Architect Tenders
Architect Tenders
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Others
United States
Closing Date13 Jan 2025
Tender AmountRefer Documents
Details: This Pre-solicitation Notice Is Not A Request For Proposal. All
information Needed To Submit Sf330 Documents Are Contained
herein. No Additional Solicitation Package Or Technical
information Will Be Issued. project: 544-25-125 Replace Dental Vacuum System work Location: Wm. Jennings Bryan Dorn Va Medical Center, Columbia, Sc 29209 estimated/target Completion Period: 145 Calendar Days After Award. construction Magnitude: Between $100,000 And $250,000. naics: 541330 - Engineering Services small Business Standard: $25.5 Million set-aside: 100% Service-disabled Veteran-owned Small Business (sdvosb) site Visits Will Not Be Arranged During This Phase. the Anticipated Award Date Of The Proposed A-e Contract Is On Or Before September
30, 2025. sf 330 Date Of Receipt/due Date: Interested Firms Having The Capabilities To Perform This Work Must Submit One (1) Electronic Sf 330 And Attachments (if Any) No Later Than
(nlt) 12:00 Pm (est) January 13, 2025. ***attention*** Acknowledgement E-mails Will Be Sent From The Co Upon Receipt Of A Submission. If An Acknowledgement Is Not Returned, The Firm Should Contact The Co At Christopher.jenkins@va.gov And 478-595-2794. project Overview:
the Columbia Va Health Care System Requires A Designed Solution To Repair Or Replace The Dental Vacuum System To Include All Piping, Pumps, Vacuums, Filters, Separators, Valving, Motors, Starters, Controllers, And All Other Necessary Components To Provide A Completely New System. The Current System Is Not Functioning Properly And Believed To Be Caused By The Current Configuration, Component Locations, And Length Of Installed Vacuum Piping. the End Result Of The Contract Is A Complete Set Of Construction Documents To Repair Or Replace The Existing Dental Vacuum System That Are Prepared For Solicitation For Construction. sdvosb Set-aside: this Requirement Is A 100% Set-aside For Service-disabled Veteran-owned Small Businesses Under The Authority Of 38 U.s.c. 8127(d). To Be Eligible For Award The Sdvosb You Must Be Considered Small Under The Relevant Naics Code. Sdvosb Contractors Must Be Verified And Viewable In Sba Vetcert: Https://veterans.certify.sba.gov/ Prior To Submission Of Proposal And Prior To Award Of Contract With Vaar 804.1103-70. Status As A Qualified Sdvosb Concern Is Under The Authority Of 38 Cfr Part 74 In Accordance With The Va Acquisition Regulation (vaar) Part 819. Any Person, Persons, Or Business Entity Suspected Of Misrepresenting Itself For The Purpose Of Securing A Government Contract May Be Criminally Investigated And Prosecuted For Fraud Against The United States Of America. Parties Found Misrepresenting Their Status Also Risk Debarment From Further Government Contracts. Eligibility Determination Is Performed By The Center For Veterans Enterprise (cve). Eligible Sdvosb Concerns Must Also Be Registered At The Following Websites: system For Award Management (sam): Https://www.sam.gov vets-4212 Federal Contractor Reporting Https://www.dol.gov/agencies/vets/programs/vets4212 important Notice: Prior To Submitting A Proposal Under This Sdvosb Set- Aside Solicitation; Offerors Must Apply For And Receive Verification From The Department Of Veteran Affairs Center For Veterans Enterprise (cve) In Accordance With 38 Cfr Part 74 And Vaar 819.70 By Submission Of Documentation Of Veteran Status, Ownership And Control Sufficient To Establish Appropriate Status. All Offerors Are Urged To Contact The Cve And Submit The Aforementioned Required Documents To Obtain Cve Verification Of Their Sdvosb Status If They Have Not Already Done So. for A Service-disabled Veteran Owned Small Business (sdvosb) To Be Considered As A Prospective Contractor, The Firm, Including Joint Ventures, Must Be Verified And Registered In The Department Of Veteran Affairs (va) Office Of Small & Disadvantaged Business Utilization (osdbu) Sba Vetcert: Https://veterans.certify.sba.gov/ And Registered In The System For Award Management (sam) Database (www.sam.gov) At Time Of Submission Of Their Qualifications. Failure Of A Prospective Sdvosb To Be Verified By The Center For Veterans Enterprise (cve) At The Time The Sf 330 Is Submitted Shall Result In Elimination From Consideration. All Joint Ventures Must Be Cve Verified At Time Of Submission And Submit Agreements That Comply With 13cfr 125.15 Prior To
contract Award. in Order To Assure Compliance With Far Clauses, 52.219-14 Limitations On
subcontracting (deviation 2019-01) And Vaar 852.219-10, Va Notice Of Total
service-disabled Veteran-owned Small Business Set-aside (jul 2019)
(deviation), All Firms Submitting A Sf 330 For This Pre-solicitation Notice Are
required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation. far Part 36.6 (brooks Act) Selection Procedures Apply. The A-e Services Listed Herein Is Being Procured In Accordance With The Brooks Act (public Law 92-582) As Implemented In Far 36.6 And Vaar 836.6. Pursuant To Far, The Firm Responding To This Requirement Must Be Permitted, By Law, To Practice The Professions Of Architecture Or Engineering And Meet All Required Qualifications For The State Of Georgia. sf330s Shall Be Organized In The Following Order: cover Sheet (one-page Limit)
design Team Background With Locations Of Supporting Offices (one-page Limit)
design Team Organizational Structure With Key Discipline Roles (one-page Limit)
factor 1 Specialized Experience (one Page Per Project Limit) factor 2 - Professional Qualifications (one Page Per Resume Limit)
factor 3 Past Performance Summary Sheet (one-page Limit)
factor 4 - Capacity (one-page Limit)
factor 5 Knowledge Or Location (one-page Limit)
factor 6 Sdvosb Inclusion Statement (one-page Limit)
full Cpars/ppqs Documentation For Factor 1 Projects (20-page Limit) additional Information (10-page Limit) sf330s Received Out Of Sequence Will Be Viewed Negatively. sf330 Specific Requirements:
all Sf330 Pages Shall Be Pdf Searchable For Items 1 Through 11 And Item 13. Full Cpars And Ppqs May Be Scanned. start Each Factor Response On A New Page.
use No Less Than 11-point Font.
all Text And Images Containing Text Is Legible When Printed On 8.5 X 11 Paper. The Evaluation Board Will Not Seek Clarification Regarding Illegible Text. primary Selection Criteria (listed In Descending Order Of Importance): factor 1
specialized Experience (sections F, G And H): Specialized Experience And Technical Competence In The Design And Construction Period Services Will Be Required To Perform Throughout The Life Of The Contract. Projects Experience Pertains To The Types, Size, Recency, Cost, And Complexity Of Work Previously Or Currently Being Performed By The Offeror That Is Comparable To The Work Covered By This Solicitation. page Limit One Page Per Project. Five-page Total For Factor 1. Information Provided On Additional Pages Beyond The One Page Per Project Limit Or Beyond The Five-page Total Limit Will Not Be Included With The Review. relevant Project Experience: Submit Five (3) Projects That Meet All Criteria Shown Below. relevant Project Type Design-bid-build Projects Involving Site Investigation, Schematic Design, Design Development, And Construction Documents. Dental Vacuum System Replacements, Renovations Of Dental Clinics That Include New Dental Vacuum Systems, And New Building Construction That Include New Dental Vacuum Systems Are Acceptable Project Types. Masterplan And Rfp Development For Design-build Contracts Will Not Be Viewed As Relevant. relevant Project Size Systems Service Five Dental Chairs Or More. relevant Project Recency Project Construction Must Be Complete Or Substantially Complete Within The Past Five Years Of The Solicitation Due Date. Substantially Complete Is Defined As 80% Or Greater Of The Construction Project Is Complete At The Time Of The Solicitation Due Date. relevant Project Cost - Construction Project Cost Must Be Greater Than $75,000
relevant Project Complexity The Project Narrative Description Must Indicate Experience With All The Following Criteria:
designing Main Vacuum Systems That Include Amalgam Separators For Dental Service Lines. designing Infection Control Risk Mitigation Plans
designing New Pump/vacuum Drive And Controller System the Relevant Project Criteria Listed Above Is The Minimal Information Required For Acceptable Project Relevance. Additional Value Will Be Considered For Projects Which Convey Expertise With The Following Categories And Will Potentially Increase The Overall Rating For This Factor. Projects That Do Not Convey Additional Value Expertise Will Not Be Considered A Weakness. Additional Value Expertise Includes: experience With The Submitting Firm Serving As The Prime Contractor Leading A Multi-discipline Team Through Investigative, Design, Solicitation, And Construction Period Services. These Services Must Be Documented For Each Project Narrative. designing Hazardous Material Abatement Plans experience With Recent Projects Intended To Support Service Line Dental Service Lines.
