Tender Results of Offshore Renewable Energy
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
River Frontage Remedial Works - ORE/25/035-The purpose of this Direct Award is to assign a Project Manager/Principal Designer for the River frontage remedial works in Blyth. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=952483115
Contract DateNA
Contract AmountRefer Documents
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Mooring Line and Dynamic Cable Monitoring and Replacement Methodologies ORE/25/003-Contract Award Notice
Contract Date13 May 2025
Contract AmountGBP 74.9 K (USD 99.8 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
UK SOV Manufacture Business Case Development - ORE/24/101-The offshore wind industry is growing rapidly, with over 850GW of capacity expected to be installed globally by 2050. This is underpinned by global commitments to reduce carbon emissions and by improving the cost efficiency of wind as an energy source. In line with this rapid expansion, the number of vessels required to support offshore wind developments throughout their operational life will also require major growth. Here at ORE Catapult, we have conducted analysis to determine the si...
Contract Date7 Apr 2025
Contract AmountGBP 200 K (USD 262 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
UK SOV Manufacture Business Case Development - ORE/24/101-The offshore wind industry is growing rapidly, with over 850GW of capacity expected to be installed globally by 2050. This is underpinned by global commitments to reduce carbon emissions and by improving the cost efficiency of wind as an energy source. r In line with this rapid expansion, the number of vessels required to support offshore wind developments throughout their operational life will also require major growth. Here at ORE Catapult, we have conducted analysis to determine the size o...
Contract Date17 Mar 2025
Contract AmountGBP 200 K (USD 259.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
AUIP Sensor Package-As part of our Innovate UK-funded project, we are required to develop an offshore wind farm simulated environment where robotic developers can test and validate their systems. To ensure the simulation accurately reflects real-world conditions, we will conduct underwater mapping inspections of key areas of interest, such as the DARE Centre, Grimsby Docks, and L
Contract DateNA
Contract AmountRefer Documents
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Universal Testing Machine - ORE/24/072-Contract Award notice ORE Catapult Materials Laboratory, located at the Charles Parsons Technology Centre at High Quay, Blyth has a requirement for purchasing a new dynamic Universal Test Machine (UTM) to meet increasing demand from customers. There are current and future planned demands for testing subsea cable manufacturers cable sheath material samples in fatigue life at increasing loads which are currently outside the capability and availability of the current test machines held in ...
Contract Date12 Mar 2025
Contract AmountRefer Documents
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
15MW Drive Train Test Facility Upgrade - ORE/22/100-*PLEASE NOTE, THIS IS A CONTRACT AWARD NOTICE* This tender is being issued by the Offshore Renewable Energy Catapult (‘ORE Catapult’) as a competitive procurement exercise in accordance with the ‘Competitive Procedure with Negotiation’ for tendering under the Public Contracts Regulations 2015 (as amended from time to time). After a number of years of world-leading testing, ORE Catapult now have a requirement to upgrade the existing Drive Train to ensure the facility is ready to se...
Contract Date12 Mar 2025
Contract AmountRefer Documents
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Security Services ORE24053-The principle objective of this tender is to appoint a single Contractor to provide a robust security service (“The “Service”) to our ORE Catapult Blyth site (site map shown at Appendix 4 ) using suitably trained, SIA Licensed security officers in compliance with The Working Time (Amendment) Regulations 2003.
Contract Date26 Feb 2025
Contract AmountGBP 112.6 K (USD 142.5 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Security Services ORE24053-The principle objective of this tender is to appoint a single Contractor to provide a robust security service ("The "Service") to our ORE Catapult Blyth site (site map shown at Appendix 4 ) using suitably trained, SIA Licensed security officers in compliance with The Working Time (Amendment) Regulations 2003.
Contract DateNA
Contract AmountGBP 112.6 K (USD 142 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Calibration HV equipment ORE/25/005-The ORE Catapult operates a high voltage test laboratory which requires the periodic calibration of the H.V. equipment contained within it. The laboratory operates in accordance with IEC 17025 and carries out testing in accordance with BS EN 60060. We have used RISE to do the high voltage calibration since 2012. They are the only company that can offer a comprehensive HV calibration service.
Contract DateNA
Contract AmountGBP 49.2 K (USD 62.2 K)
11-20 of 211 active Tender Results