Hvac Tender Results

l Kommune Tender Result

Result Stage: Awarded  (AOC Available)
Norway
The objective and scope of the agreement: The contest is for the provision of services for project and construction management, consulting engineering services, and ARK, framework agreement. The contest is split into 9 groups: Electrical Engineering (RIE). Consultant engineer for water, sewage and surface water (RIVA). Consultant engineer for heating, ventilation and sanitation engineering, HVAC (RIV). Construction management/project management. Construction, (RIB). ARK / LARK / Area planner. Consultant engineer fire (RIBR). Geotechnics RiG (specialist avalanche/landslide) Environment (RIM). The contract value is estimated to be above the EEA threshold. The need is uncertain. The contracting authority has previously procured for NOK 18 million excluding VAT a year in recent years. The value can be both higher and lower, and will depend on, among other things, the contracting authority's needs, activities, budgetary situation and other framework factors.
Contract Date15 Aug 2022
Contract AmountRefer Documents 

Border Roads Organisation - BRO Tender Result

Goods
Automobiles and Auto Parts
GEM
Result Stage: Awarded  (AOC Available)
India
CATEGORY: 0306GBH00171N Drive Belt AC , 0306GBH00041N Belt alternator , 0313ABH00131N Filter air cleaner , 0801CAA01501N Clutch cover and Disc assy , 0603AAA00640N Disc Brake Frt , 0603AAA00650N Disc Brake Rear , 0603BAB0062KT Kit Pad Frt Caliper , 0603BAB0067KT Kit Pad Rear Caliper , 0501CAA00241N Universal joint assy , 0501CAA00251N Universal kit assy , 0607AAA01581N Booster brake assy , 0401BBB03291N Bush silent block assy LCA FRT , S1203D001301N HVAC Filter Particle
Contract Date25 Dec 2024
This is an estimated contract date, exact date may vary.
Contract AmountINR 75.1 K (USD 864.7841)

Serbia And Montenegro Air Traffic Services Smatsa Llc Tender Result

Result Stage: Awarded  (AOC Available)
Serbia
Construction of the building and supply infrastructure for the needs of Terminal Area Radar (TAR) Belgrade includes the construction of antenna tower, shelter for radar equipment installation, EE and UPS equipment facility, facility for diesel-electric generator, fire water tank, substation, power supply and telecommunication infrastructure. The facilities provided for the installation of the EE, UPS, DEG and radar equipment are container-type facility. The position of TAR Belgrade is located near the runway of Belgrade Airport and outside its perimeter. The works will be performed in accordance with the technical documentation for the construction works, hydraulic and HVAC installations, structural and external cable network, fire detection, video security system, diesel electric generator installation, fire extinguishing installations. Steel construction of tower and radar shelter with complete radar equipment are the subject of a contract for the procurement of radar system.
Contract Date1 Mar 2023
Contract AmountRSD 2.4 Million (USD 21.6 K)

Cvba Providentia Tender Result

Result Stage: Awarded  (AOC Available)
Belgium
Deze raamovereenkomst voorziet in het onderhoud en de interventies van alle HVAC en sanitaire installaties aanwezig in het huurpatrimonium van Providentia. Het huurpatrimonium omvat 3317 panden, waaronder zowel appartementen als eengezinswoningen, verspreid over 21 gemeenten in de regio Vlaams-Brabant. De opdracht is opgesplitst in 2 percelen. Per perceel zal 1 contractant aangeduid worden (zie verder). De inschrijver mag slechts voor één perceel een offerte indienen. Gedurende het contract kunnen extra panden aan het contract toegevoegd worden of uit het contract gehaald worden (in voorkomend geval zonder enig recht op schadevergoeding in hoofde van de opdrachtnemer). Bijkomende panden kunnen zich bevinden in andere gemeenten dan vooropgesteld in dit bestek.
Contract Date2 Dec 2021
Contract AmountEUR 593.2 K (USD 631.3 K)

