clear Aluminum Box, Overcharge Protection, Led Charging Indicaton, Automatic Switch Ni-cd 1.2v Battery And Charger, Pmma (polymethyl Methacrylate) Board 58 20 Pcs Led Parlamp E27, 12w-15w, 180 - 265v, Daylight 59 20 Pcs Led Bulb E27, 12w-15w, 180 - 265v, Daylight 60 10 Rolls Electrical Vinyl Tape, Flame Retardant, Professional Grade, 3/4" X 66' X 0.007", 600v @ 80° C Rating 61 4 Pcs Gate Valve, Brass, 1 1/2" Heavy Duty, 150psi 62 4 Pcs Gate Valve, Brass, 1" Heavy Duty, 150psi 63 40 Pcs. Stainless Heavyduty Flexible Hose, 16" Length (1/2" X 1/2") 64 10 Set Stainless (304) Shower Set; With Shower Head Set, With Hose And Holder And Two Way Faucet 65 20 Set Toilet Flush Set Fittings Dual Button Flush Valve Toilet Inlet Valve Toilet Fittings 66 20 Pcs. Stainless (304) One Way Angle Valve (1/2" X 1/2") 67 20 Pcs. Stainless (304) Two Way Angle Valve (1/2" X 1/2" X 1/2") 68 20 Pcs. Stainless (304) Bidet Toilet Sprayer And Hose 69 20 Pcs. Stainless (304) Urinal Flush Valve 70 10 Pcs. Floor Drain, Anti-clogging, 4" X 4" Stainless (304) 71 20 Lgth Ppr Pipe Pn20, 20mm Ø Nominal X 4.0m 72 10 Pcs. Ppr Elbow Pn20, 20mm Ø 73 6 Pcs. Ppr Elbow Pn20, 25mm Ø 74 10 Pcs. Ppr Coupling Pn20, 20mm Ø 75 20 Pcs. Ppr Coupling Pn20, 25mm Ø 76 20 Pcs Ppr Tee Pn20, 20mm Ø 77 10 Pcs Ppr Tee Pn20, 25mm Ø 78 8 Pcs. Ppr Coupling Reducer Pn20, 25mm X 20mm 79 30 Pcs. Ppr Threaded Female Elbow W/ Brass Pn20, 20mm 80 10 Pcs. Ppr Threaded Female Tee W/ Brass Pn20, 20mm 81 10 Pcs. Ppr Threaded Female Adapter Coupling W/ Brass Pn20, 20mm 82 10 Pcs. Ppr Threaded Male Adapter Coupling W/ Brass Pn20, 20mm 83 10 Pcs. Ppr Threaded Female Adapter Coupling W/ Brass Pn20, 25mm 84 10 Pcs. Ppr Threaded Male Adapter Coupling W/ Brass Pn20, 25mm 85 15 Pcs. Ppr Threaded Male Union Pn20, 25mm 86 15 Pcs. Ppr Threaded Male Union Pn20, 20mm 87 15 Pcs. Ppr Threaded Female Union Pn20, 25mm 88 15 Pcs. Ppr Threaded Female Union Pn20, 20mm 89 10 Pcs. Ppr Gate Valve Pn20, 25mm 90 10 Pcs. Ppr Gate Valve Pn20, 20mm 91 10 Lgth Sanitary Pipe Pvc, S-1000, 100mmø X 3.0 92 10 Lgth Sanitary Pipe Pvc, S-1000, 50mmø X 3.0 93 4 Pcs Sanitary Tee Pvc, S-1000, 100mmø 94 2 Pcs Sanitary Elbow Pvc, S-1000, 100mmø 95 4 Pcs Sanitary Wye Pvc, S-1000, 100mmø 96 5 Pcs Sanitary Coupling Pvc, S-1000, 100mmø 97 6 Pcs Sanitary Clean-out Pvc, S-1000, 100mmø 98 10 Pcs Sanitary Tee Pvc, S-1000, 50mmø 99 10 Pcs Sanitary Elbow Pvc, S-1000, 50mmø 100 10 Pcs Sanitary Coupling Pvc, S-1000, 50mmø 101 4 Can Pvc Pipe Cement, 400cc 102 20 Pcs Teflon Tape Pipe Thread Seal Tape, 1" X 10m The Approved Budget For The Contract Is To Be Taken From Improvement Of Operation Center (res. No. 485 Series 2024 Ordinance No. 36). Partial Bids Are Allowed, However, Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. In Order To Qualify, Bidders Should Conform To The Eligibility Criteria As Prescribed Under Sec. 23 And 25 Of The Revised Irr-a Of R.a. 9184. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary "pass/fail" Criteria As Specified In The Revised Irr-a Of R.a. 9184. As Such Non-submission Of Any Of The Required Documents Will Result In The Disqualification Of The Bidder. Due To Covid-19 Pandemic And Quarantine Regulations Of Every Provinces, Presence Of The Bidders Is Not Necessary. The Bids And Awards Committee (bac) Allows The Submission Of Bids Through Electronic Means And Submission Through Courier Services. The Following Documents Are Required For Submission: A. Eligibility Documents Including Technical Documents (1st Envelope): 1. Registration Certificate From Dti For Sole Proprietorship, Sec For Corporation Or Cda For Cooperative. 2. Valid And Current Mayor's Permit Where The Principal Place Of Business Of The Bidder Is Located. 3. Bir Registration Certificate With Taxpayer’s Identification Number. 4. Statement Of The Bidder Of All Its Ongoing And Completed Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid, Within The Relevant Period Where Applicable. The Statement Shall Be Supported With A Copy Of The Contracts/purchase Or Job Orders; And End-users Acceptance Or Delivery Receipt Duly Acknowledged. The Bidder Must Have Completed Within A Period Of Five (5) Years From The Date Of Submission And Receipt Of Bids, A Single Contract That Is Similar To The Contract To Be Bid Whose Value Must Be At Least Fifty (50%) Percent Of The Abc. However, In The Case Of Expendable Supplies, Said Single Contract Must Be At Least Twenty Five (25%) Percent Of The Abc, Or; The Bidder Should Have Completed At Least Two (2) Similar Contracts And The Aggregate Contract Amounts Should Be Equivalent To At Least The Percentage Of The Abc As Required Above. 