Architect Tenders

Government Of Iceland Tender

Others
location
Iceland
Details: Community Housing is offering a bid to build a housing complex for the disabled on the plot at Nauthólsvegur 83d, in Námunda, next to the Reykjavík University Student Park. The project is a fully designed concrete house on three floors, along with a fully finished plot. The gross floor area of the house is 780 square meters, with eight apartments, along with staff facilities on the ground floor. The architect of the house is Þórður Steingrímsson from Kanon Architects.
Closing Date5 Mar 2025
Tender AmountRefer Documents 

Iberville Parish School Tender

Civil And Construction...+2Civil Works Others, Building Construction
location
United States
Details: March 13th, 2025 Advertisement For Bids Sealed Bids Will Be Received By The Iberville Parish School Board, Attention Evan Cagnolatti, Director Of Facilities And Projects, At 59125 Bayou Rd., Plaquemine, La. 70764, Not Later Than 2:00 Pm (local Time), Thursday, April 10th, 2025, For The Following: Plaquemine High School Parking Improvements (ipsb Project #2510m01) Note ** Outer Envelope If Mailed Shall Be Marked Sealed Bid. Please Find Bid-related Materials And Place Electronic Bids At – Www.centralbidding.com The Bids Will Be Opened At The Iberville Parish School Board Maintenance Office Immediately Following The Closure Of The Bid Time On The Above-noted Date. A Mandatory Pre-bid Conference Will Be Held At 10:00 A.m. Cdt On March 28th, 2025, At Ipsb Maintenance Office 59125 Bayou Rd., Plaquemine, La 70764. No Bid Will Be Accepted From Any Contractor Who Did Not Attend And Sign In At The Pre-bid Conference. Preliminary Bid Information May Be Obtained By Contacting The Architectural Firm Listed Below: Fusion Architects? 3488 Brentwood Dr. 101? Baton Rouge, La. 70809? 225-766-4848? It Is The Policy Of The Iberville Parish School Board To Provide Equal Opportunities In Educational Programs And Activities Regardless Of Race, Color, National Origin, Sex, Age, Disabilities, Or Veteran Status. This Includes Admissions, Educational Services, Financial Aid, And Employment. Insertion Dates: March 13th, 2025, March 20th, 2025, March 27th, 2025
Closing Date10 Apr 2025
Tender AmountRefer Documents 

City Of Quezon Tender

Civil And Construction...+1Civil Works Others
location
Philippines
Details: Description Invitation To Bid No. Project No. Office Project Name Amount Source Of Fund Delivery Period 1. Cad-25-services-0214 City Architect Department Line 1: Conduct Of Geotechnical Investigation For The Proposed Construction Of Three (3) Storey Multi-purpose Building (offices) At Villa Verde Subdivision At Barangay Sta. Monica 100,000.00 General Fund 20 Cd Line 2: Conduct Of Geotechnical Investigation For The Proposed Construction Of Two (2) Storey Multi-purpose Building (parking And Basketball Court) At St. Dominic 9 Subdivision, Barangay Talipapa 100,000.00 General Fund 20 Cd Line 3: Conduct Of Geotechnical Investigation For The Proposed Construction Of Three (3) Storey Multi-purpose Building (parking, Basketball Court) At Pleasantville Subdivision, Barangay Talipapa 150,000.00 General Fund 20 Cd Line 4: Conduct Of Geotechnical Investigation For The Proposed Construction Of Two (2) Storey Multi-purpose Building (parking Area, Covered Basketball Court) At Barangay U.p. Village 150,000.00 General Fund 20 Cd Line 5: Conduct Of Geotechnical Investigation For The Proposed Expansion Of Animal Care And Adoption Center (pet Crematorium) 100,000.00 General Fund 20 Cd Line 6: Conduct Of Geotechnical Investigation For The Proposed Construction Of Three (3) Storey Fire Sub-station At Barangay Sta. Lucia 100,000.00 General Fund 20 Cd 1. The Quezon City Local Government, Through The General Fund And Trust Fund Of Various Years Intends To Apply The Sums Stated Above Being The Abc To Payments Under The Contract For The Above Stated Projects Of Contract For Each Lot/item. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Quezon City Local Government Now Invites Bids For Various Projects. Delivery Of The Goods Is Required As Stated Above. Bidders Should Have Completed, Within The Last Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. A. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Quezon City Government Bids And Awards Committee (bac) Secretariat And Inspect The Bidding Documents At The Address Given Below During Weekdays From 7:00 A.m. – 5:00 P.m. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On Monday, February 10, 2025 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person. Standard Rates: Approved Budget For The Contract Maximum Cost Of Bidding Documents (in Philippine Peso) 500,000 And Below 500.00 More Than 500,000 Up To 1 Million 1,000.00 The Following Are The Requirements For Purchase Of Bidding Documents; 1. Philgeps Registration Certificate (platinum – 3 Pages) 2. Document Request List (drl) 3. Authorization To Purchase Bidding Documents 3.1 Corporate Secretary Certificate For Corporation (specific For The Project) 3.2 Special Power Of Attorney For Single Proprietorship (specific For The Project) 4. Notarized Joint Venture Agreement (as Applicable) 6. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The 2nd Floor, Procurement Department, Finance Building, Quezon City Hall Compound On Or Before 10:00a.m. Of Monday, February 17, 2025. Late Bids Shall Not Be Accepted. 7. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 8. Bid Opening Shall Be On 11:00a.m. Of Monday, February 17, 2025 At The Given Address Below And/or Via Zoom. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. Topic: Bac-goods & Services Bidding Join Zoom Meeting Https://us02web.zoom.us/j/85850855933?pwd=r2dzuup4z3lyu29izgv1wmdkrjzcdz09 Meeting Id: 858 5085 5933 Passcode: 118682 9. The Quezon City Local Government Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 10. For Further Information, Please Refer To: Atty. Dominic B. Garcia Oic, Procurement Department 2nd Floor, Procurement Department, Finance Building, Quezon City Hall Compound Elliptical Road, Barangay Central Diliman, Quezon City. Email Add: Bacgoods.procurement@quezoncity.gov.ph Tel. No. (02)8988-4242 Loc. 8506/8710 Website: Www.quezoncity.gov.ph 11. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.quezoncity.gov.ph By: Ms. Ma. Margarita S. Mejia, Dpa Chairperson, Qc-bac-goods And Services
Closing Date17 Feb 2025
Tender AmountPHP 700 K (USD 12 K)

DEPT OF THE NAVY USA Tender

Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
location
United States
Details: This Is A Sources Sought Announcement, A Market Survey For Written Information Only. This Is Not A Solicitation Announcement For Proposals And No Contract Will Be Awarded From This Announcement. No Reimbursement Will Be Made For Any Costs Associated With Providing Information In Response To This Announcement Or Any Follow-up Information Requests. no Telephone Calls Will Be Accepted Requesting A Bid Package Or Solicitation. There Is No Bid Package Or Solicitation. In Order To Protect The Procurement Integrity Of Any Future Procurement, If Any, That May Arise From This Announcement, Information Regarding The Technical Point Of Contact Will Not Be Given And No Appointments For Presentations Will Be Made. the Naval Facilities Engineering Systems Command Southeast (navfac Se) Is Seeking Qualified And Interested Parties In Any Of The Following Categories: Service Disabled Veteran-owned Small Business (sdvosb), And/or Small Business (sb) Sources, U.s. Small Business Administration Certified 8(a) Program Participants, Hubzone Small Business (hubzone), And Women Owned Small Business (wosb), With Current Relevant Qualifications, Experience, Personnel, And Capability To Perform. the Work Will Be Performed In The Area Of Operations (ao) For Navfac Se, Which Includes, But Is Not Limited To, The States Of Florida, Georgia, Louisiana, Mississippi, South Carolina, Tennessee, And Texas.projects Are Planned To Be Issued As Task Orders Under Multiple Award Construction Contracts (maccs).the Work To Be Performed Consists Of, But Is Not Limited To: New Construction, Renovation, Alteration, Demolition, And Repairs Of Electrical Power Generation Plants, Electrical Transmission Systems, Electrical Distribution Systems, Outdoor Lighting, Airfield Lighting, Secondary Electrical Components, And Other Electrical Utilities Efforts, Including Storm Recovery For The Area Of Responsibility Managed By Navfac Se. projects Will Require Either Single Discipline Or Multi-discipline Design Services Or May Include 100% Construction Performance Specifications. Projects May Be Based On Design-build Or Full Plans And Specifications Format And May Also Require Comprehensive Interior Design And Incorporation Of Sustainable Features. contracts Will Be For One (1) Five-year Ordering Period. The Aggregate Value Of All Contracts Awarded From Any Resultant Solicitation Is Anticipated To Be $249,000,000 ($249m) Over The Five-year Period Over The Five-year Period. A Per-contract Maximum Will Not Be Identified. Task Orders Will Be Firm-fixed-price And Will Range From $500,000 To $30,000,000. Task Orders Under Or Over These Amounts May Be Considered If Deemed To Be In The Government’s Best Interest And Approved By The Navfac Chief Of The Contracting Office. Macc Contractors May Be Asked To Respond To Multiple Requests For Proposals (rfps) In A Short Timeframe (e.g., Four (4) Or Five (5) Rfps Issued Within A 30-day Period). if The Solicitation Is Issued As A Small Business Set-aside, Then In Accordance With Federal Acquisition Regulations (far) 52.219-14, Limitations Of Subcontracting, For General Construction, The Prime Contractor May Not Pay More Than (85%) Of The Amount Paid By The Government For Contract Performance, Excluding The Cost Of Material, To Subcontractors That Are Similarly Situated Entities. Any Work That A Similarly Situated Entity Further Subcontracts Will Count Towards The Prime Contractor’s 85% Subcontract Amount That Cannot Be Exceeded. the North American Industry Classification System (naics) Code Is 238210 – Electrical Contractors & Other Wiring, With A Small Business Size Standard Of $19,000,000 ($19m). contractor Information: Provide Your Firm’s Contact Information, To Include Its System For Awardmanagement (sam) Unique Entity Identifier And Cage Code Numbers. indicate If A Solicitation Is Issued Will Your Firm/company Be Submitting A Proposal: Yes No. type Of Business: U.s. Small Business Administration (sba) Certified 8(a), Sba Certified Hub Zone, Service Disabled Veteran-owned Small Businesses (sdvosb), Women Owned Small Business (wosb), And Small Businesses (sb). For More Information On The Definitions Or Requirements For These Small Business Programs, Refer To Http://www.sba.gov. bond Capacity: Provide Your Firm’s Surety’s Name, Your Firm’s Maximum Bonding Capacity Per Individual Project And Aggregate Bonding Capacity. experience Submission Requirements: Submit A Minimum Of Three (3) Design-build Or Design-bid-build Projects That Demonstrate Multi-discipline, Architectural, Engineering, Construction Experience As The Prime Contractor In Performing Efforts Of A Similar Size, Scope And Complexity To The Project Description Above (construction, Renovation, Alteration, Demolition And Repair Work, Including The Necessary Design); And Completed Within The Last Seven (7) Years With A Completed Value Of $500,000 Or Greater. submissions Shall Contain The Following Items (1-7) For Each Project Submitted For Consideration: include Contract Number, If Applicable. indicate Whether Prime Contractor Or Subcontractor. contract Value. completion Date. government/agency Point Of Contact And Current Telephone Number. project Description. Include A Brief Description, With Sufficient Detail, To Determine Whether This Project Is Of A Similar Size, Scope And Complexity To The Project Description In This Announcement; And How The Contract Referenced Relates To The Project Description Herein. identify Whether Your Firm Used In-house Design Capacity Or Used An Architect/engineer (a/e) Firm To Provide Design Services. Indicate Whether Your Firm Has An Established Working Relationship With The Design Firm, If Applicable. capability Statements Consisting Of Appropriate Documentation, Literature, Brochures Will Be Accepted Providing It Contains All The Information Required Above (items 1-5). Complete Submission Package Shall Not Exceed 10 Pages.please Respond To This Announcement By 3:00pm Eastern Time On 23 January 2025 Via Email To Darrien.a.thomas.civ@us.navy.mil And A Copy To Matthew.j.abbott5.civ@us.navy.mil. The Subject Line Of The Email Shall State: Electrical Utilities Macc Sources Sought Response. Responses That Do Not Meet All Requirements Or Are Not Submitted With The Allotted Time Will Not Be Considered. Respondents Will Not Be Notified Of The Results Of The Evaluation. Navfac Se Will Utilize The Information For Technical And Acquisition Planning. All Proprietary Information Not To Be Disseminated Outside The Government Must Be Clearly Marked And Identified. Since This Is A Sources Sought Announcement, No Evaluation Letters And/or Results Will Be Issued To The Participants.