va Projects Showing Documented Experience With Implementing Va Design Guides And Standards From The Technical Information Library. experience With Recent Projects Located In The Columbia, Sc, South Carolina Midlands Area, Or Adjacent Counties. experience With Recent Projects That Include Implementing Va Cad And Bim Standards.
submissions Shall Include No More And No Less Than Three (3) Type Projects Of Recent And Relevant Government And Private Experience Projects Similar In Type, Size, Recency, And Complexity, Cost, And Experience With The Type Of Projects/competence Above.
section G Will Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together As A Cohesive Unit On The Provided Relevant Projects. An Acceptable Rating Will Be Given If All Key Disciplines Are Shown, And Each Discipline Participated With At Least One Project Listed On Section G. Proposed Design Team Members That Do Not Have Experience With Any Of The Five Submitted Example Projects As Shown In Section G Will Be Viewed Negatively. factor 2
professional Qualifications (sections C Through E) Necessary For Satisfactory Performance Of Required Service. The Ae Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. The Design Firm And A-e Staff Representing The Project Must Be Licensed To Practice In Any State Of The United States Of America. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered To Sign Drawings In Each Discipline Must But Does Not Have To Be Registered In The State Where The Project Is Located. The Licensed Professional Must Hold Current Licensure For Said Discipline To Practice In Any State Of The United States Of America. Engineer-in -training (eit) Is Not Considered A Professional Licensure. page Limit One Page Limit Per Position Resume 8 Pages Total For Factor 2. Information Provided On Additional Pages Beyond The 8-page Limit Will Not Be Included With The Review. resume Requirements - A Resume For Each Of These Key Positions Must Be Provided Identifying Their Specific Role, Via Section E In The Sf330. Key Positions And Disciplines Required For This Project Include, But Are Not Limited To, The Lists Of Professionals With Required Licensure And Preferred Licensure Below. An Unacceptable Rating May Be Given If Resumes Are Not Provided For All Roles Listed. positions Requiring Professional Licensure. Not Providing The Professional Licensure Will Be Viewed Negatively And Will Not Be Compliant With The Solicitation. architect mechanical Engineer
electrical Engineer
fire Protection Engineer
plumbing Engineer key Positions With Preferred Qualifications. Design Team Professionals That Have Obtained The Indicated Preferred Licensure May Be Viewed More Favorably. Not Providing The Professional Licensure Will Not Be Viewed Negatively And Will Not Reduce The Overall Rating For This Factor. Higher Value Will Be Given For Professionals With The Preferred Professional Licensure. quality Control Manager - Either Cqm, Cqe, Lean Six Sigma Black Belt, Or Experience With Minimum Five Projects Were Served As Qc Manager.
project Manager - Project Management Professional (pmp) Certification Or More Than 10 Years Experience With Managing A/e Design Projects. construction Cost Estimator - Aspe Certified Professional Estimator (cpe) Certification multi-function Roles Are Allowable For The Following Positions And May Be Shown As Multi-role Positions On The Resumes:
mechanical And Plumbing Engineering. architect, Seps Manager, Bim Manager, Interior Designer
electrical Engineer And Rcdd
project Manager And Quality Control Manager include The Home Office Location For Each Key Discipline Identified On Each Respective Resume In Section E Block 15. the Criteria Listed Above Is The Minimal Information Required For Acceptable Professional Qualifications. Additional Value Will Be Considered For Each Key Position And Will Potentially Increase The Overall Rating For This Factor And Shall Not Exceed The Prescribed Page Limit.
key Personnel Having Greater Than 10 Years Experience In The Practicing Field.
key Personnel With Greater Than Five Years Employment With The Proposed Design Team Firm.
va Design And Construction Experience Within The Past Five Years. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 3
past Performance (section H): Past Performance Will Be Evaluated On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules Along With The Firm S History Of Design Error, Omission, And/or Deficiency Claims. past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Va Cpars Entry. Va Cpars Are Not Required To Be Submitted With The Sf330 Submission. However, If The Va Cpars Is Not Included With The Sf330 Submission, Then The Contract Number For The Project Must Be Submitted For Each Project Provided In Section F So Cpars Can Be Reviewed In The Database. Please Note We Are Unable To Review Any Cpars From Other Federal Agencies, Outside Of The Va. for Any Project That Does Not Have Va Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. If The Firm (prime Or Subcontractor) Was Not The Prime Contractor On Any Project Submit-ted In The Sf330 A Ppq Must Be Provided Listing Their Specific Role As A Subcontractor. The Ppq Should Be Rated And Signed By The Evaluator. In The Event That A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. the Government May Also Consider Additional Performance Related Information Regarding The Firm, To Include Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services May Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Will Result In A Firm Being Considered Less Qualified. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs Should Not Be Submitted To The Vha Pcac Directly. Any Cpars And Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. page Limit Provide No More Than One Page Total For This Factor For The Summary Page. Full Cpars/ppq Documentation Shall Be Included On Additional Pages With The Sf330 And Will Not Count Towards The Total Page Count. provide A Summary Page That Provides The Factor S Required Information. For Each Of The Five Projects, Provide The Following Information. project Information (each Project For Specialized Experience)
past Performance Record Type (ppq Or Cpars)
contract Number
point Of Contact (name, Phone, Email, Job Title, Poc Role)
ae Firm Role With Project (prime Or Subcontractor)
category Ratings provide Complete Cpars (or Ppqs If Cpars Is Not Available) For All Sample Projects After The Sf330 Factor 8 Section. the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Locate This Documentation After The Complete Cpars/ppq Documents. Additional Value Documentation Shall Not Exceed Five Pages.
letters Of Appreciation Or Accolades From Previous Projects
industry Recognition Or Design Awards
any Other Information The Design Team Wishes To Include For This Factor So Long As The Five-page Limit Is Not Exceeded. factor 4
capacity (section H): The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va, Any Federal Agency, And Private Sector During The Previous Twelve (12) Months And The Full Potential Value Of Projects Forecasted Within The Next Twenty-four (24) Months Any Current Indefinite Delivery Contracts That The Firm Has. Include The Full Potential Value Of Any Current Indefinite Delivery Contracts. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members, Including Sub-consultants. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For All The Va Projects Current And Forecasted. Awarded In The Previous 12 Months. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf330. The Information For This Factor Shall Be Provided In Section H Of The Sf330. page Limit Provide No More Than Two Pages Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. include A Table That Conveys Each Key Discipline, Quantity Of Current Design Project Workload, Quantity Of Current Construction Period Service Workload, Estimated Future Design Load, Estimated Future Construction Workload, Quantity Of Current Idiq Contracts, Total Idiq Contract Capacity, Total Remaining Idiq Capacity, And Percent The Key Discipline Is Available. For Example: key Discipline
total # Of Current Design Project Workload
# Of Current Construction Project Workload
estimated # Of Future Design Project Workload
estimated # Of Future Construction Project Workload
quantity Of Current Idiq Contracts Involved With
total Idiq Capacity All Contracts
(millions)
total Idiq Remaining Capacity
(millions)
percent Available
capacity
architect
6
7
6
7
4
$1m
$2m
45%
mechanical Engineer
4
8
3
8
2
$1m
$1
10%
add Disciplines As Required the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor. Do Not Include Additional Pages In The Additional Information Section.
providing A Narrative Conveying The Design Team S Approach On How New Work Will Merge With The Current Workload. provide A Narrative Describing The Process Regarding Replacement Of Key Disciplines Should One Decide To Leave The Design Team. convey How The Design Team Can Maintain Schedule If A Key Discipline Member Is No Longer Available?