5. Certificate Of Product Registration (cpr) From Food And Drug Administration (fda). (for Medicine Only)* 6. Certificate Of Good Manufacturing Practice From Fda. (for Medicine Only)* 7. Batch Release Certificate From Fda. (for Medicine Only)* 8. If The Supplier Is Not The Manufacturer, Certification From The Manufacturer That The Supplier Is An Authorized Distributor/dealer Of The Product(s)/item(s). (for Medicine Only)* 9. License To Operate (fda). (for Medicine Or Medical Supplies/equipment)* 10. Certificate Of Accreditation From Bureau Of Local Government Finance (blgf) (for Accountable Forms Only)* 11. Audited Financial Statements, Showing, Among Others, The Bidder's Total And Current Assets And Liabilities, Stamped "received" By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission. 12. The Bidder's Updated Computation For Its Net Financial Contracting Capacity (nfcc) Bearing The Date Thereof Must At Least Be Equal To The Abc To Be Bid, Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Favor Of The Bidder If Awarded The Contract To Be Bid (cl) Must At Least Be Equal To Ten Percent (10%) Of The Abc To Be Bid.* 13. Valid Joint Venture Agreement (jva), In Case Venture Is Already In Existence. 14. All Bids Must Be Accompanied By Bid Security In Any Or Combination Of The Acceptable Forms (below):* Form Of Bid Security Amount Of Bid Security A) Cash, Cashier's/manager's Check, Bank Draft/guarantee Confirmed By A Universal Or Commercial Bank. Two Percent (2%) B) Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank; Provided, However, That It Shall Be Confirmed Or Authenticated By A Commercial Or Universal Bank'; If Issued By A Foreign Bank. C) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Five Percent (5%) D) Bid Securing Declaration Prospective Bidder May Also Submit Bid Securities In The Form Of Cashier's/manager's Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Financial Statement. Bids And Bid Securities Shall Be Valid For A Reasonable Period As Determined By The Head Of The Procuring Entity, But In No Case Shall Exceed 120 Calendar Days From The Date Of The Opening Of Bids. 15. Production/delivery Schedule.* 16. Manpower Requirements* 17. After-sales Service/parts (if Applicable) 18. Sworn Statement By The Prospective Bidder Or Its Duly Authorized Representative As To The Following: A) It Is Not Blacklisted Or Barred From Bidding By The Gop Or Any Of Its Agencies; Office Corporations, Or Lgu's, Including Foreign Government/foreign Or International Financing Institutions Whose Blacklisting Rules Have Been Recognized By The Gppb; B) Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statement And Information Provided Therein Are True And Correct; C) It Is Authorizing The Head Of Procuring Entity Or The Duly Authorized Representative/s To Verify All Documents Submitted; D) Authority Of The Signatory; E) Affidavit Of Disclosure Of No Relationship; F) Certification On Bidder's Responsibilities; G) It Comply With Existing Labor Laws And Standards, In The Case Of Procurement Of Services; H) It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Activity, And I) In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. 19. Technical Specifications With Brochures, If Applicable.* 20. Certificate Of Philgeps Registration* 21. Tax Clearance* 22. Latest Income And Business Tax Returns (quarterly/monthly); (optional/required Upon Post-qualification)** Note:*required Documents To Be Submitted By Pre-qualified Suppliers/bidders Per Bac Resolution No. 74-g Dated July 30, 2019. **optional Submission During The Opening Of Bids But Mandatory Requirement Upon Post-qualification Per Bac Resolution No. 58-d Dated August 4, 2020. B. Financial Documents: (2nd Envelope) (a) Bid Prices In The Bill Of Quantities Failure To Submit The Above Requirements On Time Or A Finding Against The Veracity Of Such Shall Be Ground For The Forfeiture Of The Bid Security And Disqualify The Bidder For Award. Performance Security And Warranty Shall Be Governed By The Provisions Of Secs. 39 And 62, Respectively, Of The Revised Irr-a Of R.a. 9184. Bid Documents Can Be Obtained Upon Payment Of Non-refundable Fee Equivalent To The Total Amount Of The Abc Of The Items In Which Interested Bidders Intend To Bid, In Accordance With The Guidelines On The Sale Of Bidding Documents, Appendix 25 Of The Revised Irr Of R.a. 9184: Approved Budget For The Contract (abc) Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 More Than 1 Million Up To 5 Million 5,000.00 More Than 5 Million Up To 10 Million 10,000.00 More Than 10 Million Up To 50 Million 25,000.00 More Than 50 Million Up To 500 Million 50,000.00 More Than 500 Million 75,000.00 Bid Documents Can Be Obtained At The Bac Secretariat, Office Of The Bids And Awards Committee, This City, Tel. No. (035) 402-8047, Anytime During Office Hours; And Can Also Be Inquired For Further Information Or Particulars. All Other Particulars Relative To The Procurement Process Shall Be Governed By The Revised Implementing Rules And