Fabrication Tender Results

Fabrication Tender Results

Kolkata Municipal Corporation - KMC Tender Result

Civil And Construction...+1Drainage Work
Eprocure
Result Stage: Awarded  (AOC Available)
1 year ago
India
Contract Date24 May 2023
Contract AmountINR 242.5 K (USD 2.9 K)
Construction Of M.s Fabricated Staircase At The Sludge Well And Shed Including Other Allied Works At Sludge Pump House Of Wtp Ph-iv Of Grww.

South Eastern Railway - SER Tender Result

Ireps
Result Stage: Awarded  (AOC Available)
India
Contract Date24 May 2023
Contract AmountINR 342.2 K (USD 4.1 K)
Description: 37521937: FABRICATED SIDE STANCHION. TO IRS DRG.NO. W/LG-1844, Alt.3. Make- AGE 

Synchrotron Soleil Tender Result

Result Stage: Awarded  (AOC Available)
France
Contract Date24 May 2023
Contract AmountEUR 643.3 K (USD 678 K)
Fabrication, livraison et installation d'un goniomètre pour la ligne de lumière PROXIMA 2A.

Water Resources Department - WRD Tender Result

Civil And Construction...+1Irrigation Work
Eprocure
Result Stage: Awarded  (AOC Available)
1 year ago
India
Contract Date24 May 2023
Contract AmountINR 719.3 K (USD 8.6 K)
Description: Supply Fabrication Erection Testing And Commisiong Of 04 Nos Scouring Sluice Gates Of Chandapara Checkdam

DEPT OF THE NAVY USA Tender Result

Result Stage: Awarded  (AOC Available)
United States
Contract Date24 May 2023
Contract AmountUSD 749.8 K 
Contact Information|4|n743.35|wwu|717-605-8399|tiana.hammaker@navy.mil| item Unique Identification And Valuation (mar 2022)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E | inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version (jun 2002)|8|x||x|||||| time Of Delivery (june 1997)|20|0001|64|294|||||||||||||||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|n50286|tbd|||n/a|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contract ||||| warranty Of Data--basic (mar 2014)|2||| buy American --free Trade Agreements--balance Of Payments Program - Basic(deviation 2020-o0019) (mar 2022))|3|||| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (may 2022)|13|332722|500|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| 1. Tdp Has Been Updated. \ 1.dd1423 Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Here In. 3.the Following Proposed Delivery Schedule Applies: submission Of All Certification Data Cdrls 20 Days Prior To Delivery. pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt final Delivery Of Material (294 Days) 4. This Requirement Falls Under The Special Emergency Procurement Authority(sepa) In Accordance With 41 U.s.c. 1903 And Class Deviation 2018-o0013. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(a); Applies To This Material. 1.1.2 This ;screw, Cap Slflkg; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May require Testing. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;sd.301.96717 56878 E B; document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=sae Ams 5920 | | |a |130201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=ss800-ag-man-010/p-9290 | | |a |200324|a| |42| 3. Requirements 3.1 ;the Cap Screw Must Be In Accordance With Sps Technologies Drawing Sd.301.96717. Mp98t Must Be Procured From Timken Latrobe Steel, Latrobe, Pa. This Material Is Required To Be Procured From Sps Technologies, Jenkintown Pa, With Timken Latrobe Steel, latrobe Pa, As The Mp98t Material Supplier. Alternate Vendors Require Navsea Approval.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;screw, Cap, Slflkg; material - ;mp98t Per Ams 5920 And Sps Technologies Drawing Sd.301.96717; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - ;liquid Penetrant Inspection; item - ;screw, Cap, Slflkg; performance - ;t9074-as-gib-010/271; Sampling Must Be 100%; acceptance - ;note 4 Of Sps Technologies Drawing Sd.301.96717; 3.4 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s). 3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.7 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address, Phone Number And Date, Quantity inspected, Identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The acceptance Criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By the Government Representative. 3.10 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.10.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.10.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.10.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.10.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.10.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.11 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.11.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.11.2 Inspection For Completeness And Proper Type. 3.11.3 Verification Of Material Quality Received. 3.11.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.11.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.11.6 Identification And Protection From Improper Use Or Disposition. 3.11.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.11.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.11.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.12 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.12.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.13 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.14.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;sps Drawing Sd.301.96717; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.14.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.14.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.14.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.14.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.15 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.15.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Material Grade Marking Must Be Mp98t.; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, a574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After the Application Of Protective Compounds. 3.15.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.16 Material Handling - The Written Material Control Process Must Include The Following: 3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.17 Receiving Inspection - 3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.17.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.18 Discrepancy Reporting - 3.18.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.19.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.19.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.19.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.19.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address, Phone Number And Date. 2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 014532156 D5) ("n/a" When Not applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Cure Date ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ; - Oct 20 2016 - Updated Ecds Url - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

