Tender Results of National Nuclear Laboratory
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
NNL Central Laboratory Replacement Chiller-This specification is for the supply, installation and setting to work of a replacement for the aircooled process water chiller located outside in the NNL Central Laboratory (B170) south compound,on Sellafield Nuclear Site in West Cumbria.
Contract Date3 Jun 2025
Contract AmountGBP 600 K (USD 809.8 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
NNL Central Laboratory Replacement Chiller-This specification is for the supply, installation and setting to work of a replacement for the aircooled process water chiller located outside in the NNL Central Laboratory (B170) south compound,on Sellafield Nuclear Site in West Cumbria.
Contract Date27 May 2025
Contract AmountGBP 600 K (USD 805.9 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Integrated Intelligent Safe Environment Feasibility Study-UKNNL requires consultancy support until the end of March 2025 to produce a feasibility study. This study will investigate the development of an AI-based system that allows safe, symbiotic interaction between humans and autonomous systems. Awarded via further competition under UKNNL UNIVERSITY SUPPLY CHAIN FRAMEWORK (NNLC321)
Contract Date20 Jan 2025
Contract AmountGBP 100 K (USD 122.3 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Particle Detector Radiation Testing-UKNNL are working with a University to develop and trial a muon particle detector to be used to image shielded boxes during decommissioning activities at Sellafield. Whilst in operation the detector will not be shielded and as such will be exposed to the full radiation field from the waste boxes. As part of the research to determine the detectors suitability, it is necessary to understand the functionality of the electronic detector modules when exposed to radiation. After a successf...
Contract Date14 Jan 2025
Contract AmountGBP 29.8 K (USD 36.6 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
PDRA for Deconversion Research into on-line process monitoring techniques-This contract has been awarded under NNLC321 - University Supply Chain Framework Lot 6. The services to be provided are a PDRA focusing on Deconversion Research into on-line process monitoring techniques.
Contract Date16 Dec 2024
Contract AmountGBP 54.9 K (USD 68.1 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
PDRA for Additive manufacture of fuels in support of the Uranics Innovation Programme-This contract has been awarded under NNLC321 - University Supply Chain Framework Lot 6. The services to be provided are a PDRA focusing on Additive manufacture of fuels in support of the Uranics Innovation Programme.
Contract Date2 Dec 2024
Contract AmountGBP 78.3 K (USD 97.3 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
On-site breakdown contract for lab equipment installed at UKNNL Central Laboratory-12 months on-site breakdown contract for lab equipment installed at UKNNL Central Laboratory, Sellafield. Period of cover 01/NOV/24 to 31/OCT/25. Optional 12 month extension: 12 months on-site breakdown contract for lab equipment installed at UKNNL Central Laboratory, Sellafield. Period of cover 01/NOV/25 to 31/OCT/26 .
Contract Date1 Nov 2024
Contract AmountGBP 29.7 K (USD 36.7 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Molten salt reactor (MSR) fuel production using direct molten salt approaches-This contract has been awarded under NNLC321 - University Supply Chain Framework Lot 6. The services to be provided are a PDRA focusing on molten salt reactor (MSR) fuel production using direct molten salt approaches.
Contract Date29 Oct 2024
Contract AmountGBP 405.1 K (USD 516.6 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
Gamechangers SNM in-situ inspection Proof of Concept-United Kingdom National Nuclear Laboratory ("UKNNL") has awarded a contract to Ice Nine Limited who will further develop the concept for an SNM package inspection device as part of the Gamechangers Innovation Programme. For further informatin on the Gamechangers Innovation Programme please go to https://www.gamechangers.techn...
Contract Date25 Oct 2024
Contract AmountGBP 79.1 K (USD 98 K)
National Nuclear Laboratory Tender Result
Result Stage: Awarded (AOC Available)
United Kingdom
An Infrastructure Delivery Partner For A Nuclear Waste Management Data Platform (VEAT)-Award of a contract without prior publication of a call for competition to a single supplier.
Contract Date15 Oct 2024
Contract AmountGBP 250 K (USD 326.6 K)
1-10 of 73 active Tender Results