Regulations Of R.a. 9184 Otherwise Known As The Government Procurement Reform Act. Pre-bid Conference Will Be On January 14, 2025, 1:30 P.m. At The City Budget Office, 2nd Floor, City Hall Annex Building, This City. Eligibility Requirements Including Technical Documents And Financial Documents Shall Be Submitted Together Each In Separate Sealed Envelopes Duly Marked As Such On January 28, 2025 At The City Budget Office, 2nd Floor, City Hall Annex Building, This City, At 1:30 Pm At Which Date, Place, And Time Said Envelopes Shall Be Opened In The Presence Of The Members Of The Bac, The Attending Bidders, The Observers, Or Their Duly Authorized Representative. Late And Unsealed Bids Shall Not Be Accepted. The City Government Of Bais Reserves The Right To Accept Or Reject Any Bid, And To Annul The Bidding Process And Reject All Bids At Anytime Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. (sgd.) Atty. Romela Mae L. Napao City Administrator Chair, Bids And Awards Committee

Philippine Fiber Industry Development Authority Tender

Software and IT Solutions
Philippines
Closing Date21 Jan 2025
Tender AmountPHP 2.6 Million (USD 45.4 K)
Details: Description Invitation To Bid For The Supply And Delivery Of Information And Communication Technology (ict) Equipment – 2 Lots Rebidding Project Identification No. Pb-011-2024-r The Philippine Fiber Industry Development Authority Through The General Appropriations Act Fy 2024 Approved Annual Procurement Plan (pcaarrd Project 4) Intends To Apply The Sum Of Two Million Six Hundred Sixty Thousand Pesos (php2,660,000.00) Being The Abc To Payments Under The Contract For The “supply And Delivery Of Information And Communication Technology (ict) Equipment – 2 Lots Rebidding” With Project Identification No. Pb-011-2024-r. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Philippine Fiber Industry Development Authority Through The General Appropriations Act Fy 2024 Approved Annual Procurement Plan (pcaarrd Project 4) Intends To Apply The Sum Of Two Million Six Hundred Sixty Thousand Pesos (php2,660,000.00) Being The Abc To Payments Under The Contract For Each Lot. Bids Received In Excess Of The Abc For Each Lot Shall Be Automatically Rejected At Bid Opening. Lot No. 1 Supply And Delivery Of Branded And Brand New Laptop Computer - Php160,000.00 Lot No. 2 Supply, Delivery, Installation And Setup Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis - Php2,500,000.00 Total Abc: Php2,660,000.00 The Philippine Fiber Industry Development Authority Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By And Shall Be In Accordance With The Delivery Schedule Under Section Vi. Schedule Of Requirements. Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. Prospective Bidders May Obtain Further Information From Philfida And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm. A Complete Set Of Bidding Documents Can Be Accessed Online Starting December 26, 2024 (thursday) And The Hard Copy Can Be Purchased By Interested Bidders Starting January 3, 2025 (friday) From The Given Address And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of: Lot No. 1 Supply And Delivery Of Branded And Brand New Laptop Computer - Php160.00 Lot No. 2 Supply, Delivery, Installation And Setup Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis - Php2,500.00 Total Bid Doc Price: Php2,660.00 The Philfida Will Hold A Pre-bid Conference On January 7, 2025 (tuesday) At 9:30 A.m. Through Video Conferencing Via Microsoft Office 365 Teams Which Shall Be Open To Prospective Bidders. Bidder/s Should Submit A Valid Email Address One (1) Day Before The Pre-bid Conference. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At Philfida’s Fiber Processing And Utilization Laboratory, Bai Compound, Visayas Ave., Diliman, Quezon City On Or Before January 21, 2025 (tuesday) At 9:00 A.m. Late Bids Shall Not Be Accepted. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. Bid Opening Shall Be On January 21, 2025 (tuesday) At 9:30 A.m. At Philfida’s Fiber Processing And Utilization Laboratory: Bai Compound, Visayas Avenue, Quezon City To Be Streamed Live Via Ms Office 365 Teams, The Link Of Which Is Available By Request. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. Bidders May Opt To Attend Virtually. The Bidders Shall Drop Three (3) Copies Of Their Duly Accomplished Eligibility Requirement, Technical And Financial Proposals In Two (2) Separate Sealed Envelopes In The Bid Box Located At Philfida’s Fiber Processing And Utilization Laboratory: Bai Compound, Visayas Avenue, Quezon City. Interested Bidders Are Requested To Contact The Bac Secretariat At Cellular Phone Nos.: 09189402419 And 09274003482 Before Submitting The Bidding Documents. Technical Specifications: Lot 1 Supply And Delivery Of Branded And Brand New Laptop Computer Technical Specifications: 1. 