Closing Date23 Jan 2025
Tender AmountRefer Documents 

Province Of South Cotabato Tender

Laboratory Equipment and Services
location
Philippines
Details: Description Republic Of The Philippines Province Of South Cotabato Bids And Awards Committee Capitol Compound Alunan Avenue, Koronadal City Tel. Fax No.: (083) 228-9951/228-8570 Invitation To Bid For The Supply And Delivery Of Various Laboratory Reagents (early Procurement – Short Of Award) 1. The Provincial Government Of South Cotabato, Through The General Fund Annual Budget 2025, Intends To Apply The Sum Of P22,166,500.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For The Supply And Delivery Of Various Laboratory Reagents / Itb No. 25-0013, As Named Below: - Reagents - Compatible With Cell Dyne P 1,381,524.00 – Ps 1 Ruby Hematology Analyzer. - Reagents - Compatible With Vitek Ii P 6,878,954.00 – Ps 2 And Bactec Machine. - Reagents - Compatible With Vidas Machine. P 2,338,752.00 – Ps 3 - Reagents - Compatible With Architect Machine. P 6,084,395.00 – Ps 4 - Reagents - Compatible With Easylyte Analyzer. P 718,050.00 – Ps 5 - Reagents - Compatible With Coagulation P 647,480.00 – Ps 6 Analyzer (wondfo). - Reagents - Compatible With Beckman P 1,131,500.00 – Ps 7 Coulter Dxh500 5part Semi-automated. - Reagents - Compatible With Optilite Analyzer P 817,700.00 – Ps 8 Machine. - Reagents - Compatible With Arkray Ha-8380v. P 1,678,145.00 – Ps 9 - Reagents - Compatible With Afinion. P 490,000.00 – Ps 10 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Provincial Government Of South Cotabato Now Invites Bids For The Supply And Delivery Of Various Laboratory Reagents. Delivery Of The Goods Is Required Within 20 Calendar Days From The Receipt Of Notice To Proceed (ps 1 – Ps 10). Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country, The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From Provincial Government Of South Cotabato And Inspect The Bidding Documents At The Address Given Below During 8:00am To 5:00pm, Mondays-fridays. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On December 04, 2024 To January 08, 2025, 12:00 Noon From The Given Address And Website(s) Below And Upon Payment Or Depositing To The Provincial Government Of South Cotabato, Development Bank Of The Philippines - Marbel Branch With Savings Account Number: 1057-935-1, Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of P1,382.00/set (ps 1), P6,879.00/set (ps 2), P2,339.00/set (ps 3), P6,084.00/set (ps 4), P718.00/set (ps 5), P647.00/set (ps 6), P1,132.00/set (ps 7), P818.00/set (ps 8), P1,678.00/set (ps 9) & P490.00/set (ps 10). The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees Presented In Person Or Through Electronic Means. 6. The Provincial Government Of South Cotabato Will Hold A Pre-bid Conference On December 11, 2024, 2:00 Pm At Bac Office, Provincial Capitol Compound, Alunan Avenue, City Of Koronadal And/or Through Video Conferencing Or Webcasting Via Zoom Meeting, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before January 08, 2025, 12:00 Noon. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On January 08, 2025, 2:00 Pm At The Given Address Below And/or Via Zoom Meeting. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Provincial Government Of South Cotabato Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: John B. Magbanua Head, Bids And Awards Secretariat/twg Provincial Capitol Compound, Alunan Avenue Koronadal City, South Cotabato (083) 228-9951 Or 228-8570 Email-add: Bacpgsc2016@gmail.com Website: Www.southcotabato.gov.ph/open-contracting 12. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.southcotabato.gov.ph/open-contracting Or Https://notices.philgeps.gov.ph Date Of Issue: December 04, 2024 (sgd)atty. Marnito B. Cosep Provincial Legal Officer Bac Chairman
Closing Date8 Jan 2025
Tender AmountPHP 22.1 Million (USD 380.8 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Building Construction
location
United States
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For The Create Cardiovascular Center Minor Construction Project At The Orlando Va Medical Center Located In Orlando, Fl. project Description: the Project Includes A Proposed 5,295-sf Building Addition And A 1,697-sf Building Addition To The Northeastern And Southwestern Portion Of The Existing Southeast Wing Of The Orlando Va Medical Center In Orlando, Florida. We Understand The Smaller Addition Will Be Single-story. The Larger Addition Will Also Be Single Story But Will Have A Mechanical Floor Above. procurement Information: the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-bid-build Approach (final Specifications And Drawings Will Be Provided). The Anticipated Solicitation Will Be Issued Either As A Request For Proposal (rfp) In Accordance With Far Part 15, Considering Technical And Price Factors Or As An Invitation For Bid (ifb) In Accordance With Far Part 14, Considering Price Only. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In Mid July 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $10,000,000.00 And $20,000,000.00. The North American Industry Classification System (naics) Code 236220 (size Standard $45.0 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 365 Calendar Days From The Issuance Of A Notice To Proceed. The Services For This Project Will Include Providing All Construction Related Services Such As: Providing Labor, Materials And Equipment Required To Complete The Project As Per Contract Documents Prepared By An Independent Architect-engineer Firm. capability Statement: respondents Shall Provide A General Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Is In Line With The Vaar Magnitude Of Construction Listed Above. section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: no More Than Three (3) Contracts That Your Company Has Performed Within The Last Seven (7) Years That Are Of Comparable Size, Complexity, And Scope To This Requirement. Include The Project Name, Project Owner And Contact Information As This Person May Be Contacted For Further Information, Project Scope, Project Size (example: Square Footage), Building Use (example: Medical Facility, Office Building, Etc.), Project Dollar Value, Start And Completion Dates. provide Specific Examples That Relate Aspects Of Previous Projects To The Proposed Project. Describe Specific Technical Skills And Key Personnel Your Company Possess To Perform The Requirements Described Under Description Of Work. describe Your Self-performed** Effort (as Either A Prime Or Subcontractor). Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided. it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Eight (8) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information. This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 4mb In Size. Please Note That Hard Copies Will Not Be Accepted. Please Also Include A Cover Page, Which Includes, At A Minimum: The Company S Name, Address, Dun & Bradstreet Number, Unique Entity Identifier (if Available), Socio-economic Status, Point-of-contact Name, Phone Number, And E-mail Address. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Submissions (responses) Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By April 28, 2025 At 2:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac) 6100 Oak Tree Blvd. Suite 490 independence, Oh 44131 primary Point Of Contact: shawn Tavernia contract Specialist shawn.tavernia@va.gov secondary Point Of Contact: bridget E. May contracting Officer bridget.may@va.gov
Closing Date28 Apr 2025
Tender AmountRefer Documents 

Iberville Parish School Tender

Civil And Construction...+2Civil Works Others, Building Construction
corrigendum
Corrigendum : Closing Date Modified
location
United States
Details: Thursday, February 20th, 2025 Advertisement For Bids Sealed Bids Will Be Received By The Iberville Parish School Board, Attention Evan Cagnolatti, Director Of Facilities And Projects, At 59125 Bayou Rd., Plaquemine, La. 70764, Not Later Than 2:00 Pm (local Time), Thursday, March 27th, 2025, For The Following: East Iberville Parking Improvements (ipsb Project #2525m01) Note ** Outer Envelope If Mailed Shall Be Marked Sealed Bid. Please Find Bid-related Materials And Place Electronic Bids At – Www.centralbidding.com The Bids Will Be Opened At The School Board Maintenance Office Immediately Following The Close Of Bid Time On The Above-noted Date. A Mandatory Pre-bid Conference Will Be Held At 10:00 A.m. Cdt On March 7th, 2025, In The Library At East Iberville School 3285 La-75, St Gabriel, La 70776. No Bid Will Be Accepted From Any Contractor Who Did Not Attend And Sign In At The Pre-bid Conference. Preliminary Bid Information May Be Obtained By Contacting The Architectural Firm Listed Below: Fusion Architects? 3488 Brentwood Dr. 101? Baton Rouge, La. 70809? 225-766-4848? It Is The Policy Of The Iberville Parish School Board To Provide Equal Opportunities Without Regard To Race, Color, National Origin, Sex, Age, Disabilities, Or Veteran Status In Educational Programs And Activities. This Includes Admissions, Educational Services, Financial Aid, And Employment. Insertion Dates: February 20th, 2025, February 27th, 2025, March 6th, 2025
Closing Date27 Mar 2025
Tender AmountRefer Documents 

Iberville Parish School Tender

Civil And Construction...+1Building Construction
location
United States
Details: April 3rd 2025 Advertisement For Bids Sealed Bids Will Be Received By The Iberville Parish School Board, Attention Evan Cagnolatti, Director Of Facilities And Projects, At 59125 Bayou Rd., Plaquemine, La. 70764, Not Later Than 2:00 Pm (local Time), Tuesday, May 6th, 2025, For The Following: Plaquemine High School Kitchen Renovation (ipsb Project #2510m02) Note ** Outer Envelope If Mailed Shall Be Marked Sealed Bid. Please Find Bid-related Materials And Place Electronic Bids At – Www.centralbidding.com The Bids Will Be Opened At The Iberville Parish School Board Maintenance Office Immediately Following The Closure Of The Bid Time On The Above-noted Date. A Mandatory Pre-bid Conference Will Be Held At 1:00 P.m. Cdt On April 17th, 2025, At Ipsb Maintenance Office 59125 Bayou Rd., Plaquemine, La 70764. No Bid Will Be Accepted From Any Contractor Who Did Not Attend And Sign In At The Pre-bid Conference. Preliminary Bid Information May Be Obtained By Contacting The Architectural Firm Listed Below: Fusion Architects? 3488 Brentwood Dr. 101? Baton Rouge, La. 70809? 225-766-4848? It Is The Policy Of The Iberville Parish School Board To Provide Equal Opportunities In Educational Programs And Activities Regardless Of Race, Color, National Origin, Sex, Age, Disabilities, Or Veteran Status. This Includes Admissions, Educational Services, Financial Aid, And Employment. Insertion Dates: April 3rd, 2025, April 10th, 2025, April 17th, 2025
Closing Date6 May 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+2Others, Civil Works Others
corrigendum
Corrigendum : Closing Date Modified
location
United States
