Architect Tenders
Don Emilio Del Valle Memorial Hospital Tender
Civil And Construction...+1Building Construction
Corrigendum : Tender Amount Updated
Philippines
Details: Description Subject : Design And Build Of Dedvmh Ob Building Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives The Purpose Of This Project Is To Repair And Expand The Existing Ob Building To Provide Patients And Healthcare Workers With A More Spacious And Comfortable Area By Improving Its Ventilation, Air Conditioning, Lighting And Ensuring That The Size, Layout, And Functions Of The Structure Meet Their Diverse Healthcare Needs. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor B. Second Floor C. Third Floor (expansion) D. Roof Deck All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Delivery Complex - Ob-gyne Emergency Department - Neonatal Intensive Care Unit (nicu) - Chief Of Medical Professional Staff (cmps) Office - Ob-gyne Wards / Recovery Rooms - Conference Room / Training Rooms - Offices - Open Space For Mechanical Outdoor Units And Equipment Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Ob-gyne Building. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To: Review And Confirm The Submitted Design Documents. Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule. Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From Foundation Up To Roof Deck (entire Building); Includes Slabs, Beams And Girders Of Up To Roof Deck D) Architectural Works I) Exterior Walls – All Exterior Wall At From Ground Floor Up To Roof Deck Including Plastering Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits From Ground Floor To Roof Deck Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Drainage System I) Electronics / Auxiliary Works - At Functional Areas: Nurse Call Systems, Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). E. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category A. Specialty: Electrical, Mechanical And Plumbing Work. 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To: Medium-rise Hospital Facility Project, At Least 6-storey Building. Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 15 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 10 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 10 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Ob Building (shall Not Exceed Php 3,500,000.00 Plus 6% Of Excess Of Php 50,000,000.00) 5%-6% Of Abc Construction Of Dedvmh Ob Building 94%-95% Of Abc Total Abc Php 63,700,000.00 The Approved Budget For The Design-build Contract Is Sixty-three Million And Seven Hundred Thousand Pesos (php 63,700,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital – Ob Building. Detailed Architectural And Engineering Design Services Shall Not Exceed Three Million Five Hundred Thousand Pesos (php 3,500,000.00) Plus Six Percent (6%) Of Excess Of Fifty Million Pesos (php 50,000.000.00) (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (360) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 300 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons. Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In: Recognition And Avoidance Of Unsafe Conditions Workplace Safety And Health Requirements Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties. Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency. Plan Must Be In Writing For Employers With Greater Than 10 Employees All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Geotechnical Investigation Five (5) Sets Duly Signed And Seal Soil Analysis And Investigation Report In Hard Bound (refer To Geotechnical Investigation Specification And Parameters) 1.2 Structural Analysis And Design Five (5) Sets Duly Signed And Seal Structural Analysis And Design Report In Hard Bound Including The Executable E-files (staad/etabs,etc.) Five (5) Sets Duly Signed And Seal Structural Specifications In Hard Bound (refer To Structural Analysis And Design Specification And Parameters) 1.3 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors: Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling. Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain All Floors (except For Third Floor To Roof Deck) Shall Have Direct Access To Ramp Both Stairs Are For Service And Emergency Use External Window At Second Floor And Up Shall Be Of Awning Type. Provision Of Electrical Room Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.). Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building. Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair. Exits Terminate Directly At Open Space To The Outside Of The Building. General / Common Areas • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow And Infection Control, Particularly Important In Sensitive Areas Like The Delivery Complex And Nicu. - Planning Relationships: A. Adjacent To Staff’s Lounge B. Within The Delivery Complex And Nicu - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. • Staff’s Hallway - A Corridor Within The Delivery Complex And Nicu That Ensures A Minimum Clear Width Of 1.83 Meters To Facilitate Smooth, Unobstructed Movement Of Staff And Equipment, Enhancing Safety And Efficiency In High-traffic Medical Areas. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Auxiliary System: C. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: D. Provide At Least Six (6) Units Smoke Detector. • Patient’s Dressing/changing Rooms - Positioned Near The Entrance For Convenient Access, This Compact Room Accommodates Only One Bed Or Stretcher, Designed To Serve Both Ambulatory Patients And Those On Stretchers. With Separate Entrances To The Emergency Department And The Delivery Complex's Sterile Hallway, It Ensures Asepsis Despite Limited Space. - Planning Relationships: A. Next To Main Entrance B. Adjacent To Delivery Complex And Ob-gyne Emergency Department C. Close To Waiting Area And Comfort Room - Lighting System: D. For General Illumination, Provide At Least 250 Lux. - Power System: E. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: F. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: G. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (sterile-ground Floor, Delivery & Nicu Suite) - A Well-ventilated Passageway With Ambient Lighting And Centralized Air Conditioning, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (non-sterile-second Floor, Ob Wards/recovery Rooms) - A Well-ventilated Passageway With Ambient Lighting, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. • Staff’s Lounge - This Room/space Is Designed To Include A Comfort Room, A Counter With A Sink, Space For Dining Tables, And Resting Facilities. It Offers A Relaxing And Functional Space For Staff To Unwind, Eat, And Refresh During Their Shifts. - Planning Relationships: A. Next To Staff’s Main Entrance B. Adjacent To Staff’s Lockers. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide At Least One (1) Unit Orbit Fan. • Janitor’s Closet - This Room/space Is Designed To Keep Cleaning Materials With Mop Sink And As Storage For Janitor’s Cleaning Tools. - Planning Relationships: A. One Janitor’s Closet Located Close To Delivery/operating Room B. One Janitor’s Closet Located To Staff’s Lockers And Lounge. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. • Wheeled Stretcher’s Area - This Room/space Is Located Near The Main Entrance, This Area Is Designed To Accommodate At Least Two (2) Bed Stretchers, Ensuring Easy Access And Quick Deployment For Patients Arriving Via Stretcher. It Is Strategically Placed For Efficient Patient Handling And Smooth Transitions To Other Areas Of The Facility. - Planning Relationships: A. Located At The Entrance Of Delivery & Nicu Suite/complex - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Power System: C. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • All Gender / Pwd Toilet - This Restroom Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Patients, Relatives And Visitors. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Toilets/comfort Rooms - One Comfort Room For Both Male And Female Adult Ward While Separate Comfort Rooms For Stations, Offices And Service Rooms. - Planning Relationships: A. Equipped With Wall Mounted Intravenous (iv) Fluid Hook For Patient Rooms And Emergency Pull Chord With Corridor Lights Installed Above The Door. - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Access/exit Stairs - Stairs That Provide Essential Vertical Circulation For Movement Between Different Levels Of A Building, Typically Serving As Both An Access Point For Entry And An Exit For Egress. These Stairs Must Meet Safety Regulations, Including Proper Width, Handrails, Non-slip Treads, And Clear Signage For Easy Navigation. They Should Also Be Designed To Accommodate Emergency Evacuations And Ensure Accessibility Where Possible. - Planning Relationships: A. Exits Terminate Directly At An Open Space To The Outside Of The Building B. Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Access Ramps - Ramps Designed To Provide A Smooth, Accessible Pathway For Individuals With Mobility Challenges, Such As Wheelchair Users, To Enter Or Exit A Building. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Electrical/auxiliary Room - Due To Limited Space, This Room Is Designed With A Bi-folding Door That Provides At Least 1.60 Meters Of Clear Opening Width. Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed Away From Direct Patient Access To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. Ground Floor – Delivery Complex • Nurse Station W/ Sink, Inc. Supply Room And T&b - This Area Is Dedicated For The Nurses And Other Medical Staff Assigned To This Floor. It Shall House The Patient’s Charts, Patient’s Medications With Proper Compartmentalization, Nurse Call System Central Station, One Dedicated Comfort Room, Supply/medication Room And Ample Area For Doctors To Do Charting And Nurses’ Personal Belongings. This Station Should Be Located To Permit Visual Observation Of Patient (specifically Areas Such As Labor Room And High-risk Pregnancy Unit Room) And Movement Into The Suite. This Is Also Located Within The Sterile Area Of The Ob-gyne Complex, Is An Open Station, And Has Direct Access To The Hallways Common/centralized Air Conditioning. - Planning Relationships: A. Adjacent To Breastfeeding Room B. Close To Nicu, Ob-gyne Emergency Department - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least Two (2) Units Smoke Detector. - Security System: H. Provide At Least Two (2) Units Smoke Detector. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station. • Labor Room - This Area Is Dedicated For Maternity Patients To Be Monitored And Supervised During Labor And Delivery. Before Being Transferred To The Delivery Room, Patients Stay In The Labor Room For Assessment And Monitoring. Labor Rooms Should Have Adequate Lighting, Including Ambient Light And Focus Lights For Labor And Examination Tables. Labor Rooms Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. It Shall Also House One Dedicated Comfort Room And A Common Counter With Sink. - Planning Relationships: A. Adjacent To Delivery Room B. Close To Caesarian Delivery Room C. Close To Scrub-up And Sub-sterilizing Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning Unit System • Delivery Room - This Area Is Dedicated For Normal Spontaneous Delivery Services. It Shall Also House At Least Four (4) Delivery Beds And A Dedicated Newborn Resuscitation Area, A Place With A Flat Firm Surface And Heat Source, For Immediate Resuscitation And Stabilization Of Newborns Who Require Assistance At Birth. This Area Is Typically Equipped With Necessary Medical Equipment, Such As Oxygen, Suction Devices, And Other Resuscitation Tools, And Is Staffed By Trained Healthcare Professionals To Provide Emergency Care To Newborns In Critical Condition. The Delivery Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 750 Lux. - Power System: D. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Outlet 15a, 2p, 240v, Single, Grounding Type, Tandem. Two (2) Units Ground Terminal, Duplex. Also, Allocate Two (2) Units Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Cesarian Delivery Room - This Area Is Specialized Operating Room Equipped For Performing Cesarean Sections, A Surgical Procedure Used To Deliver A Baby Through An Incision In The Mother's Abdomen And Uterus. This Room Is Designed To Accommodate The Surgical Team And Necessary Medical Equipment, Ensuring A Sterile Environment And Readiness For Any Complications That May Arise During The Delivery. It Is Typically Equipped With Operating Tables, Surgical Instruments, Anesthesia Equipment, And Monitoring Devices For Both The Mother And Baby. This Operating Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Operating Room (c-section), Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 1000 Lux. - Power System: D. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • High-risk Pregnancy Unit - This Area Is Dedicated To The Care And Management Of Pregnant Women Who Have Been Identified As Having A Higher Risk For Complications During Pregnancy, Labor, Or Delivery. The Unit Provides Close Observation And Interventions To Ensure The Health And Safety Of Both The Mother And The Baby, Offering Specialized Care For Conditions Such As Gestational Diabetes, Hypertension, Multiple Pregnancies, Or Other Medical Concerns. It Shall Also House One Dedicated Comfort Room Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Fourteen (14) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System Master Or Cable Antenna Television - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Septic Lr/dr (labor Room/delivery Room) - This Room/space With Septic Cases Physically Separated From Regular Cases To Avoid Infection. This Room Is Equipped To Handle Sterile Procedures While Minimizing The Risk Of Cross-contamination, With Enhanced Infection Control Measures In Place. It Is Typically Isolated To Prevent The Spread Of Infections And May Include Specialized Equipment For Both Maternal And Neonatal Care To Address Potential Complications Arising From The Infection. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Scrub-up Area - This Room/space Where Preoperative Hand Washing Is Performed Located Outside Of The Delivery/operating Room Installed Either In A Recessed Wall Or Other Open Space But Shall Be Kept Away From Main Traffic Flow. This Shall Be Located Within The Sterile Zone Of The Delivery Complex, And Shall House 3-station Scrub Sink, With Gooseneck Spout & Foot Control, Sensor Type, And Provision For Hand-dryer. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Cesarian Delivery Room - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light And Hand Dyer. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Sub-sterilizing Room - This Room/space Where Medical Instruments And Equipment Are Cleaned And Partially Sterilized Before Being Sent To A Main Sterilization Area For Final Sterilization. This Room Typically Serves As An Intermediate Step In The Sterilization Process, Focusing On Decontaminating Items, Such As Surgical Instruments, To Reduce The Risk Of Infection. This Room Is Equipped With Sinks, Disinfectants, Ultrasonic Cleaners, And Possibly Other Equipment To Assist In The Preparation Of Items For Full Sterilization. It Should Be Accessible From The Delivery Room And Operating Room. Should Have A Utility Door That Provides Access Out From The Sterile Route, Ensuring A Controlled Flow Of Items Without Compromising The Sterile Environment. This Utility Door Should Lead To A Non-sterile Area, Allowing For The Safe And Efficient Movement Of Equipment And Materials, While Preventing Contamination From Entering The Sterile Zones. - Planning Relationships: A. Adjacent To Operating Room B. Adjacent To Scrub-up Area - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: G. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Sterile Instrument And Supply Storage - This Room/space Is Where Medical Supplies And Sterile Instruments Needed For Normal Spontaneous Delivery Are Kept. This Shall House A Counter With Sink And Drainboard, And Door With Vision Panel. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Clean-up Room - This Room/space Is Intended For The Sterilization Of Instruments In Accordance With Doh Guidelines On Cleaning, Disinfection, And Sterilization Of Reusable Medical Devices In Hospital Facilities In The Philippines (annex B Of Administrative Order No. 2012-0012). This Shall House Counter For Work, Sink With Double Compartment; Laundry; 350-400 Mm Deep. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide Least One (1) Orbit Fan. • Doctor’s On-call Room - This Room/space Is Where Doctors Can Rest And Recuperate While Being Available For Urgent Patient Needs Or Emergencies. It Shall 0house One Dedicated Toilet And Bath, Resting Facilities, And With Essential Features Such As Sound-proofing And Alert System That Notifies The Doctors Of Emergencies Or When They Are Needed Urgently. It Should Be Located In Close Proximity And Have Direct Access To The High-risk Pregnancy Unit, Septic Labor/delivery Room, Labor Room, And Nurse Station. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station C. Close To High-risk Pregnancy Unit, Septic Labor/delivery Room, And Labor Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Eight (8) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System Ground Floor – Ob-gyne Emergency Department • General Requirements - This Area Should Be Located In Ground Floor To Ensure Easy Access For Patients. It Shall Also Have Separate Entrance To The Emergency, And Corridors For Access By Patient Using Bed Or Stretcher And Equipment (2.44 Meters Or 8.00 Ft. Clear Width) And A Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. Of 4.00 Ft.). Due To Limited Space Available, This Whole Area Only House Small Independent Nurse Station With Counter And Sink, Observation Bay And Treatment Area With Sink Or Wall-hung Lavatory, Divided By Privacy Curtains/dividers, Equipment/supply Storage For Direct Access To Resuscitation Equipment, One Dedicated Comfort Rooms, And A Patient Dressing/changing Room With Separate Entrances To The Emergency Department And Onto Delivery Complex Sterile Hallway To Provide Asepsis. • Waiting Area - This Room/space Is Where Patients, Companions, And Visitors Can Wait Comfortably. However, This May Be Located Outside Of The Birthing Clinic If There Is No Sufficient Space Provided That There Should Be An Overhead Cover. The Waiting Area Can Also Be Situated Along A Corridor Provided That The Width Of Such Corridor Shall Not Decrease Lower Than 1.83 M In Width. It Should Be Well-ventilated And Equipped With Ample Lighting To Ensure A Comfortable And Inviting Environment For Patients And Visitors. This Shall Be In Close Proximity To Other Provided Common Areas Such As Comfort Rooms And Common Counter With Sink For Hygienic Activities. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide Least Two (2) Units Orbit Fan • Nurse Station With Sink - This Area Is Located To Permit Observation Of Patient And Control Access To Entrance, Waiting Area, And Treatment Area. This Area Should Also House A Working Table And A Separate Counter With Sink. - Planning Relationships: A. Located At Ob-gyne Emergency Department B. Close To Emergency Entrance C. Adjacent To Observation Bay And Examination/treatment Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Ground Fault Circuit Interrupter (gfci) Outlet. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Security System: I. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: J. Provide Air Conditioning System • Observation Bay - This Room/space Is Designated Area Where Patients Can Be Closely Monitored After Initial Assessment. This Space Only Houses One (1) Observation Bed Or Recliner Due To Insufficient Space Available. It Is Adjacent To Examination/treatment Room And Should Be Divided By Privacy Curtains/dividers, And Should Be In Close Proximity To Comfort Room Available. - Lighting System A. For General Illumination, Provide At Least 750 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Allocate One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System • Examination And Treatment Area - This Room/space Where Pre- And Post-natal Check-up Is Conducted, It Is Designated Area With Clear Visibility From The Nurse Station, Efficient Equipment Placement, And Dedicated Spaces For Examination And Treatment. It Is Adjacent To Observation Bay And Should Be Divided By Privacy Curtains/dividers. This Shall Have A Sink Or A Wall-hung Lavatory And Should Be In Close Proximity To Comfort Room Available. This Space Shall Also Accommodate One (1) Procedural Bed, Similar To The Examination Bed But With Extra Support For Patients Undergoing Treatments And Space For Equipment. The Bed Should Be Adaptable For Minor Procedures Like Suturing, Drainage, Or Stabilization For Transport. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Equipment/supply Storage Room - This Room/space Is Essential For Maintaining Organized, Accessible, And Sterile Storage Of Medical Supplies, Instruments, And Other Necessary Materials. Due To Limited Space, Set-up Must Be Optimized To Ensure Essential Supplies Are Organized And Accessible. This Shall Also Be Temperature/humidity Controlled To Preserve The Quality Of Stored Sensitive Items. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. Ground Floor – Neonatal Intensive Care Unit (nicu) • General Requirements - The Nicu, Located Adjacent To The Breastfeeding Room And On The Same Floor As The Delivery Complex, Should Be Designed To Maximize Limited Space. It Will Include An Independent Nurse Station With An Attached Comfort Room For Staff Convenience. The Layout Will Accommodate Supply Storage, With Vertical Solutions To Save Space, And Provide An Ample Area For Examination Table And Essential Equipment. Infection Control Measures Will Be In Place, Including Zoning For High-risk Cases, Handwashing Stations, And Access To Ppe. Nicu Shall Be Separate But Immediately Accessible From The Delivery Room/cesarian Operating Room. The Nicu Will Be Soundproofed To Minimize Noise And Create A Quiet, Conducive Environment For Neonates' Rest And Recovery. Due To Limited Space, The Nicu Will House Only Ten (10) Bassinets. The Design Will Focus On Maximizing Available Space While Ensuring Essential Equipment, Infection Control Measures, And Patient Comfort Are Maintained. This Shall Also Include A Viewing Glass Window For Family Members To Observe Their Newborns While Maintaining The Necessary Infection Control Protocols. This Window Will Be Strategically Positioned In A Way That Provides A Clear View Of The Ten (10) Bassinets And Ensures Privacy And Security. • Nurse Station W/ Sink, Including Supply Room And Toilet - The Nicu Design Will Include An Independent Nurse Station With A Sink For Hand Hygiene, Ensuring Staff Can Maintain Cleanliness And Efficiency While Monitoring Patients. It Will Also Feature A Separate Counter With A Sink And An Additional Counter Or Table For Work Tasks. Adjacent To The Nurse Station, A Comfort Room Will Provide Convenience For Staff During Long Shifts. The Layout Will Incorporate Supply Storage With Vertical Solutions To Optimize Space And Keep Essential Equipment Organized, Maximizing The Use Of Limited Space While Ensuring Facilities For Both Patient Care And Staff Comfort. - Planning Relationships: A. Adjacent To Breastfeeding Room - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: D. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Security System: G. Provide Closed – Circuit Television Cctv At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Breastfeeding Room Including Sink And Toilet - This Room, Located Adjacent To The Nicu, Will Be Designed With Its Own Counter And Sink For Hygiene And Convenience. It Will Include A Comfort Room For The Mother's Use And Ample Seating Space For Comfortable Breastfeeding. Additionally, The Room Will Feature A Foldable Diaper Changing Station, Maximizing Space While Providing Necessary Facilities. This Layout Ensures A Private And Functional Space For Mothers To Care For Their Newborns While Maintaining Proximity To The Nicu. - Planning Relationships: A. Adjacent To Nurse Station And Nicu - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System Ground Floor – Cmps (chief Of Medical Professional Staff’s Office) • Chief Of Medical Professional Staff’s Office - The Chief Of Medical Professional Staff’s Office Will Be Strategically Located Close To The Delivery Complex And Will Be Soundproofed (such As High-density Acoustic Panels, Insulated Walls) To Ensure Privacy And A Quiet Environment. The Office Will Include A Toilet And Bath, Archive Area, With A Hidden Access Door Connecting To The Office For Discreet Access. It Will Also Feature A Secretary And Receiving Area, A Conference Room With An Attached Comfort Room, And A Pantry For Staff Convenience. The Archives Area Will Be Situated Nearby For Easy Access To Important Documents, Ensuring A Functional And Efficient Workspace While Maintaining Privacy And Comfort. The Chief Of Medical Professional Staff’s Office Will Include A Corner With A Full-length Window, Offering A Panoramic View Of The Hospital's Vicinity. This Design Feature Will Enhance Natural Light, Provide A Sense Of Openness, And Allow The Chief To Observe The Surrounding Area. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots For Cmps Office, Two (2) Units For Secretary’s Area, Two (2) Units For Receiving Area, Six (6) Units For Conference Room And Two (2) Units For Lounge/pantry. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light, For Cmps Office, Secretary’s And Receiving Area, And Conference Room. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide Three (3) Units Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Four (4) Units Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System Second Floor – Ob-gyne Wards / Recovery Rooms • Nurse Station With Sink, Including Supply Room, Medication Room, And Toilet - This Enclosed Area, Located On The Second Floor Intended For Wards, Recovery Rooms, And Other Service Rooms, Is Dedicated To Nurses And Medical Staff Assigned To This Floor. It Houses Patient Charts, Medications With Proper Compartmentalization, A Nurse Call System Central Station, A Dedicated Comfort Room, A Supply/medication Room, And Ample Space For Doctors To Do Charting And Nurses' Personal Belongings. The Station Allows For Visual Observation Of Key Patient Areas And Movement Into The Suite. It Is Centrally Located With Direct Access To The Common Hallways. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Two (2) Private Rooms (1-bed Capacity) With Toilet And Bath - These Rooms Are Designed To Provide A Private, Comfortable Space For Patients, Each With A Single Bed, And Include An Attached Toilet And Bath For Patient Convenience And Privacy. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Semi-private Rooms (3-bed Capacity) With Shared Sink, Toilet And Bath - This Room Is Designed To Accommodate Three Patients, Offering A Semi-private Setting With A Shared Space For Comfort And Care. This Room Includes A One (1) Shared Sink, And Toilet And Bath. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Infirmary Room (1-bed Capacity) With Toilet And Bath - This Room Is Designed To Accommodate The Hospital Staff’s And/or Their Immediate Family Members. It Provides A Private Space With A Bed, Toilet, And Bath, Offering Comfort And Privacy While Supporting Basic Medical Needs During Their Stay. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Isolation Room (1-bed Capacity) With Sink, Ante Room, Toilet And Bath - This Room Is Designed To Accommodate A Single Patient In Isolation, Providing A Controlled Environment For Infectious Or High-risk Patients. It Includes A Bed, Ante Room With Sink Or Wall-hung Lavatory For Staff To Change And Prepare Before Entering, And An Attached Toilet And Bath For Patient Comfort And Hygiene. The Room Is Equipped To Prevent The Spread Of Infection, With Strict Access Control And Infection Control Measures In Place. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Teen Adolescent (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six Adolescent Patients, Featuring A Shared Sink, With Separate Shower And Toilet Facilities To Ensure Privacy And Hygiene. The Shared Sink Area Allows For Efficient Use Of Space While Maintaining Cleanliness, While The Separate Shower And Toilet Provide The Necessary Amenities For Patient Comfort And Convenience. The Design Creates A Supportive And Functional Environment For Young Patients, Offering Ease Of Access To Medical Care. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Gyne Ward (7-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Seven (7) Gynecological Patients. It Includes Shared Facilities Such As A Sink, Shower, And Toilet To Efficiently Serve The Needs Of Multiple Patients While Ensuring Hygiene And Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Ob Ward (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six (6) Obstetrics Patients, Featuring Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Help Optimize Space While Ensuring Patients Have Access To Essential Hygiene Facilities. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Ob Ward Extension (18-bed Capacity) With Shared Sink, Shower And Toilet - This Extension Is Designed To Accommodate Up To Eighteen (18) Obstetrics Patients, With Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Ensure Efficient Use Of Space While Providing Essential Hygiene Facilities For All Patients. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Eighteen (18) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Six (6) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Csb Care For Small Baby Room With Toilet - This Room Is Designed For Small Or Premature Babies, With Space For Four Beds, An Attached Toilet, Foldable Diaper Changing Station, And Resting Facilities For Caregivers. It Provides A Functional And Comfortable Environment For Both Babies And Families. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Hearing Screening Room - A Dedicated Space For Conducting Hearing Tests And Screenings, Typically For Newborns Or Young Children. The Room Is Equipped With Specialized Auditory Equipment And Soundproofing To Ensure Accurate Results. It Is Designed To Provide A Quiet, Controlled Environment For Hearing Assessments, With Comfortable Seating For Patients And Their Guardians. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Newborn Screening Room - The Room Is Equipped With The Necessary Medical Equipment For Blood Sampling, Physical Exams, And Diagnostic Tests. It Is Designed To Provide A Safe, Comfortable Environment For Newborns And Their Parents While Ensuring The Efficient And Accurate Collection Of Screening Samples. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Stock Room - A Storage Area For Medical Supplies And Equipment, Organized With Proper Shelving And Labeling For Easy Access And Inventory Control. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Department Chair’s Office Including Secretary And Receiving Area And Toilet - Located Adjacent To The Conference Room, This Office Includes A Work Room For The Chair, A Secretary And Receiving Area, And An Attached Toilet For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Conference Room - Located Adjacent To The Department Chair's Office, This Room Is Designed For Meetings And Presentations, Equipped With A Large Table, Seating, And Audiovisual Equipment For Effective Communication. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Doctor’s Quarters With Shared Shower And Toilet - Due To Limited Space, This Room Accommodates Two Beds, With Shared Shower And Toilet Facilities, Providing Comfort And Privacy For Doctors During Their Shifts Or On-call Duties. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Affiliates Lounge With Toilet And Bath - A Designated Space For Hospital Affiliates To Relax, Equipped With Comfortable Seating And An Attached Toilet And Bath For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System Third Floor – Conference / Training Room, Office Rooms • Conference/training Room With Male And Female Toilets - A Room For Meetings Or Training, Featuring Separate Male And Female Toilets For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Three (3) Units Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System • Office Room 1 (research And Petru) With Sink And Toilet - A Designated Office Space For Research And Petru Activities, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: G. Provide Air Conditioning System • Office Room 2 (qi/ps, Quality Improvement Patient Survey) With Sink And Toilet - A Dedicated Office For Quality Improvement And Patient Survey Activities, Featuring A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: F. Provide Air Conditioning System • Office Room 3 (osm, Office Of The Strategic Management) With Sink And Toilet - A Designated Office Space For The Office Of Strategic Management, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System Roof Deck – Open Area • Open Areas For Mechanical Outdoor Units And Equipment - Designated Roof Deck Spaces For Housing Mechanical Units And Equipment, Ensuring Proper Ventilation And Easy Access For Maintenance. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Xii. Geotechnical Investigation Specifications And Parameters A. Location Before The Conduct Of Sub-surface Soil Exploration Works, The Consultant/contractor Shall Coordinate With The Procuring Entity Technical Representative For Proper Coordination On The Location Of The Project. B. Scope Of Work The Consultant/contractor Shall Provide All The Labor, Instrument/equipment Materials And Supplies, Vehicles, Bunkhouses, Etc., Necessary To Perform Satisfactorily The Sub-surface Exploration Herein Required, Viz: 1. Field Works 2. Laboratory Testing 3. Soil Investigation And Preparation Of Report 4. Geotechnical Evaluation Report The Consultant/contractor Shall Be Held Solely Responsible For The Result Of This Boring/drilling Exploration And Other Activities Under This Terms Of Reference C. Detailed Exploration Requirements/specifications A. Field Works 1. Location And Number Three (3) Boreholes, At Different Location Shown On The Plan. 2. Depth Of Borings Twenty (20) Meters Depth Below Natural Ground Or Five (5) Meters In Bedrock/hard Strata. 3. Procedure In Sand, Clay And Silt Materials, The Boreholes Shall Be Advanced By The Wash Boring Method In Between Sampling Sections Using Side Discharged Chopping Bits. Whenever Necessary, N-size Casings Shall Be Utilized. The Washed Section Shall Be Cleaned Thoroughly Before Each Sampling Run Ensuring, However, That The Underlying Soil Is Not Disturbed. Sampling Shall Be Done At One Meter Interval From The River Bed To Hard Strata Using 5.0 Cm. Split Spoon Sampler. In A Soft Cohesive Layer, Undisturbed Samples Using Thin-walled Tube Samplers Shall Be Obtained Hydraulically. Core Drilling Shall Be Carried Out By A Diamond Rotary Drill Method In Gravelly Or Rock Formation. Core Samples Shall Be Undertaken Whenever Solid Formation Is Encountered. Cores Shall Be Placed In Core Boxes Arranged And Labeled In Accordance To Depth As Soon As These Are Extracted From The Boreholes. Drilling And Sampling Procedures Shall Comply In Accordance With Astm Standards. 4. Equipment A. Drilling Machine The Contractor Shall Utilize At Least Two (2) Drilling Machines And Set Them Up At The Project Site. The Drilling Machine Shall Be In Good Working Condition And Shall Be Of Such Capacity As To Maintain Satisfactory Progress Of Work. B. Bits The Contractor Shall Have An Ample Supply Of Different Types Of Bits To Adopt To Varying Conditions. Bottom Discharge And Stepped Bits Shall Also Be Available. C. Core Barrels Double Tube Swivel Type Core Barrels In Good Condition And Capable Of Obtaining Maximum Core Recovery Shall Be Used. D. Casing The Contractor Shall, At His Own Expense And Responsibility, Provide Casings As Required To Ensure The Stability Of The Borehole Walls. The Casing Shall Be At Least Of N-size And Shall Be In Good Condition. After A Hole Has Been Finished The Casings Shall Be Retrieved. 5. Handling And Core Of Samples The Contractor Shall Provide All The Materials, Equipment And Labor Necessary For Preserving Samples. B. Laboratory Testing The Preparation Of Samples For Testing Shall Be Made In Accordance With Aashto. The Following Tests Shall Be Made On Samples Obtained From Boring, Drilling. Standard Penetration Test The Test Shall Be Carried Out Through Ordinary Soil Encountered To The Depths Specified Above. Standard Penetration Test Shall Be Performed Using 5.0 Cm. (2.0 In.) Outside Diameter Split Spoon Sampler, Driven By A 63.6 Kg (140 Lbs.) Hammer Falling 76.0 Cm. (30 In.) At 1.50-meter Interval Or Closer If Necessary. Moisture-density Rotation This Test Method Determines The Relationship Between The Moisture Content And The Density Of Soils Compacted In A Mold. The Contractor Shall Conduct This Procedure According To Nd T 99 Or Nd T 180. Bearing Capacity Test The Test Method Covers Estimation Of The Bearing Capacity Of Soil In Place By Means Of Field Loading Tests. This Test Method Can Be Used As Part Of A Procedure For Soil Investigation For Foundation Design. It Gives Information On The Soil Only To A Depth Equal To About Two Diameters Of The Bearing Plate, And Takes Into Account Only Part Of The Effect Of Time. Sieve Analysis The Contractor Shall Conduct This Test In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Combines The Two Test Methods. Sieve Analyses Determine The Gradation Or Distribution Of Aggregate Particles Within A Given Sample In Order To Determine Compliance With Design And Production Standards. Accurate Determination Of Material Smaller Than No. 200 (75 Μm) Cannot Be Made With Aashto T 27 Alone. If Quantifying This Material Is Required, It Is Recommended That Aashto T 27 Be Used In Conjunction With Aashto T 11. Following Aashto T 11, The Sample Is Washed Through A No. 200 (75 Μm) Sieve. The Amount Of Material Passing This Sieve Is Determined By Comparing Dry Sample Masses Before And After The Washing Process. This Procedure Covers Sieve Analysis In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Includes Two Method Choices, A And B. Liquid Limit Liquid Limit Test Shall Be Performed On Material Passing The 0.425mm (#40) Sieve. Aashto T 89 & T 90 27. There Are Two Methods Approved By Aashto, Any Of The Two Methods Can Be Used By The Contractor. Blow Count Must Be Within 22-28 Blows. Liquid Limit Is A Calculation Based On Moisture Content And Number Of Blows To Closure. Soil Classification This Standard Classifies Soils From Any Geographic Location Into Categories Representing The Results Of Prescribed Laboratory Tests To Determine The Particle-size Characteristics, The Liquid Limit, And The Plasticity Index. There Should Be Assigned Group Name And Symbol(s) Along With The Descriptive Information. Practice D2488 Can Be Used To Describe A Soil To Aid In The Evaluation Of Its Significant Properties For Engineering Use. Engineering Behavior Of The Soils Must Be Seen. C. Soil Investigation And Preparation Of Report The Soil Investigation Report Must Be Done By An Accredited Geotechnical Engineer. D. Geotechnical And Evaluation Report The Contractor Shall Prepare The Geotechnical Report & Analysis In Three (3) Bound Copies In A Form And Substance To Be Submitted To Doh – Ro7, Osmeña Boulevard, Cebu City Within Fifteen (15) Calendar Days Upon Receipt Of The Notice To Proceed. The Final Report Shall Not Be Limited To The Following: A) Field Investigation And Methodology B) Borehole Drilling And Sampling C) Laboratory Testing D) Final Boring Logs (bl) E) Final Laboratory Tests Results (fltr) F) Borehole Location Plan G) Soil Profile Along Structures Showing Boring/drilling Logs H) Soil Liquefaction Investigation Report I) Soil Bearing Capacity J) Recommendation If Called For Such As Type Of Measure/structure Of Work E. Other Data To Be Submitted A. Boring Logs 1. Job, Boring, Hole Number, Date, Time, Boring/drilling, Foreman, Supervisor 2. Weather Condition 3. Depth Of Boring At Start Of Day 4. Water Level In Casing At Start Of Day 5. Method Of Penetration And Flushing System 6. Description Of Soil Strata Encountered 7. Depth Of Soil Boundaries 8. Size, Type And Depth Of Samples And Sample Number 9. Type And Depth Of In-situ Tests 10. Standard Penetration Tests Resistance, “n” Value 11. Recovery Ratios Of Samples 12. Detailed Notes On Boring/drilling Procedure, Casing Sizes And Resistance To Driving, Description Of Wash Water Or Spoil From Boring/drilling Tools 13. Depth Of Boring At End Of Day 14. Other Relevant Information Such Rqd, Percent Core Recovery, Angle Of Friction Etc. B. Photographs Photographs Showing The Borehole Drilling And Sampling At Each Proposed Sites Shall Be Taken By The Contractor And Incorporated In The Report. Photographs Shall Be Taken At Each Borehole Location Depicting The Following: 1. Equipment Used 2. Core Drilling Operation 3. Water Level Measurements 4. Performance Of Spt And Shelby Tube Sampling 5. All Cores In The Core Boxes, Spt And Shelby Tube Samples 6. Date Photographs Was Taken -end Of Geotechnical Investigation- Xiii. Structural Design And Analysis Specifications And Parameters A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Dpwh Blue Book 4. American Concrete Institute (aci) 5. American Society For Testing Materials (astm) 6. American Welding Society (aws) B. Design Criteria Shall Be Submitted First To The Procuring Entity For Concurrence Of The Following Minimum Design Requirements: 1. Design Loads (dead Load, Live Load, Wind Load, Seismic Load And Analysis Procedure, Load Combinations) 2. Materials (concrete, Reinforcing Steel Bars, Structural Steels) 3. Foundation (allowable Foundation Pressure) 4. Design References C. Minimum Design Input File In Structural Software And Required Reports 1. Job Information 2. Joint Coordinates 3. Material Definition/specification 4. Member Property 5. Support Definition 6. Load Definition (seismic/dead/live/wind/load Combinations) 7. Analysis Procedure 8. Analysis Result 9. Load List 10. Support Reaction List 11. Design Results (footing/ Column/ Beam) 12. Load Diagrams 13. Structural Plans -end Of Structural Design And Analysis- Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards. Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies. Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans. Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans. Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters. Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters. Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details. Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing. Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing. Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes. Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings. The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans. Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01. Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures. Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections. The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design. Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation. Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles. Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following: Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line Road Network And Curbs And Sidewalks Parking Spaces Reference Location Of Existing Trees Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides: The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments. The Inner Zone Shall Include The Wards. The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services. The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers. There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks. In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation. Covered Walkways Shall Be Provided For Access And Connection To All The Buildings. Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised. The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans. Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements. Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works. Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60. Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing. Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound. Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission. Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 3. Floors For Sterile Areas, Delivery & Nicu Complex, Floor Finish Shall Be Roll-form Anti-static Anti-bacterial Homogeneous Vinyl With Welded Joints. It Shall Cove Upwards To The Sides Of The Wall Up To A Minimum Of 200mm. From The Floor. If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design. Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections. The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern. The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works The Following Rooms Shall Have A Minimum Ceiling Height: A. Operating Room – 3000mm., To Accommodate The Ceiling-mounted Or Light B. Wards Of 4 Beds And Up – 3000mm., To Provide Better Natural Ventilation Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details. If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details. Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould. Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation. Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal. Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors. Toilets And Other Wet Areas Shall Have Steel Doors. Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers. Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines. Aluminum Frames Of Glass Doors Shall Be Powder-coated. Door Finish And Color Shall Be Approved First Before Application. Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope. All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines. Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details. All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details. Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344. Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines. Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall. Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These. Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor. Electrical Light Switches Shall Be Located By The Knob Side Of The Door. Electrical Switches And Outlets Shall Be Installed Plumb And Level. Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers. Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344. A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies. Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage. Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details. Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details. Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details. The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish. Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint. Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish. Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish. Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified. Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following: Gutter, Eaves, And Parapet Ceiling - Covelight, Special Connections And Design, Mouldings, Valances Stairs - Handrail, And Baluster Design Ramps - Handrail Design And Floor Pattern Doors, Windows And Gates - Grille Works, Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/nurse Station Counter Special Carpentry Works, E.g. Partitions, Cabinetry Building And Room Signages And Wayfinding Systems All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet” Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Private Wards, Including Bed Head Panel Fixtures And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Nurse Station C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels. Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles. Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material. Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick. Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified. Aluminum T-runners Shall Be Powder Coated. Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings. Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House. The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa. The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp); For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant. For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements Provide Details Of The Following: 1. Fiberglass Pressure Tank (80g Minimum Capacity With Shallow Well Jet Pump Of At Least 1.5 Or 2 Hp) Located At Roof Deck 2. Stainless Steel Storage Tanks, Grade 304 Located At Roof Deck E. Summary Of Materials Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings) Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified) Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp) 300mm Dia. And Above, Reinforced Concrete Pipe (rcdp) Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888 Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified) Floor Drains/deck Drains; Cast Iron Brass (bps Certified) Gutter Drains; Cast Iron Dome Type Brass (bps Certified) Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Trench Grating; Galvanized/stainless Steel Iron Grates Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified) Water Closet-tank Type Push Button Flush Lavatory - (pedestal/counter Type) With C-spout Spray Faucet Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet Urinal-wall Hung Flush Valve Type Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse. An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building. Hazard Classification Shall Be Light Hazard Occupancy. Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M. Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing. All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System. Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller. Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes. Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary. Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways). Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards. Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System: Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Nurse Call System F. Master Or Cable Antenna Television Fire Alarm System Security System 5. Lightning Protection System The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following: Lighting Fixtures/luminaires Panelboard And Circuit Breakers Switchgear And Other Metering Devices Electrical And Hospital Equipment Installation And Termination Of Auxiliary And Other Special Devices And Equipment Power And Telephone Handholes (as May Be Required) Pedestal And Service Entrance To Bldg. Grounding System Layout Substation/power House And Electrical Room Transformer And Generator Mounting Others As May Be Required. C. Summary Of Materials General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3) Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied. Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure. Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40. Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size. Nurse Call System: 1. The Nurse Call System Shall Have The Following Control Panel, Bed Head Panel, Ancillary Call And Annunciating Equipment. 2. Wiring Shall Consist Of Data Cable And 24v Supply To Each Bed Head Unit. 3. Two Levels Of Call Will Be Provided By The System: Patient To Nurse. A Patient To Nurse Shall Be Actuated By Means Of The Wall-mounted Or Handset Mounted Call A) Push Button Of Bed Head Panel. B) Nurse To Nurse. Call Of Nurse To Nurse Shall Be Considered, As Emergency Call And Shall Be Instigated By Operation Of The Emergency Pull/push Switch Mounted On Call Units Of Bed Head Panel. C) Bedhead Panel Shall Be Of Different Type Depending On The Patient Bedroom Class And As May Be Required. Multiplexed Bedhead Panel Shall Be Available To Operate Sound Distribution System. D) Bathroom Shall Be Provided With Pull Cord Unit And Reset Unit. E) Room Indicator Lamp Shall Be Installed Above The Door Of Each Patient’s Bedroom Along The Corridor. F) Nurse Stations Shall Be Equipped With Indicator Unit To Provide Indication (audible And Visual) Of The Zone And Type Of Call. G) Emergency Indication Shall Be Included In Some Acute Areas But Arranged “for Staff Use Only” In The Event Of Urgent Assistance Being Required. H) The System Shall Be Of Solid State Switching With All Items Connected To Internal Printed Circuit Boards Readily Interchangeable For Maintenance Purpose. Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building. Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service. Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality. Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Nurse Station, Etc. Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities) Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards. Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government. The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals. In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities. Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun. Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain. Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System. Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials. Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc. Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible. Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology. Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals. All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security. Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms. Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank Use Of Waterless Urinals And Dual Flush Water Closets. Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets. Use Of Water-saving Shower Heads For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act. A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied. Waterless Urinals Must Be Provided For Male Toilets. There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint. Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used. Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop. Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing. Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality Harvest Natural Daylight If Applicable. Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained. Use Of Acoustic Privacy Partitions Is Required. Separate Entrances For Ambulances And Walk-in Patients. In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia. In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible. Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45. Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement Contractor’s Temporary Facility And Lay Down Yard. Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos Material Testing (rsb, Chb, Concrete, Steel) Safety Requirements (warning Signs, Hardhat, Etc.) As Built Plan Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction. All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative Soil Excavation And Soil Treatment Restoration Of Any Damaged Properties During The Construction Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. No Implementation Of The Project Without An Approved Plan And Other Related Documents. Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules. Shall Abide By The Medical Center Hospital House Rules Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives. Soil Investigation Concrete Strength Testing Reinforcing Bar Strength Testing Concrete Masonry Unit (cmu) Testing All Plumbing And Sanitary System Automatic Fire Sprinkler System Ventilation And Air Conditioning System All Electrical System And Other Tests That Necessary To Perform To Ensure The Quality Of The Project All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives. The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation. No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Design Analysiselectronics/auxiliary System Ready For Integrated Communications 1. Nurse Call System 2. Telephone System 3. Paging System 4. Lan System 5. Fire Alarm System 6. Security System Cctv 7. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
Closing Date10 Apr 2025
Tender AmountPHP 63.7 Million (USD 1.1 Million)
PUBLIC BUILDINGS SERVICE USA Tender
Civil And Construction...+1Civil Works Others
United States
Details: This Is A Pre-solicitation Notice Only.this Is Not A Request For Proposal.