DEPT OF THE NAVY USA Tender Result

Result Stage: Awarded  (AOC Available)
United States
Contract Date24 May 2023
Contract AmountUSD 749.8 K 
Contact Information|4|n744.26|wwu|717-605-2227|danielle.rhone@navy.mil| item Unique Identification And Valuation (mar 2016)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specifications Section C And Section E| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version (jun 2002)|8|x||x|||||| wide Area Workflow Payment Instructions (may 2013)|16|receiving Report And Invoice Combo|source Inspection.source Acceptance|tbd|n00104|tbd|tbd|n50286|tbd|||n/a|||||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year|365 Days After The Last Delivery Under This Contrat||||| warranty Of Data--basic (mar 2014)|2||| alternate A, Annual Representations And Certifications (jan 2015)|11|||||||||||| buy American-free Trade Agreements-balance Of Payments Certificate (nov 2014)|5|||||| buy American-balance Of Payments Program Certificate-basic (nov 2014)|1|| annual Representations And Certifications (jan 2018)|11|332722|500|||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| evaluation Criteria And Basis For Award-|1|| 1. Tdp Has Been Updated. \ solicitation Due Date Has Been Extended In An Effort To Obtain Updates Quotes. tdp Has Been Updated. qty Has Been Increased. \ reference: (a) Sps Technologies Llc (poc Danny Coppolella) Email Dated 13 March2020 1. Reference (a) States The Vendor Does Not Have A Copy Of Navsea Drawing 7384947revision B. in Response, Solicitation Note 3 States Drawings Can Be Accessed Thru:www.neco.navy.mil. If The Vendor Continues Having Difficulties Accessing Thedrawings, Then Navsup Wss Needs To Provide Additional Guidance On How The Vendoris To Get A Copy Of The Necessary drawings. 2. Reference (a) Requests Clarification On Requirement For Self-locking Element, Partnumber 273 Of Navsea Drawing 7384947 Revision B. in Response, Navsea Drawing 7384947 Revision B Part Number 260 Is A Self-lockingcap Screw And Part Number 273 Is A Self-locking Element. Specifically, The Self-lockingelement Is Zytel 101 Nylon Rod With 0.313 Inch Diameter And Must Be Installed In Partnumber 260 in Accordance With View 20-5f. Drawing View 20-5f Specifies Holelocation And Diameter In The Thread And How The Locking Element Is To Be Fitted In Thethread. The Locking Element Is Not A Standard Mil-dtl-18240 Type N Pellet Andtorque Requirement Such As Seating torque And Prevailing Torque Are Not Required. 3. Reference (a) Requests Sps Mpp-i-005 To Apply For Wedge Testing. in Response, Subject Solicitation Paragraph 3.3 Metallographic Test Section Originatedfrom Sps Mpp-i-005 Page 11. Photographs Of The First And Last Piece Longitudinal Headcross-sections Made At The Time Of Head Forging Must Be Submitted As Part Of testingcertification. 4. Reference (a) Requests To Change The Sps Parts Number To Remove The Cross Drill Andadd A Nylon Pellet. in Response, The Request To Change The Sps Part Number 96717-260 Is At The Discretion Ofsps Technologies. Ultimately, All Material Delivered Must Conform To Requirementsspecified In The Subject Solicitation. Specifically, The Cap Screw Must Be In Accordancewith mil-dtl-1222 Modified To The Requirements Of Navsea Drawing 7384947revision B Part Number 260. Part Number 273 Must Be Installed In Accordance With Drawing View 20-5f. 5. Tdp Paragraph 3.3 Metallographic Test Sectionis Updated As Follows: test - ;metallographic; item - ;screw, Cap, Slflkg; performance - ;provide Photographs Of The First And Last Piece Longitudinal Head Crosssectionsmade At The Time Of Head Forging Operation.;acceptance - ;cross Sections Shall Show No Evidence Of Any Internal Imperfectionssuch As Cracks Or Porosity. Flow Lines At The Fillet Radius (i.e. Within The Region Boundedby The Points Of Tangency With The Shank And With The Bearing Surface) Will Exhibitcontinuous Flow In The As-forged Head But May Be Compressed. Grain Flow Linesterminating In The Head-to-shank Fillet Radius Or Onto The Shank Surface In The As-forgedparts Is Not Acceptable.; 6.tdp Paragraph 3.2.2 "engineering Reports Erg541-0805a3,erg541-0805a10, Erg541-0805a35 & Erg541-0805a38 Are Not Required And Hereby Removed From This Solicitation. 7. All Other Terms And Conditions Remain The Same. reference: (a) Sps Technologies Llc (poc Danny Coppolella) Email Dated 14november 2019 1. Reference (a) Requests Clarification On Why Sps Part Number 96717-260 Is Not Called out In The Subject Solicitation.in Response, Sps Part Number 96717-260 May Be Used As A Reference Only, And Allmaterial Delivered Must Conform To The Drawings, Specifications, And Revision Levelscited In The Subject Solicitation. 2. Reference (a) Requests Clarification On Self-locking Element Requirement.specifically, If The Requirement Is To Have A Drill Hole In The Head Or A Pellet In Thethreads.in Response, Self-locking Element Is A Pellet In The Threads In Accordance With Navseadrawing 7384947 Part Number 273. 3. Reference (a) Requests Clarification On Why Sps Testing Procedure Mpp-i-005revision 12 Is Not Called Out In Section 3.3 Of The Subject Solicitation. in Response, Testing Procedure Sps Mpp-i-005 May Be Used As A Reference Only, And Allmaterial Delivered Must Conform To The Drawings, Specifications, And Revision Levelscited In The Subject Solicitation. the Metallographic Test Section In Paragraph 3.3 Is Updated As Follows: test - Metallographic item - Screw, Cap, Slflkg performance - Provide Photographs Of Each Longitudinal Metallographic Etched Headcross Section Evaluated At The Final Hot Forging Operation. acceptance - Cross Sections Shall Show No Evidence Of Any Internal Imperfections Suchas Cracks Or Porosity. Flow Lines At The Fillet Radius (i.e. Within The Region Bounded Bythe Points Of Tangency With The Shank And With The Bearing Surface) Will Exhibitcontinuous Flow In The As-forged Head But May Be Compressed. Grain Flow Linesterminating In The Head-to-shank Fillet Radius Or Onto The Shank Surface In The As-forgedparts Is Not Acceptable. 4. The Soliciation Due Date Has Also Been Extended. tdp Has Been Updated. the Solicitation Closing Date Has Been Extended. the Quantity Is Hereby Increased On This Requirement. this Requirement Is For Quantity 100 And Quantity 120, For A Total Amount Of 222. please Quote The Total Quantity Of 222. \ this Is An Urgent Casrep Dss-soc Requirement. the Solicitation Closing Date Has Been Extended. the New Buyer/poc Is Danielle Rhone. Quotes May Be Submitted Via Neco Or By Email To Danielle.rhone@navy.mil. clauses Have Been Updated As Seen Elsewhere In This Amendment. 1. Dd1423 Data Item A001 May Be Waived If Already On File At Navsup-wssmechanicsburg. 2. Navsup-wss Mechanicsburg Will Be Considering Past Performance In The evaluation Of Offers. See Clauses Navsupwssma09 And Navsupwssma06. 3. Drawings Can Be Accessed Thru: Www.neco.navy.mil 4.submission Of All Certification Dd1423 Data Cdrls Will Be On Or Before 20days Prior To Delivery pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Ofcertification Dd1423 Data Cdrls final Delivery Of Material Will Be On Or Before 186 Days After Effective Dateof Contract. 5. Consistent With Far 52.216-18, All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To Theinstant Procurement Are Considered To Be "issued" By The Government When Copiesare Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Governments Acceptance Of The Contractors Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 1.1.1 Dssp Scope Of Certification Material - Material Control Division ;(a); Applies To This Material. 