Tender Results of Integral Coach Factory

Tender Results of Integral Coach Factory

Integral Coach Factory - ICF Tender Result

Electrical Generators And Transformers...+2Electrical Goods and Equipments, Electrical and Electronics
Ireps
Result Stage: Awarded  (AOC Available)
India
47160196: 60 KVA TRANSFORMER 750/415V, 3 PHASE,TO RDSO SPEC.NO.RDSO/PE/SPEC/AC/ 0080-2007 (REV.2) WITH RDSO LETTER No.EL/7.1.108/Trans dt.17/02/2020. NOTE: 1. RCF Drawings CC71216 & CC71217 attached. 2. PACKING 
Contract Date2 Dec 2022
Contract AmountINR 17.5 Million (USD 211.2 K)

Integral Coach Factory - ICF Tender Result

Machinery and Tools
Ireps
Result Stage: Awarded  (AOC Available)
India
33566689: Self Priming Monoblock pump assembly with controller to RCF spec.no.EDTS-186, Rev-A, amendment-1&2 with cor-1&2. In drawing CC71327 Alt-c, note-7 shall be read as #Cable entry hole of the motor termin 
Contract Date2 Dec 2022
Contract AmountINR 19 Million (USD 228.8 K)

Integral Coach Factory - ICF Tender Result

Electrical Goods and Equipments...+1Electrical and Electronics
Ireps
Result Stage: Awarded  (AOC Available)
India
33580637: SUPPLY OF SWITCH BOARD CABINET FOR LHB POWER CAR TO RCF SPECN.NO. EDTS-104 REV.D, AM-5, ALONG WITH ICF ANNEXURE 01, WITH ADDITIONAL ITEMS AS PER CL.5.2 OF RDSO MODIFICATION SHEET RDSO/PE/MS/AC-0051-20 
Contract Date2 Dec 2022
Contract AmountINR 20.9 Million (USD 251.9 K)

Integral Coach Factory - ICF Tender Result

Automobiles and Auto Parts
Ireps
Result Stage: Awarded  (AOC Available)
India
33769734: SUPPLY OF META / PARA ARAMIDE BELLOWS CONFORMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/AC-0197-2020(REV-0) FOR LHB EOG AC COACHES AND SCOPE OF SUPPLY PER RMPU CONSISTING OF 1 NO. OF SUPPLY AIR BELLOW 
Contract Date2 Dec 2022
Contract AmountINR 26.7 Million (USD 321.4 K)

Integral Coach Factory - ICF Tender Result

Electrical Goods and Equipments...+1Electrical and Electronics
Ireps
Result Stage: Awarded  (AOC Available)
India
33580637: SUPPLY OF SWITCH BOARD CABINET FOR LHB POWER CAR TO RCF SPECN.NO. EDTS-104 REV.D, AM-5, ALONG WITH ICF ANNEXURE 01, WITH ADDITIONAL ITEMS AS PER CL.5.2 OF RDSO MODIFICATION SHEET RDSO/PE/MS/AC-0051-20 
Contract Date2 Dec 2022
Contract AmountINR 30.8 Million (USD 370.8 K)

Integral Coach Factory - ICF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
India
33769734: SUPPLY OF META / PARA ARAMIDE BELLOWS CONFORMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/AC-0197-2020(REV-0) FOR LHB EOG AC COACHES AND SCOPE OF SUPPLY PER RMPU CONSISTING OF 1 NO. OF SUPPLY AIR BELLOW 
Contract Date2 Dec 2022
Contract AmountINR 31.9 Million (USD 385.1 K)

Integral Coach Factory - ICF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
India
33769734: SUPPLY OF META / PARA ARAMIDE BELLOWS CONFORMING TO RDSO SPECIFICATION NO. RDSO/PE/SPEC/AC-0197-2020(REV-0) FOR LHB EOG AC COACHES AND SCOPE OF SUPPLY PER RMPU CONSISTING OF 1 NO. OF SUPPLY AIR BELLOW 
Contract Date2 Dec 2022
Contract AmountINR 47.9 Million (USD 577.1 K)

Integral Coach Factory - ICF Tender Result

Furnitures and Fixtures
Ireps
Result Stage: Awarded  (AOC Available)
India
31617130: SUPPLY & INSTALLATION OF 3-SEATER COMPLETE STAINLESS STEEL (SINGLE) FOR EMU/3PH COACHES TO DRG. No. 14061021, ALT - c.ALL NECESSARY HARDWARES REQUIRED FOR INSTALLATION AS PER RELEVANT ASSEMBLY DRAWING 
Contract Date2 Dec 2022
Contract AmountINR 102 Million (USD 1.2 Million)

Integral Coach Factory - ICF Tender Result

Electrical Generators And Transformers...+2Electrical Goods and Equipments, Electrical and Electronics
Ireps
Result Stage: Awarded  (AOC Available)
India
47160196: 60 KVA TRANSFORMER 750/415V, 3 PHASE,TO RDSO SPEC.NO.RDSO/PE/SPEC/AC/ 0080-2007 (REV.2) WITH RDSO LETTER No.EL/7.1.108/Trans dt.17/02/2020. NOTE: 1. RCF Drawings CC71216 & CC71217 attached. 2. PACKING 
Contract Date2 Dec 2022
Contract AmountINR 103.9 Million (USD 1.2 Million)

Integral Coach Factory - ICF Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
India
31617130: SUPPLY & INSTALLATION OF 3-SEATER COMPLETE STAINLESS STEEL (SINGLE) FOR EMU/3PH COACHES TO DRG. No. 14061021, ALT - c.ALL NECESSARY HARDWARES REQUIRED FOR INSTALLATION AS PER RELEVANT ASSEMBLY DRAWING 
Contract Date2 Dec 2022
Contract AmountINR 152.9 Million (USD 1.8 Million)
9891-9900 of 10000 active Tender Results