2 Units 2. 14-inch Fhd+ / Ips-level Display (at Least 1920 X 1200 Resolution) 3. Monitor Panel Refresh Rate Of At Least 144hz With At Least 100% Srgb Color Coverage 4. At Least 14 Total Cores And 18 Total Threads (combination Of Performance And Efficient Cores), With At Least 3.3ghz Performance Clock Base Speed 5. At Least 6gb Of Gddr6 Dedicated Graphical Unit, With Raytracing Capability 6. At Least 16 Gb Ddr5 Ram 7. With At Least 512gb M.2 Ssd 8. With Webcam 9. With Backlit Keyboard 10. With At Least Wifi7 Technology 11. With At Least 1x Thunderbolt™ 4 (displayport™/ Power Delivery 3.1); 1x Type-c (usb3.2 Gen2 / Displayport™/ Power Delivery 3.0); 1x Type-a Usb3.2 Gen2; 1x Hdmi™ 2.1 (8k @ 60hz / 4k @ 120hz); 1x Rj45 12. With At Least Windows 11 Pro/home Os Delivery Period: Forty-five (45) Calendar Days Upon Receipt Of Ntp Delivery Site: Immunology And Molecular Biology Laboratory, Visayas Ave., Quezon City Lot 2 Supply, Delivery, Installation And Orientation Of High Processing Workstation Set For Generative A.i. Modelling And Bioinformatics Analysis Technical Specifications: Workstation I: 1. Central Processing Unit: A. At Least 350w Thermal Design Power (tdp) With At Least 64 Core, 128 Threads, And 256mb Cache B. With A Base Clock Speed Of At Least 3.20ghz And A Turbo Speed Of At Least 5.10 Ghz C. Compatible With Wrx90 Socket D. With Compatible Heatsinks And Air Cooling Peripheral For Thermal Management 2. Graphical Processing Unit: A. Dual (2) Gpu Setup Connected Through 2-way Low Profile Bridges B. Each Gpu Should Have At Least 300w Max Power Consumption C. Each Gpu Should Have At Least 48 Gb Gddr6 D. With And Compatible With Pci Express Generation 4 X 16 Graphics Bus E. Vr/raytracing Compatible F. With At Least 4 Display Ports G. Ampere Architecture-based Gpu H. With At Least 10,700 Cuda Cores, And At Least 300 Tensor Cores For A.i Generation And Modelling 3. Memory: A. With A Total Memory Of At Least 256 Gb - Ddr5, Partitioned To 4 Channels B. Memory Should Have At Least 4,800 Mhz Speed 4. Storage: A. With At Least 2 Tb M.2 Nvme Ssd Boot Drive B. With At Least 24 Tb Total Hard-drive Storage, With A Speed Of At Least 7,200 Rpm 5. Chassis And Power Supply: A. Compatible Chassis To Contain Parts B. With At Least 1350w Power Supply 6. Operating System: A. With Windows 11 Pro (english) Operating System Workstation Ii: 1. Central Processing Unit: A. At Least 350w Thermal Design Power (tdp) With At Least 64 Core, 128 Threads, And 256mb Cache B. With A Base Clock Speed Of At Least 3.20ghz And A Turbo Speed Of At Least 5.10 Ghz C. Compatible With Wrx90 Socket D. With Compatible Heatsinks And Air Cooling Peripheral For Thermal Management 2. Graphical Processing Unit: A. With At Least 4 Gb Gddr6 Memory B. At Least 350 Cuda Cores C. With At Least Pci Express Gen 3 Bus D. Turing Gpu Architecture 3. Memory: A. With A Total Memory Of At Least 256 Gb - Ddr5, Partitioned To 4 Channels B. Memory Should Have At Least 4,800 Mhz Speed 4. Storage: A. With At Least 2 Tb M.2 Nvme Ssd Boot Drive B. With At Least 24 Tb Total Hard-drive Storage, With A Speed Of At Least 7,200 Rpm 5. Chassis And Power Supply: A. Compatible Chassis To Contain Parts B. With At Least 1350w Power Supply 6. Operating System: A. With Windows 11 Pro (english) Operating System Peripherals, Software And Warranty: 1. Monitors: A. Two (2) Ips Panel Monitors With At Least 27 Inch Diagonal Size B. Full Hd (1920x1080) Resolution C. Height, Tilt, Swivel And Pivot Adjustable D. Supports Hdmi, Usb 3.2, Rj45 Connection 2. Keyboard And Mouse: A. 2 Pairs Of Qwerty Full Keyboard, And 2 Optical Mouse For The Workstations 3. Four (4) Support Laptops: A. With At Least 16 Cores, 22 Threads And 24 Mb Cache B. With A Turbo Clockspeed Of At Least 4.8 Ghz C. With A Dedicated Graphical Processing Unit With At Least 4gb Gddr6 Memory, Ray-tracing Compatible D. With At Least 32 Gb Ddr5 Memory, With Speed Of At Least 5600 Mt/s E. With At Least 2 Tb M.2 Nvme Ssd Storage F. At Least 15.6" Display Screen With Resolution Of At Least 1920x1080 Fhd G. With Built-in Microphone, Camera, Backlit Keyboard, Wifi 6/6e H. Inclusion Of Wireless Optical Mouse And Backpack I. With Windows 11 Pro (english) Operating System 4. Services And Warranty: A. At Least 3 Years Warranty Support For All Equipment B. At Least 3 Years On-site Services For Workstations C. At Least 1 Year On-site Services For Laptops D. At Least 1 Year Warranty On Laptop Batteries Delivery Period: Forty-five (45) Calendar Days Upon Receipt Of Ntp Delivery Site: Immunology And Molecular Biology Laboratory, Visayas Ave., Quezon City

The City Government Of Baguio Tender

Others...+1Electrical and Electronics
Philippines
Closing Date10 Jan 2025
Tender AmountPHP 15.5 Million (USD 267 K)