construction Services For Roof Repairs At The Almeric L. Christian Federal Courthouse & Office Building Located Atchristiansted, St. Croix, U.s. Virgin Islands, 00820-4173
reference Is Made To Sam Sources Sought No. Sourcessought_vi0008zz_roof Posted On November 13, 2024. All Solicitation Posts And Updates For The Roof Repairs At The Almeric L. Christian Federal Courthouse & Office Building Project Will Be Posted To Solicitation No. 47pc0225r0017.
the U.s. General Services Administration (gsa), Public Buildings Service (pbs), Northeast And Caribbean Region (region 2) Intends To Issue A Request For Proposal (rfp) For A Qualified General Contractor To Provide Construction Services For The Roof Repairs At The Almeric L. Christian Federal Courthouse & Office Building Located At Christiansted, St. Croix.
the Almeric L. Christian Fob And Usch Was Constructed In 1992 And Houses The St. Croix Division Of District Court Of The U.s. Virgin Islands, Along With The Several Federal Agencies. In The Past Years, Some Repairs Have Been Made To The Building Envelope, Including To The Roof Metal Panels. The Existing Roof Metal Panels And Other Roof Elements Are Corroded And Are Near To Reach Their Life Expectancy And There Are Several Locations In The Building That Are Experiencing Water Intrusion. For This Reason, The Government Goal Is To Procure The Services Of A General Contractor To Replace And Repair The Metal Roof Panels And Membrane Roofing Systems As Identified In The Design Drawings And Specifications.
the Project For The Roof Repairs At Almeric L. Christian Federal Building & U.s. Courthouse, St. Croix, U.s.v.i, Includes All The Details Outlined In The Contract Drawings And Specifications For The Project.
the Project Includes The Following:
removal Of Existing Metal Roofing And Plywood Substrate Down To Steel Purlins As Per Structural Calculations On The Contract Drawings. Replacement With Fire-retardant Plywood.
removal And Replacement Of Existing Roof Insulation In The Areas Where The Existing Plywood Is Scheduled To Be Replaced. The Base Bid Work Will Incorporate These Areas Indicating Replacement Of Insulation And Call For The Contractor To Provide A Unit Cost For Additional Insulation As Well As The Labor To Install It.
removal And Replacement Of Existing Metal Gutters, Downspouts, Etc. New, Pre-finished Metal Gutters And Downspouts Will Tie Into The New Standing Seam Metal Roofing System.
removal Of Eastern Roof Ladder. A New Ladder Will Be Provided. The Existing Western Ladder Will Be Scraped And Painted.
provide A New Pre-finished, Standing Seam Metal Roof System. The Metal Roofing Is Interlocking With Concealed Fasteners And Is Manufactured To Withstand Hurricane Winds. A Water-resistant Membrane Will Be Installed Under The Metal Roof System. New Flashings, Boots, Etc. Will Be Installed As Required.
provide Osha Compliant Standing Seam Metal Roof Horizontal Lifeline System.
additionally, There Are Three Bid Options For This Construction Project.
bid Option No. 1: Involves The Removal And Replacement Of Tpo Membrane Roof Systems On Flat Roof Areas.
bid Option No. 2: Involves The Removal And Replacement Of Tpo Membrane Roof Systems Over The Parking Garage.
bid Option No. 3: Involves The Removal And Replacement Of The Existing Metal Roof System On The Water Treatment Building.
the Estimated Cost Of Construction Range For This Project Is $1-5 Million.
the Period Of Performance For This Contract For The Base And Options Is Two Hundred And Seventy Calendar Days (270) And Sixty Calendar Days (60) For Contract Closeout.
this Requirement Will Be Issued As A Total Small Business Set Aside. The Procurement Will Be Competed Utilizing Full And Open Competition After Exclusion Of Sources In Accordance With Far 6.203.
the North American Industry Classification System (naics) Code Associated With This Procurement Is 236220, Commercial And Institutional Building Construction. The Small Business Administration Standard Of 45 Million Dollars In Annual Receipts Averaged Over The Last Three (3) Completed Fiscal Years.
the Procurement Method That Will Be Implemented For This Project Will Be In Accordance With Far Part 15.1-source Selection Processes And Techniques. This Project Is A Competitive Acquisition Utilizing The Trade-off Process Approach Under The Best Value Continuum (far15.101). This Process Permits Tradeoffs Among Cost Or Price And Technical Factors. It Allows The Government To Accept Other Than The Lowest Priced Offeror Or Different Than The Highest Technically Rated Offeror. For This Procurement, The Technical Evaluation Factor When Combined Will Be Approximately Equal To Cost Or Price. The Best Value Method Is Essential To Evaluate And Compare Costs And Prices To Select The Most Advantageous Offer. The Planned Project Delivery Method Will Result In A Firm-fixed-price Contract For Construction Services.
gsa Anticipates Issuing The Request For Proposal (rfp) On Or About March 3, 2025, With Receipt Of Proposals At A Minimum Of Thirty (30) Calendar Days Later. All Information, Amendments And Questions Concerning This Solicitation Will Be Electronically Posted At The Https://sam.gov Website.no Telephone Requests Will Be Accepted, And No Paper Copies Will Be Mailed To Prospective Offerors.
there Is Expected To Be A Pre-proposal Conference And Site Walk-through. Information And Details Will Be Posted On The Https://sam.gov Website Solicitation No. 47pc0225r0017 Posting.interested Firms Must Be Registered In The System For Award Management (sam), In Order To Receive A Contract Award. Firms Can Register Via The Internet Site At Https://www.sam.gov Or By Contacting Sam Service Desk At Https://www.fsd.gov.
the Solicitation Will Not Be A Sealed Bid And There Will Not Be A Formal Bid Opening. All Inquiries Must Be In Writing, Via Email To The Person(s) Specified In The Solicitation. All Answers Will Be Provided In Writing And Will Be Available On The Aforementioned Https://sam.gov Posting. Offerors Will Not Be Reimbursed For Proposal Submittal Expenses.
several Solicitation Documents Will Be Posted As "locked" Packages In The Https://sam.gov Posting. In Order To View Or Download The Packages, Vendors Must Have A Secure Account. Information On How To Register For An Account And Log In Is Available On The Https://sam.gov Website, Under The "getting Started" Tab.
interested Parties Are Strongly Encouraged To Register To This Notice To Receive Notification Of Actions Including Posting Of Any Amendments. However, Offerors Are Advised To Check The Site Frequently As They Are Responsible For Obtaining Amendments.
disclaimer: The Official Solicitation Package And Technical Specifications Will Be Located On The Official Government Web Page And The Government Is Not Liable For Information Furnished By Any Other Source.amendments, If/when Issued, Will Be Posted To The Https://sam.gov Website For Electronic Downloading. This Will Normally Be The Only Method Of Distributing Amendments Prior To Closing; Therefore, It Is The Offeror's Responsibility To Check The Website Periodically For Any Amendments To The Solicitation. Websites Are Occasionally Inaccessible Due To Various Reasons. The Government Is Not Responsible For Any Loss Of Internet Connectivity Or For An Offeror's Inability To Access The Documents Posted On The Referenced Web Pages. The Government Will Not Issue Paper Copies.
controlled Unclassified Information (c.u.i.): G.s.a. Will Provide The Solicitation And Supporting Documents On Www.sam.gov. Prospective Contractors Must Limit The Dissemination Of This Information To Authorized Users Only. Dissemination Of Information Shall Only Be Made Upon Determining That The Recipient Is Authorized To Receive It. The Criterion For Deciding Authorization Is Need-to-know. Those Who Need To Know Are Those Who Are Specifically Granted Access For The Conduct Of Business On Behalf Of Or With G.s.a. This Authority Includes All Persons Or Firms Necessary To Do Work At The Request Of The Government, Such As Architects And Engineers, Consultants, Contractors, Subcontractors, Suppliers, And Others That The Prospective Contractor Deems Necessary To Submit An Offer/bid Or To Complete The Work Or Contract, As Well As Maintenance And Repair Contractors And Equipment Service Contractors.
Closing Date3 Mar 2025
Tender AmountRefer Documents
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION USA Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
Corrigendum : Closing Date Modified
United States
Details: This Synopsis Is A Pre-solicitation Notice From The U.s. Department Of Commerce, National Oceanic And Atmospheric Administration (noaa), Corporate Services Acquisition Division (csad), Facilities Support Branch
notice Id: 1305m4-24-r-0071
this Is A Pre-solicitation Notice Only.
project Title: Manchester Campus Addition Construction At The Manchester Research Station In Port Orchard, Washington
location: Noaa Nw Fisheries Research Station
7305 E. Beach Drive
Port Orchard, Wa 98366
classification And General Information:
this Requirement Will Be Issued As A Full And Open Competition
the North American Industry Classification System (naics) Code Associated With This Procurement Is 236220, Commercial And Institutional Building Construction. The Small Business Administration Standard Of $45 Million Dollars In Annual Receipts Averaged Over A Business’s Latest Three (3) Complete Fiscal Years Or (except In The Business Loan And Disaster Loan Programs) Five (5) Complete Fiscal Years To Determine The Average Annual Receipts. If A Business Hasn’t Been In Business For Five (5) Years, Multiply Its Average Weekly Revenue By 52 To Determine Its Average Annual Receipts.
this Contract Will Be Full And Open, And The Contractor Shall Be Selected By Federal Acquisition Regulation (far) Part 15.1 Source Selection Procedures. This Procurement Will Be Competitive, Utilizing The Tradeoff Process Approach Under The Best Value Continuum (far 15.101). This Process Permits Tradeoffs Among Cost Or Price And Technical Factors. It Allows The Government To Accept Other Than The Lowest Priced Offeror Or Different Than The Highest Technically Rated Offeror. All Evaluation Factors Other Than Cost Or Price, When Combined, Are Significantly More Important Than Cost Or Price. The Best Value Method Is Essential To Evaluate And Compare Costs And Prices To Select The Most Advantageous Offer. The Planned Project Delivery Method Will Result In A Firm- Fixed-price Contract For Construction Services.
background Overview:
the National Oceanic And Atmospheric Administration (noaa) Has A Requirement For A Campus Addition Construction Project For The Northwest Fisheries Science Center (nwfsc) At The Manchester Research Station (mrs), 7305 Beach Drive East, Manchester, Wa 98353. This Project Constitutes A Ground Up, New Construction Project Of Approximately 24,000 Gsf To Be Located On The Existing Mrs Campus West Of Seattle, Washington, North Of The Town Of Manchester.
the National Marine Fisheries Service (nmfs) Northwest Fisheries Science Center Mission Supports The Conservation And Management Of Living Marine Resources And Their Habitats In The Northeast Pacific Ocean. Nmfs Research Assists Resource Managers In Making Sound Decisions That Build Sustainable Fisheries, Recover Endangered And Threatened Species, Sustain Healthy Ecosystems, And Expand Domestic Seafood Production Through Sustainable Marine Aquaculture.
project Description - Construction: Generally Described As Follows But Not Limited To:
a New, Energy Efficient Facility That Will Include Modern Laboratory Facilities For Data Collection And Research That Focuses On Understanding The Life Cycle Of Marine Species And The Impacts Of Ecosystem Stressors On Anadromous And Marine Fish And Invertebrates.
2. The Facility May Include But Is Not Limited To The Following Program Areas And Facilities:
A. Recirculating Aquatic System (fresh And Saltwater)
B. Wet Labs
C. Dry Labs
D. Facility Storage
E. Gas Generation
F. Freezer Storage
G. Office Spaces
H. Hatcheries
I. Electrical, Mechanical And Communication Spaces
J. Site Work Including Utilities, Sidewalks, Parking, Roadways, And Landscaping
this Is A New Requirement For Construction Services For The Manchester Campus Addition From A Traditional Design-bid-build Delivery. The Solicitation And Resulting Contract Will Provide The 100% Design Drawings And Specifications For The Manchester Campus Addition Construction Project In Section J.
site Visit Information:
offerors Will Have The Opportunity To Visit The Site Before Submission Of Their Technical And Price Proposals. The Site Visit Details, To Be Held At The Manchester Research Station (mrs) Facility, Will Be Outlined In The Solicitation Package. Currently The Site Visit Is Projected To Be Held On Or About February 21, 2025. If Applicable, All Required Site Access Information As Outlined In Section J. Must Be Submitted In Accordance With The Solicitation Requirements For Site Visit Entry.
project Period Of Performance And Budget:
this Project Shall Be Performed By An Experienced General Construction Contractor That Has Performed Similar Work. The Estimated Performance Period Is 700 Calendar Days, Including Base + Optional Clins From Issuance Of Notice To Proceed. Prospective Offerors Are Advised To Thoroughly Review The Entire Solicitation (sf1442 Form) To Gain A Clear Understanding Of The Project's Budget As Specified By The Individual Contract Line Item Numbers (clins).
system For Award Management (sam):
all Contractors Interested In This Project And Doing Business With The Federal Government Must Be Registered With The System For Award Management (sam): Https://www.sam.gov
issuance Of Solicitation With Requirements Information:
noaa Anticipates Publishing The Solicitation And Supporting Documents Package On Or About Tuesday, February 4, 2025, With The Offer/receipt Date/time: Friday, April 4, 2025, 12:00 Pm Eastern Time (et) For Phase I And Tuesday, June 17, 2025, 12:00 Pm Et For Phase Ii. The Solicitation Will Be Available Electronically At The S.a.m. Website: Www.sam.gov. No Paper Copies, Faxes, Or Emails Will Be Available. Please Register As An Interested Source To Be Notified Of Amendments, Clarifications, Or Other Changes. Entities (even Those Registered As A Source) Are Responsible For Checking The Sam.gov Website Frequently To Ensure They Have All Available Information.
in The Interim The Government Has Elected To Provide A Draft Copy Of The Complete Solicitation On Or About December 10, 2024 (the Draft 100% Design And Specifications Only Are Available As Of November 4, 2024). Once Uploaded, We Encourage Interested Parties To Review These Draft Documents. We Again Want To Emphasize That These Documents Are In “draft” Form And Are Subject To Change Upon Final Solicitation Issuance. Please Note, Referenced Attachments Are Included With This Release. Any Questions Regarding Gaining Access To The Materials Shall Be Directed To Mr. Scott Gebhardt At Scott.gebhardt@noaa.gov And Ms. Ronette C. Mcbean-felder At Ronette.mcbean-felder@noaa.gov.
as A Reminder, This Draft Release Is Not A Solicitation For Government Services. Noaa Does Not Anticipate Posting Questions And Responses Or Amendments To This Draft As Would Occur With A Formal Rfp. No Awards Will Be Made From This Draft Release And Any Voluntary Informational Responses Submitted May Be Accomplished Via The Campus Addition Draft Solicitation Information Link. Keeping In Mind, Direct Responses To Informational Queries Or Clarifications May Not Be Made, But At The Government’s Discretion May Be Included In The Resulting Final Solicitation. Respondents Are Advised That The Government Will Not Pay For Any Information Or Administrative Costs Incurred In Response To This Draft Solicitation; All Costs Associated With Responding To This Draft Solicitation Will Be Solely At The Respondent’s Expense.
prospective Contractors Must Limit The Dissemination Of This Information To Authorized Users Only. Dissemination Of Information Shall Only Be Made Upon Determining That The Recipient Is Authorized To Receive It. The Criterion For Deciding Authorization Is Need-to-know. Those Who Need To Know Are Those Who Are Specifically Granted Access For The Conduct Of Business On Behalf Of Or With Noaa. This Authority Includes All Persons Or Firms Necessary To Do Work At The Request Of The Government, Such As Architects And Engineers, Consultants, Contractors, Subcontractors, Suppliers, And Others That The Prospective Contractor Deems Necessary To Submit An Offer/bid Or To Complete The Work Or Contract, As Well As Maintenance And Repair Contractors And Equipment Service Contractors.