United Nations International Childrens Emergency Fund - UNICEF Tender Result

Result Stage: Awarded  (AOC Available)
Afghanistan
1. BACKGROUND / RATIONALE UNICEF office in Delhi is currently undergoing an energy efficient retrofit of the existing HVAC system in the building, with a goal to significantly boost the energy efficiency and environmental performance. This modernization effort is geared towards meeting stringent energy conservation targets and supporting the office's journey towards carbon neutrality. This retrofit encompasses conducting civil and electrical works related to implementation of the chiller plant, with minimal impact on daily operations. To complete the retrofit within the fixed timelines, UNICEF India has developed specifications for civil and electrical works for this project. The TOR aims to identify a suitable service provider for supply, civil and electrical works, testing, and commissioning of civil and electrical works related to the Chiller Plantroom to the installation site in the building. 2. PURPOSE OF ASSIGNMENT The main purpose of the assignment is to conduct civil and electrical works related to implementation of energy efficient chiller plantroom in the UNICEF India office building in New Delhi. 3. OBJECTIVE/S The primary objective is to conduct civil and electrical works for the chiller plantroom implementation, ensuring it meets operational requirements and industry standards. The other goals under this assignment include: • Dismantling: Safely relocate and dismantle civil and electrical components in the existing HVAC equipment (as per BOQ), ensuring the proper relocation of components to the ground floor and the removal of electrical panels. • Civil Works: Execute comprehensive civil tasks, including setting up temporary partitions, demolishing existing structures, constructing new walls and lintels, installing waterproofing layers, laying new floor tiles, and installing fire-resistant doors, followed by finishing touches like painting and anti-termite treatment. . Electrical Works: Install new power cables and grounding strips, integrate new equipment with electrical panels, and set up and connect cable trays and terminations to ensure a fully operational electrical system. 4. MAJOR TASKS TO BE ACCOMPLISHED • Supply: o Electrical Substation: 11kV-1000 KVA Compact Substation, including HT VCB Breaker (630A VCB), Distribution Transformer, and LT Distribution (2000A ACB). o LT Panel: LT Panel with 2000A FP ACB (EDO) with MPR, 800A FP ACB, 2000A TPN AL.BUS BAR, and various outgoing feeders (630A FP MCCB, 400A FP MCCB, 250A FP MCCB, 200A FP MCCB, 125A FP MCCB, 100A FP MCCB, 63A FP MCCB, 630A FP ATS). o HVAC Panel: HVAC Panel with 630A, 4P MCCB (50 KA), digital voltmeter, 2Amps MCBs, 0-630 Amps digital Ammeter, 40/5A, 10VA, CL-1 CTs, selector switch, phase indicating lamps, 630A TPN AL.BUS BAR, and various outgoing feeders (250A FP MCCB, 125A FP MCCB, 63A FP MPCB, 32A FP MPCB, 63A FP MCB). o Hot dip galvanized cable tray: 14G gauge, wire mesh or perforated type, in specified dimensions, complete with ceiling suspenders, tee sections, flat sections, nuts and bolts, and earthing components. o XLPE ARM CU/AL Cables (11KV E, & L.T. CABLE): Supply of 11KV E & L.T. cables with XLPE insulation, PVC outer sheath, and armored construction. o Cable termination kit: Includes double compression glands, AL/CU crimping type sockets, and a hydraulic crimping tool. o Earthing grid kit: Includes copper/G.I. strips, spacers, brass bolts and nuts, washers, G.I. pipe (if required), welding materials, black bitumen paint, and cotton tape. • Installation: o Compact Substation Installation: This includes the setup of an 