Ht Cable Tender Results
DEPT OF THE NAVY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Description: Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht
Contract Date17 Mar 2025
Contract AmountUSD 1.1 Million
DEPT OF THE NAVY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Contact Information|4|n743.30|wvk|717-605-2379|scott.r.youngblood2.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
general Information-fob-destination|1|b|
repair Delivery (firm Fixed Price)|1|10 Months|
wide Area Workflow Payment Instructions (jan 2023)|16|stand-alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|n/a|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|tbd|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11||||||||||||
alternate A, Annual Representations And Certifications (oct 2024)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|333988|500||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2|||
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.2 ;ecg Refurbish Kit, Nsn 1h 3655-01-633-0242 Will Be Supplied To Hamilton Sundstrand Corp.;
1.3 ;ecg Refurbish Kit, Nsn 1h 3655-01-633-0242 Will Be Supplied To Hamilton Sundstrand Corp.;
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Identification Of Classified Documents - This Contract/purchase Order Requires The Contractor To Have Authorized Access To Classified Documents In Accordance With The Attached Contract Security Classification Specification (dd Form 254).
The Classified Documents And Security Level Are: ;eb-3204 - Confidential;
2.3 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
2.3.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;sv799150 73030 V B
sv799119 73030 N B
sv799133 73030 P B
sv799124 73030 H B
sv799128 73030 E B
sv799129 73030 K B
sv799130 73030 H B
sv799125 73030 J B
sv799127 73030 K B
svs799124 73030 F B
svs799125 73030 F B
svs799127 73030 F B
svs799128 73030 G B
svs799129 73030 G B
svs799130 73030 H B
svhs13255 73030 C B;
2.3.4 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
drawing Data=eb-3204 |96169| -|sp |d|0001 | -|00026|0000000
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=astm-b348 | | | |211101|a| | |
document Ref Data=astm-b381 | | | |130701|a| | |
document Ref Data=astm-b446 | | | |190401|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=sae Ams 2380 | | |f |080401|a| | |
document Ref Data=sae Ams 2643 | | |c |020101|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |081118|a| | |
document Ref Data=sae Ams-std-2154 | | |d |200401|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markingsto Each Unit Throughout
refurbishment.
3.1.2 Re-useable Parts - Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), May Be Utilized As Initially Supplied.
3.1.3 Non-useable Parts - Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be In Accordance With This Tdp (technical Data Package).
3.1.4 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;hamilton Standard Drawing Sv799150; , Except As Amplified Or Modified Herein. This Applies To All "parts Requiring Certification" As Identified
elsewhere In This Contract/purchase Order.
3.1.5 Additional Sow Requirements -
;n/a;
3.2 ;the Primer Called Out In Hamilton Standard Drawing Sv799125 Drawing Note 4 Must Be Loctite Primer N Or Equal. Primers Containing Methanol May Not Be Used.;
3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;receptacle Bodies For Part Numbers Sv799119-1 And Sv799119-2;
material - ;astm B446, Alloy Uns N06625, Grade 1 And Meeting The Requirements Of Note 9 Of Drawing Sv799119;
part - ;locknuts And Spacers For Part Numbers Sv799119-1 And Sv799119-2;
material - ;astm B150, Uns C63200;
part - ;receptacle Body For Part Number Sv799133-1;
material - ;astm B446, Alloy Uns N06625, Grade 1 And Meeting The Requirements Of Note 9 Of Drawing Sv799133;
part - ;locknut And Spacer For Part Number Sv799133-1;
material - ;astm B150, Uns C63200;
part - ;anode, Find 2 On Drawing Sv799129;
material - ;astm-b348, Grade 2, Annealed And Meeting The Requirements Of Notes 3 And 5 Of Drawing Svs799129;
;chemical And Mechanical Certification Is Not Required For The Anode, Find 2 On Drawing Sv799129, When Supplied As Government Furnished Material.;
part - ;generator Cover, Find 7 On Drawing Sv799150;
material - ;astm-b348, Grade 2, Annealed And Meeting The Requirements Of Notes 3 And 5 Of Drawing Svs799128;
part - ;cathode, Find 2 On Drawing Sv799130;
material - ;astm-b348, Grade 2, Annealed And Meeting The Requirements Of Notes 3 And 5 Of Drawing Svs799130;
part - ;base, Find 2 On Drawing Sv799127;
material - ;astm-b381, Grade F2, Annealed And Meeting The Requirements Of Notes 4 And 6 Of Drawing Svs799127;
part - ;cover, Find 2 On Drawing Sv799124;
material - ;astm B381, Grade F2, Annealed And Meeting The Requirements Of Notes 4 And 6 Of Drawing Svs799124;
part - ;containment Vessel Body, Find 2 On Drawing Sv799125;
material - ;astm B381, Grade F2, Annealed And Meeting The Requirements Of Notes 3 And 5 Of Drawing Svs799125;
part - ;stud, Find 3 On Drawing Sv799127; Stud, Find 3 On Drawing Sv799125; Hex Head Bolts, Find 43 And Find 47 On Drawing Sv799150; And Hex Nuts, Find 42 And Find 45 On Drawing Sv799150;
material - ;astm-b446, Grade 1;
3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - ;hydrostatic Test;
item - ;receptacle And Cable-power, Finds 51 And 61 On Drawing Sv799150;
performance - ;notes 18 And 23 On Drawing Sv799119;
acceptance - ;notes 18 And 23 On Drawing Sv799119;
test - ;hydrostatic Test;
item - ;receptacle And Cable-liquid Sensor, Find 62 On Drawing Sv799150;
performance - ;notes 18 And 23 On Drawing Sv799133;
acceptance - ;notes 18 And 23 On Drawing Sv799133;
test - ;dielectric-strength Test;
item - ;receptacle And Cable-power, Find 51 And Find 61 On Drawing Sv799150;
performance - ;note 24 On Drawing Sv799119;
acceptance - ;note 24 On Drawing Sv799119;
test - ;dielectric-strength Test;
item - ;receptacle And Cable-liquid Sensor, Find 62 On Drawing Sv799150;
performance - ;note 24 On Drawing Sv799133;
acceptance - ;note 24 On Drawing Sv799133;
test - ;non-destructive Bonding Test;
item - ;receptacle And Cable-power, Find 51 And Find 61 And Receptacle And Cable-liquid Sensor, Find 62 On Drawing Sv799150;
performance - ;figure 1 Of Mil-dtl-24231;
acceptance - ;figure 1 Of Mil-dtl-24231;
test - ;100% Ultrasonic Inspection;
item - ;starting Material For Anode, Find 2 On Drawing Sv799129; Generator Cover, Find 7 On Drawing Sv799150; Cathode, Find 2 On Drawing Sv799130; Base, Find 2 On Drawing Sv799127; Cover, Find 2 On Drawing Sv799124; And Containment Vessel Body, Find 2
on Drawing Sv799125;
performance - ;t9074-as-gib-010/271, Except That Zone Testing, Front Half, With One Half Material Plus .500 Inch Standard Must Be Allowed;
acceptance - ;sae Ams-std-2154, Table 6, Class A;
;ultrasonic Inspection Is Not Required For The Anode, Find 2 On Drawing Sv799129, When Supplied As Government Furnished Material.;
test - ;macrostructure Inspection;
item - ;starting Material For Anode, Find 2 On Drawing Sv799129; Generator Cover, Find 7 On Drawing Sv799150; Cathode, Find 2 On Drawing Sv799130; Base, Find 2 On Drawing Sv799127; Cover, Find 2 On Drawing Sv799124; And Containment Vessel Body, Find 2
on Drawing Sv799125;
performance - ;sae-ams-2643;
acceptance - ;sae-ams-2380, And The Macro-grain Structure Must Be Equal To Or Better Than Level 30;
;macrostructure Inspection Is Not Required For The Anode, Find 2 On Drawing Sv799129, When Supplied As Government Furnished Material.;
test - ;liquid Penetrant Inspection;
item - ;stud, Find 3 On Drawing Sv799127; Stud; Find 3 On Drawing Sv799125; Hex Head Bolts, Find 43 And Find 47 On Drawing Sv799150; And Hex Nuts, Find 42 And Find 45 On Drawing Sv799150;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;100% Dye Penetrant Inspection;
item - ;receptacle Bodies For Part Numbers Sv799119-1, Sv799119-2, And Sv799133-1; Anode, Find 2 On Drawing Sv799129; Generator Cover, Find 7 On Drawing Sv799150; Cathode, Find 2 On Drawing Sv799130; Base, Find 2 On Drawing Sv799127; Cover, Find 2 On
drawing Sv7991 24; Containment Vessel Body, Find 2 On Drawing Sv799125;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;hydrostatic Test;
item - ;each Assembly;
performance - ;paragraph 4.1 And 4.4 Of Specification Svhs13255;
acceptance - ;paragraph 4.1 And 4.4 Of Specification Svhs13255;
test - ;leak Test;
item - ;each Assembly;
performance - ;paragraph 4.2 And 4.5 Of Specification Svhs13255;
acceptance - ;paragraph 4.2 And 4.5 Of Specification Svhs13255;
3.5 ;contactor Must Perform A Low Pressure Flow Test On Each Assembly To Verify That There Are No Flow Path Obstructions.;
3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.7 Confidential Hydrostatic Test Pressures - When Test Pressures Are Confidential, Certification Must Reference ;svhs13255 Rev C (eb-3204 Rev -); And The Item Number To Which The Item Was Tested In Lieu Of The Actual Pressures. Any Drawing Requirement To
mark The Working Pressure On The Item Does Not Apply And Is Strictly Prohibited.
3.8 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.9 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Thread Forming - The Following Provides The Official Interpretation Of Paragraph 4.5.2.7 Of Mil-dtl-1222.
3.11.1 In Order To Qualify For "alternate Mechanical Testing" Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Utilize The Mechanical Properties For The Starting Bar Stock In Lieu Of Performing Yield Strength Or Proof Stress Testing On Finished Fasteners, All Of
the Subsequent Provisions Found In Mil-dtl-1222j Paragraphs 4.5.2.7 A Through E Must Be Met. If Any Single Provision Is Not Met, All Required Mechanical Testing Must Be Performed On The Finished Full Sized Fasteners. These Provisions Are Explained As Follows:
a. Proper Product Lot Control And Traceability Must Be In Place.
b. No Heat Treatment (including Hot Heading And Hot Forming), Cold Forming, Drawing, Rolling And Thread Rolling May Be Performed On The Starting Bar, Fastener Blanks Or Finished Fasteners After The Completion Of The Mechanical Testing On The Starting Bar.
c. And D. The Proper Size Starting Bar Must Be Selected To Ensure Mechanical Properties Of Finished Fasteners Are Represented By The Mechanical Properties Of The Starting Bar.
e. The Mandatory Testing, Axial Tensile (studs) And Wedge Tensile (screws And Bolts) Must Be Performed On Full Sized Fasteners. Note That There Is A Typographical Error In Paragraph 4.5.2.7 And That The Axial Load Test Is A Mandatory Test That Must Be
performed On Studs As Required In Paragraph 4.5.2.7.e.