any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 5
knowledge Of Locality (section H). Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review. provide An Individual Narrative Conveying Knowledge Of The Locality For Each Of The Following Categories:
local Conditions Or Project Site Features
climatic Conditions
geologic Features
working With And Local Construction Methods
working With Local Laws And Regulations the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. Additional Value Will Be Considered For Each Additional Item Below And May Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section. experience With Seismic Designs Applicable To The Columbia, Sc Area. any Other Information The Design Team Wishes To Include For This Factor So Long As The Page Limit Is Not Exceeded. factor 6
use Of Service- Disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors. Offerors Shall Be Evaluated Based On Their Utilization Plans For Service- Disabled Veteran- Owned Small Businesses (sdvosbs), Veteran-owned Small Businesses (vosbs), Or Other Types Of Small Businesses. Offerors Shall Submit Qualifications For Proposed Consultants Per Other Criteria In This Solicitation. page Limit Page Limit Provide No More Than One Page Total For This Factor. Information Provided On Additional Pages Beyond The One-page Limit Will Not Be Included With The Review.
provide A Listing Of All Consulting Firms And Business Government Certification(s). Indicate The Anticipated Percentage Of Work The Consulting Firm Will Perform.
the Criteria Listed Above Is The Minimal Information Required For Acceptable Factor Compliance. The Higher Percentage Of Certified Sdvosb Firms Included With The Design Team May Provide Additional Value And Potentially Increase The Overall Rating For This Factor So Long As The Page Limit Is Not Exceeded. Do Not Include Additional Pages In The Additional Information Section.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Closing Date25 Jan 2025
Tender AmountRefer Documents
Details: This Is A Sources Sought Notice Only solicitation: 36c25225r0033
project: 578-25-003 Renovate Elevators In B200 place Of Performance: Edward Hines, Jr. Va Hospital 5000 South 5th Avenue, Building200 Hines, Il 60141-5000 part 1 General Scope Of Work:
edward Hines Jr. Veterans Affairs Hospital (ehvah) Provides Primary, Extended, And Specialty Care Services And Is Reliant Upon Supporting Infrastructure, Programmed Spaces, And Functioning Environments To Keep Up With Demand. building 200 Construction Was Completed In 1971 And Serves As The Primary Healthcare Facility On Campus. The Building Contains Eight (8) Traction Elevators In Varying Conditions. Some Of The Equipment Has Been Modernized In The 1980 S And 1990 S But Overall, The Equipment Is In Average To Poor Condition And Operating At Its Useful Life Expectancy. The Building Also Contains Seven (7) Hydraulic Elevators But Those Are Not Included In This Contract. iaw Vaar 836.204, The Magnitude Of Construction For This Work Is Between $10,000,000 - $20,000,000 Part 836 - Construction And Architect-engineer Contracts - Office Of Acquisition And Logistics (oal) (va.gov). existing Conditions:
the Eight (8) Traction Elevators Include Five (5) Passenger Elevators And Three (3) Service Elevators. All 8 Elevators Are Beyond Their Useful Life; They Are Failing Faster Than They Can Be Repaired, Resulting In Excessive Wait Times For Patients And Staff. Repairs Are Becoming Increasingly More Difficult To Perform Due To A Diminishing Inventory Of Available Parts, Further Extending Their Downtime. new Construction this Contract Will Include Furnishing All Labor, Materials, Equipment, Tools, And Qualified Supervision Necessary To Complete The Following: renovate Five Passenger Elevators (p1, P2, P3, P4 And P5).
renovate Three Service Elevators (s6, S7 And S8).
upgrade Elevator Penthouse, Room 1700. the Medical Center Maintains Operations 24 Hours A Day, 7 Days A Week. Therefore, Any Interruption In Service Must Be Scheduled And Coordinated With The Contracting Officer S Representative (cor) To Ensure That No Lapses In Operation Occur. Elevators Are To Remain Fully Operational Until All Equipment And Materials Are On-site And Ready For Installation. the Project Work Will Be Performed In Eight (8) Phases: phase 1 - Elevator P1, Penthouse Upgrades, Ats Installation, And Fire Control Panel
phase 2 - Elevator P3
phase 3 - Elevator P4
phase 4 - Elevator P5
phase 5 - Elevator S1
phase 6 - Elevator S2
phase 7 - Elevator S3
phase 8 - Elevator P2 contract Ntp Is Tentatively Planned For Fall 2025. part 2 Sources Sought General Description: the Purpose Of This Sources Sought Notice Is To Obtain Information On The Interests, Capabilities, And Qualifications Of Business Firms Of All Sizes And Specialized Certified Small Business Firms To Determine If A Set-aside Is Appropriate. Responses To This Sources Sought Notice Will Be Used By The Government To Make Appropriate Acquisition Decisions. Proposals Are Not Being Requested Or Accepted At This Time. work Is Assigned To Naics 236220 Commerical And Instituational Building Construction. This Industry Comprises Establishments Primarily Responsible For The Construction (including New Work, Additions, Alterations, Maintenance, And Repairs) Of Commercial And Institutional Buildings And Related Structures . North American Industry Classification System (naics) U.s. Census Bureau the Small Business Size-standard For Naics 236220 Is $45 Million. should The Solicitation Be Set-aside For An Sba Verified Sbvosb , In Accordance With Vaar 852.219-73 Https://www.va.gov/oal/library/vaar/vaar852.asp#85221973: (d) (3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Certified Sdvosbs Listed In The Sba Certification Database. (d)(4) Not Applicable. (d)(5) Subcontracting. An Sdvosb Subcontractor Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Certified And Listed In The Sba Certification Database To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6.
(e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows: Xxx - By The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or ___ - By The End Of The Performance Period For Each Order Issued Under The Contract. (f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Complies With The Requirements In 13 Cfr 128.402 And The Managing Joint Venture Partner Makes The Representations Under Paragraph (c) Of This Clause. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants. part 3 Interested Sources Shall Submit The Following: company Name, Address, Point Of Contact, Phone Number, Sam Oid Number, And Business Status. indicate The Primary Nature Of Your Business, Any Teaming Agreements Or Arrangements, Planned Self- Performance And Subcontracting Program. provide Detailed Construction Background Related To Extensive Experience In Complex Elevators For Two Project Examples. This Information Should Include A Description Of The Overall Project, And Specifically What Work Your Company Performed On The Contract. Include Overall Project Cost As Well As The Cost Assigned To Your Portion Of The Project. provide Details On The Size Of Your Business From The Following Types Of Specialized Construction Small Businesses: service-disabled Veteran Owned Small Businesses (sdvosb), veteran Owned Small Businesses (vosb), women Owned Small Businesses (wosb), 8(a) Businesses,
hubzone Businesses,
small Businesses (sb), And large Businesses. if Your Intent Is To Complete This Potential Contract As One Of The Small Business-types Listed Above, Include Specific Details As To How Your Company Will Fulfill The 15% Small Business-type Requirement. if Your Company Will Not Be Self-performing The Elevator Installation, Provide Qualifications Listed Above For The Elevator Subcontractor. letter From The Surety Regarding The Maximum Bonding Capability For A Single Contract Action, Total Value Of Active Bonds And Total Aggregate Bonding Capacity. total Submittal Shall Be No Longer Than (8) Eight Pages In One .pdf File Or Word Document. responses Are Required To Be Sent Via Email To Kristi.kluck3@va.gov No Later Than Monday, January 27, 2025, 23:59 P.m., Cst. this Is Not A Request For Proposals. It Is A Market Research Tool Being Utilized To Determine The Availability Of Potential Qualified Contractors Before Determining The Method Of Acquisition. In Addition, This Sources Sought Is Not To Be Construed As A Commitment By The Government, Nor Will The Government Pay For Any Information Solicited Or Delivered. -- End Of Document --
U S CUSTOMS AND BORDER PROTECTION USA Tender
Other Consultancy Services...+1Consultancy Services
United States
Closing Date24 Jan 2025
Tender AmountRefer Documents