Details: Presolicitation Notice presolicitation Notice page 3 Of 3 presolicitation Notice *=required Field presolicitation Notice page 1 Of 3 subject* a/e Prevent Legionella And Scalding general Information contracting Office S Zip Code* 23249 solicitation Number* 36c24625r0033 response Date/time/zone 05-23-2025 3:00 Pm Eastern Time, New York, Usa archive 99 Days After The Response Date set-aside sdvosbc product Service Code* c1da naics Code* 541330 place Of Performance department Of Veterans Affairs fayetteville Va Medical Center 2300 Ramsey Street fayetteville North Carolina postal Code 28601 country usa contact Information contracting Office Address department Of Veterans Affairs network Contracting Office 6 1201 Broad Rock Blvd richmond Va 23249 point Of Contact* contract Specialist michael Proctor michael.proctor2@va.gov no Telephone Inquiries Will Be Accepted additional Information agency S Url https://www.va.gov/ url Description department Of Veterans Affairs agency Contact S Email Address michael.proctor2@va.gov email Description michael Proctor, Contract Specialist this Request For A-e Firm Qualifications Packages Is 100% Set-aside For Service-disabled Veteran Owned Small Business (sdvosb) Concerns Under Vaar 852.219-73, Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation) this Is Not A Request For Proposal. This Is A Request For Sf 330's Architect- Engineer Qualification Packages Only. public Announcement For Procurement Of Architect-engineering (a-e) Services: This Is A Request For Standard Form 330, Architect-engineer Qualifications Only. A-e Services Are Being Procured In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) Subpart 36.6. All Submissions Will Be Evaluated In Accordance With The Below Selection Criteria. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. Any Resulting Award For The Proposed A-e Services Will Be Procured Under A Negotiated Firm-fixed Price Contract. at The Time The Request For Proposal Is Issued, All Offerors Shall Adhere To Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. (jan 2023) (deviation) general Information: the Department Of Veterans Affairs, Fayetteville Veterans Administration Medical Center (vamc), Is Seeking Sources And Intends To Award A Firm Fixed-price Contract For Architect-engineering (a-e) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project # 565-25-151, Prevent Legionella And Scalding Located At 2300 Ramsey Street, Fayetteville, North Carolina 28301. the A-e Services Listed Herein Is Being Procured In Accordance With The Federal Acquisition Regulation (far) 36.6 And Vaar 836.6. Potential Contractors Must Be Registered In Sam (www.sam.gov) And Visible/certified In The Sba Certification Database At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. As A Prospective Offeror For This Service-disabled Veteran-owned Small Business (sdvosb) Set Aside, You Are Verifying Your Company Meets The Status Requirements Of A Sdvosb Concern As Established By Vaar 852.219-73. the Fayetteville Va Medical Center Is A Working Facility And Phasing Plans For Minimizing Downtime, And Provisions For Continuation Of Service During Outages Is Critical To This Project. point Of Contact: Michael Proctor, Contract Specialist Email: Michael.proctor2@va.gov project Information: project No. 565-25-151 project Title: Prevent Legionella And Scalding fayetteville Va Medical Center 2300 Ramsey Street fayetteville, North Carolina 28301 the Naics Code For This Procurement Is 541330, Engineering Services, And The Applicable Small Business Size Standard Is $25.5 Million Annual Revenue. The Projected Award Date For The Anticipated A-e Contract Is On Or Before September 30, 2025. the Naics Code For The Anticipated Construction Project Is Projected To Be 236220 And Magnitude Of Construction Is Predicted To Be Between $2,000,000 And $5,000,000 (vaar 836.204). The Anticipated Award Date Of The Construction Phase Of The Project Is To Be Determined (tbd). an Architect & Engineer (a-e) Contract Will Be Negotiated For The Development Of Complete Construction Documents Which Include Working Drawings, Specifications, Reports, And Construction Period Services. The A-e Will Be Given Written Information; Participate In Project Planning Meetings, Pre-proposal Meeting, And Pre-construction Meeting As Required; Communicate With Va Personnel Via Telephone Or E-mail; And Is Expected To Coordinate So That The Final Documents Include All Requirements In Accordance With Industry Standard Practices, Va Standards, Va Design Manuals, And Review Comments. statement Of Task/scope Of Work: i. General Intent: this Project Shall Correct Known Issues As Well As Investigate And Design Corrective Measures Required To Ensure Prevention Of Scalding Incidents And The Prevention Of Legionella Developing In Buildings Or On This Facility As A Whole. ii. Scope Of Work: correct Old Water Main Dead-end(s) Underneath Parking Lot #1 Stemming From Old Water Tower Location. create Revit Model Of The Facility Existing Domestic Water System (cold And Hot) With All Valves, Devices, Tanks, Sensors, Pumps, Back Flow Preventors, Strainers, Filters, Biocide Dosing, Sampling Ports, Etc. using Above Model Create Schedules For All Valves And Devices. using Above Schedules Identify Labeling Requirements For The Entire System Components And Piping. use The Revit Model To Put Both Domestic Cold Water And Domestic Hot Water Systems On The Existing Facility Building Automation System (bas). Accomplish All Graphics Per Existing Campus Standard. Accomplish All Bas Programming For Tracking Flow, Temperatures, Pumps, Valves, Etc. perform Trending Analysis Of The Bas Data To Identify Circumstances Where Domestic Hot Water System Is Not Performing Per Requirements. develop Design To Correct Item A; Design Plan To Accomplish Item C For Changing Out/installing Printing And Hanging Schedules In All Mechanical Spaces Per Design; Design Plan For Item D For A Contractor To Accomplish All Labeling And Tagging Requirements Per Schedules/design/bas; Design Plan To Correct Issues Identified Via Trending Analysis Item F. the Design Team Shall Evaluate And Document The Existing Hot And Cold Domestic Water Systems. This Includes All Plumbing [hot And Cold] Water Systems, Cooling Towers, Decorative Fountains, Humidifiers, And Misting Systems And All Process Water Systems. Anything Fed By Or Connected To And Supplied By Domestic Water That Could Link To Potable Water Is The Most Critical. design Shall Address Base With Options In The Concept/development Phase. the Design Team Shall Provide Professional Engineering Services To Perform Planning, Investigations, Surveys, Reports, Consultations, Site Visits, Design Work, Preparation Of Contract Drawings And Specifications, Construction Scope Of Work, Construction Cost Estimates, Submittal Register, Basic Outline Of A Construction Schedule. efforts Include Concept/developmental Drawings, Contract Drawings, Functional Layouts, Specifications, Construction Cost Estimates, Basic Estimated Construction Schedule, Submittal Register, Engineering Calculations, And Subsequent Construction Period Services. The Design Team Is Responsible For Coordinating With The Contracting Officer S Representative (cor) And Appropriate Va Personnel. design Drawings Shall Have Va Engineering/contracting Reviews At All Stages. Energy Reviews Will Be Conducted At The 65% Design Review Stage By A Va Energy Engineer. Fire/life Safety Code Review Will Be Conducted At The 65% Design Review Stage By A Va Contracted Firm. All Provided Comments Must Be Addressed To The Satisfaction Of The Va Cor Before The Va Will Accept A Final Design. iii. Materials Provided To Ae After Award: plans: existing Facility Record Drawings And Files That Are Available Will Be Provided For The Ae S Use. Note: Not All Record Drawings Exist Which Is Why This Scope Requires The Ae To Perform In-depth Surveying And Investigations On Site. The Accuracy Of Facility Conditions, Records Or As-built Drawings Will Need To Be Completely Field Verified By The Ae. specifications, Standards, Etc: the Project Design Shall Be Completed In Accordance With This Ae Scope And All Appropriate Department Of Veterans Affairs (va) Standards, Specifications, And Other Criteria Otherwise Required By The Va. Ensure Compliance With Local, State, And Federal Guidelines Such As: ashrae Standard 188-2018: Legionellosis: Risk Management For Building Water Systems. cdc For Legionella Control In Water Systems. Osha Technical Manual. The Ae Shall Retrieve All Va Design Information And Standards From The Va Facilities Web Site (http://www.cfm.va.gov/til/index.asp). Station Level Modified Specifications For Certain Specification Sections Will Be Provided By The Va After The Notice To Proceed As Been Issued. These Documents And All National, State, And Local Codes Adopted And Used By The Va Shall Be Incorporated In The Design Of This Project And Reflected In The Construction Cost Estimate. The Following References, As Applicable, Shall Be Utilized For Planning And Design Purposes: master Construction Specifications (pg-18-1) design And Construction Procedures (pg-18-3) standard Details And Cad Standards (pg-18-4) equipment Guide List (pg-18-5) space Planning Criteria, And Va-space & Equipment Planning System (pg-18-9) design Manuals (pg-18-10) design Guides (pg-18-12) barrier Free Design Guide (pg-18-13) room Finishes, Door, And Hardware Schedules (pg-18-14) minimum Requirements For A/e Submissions (pg-18-15) environmental Planning Guidance (pg-18-17) national Electric Code life Safety Codes government-furnished Record Drawings (ae To Field Verify Conditions) national Fire Protection underwriters Laboratory iv. Design Requirements: The A/e Will Be Required To Visit And Inspect The Project Site Prior To Providing Their A/e Proposal For This Project. general: These Descriptions Are To Give A General Scope And Scale Of Efforts Required And Do Not Necessarily Cover All Va Design Guide Requirements. this Project Requires The Ae To Accomplish A Comprehensive Site And System Assessment To Identify High-risk Water Systems And Vulnerabilities. the Project Shall Be Designed With Viable Options/deductive Alternates Equal To Or Less Than 10 Percent Of The Construction Funding Limitation To Ensure Construction Award Within Program Budget Limitations. The Number Of Deductive Alternates Shall Be Between Three And Five (or As Approved By The Va Contracting Officer). construction Cost Estimate: Construction Cost Estimate Shall Be Organized Using The Fifty (50) Division Format Developed By The Construction Specifications Institute (c.s.i.). The Cost Estimate Shall Include Various Categories Of Work Involved, Quantities, And Unit Cost. The Estimate Shall Also Be Based On The Anticipated Start Date For Construction, Plus An Inflation Allowance For The Fayetteville, Nc Area For The Anticipated Time Of Bidding. This Must Meet Current Va Cost Estimate Guidelines And Is Subject To Va Cor Final Approval/acceptance At Each Submission. Each Submission Must Reflect All Current Bid Deducts. construction Schedule Outlining All Major Projects Tasks And Phases With Estimated Durations For Each. This Shall Include Notice To Proceed Date, Submittal Process, Mobilization, Major Tasks And/or Discipline Work Events, Phasing, Significant Inspections/commissioning Events, Closeout, Turn-over And De-mobilization. Provide An Excel Type Project Schedule Chart Outlining A Generic Construction Schedule For This Project. Final Schedule To Be Approved By Va Cor. meeting Agendas And Minutes: The Ae Shall Provide An Agenda For Every Meeting And Take Minutes Of All Meetings, Conferences, Site Visits, Etc. A Copy Of The Agenda And Minutes For Each Meeting Or Site Visit Shall Be Provided To The Va Cor For Acceptance. The Va Cor Must Approve All Formats And Content. contract Drawings: Provide Fully Developed Contract Drawings In Revit Bim To The Minimum Level Of Detail (lod) 300 (in A Current Revit Version Accessible By The Va) And Provide Revit Drawings And Pdf Drawings Electronically And In Hard Copy. Hard Copy Drawings Shall Be Plotted At 1/8" Or 1/4" Scale, Minimum. A Larger, More Appropriate Scale Shall Be Used For Sections And Details. The Final Contract Drawings (as-builts) Shall Be Black Ink On E Size (30" X 42") Paper. (see Also Cadd Requirements Of Sections V And Viii.). specifications: Provide Fully Developed And Edited Specifications In A Microsoft Word Format Accessible By The Va. Specifications Shall Be Printed On 8 ½" X 11" Bond Paper, Font Type Times New Roman, 12 Pt. construction Statement Of Work: Provide Fully Developed Executive Summary Of The Construction Work Required In Microsoft Word Format Accessible By The Va. The Sow Shall Be Printed On 8 ½" X 11" Bond Paper, Font Type Times New Roman, 12 Pt. submittal Register: Provide A Submittal Register In An Approved Formatted Excel Spreadsheet With All A&e/designer Of Record (dor) Required Submittals Per Final Plans And Specifications For This Project. This Is Intended To Be Provided To A Construction Contractor To Use And Complete With The Expectation That The A&e Has Reviewed And Considers Complete With Maybe Minor Omissions Needing Addressed By A Gc. v. Review Requirements And Time Frames kick-off And Developing Initial Design Package expectation Is For The Ae To Execute Any Additional Information Gathering And Conduct A Preliminary Plan Development Meeting And Review With The Va Cor During This Requirement. This Must Include Initial Site Visits And Data Collection, Meeting With Stakeholders, Sight Surveys, And Develop A Comprehensive Understanding Of The Project Site. preliminary Documents: The Design Team Must Develop And Evaluate Three Alternatives For The Prevention Of Legionella. The Design Team Must Evaluate The Pros And Cons Of Each Design In Terms Of Cost, Efficiency, Feasibility Of Implementation, And Integration Challenges Into The Existing System And Facility And Recommend The Best Alternative. the Design Team Must Develop Concept Drawings (sketches, Diagrams, Layout, Form/shape Of Buildings Or Structures) Of The System To Minimize Water Stagnation And Dead Legs In The Final Plan. This Must Include An Issues Log For Tracking And Documenting Issues/decisions Made For The Project Duration And For The Final Record. design Checklist Review With Va Cor To Cover Submittals And Verify All Follow-on Submittal Stages And Requirements For Design Development And Construction Drawing Package Submittals. discuss Entire Design Scope And Address In The Plan For Tracking And Completeness Of Final Submittal. every Meeting Must Go Over The Design Scope Of Work And Have An Agenda Available Prior To The Meeting For Va Cor Approval. 