Tender Results of Offshore Renewable Energy
Tender Results of Offshore Renewable Energy
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Scaled Mooring Line Test Rig Design-ORE Catapult is currently developing a technology test and development facility in Aberdeen, known as FLOWIC (Floating Offshore Wind Innovation Centre). As part of the development of this Centre, ORE Catapult is scoping the design, and in certain cases manufacture, of a suite of testing rigs. Within FLOWIC, there is a desire to have capability that can support the development of mooring components for floating offshore wind. Mooring components include, amongst others: Synthetic Fibre Rope, Ch...
Contract Date13 Mar 2023
Contract AmountGBP 150 K (USD 182.8 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Dynamic Cable Compression Test Rig Design-ORE Catapult intends to expand its cable testing capabilities by asking a contractor to provide a detailed design for a dynamic cable compression test rig that is capable of simulating in-service dynamic loads for floating offshore wind (FOW) applications. Fundamentally, the rig design is expected to comprise of: • A steel frame. • End terminations. • Bending Actuators. • Horizontal tension/compression Actuator. • The cable specimen (during testing). • Ancillary mechanical, ...
Contract Date13 Mar 2023
Contract AmountGBP 150 K (USD 182.8 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Wind CFD Modelling-Contract award notice for Blade Test Facility 3 Wind Modelling
Contract Date7 Mar 2023
Contract AmountGBP 30 K (USD 36.5 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Riverside and Dock Fencing Replacement - ORE/22/009-Replacement and installation of fencing at the ORE Catapult site in Blyth. The fencing consisting of collapsible and fixed fencing of approximately 266 metres in length, replaced with permanent fencing bolted to the existing concrete. An additional length of approximately 75 metres of collapsible fencing replaced on the dock bridges to be replaced with permanent fencing bolted to the existing concrete.
Contract Date6 Mar 2023
Contract AmountGBP 65 K (USD 79.2 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Quayside Mooring and Anchoring Test Rig - Winch-Contract Award as part of Framework Agreement for Small Works Replacement of collapsible & fixed fencing on the quayside at Blyth location.
Contract Date6 Mar 2023
Contract AmountGBP 450 K (USD 548.4 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Cable Installation and Termination-Contract award notice
Contract Date2 Mar 2023
Contract AmountGBP 21.9 K (USD 26.8 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Contract Award as part of Framework Agreement for Small Works Replacement of collapsible & fixed fencing on the quayside at Blyth location.
Contract Date1 Mar 2023
Contract AmountGBP 30 K (USD 36.6 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Technology Impact Calculator-Contract Award Notice
Contract Date1 Mar 2023
Contract AmountGBP 60 K (USD 73.1 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Wind Tunnel Wing Models - ORE23002-Contract award notice
Contract Date24 Feb 2023
Contract AmountGBP 27.8 K (USD 33.9 K)
Offshore Renewable Energy - ORE Tender Result
Result Stage: Under Evaluation
United Kingdom
Energy Systems Benefit Study-Provision of Energy Systems Benefit Study This Contract is being funded by EU Funds
Contract Date20 Feb 2023
Contract AmountGBP 35.4 K (USD 43.2 K)
121-130 of 194 active Tender Results