Details: Background: the Advanced Trade Analytics Platform (atap) Provides Cbp With A Single, Organized Point Of Access For Cbp’s Internal And External Sources Of Trade Information, Using This Information To Develop From-scratch Data Analytic, Machine Learning, And Ai Products Meant To Enhance Cbp’s Execution Of The Trade Mission. Atap Is A Fully Operational, Internal Cbp System. cbp Intends To Obtain Contracted Data Scientists To Support The Development Of These Analytic Work Products In Collaboration With Atap’s Federal Personnel, Business Analysts, Data Architects, Engineers, And Visualization Experts To Support Mission Needs. Key Components Of The Job Will Include Data Analysis And Modeling, In Which The Data Scientist Will Build And Maintain Models To Support Business Use Cases. Atap Utilizes A Service Delivery Model That Allows Cbp To Direct Resources To The Areas Of Highest Risk Or Opportunity Within Cbp, With Work Prioritized By The Atap Director Or Their Designee. Deliverables For This Team May Include, But Are Not Limited To, Data Analytic Models Utilizing A Wide Range Of Analytics (e.g., Diagnostic, Predictive), Data Extracts, And Data Visualizations. cbp Projects A Need Of One (1) Chief Data Officer / On-site Project Lead, Once (1) Senior Data Scientist, Nine (9) Data Scientists, Five (5) Data Analysts, And One (1) User Interface Designer. Cbp Requires The Data Scientists And Project Lead To Have Advanced Degrees (ms/ph.d) In Addition To Substantial Experience. A Draft Copy Of The Statement Of Work, Which Details The Level Of Experience For Each Labor Category, Is Attached To This Request. All Assigned Staff Would Need To Successfully Pass A Cbp Background Investigation. requested Information: provide A Capabilities Statement As It Relates To Cbp’s Draft Sow. provide Three (3) Examples Of Contracts With Ph.d. Level Work, Where Your Company Was The Prime Contractor, That Is Similar To The Requirements Outlined In The Sow? would Your Firm Be Able To Staff This Contract In-house Or Do You Foresee The Need To Subcontract Out Portions Of The Work? discuss Approaches For Transitioning In Contractor Personnel In Absence Of Incumbent Contractor Personnel. Please Include In Your Response Your Company’s Experience Using These Recommended Approaches And Lessons Learned. would Your Company Be Able To Provide Cbp Background Investigation Cleared Contractors At Award Date? what North American Industrial Classification System (naics) Does Your Firm Believe Most Applicable To The Requirement At Hand? response Format And Limits interested Parties Should Submit A Written Response, No More Than Eight (8) Pages In Length, That: demonstrates The Respondent’s Ability To Meet Or Exceed The Attached Draft Sow Requirements; addresses Each Of The Requests For Information; provides The Company Name And Address, Point Of Contact With Phone Number And E-mail, Business Size, Uei Number, And Available Contracting Vehicles; cost/price Estimates And An Identification Of Potential Cost Drivers, Tradeoffs, And/or Savings; And, any Other Pertinent Information Such As Assumptions Made Relating To The Ability To Satisfy Specific Requirements Or Questions Regarding Ambiguous Or Poorly Defined Requirements. all Responses Shall Be Submitted Electronically (adobe Pdf Format). Responding To This Rfi Is Not A Prerequisite To Bid On A Subsequent Rfp, If One Is Issued. Responses May Include Links To Available Product Demonstration Websites Or Videos. Proprietary Information, If Any, Should Be Minimized And Must Be Clearly Marked. To Aid The Government, Please Segregate Proprietary Information. responses Are Due No Later Than 12pm Et, January 24, 2025. Responses Shall Be Submitted Via E-mail To Contracting Officer Jared A. Tritle At: Jared.a.tritle@cbp.dhs.gov. questions questions Regarding This Announcement Shall Be Submitted In Writing By E-mail To The Contracting Officer, Email Address Listed Above. Verbal Questions Will Not Be Accepted. Questions, If Not Answered Directly To The Respondee, May Be Answered By Posting On Sam; Accordingly, Questions Shall Not Contain Proprietary, Sensitive, Or Classified Information. summary this Is Only A Request For Information (rfi). The Information Derived From This Rfi Will Assist Cbp In Identifying Sources That Can Satisfy The Requirements Of The Attached Draft Sow. The Information And Specifications Provided In The Rfi Are Subject To Change And Are Not Binding On The Government. Cbp Has Not Made A Commitment To Procure Any Of The Items Presented, And Release Of This Rfi Should Not Be Construed As A Commitment Or Authorization To Incur Cost For Which Reimbursement Would Be Required Or Sought. All Submissions Become Government Property And Will Not Be Returned.
PUBLIC BUILDINGS SERVICE USA Tender
Civil And Construction...+1Building Construction
United States
Closing Date3 Jan 2025
Tender AmountRefer Documents
Details: This Is A Sources Sought Notice. No Proposals Are Being Requested Or Will Be Accepted In Response To This Posting. If You Are Interested In Proposing On The General Scope Of Work Stated Below For A Design-build Project, Please Respond By Email Only To Krista.miller@gsa.gov. Please Provide Your Bonding Capacity, A Capability Statement, And Your Small Business And Small Business Socioeconomic Status, If Any. Please Include In Your Capability Statement Projects Which Your Firm Has Completed That Are Particularly Relevant To This Scope Of Work, Especially Involving Exterior Structural And Glazing Improvements, And/or Performed In Hawaii. general Statement Of Work Summary: the Prince Jonah Kuhio Kalaniana’ole (pjkk) Federal Building And Courthouse Is Located At 300
ala Moana Blvd., Honolulu, Within The Hawaii Capital District And On The Outskirts Of The Downtown
central Business District. This Reinforced, Cast In Place Concrete With Concrete Masonry And Glass
curtain Walls Is A Two-building Mid-century Modern Complex Originally Constructed In 1977. The
illuminated Entry Pavilion Was Originally Designed By Gensler Sf And Constructed By Swinerton
construction In January 2015. The Illuminated Entry Pavilion Design Was An Elegant, Iconic Aia
award Winning Design That Unified Two Separate Entries Into A Single, Sky Lighted And Transparent
entrance For The Pjkk Complex. The Single Portal/pavilion Simplified The Circulation For The Public
and Created A Strong Sense Of Entry For Pjkk. on April 6, 2021 A Fire Occurred At The Entry Pavilion That Created Significant Damage. On January
24, 2022, Clifford Planning Architecture Completed A Fire Investigation Report That Stated “it Is
probable The Entry Pavilion Fire Initiated Was A Result Of An Electrical Fault Within The Led Light Panel
installed Adjacent To The Bottom Panel Of The South Wall Of The Entry Pavilion. Low Level Arcing Over
a Period Of Time Was The Likely Source Of Heat For Ignition Of The Acrylic Panel Material” (see
volume 4 – Fire Investigation). As Further Defined In The Fire Investigation Report, There Was Fire
damage To Architectural Finishes And Structural Members. The Scope Of Work For The Entry Pavilion
includes, But Is Not Limited To, Installing (2) Temporary Covered Entry Tunnels To The Existing United
states Marshal Service (usms) And Federal Protection Services (fps) Security Check-point
locations, Providing Code Compliant Construction Documents And Full Design Services That Adhere
to The Original Gensler Design And Architectural Appearance Of The Original Entry Pavilion, While
also Making The Necessary Design Changes To Address The Issues That Contributed To The Fire And
smoke Damage As Further Defined In Volume 4 - Fire Investigation. The Design Should Also
include Solutions For The Following Known Building Maintenance Issues: 1. The Original Design Led Panels Were Located Behind Heavy Glass Panels That Created
issues For Regular Maintenance And Care. 2. The Original Designed Entry Door Operated On A Small Pin That Would Fail And Was Difficult
to Replace. in Addition To The Scope Above, The Design And Construction Of The Courthouse Hardening Upgrades To The
entry Pavilion And Ground Level Windows And Doors Facing Halekauwila Street And Ala Moana Boulevard
are A Requirement For This Project. The Judiciary Had Previously Sought From Congress Supplemental
appropriations To Fund Enhanced Security Measures To Protect Judges And The Judicial Process In Response
to The Civil Unrest Following The Murder Of George Floyd And The January 6th Attack On The U.s. Capitol.
the Judicial Conference Approved Funding To Begin Enhanced Security Measure Projects To Harden
courthouses. initial Stakeholders From The General Services Administration (gsa), The Administrative Office Of The U.s.
courts (ao), U.s Marshals Service (usms), And The Federal Protective Service (fps) Worked Together To
analyze Potential Security Measures To Be Used In This Program. This Scope Of Work Covers The
countermeasures For The Pjkk Courthouse In Honolulu, Hi: 1. Windows: Impact Resistant Window Glazing System At The Entry Pavilion And
ground Level Courthouse Windows And Doors Facing Halekauwila Street And Ala
moana Boulevard, Excluding Ground Level Windows Along The United States
marshal Service Offices And Within The Confines Of The Exterior Secured Courtyard:
● Windows / Doors / Frames – Shall Meet A Minimum 15-minute Forced
entry Resistance Per Astm F3038 Or Dept Of State (dos)
sd-std.01.01 Rev G (amended) – Forced Entry Resistance Is The
standard That Shall Apply.