3.11.2 Thread Rolling Is A Cold Working Process And Is Not Considered To Be A Machining Or Grinding Operation. Therefore, Fasteners Which Have Rolled Threads Do Not Satisfy The Provisions Of Mil-dtl-1222j Paragraph 4.5.2.7.b And Are Not Eligible For The
"alternate Mechanical Testing" Provision.
3.11.3 Thread Rolling Alone Is Not A Sufficient Cold Working Process To Qualify A Fastener To Be In The Cold Worked (cw) Condition. This Condition Is Only Applicable To Some 300 Series Stainless Steel Studs, Screws And Nuts. These Cw Condition Fasteners
must Be Manufactured From Cold Worked Bar Stock Or Be Cold Headed In Order To Qualify. The Threads May Subsequently Be Rolled, Machined Or Ground. Testing Of The Finished Fasteners And/or Reporting Of The Starting Bar Stock Material Properties Is Subject To
the Same Provisions Found In Mil-dtl-1222j Paragraph 4.5.2.7 And Discussed Above.
3.12 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.13 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 765007000; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.16 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.16.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.16.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.16.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.17 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.18 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.18.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.19 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.20 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds When The Conditions Of Section 4.2.1.1 Of S9074-ar-gib-010a/278 Are Met.
3.20.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.20.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.20.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010/248, S9074-ar-gib-010a/278, And
the Contract.
3.20.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.20.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.20.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.20.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.20.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.20.9 When Production Or Repair Welding Is Required On Titanium Materials, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.20.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.20.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified Thateach Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.20.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor,the Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.32.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.33 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendmen
Contract Date17 Oct 2024
Contract AmountUSD 738.2 K
Homeland Security Tender Result
Result Stage: Awarded (AOC Available)
United States
This Is A Combined Synopsis/solicitation For Commercial Items Prepared In Accordance With The Format In Far Subpart 12.6, As Supplemented With Additional Information Included In This Notice. The Solicitation Number Is 20137705-a And Is Issued As A Request For Quote (rfq), Unless Otherwise Indicated Herein. The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2023-04. The Associated North American Industrial Classification System (naics) Code For This Procurement Is 441340 With A Small Business Size Standard Of $25.50m. This Requirement Is Unrestricted And Only Qualified Sellers May Submit Bids. The Solicitation Pricing On Https://marketplace.unisonglobal.com Will Start On The Date This Solicitation Is Posted, And, Unless Otherwise Displayed At Https://marketplace.unisonglobal.com, Will End On: 2023-06-21 11:00:00.0 Eastern Time. This Time Supersedes The Offers Due Time Listed Above. Fob Destination Shall Be In The Special Shipping Instructions.the Dhs Cbp Border Enforcement Contracting Division Requires The Following Items, Meet Or Exceed, To The Following: Base Period Of Performance: 07/17/2023 - 09/22/2023li 001: 245/75/r16 At Tires (surge) - See Statement Of Work For Specifications, 600, Ea;li 002: 235/65/r16 Ht Tires (surge) - See Statement Of Work For Specifications, 300, Ea;option 1 Period Of Performance: 04/15/2024 - 09/06/2024li 001: 245/75/r16 At Tires (surge) - See Statement Of Work For Specifications, 600, Ea;li 002: 235/65/r16 Ht Tires (surge) - See Statement Of Work For Specifications, 300, Ea;solicitation And Buy Attachments***question Submission: Interested Sellers Must Submit Any Questions Concerning The Solicitation At The Earliest Time Possible To Enable The Buyer To Respond. Questions Must Be Submitted By Using The 'submit A Question' Feature At Https://marketplace.unisonglobal.com. Questions Not Received Within A Reasonable Time Prior To Close Of The Solicitation May Not Be Considered.***for This Solicitation, Dhs Cbp Border Enforcement Contracting Division Intends To Conduct An Online Competitive Reverse Auction To Be Facilitated By The Third-party Reverse Auction Provider, Unison Marketplace. Unison Marketplace Has Developed An Online, Anonymous, Browser Based Application To Conduct The Reverse Auction. A Seller May Submit A Series Of Pricing Bids, Which Descend In Price During The Specified Period Of Time For The Aforementioned Reverse Auction. Dhs Cbp Border Enforcement Contracting Division Is Taking This Action In An Effort To Improve Both Vendor Access And Awareness Of Requests And The Agency's Ability To Gather Multiple, Competed, Real-time Bids. All Responsible Sellers That Respond To This Solicitation Must Submit The Pricing Portion Of Their Bid Using The Online Exchange Located At Https://marketplace.unisonglobal.com. There Is No Cost To Register, Review Procurement Data Or Make A Bid On Https://marketplace.unisonglobal.com.sellers That Are Not Currently Registered To Use Https://marketplace.unisonglobal.com Should Proceed To Https://marketplace.unisonglobal.com To Complete Their Free Registration. Sellers That Require Special Considerations Or Assistance May Contact Marketplace Support At 1.877.933.3243 Or Via Email At Marketplacesupport@unisonglobal.com. Sellers May Not Artificially Manipulate The Price Of A Transaction On Https://marketplace.unisonglobal.com By Any Means. It Is Unacceptable To Place Bad Faith Bids, To Use Decoys In The Https://marketplace.unisonglobal.com Process Or To Collude With The Intent Or Effect Of Hampering The Competitive Https://marketplace.unisonglobal.com Process. Should Sellers Require Additional Clarification, Notify The Point Of Contact Or Marketplace Support At 1.877.933.3243 Or Marketplacesupport@unisonglobal.com.use Of Unison Marketplace: Buyers And Sellers Agree To Conduct This Transaction Through Unison Marketplace In Compliance With The Unison Marketplace Terms Of Use. Failure To Comply With The Below Terms And Conditions May Result In Offer Being Determined As Non-responsive.unless The Buyer Indicates Otherwise Within A Particular Line Item Description, Each Seller Shall Include In Its Online Bid Individual Pricing For All Required Line Items In Order To Be Considered For Award (i.e., Do Not Use The Included In Another Line Item Function When Pricing Each Line Item). If A Line Item Cannot Be Separately Priced, You Must Notify The Buyer Through The Unison Submit A Question Feature Regarding Which Line Item(s) Should Be Included In Which Other Line Item(s) And Request Reposting. Failure To Comply With This Term May Result In The Bid Being Determined To Be Non-responsive.new Equipment Only; No Remanufactured Or "gray Market" Items. All Items Must Be Covered By The Manufacturer's Warranty.bid Must Be Good For 30 Calendar Days After Close Of Buy.shipping Must Be Free On Board (fob) Destination Conus (continental U.s.), Which Means That The Seller Must Deliver The Goods On Its Conveyance At The Destination Specified By The Buyer, And The Seller Is Responsible For The Cost Of Shipping And Risk Of Loss Prior To Actual Delivery At The Specified Destination.this Solicitation Requires Registration With The System For Award Management (sam) At The Time An Offer Or Quotation Is Submitted, Excluding The Exceptions Outlined In Far 4.1102(a). Registration Information Can Be Found At Www.sam.gov.no Partial Shipments Are Permitted Unless Specifically Authorized At The Time Of Award.the Selected Offeror Must Comply With The Following Commercial Item Terms And Conditions, Which Are Incorporated Herein By Reference: Far 52.212-1, Instructions To Offerors - Commercial Items, Applies To This Acquisition; Far 52.212-3, Offeror Representations And Certifications - Commercial Items - The Selected Offeror Must Submit A Completed Copy Of The Listed Representations And Certifications; Far 52.212-4, Contract Terms And Conditions - Commercial Items; Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Items, Paragraph (a) And The Following Clauses In Paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The Full Text Of The Referenced Far Clauses May Be Accessed Electronically At Https://www.acquisition.gov/far/.far 52.212-4, Contract Terms And Conditions - Commercial Items; Far 52.212-5, Contract Terms And Conditions Required To Implement Statutes Or Executive Orders-commercial Items, Paragraph (a) And The Following Clauses In Paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The Full Text Of The Referenced Far Clauses May Be Accessed Electronically At Http://www.acqnet.gov/far.q&a -please Submit All Questions By Using The 'submit A Question' Button. This Buy Will Then Be Reposted With Q&a Based On The Questions That Come In (if Applicable).in Addition To Providing Pricing At Www.unisonmarketplace.com For This Solicitation, Each Offeror Must Provide Any Required, Non-pricing Responses (e.g. Technical Proposal, Representations And Certifications, Etc.) So That They Are Received No Later Than The Closing Date And Time For This Solicitation. Submissions Can Be Sent To Marketplacesupport@unisonglobal.com.for Exact Match Only Commodity Buys- No Substitutions, Exact Match Only. The Vendor May Not Substitute Any Item/service Listed On This Order Without Prior Written Approval From The Dhs/cbp Contracting Officer. No Other Individual Is Authorized, Either Verbally Or In Writing To Change Part Numbers, Manufacturer, Quantity, Delivery Dates, Or Any Other Specifications Of This Rfq. Items/services That Do Not Conform To Descriptions And Part Numbers Found In This Rfq Will Be Rejected At The Time Of Delivery Causing A Return At The Vendor's Expense.for Exact Match Services Buys Only- In Order For A Sellers Bid To Be 'responsive' And Considered For Award, The Seller Is Required To Document Exactly How They Intend To Meet The Requirements Of The Sow. They Shall Document Statement Detailing The Service For Evaluation. Failure To Do This May Be Cause For Termination. This Information Is Required In Order For A Sellers Bid To Be Deemed 'responsive' And To Be Considered For Award.for All Buys Other Than Exact Match Sellers Must Document What They Are Bidding For Evaluation For Award. Sellers Must Include, Extended Specs And/or Manufacturer Name And Part Numbers (if Applicable). Failure To Do This May Be Cause For Termination. This Information Is Required In Order For A Sellers Bid To Be Deemed 'responsive' And To Be Considered For Award. Far 52.211-6.in Accordance With The Ipp Clause; Electronic Invoicing And Payment Requirements - Invoice Processing Platform (ipp) (jan 2016), Payment Requests For All New Awards Must Be Submitted Electronically Through The U. S. Department Of The Treasury's Invoice Processing Platform System (ipp). The Contractor Must Use Ipp For Contracts And Orders Awarded April 11, 2016 Or Later.to Constitute A Proper Invoice, The Payment Request Must Comply With The Requirements Identified In Far 32.905(b), "payment Documentation And Process" And The Applicable Prompt Payment Clause Included In This Contract. The Ipp Website Address Is: Https:// Www.ipp.gov.contractor Assistance With Ipp Enrollment Can Be Obtained By Contacting Ippcustomersupport@fms.treas.gov Or Phone (866) 973-3131.if The Contractor Is Unable To Comply With The Requirement To Use Ipp For Submitting Invoices For Payment, The Contractor Must Submit A Waiver Request In Writing To The Contracting Officer.