11kV-1000 KVA Compact Substation, incorporating an HT VCB Breaker (630A VCB), a Distribution Transformer, and an LT Distribution panel (2000A ACB). Proper alignment and secure mounting will be ensured as per project specifications. o HVAC and LT Panel Installation: Installation of an HVAC panel and an LT panel will be carried out according to specified dimensions and features, ensuring all electrical connections are secure and compliant with safety standards. o Cable Tray and Support Installation: Hot dip galvanized cable trays (14G, wire mesh or perforated) will be installed for effective cable management. This will be complemented by the installation of ceiling suspenders, tee sections, and flat sections, along with necessary nuts and bolts to provide structural support. o Earthing Components Installation: The installation will also include all required earthing components, ensuring proper grounding to enhance safety and protect the system from electrical faults. o Complete installation of the new HVAC Plantroom system, including necessary infrastructure modifications. • Testing and Commissioning: o The testing and commissioning phase will encompass several key components, including the 11kV-1000 KVA Compact Substation, which features an HT VCB Breaker (630A VCB), a Distribution Transformer, and an LT Distribution panel (2000A ACB), each will be verified for proper alignment and secure operation as per project specifications. o Additionally, the HVAC panel and LT panel will undergo testing to ensure all electrical connections are secure and compliant with safety standards. Hot dip galvanized cable trays (14G, wire mesh or perforated) will be assessed for effective cable management, alongside the installation of ceiling suspenders, tee sections, and flat sections, with all necessary nuts and bolts for structural integrity. o Furthermore, the testing and commissioning of earthing components will ensure proper grounding to enhance safety and protect the system from electrical faults. Post the award of the contract, the following tasks shall be accomplished for civil works as described in the RFP: • Supply: o The civil works items to be supplied include temporary partitions made of particle board with aluminium channels for support, brick walls, reinforced concrete lintels, waterproofing systems, vitrified floor tiles, gypsum partitions and ceilings. During the execution of the mentioned tasks, the contractor should ensure minimum shut-down time & arrangement of standby equipment for smooth operation of the building. 5. DELIVERABLES AND DEADLINES - Workplan report 1st week - Delivery Challan and Storage Receipt 4th week - Commissioning report 6th week - Workplan and final installation report with handover documents Up to 14th week 6. DUTY STATION: New Delhi, India 7. CONTRACT /PROJECT MANAGEMENT: Deepak Gera, Admin Specialist, A&F Section Rajat Shuvra Roy, Admin Officer, A&F Section 8. OFFICIAL TRAVEL INVOLVED (ITINERARY AND DURATION): Not Applicable 9. ESTIMATED DURATION OF CONTRACT: 14 weeks for the execution works 10. OVERALL VALUE OF CONTRACT: - Dismantling Cost = INR 1,336,545.00 - Civil Works =INR 5,187,870.00 - Electrical Works = INR 7,199,645.00 Total Price = INR 13,724,060.00 / USD 162,511.07 11.PAYMENT SCHEDULE: -Dismantling & Submission of Good for Construction drawings and execution schedule 20% =INR 2,744,812.00 - Delivery of equipment/ material 30% =INR 4,117,218.00 - Completion of all site execution works 30% = INR 4,117,218.00 - Submission of the Testing, Commissioning and Performance Verification Report, post execution drawings and handover documents 20% = INR 2,744,812.00
Contract Date23 Dec 2024
Contract AmountUSD 162.5 K 