Details: Description Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 1 Lot Various Materials For Smart City Command Center 15,500,000.00 22 Unit 16 Port Poe Switch - 16 Port Poe Switch - Cpu Core Count 1 Cpu Nominal Frequency 800 Mhz Size Of Ram 256 Mb Storage Size 16 Mb Storage Type Flash Mtbf Approximately 200'000 Hours At 25c Cooling Type Passive Poe-out Ports Ether1-ether16 Poe Out 802.3af/at Max Out Per Port Output (input 18-30 V) 1.1 A Max Out Per Port Output (input 30-57 V) 0.6 A Max Total Out (a) 2.8a (18v-30v) & 1.4a (48v-57v) X2 10/100/1000 Ethernet Ports 16 Number Of 1g Ethernet Ports With Poe-out 16 Sfp+ Ports 2 Certification Ce, Eac, Rohs Ip Ip54 Warranty :1 Year 88 Unit Adjustable Stainless Steel Strapping Band - Adjustable Stainless Steel Strapping Band - Material: Stainless Steel 304 Width: 1/2 Inch Thickness: 0.5 Mm Length: 30 Meters 44 Unit Cable Loop Holder - Cable Loop Holder - Galvanized Steel Pole Mountable 4 Branches At Least 400mmx400mm 1 Box Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable - Cat6 Utp Pure Copper Outdoor Cable 40 Unit Cctv Channel License - Cctv Channel License - Single Anpr Camera Connection For Use With Central Software Warranty :perpetual Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 1 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Unit Cctv Lpr Camera - Cctv Lpr Camera - Camera Image Sensor 1/1.8″ Progressive Scan Cmos Max. Resolution 2688 × 1520 Min. Illumination Color: 0.001 Lux @ (f1.2, Agc On) Shutter Time 1/25 S To 1/100,000 S Day & Night Ir Cut Filter Lens Focal Length & Fov 2.8-12 Mm: Horizontal: 113.5° To 39°, Vertical: 58.4° To 22.7°, Diagonal: 141.3° To 44.3° Aperture 2.8-12 Mm: F1.38, 8-32 Mm: F1.7, 10-50 Mm: F1.7 Illuminator Built-in Supplement Light Type Ir Light Built-in Supplement Light Range Up To 40 M Ir Wavelength 850 Nm Video Main Stream 50 Hz: 25 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (2688 × 1520, 1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Sub-stream 50 Hz: 25 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) 60 Hz: 30 Fps (1920 × 1080, 1280 × 760, 704 × 576, 352 × 288) Video Compression H.264 And H.265 Encoding Main Stream: H.265/h.264/mjpeg Sub-stream: H.265/h.264/mjpeg Video Bit Rate 32 Kbps To 16 Mbps Protocols Tcp/ip,icmp,http,https,ftp,sftp,dhcp,dns,ddns,rtp,rtsp,rtcp,ntp,smtp,snmp,igmp,qos,ipv4/ipv6,udp,ssl/tls,isup,arp,802.1x Simultaneous Live View Up To 6 Channels Road Traffic And Vehicle Detection Coverage Up To 3 Lane(s) Smart Function Traffic Flow Detection:average Speed, Traffic Flow, Queuing Length, And Traffic Status Incident Detection: Congestion, Stopped Vehicle, Lane Change, Wrong-way Driving, Speeding, Low-speed Driving Capture Speed Range 5 To 120 Km/h Blocklist And Allowlist Max. 50000 Records Warranty :2 Years Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 2 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 5 Unit Cctv Nvr - Cctv Nvr - Supports Redundant Power Supply To Improve The System Stability Supports Hdd Hot Swap With Raid0, Raid1, Raid5, Raid 6, And Raid10 Storage Scheme Configurable. Either Normal Or Hot Spare Working Mode Is Configurable To Constitute An N+1 Hot Spare System. Supports Some Specialist Cameras, Including People Counting Camera/anpr (automatic Number Plate Recognition) Camera/fisheye Camera Supports Video Analytic Functions Such As Vehicle Detection, License Plate Recognition --video & Audio Input -ip Video Input 128-ch -incoming/outgoing Bandwidth 576 Mbps/512 Mbps -incoming/outgoing Bandwidth (raid Mode) 576 Mbps/512 Mbps -tls Outgoing Bandwidth 128 Mbps, Or 64 Mbps (when Raid Is Enabled) --video & Audio Output -protocol Hikvision, Acti, Arecont, Axis, Bosch, Brickcom, Canon, Hunt, Onvif (version 2.5), Panasonic, Pelco, Rtsp, Samsung, Sony, Vivotek, Zavio --video & Audio Output -hdmi Output Two Independent Hdmi Outputs Of 4k Resolution. Resolution: 4k (4096 × 2160), 4k (3840 × 2160)/30hz, 2k (2560 × 1440)/60hz, 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz -vga Output 1-ch. Resolution: 1080p (1920 × 1080)/60hz, Uxga (1600 × 1200)/60hz, Sxga (1280 × 1024)/60hz, 720p (1280 × 720)/60hz, Xga (1024 × 768)/60hz --video & Audio Decoding -decoding Format H.265, H.265+, H.264, H.264+, Mpeg4, Mjpeg (for Hikvision Ip Camera Only) -video Resolution 32 Mp/24 Mp/12 Mp/8 Mp/7 Mp/6 Mp/5 Mp/4 Mp/3 Mp/1080p/uxga/720p/vga/4cif/dcif/2cif/cif/qcif *: 32 Mp And 24 Mp Is Only Available For Channel 1 To 4 When Ultra Hd Resolution Mode Is Enabled -synchronous Playback Up To 16 Channels -capability 1-ch@32 Mp (8160 × 3616, 30 Fps)/5-ch@8 Mp(30 Fps)/10-ch@4 Mp(30fps)/20-ch@1080p(30 Fps)/40-ch@720p(30 Fps) *: The Length Or Width Of Camera Resolution (each Track) Cannot Exceed 4096 Pixels --hdd -interface 16 Sata Interfaces Supporting Hot-plug -capacity Up To 10 Tb For Each Hdd -storage Extension 1 × Esata Interface, 2 × Mini Sas Interface (optional) --raid