(a)definitions. As Used In This Clausecovered Article Means Any Hardware, Software, Or Service That(1)is Developed Or Provided By A Covered Entity;(2)includes Any Hardware, Software, Or Service Developed Or Provided In Whole Or In Part By A Covered Entity; Or(3)contains Components Using Any Hardware Or Software Developed In Whole Or In Part By A Covered Entity.covered Entity Means(1)kaspersky Lab;(2)any Successor Entity To Kaspersky Lab;(3)any Entity That Controls, Is Controlled By, Or Is Under Common Control With Kaspersky Lab; Or(4)any Entity Of Which Kaspersky Lab Has A Majority Ownership.(b)prohibition. Section 1634 Of Division A Of The National Defense Authorization Act For Fiscal Year 2018 (pub. L. 115-91) Prohibits Government Use Of Any Covered Article. The Contractor Is Prohibited From(1)providing Any Covered Article That The Government Will Use On Or After October 1, 2018; And(2)using Any Covered Article On Or After October 1, 2018, In The Development Of Data Or Deliverables First Produced In The Performance Of The Contract.(c)reporting Requirement.(1)in The Event The Contractor Identifies Covered Article Provided To The Government During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractor Shall Report, In Writing, Via Email, To The Contracting Officer, Contracting Officers Representative, And The Enterprise Security Operations Center (soc) At Ndaa_incidents@hq.dhs.gov, With Required Information In The Body Of The Email. In The Case Of The Department Of Defense, The Contractor Shall Report To The Website At Https://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractor Shall Report To The Enterprise Soc, Contracting Officer For The Indefinite Delivery Contract And The Contracting Officer(s) And Contracting Officers Representative(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided At Https://dibnet.dod.mil.(2)the Contractor Shall Report The Following Information Pursuant To Paragraph (c)(1) Of This Clause:(i)within 1 Business Day From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Brand; Model Number (original Equipment Manufacturer (oem) Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended.(ii)within 10 Business Days Of Submitting The Report Pursuant To Paragraph (c)(1) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractor Shall Describe The Efforts It Undertook To Prevent Use Or Submission Of A Covered Article, Any Reasons That Led To The Use Or Submission Of The Covered Article, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Of Covered Articles.(c) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including This Paragraph (d), In All Subcontracts, Including Subcontracts For The Acquisition Of Commercial Items.(end Of Clause)52.20424 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment. As Prescribed In 4.2105(a), Insert The Following Provision: Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020) The Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument In The Provision At 52.20426, Covered Telecommunications Equipment Or Servicesrepresentation, Or In Paragraph (v) Of The Provision At 52.2123, Offeror Representations And Certifications Commercial Items. (a)definitions. As Used In This Provision Backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential Component Have The Meanings Provided In The Clause 52.20425, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To (i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or (ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles. (c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https:// Www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (d) Representations. The Offeror Represents That (1) It [ ] Will, [ ] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds Will In Paragraph (d)(1) Of This Section; And (2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That It [ ] Does, [ ] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds Does In Paragraph (d)(2) Of This Section.(e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded Will In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision. (2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded Does In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer: (i) For Covered Equipment (a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known); (b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And (c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision. (ii) For Covered Services (a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or (b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.(a) Definitions. As Used In This Clausebackhaul Means Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet).covered Foreign Country Means The Peoples Republic Of China.covered Telecommunications Equipment Or Services Means(1) Telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities);(2) For The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities);(3) Telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or(4) Telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of A Covered Foreign Country.critical Technology Means(1) Defense Articles Or Defense Services Included On The United States Munitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations;(2) Items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled-(i) Pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or(ii) For Reasons Relating To Regional Stability Or Surreptitious Listening;(3) Specially Designed And Prepared Nuclear Equipment, Parts And Components, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities);(4) Nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material); (5) Select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or(6) Emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817).interconnection Arrangements Means Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Anothers Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources. Reasonable Inquiry Means An Inquiry Designed To Uncover Any Information In The Entitys Possession About The Identity Of The Producer Or Provider Of Covered Telecommunications Equipment Or Services Used By The Entity That Excludes The Need To Include An Internal Or Third-party Audit. Roaming Means Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High.substantial Or Essential Component Means Any Component Necessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service.(b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. (2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract.(c) Exceptions. This Clause Does Not Prohibit Contractors From Providing (1) A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or(2) Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.(d) Reporting Requirement. (1) In The Event The Contractor Identifies Covered Telecommunications Equipment Or Services Used As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractor Shall Report The Information In Paragraph (d)(2) Of This Clause In Writing Via Email To The Contracting Officer, Contracting Officers Representative, And The Enterprise Security Operations Center (soc) At Ndaa_incidents@hq.dhs.gov, With Required Information In The Body Of The Email. In The Case Of The Department Of Defense, The Contractor Shall Report To The Website At Https://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractor Shall Report To The Enterprise Soc, Contracting Officer For The Indefinite Delivery Contract And The Contracting Officer(s) And Contracting Officers Representative(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided At Https://dibnet.dod.mil.(2) The Contractor Shall Report The Following Information Pursuant To Paragraph (d)(1) Of This Clause (i) Within One Business Day From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplier Unique Entity Identifier (if Known); Supplier Commercial And Government Entity (cage) Code (if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended.(ii) Within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractor Shall Describe The Efforts It Undertook To Prevent Use Or Submission Of Covered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Of Covered Telecommunications Equipment Or Services.(e) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including This Paragraph (e), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For The Acquisition Of Commercial Items.as Prescribed In 4.2105(c), Insert The Following Provision:covered Telecommunications Equipment Or Services-representation (dec 2019) (a) Definitions. As Used In This Provision, Covered Telecommunications Equipment Or Services Has The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment. (b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For Covered Telecommunications Equipment Or Services. (c) Representation. The Offeror Represents That It Does, Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument.delivery Must Be Made In Accordance To The Sow (aro). The Offeror Must Provide Within Its Offer The Number Of Days - See Sow - Required To Make Delivery After It Receives A Purchase Order From The Buyer. Unless Otherwise Noted.contractor Must Supply A Spec Sheet Including Pictures Of The Proposed Tires And Detailed Information Of The Tire's Components Including The Manufacture's Name.this Is A Firm Fixed Price Task Order.this Task Order/blanket Purchase Agreement (bpa) Is Placed Under The Terms And Conditions Of The Gsa Federal Supply Schedule Contract Identified Herein. The Contractor Warrants That, Throughout Performance, The Prices Charged The Government Shall Be As Low As, Or Lower Than, Those Charged The Contractor's Most Favored Customers And That The Government Shall Never Be Charged More Under This Order Than The Offeror/contractors Current Gsa Schedule Rates, Or The Rates Contained In The Task Order Schedule, Whichever Are Lower.if This Order Contains Options For Additional Periods Of Performance, U.s. Customs & Border Protection (cbp) Will Invoke The Option Only If The Offeror/contractor Maintains A Current Gsa Schedule. Unilateral Options Will Not Be Invoked If The Rates Indicated In The Task Order Schedule For The Option Are Higher Than Current Gsa Schedule Rates, But May Be Invoked Bilaterally At The Offeror/contractor's Current Gsa Rates. The Contractor Shall Provide Notice To The Government Of Any Proposed And/or Approved Change To The Gsa Schedule Rates. Failure To Comply With The Provisions Of This Price Warranty May Be Cause For Termination Of The Order And The Offeror/contractor May Be Required To Adjust Their Billing And/or Reimburse The Government For Any Charges Invoiced In Violation Of The Price Warranty.the Specifications, Statement Of Work, Or Statement Of Objectives Which Describe The Work To Be Performed Hereunder, Although Attached, Is Incorporated And Made A Part Of This Document With The Same Force And Effect Of "specifications" As Described In The Clause, Order Of Precedence, Far 52.215-8 Incorporated Herein By Reference.material Shall Be Packaged, Packed, And Marked For Shipment In Such A Manner That Will Insure Acceptance By Common Carriers And Safe Delivery At Destination.packages Shall Be Clearly Identified On The Outer Wrapping With The Contract Number And Delivery/task Order Number, If Applicable.the Period Of Performance Of This Contract Shall Be From June 1, 2023, Through September 29, 2023, With Two (2) Option Years.the Contract Term Shall Be For A Period Of One Year From The Date Of Award, Subject To The Government's Option To Extend The Term Of The Contract In Accordance With The Clause Entitled, "option To Extend The Term Of The Contract" Far 52.217-9 Contained Herein.the Contracting Officer Is The Only Person