● The Contractor Shall Install A New Shatter Break Resistance Riot Glazing
system
● Contractor Is Responsible To Field Verify And Measure Each Opening.
2. Exterior Doors And Hardware (see Volume 2b_existing Pavilion Design
drawings For Specific Locations):
● All Exterior Pavilion Entry Doors And Interior Courthouse Pavilion Vestibule
doors Shall Be Equipped With Hardware And Controls To Engage
electro-magnetic And/or Electro-mechanical Remote Locks.
● Remote Locks Shall Give The Ability For The Court Security Officers And The
usms To Lock All Doors Immediately In Case Of An Emergency.
● Remote Lock Override Control Shall Run To The Main Usms / Cso Control
room the Courthouse Hardening Upgrades Will Upgrade The Ground Level Courthouse Windows And
doors And Replace All Window, Exterior Doors, And Hardware Included In The Original Gensler
designed Pjkk Entry Pavilion. the Forced Entry Resistance Doors And Windows Shall Meet A Minimum 15 Minute Forced Entry
resistance In Accordance With Astm Standard F3038-21, With The Following Exception. Astm
standard F3038-21 Requires A Full Scale Test For Each Unique System Size And Configuration,
however, If The Actual Overall System Dimensions Are Within 6” (both Height And Width Dimension)
of Another Successfully Tested System Meeting The Requirements Of Astm Standard 3038-21, And
the System Components Are Of Similar Size And Makeup, The Proposed System Shall Be Considered
acceptable. Support Documentation Shall Be Provided Prior To Installation. the Construction Services Scope Of Work Includes Demolition Of The Remaining Pavilion Structure,
build-out Of (2) Temporary Tunnels To Access The Existing Usms And Fps Security Check-points,
the Build-out Of The New Entry Pavilion, Installation Of The Courthouse Hardening Window And Door
upgrades, Including But Not Limited To Structural, Architectural Finishes, Lighting, Mechanical,
electrical, Plumbing, Fire And Life Safety, And Data/cabling Infrastructure. the Federal Building And Courthouse Must Remain Fully Operational Throughout Design And
construction. All Construction Work Related To This Project Shall Be Scheduled From 5:00 Pm To 7:00
am, After Normal Building Operation Hours To Minimize Disruptions To Building Occupants And To
maintain Public Safety. Normal Building Operation Hours Are From 7:00 A.m. To 5:00 P.m.
weekdays. the Project Delivery Method Is Design-build (db).
the Db Contractor Shall Provide All Supervision, Labor, Materials, Equipment, And Testing Required
to Accomplish The Design And Construction For The Pjkk Entry Pavilion And Courthouse Hardening
project. design Services Shall Include, But Are Not Limited To, Design And Certification By A State Of Hawaii
licensed Architect-engineer (a/e), Design Reviews, Weekly Progress Meetings, Design
development, Construction Documents, Basis Of Design Documents, Site Investigation, Site
measurements And Verification, Code Compliance, Reproduction Services, Consultant Coordination,
contract Administration, Contract Close-out, Record Drawings And As-builts.
construction Services Shall Include, But Are Not Limited To, Complete And Timely Submission Of
security Clearance Applications For Workers (hspd-12 And Tenant Agency Review), Project
schedule, Cost Estimating, 3-week Look Ahead Schedules, Demolition, Site Supervision, Drywall,
mechanical, Electrical, Automatic Sprinkler System, Architectural Finishes, Submittal Samples,
submittal Schedule, Hvac, System Balancing, Structural, Fire And Life Safety, Security Infrastructure,
protocols For Utility Outages, Separation Of Utilities To Avoid Impacts To Occupied Areas, Temporary
barricade Plan, Noise Mitigation, Clean Up After Work, Lead Weekly Meetings And Provide Minutes,
file And Record Management, And All Other Work To Meet The Contract Requirements.
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+4Others, Building Construction, Consultancy Services, Civil And Architectural Services
United States
Closing Date15 Jan 2025
Tender AmountRefer Documents
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For Project 562-22-700, Construct Ehrm Infrastructure Upgrades At The Erie Va Medical Center (vamc) Located In Erie, Pennsylvania. project Description:
the Erie Vamc Is Seeking A General Contractor To Provide All Necessary Tools, Labor, Materials, Equipment, Permits, License, Supervision, And Quality Control For Ehrm Infrastructure Upgrades Erie, Pa At The Erie Va Medical Center, In Accordance With The Drawings And Specifications. Work Includes General Construction, Alterations, Grading, And The Following Infrastructure Improvements: Electrical Power (normal And Emergency); Bonding; Ups; Building Management System (bms) Interfaces; New And Upgrades Of Existing Hvac; Reconfiguration, Expansion, And Renovation Of Existing Spaces; Communication Infrastructure; Physical Security Upgrades; Upgrade Of Fiber Infrastructure Backbone Campus-wide, Within Buildings And Between Buildings; Construct New Data Center; Hazardous Material Abatement And All Necessary Removal Of Existing Structures And Construction Of Certain Other Items. the Upgrade To The Infrastructure Will Include Campus Wide New Campus Wide Fiber Backbone Underground Routing And Will Require Excavation, Trenching, Reinforced Concrete Duct Bank With Associated Access Points. Campus Buildings Impacted By The Upgrades Include Buildings 1, 6, 7, 8, 11, 14, And 18. Upgrades In These Buildings Will Include Existing Rooms And Telecommunications Closets And Include Relocation, Reconfiguration, Expansion, And Renovation Involving New Walls, Doors And Finishes, Etc. Throughout Each Space. construction Shall Comply With Va Infrastructure Standard For Telecommunications Spaces (ists) V4.0, June 1, 2023. New Data Center To Include Electrical Distribution, Cable Management, Data Cabinets, Finishes And Hvac. The Data Center Is Designed For And Meeting The Requirements Of A Small/medium Campus Support Center. The Data Center Shall Be Constructed To Withstand Blast Protection Requirements Per The Va Psrdm. procurement Information:
the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued Either As A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14, Considering Price Only. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In March, 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00. The North American Industry Classification System (naics) Code 236220 (size Standard $45.0 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 540 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Tools, Labor, Materials, Equipment, Permits, Licenses, Supervision, And Quality Control Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. capability Statement:
respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email.
section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. Please State Your Intent To Submit A Bid On This Project If The Only Evaluation Factor Is Price (far Part 14). Please Also State Your Intent To Submit A Proposal If The Solicitation Contains Both Price And Non-price Evaluation Factor (far 15). section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. Letter Should Include Single Award Limit, Aggregate Limit And Available Bonding Capacity.
section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Six (6) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work.
describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided.
it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Eight (8) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information. This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By January 15, 2025 At 1:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac)
6100 Oak Tree Blvd. Suite 490
independence, Oh 44131 primary Point Of Contact:
leslie Prather
contract Specialist
leslie.prather@va.gov secondary Point Of Contact: samantha Mihaila
contracting Officer
samantha.mihaila@va.gov
Al Ova Jiho Esk Galerie Tender
Czech Republic
Closing Date19 Jan 2025
Tender AmountRefer Documents
Details: The Subject Of The Design Competition Will Be The Comprehensive Architectural Design Of The New Building Of The Alšova South Bohemian Gallery Museum On Senovážné Square In České Budějovice. The Selected Architect/general Designer Team Will Subsequently Process All Project Phases Of The Investment Plan. The Purpose Of This Preliminary Notice Is To Survey The Market Regarding The Interest Of Potential Suppliers In The Proposal Competition. More Detailed Information On The Market Research Is Published On The Profile Of The Client. This Is Not A Preliminary Market Consultation. Publication Of The Preliminary Information Notice Does Not Initiate The Design Competition; The Contest Will Be Initiated With The Announcement Of The Contest Commencement..