1.1.2 This ;screw, Cap Slflkg; Contains Non-metallic Materials Which Must Satisfy The Toxicity And Flammability Requirements Of Navsea Ss800-ag-man-010/p-9290. Use Of Any Material Other Than That Specified Requires Special Engineering Approval And May require Testing. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order. drawing No Cage Rev Distr Cd ;sd.301.96717 56878 E B; document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=sae Ams 5920 | | |a |130201|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=ss800-ag-man-010/p-9290 | | |a |200324|a| |42| 3. Requirements 3.1 ;the Cap Screw Must Be In Accordance With Sps Technologies Drawing Sd.301.96717. Mp98t Must Be Procured From Timken Latrobe Steel, Latrobe, Pa. This Material Is Required To Be Procured From Sps Technologies, Jenkintown Pa, With Timken Latrobe Steel, latrobe Pa, As The Mp98t Material Supplier. Alternate Vendors Require Navsea Approval.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;screw, Cap, Slflkg; material - ;mp98t Per Ams 5920 And Sps Technologies Drawing Sd.301.96717; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings Is Still Required, But Certifications Are Only Required As Listed Below. test - ;liquid Penetrant Inspection; item - ;screw, Cap, Slflkg; performance - ;t9074-as-gib-010/271; Sampling Must Be 100%; acceptance - ;note 4 Of Sps Technologies Drawing Sd.301.96717; 3.4 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.5 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.5.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.5.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.5.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.5.4 A Copy Of The Final Waiver/deviation (both Approved And Disapproved) Must Be Forwarded With The Applicable Asset(s). 3.6 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.7 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address, Phone Number And Date, Quantity inspected, Identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The acceptance Criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.8 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.8.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.8.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon Notification, make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.8.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.8.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.8.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.9 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.9.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.9.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided By the Government Representative. 3.10 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.10.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.10.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.10.3 The Prime Contractor Must Ensure That The Purchased Product Conforms To Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.10.4 The Prime Contractor Must Evaluate The Requirements Of The Contract And Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.10.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.11 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.11.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.11.2 Inspection For Completeness And Proper Type. 3.11.3 Verification Of Material Quality Received. 3.11.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.11.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.11.6 Identification And Protection From Improper Use Or Disposition. 3.11.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And Necessity for Withholding The Material From Use. 3.11.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.11.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.12 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. 3.12.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein. 3.13 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.14 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.14.1 Quantitative Chemical And Mechanical Analysis Of Material Is Required ;sps Drawing Sd.301.96717; .test Reports Must Be Traceable To Traceability Marking On The Material. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, type, Finish, And/or Composition, As Applicable, Of The Material Supplied. 3.14.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification For Chemical Composition Must Be Overstamped And/or Annotated With The Unique Traceability marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ________________ And Heat Treat Number ________________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.14.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.14.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.14.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.15 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The Marking requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Marking Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is Permissible provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.15.1 Fasteners Must Be Marked In Accordance With ;mil-dtl-1222. Material Grade Marking Must Be Mp98t.; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, a574, And 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After the Application Of Protective Compounds. 3.15.2 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side Location if Necessary). Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed By Approximately .010" Located On The Top Perimeter Of The Head Of the Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings. 3.16 Material Handling - The Written Material Control Process Must Include The Following: 3.16.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.16.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.16.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats Or Loss Of Traceability. The Traceability Marking must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.16.4 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By The Traceability Marking On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.16.5 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.17 Receiving Inspection - 3.17.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.17.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.18 Discrepancy Reporting - 3.18.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Will Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.19 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.19.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.19.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.19.3 All Data Concerning Material Verification (chemical And Mechanical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification Test Reports must Also Be 100% Inspected For Completeness And Legibility. 3.19.4 All Metallic Material Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.20 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address, Phone Number And Date. 2. The Contract/purchase Order Number (i.e. N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (i.e. 1h 4820 014532156 D5) ("n/a" When Not applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Cure Date ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ; - Oct 20 2016 - Updated Ecds Url - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section.; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.