Authorized To Approve Changes In Any Of The Requirements Of This Contract. In The Event The Contractor Effects Any Changes At The Direction Of Any Person Other Than The Contracting Officer, The Changes Will Be Considered To Have Been Made Without Authority And No Adjustment Will Be Made In The Contract Price To Cover Any Increase In Costs Incurred As A Result Thereof. The Contracting Officer Shall Be The Only Individual Authorized To Accept Nonconforming Work, Waive Any Requirement Of The Contract, Or To Modify Any Term Or Condition Of The Contract. The Contracting Officer Is The Only Individual Who Can Legally Obligate Government Funds. No Cost Chargeable To The Proposed Contract Can Be Incurred Before Receipt Of A Fully Executed Contract Or Specific Authorization From The Contracting Officer.payment And Invoice Instructions (aug 2022)1. In Order To Request Contract Payment, The Contractor Shall Submit A Proper Invoice, As Defined By Federal Acquisition Regulation (far) 2.101 For Payment In The Manner And Format Described Below.a. The Contractor Shall Submit An Original Invoice/voucher, Via Postal Mail Or Electronic Mail (email), Simultaneously To The Following:finance And Accounting Division/commercial Accountsdhs/u.s. Customs And Border Protectionfinance & Accounting Division/commercial Accounts6650 Telecom Driveindianapolis, In 46278or Email: Cbpinvoices@cbp.dhs.govnote: For Invoices With Payment Terms Less Than Net 30:the Subject Line For All Emailed Invoices To The Fad Must Include The Following Text: Per Cbp, Net [state # Days] Invoiceb. Contracting Officer Or Contract Administrator (co Or Ca) [fill In At Time Of Award]dhs/u.s. Customs And Border Protectionattention: [insert Name Of Coor Ca][insert Co Or Ca Office Designation][insert Mailing Address][insert City, State, Zip Code Or Country Information]or Email: [insert Email Address]c. Contracting Officers Representative (cor) (fill In At Time Of Award):dhs/u.s. Customs And Border Protectionattention: [insert Name Of Cor][insert Cor Office Designation][insert Mailing Address][insert City, State, Zip Code Or Country Information]or Email: [insert Email Address]d. The Contractor Shall Submit A Copy Of The Original Invoice/voucher For All Dhs Cost-reimbursement And Time And Material/labor Hour Contracts And Delivery Orders To The Branch Manager/resident Auditor Of The Cognizant Defense Contract Audit Agency (dcaa) Field Audit Office. Copies May Be Sent To Dcaa, Via Postal Mail Or Email And Must Be Sent At The Same Time The Invoice/voucher Is Sent To The Fad, Co And Cor. The Co Shall Provide The Following Information:dcaa Field Office [insert Name Of Dcaa Field Office Designation]name: [insert Name Of Branch Manager/resident Auditor][insert Dcaa Field Office Mailing Address][insert City/state/zip Code Or Country Information]phone: [insert Dcaa Field Office Phone Number]email: [insert Branch Manager/resident Auditors Email Address]e. In Accordance With Far 32.904(b), The Co, In Conjunction With The Cor And Fad, Will Determine Whether The Invoice Is Proper Or Improper Within Seven (7) Days Of Receipt. Improper Invoices Will Be Returned To The Contractor Within Seven (7) Days Of Receipt.under No Circumstances Shall The Contractor, Or Anyone Acting On Behalf Of The Contractor, Refer To The Supplies, Services, Or Equipment Furnished Pursuant To The Provisions Of This Contract In Any News Release Or Commercial Advertising Without First Obtaining Explicit Written Consent To Do So From The Contracting Officer.the Contractor Agrees Not To Refer To Awards In Commercial Advertising In Such A Manner As To State Or Imply That The Product Or Service Provided Is Endorsed Or Preferred By The Federal Government Or Is Considered By The Government To Be Superior To Other Products Or Services.a. Generalany Information Made Available To The Contractor By The Government Shall Be Used Only For The Purpose Of Carrying Out The Provisions Of This Contract And Shall Not Be Divulged Or Made Known In Any Manner To Any Persons Exceptas May Be Necessaryinthe Performance Of The Contract.b. Technical Data Rightsthe Contractor Shall Not Use, Disclose, Reproduce, Or Otherwise Divulge Or Transfuse To Any Persons Any Technical Information Or Data Licensed For Use By The Government That Bears Any Type Of Restrictive Or Proprietary Legend Except As May Be Necessary In The Performance Of The Contract. Refer To The Rights In Data Clause For Additional Information.c. Privacy Actin Performance Of This Contract The Contractor Assumes The Responsibility For Protection Of The Confidentiality Of All Government Records And/or Protected Data Provided For Performance Under The Contract And Shall Ensure That (a) All Work Performed By Any Subcontractor Is Subject To The Disclosure Restrictions Set Forth Above And (b) All Subcontract Work Be Performed Under The Supervision Of The Contractor Or Their Employees.a. Contractor Performance Evaluationsinterim And Final Performance Evaluation Reports Will Be Prepared On This Contract Or Order In Accordance With Far Subpart 42.15. A Final Performance Evaluation Report Will Be Prepared At The Time The Work Under This Contract Or Order Is Completed. In Addition To The Final Performance Evaluation Report, An Interim Performance Evaluation Report Will Be Prepared Annually To Coincide With The Anniversary Date Of The Contract Or Order.interim And Final Performance Evaluation Reports Will Be Provided To The Contractor Via The Contractor Performance Assessment Reporting System (cpars) After Completion Of The Evaluation. The Cpars Assessing Official Representatives (aors) Will Provide Input For Interim And Final Contractor Performance Evaluations. The Aors May Be Contracting Officers Representatives (cors), Project Managers, And/or Contract Specialists. The Cpars Assessing Officials (aos) Are The Contracting Officers (co) Or Contract Specialists (cs) Who Will Sign The Evaluation Report And Forward It To The Contractor Representative Via Cpars For Comments.the Contractor Representative Is Responsible For Reviewing And Commenting On Proposed Ratings And Remarks For All Evaluations Forwarded By The Ao. After Review, The Contractor Representative Will Return The Evaluation To The Ao Via Cpars.the Contractor Representative Will Be Given Up To Fourteen (14) Days To Submit Written Comments Or A Rebuttal Statement. Within The First Seven (7) Calendar Days Of The Comment Period, The Contractor Representative May Request A Meeting With The Ao To Discuss The Evaluation Report. The Ao May Complete The Evaluation Without The Contractor Representatives Comments If None Are Provided Within The Fourteen (14) Day Comment Period. Any Disagreement Between The Ao/co And The Contractor Representative Regarding The Performance Evaluation Report Will Be Referred To The Reviewing Official (ro) Within The Division/branch The Ao Is Assigned. Once The Ro Completes The Review The Evaluation Is Considered Complete, And The Decision Is Final.copies Of The Evaluations, Contractor Responses, And Review Comments, If Any, Will Be Retained As Part Of The Contract File And May Be Used In Future Award Decisions.b. Designated Contractor Representativethe Contractor Must Identify A Primary Representative For This Contract And Provide The Full Name, Title, Phone Number, Email Address, And Business Address To The Co Within 30 Days After Award.c. Electronic Access To Contractor Performance Evaluationsthe Ao Will Request Cpars User Access For The Contractor By Forwarding The Contractors Primary And Alternate Representatives Information To The Cpars Focal Point (fp). The Fp Is Responsible For Cpars Access Authorizations For Government And Contractor Personnel. The Fp Will Set Up The User Accounts And Will Create System Access To Cpars.the Cpars Application Will Send An Automatic Notification To Users When Cpars Access Is Granted. In Addition, Contractor Representatives Will Receive An Automated Email From Cpars When An Evaluation Report Has Been Completed.offerors Are Notified That Per Far 33.103(d)(4), An Independent Review Of The Grounds For A Protest Is Available At A Level Above The Contracting Officer As An Alternative To The Protest To The Agency Contracting Officer, Not As An Additional Appeal After The Protest To The Agency Contracting Officer Has Been Resolved. A Choice To Protest To The Agency Contracting Officer Therefore Relieves Cbp Of Any Further Internal Review Or Appeal After The Contracting Officers Decision.(a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days Prior To Contract Expiration; Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 30 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension.(b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause.(c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 3 Years.funds Are Not Presently Available For Performance Under This Contract Beyond 6 Months. The Governments Obligation For Performance Of This Contract Beyond That Date Is Contingent Upon The Availability Of Appropriated Funds From Which Payment For Contract Purposes Can Be Made. No Legal Liability On The Part Of The Government For Any Payment May Arise For Performance Under This Contract Beyond 6 Months, Until Funds Are Made Available To The Contracting Officer For Performance And Until The Contractor Receives Notice Of Availability, To Be Confirmed In Writing By The Contracting Officer.
Contract Date11 Jul 2023
Contract AmountUSD 377.9 K
DEPT OF THE NAVY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C |
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001aa|2000|500|0001ac|1|180|0001ab|1 Lot|see Dd1423||||||||||||
stop-work Order (aug 1989)|1||
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n00
104|tbd|certifications - N39040; Material -s4306a |n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (nov 2021)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (nov 2021)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (feb 2019)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|0001aa|7|180|jill.l.sabol.civ@us.navy.mil|tbd|0001aa|120|x||
progress Payments (nov 2021)(deviation 2020-o0010)|4|||||
authorized Deviations In Clauses (nov 2020)|2|||
list Of Solicitation Attachments|5|x|all|x|x|x|
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
annual Representations And Certifications (nov 2021)|13|332710|500||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (nov 2021)|2|||
type Of Contract (apr 1984)|1|firm Fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3|||x|
1. Section L - Instructions, Conditions And Notices To Bidders And Section M - Evaluation Factors For Award Are Updated. Sections L And M Updates Are Attached To The Soliciation Notice On Sam.gov.
2. The Closing Date Is Extended To 2/10/2022 Due To This Update.
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. Any Contract Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
3. In Addition To The Section L And M In The Rfp, Please See The Attached Section L And M. Dd 1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
4. Consistent With Far 52.216-18, "all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In
the Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. Available Drawings And Additional Documents Can Be Accessed Through Sam.gov.
6. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. Do Not Fax Proposals.
7. This Procurement Has First Article Test Requirements.
8. The Following Delivery Schedule Will Apply:
within 180 Days After Contract Date And Within 30 Days After The Test Completion, Submit The Test Report To The Pco (currentlyjill.l.sabol.civ@us.navy.mil). The Review Shall Be Complete Within 120 Daysfrom Receipt.
submission Of All Other Dd Form 1423 Certification Data (cdrls) Will Beon Or Before 20 Days Prior To Delivery. Pnsy Review/acceptance Of Cdrls Shall Be 6working Days After Receipt Of Cdrls.
final Delivery Of Material Will Be On Or Before 500 Days After The Effective Date Of The Contract.