35% Review: Preliminary Design Documents. customer Concept Documents. Outline The Project S Initial Concept And Design Approach, Based On The Client S Requirements And Project Scope. schematic/preliminary Design Drawings. Develop Initial Design Concepts That Can Be Refined Based On Stakeholder Feedback. These Initial Sketches And Detailed Drawings That Provide A Visual Representation Of The Project, Including Layouts, Floor Plans, And Elevations. Provide One (1) Hard Copy Arch E (30 X42 ) Set Of Comprehensive Drawings For Va Review And Comment And One Electronic Set In Pdf Format. design Analysis. An Analysis Of The Project S Design, Addressing Factors Such As Structural Integrity, Materials, And Compliance With Relevant Codes And Standards. Also Include Initial Calculations For Mechanical, Structural, And Electrical Systems. Provide One Electronic Copy Of This Analysis For Va Review And Comment. Pdf Format Preferred. provide A Written Design Narrative That Explains The Design Intent, Key Features, And The Overall Vision Of The Project. (one Copy In Word Format, One Copy In Pdf). preliminary Specifications. These Documents Detail The Materials, Standards, And Workmanship Required For The Project, Providing A Basis For The Detailed Specifications That Will Be Developed In Later Phases. Provide One Electronic Copy Of The Proposed Specification Sections To Date. These Shall Have Been Updated To Reflect This Project And Its Requirements. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. Pdf Format Preferred. cost Estimates. Preliminary Cost Estimates Are Prepared To Give An Idea Of The Project S Budget And Financial Feasibility. Provide One Electronic Copy For Va Review, Comments, And Subsequent Approval. Excel Preferred. project Schedule. An Initial Project Schedule Outlining The Key Milestones And Timelines For The Design And Construction Phases. Provide One Electronic Copy Of The Prosed Schedule For Va Review, Comments, And Subsequent Approval. these Documents Help Ensure That All Stakeholders Have A Clear Understanding Of The Design Direction And Provide A Basis For Further Development And Refinement In Subsequent Design Phases. 65% Review: Design Development Dd-1 provide 65% Level Of Efforts For All Disciplines Required. one (1) Arch E (30 X42 ) Copy Of Work Completed To Date. one (1) Electronic Copy Of Proposed Specification Sections To Date. These Shall Have Been Updated To Reflect This Project And Its Requirements. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. provide Electronically Transferred Copy Of Any Va Design Comments With A&e Responses, Drawings, Specifications, Construction Cost Estimate And Any Other Draft Documents Ready For Review At This Level. 95% Review: Design Development Dd-2 this Shall Represent A Complete Design With Little Or No Remaining Issues Or Missing Data. This Submittal Should Have All Required Number Of Drawings To Clearly Indicate To Bidders All Requirements. one (1) Arch E (30 X42 ) Copy. one Electronic Copy Of Proposed Specification Sections To Date. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. provide Electronically Transferred Copy Of The 65% Va Design Comments With A&e Responses, Drawings, Specifications, Construction Cost Estimate, Template Construction Schedule And All Required Documents For A Complete Design Package. this Submission Shall Include 3d Renderings Of Interior And Exterior Significant Features And Views Of This Future Building. One Or More Of These Will Be Intended To Be Used By The Construction Contractor For Construction Signs. final Submission: Construction Documents (cd): all Drawings And Documents Shall Indicate Issued For Construction. va Cor Shall Review Electronic Copies Prior To Giving Approval To Print/plot This Package As A Final Check For Significant Errors. two (2) Arch E (30 X42 ) And Two (2) Half Size Printed Copies Of Final Drawings. two (2) Printed Out Set Of Final Indexed And Bound Specifications Double Sided. two (2) Printed Copies Of The Final Description Of Work Including Base Bid And All Deduct Alternates. two (2) Printed Copies Of The Construction Cost Estimate With Bid Deducts Broken Out Or Readily Identifiable And Separable From Base Bid Work. two (2) Printed Copies Of The Submittal Register. two (2) Printed Copies Of The Template Construction Schedule. two (2) Printed Copies Of All Design Review Comments And A&e Responses For The Entire Process. electronically Transferred To Va Pdf, Word And Revit/cad Copies Of All Documents And Files. All Shall Be In A Combined Copy As Well As Separated By Sheet Or Book. vi. Schedule design Kick-off And Issuance Of Notice Of Award. This Meeting Is Expected To Take Place Within 10 Calendar Days Of Notice To Proceed. concept Design And Bas Entry/programming Plans Submission Due 21 Calendar Days From Receipt Of The Notice To Proceed. concept Design And Bas Programming Plan Review Comments Due 21 Calendar Days From Receipt Of Concept Design/bas Plan Submission. 35% Schematic Design Submission Due 30 Calendar Days From The Concept Design Review. Bas Graphics And Programming May Begin If Va Approves This Plan. a&e Will Need The Trending Data To Complete Any Design For Correction Of Domestic Water System Issues That Identifies But Can Proceed With Design Efforts For Known Issues. This Below Schedule Is An Estimate Only And Revisions To The Actual Design Schedule Will Be As Approved By The Va Cor As Needed. 35% Schematic Design Submission Review Comments Due 14 Calendar Days From Receipt Of 35% Design Submission. 65% Design Development Submission Due 45 Calendar Days From Return Of 35% Schematic Design Submission Review Comments. 65% Design Development Submission Review Comments Due 14 Calendar Days From Receipt Of 65% Design Submission. 95% Design Development Submission Due 30 Calendar Days From Return Of 65% Design Development Submission Review Comments. 95% Design Development Submission Review Comments Due 14 Calendar Days From Return Of 95% Design Development Submission Review Comments. 100% Final Design ( Issued For Construction ) Submission Due 14 Days From Receipt Of 95% Design Development Submission Review Comments. total Calendar Days From Notice To Proceed To 100% Final Design Submission: 213 Days. period Of Performance design Completion: 213 Calendar Days; Includes Va Design Reviews. procurement Timeline: 180 Days From The Time Engineering Submits Package To Contracting. Designer Shall Answer Pre-bid Rfis And Provide Updated Construction Documents To Capture Any Changes Made Through The Procurement Process. construction Period Services: 365 Calendar Days (12 Months) From Date Of Construction Award. total Contract Period: 758 Calendar Days vii. Construction Services (starts Once Construction Notice To Proceed Is Issued) preconstruction Meeting: Participate And Facilitate This Meeting In Conjunction With The Contracting Officer, Cor And Contractor. Topics Shall Include Standard Contract Requirements, Facility Specific Requirements, Safety Discussion, Design And Specifications Review, Schedule Review, Quality Assurance/quality Control Processes, Submittal And Rfi Process, Changes Process. biweekly Site Inspections: Designer Shall Meet Biweekly With The Contractor, Cor And Others Needed To Inspect The Progress Of The Construction And Report Any Deficiencies To The Same. Designer To Plan On 12 Site Visits To Inspect The Work And Progress (these Are In Addition To The Pre-con, Pre-final And Final Inspections). construction Change Orders: Designer Shall Prepare The Statement Of Work And Cost Estimates (returned Within 7 Calendar Days) As Needed. submitttal Review And Logs: Designer Shall Prepare And Maintain A Log Of Submittals And Rfis And Provide The Same To The Contracting Officer And Cor. Reviewed Submittals Are To Be Returned Within 10 Working Days To The Cor. Designer Is Fully Responsible For Review Of All Submittals, Retaining A Record Copy Of Submittals For Turn Over To The Owner Upon Project Completion, And Communication With The Contractor Regarding Any Deficiencies Or Changes Required To The Submittals. weekly Progress Meetings: Designer Shall Hold Formal Progress Meetings With Contractor, Contracting Officer, And Cor. At These Meetings The Agenda Shall Contain A Narrative Of Work Completed The Previous Month, Work Upcoming, Submittals Or Rfis Outstanding, Schedule Update, Any Special Coordination Items Requiring Actions, And Discussion Of Change Orders Or Time Extension Requests. Again, Minutes Of This Meeting Shall Be Issued Within 3 Working Days Of The Meeting. project Admistration: Designer Shall Utilize A Web-based Project Tracking/administration Software During Construction Period Services. Software Will Track inspections Reports, Construction Change Orders, Submittals, Rfis, Rfps, Progress Meeting Reports, And Any Other Applicable Documents. Application Shall Be Accessible By Construction Contractor, Va Cor, And Va Co. Recommended Applications: Submittal Exchange, Procore, Or Equal. project Closeout: Designer Shall Receive Notice Of Intent For Pre-final And Final Inspections From The Contractor. The Contractor Shall Propose A Time And Place For This To Occur In Conjunction With The Contracting Officer And The Cor. Following Both The Pre-final And The Final Inspections, The Designer Shall Issue A Punch List. Contract Documents Shall Specify That The Contractor Has 15 Working Days To Complete The Punch List And Notify The Designer For Re-inspection. Following Re-inspection And Project Acceptance The Closeout Phase Will Occur. release Of Claims For Design Project: Prior To The Final Payment Under This Design Contract Or Prior To Settlement Upon Termination Of The Design Contract, And As A Condition Precedent Thereto, The Ae Shall Execute And Deliver To The Contracting Officer A Release Of All Claims Against The Government Arising Under Or By Virtue Of This Contract, Other Than Such Claims, If Any, As May Be Specifically Excepted By The Ae From The Operation Of The Release In Stated Amounts To Be Set Forth Therein. project Documentation: Designer Shall Coordinate With The Contractor To Gather Record Copies Of Submittals, As-built Documents, Mechanical Test And Balance Reports, Maintenance Manuals, Coordinate Owner Training Sessions, And Provide The Same To The Owner. upon Completion Of Construction And Incorporation Of All Revisions Required To Complete The Record Drawings, The Following Items Shall Be Submitted: 1 Set Of Original Reproducible As-built Plans (30 X 42 ) Plus An Electronic Copy In Revit/cad And Pdf Formats. 1 Set Of All O&m Manuals In Binders And Indexed Plus The Electronic Versions In Excel Or Word And Pdf For All. 1 Set Of All Other Project Documents In Binders And Indexed Plus The Electronic Versions In Excel Or Word And Pdf For All. viii. Cad Requirements: drawings: See Also Final Design Submission Requirements. Full Size Two-dimensional Drawings Electronically Submitted. The Completed Drawing Files Shall Be Fully Operational In Revit/cad; A Pdf Copy Will Additionally Be Provided. delivery Format: Media And Archive Procedure For Transfer Of All Drawing Files To The Office Of Engineering Project Section Shall Be Via A Shared Site That Can Transfer These Files And Accessible From A Va/u.s. Government Computer. naming Conventions: Files Will Be Unique And Use A Maximum Of 8 Alphanumeric Characters (or As Approved By The Va Cor), The File Name And Extension Will Be Separated By A Period. The File Layer Structure Will Follow The Va Approved Standard "cad Layer Guidelines" Recommended Designations For Architecture, Engineering, And Facility Management Computer-aided Design As Prepared By The Task Force On Cad Layer Guidelines. design Shall Comply With Va Guidelines And Specifications. Design Manuals And Specifications Can Be Found At Http://www.cfm.va.gov/til/. Design Shall Also Meet All Applicable Codes And Standards. Proposed Work Is Located At Fayetteville Va Medical Center. a-e Selection Process: the Agency Has Convened An Evaluation Board For The Evaluation Of Responses To This Notice. Responses Will Be Evaluated In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) 36.6. Specifically, Sf 330 Submissions Will Be Evaluated To Identify The Most Highly Qualified Firms, Using The Selection Criteria Identified Below. Discussions Will Be Held With At Least Three (3) Of The Most Highly Qualified Firms, In Accordance With Far 36.602-3(c). The Processes At Far 36.602-4 And Far 36.606 Will Then Be Followed. Selected Firms Will Be Notified By Telephone Or Email Of Selection And Provided Further Instructions. evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Publicly Available Sources. Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. selection Criteria: Evaluation And Selection Of Firms Will Be Based On Submissions And Direct Responses To The Following Criteria Which Are Numbered In Descending Order Of Importance: primary Selection Criteria (listed In Descending Order Of Importance): specialized Experience: Specialized Experience And Technical Competence In The Design And Construction Period Services For A Complete Mitigation For Removing Dead-end(s) From Hot & Cold-water Pipes, Or Similar Project. Project Experience Must Include Experience With Similar Sized Water Systems, Preferably In Healthcare Facilities Or Large Industrial Buildings. other Specialized Experience Includes Proficiency In Designing And Engineering Hvac Systems, Including Chillers, Cooling Towers, Pumps, And Distribution Systems, Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, And Sustainable Design Practices. Submissions Shall Include No More Or Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope And Complexity, And Experience With The Types Of Projects Above. Relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past 5 (five) Years. Any Projects Older Than Five Years But Within Seven Years, Will Be Considered Somewhat Recent And Will Have Some Consideration. Each Project Shall Include The Following: project Title, Location And Detailed Narrative Describing The Scope Of Services Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e. Prime Contract, Teaming Partner, Or Subcontractor. project Owner, Owner S Point Of Contact Including Telephone Number And Email address. services & Deliverables Provided Under The Contract/task Order. period Of Performance, Including Start And Completion Dates total Dollar Value Of The Project contract Number Associated With The Project. section G Will Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics In Section H. Simply Re-stating This List In Section H Will Not Be Sufficient. The Narrative Of How The Firm Addresses Each Of These Will Be Evaluated. 1. The Management Approach 2. The Coordination Of Disciplines And Subcontractors 3. Quality Control Procedures, And 4. Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. professional Qualifications: Necessary For Satisfactory Performance Of Required Service. The Contractor Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five (5) Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The State Where The Project Is Located. key Positions And Disciplines Required For This Project Include But Are Not Limited To: 1. Architect (leed Certified) 2. Cadd Technician 3. Structural Engineer 4. Geotechnical Engineer 5. Civil Engineer 6. Electrical Engineer 7. Environmental Engineer 8. Fire Protection Engineer 9. Industrial Hygienist 10. Mechanical Engineer 11. Plumbing 12. Project Manager 13. Quality Assurance 14. Physical Security Specialists 15. Registered Communications Distribution Designer (rcdd) 16. Commissioning Agent 17. Cost Estimator the Information Provided In Sections C Through E Of Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. experience In Construction Period Services (cps): Experience In Construction Period Services To Include Solicitation Support Services, Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates, Attendance At Weekly Conference Calls, Providing Minutes Of Meetings, Pre-final Inspection Site Visits, Generation Of Punch-list Reports, Commissioning Services And Production Of As-built Documentation. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. past Performance: Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. If A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. evaluations Will Consider Superior Performance Ratings On Recently Completed Va Projects As Well As The Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. If Appropriate, The Record Of Significant Claims Against The Firm Because Of Improper Or In-complete Architectural And Engineering Services May Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. Offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For The Va Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. knowledge Of Locality: Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. secondary Selection Criterion*: geographic Location: Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Fayetteville Va Medical Center: 2300 Ramsey Street, Fayetteville, North Carolina 28301-2856. Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). * The Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Written Responses. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf330 Submission. the Department Of Veterans Affairs Shall Evaluate Each Potential Contractor In Terms Of The Following As M Firm Meeting The Synopsized Selection Criterion And "nm" Means That The Firm Did Not Meet The Synopsized Selection Criterion.: selection Criteria specialized Experience And Technical Competence In The Design And Construction Period Services For A Complete Mitigation For Removing Dead-end(s) From Hot & Cold-water Pipes, Or Similar Project. Project Experience Must Include Experience With Similar Sized Water Systems, Preferably In Healthcare Facilities Or Large Industrial Buildings. professional Qualifications Necessary For Satisfactory Performance Of Required Service. The Contractor Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five (5) Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. experience In Construction Period Services past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. capacity To Accomplish Work In The Required Time. knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. please Note: The A-e Evaluation Board Must Be Provided With Complete And Accurate Information For All Six (6) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The A-e Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The A-e Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications. limitations: 852.219-73 Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses. 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. submission Criteria/requirements: interested Firms Having The Capabilities To Perform This Work Must Submit: one (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) Electronically To Michael.proctor2@va.gov No Later Than 3:00 P.m. Eastern Daylight Time On May 23, 2025. interested Firms Are Responsible For Ensuring Electronic Delivery Of Submission By The Time And The Date Specified. It Is Highly Recommended Interested Firms Confirm Electronic Submissions Have Been Received By The Contracting Officer. size Limits Of E-mails Are Restricted To 10mb. If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of N . (example: Sf330 Submission, #36c24625r0033 Prevent Legionella And Scalding, Project #565-25-151 (1 Of N, 2 Of N, Etc.). all Sf330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Procurement Number And Project Title (abbreviated Or Shortened Is Okay). interested Firms Are Responsible For Ensuring Delivery Of Submission. all Sf 330 Submissions Must Include The Following Information, Either On The Sf 330 Or By Accompanying Document: 1) Cage Code 2) Sam Unique Entry Id Number (uei) 3) Tax Id Number 4) The E-mail Address And Phone Number Of The Primary Point Of Contact 5) Sf 330 Must Indicate The Percentage Of The Contract Performance Cost That Will Be Expended By The Prime Firm S Employees And In Which Discipline(s) And Subcontracted Percentage Of Contract Performance Cost To Be Expended (and In What Disciplines). Any Subcontracted Or Otherwise Business Entity Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, Large, Etc.). 6) References Noted In Selection Criteria 4 the Firm And Or A-e On Staff Representing The Project Must Follow State Of North Carolina Guidelines Under State Law For All Licensing Requirements To Sign And Seal Drawings. each Respondent Must Be Able To Demonstrate The Ability To Comply With The Limitations On Subcontracting, In Accordance With Far Clause 52.219-14 And Vaar Clauses 852.219-73 And 852.219-75. electronic Submittals Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Considered. All Information Must Be Included In The Sf330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At: Www.sam.gov For Any Revisions To This Announcement Prior To Submission Of Sf330s. vendor Questions: all Questions Shall Be Submitted To Michael.proctor2@va.gov And Angelo.harris@va.gov No Later Than 3:00 P.m. Eastern Daylight Time On May 7, 2025. attachments: sf 330 past Performance Questionnaire
Closing Date23 May 2025
Tender AmountRefer Documents 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Civil And Construction...+1Others
corrigendum
Corrigendum : Closing Date Modified
location
United States
Details: This Request For A-e Firm Qualifications Packages Is 100% Set-aside For Service-disabled Veteran Owned Small Business (sdvosb) Concerns Under Vaar 852.219-73, Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses (jan 2023) (deviation) this Is Not A Request For Proposal. This Is A Request For Sf 330s Architect- Engineer Qualification Packages Only. Public Announcement For Procurement Of Architect-engineering (a-e) Services: This Is A Request For Standard Form 330, Architect-engineer Qualifications Only. A-e Services Are Being Procured In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) Subpart 36.6. All Submissions Will Be Evaluated In Accordance With The Below Selection Criteria. The Government Will Not Pay, Nor Reimburse, Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement. Firms Will Be Selected Based On Demonstrated Competence And Qualifications For The Required Work. Any Resulting Award For The Proposed A-e Services Will Be Procured Under A Negotiated Firm-fixed Price Contract. at The Time The Request For Proposal Is Issued, All Offerors Shall Adhere To Vaar 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. (jan 2023) (deviation) general Information: the Department Of Veterans Affairs, Fayetteville Veterans Administration Medical Center (vamc), Is Seeking Sources And Intends To Award A Firm Fixed-price Contract For Architect-engineering (a-e) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project #565-25-153, Increase Chilled Water Capacity Located At 2300 Ramsey Street, Fayetteville, North Carolina 28301. the A-e Services Listed Herein Is Being Procured In Accordance With The Federal Acquisition Regulation (far) 36.6 And Vaar 836.6. Potential Contractors Must Be Registered In Sam (www.sam.gov) And Visible/certified In The Sba Certification Database At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award. As A Prospective Offeror For This Service-disabled Veteran-owned Small Business (sdvosb) Set Aside, You Are Verifying Your Company Meets The Status Requirements Of A Sdvosb Concern As Established By Vaar 852.219-73. the Fayetteville Va Medical Center Is A Working Facility And Phasing Plans For Minimizing Downtime, And Provisions For Continuation Of Service During Outages Is Critical To This Project. point Of Contact: Elaine Belber, Contract Specialist Email: Elaine.belber@va.gov project Information: Project No. 565-25-153 project Title: Increase Chilled Water Capacity (ae) fayetteville Va Medical Center 2300 Ramsey Street Fayetteville, Nc 28301 the Naics Code For This Procurement Is 541330, Engineering Services, And The Applicable Small Business Size Standard Is $25.5 Million Annual Revenue. The Projected Award Date For The