Eastern Coalfields Limited - ECL Tender Result

Civil And Construction...+1Excavation
Eprocure
Result Stage: Awarded  (AOC Available)
1 year ago
India
Contract Date24 May 2023
Contract AmountINR 839.4 K (USD 10 K)
Description: Fabrication of 1200mm conveyor structure at Shyamsundarpur Colliery under Bankola Area.

City Of Versoix Management &amp Schools Department Tender Result

Result Stage: Awarded  (AOC Available)
Switzerland
Contract Date24 May 2023
Contract AmountCHF 2 Million (USD 2.2 Million)
Fabrication et livraison des repas pour les restaurants scolaires de la Ville de Versoix

Kerala State Electricity Board - KSEB Tender Result

Machinery and Tools
Eprocure
Result Stage: Awarded  (AOC Available)
1 year ago
India
Contract Date24 May 2023
Contract AmountINR 2.4 Million (USD 28.9 K)
Description: Fabrication of line materials

DEPT OF THE NAVY USA Tender Result

Result Stage: Awarded  (AOC Available)
United States
Contract Date24 May 2023
Contract AmountUSD 2.8 Million 
Item Unique Identification And Valuation (mar 2022)|19|||||||||||||||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (dec 2018)|16|invoice And Receiving Reports. (combo). |source|tbd|n00383|tbd|tbd|tbd|tbd||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss Phl| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (feb 2019)|2||| progress Payments (mar 2020)|4|x||85%|| limitation Of Liability--high-value Items (feb 1997)|1|| alternate A, Annual Representations And Certifications (nov 2020)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate (deviation 2020-o0019) (jul 2020))|3|||| buy American--balance Of Payments Program (nov 2014)|1|| annual Representations And Certifications (may 2022)|13|336413|1250|||||||||||| instructions To Offerors--competitive Acquisition (nov 2021)|2||| facsimile Proposals (oct 1997)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2|do-a1a |do| the Purpose Of This Amendment Is To Update The Delivery Requirement Under Section L Volume I Non-price Proposal Of The Solicitation And Extend The Proposal Submission Date. 1. The Required Delivery Is To Begin 750 Days Or Less After Contract Award; The Contractor May Offer An Alternate Faster Delivery Schedule. 2. If A Proposal Already Submitted Is The Final Proposal Offer Then No Resubmission Is Required, Although Any Offeror Must Sign And Return This Amendment To Be Considered For Award. 3. The Revised Proposal Submission Due Date Is April 6th 2023. 4. No Other Terms Were Changed. 5. All Contractual Documents Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such Asemail. The Government's acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. \ the Purpose Of This Amendment Is To Extend The Proposal Submission Date Until 20th March 2023. no Other Terms Were Changed. all Contractual Documents Related To The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. \ please See Solicitation Posting On Sam.gov For Documents Required Under This Solicitation. The Documents Are Held Under Attachments And Links. three Documents Will Be Provided: 1. Addition To Sections L And M. 2. Attachment I The Past Performance Information Sheet. 3. Attachment C The Proposed Pricing Sheet. no Other Terms Were Changed Under This Amendment. all Contractual Documents Related To The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. \ this Solicitation Is For Made New Manufacture Spare Parts. please See Amendment 001 For Further Solicitation Requirements And Instructions. the Government Physically Does Not Have In Its Possession Sufficient, Accurate, Or Legible Data To Contract With Other Than The Current Sources. these Items Require Government Source Approval Prior To Award. If You Are Not An Approved Source, You Must Submit, Together With Your Proposal, The Information Detailed In The Navsup Wss Source Approval Brochure Which Can Be Obtained On The Internet At H https://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers Received Which Fail To Provide All Data Required By The Source Approval Brochure Will Not Be Considered For Award Under This Solicitation. for Information Or Questions Regarding This Notice, Please Contact Matthew Pizzarelli At The Emailaddress: Matthew.f.pizzarelli.civ@us.navy.mil. navsup Wss Requests Proposals Submitted In Response To This Solicitation Remain Valid For A Minimum Of 120 Days Following Submission. �all Contractual Documents Related To The Instant Procurement Are Considered Tobe "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Pre-award / Post Award Requirements: due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended. 