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+1Building Construction
United States
Closing Date17 Jan 2025
Tender AmountRefer Documents
Details: Synopsis:
project Title: pre-solicitation Notice For Project 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1, Saint Louis Va Medical Center John Cochran Division, Saint Louis, Mo. contract Information a. This A/e Services Requirement Is Being Procured In Accordance With The Brooks Act (public Law (pl0582) And Implemented In Accordance With The Federal Acquisition Regulation (far) Subpart 36. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. b. This Procurement Is Restricted To Service-disabled Veteran Owned Small Business (sdvosb) Firms. This Requirement Is Being Procured In Accordance With The Vaar 836.606-73 As Implemented In Far Subpart 36.6. c. This Is Not A Request For Proposal, And An Award Will Not Be Made With This Announcement. This Announcement Is A Request For Sf 330 S From Qualified Contractors That Meet The Professional Requirements. d. The Selection Criteria For This Acquisition Will Be In Accordance With Far 36.602-1 And Vaar 836.602-1 And Are Listed Below In Descending Order Of Importance. The Completed Sf 330 Will Be Evaluated By The St. Louis Va Medical Center Evaluation Board In Accordance With Far 36.602-5(a) And The Selection Report Shall Serve As The Final Selection List, Which Will Be Provided Directly To The Contracting Officer. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. e. Award Of Any Resultant Contract Is Contingent Upon The Availability Of Funds. f. No Solicitation Document Is Available And No Other Information Pertaining To Project Scope, Etc. Is Available At This Time. Any Request For Assistance With Submission Or Other Procedural Matters Shall Be Submitted Via Email Only To Abby.monroe2@va.gov And Arnold.payne@va.gov. Personal Visits To Discuss This Announcement Will Not Be Allowed. g. The Naics Codes For This Procurement Is 541310 Architectural Services And Small Business Size Standard Of $12.5m. Award Of A Firm Fixed Price Contract Is Anticipated. The Anticipated Time For Completion Of Design Is Approximately 199 Calendar Days Including Time For Va Reviews. The Estimated Magnitude Of The Resulting Construction Price Range Is Estimated To Be Between $1,000,000 And $5,000,000. h. Database Registration Information:
verification Of Status Of Apparently Successful Offeror This Acquisition Is 100% Set-aside For Qualified Service-disabled Veteran Owned Small Business Ae Firms Incompliance With Vaar 852.219-10. Only Businesses Verified And Listed In The Small Business Administration (sba) Registry Https://veterans.certify.sba.gov, Shall Be Considered.
system For Award Management (sam): federal Acquisition Registrations Require That Federal Contractors Register In The System For Award Management (sam) Database At Www.sam.gov And Enter All Mandatory Information Into The System. Award Cannot Be Made Until The Contractor Has Registered. Offerors Are Encouraged To Ensure That They Are Registered In Sam Prior To Submitting Their Qualifications Package. j. The Excluded Parties List System (epls): to Ensure That The Individuals Providing Services Under The Contract Have Not Engaged In Fraud Or Abuse Regarding Sections 1128 And1128a Of The Social Security Act Regarding Federal Health Care Programs, The Contractor Is Required To Check The Excluded Parties List System (epls) Located At Www.sam.gov For Each Person Providing Services Under This Contract. Further The Contractor Is Required To Certify That All Persons Listed In The Qualifications Package Have Been Compared Against The Epls List And Are Not Listed. During The Performance Of This Contract The Contractor Is Prohibited From Using Any Individual Or Business Listed On The List Of Excluded Individuals/entities. k. E-verify System:
companies Awarded A Contract With The Federal Government Shall Be Required To Enroll In E-verify Within 30 Days Of The Contract Award Date. They Shall Also Need To Begin Using The E-verify System To Confirm That All Of Their New Hires And Their Employees Directly Working On Federal Contracts Are Authorized To Legally Work In The United States. E-verify Is An Internet-based System That Allows An Employer, Using Information Reported On An Employee's Form I-9, To Determine The Eligibility Of That Employee To Work In The United States. There Is No Charge To Employers To Use E-verify. (far 52.222-54) l. A/e Firms Are Required To Respond If Interested By Submitting One (1) Completed Standard Form 330 Qualification Package Parts I And Ii To Include All Consultants (form Available On-line At: Https://www.gsa.gov/system/files/sf330-21.pdf). Must Include In Part I Section H An Organizational Chart Of The Firm (excludes Consultants) And A Design Quality Management Plan. Submission Information Incorporated By Reference Is Not Allowed. All Submissions Shall Be Made Electronically. m. Completed Package Shall Be Delivered Electronically On Or Before 1/17/2025 At 3:00pm Central Standard Time To The Nco 15 Contracting Office, Attn: Arnold Payne, Contracting Officer @ Arnold.payne@va.gov And Abby Monroe, Contract Specialist @ Abby.monroe2@va.gov. project Information the Mission Of The Veterans Affairs Saint Louis Health Care System (vastlhcs) Is To Provide The Highest Quality Health Care To Our Nation S Veterans. In Order To Accomplish This Mission, Vastlhcs Facility Engineering Service (fes) Intends To Partner With An A/e Firm On A Project To 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1, John Cochran Division, St. Louis, Mo 63106. Project Will Renovate An Ambassador Entrance, Entrance Corridor, And The Ambassador Suite To Improve Patient And Ada Access To The Building, Fix Moisture And Leaking Issues With The Existing Skylight, Update Finishes, Improve Patient Circulation, And Optimize Space For The Existing Functions Operating In The Area As Well As Correct Hvac And Electrical Deficiencies, And Other Facilities Conditions Assessment Deficiencies Located Within The Area. The Main Entrance Of Bldg. 1 Will Be Updated To Facilitate Visitor Traffic Flow And Experience. The Existing Revolving Door Will Be Replaced With An Airlock Of Sliding And Swinging Doors With Automatic Controls. supplement B scope Of Work: a/e Services Are Required For Schematics, Design Development, Construction Documents, Construction Cost Estimate And Construction Period Services For Project Number 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1. This Delivery Order Shall Cover The Following Tasks. a/e Part Two Services Of This Design Project (also Known As Construction Period Services) Includes Responding To Construction Contractor Requests For Information (rfis) During The Solicitation And Construction Phases Of The Construction Project, Attendance At Pre-bid, Post-award And Commissioning Kick Off Construction Project Conferences, Review Of Construction Material Submittals And Shop Drawings, Approximately 5 Site Visits During Construction To Ensure Compliance With The Design Drawings And Specifications, Preparation Of Site Visit Reports, Coordination With Project Commissioning Requirements, Review Of Any Construction Project Modifications For Cost And Technical Acceptability, Attendance In The Final Acceptance Inspection, Preparation Of The Punch List And Preparation Of Record Drawings Of The Completed Construction Project Based On The Construction Contractor S As-built Drawings. The A/e Shall Prepare A Submittal Log To Be Utilized By The Va During Construction Period Services, Maintain Rfi Log And Provide Meeting Minutes For Weekly Construction Meetings Throughout The Duration Of Construction. The A/e Shall Hire A Third-party Commissioning Agent To Commission All Installed Equipment. the Above Paragraphs Constitute A Basic Outline Of The Work To Be Accomplished And In No Way Comprises All The Details For Design Of This Project. The A/e Shall Initiate Detailed Inspection Of The Project Site To Determine The Needs And Conditions For The Design Of This Project. the A/e Shall Be Solely Responsible For The Management, Including All Associated Labor, Equipment, Materials, Mailing Costs, And Inspection, To Meet The Requirements Of The Design Project. The A/e Shall Further Provide Meeting Minutes For All Meetings Held Under This Design Project. general Statement a/e Part One Services (also Known As Design Phase) For This Design Project Includes Site Visit, Field Investigation, Conduct Of Studies And User Interviews To Update Drawings, Specifications And Cost Estimates For All Facets Of Work And Disciplines/trades To Facilitate A Construction Project. This Project Will Renovate Ambassador Suite & Main Lobby, Building 1 2. Design Development: the A/e Firm Shall: a. Meet With Facilities, And Other Personnel Prior To Start Of Design To Determine Detailed Requirements Of Work Involved. b. Work From Existing Building And Site Drawings Furnished By The Va To Develop Project Design. (these Are To Be Used Only As Guidelines); c. Perform Any Necessary On-site Field Investigations To Accomplish Work And To Verify Drawings Provided By The Va; d. Prepare Rough Sketches, If Necessary, To Solve Possible Problems In Design Throughout The Contract; And e. Follow Va Program Guide Pg-08-15 Volume C, And Other Applicable Guidelines To Design The Project. 