Closing Date5 Apr 2025
Tender AmountRefer Documents
Texas Comptroller Of Public Accounts - TCPA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: A. Background Fannin County Proposes To Retain A Highly Qualified, Capablefirm To Act As An Inspector To Assess Fannin County Courthouse Fordefects And To Provide An Estimate For Repairs. Focus Should Be On Fire Andsafety Hazards, Faulty Architectural Design And Engineering, And Codeviolations. Do Not Show Fees At This Time. The County Is Reviewingqualifications Only At This Time. Theselected Firm Will Need To Have Qualified Staff Available Including Electrical,civil, Mechanical, Plumbing, And Structural, Engineers, And Architects. The County Anticipates A Contract, Which Will Includea Completion Date And Hourly Fees. The County Reserves The Right To Includeadditional Project Elements In The Initial Or Subsequent Professional Serviceagreements As The County (at Its Sole Discretion) May Deem Appropriate. Thefirm May Be Required To Identify And Select Any Appropriate Sub-consultants;however, The County Reserves The Right To Disapprove Proposed Sub-consultantsthat Will Be Associated With The Project. Project Scope Of Work Fannin County, Texas, Invites The Submittal Of Responses To This Requestfor Qualifications (rfq) From Qualified Firm(s) Interested In Inspecting The Fannin County Courthouse Determiningwhat Is Defective With Construction And The Cost Of Repair. The Process Willentail Reviewing Documents Including Contracts, Work Orders Plans Andcertifications, Permits, Construction Meeting Minutes, Correspondence, And Suchother Documentation As It Deems Necessary. B. Selection And Award Process Fannin County Uses A Two-step Process For The Final Selection Of An Inspection Firm. Step 1 Consists Of A Qualifications Package To Be Submitted By Firms Interestedin Being Considered. The County May Select Up To Three (3) Short-listed Firmsbased On An Evaluation Of The Written Materials Submitted. Short-listed Firmsmay Be Asked To Submit Additional Information. Step 2 Consists Of The Selection Of One Finalist Following Interviews With Theshort-listed Firms. The County Initiates Negotiations With The Selectedconsultant To Develop A Scope Of Work. If Negotiations Are Unsuccessful, Thecounty Enters In To The Process With The Next Highest Ranked Short-listed Firm.the Contract Is Subject To The Approval Of The Commissioners Court. Professional Services Are Procured In Accordance With Chapter 2254 Of Thegovernment Code, Title 10, Subchapter A, And Professional Services. Selectionof The Most Highly Qualified Respondent Is Made Based On Demonstratedcompetence And Qualifications As Determined By Fannin County Based On Theinformation Provided In The Response To The Rfq. No Individual Of Any Countydepartment Has The Authority To Legally And/or Financially Commit The County Toany Contract, Agreement Or Purchase Order For Goods Or Services, Unlessspecifically Sanctioned By The Requirements Of The Request For Qualifications. C. Submission Process, Due Date, Andrequired Documents One Original And Five Copies Of The Response, Including All Required Formsand Applicable Supporting Documentation, Are Required. Failure To Submit Therequired Number Of Copies May Result In The Proposal Being Declaredunresponsive. The Original Must Be Clearly Marked “original” And The Copiesmust Be Clearly Marked “copy”. Qualified Firm Must Fill In And Sign: Responsesmust Be Submitted No Later Than June 3, 2025 At 3:00 Pm. Theresponses Must Be Inside A Sealed Envelope Or Container When Submitted. Theresponse Material Must Be Addressed And Delivered To: Fannin County Purchasing Julie Criswell 101 East Sam Rayburn Drive, Ste. 313 Bonham, Tx 75418 The Outsideof The Envelope Or Container Must State: 2025-01rfq For Inspection Services For Fannin County. Questions Mustbe Directed To Julie Criswell At Jcriswell@fanninco.net. Questions Relating To Definitionsor Interpretations Of The Rfq Must Be Submitted In Writing On Or Before May 30,2025. Submittals Received Later That Theabove Deadline For Submissions Will Be Rejected And Returned Unopened. D. Schedule For Selection Process · Fannincounty Begins The Rfq Process On May 20, 2025 · Submittalsare Due No Later Than June 3, 2025 At 3:00 Pm · Submittals Will Beopened June 3, 2025 At 3:15pm · Ascreening Committee Reviews Submittals And Determines Which Qualifiedcandidates Are Invited To Present Their Qualifications Further At An Interviewwith The Screening Committee. · Thescreening Committee Will Meet With Candidates June 10, 2025 At 3:00 Pm And The Commissionerscourt Will Follow Up With The Screening Committees Decision No Later Than July1, 2025 · Writtenquestions Must Be Directed To Julie Criswell At Jcriswell@fanninco.net. Questions Relating To Definitions Or Interpretations Of Therfq Must Be Submitted In Writing On Or Before May 30, 2025. E. Right Of County To Cancel Request For Qualifications, To Elect Not Toaward, To Reject Submittals, And To Waive Informalities Or Irregularites The County Expressly Reserves The Right To Cancel The Rfq At Any Time, Toelect Not To Award Contracts Cited In The Rfq, To Reject Any Or All Submittals,to Waive Any Informality Or Irregularity In Any Submittal Received, And To Bethe Sole Judge Of The Merits Of The Respective Submittals Received. F. Description Of Selection Criteria 1) Project Team Organizations Andqualifications (30 Points) · Qualificationsand Previous Related Work Of Key Project Personnel, Particularly With Regard Toworking With Municipalities Of Similar Size, Government Structure, Complexityand Issues. · Communicationand Logical Structure Of The Team Organization. · Includean Organizational Chart Of The Project Team. · Indicateeach Team Member’s Name, Title, License (if Applicable), And Years Ofexperience Necessary For The Engagement. · Describethe Qualifications Of Each Team Member As It Relates To The Scope Of Work · Includedescriptions Of Relevant Previousprojects That Key Project Staff Have Played A Central Role In Developing. · Includeeducational Background. · Includeprofessional Engineering License Status. 2) Experience On Similar Projects (30points) · Recordof Performance Of The Firm · Abilityto Complete The Work On Time And Within Budget · Discussthe Firm’s Experience On Similar Projects Include Abrief Description Of Each Relevant Projectthat Includes: (1) Project Scope, (2) Location, (3) Client Liaison Name Andphone Number, (4) Proposed And Actual Start And Completion Dates, And (5) Otherpertinent Information. 3) Project Approach (30 Points) · Projectmethodology · Typesof Services To Be Provided · Timelinessof Proposed Work Schedule · Discussthe Approach To Be Used To Complete The Work · Indicatethe Responsibilities Of Each Team Member · Indicatethe Office Location From Which The Work Is To Be Performed 4) Overall Responsivenss To The Rfq (10points) Electronic Capabilities.discuss The Firm’s Capabilities To Use Electronic Systems; E.g., Email,computer Drafting (indicate Software Used). No Statement Of Fees For The Subjectscope Of Work, Either Hourly Or Fixed Proposal Cost, Shall Be Included With Thesubmittal. Disclosure Ofinterested Parties Form 1295 House Bill1295, Adopted By The 84th Legislature, Created §2252.908, Texas Governmentcode. Section 2252.908 Requires A Business Entity Entering Into Certaincontracts With A Governmental Entity Or State Agency To File With Thegovernmental Entity Or State Agency A Disclosure Of Interested Parties At Thetime The Business Entity Submits The Signed Contract To The Governmental Entityor State Agency. §2252.908,texas Government Code Requires The Commission To Adopt Rules Necessary Toimplement The New Disclosure Requirement And To Prescribe The Disclosure Form.section 2252.908 Requires The Disclosure Form To Be Signed By The Authorizedagent Of The Contracting Business Entity, Acknowledging That The Disclosure Ismade Under Oath And Under Penalty Of Perjury. Section 2252.908 Applies Only Toa Contract That Requires An Action Or Vote By The Governing Body Of Thegovernmental Entity Or State Agency Before The Contract May Be Signed Or Hasvalue Of At Least $1 Million. Section 2252.908 Provides Definitions Of Certainterms Occurring In The Section. House Bill 1295 Provides That §2252.908 Appliesonly To A Contract Entered Into On Or After January 1, 2016. Aninterested Party Is Defined As A Person Who Has A Controlling Interest In Abusiness Entity With Whom A Governmental Entity Or State Agency Contracts Orwho Actively Participates In Facilitating The Contract Or Negotiating The Termsof The Contract, Including A Broker, Intermediary, Advisor, Or Attorney For Thebusiness Entity. Contractorsare Required To Acquire Form 1295 Via The Texas Ethics Commission Website. Thisrequires Registration, Generation Of Form 1295 With A Unique Certificate Number& Filing Date, Printing The Form, Signing And Returning The Form To Thefannin County Purchasing Department. Oncethe Form Is Received By The Purchasing And Contract Department, The Buyerassociated With The Project Will Log-in To The Texas Ethics Commission Portaland Acknowledge The Receipt Of The Form Not Later Than The 30th Dayafter The Date Of The Contract For Which The Form Was Filed Binds All Partiesto The Contract. This Will Complete The Form For The Contract With Which Theform Is Associated. The Completed Form Will Be Made Available Via The Texasethics Commission Website.
Closing Date3 Jun 2025
Tender AmountRefer Documents
Municipality Of Opol, Misamis Oriental Tender
Civil And Construction...+1Civil Works Others
Philippines
Details: Description 1. The Local Government Unit (lgu) Of Opol, Misamis Oriental, Through The Budget Of Lgu-opol (bank Loan) Intends To Apply The Sum Of Ninety-nine Million Nine Hundred Ninety Thousand Three Hundred Ninety-two Pesos And 88/100 (php 99,990,392.88) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Construction Of Opol Sanitary Landfill At Sitio Sto. Niño, Brgy. Bagocboc, Opol, Misamis Oriental / Opol 2025-001. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Local Government Unit (lgu) Of Opol Through The Bids And Awards Committee (bac) Now Invites Bids For The Construction Of Opol Sanitary Landfill At Brgy. Bagocboc, Opol, Misamis Oriental, With The Following Scope Of Works: Bill Of Quantities Qty Unit Item No. Item Description Part I. General Requirements 1.00 L.s. B.3 Permits And Clearances 1.00 L.s. B.7(1) Occupational Safety And Health Program 1.00 Ea. B.5 Project Billboard/signboard 1.00 L.s. B.9 Mobilization/demobilization Part Ii. Civil Works, Mechanical, Electrical, And Sanitary/plumbing Works A. Construction Of Guard House 3.53 Cu.m. 803(1)a Structure Excavation, Common Soil 2.79 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 881.33 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 18.19 Sq.m. 903(2) Formworks And Falseworks 1.00 L.s. 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 1.00 L.s. 1002(27) Plumbing Works 5.46 Sq.m. 1003(1)a1 Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) 11.14 Sq.m. 1014(1)b2 Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427mm Thk. 28.27 Sq.m. 1046(2)a2 Chb Non Load Bearing (including Reinforcing Steel), 100mm 56.54 Sq.m. 1027(1) Cement Plaster Finish 5.43 Sq.m. 1018(1) Glazed Tiles & Trims 62.00 Sq.m. 1032(1)a Painting Works, Masonry/concrete 1.00 L.s. 1047(1) Structural Steel (roof Framing Works) 3.26 Sq.m. 1010(2)a Doors (flush) 1.00 L.s. 1008 Aluminum Glass Windows 1.00 L.s. Part D Electrical B. Construction Of Admin Building 19.56 Cu.m. 803(1)a Structure Excavation, Common Soil 16.58 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 2617.95 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 38.79 Sq.m. 903(2) Formworks And Falseworks 1.00 L.s. 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 1.00 L.s. 1002(27) Plumbing Works 5.46 Sq.m. 1003(1)a1 Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) 11.40 Sq.m. 1014(1)b2 Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427mm Thk. 101.47 Sq.m. 1046(2)a2 Chb Non Load Bearing (including Reinforcing Steel), 100mm 202.94 Sq.m. 1027(1) Cement Plaster Finish 53.77 Sq.m. 1018(1) Glazed Tiles & Trims 208.40 Sq.m. 1032(1)a Painting Works, Masonry/concrete 1.00 L.s. 1047(1) Structural Steel (roof Framing Works) 8.40 Sq.m. 1010(2)a Doors (flush) 12.22 Sq.m. 1008(1)b Aluminum Glass Windows (casement Type) 1.00 L.s. Part D Electrical C. Construction Of Material Recovery Facility 24.20 Cu.m. 803(1)a Structure Excavation, Common Soil 23.84 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 3737.43 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 72.00 Sq.m. 903(2) Formworks And Falseworks 37.00 Mtr 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 175.20 Sq.m. 1014(1)b2 Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427mm Thk. 48.00 Sq.m. 1046(2)a2 Chb Non Load Bearing (including Reinforcing Steel), 100mm 96.00 Sq.m. 1027(1) Cement Plaster Finish 105.60 Sq.m. 1032(1)a Painting Works, Masonry/concrete 1.00 L.s. 1047(8) Structural Steel (post & Roof Framing) 1.00 L.s. Part D Electrical D. Construction Of The Composting Bed 8.82 Cu.m. 803(1)a Structure Excavation, Common Soil 14.89 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 670.58 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 21.92 Sq.m. 903(2) Formworks And Falseworks 30.00 Mtr 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 98.00 Sq.m. 1014(1)b2 Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427mm Thk. 81.00 Sq.m. 1046(2)a2 Chb Non Load Bearing (including Reinforcing Steel), 150mm 162.00 Sq.m. 1027(1) Cement Plaster Finish 162.00 Sq.m. 1032(1)a Painting Works, Masonry/concrete 1.00 L.s. 1047(8) Structural Steel (post & Roof Framing) 1.00 L.s. Part D Electrical E. Construction Of Weighbridge 51.53 Cu.m. 803(1)a Structure Excavation, Common Soil 16.23 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 1305.36 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 58.62 Sq.m. 903(2) Formworks And Falseworks 1.00 L.s. 1047(1) Structural Steel 1.00 L.s. Part D Electrical 1.00 L.s. 1726 Weigh Bridge System 75.41 Sq.m. 1032(1)a Painting Works F. Construction Of Hazardous Vault 7.20 Cu.m. 803(1)a Structure Excavation (common Soil) 21.78 Cu.m. 900(2)c Structural Concrete, Class B @ 28 Days 1733.72 Kg 902(1)a Reinforcing Steel (grade 40) 142.28 Sq.m. 903(2) Formworks And Falseworks 4.09 Sq.m. 1010(2)b Wooden Panel Door 82.20 Sq.m. 1046(2)a2 Chb Non Load Bearing (inc. Reinforcing Steel), 100mm 164.40 Sq.m. 1027(1) Cement Plaster Finish 129.12 Sq.m. 1032(1)a Painting Works (masonry/concrete) G. Construction Of Sanitary Landfill Cell 80495.84 Cu.m. 103(1)a Structure Excavation (common Soil) 6171.74 Cu.m. 104(1)a Embankment 12768.54 Sq.m. 105(1) Subgrade Preparation 14056.80 L.m. 715(1) Geotextile 14056.80 Sq.m. Spl-1 Hdpe Liner 1.5mm Thick 1000.00 Cu.m. Spl-2 Sand Filter 390.00 Cu.m. 804 (4) Gravel Fill 120.00 Lh 1001(1)c5 Pipes And Fittings (8" Hdpe) 262.60 Cu.m. 1710(2)a Grouted Riprap (line Canal) 5.00 Units Spl-4 Access Ramp 6.00 Units Spl-5 Gas Vents 396.00 Lin.m Spl-6 Hdpe Line Canal H. Construction Of Wash Bay 12.00 Cu.m. 803(1)a Structure Excavation, Common Soil 20.52 Cu.m. 900(1)c1 Structural Concrete Class A @ 28 Days 2192.66 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 24.00 Sq.m. 903(2) Formworks And Falseworks 1.00 L.s. 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 1.00 L.s. 1047(1) Structural Steel (post & Roof Framing Works) 1.00 L.s. Part D Electrical I. Construction Of Leachate Treatment Pond 1998.00 Cu.m. 103(1)a Structure Excavation (common Soil) 1091.28 Sq.m. 105(1) Subgrade Preparation 1091.28 Sq.m. 715(1) Geotextile 1091.28 Sq.m. Spl-1 Hdpe Liner 1.5mm Thick 4.00 Le. 1001(1)c5 Pipes And Fittings (8" Hdpe) J. Construction Of Leachate Treatment Plant 530.40 Cu.m. 803(1)a Structure Excavation, Common Soil 19.20 Cu.m. 804(4) Gravel Fill Bedding 8025.22 Kg 902(1)a Reinforcing Steel (deformed), Grade 40 89.73 Cu.m. 405(1)b2 Structural Concrete Class A, 27.58 Mpa @ 14 Days 292.20 Sq.m. 903(2) Formworks And Falseworks 30.00 Mtr 1001(1)a7 Pipes And Fittings, 100mm Dia. Pvc Series 1000 3.30 Sq.m. 1003(1)a1 Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) 22.50 Sq.m. 1013(1) Corrugated Metal Roofing Gauge 26 821.80 Sq.m. 1016(1)a Waterproofing, Cement-based 22.20 Sq.m. 1046(2)a2 Chb Non Load Bearing (including Reinforcing Steel), 100mm 22.20 Sq.m. 1003(2)a1 4.5mm Thk Ficem Board Wall On Metal Frame 45.10 Sq.m. 1032(1)a Painting Works, Masonry/concrete 1.00 L.s. 1047(8) Structural Steel (post & Roof Framing) 1.00 L.s. 1,010.00 Doors And Windows For Control Room 1.00 L.s. Part D Electrical 1.00 L.s. 1726 Wastewater Treatment Plant K. Concreting Of Access Road 500.00 Cu.m. 103(1)a Surplus Common Excavation 372.96 Cu.m. 104(1)a Structure Excavation (common Soil) 2880.00 Cu.m. 103(1)a Embankment 3648.20 Sq.m. 105(1) Subgrade Preparation 347.62 Cu.m. 200 Aggregate Subbase Course 1032.00 Sq.m. 311(1)b1 Portland Cement Concrete Pavement (unreinforced), 0.20m Thk, 3500psi @ 14 Days 101.00 Cu.m. 1710(2)a Grouted Riprap (line Canal) L. Construction Of Barbed Wire Perimeter Fence 0.11 Ha. 100(1) Clearing And Grubbing 9.95 Cu.m. 803(1)a Structure Excavation (common Soil) 3595.41 Kg. 902(1)a Reinforcing Steel (grade 40) 205.26 Sq.m. 903(2) Formworks And Falseworks 23.09 Cu.m. 900(2)c Structural Concrete, Class B @ 28 Days 5580.00 L.m. 604(1) Fencing, Barbed Wire 3. The Lgu Of Opol Now Invites Bids For The Above Procurement Project. Completion Of The Works Is Required Within Three Hundred Sixty (360) Calendar Days Upon Receipt Of The Notice To Proceed (ntp). Bidders Should Have Completed A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. 5. Interested Bidders May Obtain Further Information From Lgu Of Opol And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm On Working Days. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 3, 2025 To March 3, 2025 From Given Address And Website And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos (php 50,000.00) And A Special Permit Fee In The Amount Of One Thousand Pesos (php 1,000.00) Pursuant To The Revised Revenue Code Of Opol, Misamis Oriental 2016. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. 7. The Lgu Of Opol Will Hold A Pre-bid Conference On February 17, 2025 At 1:00 Pm At The Bids And Awards Committee (bac) Office Located At The 2nd Floor Of Old Municipal Building, Which Shall Be Open To Prospective Bidders. 8. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address As Indicated Below, On Or Before March 3, 2025 At 12:00 Noon. Late Bids Shall Not Be Accepted. 9. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 16. 10. Bid Opening Shall Be On March 3, 2025 At 1:00 Pm At The Given Address Below. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 11. The Lgu Of Opol Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Cherryl G. Magnetico, Mpa Secretariat, Bids And Awards Committee Municipality Of Opol, Misamis Oriental Email Address: Lguopolbac.misor@gmail.com Mobile Phone No. 0917-773-5450 Edgar C. Olaco, Mpa, Rea Chairman, Bids And Awards Committee Municipality Of Opol, Misamis Oriental Mobile Phone No. 0917-172-9478 February 3, 2025 ______________________________________ (sgd.) Edgar C. Olaco, Mpa, Rea Bac Chairperson Terms Of Reference Project Title: Construction Of Opol Sanitary Landfill Location: Sitio Sto. Niño, Brgy Bagocboc, Opol, Misamis Oriental Project Description: The Local Government Unit (lgu) Of Opol, Misamis Oriental, Through The Budget Of Lgu-opol (bank Loan) Intends To Apply The Sum Of Ninety-nine Million Nine Hundred Ninety Thousand Three Hundred Ninety-two And 88/100 Pesos (php 99,990,392.88) Being The Approved Budget Of The Contract (abc) For The Construction Of Opol Sanitary Landfill At Brgy. Bagocboc, Opol, Misamis Oriental. The Project Composed Of 2 Parts. Part I. General Requirements • Permits And Clearances • Occupational Safety And Health Program • Project Billboard/signboard • Mobilization/demobilizations Part Ii. Civil Works, Mechanical, Electrical, And Sanitary/ Plumbing Works 1. Construction Of Guard House • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Plumbing Works • Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) • Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427 Mm Thk. • Chb Non Load Bearing (including Reinforcing Steel), 100mm • Cement Plaster Finish • Glazed Tiles & Trims • Painting Works, Masonry/concrete • Structural Steel (roof Framing Works) • Doors (flush) • Aluminum Glass Windows • Electrical 2. Construction Of Admin Building • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Plumbing Works • Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) • Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427 Mm Thk. • Chb Non Load Bearing (including Reinforcing Steel), 100mm • Cement Plaster Finish • Glazed Tiles & Trims • Painting Works, Masonry/concrete • Structural Steel (roof Framing Works) • Doors (flush) • Aluminum Glass Windows (casement Type) • Electrical 3. Construction Of Material Recovery Facility • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427 Mm Thk. • Chb Non Load Bearing (including Reinforcing Steel), 100mm • Cement Plaster Finish • Painting Works, Masonry/concrete • Structural Steel (post & Roof Framing) • Electrical 4. Construction Of Composting Bed • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Prepainted Metal Sheets, Long Span - Rib-type, Above 0.427 Mm Thk. • Chb Non Load Bearing (including Reinforcing Steel), 150mm • Cement Plaster Finish • Painting Works, Masonry/concrete • Structural Steel (post & Roof Framing) • Electrical 5. Construction Of Weighbridge • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Structural Steel • Electrical • Weigh Bridge System • Painting Works 6. Construction Of Hazardous Vault • Structure Excavation (common Soil) • Structural Concrete, Class B @ 28 Days • Reinforcing Steel (grade 40) • Formworks And Falseworks • Wooden Panel Door • Chb Non Load Bearing (inc. Reinforcing Steel), 100mm • Cement Plaster Finish • Painting Works (masonry/concrete) 7. Construction Of Sanitary Landfill Cell • Structure Excavation (common Soil) • Embankment • Subgrade Preparation • Geotextile • Hdpe Liner 1.5mm Thick • Sand Filter • Gravel Fill • Pipes And Fittings (8" Hdpe) • Grouted Riprap (line Canal) • Access Ramp • Gas Vents • Hdpe Line Canal 8. Construction Of Wash Bay • Structure Excavation, Common Soil • Structural Concrete Class A @ 28 Days • Reinforcing Steel (deformed), Grade 40 • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Structural Steel (post & Roof Framing Works) • Electrical 9. Construction Of Leachate Treatment Pond • Structure Excavation (common Soil) • Subgrade Preparation • Geotextile • Hdpe Liner 1.5mm Thick • Pipes And Fittings (8" Hdpe) 10. Construction Of Leachate Treatment Plant • Structure Excavation, Common Soil • Gravel Fill Bedding • Reinforcing Steel (deformed), Grade 40 • Structural Concrete Class A, 27.58 Mpa @ 14 Days • Formworks And Falseworks • Pipes And Fittings, 100mm Dia. Pvc Series 1000 • Ceiling (4.5mm Thk Fiber Cement Board On Metal Frame) • Corrugated Metal Roofing Gauge 26 • Waterproofing, Cement-based • Chb Non Load Bearing (including Reinforcing Steel), 100mm • 4.5mm Thk Ficem Board Wall On Metal Frame • Painting Works, Masonry/concrete • Structural Steel (post & Roof Framing) • Doors And Windows For Control Room • Electrical • Wastewater Treatment Plant 11. Concreting Of Access Road • Surplus Common Excavation • Structure Excavation (common Soil) • Embankment • Subgrade Preparation • Aggregate Subbase Course • Portland Cement Concrete Pavement (unreinforced), 0.20m Thk, 3500psi @ 14 Days • Grouted Riprap (line Canal) 12. Construction Of Barbed Wire Perimeter Fence • Clearing And Grubbing • Structure Excavation (common Soil) • Reinforcing Steel (grade 40) • Formworks And Falseworks • Structural Concrete, Class B @ 28 Days • Fencing, Barbed Wire The Project Is Closely Monitored By Emb/denr That It Will Conform To The Latest Standards And Practices With Regards To The Implementing Rules And Regulations Of Republic Act 9003 Or The Ecological Solid Waste Management Act Of 2000 And The Denr Administrative Order No. 2005-10 Other Known As Philippine Clean Water Act Of 2004. Furthermore, The Project Must Comply With Conditions As Stated In The Approved Environmental Compliance Certificate (ecc) Before Construction, During Construction And After Completion Of The Project. The Eligibility Requirements For The Construction Of The Opol Sanitary Landfill Must Include Having Demonstrated Experience In Sanitary Landfill Operations To Ensure Compliance With The Standards Set By The Department Of Environment And Natural Resources (denr) During Implementation. Furthermore, The Contractor Must Adhere To The Applicable Provisions Of Sections 23-24 Of The Implementing Rules And Regulations (irr) Of Republic Act No. 9184. Itb 5.2 – Single Largest Completed Contract (slcc) & Pcab License Allowable Range Of Contract Cost For This Purpose, Contracts Similar To The Project Refer To Contracts Which Have The Same Major Categories Of Work, Which Shall Be: • Site Development With Building Construction Worth 50 Million And Above For The Past 7 Years • License Category: B • Size Range: “medium A” For Roads, Highway, Pavement, Railways, Airport Horizontal And “medium A” For Building And Industrial Plant Itb 10.4 – Key Personnel For The Construction Of The Contract, The Bidder Is Required To Deploy The Minimum Required Key Personnel: 1. Project Manager A. Licensed Architect Or Civil Engineer For At Least 10 Years. B. Must Be Involved In A Sanitary Landfill Project For The Past 5 Years, Worth 50 Million And Above. Must Present Certificate Of Involvement Signed By The Implementing Office Of The Said Project/s Indicating The Amount And Year Of The Said Project/s. 2. Environmental Planner A. Licensed Environmental Planner For At Least 5 Years. B. Must Be Involved In A Sanitary Landfill Project For The Past 5 Years, Worth 50 Million And Above. Must Present Certificate Of Involvement Signed By The Implementing Office Of The Said Project/s Indicating The Amount And Year Of The Said Project/s. 3. Project Engineer A. Licensed Civil Engineer For At Least 10 Years. B. At Least 10 Years’ Experience In Construction Projects. 4. Sanitary Engineer A. Licensed Sanitary Engineer For At Least 10 Years. B. At Least 10 Years’ Experience In Construction Projects. 5. Materials Engineer A. Licensed Materials Engineer For At Least 10 Years. B. At Least 10 Years’ Experience In Construction Projects. 6. Safety Officer (dole Accredited) A. Certified Safety Officer For At Least 5 Years. B. At Least 5 Years’ Experience In Construction Projects. 7. Foreman A. At Least 10 Years’ Experience In Construction Projects. Itb 10.5 - Equipments Minimum Equipment Needed For The Said Project Is As Follows: Self-loading Truck 1 Unit Excavator (1cum Bucket Capacity) 2 Units 10t Vibratory Roller 1 Unit Motorized Grader 1 Unit 10wheeler Dump Truck 3 Units Payloader 1 Unit Single Bagger Mixer 2 Units Concrete Vibrator 2 Units Plate Compactor 1 Unit Bar Bender 1 Unit Bar Cutter 1 Unit Welding Machine 2 Units
Closing Date3 Mar 2025
Tender AmountPHP 99.9 Million (USD 1.7 Million)
DEPT OF THE ARMY USA Tender
Electrical and Electronics...+1Electrical Works
Corrigendum : Closing Date Modified
United States
Details: Statement Of Work
troy Lock Automatic Transfer Switch Replacement
albany Field Office (afo), Troy, Ny
sw-1 Location: Albany Field Office, Troy, Ny. Arrangements For Entrance Onto Afo Must Be Made By Contacting Afo At (518) 273-0870 Between The Hours Of 7:00 A.m. And 3:00 P.m., Monday Through Friday. Access Is Restricted, Escorts Shall Be Provided By Albany Field Office Personnel.
sw-2 Scope Of Work: The Work Covered In This Contract Consists Of Furnishing All Labor, Expertise, Equipment, Materials, Facilities, Transportation, And Appliances Necessary To Perform Operations In Connection With The Work Described In Paragraph Sw-3. It Is The Intent Of The Government For The Contractor To Provide A Complete And Useable System. Any Relevant Details Required For A Complete System That Are Omitted In The Contract Plans And Specifications Will Be Provided By The Contractor At No Cost To The Government.
sw-3 Summary Of Work: Work Shall Consist Of But Is Not Limited To The Following:
remove Existing Automatic Transfer Switch (ats) And Furnish And Install A With New Ats Of An Appropriate Type, Rating, And Size For The System (see Characteristics Below). Contractor Will Dispose Of The Removed Ats. Functionally Test The Ats After Installation Per The Troy Lock Ats Specifications. See Attached Drawing And Specifications For More Details. Continuous Temporary Power To The Lockhouse Will Be Required During The Ats Replacement. The Lock And Lockhouse Shall Not Be Without Power For More Than 30 Minutes. The Ats And Connected Switchgear Are All Outside.
ats Requirements– 208v 600a, 3 Phase, 4 Wire, 35,000 A.i.c., Nema 3r With Maintenance Bypass. The New Ats Will Have A Manual Actuation Handle In Addition To The Automatic Function. The New Ats Must Be Service Rated.
current Ats (for Information Only): Asco 300 Series. See Attached O+m Manual
the Contractor Shall Conduct A Load Test Of The Existing Generator Up To 80% Of Its Maximum Load For Three Hours And Prepare A Report Documenting The Load Test And Its Results.
as Part Of Functional Testing Of The Ats, The Contractor Shall Troubleshoot And Document Issues Encountered In A Report.
sw-4 Timing Of Work: Workdays For Which The Lock Shall Be Without Power For Any Length Of Time Shall Be Scheduled No Less Than Two Weeks In Advance To Allow For Posting Of Notice To Mariners. The Period Of Performance Is 30 Days After 15 April, 2025. The Contractor Shall Notify The Government Of Any Material Delays They Encounter.
sw-5 Codes & Standards: All Work Performed Under This Contract Shall Be In Accordance With Federal, State And Local Codes & Standards, As Well As Widely Accepted Industry Standards, Including But Not Limited To: American Institute Of Architects, American Institute Of Electrical Engineers, American National Standards Institute, American Society Of Mechanical Engineers, American Society Of Testing Materials, National Bureau Of Standards, National Electric Code, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, And The New York Dot Standard Specification. Additionally, All Requirements Of The New York Department Of Health Must Be Satisfied In Their Entirety For Any Work Performed Or Materials Bought Under This Contract. Failure To Comply With Any Of The Aforementioned Codes And Standards Shall Be Considered As A Failure To Comply To Contract Specifications.
sw-6 Utilities: Contractors Shall Coordinate With All Local Utilities Having Jurisdiction. The Local Power Utility Company Is National Grid.
sw-7 Materials: The Materials Shall Conform To Specifications, Applicable Industry Codes And Standards And The Manufacturer's Recommendations, Whichever Is More Stringent. Certificates Of Compliance And Technical Data Sheets Are Required For All Materials Supplied.
sw-8 Site Inspection: The Contractor Shall Have The Opportunity To Visit The Site Before The Bid Opening. The Contractor Is Required To Acknowledge At Time Of Bid Opening That Said Contractor Has Inspected And Is Fully Cognizant Of Conditions At The Site. No Allowance Or Consideration Will Be Given After Award For Any Condition Which Existed At The Time Of The Site Visit.
sw-9 Security And Facility Access: The Contractor Shall Be Granted Access To The Afo Site. Contractor Personnel Must Sign In At The Administration Building When They Arrive On Site And Sign Out Before They Leave The Site. The Government Reserves The Right To Deny Access To Any Person, With No Consequence To The Contract.
1. General Security Requirements And Guidance: The Security Requirements Described Below Apply To All Contract Personnel (including Employees Of The Prime Contractor ("contractor") And All Subcontractor Employees) Supporting The Performance Requirements Of This Contract. The Contractor Is Responsible For Compliance With These Security Requirements. Questions Regarding Security Matters Shall Be Addressed To The Designated Government Representative (e.g., Contracting Officer Representative (cor), Requiring Activity (ra) Representative, Or Contracting Officer (if A Cor Or Other Ra Representative Is Not Appointed)). Contract Personnel Are Critical To The Overall Security And Safety Of Us Army Corps Of Engineers (usace) Installations, Facilities And Activities, And Security Awareness Training Contributes To Those Efforts. The Department Of Defense (dod) And Army Security Training Requirements Specified Below, If Applicable, Are Performance Requirements; All Applicable Contract Personnel Shall Complete Initial Training Within 30 Days Of Contract Award Or The Date New Contract Personnel Begin Performance On The Contract. Within Five Business Days From The Completion Of Training, The Contractor Shall Provide Written Documentation (e.g., Email Or Memorandum) To The Government Representative. The Documentation Shall Include The Names Of Contract Personnel Trained And Which Training They Completed; The Contractor Shall Maintain Training Records As Part Of Their Contract Files And Be Prepared To Provide Copies Of Training Certificates To The Government Representative. Contractor Personnel And Vehicles Are Subject To Search When Entering Federal Installations. Additionally, All Contract Personnel Shall Comply With Force Protection Condition (fpcon) Measures, Random Antiterrorism Measures (commonly Referred To As "rams"), And Health Protection Condition (hpcon) Measures. The Contractor Is Responsible For Meeting Performance Requirements During Elevated Fpcon And/or Hpcon Levels In Accordance With Applicable Ra Plans And Procedures --this Includes Identifying Mission Essential And Non-mission Essential Personnel. In Addition To The Changes Otherwise Authorized By The Changes Clause Of This Contract, Should The Fpcon Or Hpcon Levels At Any Individual Facility Or Installation Change, The Government May Implement Security Changes That Affect Contract Personnel. The Contractor Shall Ensure All Contract Personnel Are Aware Of Their Security Responsibilities, Including Any Site-specific Requirements Identified In Local Policies Or Procedures.
2. Physical Security And Access Control Requirements: All Contract Personnel Requiring Physical Access To A Federal Installation Or Facility Shall Comply With The Access Control Procedures Of That Location. Contract Personnel Requiring Unescorted Access To Meet Contract Performance Requirements On A Dod Installation In The Us Shall Be Vetted By The Installation/facility Provost Marshal/directorate Of Emergency Services/security Office Using The National Crime Information Center-interstate Identification Index (commonly Referred To As "ncic-111") And Terrorist Screening Database (commonly Referred To As "tsdb"). Contract Personnel Shall Comply With All Personal Identity Verification Requirements Specified In Installation/facility Policies And Procedures. Contract Personnel Who Do Not Meet Requirements For Unescorted Access To Usace Facilities Shall Coordinate Escorted Access With The Government Representative, As Needed. Contract Personnel Who Receive Keys, Access Cards, Or Lock Combinations That Provide Access To Government-owned Property Shall Comply With Key And Lock Control Procedures Of The Ra.
sw-10 Safety: Compliance With Osha And Other Applicable Laws And Regulations For The Protection Of Employees Is Exclusively The Obligation Of The Commercial Contractor. Government And Contractor Employees Must Comply With The Corps Of Engineers Safety Manual Em 385-1-1. All Contractors And Employees Will Attend A Pre-construction Meeting Prior To Project Work Beginning.
sw-11 Clean-up: Clean-up And Remove Debris Generated By This Contract To An Approved Off-site Location. Two (2) Copies Of The Receiving (tipping Or Dumping) Tickets, With A Cover Letter From The Prime Contractor Stating The Full Name And Address Of The Location To Which Debris Was Taken.
sw-12 Government Resources: No Government Resources Shall Be Made Available To The Contractor, Unless Otherwise Stated In This Statement Of Work. The Contractor Shall Provide For All Necessary Resources To Provide A Complete And Usable Facility Or Systems As Described In The Contract Documents. The Contractor Shall Not Obligate Government Resources In Any Manner. The Government Shall Seek Remedy For Any Obligation Or Encumbrance Imposed By The Contractors Actions. Government Resources Include, But Are Not Limited To, Government Owned Materials, Equipment, Tools, Vehicles, Personnel, And Facilities.