government Financing May Apply If Applicable To The Resulting Contractor And/or Dollar Threshold Met.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.2 ;tr-317b Transducer Elements And Receptacle End Seal Assemblies Necessary To Conduct The Tests Required By Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications Must Be Supplied To The Successful Bidder. The Successful Bidder
must Contact The Naval Undersea Warfare Center Division Newport, Ri, Transducer In-service Engineering Agent Nuwc_npt_1535_transducerisea@navy.mil, (401) 832-4931 To Obtain The Required Units. After Completion Of Testing The Successful Bidder Will Forward The
units To The Receipt Inspection Activity.;
1.3 ;tr-317b Transducer Elements And Receptacle End Seal Assemblies Necessary To Conduct The Tests Required By Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications Shall Be Supplied To The Successful Bidder. The Successful Bidder
shall Contact The Naval Undersea Warfare Center Division Newport, Ri, Transducer In-service Engineering Agent Nuwc_npt_1535_transducerisea@navy.mil, (401) 832-4931 To Obtain The Required Units. After Completion Of Testing The Successful Bidder Will Forward The
units To The Receipt Inspection Activity.;
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3 Specification Revisions - The Specification Revisions Listed Under "docu Ments References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
drawing Data=03411001 |88594| -| |d|0001 | -|49998|0172863
drawing Data=03411001 |88594| A|dl |d|0001 | A|49998|0034504
drawing Data=03411002 |88594| F| |d|0001 | |49998|0551091
drawing Data=03411004 |88594| -| |d|0001 | -|49998|0112150
drawing Data=03411005 |88594| -| |d|0001 | -|49998|0070342
drawing Data=03411008 |88594| -| |d|0001 | -|49998|0054085
drawing Data=03411009 |88594| A| |d|0001 | A|49998|0024810
drawing Data=03411010 |88594| A| |d|0001 | A|49998|0026695
drawing Data=03411011 |88594| -| |d|0001 | -|49998|0052217
drawing Data=03411012 |88594| -| |d|0001 | -|49998|0048271
drawing Data=03412001 |88594| -| |d|0001 | -|49998|0059657
drawing Data=03412001 |88594| -|dl |d|0001 | -|49998|0441212
drawing Data=03412003 |88594| -| |d|0001 | -|49998|0059560
drawing Data=8192757 |53711| B|ts |d|0000.cov | B|49998|0079990
drawing Data=8192757 |53711| B|ts |d|0001 | B|49998|0082446
drawing Data=8192757 |53711| B|ts |d|0002 | B|49998|0080672
drawing Data=8192757 |53711| B|ts |d|0003 | B|49998|0080697
drawing Data=8192757 |53711| B|ts |d|0004 | B|49998|0080675
drawing Data=8192757 |53711| B|ts |d|0005 | B|49998|0079861
drawing Data=8192757 |53711| B|ts |d|0006 | B|49998|0080539
drawing Data=8192757 |53711| B|ts |d|0007 | B|49998|0080385
drawing Data=8192757 |53711| B|ts |d|0008 | B|49998|0080652
drawing Data=8192757 |53711| B|ts |d|0009 | B|49998|0080471
drawing Data=8192757 |53711| B|ts |d|0010 | B|49998|0105395
drawing Data=8192757 |53711| B|ts |d|0011 | B|49998|0080821
drawing Data=8192757 |53711| B|ts |d|0012 | B|49998|0080670
drawing Data=8192757 |53711| B|ts |d|0013 | B|49998|0080882
drawing Data=8192757 |53711| B|ts |d|0014 | B|49998|0080863
drawing Data=8192757 |53711| B|ts |d|0015 | B|49998|0080906
drawing Data=8192757 |53711| B|ts |d|0016 | B|49998|0080770
drawing Data=8192757 |53711| B|ts |d|0017 | B|49998|0110761
drawing Data=8192757 |53711| B|ts |d|0018 | B|49998|0085519
drawing Data=8192757 |53711| B|ts |d|0019 | B|49998|0080949
drawing Data=8192757 |53711| B|ts |d|0020 | B|49998|0085664
drawing Data=8192757 |53711| B|ts |d|0021 | B|49998|0080790
drawing Data=8192757 |53711| B|ts |d|0022 | B|49998|0080465
drawing Data=8192757 |53711| B|ts |d|0023 | B|49998|0080674
drawing Data=8192757 |53711| B|ts |d|0024 | B|49998|0108815
drawing Data=8192757 |53711| B|ts |d|0025 | B|49998|0101461
drawing Data=8192757 |53711| B|ts |d|0026 | B|49998|0080632
drawing Data=8192757 |53711| B|ts |d|0027 | B|49998|0080359
drawing Data=8192757 |53711| B|ts |d|0028 | B|49998|0094045
drawing Data=8192757 |53711| B|ts |d|0029 | B|49998|0085804
drawing Data=8192757 |53711| B|ts |d|0030 | B|49998|0080346
drawing Data=8192757 |53711| B|ts |d|0031 | B|49998|0091717
drawing Data=8192757 |53711| B|ts |d|0032 | B|49998|0090964
drawing Data=8192757 |53711| B|ts |d|0033 | B|49998|0096753
drawing Data=8192757 |53711| B|ts |d|0034 | B|49998|0100170
drawing Data=8192757 |53711| B|ts |d|0035 | B|49998|0080892
drawing Data=8192757 |53711| B|ts |d|0036 | B|49998|0080538
document Ref Data=fed-std-h28 | | |b |940424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=s9320-am-pro-020/mldg | | |2 |990801|a| | |
document Ref Data=s9320-am-pro-030/mldg | | |3 |050201|a| | |
3. Requirements
3.1 ;the Complete Tr-317b/bq Hull Penetrator Assembly Must Be In Accordance With Naval Underwater Systems Center Drawing 03411001 (less Find Number 2), Naval Sea Systems Command Drawing 8192757, Except As Amplified Or Modified Herein.;
3.1.1 ;note 6 On Drawing 03411001 Must Be Changed To Reflect Drawing 8192757, Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications.;
3.1.2 ;drawing 03411002, Zone 4d Should Be Changed To Reflect A 125 Rhr Surface Finish For The Major Outside Diameter (1.623/1.619") In Lieu Of The 63 Rhr Finish.;
3.1.3 ;note: Prior To Application Of The Rubber Mold, The Surface Finish Of The Penetrator Must Be Visually Inspected. Evidence Of Adverse Reaction Between The Neoprene Primer And Phenolic Sealer Is Not Acceptable.;
3.2 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required.
3.3 ;the First Article Test Sample(s) Must Not Be Delivered Against The Contract Quanitity.;
3.4 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;hull Penetrator Body, Find Number 1 On Drawing 03411002;
material - ;qq-n-281, Class A, Form 1 Or Form 2 With A Minimum Yield Strength Of 40 Ksi At .2% Offset;
part - ;hex Nut, On Drawing 03411009;
material - ;astm-b150, Alloy C63200, Temper Tq50;
3.5 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;hull Penetrator Assembly;
performance - ;paragraph 3.4 And Table 1 Of Naval Sea Systems Command Drawing 8192757;
acceptance - ;paragraph 3.4 And Table 1 Of Naval Sea Systems Command Drawing 8192757;
3.6 ;the Requirement For Hardness Testing Of Molded Rubber Is Not Required.;
3.7 ;delete References To Material Identification Code (mic) Requirements Cited In Nusc Drawing 03411002, Note 11 And 12. A Unique Serial Number, For Material Traceability Purposes, Must Be Applied To The Penetrator In Lieu Of The Mic.;
3.8 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.9 Prior To Molding, Mil-dtl-24231 Connector Plug Bodies Must Be Treated With A Non-conductive Coating (ncc) Plasma Spray In Accordance With Navsea S9320-am-pro-030/mldg By An Approved Vendor Listed In Csd024 Of The Ecds (electronic Contractor Data
submission) System At: Https://register.nslc.navy.mil/
3.9.1 The Approved Vendor Utilized For This Contract, If Other Than The Prime Manufacturer, Must Be Identified On The Special Emphasis C Of C.
3.10 The Cable Assembly Must Be Wired And Molded In Accordance With Volume Ii Of Navsea S9320-am-pro-020/mldg By An Approved Vendor Listed In Csd023 Of The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/
3.10.1 The Approved Vendor Utilized For This Contract, If Other Than The Prime Manufacturer, Must Be Identified On The Special Emphasis C Of C.
3.11 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.11.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.11.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.11.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.12 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.13 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified Under S9074-aq-gib-010/248 For All Production
and Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.16 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.17 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.18 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.18.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.19 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.20 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.20.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.20.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data
submitted, Citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." " Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz."). Authority For The
repair Of Special Repairs In Castings And Authority For The Repair Of Wrought Or Forged Material Material Must Be Obtained From The Procurement Contracting Officer. This Request Must Describe The Defect; Including Size, Depth, Location, And A Description Of
the Proposed Repair. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.20.3 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 48 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 48 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.20.4 When Drawings Require Hard Facing Surface Iron Content (nickel For Monel Valves) Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results
must Be Submitted As Part Of The Qualification Data.
3.20.5 Qualification Requirements For Production Hardfacing: The Maximum Qualified Thickness For Hardfacing Must Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt (non-destructive Testing) And Any
additional Drawing Requirements. The Minimum Qualified Thickness Is The Final Machined Thickness At Which Hardness Testing, Ndt, Macro-etch, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.20.6 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential Elements And Any Elements Not
listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.20.7 Qualification Requirements For Production Cladding: The Maximum Qualified Thickness For Cladding Must Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt And Any Additional Drawing Requirements.
the Minimum Qualified Thickness Is The Final Machined Thickness At Which Ndt, Side Bends, Macro-etch Testing, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.20.8 When Weld Repair Is Required On Titanium Material, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Be Submitted For Review And Approval.
3.20.9 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Formation, Such As Adobe Acrobat
pdf.
3.20.10 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.20.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.20.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.21 See Cdrl Di-ndti-80809 (first Article Testing) - First Article Test/inspection (contractor) - The Contractor Must Conduct ;destructive; First Article Test/inspection On ;1; Unit(s) In Accordance With Requirements ;of Paragraph 4.2.1 And Table 1 Of Naval
sea Systems Command Drawing 8192757; .
3.22 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.22.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.22.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.22.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.22.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.22.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.23 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.23.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.23.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.24 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.24.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.24.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.24.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.24.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.24.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.25 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.25.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.25.2 Inspection For Completeness And Proper Type.
3.25.3 Verification Of Material Quality Received.
3.25.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.25.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.25.6 Identification And Protection From Improper Use Or Disposition.
3.25.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.25.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.25.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.26 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.26.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.27 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.27.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.27.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.27.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.27.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.;
3.28 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.28.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.28.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.28.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.28.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.28.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.29 Material Handling - The Written Material Control Process Must Include The Following:
3.29.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.29.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.29.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.29.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.29.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.29.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.30 Receiving Inspection -
3.30.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.30.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.31 Discrepancy Reporting -
3.31.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.32 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.32.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.32.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.32.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.32.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.33 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1)
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
; - Oct 20 2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe
- Dec 17 2011 - Moved Quality Assurance Text Location For Readability
- Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes
- Jan 19 2011 - Added Notification Of Dcma Upon Contract Award
- May 02 2009 - Added Lubricants And Sealants To The C Of C
- Aug 27 2014 - Took Out Contractor's Phone Number Requirement
- Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section
- Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.;
date Of First Submission=asreq
paragraph 10.4 Of Di-qcic-81110 Does Not Apply.
date Of First Submission=asreq
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow).
enter In Wawf As Follows:
"ship To" N50286
"inspect By" N39040
"accept By" N39040
and Email Notification Field: Port_ptnh_wawf_notification@navy.mil
no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
date Of First Submission=asreq
block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply.
block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Fl
Contract Date13 Apr 2022
Contract AmountUSD 1.7 Million
DEPT OF THE NAVY USA Tender Result
Result Stage: Awarded (AOC Available)
United States
Item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection And Acceptance - Short Version|8|x||x||||||
time Of Delivery (june 1997)|20|0001aa|5000|400|0001ac|1|180 Days|||||||||||||||
stop-work Order (aug 1989)|1||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (dec 2018)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd|n00
104|tbd|certifications - N39040; Material -s4306a|n50286|tbd|133.2|n/a|n/a|certifications - N39040|n/a|n/a|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
small Business Subcontracting Plan (dod Contracts)- Basic (dec 2019)|2|||
integrity Of Unit Prices (jun 2020)|1||
equal Opportunity For Veterans (jun 2020)|4|||||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery |||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (jun 2020)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (feb 2019)|2|||
first Article Approval--contractor Testing (sep 1989)|10|1|0001aa|7|180|the Navsup Wss Poc For The Contract (jill.sabol@navy.mil)|tbd|0001aa|120|x||
progress Payments (mar 2020)(deviation 2020-o0010)|4|||||
authorized Deviations In Clauses (nov 2020)|2|||
list Of Solicitation Attachments|5||||||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
royalty Information (apr 1984)|1||
annual Representations And Certifications (mar 2020)|13|332710|750||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
instructions To Offerors -- Competitive Acquisition (jan 2004)|2|||
type Of Contract (apr 1984)|1|firm Fixed Price|
alterations In Solicitation (apr 1984)|3||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Of First Article Testing|3|||x|
52.209-13 Violation Of Arms Control Treaties Or Agreements-certification Is Added To N0010421rfb75.
violation Of Arms Control Treaties Or Agreements-certification (feb 2021)
(a) This Provision Does Not Apply To Acquisitions At Or Below The Simplified Acquisition Threshold Or To Acquisitions Of Commercial Items As Defined At Far 2.101.
