Spain Tender Results

Spain Tender Results

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 88.3 K (USD 92.4 K)
Project drafting and execution of works to improve the installation of emergency doors at exits 2 and 6 of the Cabanyal tunnel and exits 2, 3, 9, 10 and 11 of the Castellón tunnel, located in the municipality of Castellón and Valencia.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 151.8 K (USD 158.8 K)
Project drafting and execution of treatment works between PK. 356/153 to PK. 356/289 of line 822 Bif. Valorio to La Coruña, section Orense to Santiago de Compostela.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 202.7 K (USD 212.6 K)
Technical assistance for the quality, quantitative and qualitative control of the works of the construction projects for the suppression of level crossing no. 24 (PK 14/015) and no. 26 (PK 13/372) of the RFIG 764 Baiña-Collanzo line. Municipality of Miers(stras).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 226.8 K (USD 235.4 K)
Re-project and execution of trench treatment works between Miño and Perbes from PK. 16/772 to 17/050 of line 804 Betanzos- Infiesta to Ferrol, TM of Miño (La Coruña).-

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 976.1 K (USD 1 Million)
Supply, transport and pre-assembly of track devices for the connection of the Almussafes bypass with the Valencia-Alicante high-speed line (HSL)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 1.1 Million (USD 1.2 Million)
Execution of the works of the construction project to make the overhead contact line reliable with the replacement of funicular gantries between Getafe Industrial and Aranjuez

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 1.5 Million (USD 1.5 Million)
Supply and transport of track devices for the renewal of the Buñol - Utiel section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountEUR 4.1 Million (USD 4.3 Million)
Supply and delivery of electromechanical lifting platforms for boarding and disembarking people in wheelchairs at passenger stations (ADIF ACERCA Service)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountRefer Documents 
Supply of track elements. Lot 4: Bent plates

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date13 Feb 2025
Contract AmountRefer Documents 
Supply of track elements. Lot 5: Rubber plates
31-40 of 10000 active Tender Results