1.3 . The Contractor Shall Include On The Detailed Process/operation Sheets Developed, (1) All In House Manufacturing Processes And (2) The Identity Of All Manufacturing Sources Performing Processes/operations Outside Their Facility. These Sheets Shall Not Be revised Or Altered After The Successful Completion Of First Article Or Production Lot Testing Without Approval From The Basic Design Engineering Activity, Via The Pco. 1.4 . Unless Otherwise Specified, For Fabricated Parts, The Inspection method Sheets/ Final Inspection Sheets Shall List The Characteristics of Each Item Produced Under The Contract. the Manufacturer Shall Be Required To Provide Certifications Of All Raw material Including Castings And Forgings. The Material Source Shall Be identified And The Documentation Shall Be Able To Identify The Customer and/or Contract Number. The Manufacturer Shall Maintain All Raw Material documentation For A Minimum Of Ten (10) Years. the Contractor Is Responsible For Providing Completed Inspection Method Sheets/final Inspection Sheets Showing The Actual Dimensions Taken For all Characteristics,in Addition, Critical Characteristics Shall Be annotated. 1.5 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation: (a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval. (b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors. (c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents. (d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings, forgings, Etc. (e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics should Be Discernible From All Other Characteristics. the Above Requirements Are A Subset Of Requirements Specified In The Aso source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval brochure. 1.6 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;80020; ) ;11-61369-5; , Revision ;v; And All Details And Specifications Referenced Therein. 1.7 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not Be provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced Specification. 1.8 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents drawing Data=mpr 1223 |80020| C| |d| | | | drawing Data=mpr 4 |80020| D| |d| | | | drawing Data=11-61369 |80020| V| |d| | | | 3. Requirements - Not Applicable 4. Quality Assurance 4.1 Review Documentation As Provided Under Dd 1423 Requirements. 4.2 Critical Manufacturing Processes ( ;applies; ) Heat Treat ( ; ; ) Welding ( ; ; ) Cadmium Plating ( ; ; ) Engineering Chrome Plating ( ; ; ) Nickel Chrome Plating ( ; ; ) Casting(s) ( ; ; ) Forging(s) ( ;applies; ) Mpr (material Processing Requirements) 4.3 The Test To Be Performed Under The First Article Approval Clause (far 52.209-3) Of The Contract Are Listed Below 4.3.1 Dimensional Test (special) ;close Tolerances. Hardness Test; 4.3.2 Requirements Of: ;lke Drawing Package; 4.3.3 Form ;applies; 4.3.4 Fit ;n/a; 4.3.5 Function ;n/a; 4.3.6 Compliance With Drawing ( ;80020; ) ;11-61369; , Revision ;v; And Specifications Referenced Therein. 4.4 In Addition To The Above Tests, The First Article(s) To Be Inspected Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Article(s) Comply With The Contract Requirements 4.5 The Contractor Shall Be Responsible For Providing The Necessary Parts And Repair Of The First Article Sample(s) During Inspection 4.6 The Contractor Shall Notify The Pco, Aco, And Qar Fourteen (14) Days Prior To Conducting The First Article Test So That The Government May Witness Such Testing. 4.6.1 The Qar Shall Be Present To Witness All First Article Testing. 4.6.2 The Following Additional Personnel Shall Witness The First Article Testing: ;roy Janney Qa Rep At Fax (732) 323-1381; 4.7 Disposition Of Fat Samples 4.7.1 ; ; Sample(s) May Be Destroyed During Testing. 4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Sample(s) Shall Remain At The Contractor And May Be Considered As Production Items Under The Contract Provided The Sample(s) Can Be Refurbished To Ready For Issue Condition And Provided The sample(s) Have Inspection Approval Of The Cognizant Dcmc Qar. Sample(s) May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment. 4.8 Test Sample Coating Instructions 4.8.1 Samples Are To Be Unpainted. Corrosive Areas Are To Be Coated With A Light Preservative If Required. 4.9 Notice To Government Of Testing At The Contractors Facility. 