Hvac Tender Results
Serbia And Montenegro Air Traffic Services Smatsa Llc Tender Result
Serbia
Contract Date1 Mar 2023
Contract AmountRSD 2.4 Million (USD 21.6 K)
Construction of the building and supply infrastructure for the needs of Terminal Area Radar (TAR) Belgrade includes the construction of antenna tower, shelter for radar equipment installation, EE and UPS equipment facility, facility for diesel-electric generator, fire water tank, substation, power supply and telecommunication infrastructure. The facilities provided for the installation of the EE, UPS, DEG and radar equipment are container-type facility. The position of TAR Belgrade is located near the runway of Belgrade Airport and outside its perimeter. The works will be performed in accordance with the technical documentation for the construction works, hydraulic and HVAC installations, structural and external cable network, fire detection, video security system, diesel electric generator installation, fire extinguishing installations. Steel construction of tower and radar shelter with complete radar equipment are the subject of a contract for the procurement of radar system.
Hyderabad University Tender Result
Electrical Goods and Equipments...+1Electrical and Electronics
GEM
India
Contract Date29 Nov 2024 This is an estimated contract date, exact date may vary.
Contract AmountINR 1.8 Million (USD 21.3 K)
CATEGORY: Air Handling Units , Chillers sixty TR , Hot-water generators ,
Chilled water pumps , Hot water pumps , Pan Humidifiers ,
Rotary Dehumidifiers and packed air condition , Process
Chilled water with Plate Heat exchanger pumps tank , RO
plant , Scrubber with blower and acid tank , BMS system
with computer and user interface , Fire alarm system with
smoke and heat detectors , PA system , CCTV system ,
Interiors with 10000 sft of different ISOs , Air Showers ,
Garment closet with HEPA , Access Control , Earth pits , Wet
stations , CDA and Nitrogen Generator with two
compressors , Gas manifold with UHP piping , Electricals
with two panels for all HVAC Fire alarm system PA and CCTV
, Packed Air Conditioners , All gas liner water piper and CDA
Central Public Works Department - CPWD Tender Result
Building Construction...+1Civil And Construction
India
Contract Date15 Mar 2024
Contract AmountINR 49.4 Million (USD 579.7 K)
Construction Of Combinational Device Block At Bmt Wing, Sctimst At Poojappura, Trivandrum, Kerala. Sh:1) Setting Up Of Bio Safety Containment Facilities Of Bio Safety Level-2 (bsl-2) & Bio Safety Level-1 (bsl-1), Class 10000, Class 100000 Labs At Ground Floor & Iso-8 Laboratory At Second Floor Including Civil Works And E&m Works Of Internal Electrical Installations, Cctv, Access Control System, Lan, Hvac , Firefighting System, Fire Alarm System, Bms System, Purified Water Supply System Etc. Sh:2) Providing Fan Coil Unit/ahu, Chilled Water Piping And Puf Insulated Doors In Pre-clinical Evaluation Facility At First Floor Of Cd Block (wing 1) Including Comprehensive Amc And Running, Maintenance & Operation.
Cvba Providentia Tender Result
Belgium
Contract Date2 Dec 2021
Contract AmountEUR 593.2 K (USD 631.3 K)
Deze raamovereenkomst voorziet in het onderhoud en de interventies van alle HVAC en sanitaire installaties aanwezig in het huurpatrimonium van Providentia. Het huurpatrimonium omvat 3317 panden, waaronder zowel appartementen als eengezinswoningen, verspreid over 21 gemeenten in de regio Vlaams-Brabant. De opdracht is opgesplitst in 2 percelen. Per perceel zal 1 contractant aangeduid worden (zie verder). De inschrijver mag slechts voor één perceel een offerte indienen. Gedurende het contract kunnen extra panden aan het contract toegevoegd worden of uit het contract gehaald worden (in voorkomend geval zonder enig recht op schadevergoeding in hoofde van de opdrachtnemer). Bijkomende panden kunnen zich bevinden in andere gemeenten dan vooropgesteld in dit bestek.
