Tender Results of Offshore Renewable Energy

Tender Results of Offshore Renewable Energy

Offshore Renewable Energy - ORE Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Air Conditioning / Air Ventilation - Maintenance & Inspection-This is a contract award only, not an invitation to tender. The purpose of this ITT was to assist ORE Catapult in establishing a Framework Agreement for the provision of Air Conditioning / Air Ventilation Maintenance and the provision of new equipment and its installation to the ORE Catapult site in Blyth, Northumberland.
Contract DateNA
Contract AmountGBP 250 K (USD 304.6 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Under Evaluation
United Kingdom
Personal Protective Equipment & Corporate Workwear Framework Agreement - ORE/21/088-The purpose of this ITT is to assist ORE Catapult in establishing a Framework for the supply of Personal Protective Equipment (PPE) & Corporate Workwear by appointing professional, reliable Suppliers to meet their ongoing requirements.
Contract DateNA
Contract AmountGBP 250 K (USD 304.6 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Electricity Gas & Water Brokerage Services Framework-Framework Award Award of positions on Framework to two (2) Brokerages for the supply of services related to gas, electricity and water supply brokerage services.
Contract DateNA
Contract AmountGBP 250 K (USD 304.6 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Safety Health Environment and Quality Training Management System - ORE23039-ORE Catapult intend to appoint one (1) Contractor to provide HSE training and training management for all UK based employees. The majority of training delivery will be focussed around the ORE Catapult sites in Blyth, Aberdeen, Pembroke, Glasgow, Grimsby and Hayle
Contract DateNA
Contract AmountGBP 320 K (USD 389.9 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Ground Investigations ORE25004-Ground Investigation works.
Contract DateNA
Contract AmountGBP 400 K (USD 506.3 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Awarded  (AOC Available)
United Kingdom
Inspection & Maintenance of Hydraulic Hoses & Hose Management System - ORE/23/063-ORE Catapult was seeking to appoint suitably qualified and experienced Contractor to provide high quality Services supported by robust management system of the hydraulic hoses and quality control processes. This is a contract award notice.
Contract DateNA
Contract AmountGBP 500 K (USD 636.8 K)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Under Evaluation
United Kingdom
Grid Emulation System-ORE Catapult is looking to procure a Grid Emulation System to be used in the soon to be developed Technology Demonstration Centre (TDC). This new centre will house a wind tunnel, tribology laboratory, 1MW drivetrain test rig and the new Grid Emulation System. The main purpose of the new Grid Emulation System is to provide a flexible test facility for customers to validate designs or simulation models of their device(s) or control systems
Contract DateNA
Contract AmountGBP 2 Million (USD 2.4 Million)

Offshore Renewable Energy - ORE Tender Result

Result Stage: Under Evaluation
United Kingdom
Hydrophone System-*CONTRACT AWARD NOTICE* The Marine Energy Engineering Centre of Excellence (MEECE) is an ERDF and Swansea Bay City Deal funded project led by ORE Catapult and based in Pembroke Dock. MEECE aspires to measure the underwater background noise at prospective tidal energy development sites and also existing tidal turbines in the Milford Haven waterway and Welsh coastal waters with hydrophones held in a bespoke frame fixing the hydrophone head at a minimum of 1m above the seabed for continuous m...
Contract DateNA
Contract AmountNA 

Offshore Renewable Energy - ORE Tender Result

Result Stage: Under Evaluation
United Kingdom
Realtime Simulator-ORE Catapult is in the process of enhancing its real-time simulation capability and subsequently have a requirement for a real-time simulator that is capable of communicating with standard wind industry power converters and automation industry drives which will allow ORE Catapult to conduct novel control strategy of complex power systems and power electronics systems in a high speed and accurate manner.
Contract DateNA
Contract AmountNA 

Offshore Renewable Energy - ORE Tender Result

Result Stage: Under Evaluation
United Kingdom
Quayside Mooring and Anchoring Test Rig - Winch-ORE Catapult are seeking to appoint a Contractor to supply, deliver and install all necessary equipment and software to facilitate the FLOWIC Hexapod, reference ORE/22/155.
Contract DateNA
Contract AmountNA 
181-190 of 194 active Tender Results