4.9.1 Far 52.209-3 Applies (a) The Contractor Shall Present ;one; ; Unit(s) Of The Following Cage( ;80020; ; ), Part Number ;11-61369-5; ; , Revision ;v; ; As Specified In This Contract. At Least Fourteen (14) Calendar Days Before The Beginning Of The First Article Testing, The contractor Shall Notify The Contracting Officer, In Writing, Of The Time And Location Of The Testing So That The Government May Witness The Tests. (b) The Contractor Shall Submit The First Article Test Report Within 15 Calendar Days From The Date Of Testing To: ;pco; ; the Contractor Shall Mark The Report "first Article Test Report" And Cite The Contract Number And Lot/item Number. Review Documentation As Provided Under The Dd1423 Requirements. (c) Within 45 Calendar Days After The Government Inspects The First Article, The Contracting Officer Shall Notify The Contractor, In Writing, Of The Approval, Conditional Approval, Or Disapproval Of The First Article. The Notice Of Approval, Conditional approval, Or Disapproval Shall Not Relieve The Contractor From Complying With All Requirements Of The Specifications And All Other Terms And Conditions Of This Contract. A Notice Of Conditional Approval Shall State Any Further Action Required Of The contractor. A Notice Of Disapproval Shall Cite Reasons For Disapproval. (d) If The First Article Is Disapproved, The Contractor, Upon Government Request Shall Repeat Any Or All First Article Tests. After Each Request For Additional Tests, The Contractor Shall Make Any Necessary Changes, Modifications, Or Repairs To The First article Or Select Another First Article For Testing. All Costs Related To These Tests Are To Be Borne By The Contractor, Including Any And All Costs For Additional Tests Following A Disapproval. The Contractor Shall Then Conduct The Tests And Deliver Another report To The Government Under The Terms And Conditions And Within The Time Specified In Paragraph B Above. The Government Reserves The Right To Require An Equitable Adjustment Of The Contract Price For Any Extension Of The Delivery Schedule Or For Any additional Costs To The Government Related To These Tests. (e) If The Contractor Fails To Present Any First Article On Time, Or The Contracting Officer Disapproves Any First Article, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The Meaning Of The Default Clause Of This Contract. (f) Unless Otherwise Provided In The Contract, And If The Approved First Article Is Not Consumed Or Destroyed In Testing, The Contractor May Deliver The Approved First Article As Part Of The Contract Quantity If It Meets All Contract Requirements For acceptance. (g) If The Government Does Not Act Within The Time Specified In Paragraph (c) Above The Contracting Officer, Shall, Upon Timely Written Request From The Contractor, Equitably Adjust Under The Changes Clause Of This Contract The Delivery Or Performance Dates and/or The Contract Price, And Any Other Contractual Term Affected By The Delay. (h) Before First Article Approval, The Acquisition Of Materials Or Components For, Or The Commencement Of Production Or, The Balance Of The Contract Quantity Is At The Sole Risk Of The Contractor. Before First Article Approval, The Costs Thereof Shall Not Be allocated To This Contract For 1) Progress Payments, Or 2) Termination Settlements If The Contract Is Terminated For The Convenience Of The Government. The Contractor Is Responsible For Providing Operating And Maintenance Instructions, Spare Parts, And Repair of The First Article During Any First Article Test. (i) The Contractor Shall Produce Both The First Article And The Production Quantity At The Same Facility And Shall Submit A Certification To The Effect With Each First Article. (j) The Test Report (2 Copies) Shall Be In Accordance With Mil-std-831, Unless Otherwise Specified On The Dd1423, And Shall Be Submitted Via The Cognizant Dcmc To Navsup, Attn: (cite Name And Code In Block 10.a Of The Sf33). The Dcmc Shall Provide Comments On form Dd1222 (2 Copies) Which Shall Be Forwarded With The Test Report. Approval Of The Test Report Is The Pco's Responsibility. Upon Notification Of Approval, Condition Approval, The Aco Shall Execute The Dd250 To Indicate Government Acceptance Of The Test report. 4.10 Alternate Offers - Waiver Of First Article Approval Requirements. (the Following Provisions Supersede Any Waiver Of First Article Approval Requirements Terms Set Forth In Clause 52.209-3 Or 52.209-4 As Appropriate) (a) Unless Otherwise Specified In The Solicitation, Navsup Wss Reserves The Right To Waive The First Article Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production Articles Accepted By The Government Or The original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of First Article Requirements Shall Submit Evidence With Its Offer Establishing That: (i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation, And (ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run. additionally, The