3. Evaluation Factors: selection Criteria Are In Accordance With Federal Acquisition Regulation (far) Part 36.602-5 And Va Acquisition Regulation (vaar) Part 836.602-1.â Prospective Firms Are Required To Address All Selection Criteria Within Submitted Sf330 Packages Using Additional Pages As Necessary.â Sf 330 Submissions Including Any Additional Pages Are Not To Exceed Fifty (50) Pages. Each Page Cannot Exceed 81/2 X 11 In Size. qualifications (sf330) Submitted By Each Firm For Project Number: 657-24-111jc Renovate Ambassador Suite & Main Lobby, Building 1 Va Medical Center Saint Louis John Cochran Division Will Be Reviewed And Evaluated Based On The Following Evaluation Criteria Listed Below In Descending Order Of Importance: 1. Professional Qualifications: The Qualifications Of The Individuals Which Will Be Used For These Services Will Be Examined For Experience And Education And Their Record Of Working Together As A Team. A/e Firms Shall Have Licensed Professional Architects And Engineers Currently Registered In The State Of Missouri Or In A State Of Which Missouri Has Recognized The Engineering License. The Specific Disciplines Which Will Be Evaluated Are Architects, Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Industrial Hygienists, Estimators, Cad Operators, Project Managers, Leed Consultant, Fire Protection Engineer, And Interior Designer. 2. Specialized Experience And Technical Competence: Provide Detailed Project Information On Any Projects (that Are Complete - Design And Construction) The Proposed Team Has Worked Together On In The Last Five (5) Years. Special Emphasis Will Be Given To Any Medical Facility Related Projects. If The Entire Team Has Not Worked Together Previously, Provide Detailed Project Information That Each Of The Team Members Have Worked On In The Last Three (3) Years With Special Emphasis On Medical Facility Projects. The Project Information Should Include Project Titles, A Short Scope Of Work, Date Of Design Completion, Date Of Construction Completion, Firms Involved, Etc. The A/e Shall Also Describe If They Have Any Experience Completing A Design That Was Started By Another A/e Firm. Provide The Project Title, Scope Of Work, Date Of Design Start For This Team, Percentage Of Design When Accepted By Team And Completion Of Design. 3. Capacity To Accomplish The Work. The General Workload And Staffing Capacity Of The Design Offices Which Will Be Responsible For The Majority Of The Design And The Ability To Accomplish The Work In The Required Time Will Be Evaluated. 4. Past Performance: Nco 15 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Construction Cost Estimating, Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm Due To Improper Or Incomplete Engineering Services (references Required). Project Past Performances That Are Older Than 3 Years Will Receive A Lesser Score Than Those References For Projects Accomplished Within The Past 3 Years. 5. Location Of Design Firm: The Geographic Proximity Of Each Firm To The Location Of The Va Medical Center Will Be Evaluated. The Firm Must Be Capable Of Issuing Stamp Drawings In The State Where The Work Is Performed.â The Medical Center Is Located At Saint Louis, Va Medical Center, Saint Louis Missouri 63106. 6. Claims And Terminations: Provide Documentation Of Significant Claims Against The Firm Or Terminated Contracts Because Of Improper Or Incomplete Architectural And Engineering Services. Provide A Detailed Narrative Of Relevant Projects Within The Last 5 Years That Have Claims Against The Organization Or Have Been Terminated By The Owner. Include The Circumstances, Cost, And Schedule Impacts To Involved Parties, And Outcomes Of The Claims And/or Terminations. They Will Be Examined.
Issyk Kul Region Upr On Urban Planning And Architect State Agency Arch, Build And Residential com hoz With RCC Tender
Others
Kyrgyzstan
Closing Date10 Jan 2025
Tender AmountKGS 1.9 Million (USD 22.8 K)
Purchaser Name: Issyk Kul Region Upr On Urban Planning And Architect State Agency Arch, Build And Residential com hoz | Purchasing a Passenger Car
DEPT OF THE NAVY USA Tender
Aerospace and Defence
United States
Closing Date6 Jan 2025
Tender AmountRefer Documents
Details: Description the Airborne Strategic Command, Control, And Communications (asc3) Program Office (pma-271) Is Conducting Market Research For A Competitive Indefinite Delivery Indefinite Quantity (idiq) Multiple Award Contract (mac) In Support Of The E-6b Mercury Aircraft. the Anticipated Request For Proposal Release Is First Quarter Fy2026. the Anticipated Idiq Mac Award Is First Quarter Fy2027. the Anticipated Ordering Period Is 10 Years. the Results Of This Sources Sought Will Be Utilized To Determine The Interest, Availability And Technical Capability Of Both Large And Small Businesses (including The Following Subsets: Small Disadvantaged Businesses, Hubzone Firms, Certified 8(a), Service-disabled Veteran-owned Small Businesses, And Woman Owned Small Business) To Provide The Required Products And/or Services. As Such, All Eligible Small Businesses, To Include Those With Any Socio-economic Status, Are Encouraged To Respond. the Execution Of Efforts Under This Mac Will Be Competitively Awarded Delivery And Task Orders. The Efforts Herein May Include Contractor Owned, Government Owned, Or A Combination Of Two And Will Be Specified At The Delivery Or Task Order Level. specific Requirements the Idiq Mac Scope Will Include Products And Services Such As, But Not Limited To, Engineering, Test, Facilities, Integrated Product Support (ips), Product Design, Development, Maintenance, Integration, And Logistics Support Services, To Support The Acquisition And Sustainment For The Life Cycle Of The E-6b, And Its Systems, System Of Systems (sos), Sub-systems, And Support Equipment (se). The Idiq Mac Scope Will Support The Take Charge And Move Out (tacamo), Airborne Command Post (abncp), Presidential National Voice Conferencing (pnvc), And Airborne Launch Control System (alcs) Missions, Plus Their Replacements, On The E-6b. the Scope Of Work For Delivery And Task Orders Issued Under The Idiq Mac Are Anticipated To Include, But Are Not Limited To, The Following Functional Areas: 1. Mission Communications Systems And Integration mission Communications Systems Are Integrated Into The E-6b And Provide Its Users With Data And Voice Connectivity To Other Aircraft, Ground-based Installations, And Surface Vessels. Capabilities Include Line Of Sight Radio In Multiple Bands/frequencies, Beyond Line Of Sight (blos) Communications, Satellite Communications (satcom), And Their Integration Into E-6b And Its Systems. Systems In This Functional Area Will Need To Interface With And Provide Data And/or Voice Communications To Support The Systems That Provide The Tacamo, Abncp, Pnvc, And Alcs Missions, And Their Replacements. Delivery Orders And Task Orders (dos/tos) Within This Functional Area Are Expected To Include Mission Communications Systems Research, Development, Technical Studies, Cybersecurity, Design And Prototyping, Delivery Of Build-to-print Technical Data Packages (tdps) Suitable For Follow-on Competition, Production, Modification, Integration, Maintenance, And Test. 2. Mission Systems Architecture Design, Development, And Integration mission Systems Architecture Provides The Airborne Information Technology (it) Infrastructure And The Integration Of The Various Aircraft Avionics, Broadband Capabilities, And Mission Communications Systems To Support The E-6b Operational Mission. In Addition, The Very Low Frequency (vlf) Transmit And Receive System Provides A Vital Component Of The E-6b Operational Mission To Communicate With Critical Components Of The Nuclear Enterprise. Components And Systems Within This Functional Area With Need To Interface With And Support The Systems That Provide The Tacamo, Abncp, Pnvc, And Alcs Missions, And Their Replacements. Do/tos Within This Functional Area Are Expected To Include Mission Systems Architecture Research, Development, Technical Studies, Cybersecurity, Design And Prototyping, Delivery Of Build-to-print Technical Data Packages (tdps) Suitable For Follow-on Competition, Production, Modification, Integration, Maintenance, And Test. 3. Air Vehicle Maintenance, Modification, And Support this Functional Area Supports The Sustainment And Modifications To The E-6b Air Vehicle. The Maintenance, Modification, And Improvement Of The E-6b Avionics, Flight Deck, And Aircraft Power, And Any Related Systems, Subsystems, And Components Is Required To Ensure The Viability Of The Aging E-6b Airframe. Do/tos Within This Functional Area Are Expected To Include Air Vehicle Systems And Subsystems Research, Development, Technical Studies, Cybersecurity, Design And Prototyping, Delivery Of Build-to-print Technical Data Packages (tdps) Suitable For Follow-on Competition, Production, Modification, Integration, Maintenance, And Test. 4. Systems Engineering this Functional Area Supports Systems Engineering Analysis, Reviews, White-paper Creation, And Studies To Support All Aspects Of The Operation And Upkeep Of The E-6b And All Its Systems And Subsystems, As Well As Potential New Capabilities And Directed System Integration. This Support Includes Mass Properties, Weight And Balance, System Safety Engineering, Position, Navigation, And Timing (pnt), System Integration Design, System Specification Creation And Modification, And System Operation Analysis. Dos/tos Within This Functional Area Are Expected To Include Analyses, Studies, White Papers, And Support Of Systems Engineering Technical Review (setr) Events, 5. Software Design, Development, And Integration this Functional Area Supports Software Development Activities In Support Of Aircraft Infrastructure, Mission Systems And Mission Communications Systems, Ground Infrastructure And Lab Setup And Integration, And The Sustainment And Support System (sass). Dos/tos Within This Functional Area Are Expected To Include Software Requirements Definition And Derivation, Design, Development, Test, Integration, Documentation, Delivery, Deployment, And Maintenance Of Software Components And Systems. 