VETERANS AFFAIRS, DEPARTMENT OF USA Tender Result

Result Stage: Awarded  (AOC Available)
United States
This Amendment Is To Inform All Interested Parties That This Requirement Is Being Canceled. A New Requirement Will Be Posted At A Later Date And Time. All Interested Parties Must Reply To The New Requirement Once Posted. The Department Of Veterans Affairs, Network Contracting Office (nco) 2 Intends To Release A Commercial Sdvosb Set Aside For Water Treatment Of Hvac And Potable Water Systems At The James J. Peters Va Medical Center, Bronx Campus. The Request For Quote (rfq)/solicitation Number Is 36c24221q0291. All Other Contract Details Including Full Specification Will Be Included In The Rfq Which Will Be Release On Or Before December 16, 2020. The Closing Date For The Solicitation Will Be January 29, 2021 At 10:00am Est. The North American Industry Classification Systems (naics) Is 561210 (facilities Support Services) And The Standard Size Is $41.5 Million.
Contract Date26 May 2022
Contract AmountUSD 1.7 Million 

Indian Army Tender Result

Goods
Automobiles and Auto Parts...+1Machinery and Tools
GEM
Result Stage: Awarded  (AOC Available)
India
CATEGORY: COVER ASSY , GEAR LEVER KIT , POLY V BELT , RUBBER HOSE PRIMING PUMP TO FILTER , ASSY SUCTION LINE , ASSY HVAC CONTROL , BRAKE SHOE WITH LINING STD , SEAL OIL FOR CRANK SHAFT FRT , OIL FILTER , GAUGE ASSY FUEL LEVEL , BRAKE SHOE , BRAKE PAD SET , RETAINER KICK STARTER SPRING , STAND COMP MAIN , SPARK PLUG M 10 BOSCH , SPARK PLUG M14W5DC , OIL SEAL KICK STARTER G20X27X5 DOUUBLE , CARBURETOR BS 29 , REAR HUB SPROCKET 38 TEETH , SPROCKET DRIVE 16T , MAIN CABLE HARNESS , FUEL TAP , BALL BEARING , GRIP COMPLETE THROTTLE RH , PISTON RING SET , MASTER CYL POWER UNIT , ASSY POWER TAKE OFF
Contract Date31 Jul 2024
This is an estimated contract date, exact date may vary.
Contract AmountINR 102.7 K (USD 1.2 K)

Indian Army Tender Result

Goods
Electrical Goods and Equipments...+2Electrical and Electronics, Machinery and Tools
GEM
Result Stage: Awarded  (AOC Available)
India
CATEGORY: Welding Magnet Set , Drill machine heavy duty 900 watt , Stanley STG9125 900W 125mm small angle grinder yellow and black , Stanley STDH8013 800W 13mm reversible percussion drill yellow and black , Grinding wheel 5 inch BOSCH , Oil Filter Clamp , Digital Hydrometer , HVAC Leak Detector , AC refilling system with accessories , Clamp meter Freq Hz , Cutting piler set DC Neers , Electric engraving machine 230V , Tool Bag Stanley , Screw Driver set stanley , Nose piler set 6 inch Stanley set of 3 , Stanley LN Key Set Set of 12 , Stanley Nose piler 7 inch Set of 3 , Trolley Caplliper , Heavy Duty hand pallet Truck 5 Ton , Winter Tool Kit EE Mech
Contract DateNA
Contract AmountINR 140.3 K (USD 1.6 K)

National Athens of Iasi - Romania Tender Result

Result Stage: Awarded  (AOC Available)
Romania
HVAC (climatizare) la Cinematograful Victoria - Sala Unirii” Cod principal CPV: 39717000-1 Ventilatoare şi aparate de aer condiţionat (Rev.2); ii. Service în perioada de garanţie, Cod secundar CPV 45331000-6 Lucrări de instalare de echipamente de încălzire, de ventilare şi de aer condiţionat avand inclusa si operatiunea de instalare, punere in functiune si efectuare a unui training de 3 zile Conform art. 3 alin. 14 lit. n din Legea nr. 98/2016.umărul de zile până la care se pot solicita clarificări înainte de data limită de depunere a ofertelor: 12 zile. Autoritatea contractantă va răspunde solicitărilor de clarificări înainte cu pana la 6 zile de data limită de depunere a ofertelor.
Contract Date28 Dec 2022
Contract AmountRON 2.6 Million (USD 564.2 K)

Central Public Works Department - CPWD Tender Result

Works
Building Construction...+5Civil And Architectural Services, Civil And Construction, Consultancy Services, Electrical Works, Electrical and Electronics
Result Stage: Awarded  (AOC Available)
India
Infrastructure Development For Smart Township Of Hal Helicopter Factory At Biderahalla Kaval, Gubbi(t) Tumakuru(d) Phase-1: Sh Planning, Designing And Construction Of Various Rcc Buildings For Staff Qtr (b&c) With Basement Parking, Senior Officers Qtr, Transit Accommodations For Officers And Workmen And Guest House With Stilt Parking, Club House, Primary School, Health Center, Market Complex, Township Maintenance Office, Electrical Substation, Gate Complex, Oat, Supply Of Furniture, Indoor Gym Equipment Etc. I/c Internal Water Supply, Drainage, Sanitary Installation, 100kld Stp, Rwh, And All E&m Service Like Iei, Fa, Ff, Lifts, Dg, Ups, Cctv,hvac,lan,ip And Their Integration, Making The Entire Smart Township Fit For Occupation All Complete On Epc Basis Including Development Of Building Information Models.
Contract Date18 Mar 2024
Contract AmountINR 1.3 Billion (USD 15.7 Million)
9051-9060 of 9127 active Tender Results