sw-13 Supplemental Attachments:
troy Lock Electrical One Line Riser Diagram
troy Lock Ats Specifications
asco 300 Series Operation And Maintenance Manual
generator Data Plate
power System Analysis
Closing Date24 Jan 2025
Tender AmountRefer Documents
Department Of Social Welfare And Development Main Tender
Software and IT Solutions
Philippines
Details: Description Request For Proposal (negotiated Procurement - Small Value Procurement – Consulting Firm) Hiring Of Consultancy Service For The Low Code Development Of Bts And Agapp Dswd Rfp No. 25-gop-svp-cf-004-a (pr No. 2024111680) 1. The Republic Of The Philippines, Through The Department Of Social Welfare And Development – Information And Communications Technology Management Service (dswd-ictms) Cy2025 Funds Intends To Apply The Sum Of Nine Hundred Ninety-two Thousand Seven Hundred Sixteen Pesos And Eighty-seven Centavos (php992,716.87) Being The Approved Budget For The Contract (abc) For The Hiring Of Consultancy Service For The Low Code Development Of Bts And Agapp Under (dswd Rfp No. 25-gop-svp-cf-004-a). 2. Objectives The Consulting Firm Shall Be Hired To Implement The Software Development Cycle To Establish The Bts And Agapp Website, Web, And Mobile Application. Specifically, The Project Aims To: A. Analyze The Business Requirements Of The Program; B. Design And Develop The Bts And Agapp, Including A Public-facing Website Based On The Specified Business Requirements; C. Perform The Necessary Quality Assurance Tests For The Bts And Agapp, Including The Privacy Impact Assessment; D. Assist In The Deployment Of The Bts And Agapp, Including The Conduct Of Training Of Trainers; And E. Provide A Warranty Service Upon Post-deployment Of The Bts And Agapp Application. 3. Scope Of Work A. Project Planning. The Consulting Firm Shall Formulate An Inception Report Or Project Plan Indicating The Framework, Approaches, Methodologies, And Specific Timeline For Tasks, Activities, And Deliverables Of The Project, Including Privacy Impact Assessment. B. Requirements Analysis, Design, And Project Management. Conduct A Thorough Requirements Analysis, Create System Designs Such As Wireframes And High-fidelity Prototypes, And Manage The Project. This Phase Includes Understanding Dswd’s Needs, Defining System Specifications, And Overseeing The Project’s Progress To Ensure Meeting Objectives. C. Software Development. Develop The Software According To The Specified Requirements. This Involves Coding, Configuring, And Creating All Necessary System Components, Ensuring Functionality And User-friendliness. D. Testing. Perform Extensive Software Testing To Ensure It Meets All Functional, Security, And Performance Requirements. This Includes Identifying And Fixing Bugs And Verifying System Integrity And Efficiency. E. Deployment Support. Assist With The System’s Deployment In The Identified Domain Environment, Including Support During The User Acceptance Testing (uat) Phase And Final Deployment In The Production Environment. F. Learning And Development Intervention. Design And Implement Learning And Development Interventions To Manage And Use The Application. This Service Also Includes The Development Of Print And Multimedia Assets Such As Walkthroughs, Audio-visual Presentations Highlighting The Features, And Brochures. G. Maintenance. Provide Maintenance Services Post-deployment For A Specified Support Period To Address Any System Issues, Updates, Or Enhancements. 4. Technical Specification A. General Requirements • Web-based Compatibility: This Application Must Be Accessible Via Popular Web Browsers And Support Both Computer And Mobile Device Use. This Ensures Broad Accessibility And Ease Of Use For Diverse Users. • Offline Compatibility: This Application Must Be Accessible Via Mobile Or Similar Devices Without Internet Connection. • Provide An Intuitive User Interface With Easy Navigation And User-friendly Features For Users Of Varying Technical Expertise. • Implement Robust Security Measures, Including Encryption For Data At Rest And In Transit, And Comprehensive Security Protocols. • Reference Material: Shall Have Training/learning Avp Materials Of The System. • Must Be Designed Using A Platform Preferably Aligned With This Min. Requirement: Online Offline Relational Database Management System Mysql 8.0 Or Higher Sqlite 4.0 Or Similar Tools Front-end Flutterflow Back-end Api With Json Returns Data Visualization Google Looker, Tableau, Or Similar Tools Applicable For Flutterflow • Shall Provide Comprehensive Documentation On Front-end And/or Back-end Tools Using Swagger Or Similar Tools Deployed On Dswd Managed Infrastructure. • The System Shall Cover An Unlimited Number Of Users With No Additional Cost From The Proponent. • User Load Capacity: The System Should Be Capable Of Handling An Unlimited Number Of Users, Ensuring Consistent Performance Even During Peak Usage Periods. • Ownership Of Work Products: All Work Products, Including Software, Documentation, And Design Materials Developed For This Project, Will Be The Property Of Dswd. • Service Provider Access Limitations: The Service Provider Will Not Have Access To The Dswd Production System. They Must Provide Comprehensive Instructions And Support For The Dswd System Administrators For System Deployment And Setup. • Learning And Development Intervention: The Service Provider Shall Provide Comprehensive Capability Building Activities Focusing On Building The Necessary Skills For Effective Implementation And Continuous Utilization Of System. • The Low Code Development Tools Must Be Provided By The Service Provider With No Additional Cost During The Development And Within The 2-year Warranty Period Following The Production Deployment Of The Application. B. Non-functional Requirement • Compliance With Cybersecurity And Data Privacy Policies: The System Must Adhere To All Dswd Cybersecurity, Data Privacy Policies, And Other Relevant Legal And Ethical Standards Concerning Data Privacy And Protection. This Ensures The Protection Of Sensitive Data And Aligns With Legal And Regulatory Standards. • Disclosure Of Third-party Libraries: The Service Provider Must Disclose All Third-party Libraries Used In The System’s Development. These Libraries Must Be Verified To Be Free From Security Vulnerabilities, Ensuring The Overall Security And Integrity Of The System. • Multi-factor Authentication: The System Shall Implement Multi-factor Authentication (mfa) To Enhance Security By Requiring Users To Provide Multiple Forms Of Identification Before Granting Access. This Extra Layer Of Security Will Prevent Unauthorized Access, Even If A User’s Password Is Compromised. The Mfa May Include Combinations Such As Passwords, Security Tokens, Or One-time Passwords (otps). • Audit Trail: The System Shall Maintain A Comprehensive Audit Log That Records All User Activities. This Includes Logins, Data Access, Modifications, And Any Other Actions Performed Within The System. The Audit Trail Is Essential For Monitoring User Behavior, Detecting Security Breaches, And Facilitating Troubleshooting. The Records Shall Be Tamper-proof And Stored Securely To Ensure Data Integrity. • Support: The Service Provider Shall Address All Vulnerability And Quality Assurance Results During The Development And Within The Warranty Period. C. Deployment Requirements • Compatibility With Dswd Managed Infrastructure: The System Shall Be Hosted On Identified Cloud Infrastructure And Be Compatible With Existing Digital And Cybersecurity Infrastructure, Ensuring Seamless Integration And Adherence To Security Standards That Need To Include The Following Set Of Environments: ○ Development, Staging, Uat, And Production Environment • Performance Testing: The Service Provider Must Perform Load Testing To Validate The System’s Performance And Stability Under Varying Degrees Of User Traffic, Ensuring Reliability And Efficiency During Peak Usage Including But Not Limited To Load Testing, Stress Testing, Etc. • Quality Assurance: The Service Provider Shall Conduct A Thorough Testing Of The System To Ensure All Functionalities Work As Intended And Meet The Specified Requirements. The Service Provider Must Address All Identified Quality Assurance Findings Throughout Its Development And During The Warranty Period. This Will Ensure That The System Meets All Performance, Usability, And Reliability Standards. • Security Vulnerability Assessment: The System Must Be Rigorously Tested For Known Vulnerabilities. The Service Provider Must Ensure The System Is Secure Against Potential Cyber Threats. The Service Provider Must Address All Identified Vulnerability Findings Throughout Its Development And During The Warranty Period. This Will Ensure That The System Meets All Performance, Usability, And Reliability Standards. D. Use Case The System Shall Ensure The Inclusion Of These Min. Use Case Requirement: Application Use Case Advanced Data Gathering For Assistance Preparedness For Protection (agapp) • Data Processing Of: ○ Disaster Incident Report ○ Evacuation Centers ○ Stockpile • Report Generation For: ○ Disaster Incident Reports ○ Evacuation Report • Capture Geolocation Beneficiary Transactional Account Information System (bts) • Data Processing Of Beneficiary Payment Modality Registry • Integration To 4ps Api Support Features: • Shall Be Integrated With The Philsys Authentication • Shall Be Mobile Responsive • Shall Include Role-based Access Control (rbac) • Customized Profile Pages • Dashboard And Report Generation • User Management • Data Visualization And Exporting • Data Migration Fron Existing Platform • Shall Provide The Low Code Development Platform At No Additional Cost During The Development And Within 2 Years Warranty Period Following The Production Deployment Of The Application. Any Additional Use Cases Identified During The Business Process Review And Analysis Must Be Discussed With The Service Provider And Approved By The Dswd For Inclusion In The Development Of This Project. Likewise, All Forms, Intake Sheets, And Other Relevant Documents Required For The Development Of This Application Shall Be Subject To Approval By The Dswd E. Phases Of Development Component/activities Deliverables Sprint 0: Project Initiation Inception Report Sprint 1: Completion Of Design Discovery Team 1: Beneficiary Transactional Account Information System (bts) • Conduct Of Business Process Review And Requirements • System Design • Business Process And Requirements Analysis Report • System Requirements Specification • Business Requirements Document • Document: Approved System Design (wireframe And Use Case Document) And Implementation Plan Approved By The Business Owner Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Sprint 2: Completion Of Baseline Development Requirements Team 1: Beneficiary Transactional Account Information System (bts) System Customization: Programming & Testing And Deployment Of These Modules: • Philsys Authentication • Data Processing Of Beneficiary Payment Modality Registry • User Management ○ Registration ○ Login ○ Password Recovery ○ Access Permission ○ System Security (i.e. Audit Trail, Mfa, Etc.) ○ Data Exporting Action: • System Configuration And Consultation Between Consulting Firm, Dswd Focals • Conduct Of Vulnerability Assessment • Conduct Of Qa • Configuration On Host, And Monitoring Services (dev, Testing And Production) Document: • Administration Console • System Version, Record Of Technical & Business Tests • Accomplished Testing Tool • Report On Test Results Accepted By The Business Owner • Report/dashboard Generation (if Any) • System Enhancement Based On Test Result • Report On Issues And Concerns • Record Of Monitoring And Maintenance Services • Addressed Va Result • Addressed Qa Result • Successful Deployment Report (dev, Testing And Production) Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) System Customization: Programming & Testing And Deployment Of These Modules: • Data Processing Of: ○ Disaster Incident Report ○ Evacuation Centers ○ Stockpile • User Management ○ Registration ○ Login ○ Password Recovery ○ Access Permission • System Security (i.e. Audit Trail, Mfa, Etc.) • Data Exporting Sprint 3: Completion Of Data Integration, Generation, Migration, And Other Requirements Team 1: Beneficiary Transactional Account Information System (bts) System Customization: Programming & Testing And Deployment Of These Modules: • 4ps Integration And Other Use Cases Identified During The Bpra • Dashboard And Report Generation • Data Migration Action: • System Configuration And Consultation Between Consulting Firm, Dswd Focals • Conduct Of Vulnerability Assessment • Conduct Of Qa • Configuration On Host, And Monitoring Services (dev, Testing And Production) Document: • Administration Console • System Version, Record Of Technical & Business Tests • Accomplished Testing Tool • Report On Test Results Accepted By The Business Owner • Report/dashboard Generation (if Any) • System Enhancement Based On Test Result • Report On Issues And Concerns • Record Of Monitoring And Maintenance Services • Addressed Va Result • Addressed Qa Result • Successful Deployment Report (dev, Testing And Production) Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) System Customization: Programming & Testing And Deployment Of These Modules: • Dashboard And Report Generation • Data Migration • Other Use Cases Identified During The Bpra Sprint 4: Completion Of Learning And Development Interventions Team 1: Beneficiary Transactional Account Information System (bts) Completed Learning And Development Interventions (ldis) With Documentation Report Action: At Least Two (2) Training Of Trainers Conducted With Comprehensive Documentation Either Onsite Or Virtual Documentation: Comprehensive Documentation Report Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Team 1: Beneficiary Transactional Account Information System (bts) Completion Report • Sign Off Document With Packaged System Documentation – Bpra, System Design, System Testing Report • User’s Manual/guide (for System Users And System Administrators) • Technical Systems Documentation • Comprehensive Api Documentation • Installation Guide • Troubleshooting Guide Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Sprint 5: Final Systems Documentation And Turn-over Team 1: Beneficiary Transactional Account Information System (bts) Final Systems Documentation And Turn-over • Full System Sign Off Document With Packaged System Documentation – Bpra, System Design, System Testing Report • Final User’s Manual/guide (for System Users And System Administrators) • Final Technical Systems Documentation • Final Comprehensive Api Documentation • Final Installation Guide • Final Troubleshooting Guide Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) F. Work Deliverables And Payment Schedule Milestone Deliverables Timeline % Of The Contract Price Sprint 0 Inception Report Within Five (5) Calendar Days After Receipt Of The Notice To Proceed 0% Sprint 1 Completion Of Design Discovery Within 25 Calendar Days Upon Receipt And Approval Of Inception Report 20% Sprint 2 Completion Of Baseline Development Requirements Within 25 Calendar Days Upon Completion Of Sprint 1 20% Sprint 3 Completion Of Data Integration, Generation, Migration And Other Requirements Within 25 Calendar Days Upon Completion Of Sprint 2 20% Sprint 4 Completion Of Learning And Development Interventions Documentation And Turn-over Within 25 Calendar Days Upon Completion Of Sprint 3 20% Sprint 5 Final Systems Documentation And Turn-over Within 15 Calendar Days Upon Completion Of Sprint 4 20% Outputs Of The Consultant Will Undergo Evaluation Before Proceeding To The Next Step. Each Deliverable, Particularly On The System Modules, Must Be Provided To The Ictms And Ico, Along With The Source Code. Deliverables Will Be Subject To Liquidated Damages If Submitted Beyond The Allotted Timeline, Which Is 15-30 Calendar Days Upon Acceptance And Approval. Only Work Outputs Or Deliverables Deemed Acceptable Will Be Compensated. Failure To Submit The Expected Output On Time Will Result In A Deduction Of One-tenth Of One Percent (0.001) Per Day From The Payment For The Covered Work Output/deliverable Unless Satisfactorily Justified. G. Institutional Arrangements Service Provider • Pre-development And Installation ○ The Service Provider Should Provide A Project Implementation Plan That Must Be Approved By The Dswd ○ Engage The Business Owner In The Conduct Of Business Process And Requirements Analysis As The Basis Of System Requirement Specification (srs) For The Information System That Will Be Developed ○ Ensure Approval On The Sign-off Documents On All The Identified Deliverables • During Development And Installation ○ The Service Provider Should Manage And Execute Project Tasks Alongside The Dswd In Accordance With The Project Scope Period Of Performance And Quality Standards ○ The Service Provider Shall Ensure Compliance With The Data Sharing Agreement ○ The Service Provider Shall Ensure Timely Completion Of Deliverables Identified In This Project ○ The Service Provider Should Lead The Deployment Project In Collaboration With The Dswd And Provide Weekly Project Updates, Bi-weekly Steering Committee Meetings, Milestone Reports, And Closeout Reports ○ The Service Provider Should Provide A Status Report Of The Project In The Form Of Charts/graphs ○ The Service Provider Should Assume Full Responsibility For The Project Plan And Lead The Change Management Process ○ The Service Provider Should Formulate And Execute A Training Approach And Strategy ○ The Service Provider Should Establish A Dedicated Project Team As The Primary Point Of Contact For Dswd Throughout The Deployment Process ○ The Service Provider Should Have A Project Manager Responsible For Overseeing The Integrated Project Plan, Managing Risk Mitigation, And Resolving Issues ○ The Service Provider Should Have A Technical Deployment Architect Responsible For Coordinating And Supporting The Implementation Of Technical Tasks, Providing Best Practices, And Troubleshooting ○ The Service Provider Should Have A Change Manager Responsible For Executing The Change Management Plan, Publishing Communication Plans, And Designing The Training Curriculum ○ The Service Provider Shall Inform The Proponent Office Of Any Challenges Requiring Further Assistance ○ The Service Provider Should Have A Trainer Responsible For Conducting And-user Training And Technical Training Workshops • Post Installation ○ The Service Provider Representative Shall Co-manage The Project With The Assigned Project Focals From The Dswd Ensuring That The System Is Operational 24/7 ○ The Service Provider Should Provide An Escalation Procedure In Reporting Issues And Concerns ○ The Service Provider Should Ensure End-to-end Security To The System To Safeguard Against Breaches And Potential Threats, Including Administration Tools And Best Practices ○ The Service Provider Should Perform Capacity Planning, Identify Requirements, And Provide Recommendations To Enhance The Performance And Usability Of The System. The Service Provider Is Responsible For All Configurations, Including Those For Future Requirements Identified By Dswd ○ The Service Provider Shall Provide A 2-year Warranty Period At No Additional Cost To Address Errors/bugs/vulnerabilities After All The Sprint Has Been Completed • Service Level Agreement ○ The Service Provider Shall Maintain 24/7 Availability ○ The Service Provider Shall Include Unlimited 24x7 Service Support Via Phone, Email, Remote, Or On-site When Needed At No Additional Cost Within The Warranty Period ○ The Service Provider Shall Respond To Support Requests Within The Following Timeframes: 1. Critical Issues: Within 1 Hour 2. High Priority Issues: 1-4 Hours 3. Medium Priority Issues: Within 24 Hours 4. Low Priority Issues: 1-3 Business Days ○ The Service Provider Shall Commit To Resolving Issues Within The Following Timeframes: 1. Critical Issues: Within 4 Hours 2. High Priority Issues: Within 24 Hours 3. Medium Priority Issues: 1-3 Business Days 4. Low Priority Issues: 1-7 Business Days ○ The Service Provider Shall Address All Vulnerability And Quality Assurance Results During The Development And Within The Warranty Period ○ The Service Provider Shall Provide Thorough Guidance And Comprehensive Documentation For All Changes, Enhancements, And Interventions Made During The Warranty Period ○ The Service Provider Shall Document All Interventions, Changes, Troubleshooting Activities, And Enhancements, Ensuring Approval From The Department’s Designated It Team And Submission Within The Prescribed Period ○ The Service Provider Shall Strictly Adhere To The Existing Ict Policy And/or Guidelines Of The Department Department Of Social Welfare And Development (dswd) • Provide Overall Management Directions To The Project • Support The Offices, Bureaus, Services And Units (obsus) In Establishing Institutional Mechanisms For The Sustainability Of The Project • Enforce A Data Sharing Agreement / Non-disclosure Agreement Among The Project Stakeholders (if Needed) • Ensure That The Project Is Aligned With The Secretary’s Directive Regarding Digitalization, Specifically On The Transition To Online Systems, And Consistent With The Department’s Pgs And Strategy Map • Ensure The Project’s Inclusion In The Dswd Information Systems Strategic Plan • Provide Contextual Inputs To The Service Provider To Ensure Alignment Of The Design And Development Of The Application To The Business Requirements • Review The Quality Of Operations-related And Ict Related Outputs Submitted By The Service Provider Under The Terms Provided Herein • Provide Appropriate Documents Relevant To The Project Within The Duration Of The Engagement • Create A Policy And/or Document Supporting The Sustainability Of This Project • Lead The Preparatory Tasks, Onsite Tasks, And Post-activity Tasks With The Service Provider, Including Organization Of Launching Activity And Training Of Trainers, Production Of Multimedia Assets • Ensure Timely Monitoring Of This Project Including But Not Limited To: ○ Deliverables Of The Service Provider ○ Timely Monitoring, Tracking And Updates Of Procurement And Financial Related Activities • Assist In The Preparatory Tasks, Onsite Tasks, And Post-activity Tasks With The Service Provider, Including Organization Of Launching Activity And Training Of Trainers, Production Of Multimedia Assets H. Learning And Development Interventions The Following Learning And Development Interventions (ldis) For Dswd End-users And Technical Staff Shall Be Conducted By The Service Provider Who Shall Also Issue Certificates Of Completion To The Participants Duly Signed By A Certified Trainer, At No Extra Cost To The Dswd: • Onboarding Sessions And Other Learning And Development Interventions On The Proposed Platform For Administrators And End-users Within The Subscription Period • At Least Four (4) Training-of-trainers During The Development And/or Prior Development • At Least One (1) Capability-building Session Must Be Held Per Semester During The Warranty Period To Keep Participants Updated On The System Enhancements And Best Practices • At Least One (1) Capability-building Session Must Be Held Per Semester For The Administration Management Console Technical Training For It Administrators I. Confidentiality And Non-disclosure Agreement • All Data And Information Used In This Service Shall Be Governed By Republic Act 10173 – Data Privacy Act Of 2012 • Any Information, Including But Not Limited To The Information Related To Dswd Provided To The Service Provider For The Purpose Of Warehouse Inventory Management Solution Agreement, Are The Sole Property Of The Dswd. The Service Provider Shall Treat This Information As Confidential And Shall Not Disclose It To Any Company, Firm Or Person During The Duration Of The Agreement, Or At Any Time Thereafter. • All Business, Personnel And Technical Information And Any Related Documentation, In Whatever Form, Which The Dswd May Provide Shall Be Used By The Service Provider Solely For The Purpose For Which It Was Provided And Shall Be Treated In Strictest Confidence And Protected; If In Tangible Form, The Same Shall Be Returned To Dswd Upon The End Of The Service Agreement. • All Account Information And Data Are Sole Property Of The Dswd. The Service Provider Shall Not Retain Copies Of It In Any Form Upon The End Of The Service Agreement J. Minimum Qualifications • With At Least Three (3) Years Of Experience In An It Company Offering Software Solutions Design And Development, Both In Web And Mobile Forms And Web Design And Development • With At Least Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors. Demonstrable Knowledge Of Data Governance, Data Interoperability, And Data Protection Is An Advantage • With At Least (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients • With Sufficient Human Resources That Process Technical Expertise In Areas Of Business Analysis, Ui/ux Design, Front–end Development, Back-end Development, And Software Quality Assurance, With Technical Certifications K. Ownership And Publication Rights • All Documentation Produced Under The Terms Of This Engagement Shall Remain The Property Of Dswd. Dswd Retains The Exclusive Right To Publish Or Disseminate The Knowledge Products Arising From The Engagement Even After The Termination Of This Project • The Service Provider Must Submit A Written Letter When Requesting Raw Data, Versions, And/or Parts Of The Outputs That Will Be Used For Purposes Other Than What Was Originally Agreed Upon With The Terms Of This Engagement • The System Including Source Code That Will Be Developed Shall Be Fully And Exclusively Owned And Used By The Dswd And Shall Not Be Transferred In Favor Of Any Entity And In Any Other Mode. Intellectual Property Over The Design And Implementation Of The Requirements (including Custom Code And Configurations) Shall Remain With Dswd • Source Code Or Binaries, Database Schema And Definitions, Configuration Files And Build Artifacts, Documentation, Licenses And Any Other Custom-developed Artifact Of The Application Specifically Developed For This Project Must Be Submitted To The Dswd In Order For The End-users To Carry Out Independent Maintenance And Updating/modification Of The Application In The Future. The Complete Source Code And Scripts, Properly Versioned, Must Be Submitted To The Dswd Immediately At The Start Of The Implementation Phase L. Budgetary Requirements: The Total Budgetary Requirement Amounts To Nine Hundred Ninety-two Thousand Seven Hundred Sixteen Pesos And Eighty-seven Centavos (php992,716.87) Chargeable Against Ictms 2024 Funds And Payment Will Be Staggered Per Milestone Achievement Following Dswd – Approved Policies And Guidelines. 