l Kommune Tender Result
Norway
Contract Date15 Aug 2022
Contract AmountRefer Documents
The objective and scope of the agreement: The contest is for the provision of services for project and construction management, consulting engineering services, and ARK, framework agreement. The contest is split into 9 groups: Electrical Engineering (RIE). Consultant engineer for water, sewage and surface water (RIVA). Consultant engineer for heating, ventilation and sanitation engineering, HVAC (RIV). Construction management/project management. Construction, (RIB). ARK / LARK / Area planner. Consultant engineer fire (RIBR). Geotechnics RiG (specialist avalanche/landslide) Environment (RIM). The contract value is estimated to be above the EEA threshold. The need is uncertain. The contracting authority has previously procured for NOK 18 million excluding VAT a year in recent years. The value can be both higher and lower, and will depend on, among other things, the contracting authority's needs, activities, budgetary situation and other framework factors.
Border Roads Organisation - BRO Tender Result
Automobiles and Auto Parts
GEM
India
Contract Date25 Dec 2024 This is an estimated contract date, exact date may vary.
Contract AmountINR 75.1 K (USD 864.7841)
CATEGORY: 0306GBH00171N Drive Belt AC , 0306GBH00041N Belt
alternator , 0313ABH00131N Filter air cleaner ,
0801CAA01501N Clutch cover and Disc assy ,
0603AAA00640N Disc Brake Frt , 0603AAA00650N Disc
Brake Rear , 0603BAB0062KT Kit Pad Frt Caliper ,
0603BAB0067KT Kit Pad Rear Caliper , 0501CAA00241N
Universal joint assy , 0501CAA00251N Universal kit assy ,
0607AAA01581N Booster brake assy , 0401BBB03291N
Bush silent block assy LCA FRT , S1203D001301N HVAC
Filter Particle
United Nations International Childrens Emergency Fund - UNICEF Tender Result
Afghanistan
Contract Date23 Dec 2024
Contract AmountUSD 162.5 K
1. BACKGROUND / RATIONALE UNICEF office in Delhi is currently undergoing an energy efficient retrofit of the existing HVAC system in the building, with a goal to significantly boost the energy efficiency and environmental performance. This modernization effort is geared towards meeting stringent energy conservation targets and supporting the office's journey towards carbon neutrality. This retrofit encompasses conducting civil and electrical works related to implementation of the chiller plant, with minimal impact on daily operations. To complete the retrofit within the fixed timelines, UNICEF India has developed specifications for civil and electrical works for this project. The TOR aims to identify a suitable service provider for supply, civil and electrical works, testing, and commissioning of civil and electrical works related to the Chiller Plantroom to the installation site in the building. 2. PURPOSE OF ASSIGNMENT The main purpose of the assignment is to conduct civil and electrical works related to implementation of energy efficient chiller plantroom in the UNICEF India office building in New Delhi. 3. OBJECTIVE/S The primary objective is to conduct civil and electrical works for the chiller plantroom implementation, ensuring it meets operational requirements and industry standards. The other goals under this assignment include: • Dismantling: Safely relocate and dismantle civil and electrical components in the existing HVAC equipment (as per BOQ), ensuring the proper relocation of components to the ground floor and the removal of electrical panels. • Civil Works: Execute comprehensive civil tasks, including setting up temporary partitions, demolishing existing structures, constructing new walls and lintels, installing waterproofing layers, laying new floor tiles, and installing fire-resistant doors, followed by finishing touches like painting and anti-termite treatment. . Electrical Works: Install new power cables and grounding strips, integrate new equipment with electrical panels, and set up and connect cable trays and terminations to ensure a fully operational electrical system. 