Tenders of Rural Municipality Of Mcleod No 185
Tenders of Rural Municipality Of Mcleod No 185
Sorry!
No Active
Tenders of Rural Municipality Of Mcleod No 185
foundCheck archived
Tenders of Rural Municipality Of Mcleod No 185
Canada
Clay Cap #1 Sw-se 7-20-08 W2 : May 12, 2022 Invitation To Tender The R.m. Of Mcleod No. 185 Is Accepting Quotes/tenders For The Following Road Project: Clay Clap West Of Sw 07-20-08 W2 Through To East Of Se 07-20-08 W2 –approximately 1 Mile. This Project Involves The Removal Of 3 Existing Culverts And Replacement With 3 New Culverts, Supplied By The R.m, Clay Capping With A 12” Lift, Ensuring The Finished Road Top Is At Least 7.0 M Wide With 3:1 Shoulders. Contractor Must: Ensure Rocks Are Removed From Clay And That The Top 0.4 M Of Surface Is Rock Free, Compact To Construction Standards, Haul And Place Rip Rap, Reshape And Slope Ditch, And Perform All Other Associated Work Related To The Installation/clay Cap. Clay Supplied Nearby. Gravel Will Be Supplied By The Municipality. Excess Stones To Be Picked And Piled. A Grader Will Be Required On-site. It Is Expected That The Contractor Will Supply And Ensure That Appropriate Signage Is Maintained During Construction Phase. Work To Be Substantially Completed By October 31, 2022.
Closing Date
24 May 2022Tender Amount
Refer DocumentsCanada
Clay Cap #2 Sw-se 11-20-09 W2 : May 12, 2022 Invitation To Tender The R.m Of Mcleod No. 185 Is Accepting Quotes/tenders For The Following Road Project: Clay Clap West Of Sw 11-20-09 W2 Towards Se 11-20-09 W2– Approximately 0.75 Miles. This Project Involves The Removal Of 4 Existing Culverts And Replacement With 4 New Culverts, Supplied By The R.m, Clay Capping With A 12” Lift, Ensuring The Finished Road Top Is At Least 7.0 M Wide With 3:1 Shoulders. Contractor Must: Ensure Rocks Are Removed From Clay And That The Top 0.4 M Of Surface Is Rock Free, Compact To Construction Standards, Haul And Place Rip Rap, Reshape And Slope Ditch, And Perform All Other Associated Work Related To The Installation/clay Cap. Clay Supplied Nearby. Gravel Will Be Supplied By The Municipality. Excess Stones To Be Picked And Piled. A Grader Will Be Required On-site. It Is Expected That The Contractor Will Supply And Ensure That Appropriate Signage Is Maintained During Construction Phase. Work To Be Substantially Completed By October 31, 2022.