(b) Certification. �offeror Shall Check Either (1) Or (2).�
__(1) The Offeror Certifies That-
(i) It Does Not Engage And Has Not Engaged In Any Activity That Contributed To Or Was A Significant Factor In The President's Or Secretary Of State's Determination That A Foreign Country Is In Violation Of Its Obligations Undertaken In Any Arms
control, Nonproliferation, Or Disarmament Agreement To Which The United States Is A Party, Or Is Not Adhering To Its Arms Control, Nonproliferation, Or Disarmament Commitments In Which The United States Is A Participating State. The Determinations Are Described In
The Most Recent Unclassified Annual Report Provided To Congress Pursuant To Section 403 Of The Arms Control And Disarmament Act (22 U.s.c. 2593a). The Report Is Available At Https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international
l-security-affairs/bureau-of-arms-control-verification-and-compliance/; And
(ii) No Entity Owned Or Controlled By The Offeror Has Engaged In Any Activity That Contributed To Or Was A Significant Factor In The President's Or Secretary Of State's Determination That A Foreign Country Is In Violation Of Its Obligations Undertaken In
Any Arms Control, Nonproliferation, Or Disarmament Agreement To Which The United States Is A Party, Or Is Not Adhering To Its Arms Control, Nonproliferation, Or Disarmament Commitments In Which The United States Is A Participating State. The Determinations Are D
described In The Most Recent Unclassified Annual Report Provided To Congress Pursuant To Section 403 Of The Arms Control And Disarmament Act (22 U.s.c. 2593a). The Report Is Available At Https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and
d-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; Or
__ (2) The Offeror Is Providing Separate Information With Its Offer In Accordance With Paragraph (d)(2) Of This Provision.
(c) Procedures For Reviewing The Annual Unclassified Report (see Paragraph (b)(1) Of This Provision). For Clarity, References To The Report In This Section Refer To The Entirety Of The Annual Unclassified Report, Including Any Separate Reports That Are
incorporated By Reference Into The Annual Unclassified Report, Including Any Separate Reports That Are Incorporated By Reference Into The Annual Unclassified Report.
(1) Check The Table Of Contents Of The Annual Unclassified Report And The Country Section Headings Of The Reports Incorporated By Reference To Identify The Foreign Countries Listed There. Determine Whether The Offeror Or Any Person Owned Or Controlled By The
offeror May Have Engaged In Any Activity Related To One Or More Of Such Foreign Countries.
(2) If There May Have Been Such Activity, Review All Findings In The Report Associated With Those Foreign Countries To Determine Whether Or Not Each Such Foreign Country Was Determined To Be In Violation Of Its Obligations Undertaken In An Arms Control,
nonproliferation, Or Disarmament Agreement To Which The United States Is A Party, Or To Be Not Adhering To Its Arms Control, Nonproliferation, Or Disarmament Commitments In Which The United States Is A Participating State. For Clarity, In The Annual Report An
explicit Certification Of Non-compliance Is Equivalent To A Determination Of Violation. However, The Following Statements In The Annual Report Are Not Equivalent To A Determination Of Violation:
(i) An Inability To Certify Compliance.
(ii) An Inability To Conclude Compliance.
(iii) A Statement About Compliance Concerns.
(3) If So, Determine Whether The Offeror Or Any Person Owned Or Controlled By The Offeror Has Engaged In Any Activity That Contributed To Or Is A Significant Factor In The Determination In The Report That One Or More Of These Foreign Countries Is In Violation
of Its Obligations Undertaken In An Arms Control, Nonproliferation, Or Disarmament Agreement To Which The United States Is A Party, Or Is Not Adhering To Its Arms Control, Nonproliferation, Or Disarmament Commitments In Which The United States Is A Participating
state. Review The Narrative For Any Such Findings Reflecting A Determination Of Violation Or Non-adherence Related To Those Foreign Countries In The Report, Including The Finding Itself, And To The Extent Necessary, The Conduct Giving Rise To The Compliance Or
adherence Concerns, The Analysis Of Compliance Or Adherence Concerns, And Efforts To Resolve Compliance Or Adherence Concerns.
(4) The Offeror May Submit Any Questions With Regard To This Report By Email To Ndaa1290cert@state.gov. To The Extent Feasible, The Department Of State Will Respond To Such Email Inquiries Within 3 Business Days.
(d) Do Not Submit An Offer Unless-
(1) A Certification Is Provided In Paragraph (b)(1) Of This Provision And Submitted With The Offer; Or
(2) In Accordance With Paragraph (b)(2) Of This Provision, The Offeror Provides With Its Offer Information That The President Of The United States Has
(i) Waived Application Under 22 U.s.c. 2593e(d) Or (e); Or
(ii) Determined Under 22 U.s.c. 2593e(g)(2) That The Entity Has Ceased All Activities For Which Measures Were Imposed Under 22 U.s.c. 2593e(b).
(e) Remedies. The Certification In Paragraph (b)(1) Of This Provision Is A Material Representation Of Fact Upon Which Reliance Was Placed When Making Award. If It Is Later Determined That The Offeror Knowingly Submitted A False Certification, In Addition To Other
remedies Available To The Government, Such As Suspension Or Debarment, The Contracting Officer May Terminate Any Contract Resulting From The False Certification.
(end Of Provision)
there Are No Changes To The Solicitation At This Time. Closing Date Is Extended Due To A Posting Issue On Sam.gov.
clauses Have Been Updated
1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution.
2. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency
preparedness, And Energy Program Use.
3. Dd 1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
4. Consistent With Far 52.216-18, "all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In
the Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
5. Available Drawings And Additional Documents Can Be Accessed Through Sam.gov.
6. The Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Email Proposals To Jill.l.sabol.civ@us.navy.mil. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. Due To The Max Telework Environment, Please Do Not Fax Or
snail Mail Proposals.
7. This Procurement Has First Article Test Requirements.
8. The Following Delivery Schedule Will Apply:
Within 180 Days After Contract Date And Within 30 Days After The Test Completion, Submit The Test Report To The Pco (currently Jill.l.sabol.civ@us.navy.mil). The Review Shall Be Complete Within 120 Days From Receipt.
Submission Of All Other Dd Form 1423 Certification Data (cdrls) Will Be On Orbefore 20 Days Prior To Delivery. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls.
Final Delivery Of Material Will Be On Or Before 400 Days After Theeffective Date Of The Contract.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
1.2 ;tr-317b Transducer Elements And Receptacle End Seal Assemblies Necessary To Conduct The Tests Required By Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications Must Be Supplied To The Successful Bidder. The Successful Bidder
must Contact The Naval Undersea Warfare Center Division Newport, Ri, Transducer In-service Engineering Agent Nuwc_npt_1535_transducerisea@navy.mil, (401) 832-4931 To Obtain The Required Units. After Completion Of Testing The Successful Bidder Will Forward The
units To The Receipt Inspection Activity.;
1.3 ;tr-317b Transducer Elements And Receptacle End Seal Assemblies Necessary To Conduct The Tests Required By Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications Shall Be Supplied To The Successful Bidder. The Successful Bidder
shall Contact The Naval Undersea Warfare Center Division Newport, Ri, Transducer In-service Engineering Agent Nuwc_npt_1535_transducerisea@navy.mil, (401) 832-4931 To Obtain The Required Units. After Completion Of Testing The Successful Bidder Will Forward The
units To The Receipt Inspection Activity.;
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.3 Specification Revisions - The Specification Revisions Listed Under "docu Ments References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.3.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.3.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
drawing Data=03411001 |88594| -| |d|0001 | -|49998|0172863
drawing Data=03411001 |88594| A|dl |d|0001 | A|49998|0034504
drawing Data=03411002 |88594| F| |d|0001 | |49998|0551091
drawing Data=03411004 |88594| -| |d|0001 | -|49998|0112150
drawing Data=03411005 |88594| -| |d|0001 | -|49998|0070342
drawing Data=03411008 |88594| -| |d|0001 | -|49998|0054085
drawing Data=03411009 |88594| A| |d|0001 | A|49998|0024810
drawing Data=03411010 |88594| A| |d|0001 | A|49998|0026695
drawing Data=03411011 |88594| -| |d|0001 | -|49998|0052217
drawing Data=03411012 |88594| -| |d|0001 | -|49998|0048271
drawing Data=03412001 |88594| -| |d|0001 | -|49998|0059657
drawing Data=03412001 |88594| -|dl |d|0001 | -|49998|0441212
drawing Data=03412003 |88594| -| |d|0001 | -|49998|0059560
drawing Data=8192757 |53711| B|ts |d|0000.cov | B|49998|0079990
drawing Data=8192757 |53711| B|ts |d|0001 | B|49998|0082446
drawing Data=8192757 |53711| B|ts |d|0002 | B|49998|0080672
drawing Data=8192757 |53711| B|ts |d|0003 | B|49998|0080697
drawing Data=8192757 |53711| B|ts |d|0004 | B|49998|0080675
drawing Data=8192757 |53711| B|ts |d|0005 | B|49998|0079861
drawing Data=8192757 |53711| B|ts |d|0006 | B|49998|0080539
drawing Data=8192757 |53711| B|ts |d|0007 | B|49998|0080385
drawing Data=8192757 |53711| B|ts |d|0008 | B|49998|0080652
drawing Data=8192757 |53711| B|ts |d|0009 | B|49998|0080471
drawing Data=8192757 |53711| B|ts |d|0010 | B|49998|0105395
drawing Data=8192757 |53711| B|ts |d|0011 | B|49998|0080821
drawing Data=8192757 |53711| B|ts |d|0012 | B|49998|0080670
drawing Data=8192757 |53711| B|ts |d|0013 | B|49998|0080882
drawing Data=8192757 |53711| B|ts |d|0014 | B|49998|0080863
drawing Data=8192757 |53711| B|ts |d|0015 | B|49998|0080906
drawing Data=8192757 |53711| B|ts |d|0016 | B|49998|0080770
drawing Data=8192757 |53711| B|ts |d|0017 | B|49998|0110761
drawing Data=8192757 |53711| B|ts |d|0018 | B|49998|0085519
drawing Data=8192757 |53711| B|ts |d|0019 | B|49998|0080949
drawing Data=8192757 |53711| B|ts |d|0020 | B|49998|0085664
drawing Data=8192757 |53711| B|ts |d|0021 | B|49998|0080790
drawing Data=8192757 |53711| B|ts |d|0022 | B|49998|0080465
drawing Data=8192757 |53711| B|ts |d|0023 | B|49998|0080674
drawing Data=8192757 |53711| B|ts |d|0024 | B|49998|0108815
drawing Data=8192757 |53711| B|ts |d|0025 | B|49998|0101461
drawing Data=8192757 |53711| B|ts |d|0026 | B|49998|0080632
drawing Data=8192757 |53711| B|ts |d|0027 | B|49998|0080359
drawing Data=8192757 |53711| B|ts |d|0028 | B|49998|0094045
drawing Data=8192757 |53711| B|ts |d|0029 | B|49998|0085804
drawing Data=8192757 |53711| B|ts |d|0030 | B|49998|0080346
drawing Data=8192757 |53711| B|ts |d|0031 | B|49998|0091717
drawing Data=8192757 |53711| B|ts |d|0032 | B|49998|0090964
drawing Data=8192757 |53711| B|ts |d|0033 | B|49998|0096753
drawing Data=8192757 |53711| B|ts |d|0034 | B|49998|0100170
drawing Data=8192757 |53711| B|ts |d|0035 | B|49998|0080892
drawing Data=8192757 |53711| B|ts |d|0036 | B|49998|0080538
document Ref Data=fed-std-h28 | | |b |940424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b150 | | | |190401|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=s9074-aq-gib-010/248 | | | |950801|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=s9320-am-pro-020/mldg | | |2 |990801|a| | |
document Ref Data=s9320-am-pro-030/mldg | | |3 |050201|a| | |
3. Requirements
3.1 ;the Complete Tr-317b/bq Hull Penetrator Assembly Must Be In Accordance With Naval Underwater Systems Center Drawing 03411001 (less Find Number 2), Naval Sea Systems Command Drawing 8192757, Except As Amplified Or Modified Herein.;
3.1.1 ;note 6 On Drawing 03411001 Must Be Changed To Reflect Drawing 8192757, Tr-317 Hull Penetrator First Article And Quality Conformance Test Specifications.;
3.1.2 ;drawing 03411002, Zone 4d Should Be Changed To Reflect A 125 Rhr Surface Finish For The Major Outside Diameter (1.623/1.619") In Lieu Of The 63 Rhr Finish.;
3.1.3 ;note: Prior To Application Of The Rubber Mold, The Surface Finish Of The Penetrator Must Be Visually Inspected. Evidence Of Adverse Reaction Between The Neoprene Primer And Phenolic Sealer Is Not Acceptable.;