Raid Type Raid0, Raid1, Raid5, Raid 6, And Raid10 --network Management -protocol Ipv6, Https, Upnp, Snmp, Ntp, Sadp, Smtp, Nfs, Iscsi, Pppoe, Ddns Network Interface 4, Rj45 10m/100m/1000m Self-adaptive Ethernet Interface --external Interface -usb Interface Front Panel: 2 × Usb 2.0; Rear Panel: 2 × Usb 3.0 Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 3 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) -alarm Input/output 16/8 --general -power Supply 100 To 240 Vac, 50 To 60hz, 5 A -fan Redundant Dual Ball Bearing Fan; Speed Adjustable -consumption (without Hdd) ≤ 140w -warranty :2 Years 1. Responsibility Of The Supplier 1.1 Supply And Delivery Of Ict Equipment 1.2 Inventory Of The Items Deliverd With The Following Details 1.2.1 Brand 1.2.2 Model 1.2.3 Serial Number 1.2.4 Quantity 1.3 The Bidder Must Ensure That All Components Delivered Will Be Brand New 1.4 All Equipment Provided Must Be Compatible And Working With The Cctv System As A Whole 1.5 Materials And Equipment Delivery Within 90 Days 1.6 Cctv Contractor Should Have Manufacture Authorization And Certification. 1.7 Contractor Must Have A Valid Iso 9001:2015 Certificate 1.8 All Equipment Provided Must Be Capable/compatible To Interconnect With The Existing Systems Located At The Smart City Command Center (sc3) To Be Viewable And Configurable In The Sc3. 80 Unit Cctv Nvr Surveillance Hard Drive - Designed And Built To Handle Heavy Surveillance Workloads Advanced Vibration Management Capacity 10tb Interface Sata 6 Gb/s Max. Sustained Transfer Rate Od (mb/s) 250mb/s Cache (mb) 256 Tarnish Resistant Yes Mtbf 1,500,000 Hr Warranty :2 Years 15 Set Command Center Desktop Computer - Minimum Specifications: Operating System: Microsoft Windows 11 Pro 64bit Processor: Intel Core I5 14600k Turbo Frequency 5.3ghz 14 Cores/20 Threads, 24mb Cache, Socket Lga1700 Cpu Air Cooler: Twin Tower Cpu Air Cooler, With 6x6mm Sintered Copper Heatpipes, With 2x140mm Fans Motherboard: B760 Chipset, Lga1700 Socket, Ddr5 4xdimm Matx Form Factor Ram: Ddr5 5600mhz, 32gb (dual 2x16gb) Memory Modules Gpu: Rtx 4070, 12gb Gddr6/gddr6x Ssd: 512gb Capacity R/w 560/520 Mb/s 3d Tlc Ssd 2.5 Inch Form Factor Hdd: Capacity 2tb, 7200 Rpm, 256mb Cache, 3.5 Inch Form Factor Power Supply: 1000 Watts, 80 Plus Gold Certified, Fully Modular, With 120mm Smart Hydraulic Bearing (hyb) Fan, With Active Pfc, Mtbf: >100,000 Hours Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 4 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) Case: Tempered Glass Mid Tower Atx Case With At Least 3 Fans Monitor: 2 Units, 24 Inches, Resolution: Fhd 1920 X1080, Aspect Ratio:16:9, Brightness: 250cd, Color Gamut Ntsc 72%, Refresh Rate: 100hz, Response Time: 5ms(gtg), Connectivity: 1x Hdmi 1x Displayport Keyboard: Usb Connectivity, With Backlight, Rubber Dome, Usb Connectivity, Multi-key Anti-ghosting, Polling Rate: 1000hz, Cable Type: Attached, Braided, Cable Length: 5.9ft Mouse: Usb Connectivity, Optical Sensor, Mouse Button Durability: 30m L/r Click, Cable: 1.8m Tangle Free Rubber, Dpi: 12,400 Dpi Ups: Max Configurable Power (watts) 650 Watts / 1.2kva, At Least 3 Universal Socket Warranty :2 Years 2 Unit Command Center Field Laptop - Command Center Field Laptop - Intel Core I7-13700hx Processor (30 Mb Smart Cache, 2.1 Ghz Performance-core With Turbo Boost Max Technology 3.0 Up To 5.0 Ghz, Overclock Capable) 1x 16gb Of Ddr5 4800mhz System Memory, Upgradable To 32 Gb Using Two Sodimm Modules 2x 512gb Nvme Ssd; Total Of 1tb 16 Display With Ips (in-plane Switching) Technology, Wqxga 2560 X 1600, High-brightness (500 Nits) Nvidia® Geforce Rtx 4060 With 8 Gb Of Dedicated Vram Warranty :2 Years 2 Unit Command Center Printer - Command Center Printer - A3 Wi-fi Duplex All-in-one Ink Tank Printer Print Speed Of Up To 25.0 Ipm Prints Up To A3+ (for Simplex) Automatic Duplex Printing Ultra-high Page Yield Of 7,500 Pages (black) And 6,000 Pages (colour) Wi-fi, Wi-fi Direct, Ethernet Printer Type: Print, Scan, Copy, Fax With Adf Minimum Ink Droplet Volume: 3.8 Pl Print Direction: Bi-directional Printing Nozzle Configuration:800 X 1 Nozzles Black, 256 X 1 Nozzles Per Colour (cyan, Magenta, Yellow) Maximum Resolution: 4800 X 2400 Dpi Automatic 2-sided Printing: Yes (up To A3) Print Speed: Photo Default - 10 X 15 Cm / 4 X 6 " *1: Approx. 