Tender Results of Offshore Renewable Energy
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date17 Apr 2023
Contract AmountGBP 59 K (USD 71.9 K)
ORE/22/077 - Lifecycle Assessment Methodology for Carbon Emissions in Offshore Wind-The project will be split into two parts: Phase 1 and Phase 2. This tender is for Phase 1 only but Phase 2 is outlined for overall context only. Phase 1 Objectives; •Review current LCA methodologies within industries to identify methodologies, approaches and tools suited to the offshore renewable industry; •Develop a standard taxonomy based around main project life cycle phases (e.g., raw material extraction, manufacture, distribution and transport, operations and maintenance, disposal,...
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date15 Apr 2023
Contract AmountGBP 373.1 K (USD 454.6 K)
Ansys Software Agreement-Ansys software provides engineering simulation and 3D design capabilities, including Mechanical CFD and Mechanical simulation, modelling and analysis solutions. Applying engineering simulation early in product and project development, enables cost effective ways to evaluate new concepts faster and with greater frequency than with traditional prototyping and testing methods. It is a portfolio of affordable, easy-to-use software tools that address all aspects of the product development process.
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date10 Apr 2023
Contract AmountGBP 70 K (USD 85.3 K)
ORE/22/076 - Floating Offshore Wind - Major Component Exchange Methodologies and Innovation Opportunities-FOWCoE Open Tender. Tender documents can be accessed at https://procontract.due-north.com/ free of charge
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date10 Apr 2023
Contract AmountGBP 250 K (USD 304.6 K)
Waste Management & Recycling Services-Contract Award The purpose of this Invitation To Tender is to assist ORE Catapult in establishing a Framework for Waste Management & Recycling Services which complies with all current, relevant legislation. To comply with these regulations, and to maintain our certification to ISO45001 and 14001, ORE Catapult is seeking to appoint suitably qualified and experienced Contractors to provide high quality Services supported by robust management and quality control processes.
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date5 Apr 2023
Contract AmountGBP 35.2 K (USD 42.9 K)
02962837-This project is a technology agnostic high-level study of the costs, risks and opportunities for different cable topology and cable connection methods (including subsea wet mate connectors) for offshore floating wind, in comparison to a more conventional topology in a daisy chain configuration between turbines. This study is important as it aims to answer the following questions: • What topologies will potentially be used for future FOW sites (e.g. daisy chain, fishbone, or star)? • What t...
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date1 Apr 2023
Contract AmountGBP 4 Million (USD 4.8 Million)
Grid Connection Upgrade - Blyth Test facility - ORE/22/121-Upgrade of existing Grid Connection at ORE Catapult Site in Blyth, Northumberland
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date29 Mar 2023
Contract AmountGBP 1.2 Million (USD 1.4 Million)
Dynamic Cable Flex Fatigue Test Rig-ORE Catapult intends to expand its cable testing capabilities by constructing a dynamic cable flex fatigue test rig that is capable of simulating in-service dynamic loads for floating offshore wind (FOW) applications. ORE Catapult intends to appoint a single contractor (or consortium) to design, procure, construct and commission the dynamic cable fatigue test rig at its (to be inaugurated) National Floating Offshore Wind Innovation Centre (FLOWIC) site in Aberdeen. ORE Catapult reserve the ri...
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date28 Mar 2023
Contract AmountGBP 190 K (USD 231.5 K)
Electrical Supply Upgrade-Upgrade of existing Electrical Supply
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date28 Mar 2023
Contract AmountGBP 1.6 Million (USD 2 Million)
Grid Emulation System-ORE Catapult is looking to procure a Grid Emulation System to be used in the soon to be developed Technology Demonstration Centre (TDC). This new centre will house a wind tunnel, tribology laboratory, 1MW drivetrain test rig and the new Grid Emulation System. The main purpose of the new Grid Emulation System is to provide a flexible test facility for customers to validate designs or simulation models of their device(s) or control systems.
Offshore Renewable Energy - ORE Tender Result
United Kingdom
Contract Date28 Mar 2023
Contract AmountNA
5G Testbed Laboratory Equipment : ORE/23/028-5G Testbed laboratory Equipment
111-120 of 206 active Tender Results