5. Evaluation Criteria This Project Shall Be Procured Using Section 53.9 (negotiated Procurement-small Value Procurement) Of The Revised 2016 Implementing Rules And Regulations Of Republic Act No. 9184 Or The Government Procurement Reform Act And Pursuant To The Following Criteria: Qualification Rating With At Least Three (3) Years Of Experience In An It Company Offering Software Solutions Design And Development, Both In Web And Mobile Forms And Web Design And Development 35% A. The Consulting Firm Has More Than Three (3) Years Of Experience As An It Company Specializing In Software Solutions Design And Development, Both In Web And Mobile Forms, And Web Design And Development 35% B. The Consulting Firm Has Three (3) Years Of Experience As An It Company Specializing In Software Solutions Design And Development, Both In Web And Mobile Forms, And Web Design And Development 25% With At Least Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors. Demonstrable Knowledge Of Data Governance, Data Interoperability, And Data Protection Is An Advantage 35% A. The Consulting Firm Has More Than Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors; One Team Member Has Certification In Conducting Privacy Impact Assessment 35% B. The Consulting Firm Has Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors; One Team Member Has Certification In Conducting Privacy Impact Assessment 25% With At Least (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 10% A. The Consulting Firm Has More Than Three (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 10% B. The Consulting Firm Has Three (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 5% With Sufficient Human Resources That Process Technical Expertise In Areas Of Business Analysis, Ui/ux Design, Front–end Development, Back-end Development, And Software Quality Assurance, With Technical Certifications 20% A. The Consulting Firm Has 2 Or More Team Of Over Five (5) Members, Each Fulfilling Specific Roles Within The Software Development Life Cycle And With Relevant Technical Certifications 20% B. The Consulting Firm Has Less Than 2 Team Of Five (5) Members, Each Fulfilling Specific Roles Within The Software Development Life Cycle And With Relevant Technical Certifications Role Quantity Project Manager 1 Developers 2 Quality Assurance (qa) Specialist 1 Analyst 1 15% Total 100% Passing Rate 70% Note: Failure To Meet Any Of The Minimum Requirements Per Criteria Stated Above Will Automatically Be Given A Zero (0%) Rating And Will Be Automatically Disqualified. 9. The Dswd Now Invites Interested Consulting Firms To Submit The Following: A. Company Profile/portfolio (highlighting The Years And Experiences Of The Firm And With Proof Of Engagements With The Government); B. Comprehensive Curriculum Vitae (cvs) Of The Project Team Members Including Evidences; C. Financial Proposal (annex A); D. Bir Certificate Of Registration; E. 2025 Mayor’s/business Permit Or 2024 Mayor’s/business Permit With Proof Of Application And/or Official Receipt Of Renewal For 2025 (2025 Mayor’s/business Permit Must Be Submitted As Condition For Payment); F. Income/business Tax Return; G. Duly Notarized Omnibus Sworn Statement With Secretary’s Certificate; And H. Proof Of Philgeps Registration/ Philgeps Registration Number. 10. The Required Documents Shall Be Submitted At The Address Below Or Through Email At Quotations@dswd.gov.ph Not Later Than 5:00pm Of 7 March 2025 (friday). 11. The Project Duration For Cy 2025 Is Four (4) Months Upon Receipt Of The Notice To Proceed (ntp). 12. The Consulting Firm Shall Be Required To Issue Official Receipt (or) As Acceptable Evidence Of Receipt Of Payment For Disbursements. The Chairperson Bids And Awards Committee C/o Bids And Awards Committee Secretariat As-procurement Management Division Dswd Central Office Ibp Road, Constitution Hills. Quezon City Telephone Nos.: (02) 8931 8101 To 07 Voip Nos. 10095 Email Address: Bacsec@dswd.gov.phquotations@dswd.gov.ph (original Signed) Monina Josefina H. Romualdez Undersecretary And Chairperson Bids And Awards Committee
Closing Date7 Mar 2025
Tender AmountPHP 992.7 K (USD 17.1 K)
Department Of Social Welfare And Development Main Tender
Software and IT Solutions
Philippines
Details: Description Request For Proposal (negotiated Procurement - Small Value Procurement – Consulting Firm) Hiring Of Consultancy Service For The Low Code Development Of Bts And Agapp Dswd Rfp No. 25-gop-svp-cf-004 (pr No. 2024111680) 1. The Republic Of The Philippines, Through The Department Of Social Welfare And Development – Information And Communications Technology Management Service (dswd-ictms) Cy2025 Funds Intends To Apply The Sum Of Nine Hundred Ninety-two Thousand Seven Hundred Sixteen Pesos And Eighty-seven Centavos (php992,716.87) Being The Approved Budget For The Contract (abc) For The Hiring Of Consultancy Service For The Low Code Development Of Bts And Agapp Under (dswd Rfp No. 25-gop-svp-cf-004). 2. Objectives The Consulting Firm Shall Be Hired To Implement The Software Development Cycle To Establish The Bts And Agapp Website, Web, And Mobile Application. Specifically, The Project Aims To: A. Analyze The Business Requirements Of The Program; B. Design And Develop The Bts And Agapp, Including A Public-facing Website Based On The Specified Business Requirements; C. Perform The Necessary Quality Assurance Tests For The Bts And Agapp, Including The Privacy Impact Assessment; D. Assist In The Deployment Of The Bts And Agapp, Including The Conduct Of Training Of Trainers; And E. Provide A Warranty Service Upon Post-deployment Of The Bts And Agapp Application. 3. Scope Of Work A. Project Planning. The Consulting Firm Shall Formulate An Inception Report Or Project Plan Indicating The Framework, Approaches, Methodologies, And Specific Timeline For Tasks, Activities, And Deliverables Of The Project, Including Privacy Impact Assessment. B. Requirements Analysis, Design, And Project Management. Conduct A Thorough Requirements Analysis, Create System Designs Such As Wireframes And High-fidelity Prototypes, And Manage The Project. This Phase Includes Understanding Dswd’s Needs, Defining System Specifications, And Overseeing The Project’s Progress To Ensure Meeting Objectives. C. Software Development. Develop The Software According To The Specified Requirements. This Involves Coding, Configuring, And Creating All Necessary System Components, Ensuring Functionality And User-friendliness. D. Testing. Perform Extensive Software Testing To Ensure It Meets All Functional, Security, And Performance Requirements. This Includes Identifying And Fixing Bugs And Verifying System Integrity And Efficiency. E. Deployment Support. Assist With The System’s Deployment In The Identified Domain Environment, Including Support During The User Acceptance Testing (uat) Phase And Final Deployment In The Production Environment. F. Learning And Development Intervention. Design And Implement Learning And Development Interventions To Manage And Use The Application. This Service Also Includes The Development Of Print And Multimedia Assets Such As Walkthroughs, Audio-visual Presentations Highlighting The Features, And Brochures. G. Maintenance. Provide Maintenance Services Post-deployment For A Specified Support Period To Address Any System Issues, Updates, Or Enhancements. 4. Technical Specification A. General Requirements • Web-based Compatibility: This Application Must Be Accessible Via Popular Web Browsers And Support Both Computer And Mobile Device Use. This Ensures Broad Accessibility And Ease Of Use For Diverse Users. • Offline Compatibility: This Application Must Be Accessible Via Mobile Or Similar Devices Without Internet Connection. • Provide An Intuitive User Interface With Easy Navigation And User-friendly Features For Users Of Varying Technical Expertise. • Implement Robust Security Measures, Including Encryption For Data At Rest And In Transit, And Comprehensive Security Protocols. • Reference Material: Shall Have Training/learning Avp Materials Of The System. • Must Be Designed Using A Platform Preferably Aligned With This Min. Requirement: Online Offline Relational Database Management System Mysql 8.0 Or Higher Sqlite 4.0 Or Similar Tools Front-end Flutterflow Back-end Api With Json Returns Data Visualization Google Looker, Tableau, Or Similar Tools Applicable For Flutterflow • Shall Provide Comprehensive Documentation On Front-end And/or Back-end Tools Using Swagger Or Similar Tools Deployed On Dswd Managed Infrastructure. • The System Shall Cover An Unlimited Number Of Users With No Additional Cost From The Proponent. • User Load Capacity: The System Should Be Capable Of Handling An Unlimited Number Of Users, Ensuring Consistent Performance Even During Peak Usage Periods. • Ownership Of Work Products: All Work Products, Including Software, Documentation, And Design Materials Developed For This Project, Will Be The Property Of Dswd. • Service Provider Access Limitations: The Service Provider Will Not Have Access To The Dswd Production System. They Must Provide Comprehensive Instructions And Support For The Dswd System Administrators For System Deployment And Setup. • Learning And Development Intervention: The Service Provider Shall Provide Comprehensive Capability Building Activities Focusing On Building The Necessary Skills For Effective Implementation And Continuous Utilization Of System. • The Low Code Development Tools Must Be Provided By The Service Provider With No Additional Cost During The Development And Within The 2-year Warranty Period Following The Production Deployment Of The Application. B. Non-functional Requirement • Compliance With Cybersecurity And Data Privacy Policies: The System Must Adhere To All Dswd Cybersecurity, Data Privacy Policies, And Other Relevant Legal And Ethical Standards Concerning Data Privacy And Protection. This Ensures The Protection Of Sensitive Data And Aligns With Legal And Regulatory Standards. • Disclosure Of Third-party Libraries: The Service Provider Must Disclose All Third-party Libraries Used In The System’s Development. These Libraries Must Be Verified To Be Free From Security Vulnerabilities, Ensuring The Overall Security And Integrity Of The System. • Multi-factor Authentication: The System Shall Implement Multi-factor Authentication (mfa) To Enhance Security By Requiring Users To Provide Multiple Forms Of Identification Before Granting Access. This Extra Layer Of Security Will Prevent Unauthorized Access, Even If A User’s Password Is Compromised. The Mfa May Include Combinations Such As Passwords, Security Tokens, Or One-time Passwords (otps). • Audit Trail: The System Shall Maintain A Comprehensive Audit Log That Records All User Activities. This Includes Logins, Data Access, Modifications, And Any Other Actions Performed Within The System. The Audit Trail Is Essential For Monitoring User Behavior, Detecting Security Breaches, And Facilitating Troubleshooting. The Records Shall Be Tamper-proof And Stored Securely To Ensure Data Integrity. • Support: The Service Provider Shall Address All Vulnerability And Quality Assurance Results During The Development And Within The Warranty Period. C. Deployment Requirements • Compatibility With Dswd Managed Infrastructure: The System Shall Be Hosted On Identified Cloud Infrastructure And Be Compatible With Existing Digital And Cybersecurity Infrastructure, Ensuring Seamless Integration And Adherence To Security Standards That Need To Include The Following Set Of Environments: ○ Development, Staging, Uat, And Production Environment • Performance Testing: The Service Provider Must Perform Load Testing To Validate The System’s Performance And Stability Under Varying Degrees Of User Traffic, Ensuring Reliability And Efficiency During Peak Usage Including But Not Limited To Load Testing, Stress Testing, Etc. • Quality Assurance: The Service Provider Shall Conduct A Thorough Testing Of The System To Ensure All Functionalities Work As Intended And Meet The Specified Requirements. The Service Provider Must Address All Identified Quality Assurance Findings Throughout Its Development And During The Warranty Period. This Will Ensure That The System Meets All Performance, Usability, And Reliability Standards. • Security Vulnerability Assessment: The System Must Be Rigorously Tested For Known Vulnerabilities. The Service Provider Must Ensure The System Is Secure Against Potential Cyber Threats. The Service Provider Must Address All Identified Vulnerability Findings Throughout Its Development And During The Warranty Period. This Will Ensure That The System Meets All Performance, Usability, And Reliability Standards. D. Use Case The System Shall Ensure The Inclusion Of These Min. Use Case Requirement: Application Use Case Advanced Data Gathering For Assistance Preparedness For Protection (agapp) • Data Processing Of: ○ Disaster Incident Report ○ Evacuation Centers ○ Stockpile • Report Generation For: ○ Disaster Incident Reports ○ Evacuation Report • Capture Geolocation Beneficiary Transactional Account Information System (bts) • Data Processing Of Beneficiary Payment Modality Registry • Integration To 4ps Api Support Features: • Shall Be Integrated With The Philsys Authentication • Shall Be Mobile Responsive • Shall Include Role-based Access Control (rbac) • Customized Profile Pages • Dashboard And Report Generation • User Management • Data Visualization And Exporting • Data Migration Fron Existing Platform • Shall Provide The Low Code Development Platform At No Additional Cost During The Development And Within 2 Years Warranty Period Following The Production Deployment Of The Application. Any Additional Use Cases Identified During The Business Process Review And Analysis Must Be Discussed With The Service Provider And Approved By The Dswd For Inclusion In The Development Of This Project. Likewise, All Forms, Intake Sheets, And Other Relevant Documents Required For The Development Of This Application Shall Be Subject To Approval By The Dswd E. Phases Of Development Component/activities Deliverables Sprint 0: Project Initiation Inception Report Sprint 1: Completion Of Design Discovery Team 1: Beneficiary Transactional Account Information System (bts) • Conduct Of Business Process Review And Requirements • System Design • Business Process And Requirements Analysis Report • System Requirements Specification • Business Requirements Document • Document: Approved System Design (wireframe And Use Case Document) And Implementation Plan Approved By The Business Owner Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Sprint 2: Completion Of Baseline Development Requirements Team 1: Beneficiary Transactional Account Information System (bts) System Customization: Programming & Testing And Deployment Of These Modules: • Philsys Authentication • Data Processing Of Beneficiary Payment Modality Registry • User Management ○ Registration ○ Login ○ Password Recovery ○ Access Permission ○ System Security (i.e. Audit Trail, Mfa, Etc.) ○ Data Exporting Action: • System Configuration And Consultation Between Consulting Firm, Dswd Focals • Conduct Of Vulnerability Assessment • Conduct Of Qa • Configuration On Host, And Monitoring Services (dev, Testing And Production) Document: • Administration Console • System Version, Record Of Technical & Business Tests • Accomplished Testing Tool • Report On Test Results Accepted By The Business Owner • Report/dashboard Generation (if Any) • System Enhancement Based On Test Result • Report On Issues And Concerns • Record Of Monitoring And Maintenance Services • Addressed Va Result • Addressed Qa Result • Successful Deployment Report (dev, Testing And Production) Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) System Customization: Programming & Testing And Deployment Of These Modules: • Data Processing Of: ○ Disaster Incident Report ○ Evacuation Centers ○ Stockpile • User Management ○ Registration ○ Login ○ Password Recovery ○ Access Permission • System Security (i.e. Audit Trail, Mfa, Etc.) • Data Exporting Sprint 3: Completion Of Data Integration, Generation, Migration, And Other Requirements Team 1: Beneficiary Transactional Account Information System (bts) System Customization: Programming & Testing And Deployment Of These Modules: • 4ps Integration And Other Use Cases Identified During The Bpra • Dashboard And Report Generation • Data Migration Action: • System Configuration And Consultation Between Consulting Firm, Dswd Focals • Conduct Of Vulnerability Assessment • Conduct Of Qa • Configuration On Host, And Monitoring Services (dev, Testing And Production) Document: • Administration Console • System Version, Record Of Technical & Business Tests • Accomplished Testing Tool • Report On Test Results Accepted By The Business Owner • Report/dashboard Generation (if Any) • System Enhancement Based On Test Result • Report On Issues And Concerns • Record Of Monitoring And Maintenance Services • Addressed Va Result • Addressed Qa Result • Successful Deployment Report (dev, Testing And Production) Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) System Customization: Programming & Testing And Deployment Of These Modules: • Dashboard And Report Generation • Data Migration • Other Use Cases Identified During The Bpra Sprint 4: Completion Of Learning And Development Interventions Team 1: Beneficiary Transactional Account Information System (bts) Completed Learning And Development Interventions (ldis) With Documentation Report Action: At Least Two (2) Training Of Trainers Conducted With Comprehensive Documentation Either Onsite Or Virtual Documentation: Comprehensive Documentation Report Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Team 1: Beneficiary Transactional Account Information System (bts) Completion Report • Sign Off Document With Packaged System Documentation – Bpra, System Design, System Testing Report • User’s Manual/guide (for System Users And System Administrators) • Technical Systems Documentation • Comprehensive Api Documentation • Installation Guide • Troubleshooting Guide Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) Sprint 5: Final Systems Documentation And Turn-over Team 1: Beneficiary Transactional Account Information System (bts) Final Systems Documentation And Turn-over • Full System Sign Off Document With Packaged System Documentation – Bpra, System Design, System Testing Report • Final User’s Manual/guide (for System Users And System Administrators) • Final Technical Systems Documentation • Final Comprehensive Api Documentation • Final Installation Guide • Final Troubleshooting Guide Team 2: Advanced Data Gathering For Assistance Preparedness For Protection (agapp) F. Work Deliverables And Payment Schedule Milestone Deliverables Timeline % Of The Contract Price Sprint 0 Inception Report Within Five (5) Calendar Days After Receipt Of The Notice To Proceed 0% Sprint 1 Completion Of Design Discovery Within 25 Calendar Days Upon Receipt And Approval Of Inception Report 20% Sprint 2 Completion Of Baseline Development Requirements Within 25 Calendar Days Upon Completion Of Sprint 1 20% Sprint 3 Completion Of Data Integration, Generation, Migration And Other Requirements Within 25 Calendar Days Upon Completion Of Sprint 2 20% Sprint 4 Completion Of Learning And Development Interventions Documentation And Turn-over Within 25 Calendar Days Upon Completion Of Sprint 3 20% Sprint 5 Final Systems Documentation And Turn-over Within 15 Calendar Days Upon Completion Of Sprint 4 20% Outputs Of The Consultant Will Undergo Evaluation Before Proceeding To The Next Step. Each Deliverable, Particularly On The System Modules, Must Be Provided To The Ictms And Ico, Along With The Source Code. Deliverables Will Be Subject To Liquidated Damages If Submitted Beyond The Allotted Timeline, Which Is 15-30 Calendar Days Upon Acceptance And Approval. Only Work Outputs Or Deliverables Deemed Acceptable Will Be Compensated. Failure To Submit The Expected Output On Time Will Result In A Deduction Of One-tenth Of One Percent (0.001) Per Day From The Payment For The Covered Work Output/deliverable Unless Satisfactorily Justified. G. Institutional Arrangements Service Provider • Pre-development And Installation ○ The Service Provider Should Provide A Project Implementation Plan That Must Be Approved By The Dswd ○ Engage The Business Owner In The Conduct Of Business Process And Requirements Analysis As The Basis Of System Requirement Specification (srs) For The Information System That Will Be Developed ○ Ensure Approval On The Sign-off Documents On All The Identified Deliverables • During Development And Installation ○ The Service Provider Should Manage And Execute Project Tasks Alongside The Dswd In Accordance With The Project Scope Period Of Performance And Quality Standards ○ The Service Provider Shall Ensure Compliance With The Data Sharing Agreement ○ The Service Provider