43 Sec Per Photo (border) / 52 Sec Per Photo (borderless)*2 Draft, A4 (black / Colour): Up To 32.0 Ppm / 22.0 Ppm *2 Iso 24734, A4 Simplex (black / Colour): Up To 25.0 Ipm / 12.0 Ipm *2 Iso 24734, A4 Duplex (black / Colour): Up To 16.0 Ipm / 9.0 Ipm *2 Iso 24734, A3 Simplex (black / Colour): Up To 13.5 Ipm / 6.0 Ipm *2 Iso 24734, A3 Duplex (black / Colour): Up To 10.0 Ipm / 5.0 Ipm *2 Warranty :1 Year Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 5 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 1 Unit Command Center Video Wall Controller - Command Center Video Wall Controller - Interface Alarm In Alarm Out 8-ch Alarm Out 8-ch Alarm In Serial Interface Rs-232 (rj45) × 1, Rs-485 × 1 Usb Interface Usb 2.0 × 2 Network Interface Rj45 × 2, 10 M/100 M/1000 Mbps Self-adaptive Ethernet Interface Optic Interface × 2 100 Base-fx/1000 Base-x Supports Optoelectronic Self-adaptation Video Walls 1 Video Wall Size <= 8 Layers Per Screen 1080p × 3 Or 4k × 1.5 Layers Layers Per Screen × Output Interface(s) Split Window Yes Scene Auto-switch Delay 3s Auto-switching Plans Support 256 Auto-switching Plans Max. Input Resolution 4k Audio Encoding Format G722.1, G711u, G711a, Aac-lc Video Output Interface Type Hdmi 1.4 Video Output Interface(s) 8 Video Decoding Resolution Up To 32 Mp Warranty:2 Years 8 Unit Command Center Video Wall Display - Command Center Video Wall Display - Display Panel Diagonal Size Class 55 Measured 54.6 Resolution 3,840 X 2,160 (16:9) Brightness (typ.) 700 Nit Orientation Landscape/portrait Haze 25% Contrast Ratio (typ.) 4,000:1 Type Va Active Display Area 1,209.6 (h) X 680.4 (v) Pixel Pitch (mm) 0.315 X 0.315 Color Gamut Ntsc 72% Operation Hour 24/7 Connectivity / Sound Input Video Dp 1.2 (1), Hdmi 2.0 (3) Audio N/a Usb Usb 2.0 X 2 Tuner N/a Output Audio Stereo Mini Jack Wifi / Bt O/o External Control Rs232c (in/out), Rj45 Speaker 10w 2ch Mechanical Spec Dimension (mm / In.) With Heavy Duty Full Motion Tv Wall Mount Warranty :3 Year 44 Unit Din Rail Mount - Din Rail Mount - 35mm At Least 7.5mm Depth Aluminum 22 Unit Electrical Box Enclosure - Electrical Box Enclosure - Electricalbox Panel Box Metal Enclosure(ip66, Nema 4 & 12) 300x250x150 Mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Molded Case Circuit Breaker Mccb30a 220v 2 Pole Din Rail Mount Type X1 Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Rail Mount Type X1 Grounding Bus Bar With Insulator X1 Din Rail Mount Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 6 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 40 Roll Fiber Optic Connectivity - Fiber Optic Connectivity - Fiber Optic Connectivity 2.0 Kms 4 Core Fiber Optic Cable Maintenance Of Outside And Inside Plant Equipment To Smart City Command Center For 1 Year 1 Unit Fiber Optic Fusion Equipment - Fiber Optic Fusion Equipment - Fiber Alignment Core/cladding Motor Number 6 Motors Splicing Time 5s Heating Mode 15s, Can Be Customized According To The External Environment Fiber Type Single-mode Fiber (smf/g.652), Bif/g.657); Suitable For Single Mode, Multi-mode, Bare Fiber, Tail Fiber, Drop Cable, Jumper, Invisible Fiber Fusion; The Cladding Diameter 80-150μm Splicing Loss 0.02db(sm)、0.01db(mm)0.04db(ds/nzds) Splicing Mode Automatic Focusing Core Alignment, Conventional/high Precision Welding Splicing Way Automatic, Semi-automatic Opm Wavelength: 850nm、1300nm、1310nm、1490nm、1550nm、1625nm、980nm、1270nm、1577nm、1650nm/measurement Range: -50+26dbm Absolute Error: <0.3db (-50dbm ~+3dbm Range) Battery Capacity 7800mah Large Capacity Lithium Battery Charging Time ≤3.5; It Can Continuously Weld And Heat About 260 Cores Magnification 320x (x Or Y Axis Single Display) 200x (x And Y Axis Dual Display) Fiber Diameter Coating Diameter: 80-150μm/coating Diameter: 100-1000μm Cutting Length Coating Layer 250μm Below: 8-16mm/coating Layer 250-1000μm: 16mm Heat Shrink Tube 60mm、50mm、40mm、25mm Tensile Testing Standard 2n Display 5 Inch Tft Color Display Screen Return Loss Better Than 60 Db Product Protection Waterproof, Dustproof And Fall Proof Warranty :1 Year 44 Unit Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upc To Lc/upc - Fiber Patch Cord Single-mode 9/125 Sc/upcto Lc/upc3 Meter 44 Unit Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upc To Sc/upc - Fiber Patch Cord Single-mode Sc/upcto Sc/upc3 Meter 45 Unit Gigabit Rj-45 Surge Protector Arrester - Gigabit Rj-45 Surge Protector Arrester - Protects Your Ethernet Device From The Damage Of Lightning & Surge Gigabit 10/100/1000 Specification: Connectors: Rj-45 Material: Shielded Aluminum Alloy 44 Unit Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulator - Grounding Bus Bar With Insulatorat Least 8 Way At Least 8x12mm² 2 Roll Grounding Cable Pure Copper Wire - Grounding Cable 4mm Pure Copper Wire Round Solid 100m Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 7 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Grounding Rod And Clamp Copper Plated - Grounding Rod And Clamp Copper Plated - "grounding Rod Full Set - (1pc Grounding Rod + 1 Pc Grounding Clamp) Size: Approximately 50cm Length X 0.9cm Diameter" 22 Unit Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang - Heavy Duty Surface Type Extension Outlet 4 Gang 15 Amperes Capacity/ Maximum 3,750watts 1 Lot Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of Outside Plant Equipment - Installation, Integrations And Configuration Of All Outside Plant Project Equipment In Outside Project Sites Outside Of The Smart City Command Center 1 Lot Installation, System Integrations And Configuration Of All Inside Plant Project Equipment - Installation, System Integrations And Configuration Of All Inside Plant Project Equipment In The Smart City Command Center Such As The Hikcentral Camera License, Integration To Existing Hikcentral Software And Integration Of Existing Cctv Cameras Into New Nvr 22 Unit Iot Box Panelbox Metal Enclosure (ip66,nema4 & 12) 500x300x200mm W/ 2 Fans And Fan Filter With Pole Mount Bracket X1 Heavy Duty Surface Type Extension Outlet 4 Gang Terminal Block Distribution 2 Input 4 Output Push-in Type 40 Unit Lpr Camera Arm Mount - Gi Pipe Extension Arm 1.5-3 Meters 40 Unit Lpr Camera Memory Card - Product Capacity Covering 128g The Storage Mediumis Tlc Particles Long Reading And Writing Times, Which Can Meet More Than 1000 Cycles Optimized For Long Time On-board Video Recording, Offering More Stable Reading And Writing Experience Operating Voltage 2.7v~3.6v Compatibility Sd 6.1 Working Life 1,000 Cycles Storage Medium Tlc Speed Class Write/read Speed 64gb:up To 35/100mb/s 128gb:up To 70/100mb/s256gb:up To 90/100mb/s Durability 10,000 Insertion/removal Cycles Uhs-i Sdr104 Type Sdxc 40 Unit Lpr Camera Vertical Pole Mount - Vertical Pole Mounting Bracket Installed On The Cross Bar Galvanized Steel Sheet And Steel Material With Surface Spray Treatment Can Be Used For New Bullet Camera Outdoor Greycolo Must Be Compatible With Cctv Camera 22 Roll Metal Flexible Conduit 1 Inch - Metal Flexible Conduit 1 Inch 30 Meters Per Roll 44 Unit Molded Case Circuit Breaker Mccb 30a - Molded Case Circuit Breaker Mccb 30a 220v 2 Pole Din Rail Mount Type 22 Unit Molded Case Circuit Breaker Mccb 63a - Molded Case Circuit Breaker Mccb 63a 220v 2 Pole Din Rail Mount Type 22 Unit Poe Switch Power Supply - Power Supply 48v 2a 96w With Us Plug Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature Page 8 Of 12 Republic Of The Philippines Bids And Awards Committee Baguio City (074) 300-6537/ (074)442-8795 Bid Form Cp No. 2024-231 Bidding December 10, 2024 Circular Proposal No. Date Prepared The City Government Of Baguio, Through Its Bids And Awards Committee Desires To Purchase The Articles Listed Below Seven (7) Months Upon Receipt Of Contract Award. Item Qty Unit Particulars Abc (php) Unit Price Total (php) 22 Unit Residual Current Circuit Breaker 63a 220v - Residual Current Circuit Breaker 63a 220v With Grounding/earthing 2 Pole Din Railmount Type 44 Unit Sfp+ Module Lc Connector Type - Gigabit Single-mode Wdm Bi-directional Sfp Module Spec: Lc Connector, Tx:1550nm/rx:1310nm, Single-mode, 20 Km 7 Roll Solidwire Awg#12 - Solidwire Awg#12 75m Per Roll Use For Termination Inside Iot Box 7 Roll Solidwire Awg#16 - Solid Wire Awg#16 75m Per Roll Use For Termination Inside Iot Box 66 Unit Terminal Block Distribution 2 Input 4 Output - Terminal Block Distribution 2 Input 4 Output Push-in Type This Is A Lot Bidding, Partial Bids Are Not Allowed Please Indicate Brands Of Offers And Attach Complete Technical Brochures In The Eligibility And Technical Proposal Please Indicate Unit Prices Of Offers In The Financial Proposal Bidders Must Possess Valid Mayor's/business Permit With A Relevant Line Of Business For Use Of Cmo Mitd Under Pr No. 1 Please Refer To Attached Terms Of Reference In The Associated Components Please Refer To Attached Bid Instruction For The Eligibility Requirements, Technical Proposal And Financial Proposal Format. Drop Your Documents In The Bidding Box Located At The City General Services Officel, City Hall, Baguio. The Opening Of Bids By The Bids And Awards Committee Shall Be At The Cdrrmc Bldg., Lower Rock Quarry, Baguio City, January 10 , 2025 9:30 Am Coa Representative, Two (2) Observers From The Private Sector And Non-governmentagency As Well As Interested Bidders. Atty. Augustin P.laban Iii Chairperson, Bids & Awards Committee Please Read Conditions At The Back Hereof. Non-compliance Of Any Of The Provisions Thereof Will Invalidate One's Bid/quotation. Bidders Shall Fill The Blank Spaces Below. Respectfully Returned To The Bids And Awards Committee, Baguio, With The Prices Quoted. All Conditions Set At The Back Hereof Are Hereby Accepted. The Required Good Faith Deposit Is Hereby Enclosed In The Amount Of Php ______________________________________ In Cash, Check Or Surety Bond. My Business Is _________________________________________________ Which Is Licensed Under Business Permit No./ Mayor's Permit No.____________ Issued On ________________________________. My Nationality Is ________________________. Please Refer To The Bid Conditions At The Back Name Of Establishment Bidder's Signature
4741-4750 of 4757 archived Tenders