3.2 First Article Approval (contractor Testing) - First Article Test (fat) And Approval Is Required.
3.3 ;the First Article Test Sample(s) Must Not Be Delivered Against The Contract Quanitity.;
3.4 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;hull Penetrator Body, Find Number 1 On Drawing 03411002;
material - ;qq-n-281, Class A, Form 1 Or Form 2 With A Minimum Yield Strength Of 40 Ksi At .2% Offset;
part - ;hex Nut, On Drawing 03411009;
material - ;astm-b150, Alloy C63200, Temper Tq50;
3.5 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - Quality Conformance/compliance Inspection
item - ;hull Penetrator Assembly;
performance - ;paragraph 3.4 And Table 1 Of Naval Sea Systems Command Drawing 8192757;
acceptance - ;paragraph 3.4 And Table 1 Of Naval Sea Systems Command Drawing 8192757;
3.6 ;the Requirement For Hardness Testing Of Molded Rubber Is Not Required.;
3.7 ;delete References To Material Identification Code (mic) Requirements Cited In Nusc Drawing 03411002, Note 11 And 12. A Unique Serial Number, For Material Traceability Purposes, Must Be Applied To The Penetrator In Lieu Of The Mic.;
3.8 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance
criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The
applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac
document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.9 Prior To Molding, Mil-dtl-24231 Connector Plug Bodies Must Be Treated With A Non-conductive Coating (ncc) Plasma Spray In Accordance With Navsea S9320-am-pro-030/mldg By An Approved Vendor Listed In Csd024 Of The Ecds (electronic Contractor Data
submission) System At: Https://register.nslc.navy.mil/
3.9.1 The Approved Vendor Utilized For This Contract, If Other Than The Prime Manufacturer, Must Be Identified On The Special Emphasis C Of C.
3.10 The Cable Assembly Must Be Wired And Molded In Accordance With Volume Ii Of Navsea S9320-am-pro-020/mldg By An Approved Vendor Listed In Csd023 Of The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/
3.10.1 The Approved Vendor Utilized For This Contract, If Other Than The Prime Manufacturer, Must Be Identified On The Special Emphasis C Of C.
3.11 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.11.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.11.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.11.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.12 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.13 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified Under S9074-aq-gib-010/248 For All Production
and Repair Welding And Brazing. Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.15.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.15.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.15.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.16 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.17 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.18 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.18.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.19 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.20 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.20.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.20.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data
submitted, Citing The Drawing Number And Pieces To Be Welded. (i.e. "wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc." " Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz."). Authority For The
repair Of Special Repairs In Castings And Authority For The Repair Of Wrought Or Forged Material Material Must Be Obtained From The Procurement Contracting Officer. This Request Must Describe The Defect; Including Size, Depth, Location, And A Description Of
the Proposed Repair. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.20.3 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 48 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 48 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.20.4 When Drawings Require Hard Facing Surface Iron Content (nickel For Monel Valves) Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results
must Be Submitted As Part Of The Qualification Data.
3.20.5 Qualification Requirements For Production Hardfacing: The Maximum Qualified Thickness For Hardfacing Must Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt (non-destructive Testing) And Any
additional Drawing Requirements. The Minimum Qualified Thickness Is The Final Machined Thickness At Which Hardness Testing, Ndt, Macro-etch, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.20.6 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential Elements And Any Elements Not
listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.20.7 Qualification Requirements For Production Cladding: The Maximum Qualified Thickness For Cladding Must Be Twice The Weld Deposit Thickness Measured In The As-welded Condition That Is Subjected To Initial Ndt And Any Additional Drawing Requirements.
the Minimum Qualified Thickness Is The Final Machined Thickness At Which Ndt, Side Bends, Macro-etch Testing, And Any Additional Drawing Requirements Are Satisfactorily Performed.
3.20.8 When Weld Repair Is Required On Titanium Material, The Applicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Be Submitted For Review And Approval.
3.20.9 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Formation, Such As Adobe Acrobat
pdf.
3.20.10 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.20.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.20.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.21 See Cdrl Di-ndti-80809 (first Article Testing) - First Article Test/inspection (contractor) - The Contractor Must Conduct ;destructive; First Article Test/inspection On ;1; Unit(s) In Accordance With Requirements ;of Paragraph 4.2.1 And Table 1 Of Naval
sea Systems Command Drawing 8192757; .
3.22 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.22.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.22.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.22.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.22.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.22.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.23 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.23.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.23.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.24 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.24.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.24.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.24.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.24.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.24.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.25 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.25.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.25.2 Inspection For Completeness And Proper Type.
3.25.3 Verification Of Material Quality Received.
3.25.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.25.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.25.6 Identification And Protection From Improper Use Or Disposition.
3.25.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.25.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.25.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.26 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.26.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.27 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.27.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.27.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.27.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.27.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.;
3.28 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.28.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.28.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.28.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.28.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.28.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.29 Material Handling - The Written Material Control Process Must Include The Following:
3.29.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.29.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.29.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.29.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.29.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.29.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.30 Receiving Inspection -
3.30.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.30.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.31 Discrepancy Reporting -
3.31.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.32 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.32.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.32.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.32.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.32.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.33 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1)
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current
Contract Date30 Aug 2021
Contract AmountUSD 4.4 Million
Dept Of Defense Tender Result
Result Stage: Awarded (AOC Available)
United States
Contact Information|4|n743.49|wve|7176052147|benjamin.spangler@navy.mil|
item Unique Identification And Valuation (mar 2016)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E.|
inspection Of Supplies--fixed-price (aug 1996)|2|||
time Of Delivery (june 1997)|20|0001|10|540||||||||||||||||||
general Information-fob-destination|1|b|
wide Area Workflow Payment Instructions (dec 2018)|16|stand-alone Receiving Report - Certifications Combo - Receiving Report & Invoice - Material |n/a|tbd|n00104|tbd|n39040 - Certifications, S4306a - Material |n50286|tbd|133.2|n/a|n/a|n39040 - Certifications |n/a
|n/a|see Dd Form 1423 |port_ptnh_wawf_notification@navy.mil Benjamin.spangler@navy.mil|
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1||
equal Opportunity (sep 2016)|2|||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery.|one Year From Date Of Delivery.|||||
warranty Of Data--basic (mar 2014)|2|||
buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (jul 2020))|3||||
notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1||
alternate A, Annual Representations And Certifications (nov 2020)|13||||||||||||||
buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3||||
buy American-balance Of Payments Program Certificate-basic (nov 2014)|1||
annual Representations And Certifications (nov 2021)|13|334417|1000||||||||||||
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
evaluation Criteria And Basis For Award-|1||
this Amendment Is Issued To Post Results Of Query.
references:
(a) Teledyne (poc: Tara Reischl, Inside Product Sales Representative) Email Dated 25 January 2022
(b) Teledyne Quote 17476_20115-0059
1. Reference (a) Submits Reference (b) For Review. Reference (b) Provides A List Ofdrawing And Parts Lists That Teledyne Indicates Have Newer Revisions That Should Beinvoked In The Subject Solicitation. Subsequent To The Submission Of Reference (b),teledyne
provided An Updated List With Additional Documents That Teledyne Indicatedhad Newer Revisions.
in Response, The Following Drawings And Parts Lists Are Acceptable For Use On The Subjectsolicitation And Subsequent Contract If Awarded:
a. Navsea Drawing 7309103 Revision O In Lieu Of Navsea Drawing 7309103 Revision M
b. Navsea Parts List Pl7309103/4 Revision M In Lieu Of Navsea Parts Listpl7309103/4 Revision H
c. Navsea Drawing 7309104 Revision D In Lieu Of Navsea Drawing 7309104 Revision C
d. Navsea Drawing 7309105 Revision D In Lieu Of Navsea Drawing 7309105 Revision C
e. Navsea Drawing 7309106 Revision D In Lieu Of Navsea Drawing 7309106 Revision C
f. Navsea Drawing 7309107 Revision D In Lieu Of Navsea Drawing 7309107 Revision C
g. Navsea Drawing 7309109 Revision B In Lieu Of Navsea Drawing 7309109 Revision A
h. Navsea Drawing 7309112 Revision C In Lieu Of Navsea Drawing 7309112 Revision B
i. Navsea Drawing 7309113 Revision D In Lieu Of Navsea Drawing 7309113 Revision C
j. Navsea Parts List Pl7309113 Revision D In Lieu Of Navsea Parts Listpl7309113 Revision C
k. Navsea Drawing 7309114 Revision D In Lieu Of Navsea Drawing 7309114 Revision B
l. Navsea Drawing 7309124 Revision F In Lieu Of Navsea Drawing 7309124 Revision E
closing Date Is Extended To 26 May 23.
for Pco Use Only (er54311)
\
1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
2. Portsmouth Nsy's Dodaac Has Changed From N00102 To N50286. Any Reference Ton00102 Within This Order Should Be Updated To N50286.
3. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In.
4.the Following Proposed Delivery Schedule Applies:
submission Of All Certification Data Cdrls 20 Days Prior To Delivery.
pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt
final Delivery Of Material (540 Days)
5.navsup Wss Mech Will Be Considering Past Performance In The Evaluation Of Offers. See Clause 252.213-7000.
6. Drawings Can Be Accessed Thru: Sam.gov
7. This Requirement Falls Under The Special Emergency Procurement Authority(sepa) In Accordance With 41 U.s.c. 1903 And Class Deviation 2018-o0013.
