Tender Results of The Morbian Water
Tender Results of The Morbian Water
The Morbian Water Tender Result
Result Stage: Awarded (AOC Available)
France
Public service production drinking water perimeter of the subt in Brocéliande Community for part, Arc Sud Bretagne for part, Questembert Community for part and Redon Agglo for part (D)
Contract Date2 Dec 2019
Contract AmountEUR 3.2 Million (USD 3.4 Million)
The Morbian Water Tender Result
Result Stage: Awarded (AOC Available)
France
Operation of the public drinking water production service on the perimeter of Pontivy Community for part, Morbihan Community and Gulfe Morbihan Vannes Agglomeration for part
Contract Date28 Jul 2018
Contract AmountEUR 4.2 Million (USD 4.5 Million)
The Morbian Water Tender Result
Result Stage: Under Evaluation
France
"Transfer channels between Trégat I and Trégat II. - The supply and laying of 860 ml of pipes (raw water) Ø 400 mm in ductile cast class C30, of which 80 ml locked "" standard". - The supply and laying of 1 105 ml of pipes (gross water) Ø 400 mm in ductile cast iron class C30 "" All-Terrain" in polyurethane or polyethylene, of which 175 ml locked "" standard". - The supply and laying of 920 ml of pipes (treated water) Ø 400 mm in ductile cast iron class C30, of which 110 ml locked "" standard". - The supply and laying of 1,095 ml of pipes (treated water) Ø 400 mm in ductile cast iron class C30 "" All-Terrain" in polyurethane or polyethylene, of which 175 ml locked """ standard". - Supplying and laying 5 butterfly valves in glance - The supply and installation of 4 draining devices and 4 suction cup devices - The realization of a work track 1 810 ml - Work in wetlands: 1,080 ml."
Contract Date27 Dec 2014
Contract AmountNA
The Morbian Water Tender Result
Result Stage: Awarded (AOC Available)
France
Market: 13500103. Call for applications for a master's market for the construction of the new Tréauray 2 drinking water production plant in the commune of Sainte-Anne d'Auray. The nominal production capacity is 1000 m3/h and 20,000 m3/d. The water treatment industry is a complete A3-type line with a Charbon Active in Powder contact stage. The discharge treatment system has a mechanical dehydration stage. The operation also includes the equipment necessary to supply the plant by the Tréauray deduction (pompage and exhaure pipe). Permis de Construire's application file will be developed by the master's working group, as well as regulatory records
Contract Date21 Oct 2014
Contract AmountEUR 647.8 K (USD 689.4 K)
1-10 of 11 active Tender Results