4. MAJOR TASKS TO BE ACCOMPLISHED • Supply: o Electrical Substation: 11kV-1000 KVA Compact Substation, including HT VCB Breaker (630A VCB), Distribution Transformer, and LT Distribution (2000A ACB). o LT Panel: LT Panel with 2000A FP ACB (EDO) with MPR, 800A FP ACB, 2000A TPN AL.BUS BAR, and various outgoing feeders (630A FP MCCB, 400A FP MCCB, 250A FP MCCB, 200A FP MCCB, 125A FP MCCB, 100A FP MCCB, 63A FP MCCB, 630A FP ATS). o HVAC Panel: HVAC Panel with 630A, 4P MCCB (50 KA), digital voltmeter, 2Amps MCBs, 0-630 Amps digital Ammeter, 40/5A, 10VA, CL-1 CTs, selector switch, phase indicating lamps, 630A TPN AL.BUS BAR, and various outgoing feeders (250A FP MCCB, 125A FP MCCB, 63A FP MPCB, 32A FP MPCB, 63A FP MCB). o Hot dip galvanized cable tray: 14G gauge, wire mesh or perforated type, in specified dimensions, complete with ceiling suspenders, tee sections, flat sections, nuts and bolts, and earthing components. o XLPE ARM CU/AL Cables (11KV E, & L.T. CABLE): Supply of 11KV E & L.T. cables with XLPE insulation, PVC outer sheath, and armored construction. o Cable termination kit: Includes double compression glands, AL/CU crimping type sockets, and a hydraulic crimping tool. o Earthing grid kit: Includes copper/G.I. strips, spacers, brass bolts and nuts, washers, G.I. pipe (if required), welding materials, black bitumen paint, and cotton tape. • Installation: o Compact Substation Installation: This includes the setup of an 11kV-1000 KVA Compact Substation, incorporating an HT VCB Breaker (630A VCB), a Distribution Transformer, and an LT Distribution panel (2000A ACB). Proper alignment and secure mounting will be ensured as per project specifications. o HVAC and LT Panel Installation: Installation of an HVAC panel and an LT panel will be carried out according to specified dimensions and features, ensuring all electrical connections are secure and compliant with safety standards. o Cable Tray and Support Installation: Hot dip galvanized cable trays (14G, wire mesh or perforated) will be installed for effective cable management. This will be complemented by the installation of ceiling suspenders, tee sections, and flat sections, along with necessary nuts and bolts to provide structural support. o Earthing Components Installation: The installation will also include all required earthing components, ensuring proper grounding to enhance safety and protect the system from electrical faults. o Complete installation of the new HVAC Plantroom system, including necessary infrastructure modifications. • Testing and Commissioning: o The testing and commissioning phase will encompass several key components, including the 11kV-1000 KVA Compact Substation, which features an HT VCB Breaker (630A VCB), a Distribution Transformer, and an LT Distribution panel (2000A ACB), each will be verified for proper alignment and secure operation as per project specifications. o Additionally, the HVAC panel and LT panel will undergo testing to ensure all electrical connections are secure and compliant with safety standards. Hot dip galvanized cable trays (14G, wire mesh or perforated) will be assessed for effective cable management, alongside the installation of ceiling suspenders, tee sections, and flat sections, with all necessary nuts and bolts for structural integrity. o Furthermore, the testing and commissioning of earthing components will ensure proper grounding to enhance safety and protect the system from electrical faults. Post the award of the contract, the following tasks shall be accomplished for civil works as described in the RFP: • Supply: o The civil works items to be supplied include temporary partitions made of particle board with aluminium channels for support, brick walls, reinforced concrete lintels, waterproofing systems, vitrified floor tiles, gypsum partitions and ceilings. During the execution of the mentioned tasks, the contractor should ensure minimum shut-down time & arrangement of standby equipment for smooth operation of the building. 