Anticipated A-e Contract Is On Or Around August 25, 2025. the Naics Code For The Anticipated Construction Project Is Projected To Be 238220 And Magnitude Of Construction Is Predicted To Be Between $2,000,000 And $5,000,000. The Anticipated Award Date Of The Construction Phase Of The Project Is To Be Determined (tbd). an Architect & Engineer (a-e) Contract Will Be Negotiated For The Development Of Complete Construction Documents Which Include Working Drawings, Specifications, Reports, And Construction Period Services. This Will Require Performing Site Investigations Using 3d Scanning, Revit/bim, And Supporting Information. The A-e Will Be Given Written Information; Participate In Project Planning Meetings, Pre-proposal Meeting, And Pre-construction Meeting As Required; Communicate With Va Personnel Via Telephone Or E-mail; And Is Expected To Coordinate So That The Final Documents Include All Requirements In Accordance With Industry Standard Practices, Va Standards, Va Design Manuals, And Review Comments. statement Of Task/scope Of Work: i. General Intent: provide Professional Engineering Services To Perform Planning, Investigations, Surveys, Reports, Consultations, Site Visits, Design Work, Preparation Of Contract Drawings And Specifications, Preparation Of Construction Cost Estimates, Construction Schedule And Provision Of Construction Period Services As Necessary For All Demolition, Modification, Construction, Inspection, Testing And Certification For All Construction Components For Project 565-25-153, Increase Chilled Water Capacity. The Construction Budget Is Between $2,000,000 And $5,000,000. The Intent Of This Project Is To Work Under Review Authority Of The Vamc Staff To Accomplish A Detailed Investigation And Survey Of The Existing Chilled Water Plant And Capacity, To Design And Prepare A Set Of Complete Construction Documents For All Architectural, Structural, Civil, Mechanical, Plumbing, Electrical, Life Safety And Other Applicable Components Of This Project. The Design Is To Provide An Increase Of 1000-ton Chilled Water Capacity At/to The Medical Center. the Design Team Shall Develop Three Alternatives For Chilled Water Expansion, Each With A Different Approach To Increase Capacity. The Design Team Must Evaluate The Pros And Cons Of Each Design In Terms Of Cost, Efficiency, Feasibility Of Implementation, And Integration Challenges Into The Existing System And Facility. design Shall Address Options In The Concept Phase As Well As Physical Placement On The Facility To Both Provide The Additional Capacity To Meet The Facilities Needs As Well As To Minimize Operational Interference During The Construction. ii. Scope Of Work: this Project Will Engage An Architectural Engineering (ae) Firm To Provide An Investigation And Surveying Plan, Construction Scope Of Work, Contract Drawings, Functional Layout, Specifications, Commissioning Plan, Construction Cost Estimates, Construction Schedule, Submittal Register, Engineering Calculations, And Subsequent Construction Period Services. It Will Also Engage Said Architectural Engineering (ae) Firm To Provide A Memorandum Of Agreement For All Above. The Design Team Is Responsible For Coordinating With The Contracting Officer S Representative (cor) And Appropriate Va Personnel To Determine A Plan For Increased Chiller Capacity. the Ae Firm Shall Hire A Third-party Commissioning Agent (cxa) To Be Involved From Project Kickoff Through Final Design And Throughout Construction. Ae To Coordinate For The Cxa To Develop The Commissioning Plan And Be Involved Throughout The Design And Construction. demolition/site Work: Demolition Of Utilities As Needed. Clearing Vegetation And Grading As Required. new Work: This Project Will Add 1000-ton Chilled Water Capacity On The Main Campus Of The Fayetteville Vamc. The Design Team Must Develop Concept Drawings Of The Increased Capacity And Recommended Location. The Design Team Must Develop And Evaluate Three Alternatives For Chilled Water Expansion, Each With A Different Approach To Increase Capacity. The Design Team Must Evaluate The Pros And Cons Of Each Design In Terms Of Cost, Efficiency, Feasibility Of Implementation, And Integration Challenges Into The Existing System And Facility. Design Drawings Are To Be Completed With Va Engineering, Contracting And The Executive Leadership. Energy Reviews Will Be Conducted At The 65% Design Review Stage By A Va Energy Engineer. Fire/life Safety Code Review Will Be Conducted At The 65% Design Review Stage By A Va Contracted Firm. All Provided Comments Must Be Addressed To The Satisfaction Of The Va Cor. iii. Materials Provided To Ae After Award: plans: Existing Facility Record Drawings And Files That Are Available Will Be Provided For The Ae S Use. Note: Not All Record Drawings Exist Which Is Why This Scope Requires The A&e To Perform In-depth Surveying And Investigations On Site. The Accuracy Of Facility Conditions, Records Or As-built Drawings Will Need To Be Completely Field Verified By The Ae. specifications, Standards, Etc: The Project Design Shall Be Completed In Accordance With This Ae Scope And All Appropriate Department Of Veterans Affairs (va) Standards, Specifications, And Other Criteria Otherwise Required By The Va. The Ae Shall Retrieve All Va Design Information And Standards From The Va Facilities Web Site (http://www.cfm.va.gov/til/index.asp). Station Level Modified Specifications For Certain Specification Sections Will Be Provided By The Va After The Notice To Proceed As Been Issued. These Documents And All National, State, And Local Codes Adopted And Used By The Va Shall Be Incorporated In The Design Of This Project And Reflected In The Construction Cost Estimate. The Following References, As Applicable, Shall Be Utilized For Planning And Design Purposes: master Construction Specifications (pg-18-1) Design And Construction Procedures (pg-18-3) Standard Details And Cad Standards (pg-18-4) Equipment Guide List (pg-18-5) Space Planning Criteria, And Va-space & Equipment Planning System (pg-18-9) Design Manuals (pg-18-10) Design Guides (pg-18-12) Barrier Free Design Guide (pg-18-13) Room Finishes, Door, And Hardware Schedules (pg-18-14) Minimum Requirements For A/e Submissions (pg-18-15) Environmental Planning Guidance (pg-18-17) National Electric Code Life Safety Codes Government-furnished Record Drawings (ae To Field Verify Conditions) National Fire Protection Underwriters Laboratory iv. Design Requirements: The A/e Designer Will Be Required To Visit And Inspect The Project Site Prior To Providing Their A/e Proposal For This Project Design. general: These Descriptions Are To Give A General Scope And Scale Of Efforts Required And Do Not Necessarily Cover All Va Design Guide Requirements. this Project Requires The A&e To Accomplish A Thorough Study And Evaluation Of The Existing Chiller Plant, Existing Capacity, And Supporting Areas Within The Facility Including Increased Capacity Alternatives. The Project Shall Be Designed With Viable Deductive Alternates Equal To Or Greater Than 10 Percent Of The Construction Funding Limitation To Ensure Construction Award Within Program Budget Limitations. The Number Of Deductive Alternates Shall Be Between Three And Five (or As Approved By The Va Contracting Officer). construction Cost Estimate: Construction Cost Estimate Shall Be Organized Using The Fifty (50) Division Format Developed By The Construction Specifications Institute (c.s.i.). The Cost Estimate Shall Include Various Categories Of Work Involved, Quantities, And Unit Cost. The Estimate Shall Also Be Based On The Anticipated Start Date For Construction, Plus An Inflation Allowance For The Fayetteville, Nc Area For The Anticipated Time Of Bidding. This Must Meet Current Va Cost Estimate Guidelines And Is Subject To Va Cor Final Approval/acceptance At Each Submission. Each Submission Must Reflect All Current Bid Deducts. construction Schedule Outlining All Major Projects Tasks And Phases With Estimated Durations For Each. This Shall Include Notice To Proceed Date, Submittal Process, Mobilization, Major Tasks And/or Discipline Work Events, Phasing, Significant Inspections/commissioning Events, Closeout, Turn-over And De-mobilization. Provide An Excel Type Project Schedule Chart Outlining A Generic Construction Schedule For This Project. Final Schedule To Be Approved By Va Cor. meeting Agendas And Minutes: The Ae Shall Provide An Agenda For Every Meeting And Take Minutes Of All Meetings, Conferences, Site Visits, Etc. A Copy Of The Agenda And Minutes For Each Meeting Or Site Visit Shall Be Provided To The Va Cor For Acceptance. The Va Cor Must Approve All Formats And Content. contract Drawings: Provide Fully Developed Contract Drawings In Revit Bim To The Minimum Level Of Detail (lod) 300 (in A Current Revit Version Accessible By The Va) And Provide Revit Drawings And Pdf Drawings Electronically And In Hard Copy. Hard Copy Drawings Shall Be Plotted At 1/8" Or 1/4" Scale, Minimum. A Larger, More Appropriate Scale Shall Be Used For Sections And Details. The Final Contract Drawings (as-builts) Shall Be Black Ink On E Size (30" X 42") Paper. (see Also Cadd Requirements Of Sections V And Viii.). specifications: Provide Fully Developed And Edited Specifications In A Microsoft Word Format Accessible By The Va. Specifications Shall Be Printed On 8 ½" X 11" Bond Paper, Font Type Times New Roman, 12 Pt. construction Statement Of Work: Provide Fully Developed Executive Summary Of The Construction Work Required In Microsoft Word Format Accessible By The Va. The Sow Shall Be Printed On 8 ½" X 11" Bond Paper, Font Type Times New Roman, 12 Pt. Submittal Register: Provide A Submittal Register In An Approved Formatted Excel Spreadsheet With All A&e/designer Of Record (dor) Required Submittals Per Final Plans And Specifications For This Project. This Is Intended To Be Provided To A Construction Contractor To Use And Complete With The Expectation That The A&e Has Reviewed And Considers Complete With Maybe Minor Omissions Needing Addressed By A Gc. v. Review Requirements And Time Frames Kick-off And Developing Initial Design Package expectation Is For The A&e To Execute Any Additional Information Gathering And Conduct A Preliminary Plan Development Meeting And Review With The Va Cor During This Requirement. This Must Include Initial Site Visits And Data Collection, Meeting With Stakeholders, Sight Surveys, And Develop A Comprehensive Understanding Of The Project Site. preliminary Documents: The Design Team Must Develop And Evaluate Three Alternatives For Chilled Water Expansion, Each With A Different Approach To Increase Capacity. the Design Team Must Evaluate The Pros And Cons Of Each Design In Terms Of Cost, Efficiency, Feasibility Of Implementation, And Integration Challenges Into The Existing System And Facility And Recommend The Best Alternative. The Design Team Must Develop Concept Drawings (sketches, Diagrams, Layout, Form/shape Of Buildings Or Structures) Of The Increased Capacity And Recommended Location To Be Used In The Final Plan. This Must Include An Issues Log For Tracking And Documenting Issues/decisions Made For The Project Duration And For The Final Record. design Checklist Review With Va Cor To Cover Submittals And Verify All Follow-on Submittal Stages And Requirements For Design Development And Construction Drawing Package Submittals. Discuss Entire Design Scope And Address In The Plan For Tracking And Completeness Of Final Submittal. every Meeting Must Go Over The Design Scope Of Work And Have An Agenda Available Prior To The Meeting For Va Cor Approval. 35% Review: Preliminary Design Documents. customer Concept Documents. Outline The Project S Initial Concept And Design Approach, Based On The Client S Requirements And Project Scope. schematic/preliminary Design Drawings. Develop Initial Design Concepts That Can Be Refined Based On Stakeholder Feedback. These Initial Sketches And Detailed Drawings That Provide A Visual Representation Of The Project, Including Layouts, Floor Plans, And Elevations. Provide One (1) Hard Copy Arch E (30 X42 ) Set Of Comprehensive Drawings For Va Review And Comment And One Electronic Set In Pdf Format. design Analysis. An Analysis Of The Project S Design, Addressing Factors Such As Structural Integrity, Materials, And Compliance With Relevant Codes And Standards. Also Include Initial Calculations For Mechanical, Structural, And Electrical Systems. Provide One Electronic Copy Of This Analysis For Va Review And Comment. Pdf Format Preferred. provide A Written Design Narrative That Explains The Design Intent, Key Features, And The Overall Vision Of The Project. (one Copy In Word Format, One Copy In Pdf). preliminary Specifications. These Documents Detail The Materials, Standards, And Workmanship Required For The Project, Providing A Basis For The Detailed Specifications That Will Be Developed In Later Phases. Provide One Electronic Copy Of The Proposed Specification Sections To Date. These Shall Have Been Updated To Reflect This Project And Its Requirements. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. Pdf Format Preferred. cost Estimates. Preliminary Cost Estimates Are Prepared To Give An Idea Of The Project S Budget And Financial Feasibility. Provide One Electronic Copy For Va Review, Comments, And Subsequent Approval. Excel Preferred. project Schedule. An Initial Project Schedule Outlining The Key Milestones And Timelines For The Design And Construction Phases. Provide One Electronic Copy Of The Prosed Schedule For Va Review, Comments, And Subsequent Approval. these Documents Help Ensure That All Stakeholders Have A Clear Understanding Of The Design Direction And Provide A Basis For Further Development And Refinement In Subsequent Design Phases. 65% Review: Design Development Dd-1 provide 65% Level Of Efforts For All Disciplines Required. One (1) Arch E (30 X42 ) Copy Of Work Completed To Date. One Electronic Copy Of Proposed Specification Sections To Date. These Shall Have Been Updated To Reflect This Project And Its Requirements. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. Provide Electronically Transferred Copy Of Any Va Design Comments With A&e Responses, Drawings, Specifications, Construction Cost Estimate And Any Other Draft Documents Ready For Review At This Level. 95% Review: Design Development Dd-2 this Shall Represent A Complete Design With Little Or No Remaining Issues Or Missing Data. This Submittal Should Have All Required Number Of Drawings To Clearly Indicate To Bidders All Requirements. One (1) Arch E (30 X42 ) Copy. One Electronic Copy Of Proposed Specification Sections To Date. Index Shall Show Which Va Specifications Are Included And Which Va Specifications Are Not (lined Through) For Ease Of Review And Ensuring All Required Specifications Are Included To Move Forward. Provide Electronically Transferred Copy Of The 65% Va Design Comments With A&e Responses, Drawings, Specifications, Construction Cost Estimate, Template Construction Schedule And All Required Documents For A Complete Design Package. this Submission Shall Include 3d Renderings Of Interior And Exterior Significant Features And Views Of This Future Building. One Or More Of These Will Be Intended To Be Used By The Construction Contractor For Construction Signs. final Submission: Construction Documents (cd): All Drawings And Documents Shall Indicate Issued For Construction. Va Cor Shall Review Electronic Copies Prior To Giving Approval To Print/plot This Package As A Final Check For Significant Errors. Two (2) Arch E (30 X42 ) And Two (2) Half Size Printed Copies Of Final Drawings. Two (2) Printed Out Set Of Final Indexed And Bound Specifications Double Sided. Two (2) Printed Copies Of The Final Description Of Work Including Base Bid And All Deduct Alternates. Two (2) Printed Copies Of The Construction Cost Estimate With Bid Deducts Broken Out Or Readily Identifiable And Separable From Base Bid Work. Two (2) Printed Copies Of The Submittal Register. Two (2) Printed Copies Of The Template Construction Schedule. Two (2) Printed Copies Of All Design Review Comments And A&e Responses For The Entire Process. Electronically Transferred To Va Pdf, Word And Revit/cad Copies Of All Documents And Files. All Shall Be In A Combined Copy As Well As Separated By Sheet Or Book. vi. Schedule concept Design Submission 21 Calendar Days From Ntp va Concept Design Review 14 Calendar Days From Concept Design Submission 35% Schematic Design Submission 30 Calendar Days From Concept Design Review va 35% Schematic Design Review 14 Calendar Days From 35% Design Submission 65% Design Development Submission 45 Calendar Days From 35% Design Review va 65% Design Development Review 14 Calendar Days From 65% Design Submission 95% Design Development Submission 30 Calendar Days From 65% Design Review va 95% Design Development Review 14 Calendar Days From 95% Design Submission 100% Final Design Submission 14 Calendar Days From 95% Design Review total Calendar Days From Notice To Proceed To 100% Final Design Submission: 196 Days. procurement Timeframe: 180 Days From The Time Engineering Submits Package To Contracting. During This Timeframe, Designer Shall Answer Pre-bid Rfis And Provide Updated Construction Documents To Capture Any Changes Made Through The Procurement Process. construction Period Services: 365 Calendar Days From Construction Award Date total Contract Period: 741 Calendar Days vii. Construction Services (starts Once Construction Notice To Proceed Is Issued) preconstruction Meeting: Participate And Facilitate This Meeting In Conjunction With The Contracting Officer, Cor And Contractor. Topics Shall Include Standard Contract Requirements, Facility Specific Requirements, Safety Discussion, Design And Specifications Review, Schedule Review, Quality Assurance/quality Control Processes, Submittal And Rfi Process, Changes Process. biweekly Site Inspections: Designer Shall Meet Biweekly With The Contractor, Cor And Others Needed To Inspect The Progress Of The Construction And Report Any Deficiencies To The Same. Designer To Plan On 10 Site Visits To Inspect The Work And Progress (these Are In Addition To The Pre-con, Pre-final And Final Inspections). construction Change Orders: Designer Shall Prepare The Statement Of Work And Cost Estimates (returned Within 7 Calendar Days) As Needed. submitttal Review And Logs: Designer Shall Prepare And Maintain A Log Of Submittals And Rfis And Provide The Same To The Contracting Officer And Cor. Reviewed Submittals Are To Be Returned Within 10 Working Days To The Cor. Designer Is Fully Responsible For Review Of All Submittals, Retaining A Record Copy Of Submittals For Turn Over To The Owner Upon Project Completion, And Communication With The Contractor Regarding Any Deficiencies Or Changes Required To The Submittals. weekly Progress Meetings: Designer Shall Hold Formal Progress Meetings With Contractor, Contracting Officer, And Cor. At These Meetings The Agenda Shall Contain A Narrative Of Work Completed The Previous Month, Work Upcoming, Submittals Or Rfis Outstanding, Schedule Update, Any Special Coordination Items Requiring Actions, And Discussion Of Change Orders Or Time Extension Requests. Again, Minutes Of This Meeting Shall Be Issued Within 3 Working Days Of The Meeting. project Admistration: Designer Shall Utilize A Web-based Project Tracking/administration Software During Construction Period Services. Software Will Track Inspections Reports, Construction Change Orders, Submittals, Rfis, Rfps, Progress Meeting Reports, And Any Other Applicable Documents. Application Shall Be Accessible By Construction Contractor, Va Cor, And Va Co. Recommended Applications: Submittal Exchange, Procore, Or Equal. project Closeout: Designer Shall Receive Notice Of Intent For Pre-final And Final Inspections From The Contractor. The Contractor Shall Propose A Time And Place For This To Occur In Conjunction With The Contracting Officer And The Cor. Following Both The Pre-final And The Final Inspections, The Designer Shall Issue A Punch List. Contract Documents Shall Specify That The Contractor Has 15 Working Days To Complete The Punch List And Notify The Designer For Re-inspection. Following Re-inspection And Project Acceptance The Closeout Phase Will Occur. release Of Claims For Design Project: Prior To The Final Payment Under This Design Contract Or Prior To Settlement Upon Termination Of The Design Contract, And As A Condition Precedent Thereto, The Ae Shall Execute And Deliver To The Contracting Officer A Release Of All Claims Against The Government Arising Under Or By Virtue Of This Contract, Other Than Such Claims, If Any, As May Be Specifically Excepted By The Ae From The Operation Of The Release In Stated Amounts To Be Set Forth Therein. project Documentation: Designer Shall Coordinate With The Contractor To Gather Record Copies Of Submittals, As-built Documents, Mechanical Test And Balance Reports, Maintenance Manuals, Coordinate Owner Training Sessions, And Provide The Same To The Owner. Upon Completion Of Construction And Incorporation Of All Revisions Required To Complete The Record Drawings, The Following Items Shall Be Submitted: 1 Set Of Original Reproducible As-built Plans (30 X 42 ) Plus An Electronic Copy In Revit/cad And Pdf Formats. 1 Set Of All O&m Manuals In Binders And Indexed Plus The Electronic Versions In Excel Or Word And Pdf For All. 1 Set Of All Other Project Documents In Binders And Indexed Plus The Electronic Versions In Excel Or Word And Pdf For All. viii. Cad Requirements: drawings: See Also Final Design Submission Requirements. Full Size Two-dimensional Drawings Electronically Submitted. The Completed Drawing Files Shall Be Fully Operational In Revit/cad; A Pdf Copy Will Additionally Be Provided. delivery Format: Media And Archive Procedure For Transfer Of All Drawing Files To The Office Of Engineering Project Section Shall Be Via A Shared Site That Can Transfer These Files And Accessible From A Va/u.s. Government Computer. naming Conventions: Files Will Be Unique And Use A Maximum Of 8 Alphanumeric Characters (or As Approved By The Va Cor), The File Name And Extension Will Be Separated By A Period. The File Layer Structure Will Follow The Va Approved Standard "cad Layer Guidelines" Recommended Designations For Architecture, Engineering, And Facility Management Computer-aided Design As Prepared By The Task Force On Cad Layer Guidelines. ix. Attachments: 100% Construction Drawings With Chiller Mod 05-22-2017 (end Statement Of Work) a-e Selection Process: The Agency Has Convened An Evaluation Board For The Evaluation Of Responses To This Notice. Responses Will Be Evaluated In Accordance With The Selection Of Architects And Engineers Statute (public Law 92-582), Formerly Known As The Brooks Act, And Implemented In Federal Acquisition Regulation (far) 36.6. Specifically, Sf 330 Submissions Will Be Evaluated To Identify The Most Highly Qualified Firms, Using The Selection Criteria Identified Below. Discussions Will Be Held With At Least Three (3) Of The Most Highly Qualified Firms, In Accordance With Far 36.602-3(c). The Processes At Far 36.602-4 And Far 36.606 Will Then Be Followed. Selected Firms Will Be Notified By Telephone Or Email Of Selection And Provided Further Instructions. evaluating Past Performance And Experience May Include Information Provided By The Firm, Customer Inquiries, Government Databases, And Publicly Available Sources. Failure To Provide Requested Data, Accessible Points Of Contact Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. selection Criteria: Evaluation And Selection Of Firms Will Be Based On Submissions And Direct Responses To The Following Criteria Which Are Numbered In Descending Order Of Importance: specialized Experience: Specialized Experience And Technical Competence In The Design And Construction Period Services For A Complete Design Of A 1000-ton Chiller (capacity Increase) Or Similar Project. Project Experience Must Include Experience With Similar Sized Chilled Water Systems, Preferably In Healthcare Facilities Or Large Industrial Buildings. other Specialized Experience Includes Proficiency In Designing And Engineering Hvac Systems, Including Chillers, Cooling Towers, Pumps, And Distribution Systems, Critical Path Scheduling, Fire Protection, Construction Infection Control Protocols, Energy Conservation, And Sustainable Design Practices. Submissions Shall Include No More Or Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope And Complexity, And Experience With The Types Of Projects Above. relevant Is Defined As Those Task Requirements Identified In The Statement Of Work. Recent Is Defined As Services Provided Within The Past 5 (five) Years. Any Projects Older Than Five Years But Within Seven Years, Will Be Considered Somewhat Recent And Will Have Some Consideration. Each Project Shall Include The Following: Project Title, Location And Detailed Narrative Describing The Scope Of Ser-vices Provided Including The Type Of Work Performed By The Offeror And Its Role In The Project I.e. Prime Contract, Teaming Partner, Or Subcontractor. Project Owner, Owner S Point Of Contact Including Telephone Number And Email Address. Services & Deliverables Provided Under The Contract/task Order. Period Of Performance, Including Start And Completion Dates Total Dollar Value Of The Project Contract Number Associated With The Project. section G Will Used To Evaluate The Prior Experience Of The Prime Firm And Any Key Subcontractors Working Together On The Provided Relevant Projects. the Evaluation Will Also Consider Narratives Addressing The Following Topics In Section H. Simply Re-stating This List In Section H Will Not Be E Sufficient. The Narrative Of How The Firm Addresses Each Of These Will Be Evaluated. The Management Approach The Coordination Of Disciplines And Subcontractors Quality Control Procedures, And Familiarity With Va Design Guides/manuals, Master Specifications, And Other Applicable Standards. professional Qualifications: Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Below. Provide Professional License Numbers And/or Proof Of Licensure. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The State Where The Project Is Located. key Positions And Disciplines Required For This Project Include But Are Not Limited To: Architect (leed Certified) Cadd Technician Structural Engineer Geotechnical Engineer Civil Engineer Electrical Engineer Environmental Engineer Fire Protection Engineer Industrial Hygienist Mechanical Engineer Plumbing Project Manager Quality Assurance Physical Security Specialists Registered Communications Distribution Designer (rcdd) Commissioning Agent Cost Estimator responses Must Include The Extent To Which Potential Contractors/subcontractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses When Submitting The Personnel Proposed To Perform The Work Under This Requirement. the Information Provided In Sections C Through E Of Sf 330 Will Be Used To Evaluate This Evaluation Factor. Do Not Include This Information In Section H, Unless It Is Pertinent To Support The Information Listed In The Other Sections. experience In Construction Period Services (cps): Experience In Construction Period Services To Include Solicitation Support Services, Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, Support Of Construction Contract Changes To Include Drafting Statements Of Work And Cost Estimates, Attendance At Weekly Conference Calls, Providing Minutes Of Meetings Between The Ae, Va, And Contractors, Pre-final Inspection Site Visits, Generation Of Punch-list Reports, Commissioning Services And Production Of As-built Documentation. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. past Performance: Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. Past Performance Will Be Evaluated For All Projects Provided In Section F. The Contractor Performance Assessment Rating System (cpars) Database Will Be Reviewed To Evaluate The Projects That Have A Cpars Entry. Cpars Are Not Required To Be Submitted With The Sf330 Submission. The Contract Number For The Project Must Be Submitted With Each Project In Section F So Cpars Can Be Reviewed In The Database. for Any Project That Does Not Have Cpars Data Available, A Past Performance Questionnaire (ppq) Is Required To Be Submitted With The Sf330. The Ppq Should Be Rated And Signed By The Evaluator. If A Firm Does Not Receive A Requested Complete Ppq From An Evaluator Prior To The Time For Submission, The Firm Shall Submit The Partially Completed Ppq With Section 1 And The Evaluator Information In Section 2 Completed. Ensure A Poc Is Listed With The Project Title/contract Number. The Va Will Make Reasonable Attempts To Contact The Poc Upon Submission For Ppq Completion. evaluations May Also Include Additional Performance Related From The Firm, Customer Inquiries, Government Databases, Publicly Available Sources, And Additional Projects In Cpars. The Government Reserves The Right To Contact Any Poc Listed On A Cpars Report Or Ppq. Evaluations Will Consider Superior Performance Ratings On Recently Completed Va Projects As Well As The Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness. If Ap-propriate, The Record Of Significant Claims Against The Firm Because Of Improper Or In-complete Architectural And Engineering Services May Be Evaluated. failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified. All Projects Provided In The Sf330 Must Be Completed By The Office/branch/individual Team Member Performing The Work Under This Contract. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. for Ppqs, Please Utilize The Attached Ppq Document. Completed Ppqs Should Be Incorporated Into The Sf 330 Directly. Ppqs May Be Submitted To The Vha Nco 6 Point Of Contact Specified In The Attached Ppq Document. Any Ppqs Will Not Be Counted Towards The Page Limitations For This Submission. However, Any Narratives Provided For Past Performance In Section H Will Be Counted Toward The Page Limit. capacity: The Evaluation Will Consider The Firm S Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. Provide The Available Capacity Of Key Disciplines By Providing Current Project Workload, Inclusive Of All Projects Awarded By The Va During The Previous 12 Months And The Full Potential Value Of Any Current Indefinite Delivery Contracts. offeror Shall Clearly State Their Available Capacity Presenting Workload Percentages For The Key Disciplines And/or Team Members. Also, The Offeror Must Provide The Completion Percentages And Expected Completion Date For The Va Projects Awarded In The Previous 12 Months. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. Please Ensure The Capacity Applies Toward The Team/personnel Provided In The Sf 330. knowledge Of Locality: Knowledge Of The Locality, To Include Specific Knowledge Of Certain Local Conditions Or Project Site Features, Such As Geological Features, Climatic Conditions, Working With And Local Construction Methods Or Local Laws And Regulations. The Information For This Factor Shall Be Provided In Section H Of The Sf 330. note That The Intent Of This Factor Is To Showcase A Firm S Understanding Of The Site And Locality, And Not Where The Firm Is Located, How Far Away The Firm/branch Office Is From The Site, And How They Would Travel To The Site. Information Related To The Firm S Location Shall Instead Be Provided In Section H Under Secondary Selection Criterion Factor 1, Geographic Location. See Below. secondary Selection Criterion*: Geographic Location. Location Of The Firm, As Measured By The Driving Distance (miles) Between The Offeror S Principal Business Location And The Fayetteville Va Medical Center: 2300 Ramsey Street, Fayetteville, North Carolina 28301-2856. Determination Of The Mileage Will Be Based On Google Maps (https://www.google.com/maps/dir/). * The Secondary Selection Criterion Is Used As A Tiebreaker, If Necessary, In Ranking The Most Highly Qualified Firms Following The Completion Of Written Responses. The Secondary Selection Criterion Will Not Be Applied When Determining A Firm S Sf330 Submission. the Department Of Veterans Affairs Shall Evaluate Each Potential Contractor In Terms Of The Following As M Firm Meeting The Synopsized Selection Criterion And "nm" Means That The Firm Did Not Meet The Synopsized Selection Criterion.: selection Criteria Specialized Experience: specialized Experience And Technical Competence In The Design And Construction Period Services For A Complete Design Of A 1000-ton Chiller (capacity Increase) Or Similar Project. Project Experience Must Include Experience With Similar Sized Chilled Water Systems, Preferably In Healthcare Facilities Or Large Industrial Buildings. Submissions Shall Include No More Or Less Than Five (5) Recent And Relevant Government And Private Experience Projects Similar In Size, Scope And Complexity, And Experience With The Types Of Projects Above. professional Qualifications: Necessary For Satisfactory Performance Of Required Service. The A-e Shall Demonstrate They Are Able To Sign And Stamp Each Drawing By Individuals Licensed In Any State In The United States For The Key Positions Listed Above. The Evaluation Shall Consider The Specific Experience (minimum Of Five Years) And Qualifications (i.e., Education, Training, Registration, Certifications, Overall Relevant Experience, And Longevity With The Firm As Full-time Employees) Of Personnel Proposed For Assignment To The Project, And Their Record Of Working Together As A Team When Evaluating Professional Qualifications. experience In Construction Period Services (cps) past Performance: Past Performance On Contracts With Government Agencies And Private Industry In Terms Of Cost Control, Quality Of Work, And Compliance With Performance Schedules. capacity: The Evaluation Will Consider The Firms Ability To Meet The Schedule Of The Overall Project, As Well As The Available Capacity Of Key Disciplines To Perform The Work In The Required Time. knowledge Of Locality please Note: The A-e Evaluation Board Must Be Provided With Complete And Accurate Information For All Seven (7) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The A-e Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The A-e Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications. limitations: 852.219-73 Va Notice Of Total Set-aside For Certified Service-disabled Veteran-owned Small Businesses. 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction. submission Criteria/requirements: Interested Firms Having The Capabilities To Perform This Work Must Submit: one (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) Electronically To The Contract Specialist, Elaine Belber, Via Email At Elaine.belber@va.gov No Later Than 1:00 P.m. Edt On Thursday, April 17, 2025. interested Firms Are Responsible For Ensuring Electronic Delivery Of Submission By The Time And The Date Specified. It Is Highly Recommended Interested Firms Confirm Electronic Submissions Have Been Received By The Contracting Officer. size Limits Of E-mails Are Restricted To 10mb. If More Than One Email Is Sent, Please Number Emails In Subjects As 1 Of N . (example: Sf330 Submission, 36c24625r0031 Increase Chilled Water Capacity, Project 565-25-153 (1 Of N, 2 Of N, Etc.). All Sf330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Procurement Number And Project Title (abbreviated Or Shortened Is Okay). Interested Firms Are Responsible For Ensuring Delivery Of Submission. all Sf 330 Submissions Must Include The Following Information, Either On The Sf 330 Or By Accompanying Document: 1) Cage Code 2) Sam Unique Entry Id Number (uei) 3) Tax Id Number 4) The E-mail Address And Phone Number Of The Primary Point Of Contact 5) Sf 330 Must Indicate The Percentage Of The Contract Performance Cost That Will Be Expended By The Prime Firm S Employees And In Which Discipline(s) And Subcontracted Percentage Of Contract Performance Cost To Be Expended (and In What Disciplines). Any Subcontracted Or Otherwise Business Entity Must Be Identified By Name, Office Location And Size/type Of Business (i.e. Sdvosb, Vosb, Large, Etc.). 6) References Noted In Selection Criteria 4 the Firm And Or A-e On Staff Representing The Project Must Follow State Of North Carolina Guidelines Under State Law For All Licensing Requirements To Sign And Seal Drawings. each Respondent Must Be Able To Demonstrate The Ability To Comply With The Limitations On Subcontracting, In Accordance With Far Clause 52.219-14 And Vaar Clauses 852.219-73 And 852.219-75. electronic Submittals Received After The Date And Time Specified Will Not Be Considered. Late Proposal Rules Per Far 15.208 Will Be Followed For Late Submittals. Firms Not Providing The Required Information May Not Be Considered. All Information Must Be Included In The Sf330 Submission Package. it Is The Offeror S Responsibility To Check The Contract Opportunities Website At: Www.sam.gov For Any Revisions To This Announcement Prior To Submission Of Sf330s. vendor Questions: All Questions Shall Be Submitted To The Contract Specialist, Elaine Belber, Via Email At Elaine.belber@va.gov No Later Than 1:00 P.m. Edt On Tuesday, April 1, 2025. attachments: 100% Construction Drawings With Chiller Mod 05-22-2017 sf 330 past Performance Questionnaire
Closing Date17 Apr 2025
Tender AmountRefer Documents 
2061-2070 of 2262 archived Tenders