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.2 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;g745210 49956 P B;
2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.4 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made.
drawing Data=7309103 |53711| M| |d|0001 | M|49998|0436358
drawing Data=7309103/4 |53711| H|pl |d|0001 | H|49998|0092995
drawing Data=7309104 |53711| C| |d|0001 | C|49998|0125747
drawing Data=7309105 |53711| C| |d|0001 | C|49998|0101103
drawing Data=7309106 |53711| C| |d|0001 | C|49998|0196187
drawing Data=7309107 |53711| C| |d|0001 | |49998|0024837
drawing Data=7309109 |53711| A| |d|0001 | A|49998|0046433
drawing Data=7309112 |53711| B| |d|0001 | B|49998|2205878
drawing Data=7309112 |53711| B|pl |d|0001 | B|49998|0022464
drawing Data=7309113 |53711| C| |d|0001 | C|49998|0750529
drawing Data=7309113 |53711| C|pl |d|0001 | C|49998|0026864
drawing Data=7309114 |53711| B| |d|0001 | B|49998|0052247
drawing Data=7309124 |53711| E| |d|0001 | E|49998|0559792
drawing Data=7309124 |53711| E| |d|0002 | C|49998|0027401
drawing Data=7309124 |53711| E| |d|0003 | C|49998|0027251
drawing Data=7309124 |53711| E| |d|0004 | B|49998|0687974
drawing Data=7309124 |53711| E| |d|0005 | A|49998|0721991
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=qq-n-286 | | |g |001207|a| | |
document Ref Data=astm-a574 | | | |120401|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=mil-std-2035 | | |a |950515|a| | |
document Ref Data=mil-std-2132 | | |d |080310|f| |01|
document Ref Data=sae As 8660 | | |a |200901|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-dtl-24231 | | |e |130426|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=a-a-59004 | | |b |181118|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
document Ref Data=s9320-am-pro-020/mldg | | |2 |990801|a| | |
3. Requirements
3.1 ;the Electrical Penetrator Assembly Shall Be In Accordance With Naval Sea Systems Command Drawing 7309103 Along With Parts List 7309103/4 And Raytheon Drawing G745210 And Mil-dtl-24231, Except As Amplified Or Modified Herein.;
3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
part - ;hull Penetrator Body, Find Number 1; Penetrator Washer, Find Number 3 And Penetrator Retaining Nut, Find Number 4 On Drawing 7309103 And Parts List 7309103/4;
material - ;qq-n-286, Form 2, Annealed And Age Hardened;
part - ;receptacle Body, Find Number 1 On Drawing 7309113 And Parts List 7309113;
material - ;qq-n-286, Form 2, Annealed And Age Hardened. The Hardness Will Be Obtained In Accordance With Notes 11 And 12 On Drawing 7309113.;
part - ;penetrator Hex Socket Bolt, Find Number 9 On Drawing 7309103 And Parts List 7309103/4;
material - ;ff-s-86, Qq-n-286, Annealed And Age Hardened And Marked .k.;
3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below.
test - ;dye Penetrant Inspection (final Machine Condition);
item - ;hull Penetrator Body, Find Number 1; Penetrator Washer, Find Number 3 And Penetrator Retaining Nut, Find Number 4 On Drawing 7309103 And Parts List 7309103/4; Receptacle Body, Find Number 1 On Drawing 7309113 And Parts List 7309113;
performance - ;t9074-as-gib-010/271;
acceptance - ;mil-std-2035;
test - ;liquid Penetrant Inspection;
item - ;penetrator Hex Socket Bolt, Find Number 9 On Drawing 7309103 And Parts List 7309103/4;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - Quality Conformance/compliance Inspection
item - ;each Electrical Connector Assembly;
performance - ;raytheon Drawing G745210, Paragraph 4.2;
acceptance - ;raytheon Drawing G745210, Paragraph 4.2;
attribute - Annealing And Age Hardening
item - ;hull Penetrator Body, Find Number 1, Penetrator Washer, Find Number 3, Penetrator Retaining Nut, Find Number 4, And Penetrator Hex Socket Bolt, Find Number 9 On Drawing 7309103 And Parts List 7309103/4; Receptacle Body, Find Number 1 On Drawing
7309113 And Parts List 7309113;
performance - Qq-n-286
test - Ultrasonic Inspection On Starting Material
item - ;all Items Requiring Certification Made From Qq-n-286 With A Diameter Or Minimum Distance Between Parallel Surfaces Of 4 Inches Or Greater Of The Starting Material, Or When Required By A Drawing Or Specification Invoked Elsewhere In This Contract;
performance - T9074-as-gib-010/271 Or Mil-std-2132, And Qq-n-286
acceptance - Qq-n-286
3.4 The Cable Assembly Must Be Wired And Molded In Accordance With Volume Ii Of Navsea S9320-am-pro-020/mldg By An Approved Vendor Listed In Csd023 Of The Ecds (electronic Contractor Data Submission) System At: Https://register.nslc.navy.mil/
3.4.1 The Approved Vendor Utilized For This Contract, If Other Than The Prime Manufacturer, Must Be Identified On The Special Emphasis C Of C.
3.5 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.5.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.5.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.5.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.6 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test Of Qq-n-286 Must Be Performed By One Of The Following Laboratories:
huntington Alloys, A Special Metals Company
attn: Bill Bolenr
3200 Riverside Drive
huntington, Wv 257059
phone: (304) 526-5889
fax: (304) 526-5973
metallurgical Consultants, Inc.
attn: W. M. Buehler
4820 Caroline
po Box 88046
houston, Tx 77288-0046
phone: (713) 526-6351
fax: (713) 526-2964
naval Surface Warfare Center, Carderock Division
attn: Eric Focht Code 614
9500 Macarthur Blvd
west Bethesda, Md 20817-5700
phone: (301) 227-5032
fax: (301) 227-5576
teledyne Allvac
attn: Dr. W. D. Cao
2020 Ashcraft Ave.
monroe, Nc 28110
phone: (704) 289-4511
fax: (704) 289-4269
westmoreland Mechanical Testing And Research Inc.
attn: Andrew Wisniewski
p.o. Box 388
youngstown, Pa 15696-0388
mannesmann Rohrenwerke
mannesmann Forschungsinstitut (mfi)
attn: Dr. Weiss
postfach 251160
47251 Duisburg
germany
phone: 011-49-0203-9993194
fax: 011-49-0203-9994415
thyssenkrupp Vdm Usa, Inc.
attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
houston, Tx 77065-4939
phone: (281) 955-6683
3.7 K-monel Fasteners - Material Must Be Heat Treated Per Qq-n-286.
3.7.1 Fasteners That Have Been Hot Or Cold Headed Or Roll Threaded Must Be Solution Annealed Followed By Age Hardening Subsequent To All Heading And Thread Rolling Operations. The Mechanical Properties On Certifications Must Be Actual Properties Of The
annealed And Age Hardened Material And Must Meet The Requirements Of Qq-n-286.
3.7.2 Qq-n-286 Fasteners That Have Been Headed And/or Roll Threaded Must Not Beage Hardened Unless The Material Has Been Solution Annealed Subsequent To The Heading And Threading Operations. Threads Formed After The Final Age Hardening Heat Treatment Must Be
cut Or Ground Only.
3.8 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.9 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The
fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly.
3.10 ;o-rings Must Be Lubricated With A Light Film Of Silicone Compound In Accordance With Sae-as8660 At The Time Of Assembly.;
3.11 First Article Approval (government Testing) - First Article Test (fat) And Approval Is Required.
3.12 ;the Fat Sample(s) Shall Not Be Delivered Against The Contract Quantity.;
3.13 ;the Nameplate Shall Be Per Drawing 7309114 Piece /4 Except The Contractor Name Shall Be Changed From "raytheon" To "d. G. O'brien".;
3.14 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.15 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.15.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.15.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.15.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.16 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.16.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.16.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted Using The Ecds (electronic Contractor Data Submission) System At Https://register.nslc.navy.mil/
3.16.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.17 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, They Must Be In Accordance With S9074-ar-gib-010a/278, (s9074-aq-gib-010/248 For Brazing) By Personnel And Procedures Qualified Under S9074-aq-gib-010/248 For All Production
welding And Brazing. Repair Welding Is Not Permitted ;qq-n-286 Material; . Procedures And Qualification Data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.18 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.19 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.20 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.20.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.21 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.22 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.22.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.22.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.22.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.22.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.22.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.22.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.22.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.22.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.22.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.22.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.22.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.22.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.23 First Article Test/inspection (government) - ;destructive; - The Contractor Shall Deliver ;one (1) Electrical Connector Assembly; Unit(s) To ;receiving Officer
portsmouth Naval Shipyard,
building 240, Code 270. (207-438-5445);
for First Article Tests In Accordance With The ;raytheon Drawing G745210, Paragraph 4.1 And Requirements Of Mil-dtl-24231 For Type Iii Connectors (hi Shock Testing Must Be Performed Instead Of Undex); .
3.24 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.24.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.24.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.24.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.24.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.24.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.25 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.25.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.25.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.26 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.26.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.26.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.26.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.26.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.26.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.27 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.27.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.27.2 Inspection For Completeness And Proper Type.
3.27.3 Verification Of Material Quality Received.
3.27.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.27.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.27.6 Identification And Protection From Improper Use Or Disposition.
3.27.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.27.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.27.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.28 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.28.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.29 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.29.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.29.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.29.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Item Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.29.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.;
3.30 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.30.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.30.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.30.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.30.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.30.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.31 Material Handling - The Written Material Control Process Must Include The Following:
3.31.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.31.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.31.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.31.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.31.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.31.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.32 Receiving Inspection -
3.32.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.32.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.33 Discrepancy Reporting -
3.33.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.34 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.34.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.34.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.34.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.34.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.35 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.35.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.36 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
- Weight, Stability, Or Structural Integrity
- System Design Parameters As Schematics, Flows, Pressures Or Temperatures
- Compartment Arrangements Or Assigned Function
6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major.
6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item.
6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval.
6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification.
6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order.
6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information
contained On Those Documents And Drawings.
6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows:
a... Approved For Public Release; Distribution Is Unlimited.
b... Distribution Authorized To Us Governments Agencies Only.
c... Distribution Authorized To Us Government Agencies And Their Contractors.
d... Distribution Authorized To Dod And Dod Contractors Only.
e... Distribution Authorized To Dod Components Only.
f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t.
x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161.
6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss)
(i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/
a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk.
b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies.
c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To:
commander, Indian Head Division, Naval Surface Warfare Center
code 8410p, 101 Strauss Avenue
indian Head, Md 20640-5035
d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For
certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document.
e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From:
contracting Officer
navsup-wss
code 87321
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue:
commanding Officer
navsup-wss
code 009
5450 Carlisle Pike
p.o. Box 2020
mechanicsburg, Pa. 17055-0788
g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From:
commanding Officer
navsup-wss
code 1 Support Branch
700 Robbins Avenue
philadelphia, Pa. 19111-5094
h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss.
6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience
only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order.
;10/20/2016 - Updated Ecds Url
- Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed
- Oct 29 2010 - Added Sampling Std For Li In-process Testing
- Jun 28 2012 - Updated Ut Of Qq-n-286 Bar 4" And Over
- Dec 17 2011 - Expanded Thread Cutting Requirements
- Sep 30 2008 - Thread Inspection Requirements Were Clarified
- Dec 17 2011 - Began Using Ecds For Submissions
- Jan
Contract Date3 Nov 2023
Contract AmountUSD 600.8 K
7431-7440 of 7436 active Tender Results