Offeror Shall Submit A Certification, To Be Executed By The Officer Or Employee For The Offer, Stating That: (i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequences Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer, and (ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause. (note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States code, Section 1001.) (b) Offerors Requesting Waiver Of First Article Approval Requirements Under The Provisions Of This Clause Are Cautioned To Submit Two Prices For Articles Required Herein - One That Is Based On Compliance With The First Article Approval Requirements And one That Is Based On A Waiver Of Such Requirements. Where An Offeror Submits Only One Price And Fails To Clearly State That The Price Is Based On Waiver Of The First Article Approval Requirements It Will Be Deemed To Be Based On Compliance With The First article Approval Requirements (c) In The Event Of The First Article Approval Requirement Is Granted, The Delivery Schedule For The Production Items Shall Be Reduced By The Number Of Days Designated For Delivery Of First Article Test Unit Plus The Number Of Calendar Days Indicated For The government Notification Of Conditional Approval Or Approval. These Requirements Are Specified In The Quality Assurance Section Of This Solicitation. If The Offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule he Offers To The Government. Offeror's Proposed Alternate Delivery Schedule (based On Waiver Of First Article Approval Requirements) within Days: item No. _____________ Quantity:_______ After Date Of Contract:_________ 4.11 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar). during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows: A. Level Of Inspection (loi). 1. Critical Characteristics: 100% Inspection Shall Apply. 2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar. B. Critical Characteristics: ;all Actual Dimensions Minor, Major Or Critical Characteristics Shall Be Recorded. The Ambeint Temperature Shall Be Recorded At Time Measurements Are Taken. Certifications To Be On File For A Minimum Of Seven Years After Delivery Of Contract testing And Evaluation: i. The Contractor Shall Accomplish 100% Inspection And/or Testing Of All Critic And/or Requirements Identified In The Drawings, Drawing Notes, And Process And Results Shall Consist Of Actual Dimensions, Measurements, And Test Outcomes And Included In The First article Test Report. Attributes For Hardness And Non-destructive Testing Shall Be Inspected Certifications Shall Be On File For A Minimum Of Seven Years After Delivery Of Contract. acceptance/reject Criteria: i. Satisfactorily Meeting All Requirements Cited Inparagraph 7a And Satisfactory Demonstrating 100% Conformance To The Test And Evaluation Elements Cited In Paragraph 7.b Shall Constitute Acceptance Of The First Article; ii. Failure To Meet Any Of The Conditions In Paragraph 7.a And 7.b Shall Be Cause For Rejection.; C. Major And Minor Characteristics 1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications. 4.12 Special Inspection Requirements ( ;applies; ) Magnetic Particle Inspection ( ;applies; ) Surface Inspection ( ; ; ) Penetrant Inspection ( ; ; ) Radiographic Inspection ( ; ; ) Ultrsonic Inspection ( ; ; ) High Shock Test ( ; ; ) Mechanical Vibration Test 4.13 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of witnessing The Final Inspection. The Contractor Shall Notify By Email Or telefax Pco And Nawc Lakehurst Qa ;roy Janney Nawc Qa Rep At Fax (732) 323-1381; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units. 4.14 In Process Inspection Requirements: due To The Critical Nature Of This Item It Is Necessary To Conduct In-process Inspections On Critical Component Features, Attributes, Or Manufacturing Processes. The Contractor Shall Notify The Pco And Nawc Via Email Or Telefax Pco And Nawc Lakehurst Qa ;the below Interim Inspections Shall Take Place At The Contractor's Location:; to Arrange For The In-process Inspection. a Minimum Of 10 Days Is Needed For Advance Notice For Each Occurrence. the Authority Of The Qar Shall Not Be Abrogated. The Qar Shall Verify That timely Notification Was Given All Parties Listed Below. characterisics To Be Inspected: ;i. Verification Of Material, Tensile Strength, Yield Strength, Elongation, Reduand Per Drawing 11-61369 ii. Verification Of Heat Treatment Iaw Ams 2759/1,mpr 4 Per Drawing 11-61369 iii. Verification Of Hardness Per Drawing 11-61369 iv. Witness Magnetic Particle Inspection Iaw Mpr 4 And Per Drawing 11-61369 Prior To Protective Coating v. Verification