6. Systems Security Engineering this Functional Area Supports Cybersecurity, Anti-tamper (at) And Cryptographic Encryption Analysis, Studies, And Products To Support The Secure And Reliable Operation Of The E-6b And Its Connectivity To Other Systems. Dos/tos Within This Functional Area Are Expected To Include Cybersecurity Analysis, Studies, Cross-domain Solutions (cds), Data, And Support Of The Risk Management Framework (rmf) Submissions By The Government, And Any Follow-on Or Similar Systems, To Support Interim Authority To Test (iatt) And Authority To Operate (ato) For The E-6b And Any Of It Systems, Subsystems, Ground Components, And Labs. Dos/tos Within This Functional Area Are Also Expected To Include Analyses, Studies, Data, And Other Needs Defined By The Government In Support Of Systems Security Engineering, At, And Cryptographic Encryption. 7. Sustainment And Product Support logistics And Sustainment Activities Consist Of Providing Services That Are Required For Optimal Performance Of The E-6b And Related Components Throughout The Program Lifecycle. Logistics And Sustainment Activities May Include Contractor Logistics Support (cls), Life Cycle Sustainment, Supply Support, Depot-level Support, Organization-level Maintenance, Intermediate Field-level Maintenance, Repair And Refurbishment, Alteration Installation, Logistics And Sustainment Analyses, Maintenance Planning, Management, And Services, Packaging, Handling, Storage, And Transportation (phs&t), Training And Training Support, Operation And Operator Training Curriculum Development, Obsolescence Management, Diminishing Manufacturing Sources And Material Shortages (dmsms) Support, Inventory And Sparing Management, Documenting Technical Data/red-lines For Data/ Documents/drawings Updates, Part And System Identification, Labeling, And Marking, Developing Test Plans, Performance Testing, System Operational Testing, Test Instrument Installation And Removal, User Familiarization, Configuration Audits, Material Delivery/validation, Support Equipment, Providing Support To Operational Fleet Assets, Facilities And Infrastructure Support, Sparing, And Disposition Of Materials. Logistics And Sustainment Activities May Include Cross-domain Solutions Also Applicable To Unmanned Air Vehicles Or Unmanned Underwater Vehicles. Do/tos Within This Functional Area Are Expected To Include Logistics And Sustainment Research, Technical Studies, And Support Services. eligibility the Product Service Codes (psc) For These Requirements Are Anticipated To Include, But Are Not Limited To: 7a20 -it And Telecom - Application Development Software (perpetual License Software) 7j20 - It And Telecom - Security And Compliance Products (hardware And Perpetual License Software) 5831 - Intercommunication And Public Address Systems, Airborne 5826 - Radio Navigation Equipment, Airborne 5841 - Radar Equipment, Airborne r425 - Support- Professional: Engineering/technical r499 - Support- Professional: Other r706 – Logistics Support Services r699 – Support – Administrative: Other r799 - Support- Management: Other ac11 - National Defense R&d Services; Department Of Defense - Military; Basic Research ac12 - National Defense R&d Services; Department Of Defense - Military; Applied Research ac13 - National Defense R&d Services; Department Of Defense - Military; Experimental Development 6910 - Training Aids 1560 - Airframe Structural Components 1620 - Aircraft Landing Gear Components 1630 - Aircraft Wheel And Brake Systems 1730 - Aircraft Ground Servicing Equipment 1710 - Aircraft Landing Equipment 5342 - Hardware, Weapon System c219 – Architect And Engineering – General: Other 5963 – Electronic Modules ac31 - National Defense R&d Services; Defense-related Activities; Basic Research ac32 - National Defense R&d Services; Defense-related Activities; Applied Research ac33 - National Defense R&d Services; Defense-related Activities; Experimental Development j015 - Maint/repair/rebuild Of Equipment- Aircraft And Airframe Structural Components j016 - Maint/repair/rebuild Of Equipment- Aircraft Components And Accessories the North American Industry Classification System (naics) Codes Are Anticipated To Include, But Are Not Limited To: 336411 - Aircraft Manufacturing 336413 - Other Aircraft Parts And Auxiliary Equipment Manufacturing 488190 - Other Support Activities For Air Transportation 541330 (exception 1) Military And Aerospace Equipment And Military Weapons 334111 - Electronic Computer Manufacturing 513210 - Software Publishers 541611 - Administrative Management And General Management Consulting Services 541715 - Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology) 334112 - Computer Storage Device Manufacturing 541618 - Other Management Consulting Services 541715 – Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology) 334511 - Search, Detection, Navigation, Guidance, Aeronautical, And Nautical System And Instrument Manufacturing 334220 - Radio And Television Broadcasting And Wireless Communications Equipment Manufacturing please Note That Under A Small Business Set-aside, The Small Business Prime Must Perform At Least 50% Of The Work To Be Performed In Accordance With Far 19.505. disclaimer this Sources Sought Is For Informational Purposes Only. This Is Not A Request For Proposal. It Does Not Constitute A Solicitation And Shall Not Be Construed As A Commitment By The Government. Responses In Any Form Are Not Offers And The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. No Funds Are Available To Pay For Preparation Of Responses To This Announcement. Any Information Submitted By Respondents To This Technical Description Is Strictly Voluntary. submission Details it Is Requested That All Interested Businesses Complete The Sources Sought Response Defined In Attachment 1, In Ms Word Format (ms 365 Compatible). All Responses Must Be Unclassified. If The Response Provided Contains Proprietary Information, It Must Be Marked Accordingly. Submitted Data Will Not Be Returned To The Responders. interested Vendors Are Solely Responsible For All Expenses Associated With Responding To This Sources Sought Notice. Pma-271 Will Not Pay For Information Received In Response To This Sources Sought Notice. do Not Submit Pricing Information In Response To This Sources Sought Notice. the Sources Sought Response Shall Be Electronically Submitted To Randy Putnam At Randolph.a.putnam.civ@us.navy.mil And Lisa Troccoli At Lisa.j.troccoli.civ@us.navy.mil In Accordance With The Response Date Identified Within This Posting. Questions Or Comments Regarding This Notice May Be Addressed To Randy Putnam At Randolph.a.putnam.civ@us.navy.mil.
Ministry Of The Interior Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
France
Closing Date15 Jan 2025
Tender AmountRefer Documents
Details: In 2024, a Contemporary Architecture Photography Campaign in Morbihan Was Led by Photographer Kourtney Roy at the Request of the Ddtm of Morbihan. It Is Planned to Publish This Work; To Do This, It Is Necessary to Supplement the Photographs with Graphic Documents and Explanatory Texts in Order to Present These Remarkable Architectures More Precisely. If Photography Indeed Makes It Easy to Present Buildings and Reach a Wide Audience, Technical and Analytical Information Are Essential to Understand and Respect the Qualities of Constructions, Whether for Visitors, Amateurs, Owners or Project Leaders. The Approach to Raising Awareness of Contemporary and Modern Architecture Does Not Aim to Protect But to Highlight and Stimulate the Desire for Architecture. The architect's approach is to respond as best as possible to today's uses and construction practices. Knowledge of architecture is a prerequisite for any proper consideration of the context, potentials and constraints, in the same way as geography or climate.
331-340 of 349 archived Tenders