Shall Ensure Timely Completion Of Deliverables Identified In This Project ○ The Service Provider Should Lead The Deployment Project In Collaboration With The Dswd And Provide Weekly Project Updates, Bi-weekly Steering Committee Meetings, Milestone Reports, And Closeout Reports ○ The Service Provider Should Provide A Status Report Of The Project In The Form Of Charts/graphs ○ The Service Provider Should Assume Full Responsibility For The Project Plan And Lead The Change Management Process ○ The Service Provider Should Formulate And Execute A Training Approach And Strategy ○ The Service Provider Should Establish A Dedicated Project Team As The Primary Point Of Contact For Dswd Throughout The Deployment Process ○ The Service Provider Should Have A Project Manager Responsible For Overseeing The Integrated Project Plan, Managing Risk Mitigation, And Resolving Issues ○ The Service Provider Should Have A Technical Deployment Architect Responsible For Coordinating And Supporting The Implementation Of Technical Tasks, Providing Best Practices, And Troubleshooting ○ The Service Provider Should Have A Change Manager Responsible For Executing The Change Management Plan, Publishing Communication Plans, And Designing The Training Curriculum ○ The Service Provider Shall Inform The Proponent Office Of Any Challenges Requiring Further Assistance ○ The Service Provider Should Have A Trainer Responsible For Conducting And-user Training And Technical Training Workshops • Post Installation ○ The Service Provider Representative Shall Co-manage The Project With The Assigned Project Focals From The Dswd Ensuring That The System Is Operational 24/7 ○ The Service Provider Should Provide An Escalation Procedure In Reporting Issues And Concerns ○ The Service Provider Should Ensure End-to-end Security To The System To Safeguard Against Breaches And Potential Threats, Including Administration Tools And Best Practices ○ The Service Provider Should Perform Capacity Planning, Identify Requirements, And Provide Recommendations To Enhance The Performance And Usability Of The System. The Service Provider Is Responsible For All Configurations, Including Those For Future Requirements Identified By Dswd ○ The Service Provider Shall Provide A 2-year Warranty Period At No Additional Cost To Address Errors/bugs/vulnerabilities After All The Sprint Has Been Completed • Service Level Agreement ○ The Service Provider Shall Maintain 24/7 Availability ○ The Service Provider Shall Include Unlimited 24x7 Service Support Via Phone, Email, Remote, Or On-site When Needed At No Additional Cost Within The Warranty Period ○ The Service Provider Shall Respond To Support Requests Within The Following Timeframes: 1. Critical Issues: Within 4 Hours 2. High Priority Issues: Within 24 Hours 3. Medium Priority Issues: 1-3 Business Days 4. Low Priority Issues: 1-7 Business Days ○ The Service Provider Shall Address All Vulnerability And Quality Assurance Results During The Development And Within The Warranty Period ○ The Service Provider Shall Provide Thorough Guidance And Comprehensive Documentation For All Changes, Enhancements, And Interventions Made During The Warranty Period ○ The Service Provider Shall Document All Interventions, Changes, Troubleshooting Activities, And Enhancements, Ensuring Approval From The Depaartment’s Designated It Team And Submission Within The Prescribed Period ○ The Service Provider Shall Strictly Adhere To The Existing Ict Policy And/or Guidelines Of The Department Department Of Social Welfare And Development (dswd) • Provide Overall Management Directions To The Project • Support The Offices, Bureaus, Services And Units (obsus) In Establishing Institutional Mechanisms For The Sustainability Of The Project • Enforce A Data Sharing Agreement / Non-disclosure Agreement Among The Project Stakeholders (if Needed) • Ensure That The Project Is Aligned With The Secretary’s Directive Regarding Digitalization, Specifically On The Transition To Online Systems, And Consistent With The Department’s Pgs And Strategy Map • Ensure The Project’s Inclusion In The Dswd Information Systems Strategic Plan • Provide Contextual Inputs To The Service Provider To Ensure Alignment Of The Design And Development Of The Application To The Business Requirements • Review The Quality Of Operations-related And Ict Related Outputs Submitted By The Service Provider Under The Terms Provided Herein • Provide Appropriate Documents Relevant To The Project Within The Duration Of The Engagement • Create A Policy And/or Document Supporting The Sustainability Of This Project • Lead The Preparatory Tasks, Onsite Tasks, And Post-activity Tasks With The Service Provider, Including Organization Of Launching Activity And Training Of Trainers, Production Of Multimedia Assets • Ensure Timely Monitoring Of This Project Including But Not Limited To: ○ Deliverables Of The Service Provider ○ Timely Monitoring, Tracking And Updates Of Procurement And Financial Related Activities • Assist In The Preparatory Tasks, Onsite Tasks, And Post-activity Tasks With The Service Provider, Including Organization Of Launching Activity And Training Of Trainers, Production Of Multimedia Assets H. Learning And Development Interventions The Following Learning And Development Interventions (ldis) For Dswd End-users And Technical Staff Shall Be Conducted By The Service Provider Who Shall Also Issue Certificates Of Completion To The Participants Duly Signed By A Certified Trainer, At No Extra Cost To The Dswd: • Onboarding Sessions And Other Learning And Development Interventions On The Proposed Platform For Administrators And End-users Within The Subscription Period • At Least Four (4) Training-of-trainers During The Development And/or Prior Development • At Least One (1) Capability-building Session Must Be Held Per Semester During The Warranty Period To Keep Participants Updated On The System Enhancements And Best Practices • At Least One (1) Capability-building Session Must Be Held Per Semester For The Administration Management Console Technical Training For It Administrators I. Confidentiality And Non-disclosure Agreement • All Data And Information Used In This Service Shall Be Governed By Republic Act 10173 – Data Privacy Act Of 2012 • Any Information, Including But Not Limited To The Information Related To Dswd Provided To The Service Provider For The Purpose Of Warehouse Inventory Management Solution Agreement, Are The Sole Property Of The Dswd. The Service Provider Shall Treat This Information As Confidential And Shall Not Disclose It To Any Company, Firm Or Person During The Duration Of The Agreement, Or At Any Time Thereafter. • All Business, Personnel And Technical Information And Any Related Documentation, In Whatever Form, Which The Dswd May Provide Shall Be Used By The Service Provider Solely For The Purpose For Which It Was Provided And Shall Be Treated In Strictest Confidence And Protected; If In Tangible Form, The Same Shall Be Returned To Dswd Upon The End Of The Service Agreement. • All Account Information And Data Are Sole Property Of The Dswd. The Service Provider Shall Not Retain Copies Of It In Any Form Upon The End Of The Service Agreement J. Minimum Qualifications • With At Least Three (3) Years Of Experience In An It Company Offering Software Solutions Design And Development, Both In Web And Mobile Forms And Web Design And Development • With At Least Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors. Demonstrable Knowledge Of Data Governance, Data Interoperability, And Data Protection Is An Advantage • With At Least (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients • With Sufficient Human Resources That Process Technical Expertise In Areas Of Business Analysis, Ui/ux Design, Front–end Development, Back-end Development, And Software Quality Assurance, With Technical Certifications K. Ownership And Publication Rights • All Documentation Produced Under The Terms Of This Engagement Shall Remain The Property Of Dswd. Dswd Retains The Exclusive Right To Publish Or Disseminate The Knowledge Products Arising From The Engagement Even After The Termination Of This Project • The Service Provider Must Submit A Written Letter When Requesting Raw Data, Versions, And/or Parts Of The Outputs That Will Be Used For Purposes Other Than What Was Originally Agreed Upon With The Terms Of This Engagement • The System Including Source Code That Will Be Developed Shall Be Fully And Exclusively Owned And Used By The Dswd And Shall Not Be Transferred In Favor Of Any Entity And In Any Other Mode. Intellectual Property Over The Design And Implementation Of The Requirements (including Custom Code And Configurations) Shall Remain With Dswd • Source Code Or Binaries, Database Schema And Definitions, Configuration Files And Build Artifacts, Documentation, Licenses And Any Other Custom-developed Artifact Of The Application Specifically Developed For This Project Must Be Submitted To The Dswd In Order For The End-users To Carry Out Independent Maintenance And Updating/modification Of The Application In The Future. The Complete Source Code And Scripts, Properly Versioned, Must Be Submitted To The Dswd Immediately At The Start Of The Implementation Phase L. Budgetary Requirements: The Total Budgetary Requirement Amounts To Nine Hundred Ninety-two Thousand Seven Hundred Sixteen Pesos And Eighty-seven Centavos (php992,716.87) Chargeable Against Ictms 2024 Funds And Payment Will Be Staggered Per Milestone Achievement Following Dswd – Approved Policies And Guidelines. 5. Evaluation Criteria This Project Shall Be Procured Using Section 53.9 (negotiated Procurement-small Value Procurement) Of The Revised 2016 Implementing Rules And Regulations Of Republic Act No. 9184 Or The Government Procurement Reform Act And Pursuant To The Following Criteria: Qualification Rating With At Least Three (3) Years Of Experience In An It Company Offering Software Solutions Design And Development, Both In Web And Mobile Forms And Web Design And Development 35% A. The Consulting Firm Has More Than Three (3) Years Of Experience As An It Company Specializing In Software Solutions Design And Development, Both In Web And Mobile Forms, And Web Design And Development 35% B. The Consulting Firm Has Three (3) Years Of Experience As An It Company Specializing In Software Solutions Design And Development, Both In Web And Mobile Forms, And Web Design And Development 25% With At Least Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors. Demonstrable Knowledge Of Data Governance, Data Interoperability, And Data Protection Is An Advantage 35% A. The Consulting Firm Has More Than Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors; One Team Member Has Certification In Conducting Privacy Impact Assessment 35% B. The Consulting Firm Has Three (3) Years Of Experience As An Institution Working With The Government On The Design, Development, And Management Of Digital Solutions, Including Across Different Administrative Levels And Sectors; One Team Member Has Certification In Conducting Privacy Impact Assessment 25% With At Least (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 10% A. The Consulting Firm Has More Than Three (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 10% B. The Consulting Firm Has Three (3) Successful Service Deployments With Proof Of Satisfactory Service From Its Clients 5% With Sufficient Human Resources That Process Technical Expertise In Areas Of Business Analysis, Ui/ux Design, Front–end Development, Back-end Development, And Software Quality Assurance, With Technical Certifications 20% A. The Consulting Firm Has 2 Or More Team Of Over Five (5) Members, Each Fulfilling Specific Roles Within The Software Development Life Cycle And With Relevant Technical Certifications 20% B. The Consulting Firm Has Less Than 2 Team Of Five (5) Members, Each Fulfilling Specific Roles Within The Software Development Life Cycle And With Relevant Technical Certifications Role Quantity Project Manager 1 Developers 2 Quality Assurance (qa) Specialist 1 Analyst 1 15% Total 100% Passing Rate 70% Note: Failure To Meet Any Of The Minimum Requirements Per Criteria Stated Above Will Automatically Be Given A Zero (0%) Rating And Will Be Automatically Disqualified. 9. The Dswd Now Invites Interested Consulting Firms To Submit The Following: A. Company Profile/portfolio (highlighting The Years And Experiences Of The Firm And With Proof Of Engagements With The Government); B. Comprehensive Curriculum Vitae (cvs) Of The Project Team Members Including Evidences; C. Financial Proposal (annex A); D. Bir Certificate Of Registration; E. 2025 Mayor’s/business Permit Or 2024 Mayor’s/business Permit With Proof Of Application And/or Official Receipt Of Renewal For 2025 (2025 Mayor’s/business Permit Must Be Submitted As Condition For Payment); F. Income/business Tax Return; G. Duly Notarized Omnibus Sworn Statement With Secretary’s Certificate; And H. Proof Of Philgeps Registration/ Philgeps Registration Number. 10. The Required Documents Shall Be Submitted At The Address Below Or Through Email At Quotations@dswd.gov.ph Not Later Than 5:00pm Of 21 February 2025. 11. The Project Duration For Cy 2025 Is Four (4) Months Upon Receipt Of The Notice To Proceed (ntp). 12. The Consulting Firm Shall Be Required To Issue Official Receipt (or) As Acceptable Evidence Of Receipt Of Payment For Disbursements. The Chairperson Bids And Awards Committee C/o Bids And Awards Committee Secretariat As-procurement Management Division Dswd Central Office Ibp Road, Constitution Hills. Quezon City Telephone Nos.: (02) 8931 8101 To 07 Voip Nos. 10095 Email Address: Bacsec@dswd.gov.phquotations@dswd.gov.ph Monina Josefina H. Romualdez Undersecretary And Chairperson Bids And Awards Committee
Closing Date21 Feb 2025
Tender AmountPHP 992.7 K (USD 17.1 K)
DEPT OF THE NAVY USA Tender
Security and Emergency Services
United States
Details: This Is A Sources Sought Notice For Market Research Purposes, Only. This Notice Does Not Constitute A Request For Proposal, Request For Quotation, Or Invitation For Bids. This Notice Does Not Commit The Government To Issue Any Type Of Solicitation Or Award An Ultimate Contract. This Notice Does Not Restrict The Government From A Particular Acquisition Approach.
the Naval Facilities Engineering Systems Command, Mid-atlantic Is Seeking Eligible Small Business Firms Capable Of Performing Fire Protection Engineering Design Services Under A Contemplated Indefinite Delivery Indefinite Quantity Contract To Support Projects Throughout The Naval Facilities Engineering Systems Command, Mid-atlantic's Area Of Responsibility (aor). Work Under The Contract Is Anticipated To Occur Primarily At Navfac Midlant Area Of Responsibility (aor), Which Includes Connecticut, Delaware, Illinois, Indiana, Massachusetts, Maine, Michigan, New Hampshire, New Jersey, New York, North Carolina, Ohio, Pennsylvania, Rhode Island, South Carolina, Virginia, West Virginia, And Wisconsin. The Mid-atlantic Region Offices Are Located In Norfolk, Virginia, However, Work Can Be Awarded For Any Location Within The Mid-atlantic Region. Work May Also Be Ordered Throughout The Entire Naval Facilities Engineering Systems Command, If Deemed Necessary And Approved By The Navfac Mid-atlantic Chief Of The Contracting Office. Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Appropriate North American Industry Classification System (naics) Code For This Procurement Is 541330 – Engineering Services. The Small Business Size Classification For This Procurement Is $25,500,000.00.
fire Protection Design And Engineering Services Provided Under The Contract Shall Be In Accordance With Unified Facilities Criteria (ufc) 1-200-01 And Ufc 3-600-01, As Well As All Other Applicable National Fire Protection Association (nfpa) Codes/standards Not Covered By The Ufc And Extensive Knowledge And Experience With The International Building Code (ibc), And All Navy/navfac Guides, Specifications, And Instructions. Specifically, Navfac Midlant Requires All Fire Protection Engineers To Be Registered In That Particular Discipline. The Fire Protection Work May Include, But Is Not Limited To Building Code Analysis; Life-safety Code Analysis; Water Flow Tests Of Existing Water Supply And Hydraulic Supply Analysis; Fire-protection Design Analysis Of Automatic Detection And Suppression Systems; And Verification Of The Adequacy Of Water Supply (i.e., Preliminary Sprinkler Layout With Supporting Hydraulic Calculations); Fire Protection Engineering Survey, Assessment Or Studies; Construction Support Services; Performance-based Designs; Special Systems/ Hazards Analysis; In-house Design Services (ae Collaborating With Government Design Team); Rfp Development; And Fire Modeling.
fire Protection Engineering Staff Shall Meet The Following Requirements: An Individual Who Is A Registered Professional Engineer (p.e.) Who Has Passed The Fire Protection Engineering Written Examination Administered By The National Council Of Examiners For Engineering And Surveying (ncees) And Has Relevant Fire Protection Engineering Experience. In Addition, Firms Are Required To Have A Minimum Of Three (3) Registered Fire Protection Engineers On Staff To Perform The Work.
the Contemplated Contract Will Be For A Duration Not To Exceed Five (5) Years. The Total Fee For The Contract Term Shall Not Exceed $15,000,000.00 For The Life Of The Contract. It Is Anticipated That Projects With An Estimated Construction Cost Of No More Than $2,000,000 Will Be Performed Under The Resultant Contract, However, Larger Projects May Be Performed At The Discretion Of The Contracting Officer.
typical Task Orders Issued Under This Contract Are Expected To Range Between $50,000 And $1,000,000. Project Programs Typically Supporting This Contract Are Special Projects And Military Construction Programs. Firms Must Comply With Far 52.219-14, Limitations On Subcontracting.
the Sources Sought Notice Is Not A Request For Proposal. It Is A Market Research Tool Used To Determine The Availability And Adequacy Of Potential Small Business Sources Prior To Determining The Method Of Acquisition And Issuance Of An Award. The Government Is Not Obligated To And Will Not Pay For Any Information Received From Potential Sources As A Result Of This Sources Sought Notice. All Small Businesses, Small Disadvantaged Businesses, Service-disabled Veteran-owed Small Businesses, Certified Hub-zone Small Businesses, Economically Disadvantaged Women-owned Small Businesses/women-owned Small Businesses, And Certified 8(a) Small Businesses Are Encouraged To Respond. Upon Review Of Industry Response To The Sources Sought Notice, The Government Will Determine Whether A Set-aside Acquisition In Lieu Of Full And Open Competition Is In The Government's Best Interest.
it Is Requested That Interested Small Businesses Submit To The Contracting Office A Brief Capabilities Statement Package (no More Than 25 Pages In Length, Single-spaced, 12-point Font Minimum Including Document Searchable Bookmarks) Demonstrating The Ability To Perform The Requested Services. Please Use The Attached Sources Sought Project Information Form For Each Project Submitted Demonstrating The Requisite Experience To Document A Minimum Of Five (5) And Up To A Maximum Of Ten (10) Fire Protection Engineering Design And/or Consulting Projects Completed In The Past Seven (7) Years That Best Demonstrate Your Relevant Experience In Providing Professional Fire Protection Engineering Services Similar In Size, Scope And Complexity To What Will Be Required Under This Idiq. Project Experience Will Be Evaluated In Accordance With The Following Characteristics:
relevant Professional Design Services:
investigative Services, Facility Analysis & Deliverables:
on-site Surveys Of Existing Facilities And Documentation Of Existing Conditions.
life Safety Code And Building Code Analysis Of Existing Facilities And Adjacent Facilities.
assessment Of Existing Fire Protection Systems, And Hydraulic Water Supply Analysis.
documentation Of On-site Surveys, Life Safety Code And Building Code Analysis And Assessment Of Existing Fire Protection Systems, Along With Professional Recommendations, In A Report To The Government.
design Services & Deliverables:
development Of Design-build Rfp Packages For New Fire Protection Systems Or Upgrade Of Existing Fire Protection Systems.
development Of Comprehensive Design-bid-build Packages That Include Full Plans And Specifications For New Fire Protection Systems Or Upgrade Of Existing Fire Protection Systems. Indicate Projects Utilizing Building Information Modeling (bim).
fire Protection Design Calculations.
performance- Based Fire Protection Design
fire Modeling
construction Cost Estimates
construction Services:
review Of Construction Shop Drawing Submittals.
field Consultation And Special Inspections.
as-built And Record Document Preparation.
relevant Projects:
project Size:
design And Engineering Services For A Project With A Final Construction Cost Of $500,000 Or Greater.
design And Engineering Services For At Least One (1) Project With A Final Construction Cost Of $2,000,000 Or Greater.
engineering Services/studies/assessment/fire Modeling With A Contract Value Of $50,000 Or Greater.
project Type (submit Projects That Fall Within Any Of The Below Project Types. A Prospective Offeror Is Not Required To Submit One Of Each Project Type To Be Considered, But A Greater Breadth Of Project Experience Will Be Considered More Favorably):
new Construction Or Renovation Of Fire Protection System Water Supply And Distribution Systems.
new Construction Or Renovation Of Base - Wide Fire-reporting Systems.
new Construction Or Renovation Of Administrative Facilities.
new Construction Or Renovation Of Industrial Facilities.
new Construction Or Renovation Of Transportation Centers.
new Construction Or Renovation Of Commercial Facilities.
engineering Services/studies/assessment/fire Modeling.
submitter’s Experience Performing As A Subcontractor Will Be Considered, However, Experience Of Companies Proposed To Work As Subcontractors On The Resulting Solicitation/contract Will Not. Ensure That The Project Description Clearly Identifies Whether The Project Is New Construction Or Renovation, Provides The Final Construction Cost, And Addresses How The Project Meets The Scope/complexity Requirements And Whether The Project Was Completed Or Not.
a Company Profile Shall Also Be Included Utilizing The Attached Sources Sought Contractor Information Form. This Will Include The Number Of Employees, Office Locations(s), Uei, Cage Code, And Statement Regarding Small Business Designation And Status.
the Information Provided In This Notice Is Subject To Change And In No Way Binds The Government To Solicit For Or Award A Contract. The Government Will Not Provide Debriefs On The Results Of This Research, But Feedback Regarding The Decision To Set Aside Or Not Set Aside The Procurement Will Be Accomplished Via Pre-solicitation Synopsis Or Solicitation For These Services As Applicable. All Information Submitted Will Be Held In A Confidential Manner And Will Only Be Used For The Purpose Intended. Points Of Contact Listed May Be Contacted For The Purpose Of Verifying Performance.
this Office Anticipates Award Of A Contract For These Services No Later Than March 2026.
responses Are Due No Later Than 16 May 2025 By 2:00 Pm Local Time. Late Submissions May Not Be Accepted.
the Package Shall Be Emailed To Leslie Mcgehee At Leslie.m.mcgehee.civ@us.navy.mil With The Subject Referencing The Solicitation Number N4008525r2578. Attachments Are Limited To A Total Of 5mb.
questions Or Comments Regarding This Notice May Be Addressed By Email To Leslie Mcgehee At Leslie.m.mcgehee.civ@us.navy.mil.
Closing Date16 May 2025
Tender AmountRefer Documents
2081-2090 of 2143 archived Tenders