Of Dimensional Inspection Per Drawing 11-61369 Prior To Protective Coating.; ;the Contractor Shall Assist On The Conduct Of The Interim Inspection(s) As Descfacilities, Inspection Equipment, And Skilled Personnel, To Support The Nawcadlinterim Inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To perform The Inspections. The Contractor Shall Also Provide Sufficient Rigging/material Handling Services And & Machines Used To Accomplish The Inspection Task. This Contractor Assist Require The Production Quantities And As A Minimum, Include Inspection Of All (100%) Interim Inspection Requirements Identified Above.; ; Contractor Assist And Part Marking: The Contractor Shall Assist On The Conduct Of The Inspections (both Final And Interim) Required That Are Necessary To Certify The Critical Items Specified Herein. The Contractor Shall Provide Adequate Facilities, inspection Equipment, And Skilled Personnel, To Support The Navair Inspector In The Conduct Of The Interim Inspection(s). The Contractor Shall Provide Gauges, Tools, Fixtures, And Jigs Necessary To Perform The Inspections. The Contractor shall Also Provide Sufficient Rigging/material Handling Services And Manpower To Setup/configure/configure/operate Equipment & Machines Used To Accomplish The Inspection Task. This Contractor Assist Requirement Shall Be Applicable To 100% Of The Production quantities. As Part Of The Mri Process, The Navair Qa Representative Will Provide, In Writing, A Certification Number Along With Direction For Marking The Critical Safety Items (csi). ; ; ; ; ; ; ; 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable this Is An Alre Critical Safety Item. For Drawing Updates, See Attached Nawc Lke Drawing Update Sheet. navsup Reference Only: (22-10038):procurement Tdr the Components Being Acquired Under This Solicitation Have Been Classified As "critical" Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Subm& Been Approved Will Be Eligible For Award Under This Solicitation Any company Submit A Source Approval Request As Outlined In This Solicitation. alre Csi Parts Require Certification. when Certified, An Alre Part Is Marked With A Material Identification Code(mic). Nawcadlke Qa Will Provide The Mic To Dcma If The Component Is Source Accepted, And After Receipt Of All Associated Data. Application Of Mic Shall Be In The Same Methodology As The drawing Note For Part Marking, And In Same Area As Part Marking (next To, Above, Or Below). \ date Of First Submission=180 Dac first Article: all Certifications. Test Reports, And In-process Inspection Documents Needed To Substantiate Product Quality Shall Be Available With The First Article When Presented For Inspection At Contractors Facility. Notification Of 14 Days Prior To Presentation For inspection Must Be Given To Roy Janney Nawc Qa At Fax (732) 323-1381. data Requirements: a. Copies Of All Approved Requests For Variations.b. Material And Mill Certifications Iaw Mpr 4 And Per Drawing 11-61369. c. Heat Treat Iaw Ams 2759/1, Mpr 4 Per Drawing 11-61369. d. Hardness Test Per Drawing Per Drawing 11-61369. e. Izod Test Iaw Mpr 4 And Per Drawing 11-61369. f. Tensile Strength, Yield Strength, Elongation, And Reduction Of Area Iaw Mpr 4 And Per Drawing 11-61369. g. Magnetic Particle Inspection Iaw Mpr 4 Per Drawing 11-61369. h. Sand Blast Iaw Mpr 1223 Per Drawing 11-61369. i. Identification And Marking Per Drawing 11-61369. j. Dimensional Inspection Per Drawing 11-61369. k. Flatness Per Drawing 11-61369 date Of First Submission=asreq receipt Inspection all Certifications. Test Reports, And In-process Inspection Documents Needed To Substantiate Product Quality Shall Be Submitted With Production Units When Presented For Receipt Inspection At Contractors Facility.notification Of 14 Days Prior To Presentation For inspection Must Be Given To Roy Janney Nawc Qa At Fax (732) 323-1381. data Requirements a. Copies Of All Approved Requests For Variations. b. Material And Mill Certifications Iaw Mpr 4 And Per Drawing 11-61369. c. Heat Treat Iaw Ams 2759/1, Mpr 4 Per Drawing 11-61369. d. Hardness Test Per Drawing Per Drawing 11-61369. e. Izod Test Iaw Mpr 4 And Per Drawing 11-61369. f. Tensile Strength, Yield Strength, Elongation, And Reduction Of Area Iaw Mpr 4 And Per Drawing 11-61369. g. Magnetic Particle Inspection Iaw Mpr 4 Per Drawing 11-61369. h. Sand Blast Iaw Mpr 1223 Per Drawing 11-61369. i. Preparation For Coating And Finish Per Drawing 11-61369 j. Identification And Marking Per Drawing 11-61369. k. Dimensional Inspection Per Drawing 11-61369. l. Flatness Per Drawing 11-61369.
9971-9980 of 10000 active Tender Results