5. DELIVERABLES AND DEADLINES - Workplan report 1st week - Delivery Challan and Storage Receipt 4th week - Commissioning report 6th week - Workplan and final installation report with handover documents Up to 14th week 6. DUTY STATION: New Delhi, India 7. CONTRACT /PROJECT MANAGEMENT: Deepak Gera, Admin Specialist, A&F Section Rajat Shuvra Roy, Admin Officer, A&F Section 8. OFFICIAL TRAVEL INVOLVED (ITINERARY AND DURATION): Not Applicable 9. ESTIMATED DURATION OF CONTRACT: 14 weeks for the execution works 10. OVERALL VALUE OF CONTRACT: - Dismantling Cost = INR 1,336,545.00 - Civil Works =INR 5,187,870.00 - Electrical Works = INR 7,199,645.00 Total Price = INR 13,724,060.00 / USD 162,511.07 11.PAYMENT SCHEDULE: -Dismantling & Submission of Good for Construction drawings and execution schedule 20% =INR 2,744,812.00 - Delivery of equipment/ material 30% =INR 4,117,218.00 - Completion of all site execution works 30% = INR 4,117,218.00 - Submission of the Testing, Commissioning and Performance Verification Report, post execution drawings and handover documents 20% = INR 2,744,812.00
National Athens of Iasi - Romania Tender Result
Romania
Contract Date28 Dec 2022
Contract AmountRON 2.6 Million (USD 564.2 K)
HVAC (climatizare) la Cinematograful Victoria - Sala Unirii” Cod principal CPV: 39717000-1 Ventilatoare şi aparate de aer condiţionat (Rev.2); ii. Service în perioada de garanţie, Cod secundar CPV 45331000-6 Lucrări de instalare de echipamente de încălzire, de ventilare şi de aer condiţionat avand inclusa si operatiunea de instalare, punere in functiune si efectuare a unui training de 3 zile Conform art. 3 alin. 14 lit. n din Legea nr. 98/2016.umărul de zile până la care se pot solicita clarificări înainte de data limită de depunere a ofertelor: 12 zile. Autoritatea contractantă va răspunde solicitărilor de clarificări înainte cu pana la 6 zile de data limită de depunere a ofertelor.
Central Public Works Department - CPWD Tender Result
Building Construction...+5Civil And Architectural Services, Civil And Construction, Consultancy Services, Electrical Works, Electrical and Electronics
India
Contract Date18 Mar 2024
Contract AmountINR 1.3 Billion (USD 15.7 Million)
Infrastructure Development For Smart Township Of Hal Helicopter Factory At Biderahalla Kaval, Gubbi(t) Tumakuru(d) Phase-1: Sh Planning, Designing And Construction Of Various Rcc Buildings For Staff Qtr (b&c) With Basement Parking, Senior Officers Qtr, Transit Accommodations For Officers And Workmen And Guest House With Stilt Parking, Club House, Primary School, Health Center, Market Complex, Township Maintenance Office, Electrical Substation, Gate Complex, Oat, Supply Of Furniture, Indoor Gym Equipment Etc. I/c Internal Water Supply, Drainage, Sanitary Installation, 100kld Stp, Rwh, And All E&m Service Like Iei, Fa, Ff, Lifts, Dg, Ups, Cctv,hvac,lan,ip And Their Integration, Making The Entire Smart Township Fit For Occupation All Complete On Epc Basis Including Development Of Building Information Models.
NHPC Limited Tender Result
Electrical Works...+2Electrical and Electronics, Solar Installation and Products
GEM
India
Contract Date30 May 2025
Contract AmountINR 91.9 Million (USD 1 Million)
CATEGORY: Operation and Maintenance Of Electrical Systems/Electrical
Installations - Providing Operation Maintenance of Electrical
SystemSubStationBMS Solar System DG Sets HVAC system
and Elevators at Neer Shakti Sadan Office Complex
Sector33 NHPC Limited Se.. , Operation and Maintenance Of
Electrical Systems/Electrical Installations - Providing
Operation Maintenance of Electrical and Mechanical
Installations and operation of DG Sets Chillers Elevators at
Jyoti Sadan of NHPC Limited Corporate Office Secto.. ,
Operation and Maintenance Of Electrical Systems/Electrical
Installations - Providing Operation Maintenance of Electrical
Mechanical Installations at NHPC Residential Complex Sector
41 Faridabad for Two years as per SOW SCC in ATC of Bid ,
Operation and Maintenance Of Electrical Systems/Electrical
Installations - Providing PPE TOOLS CONSUMABLE TP for
Operation Maintenance of Electrical Mechanical Installations
at NHPC Limited Office ComplexSector33 and Residential
Complex Sector41 Fa..
9051-9060 of 9129 active Tender Results