ERWM2201 - Gofer Waste Transfer Station, Lead Consultant and Multi-disciplinary Team-The scheme was to provide two full design options for Gofer Bulking Station up to RIBA 3, then progress with single scheme up to the end of RIBA 4. Technical support was also to provided during the construction phase, RIBA 5.
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Award of Boiler Plant and Air Conditioning System Replacement -Ysgol Emrys Ap Iwan - Abergele-The works were for the renewal and upgrading of Boiler plant and Air Conditioning System replacement to current standards in a large sized secondary school on multiple sites where students are educated through the medium of Welsh.
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Theatre Colwyn - External Works 2022-2023-The works comprised of internal works to a fire escape together with repairs and renewals to the roof, front and part side returns brickworks, ornamental terracotta work and the glazed canopy
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Footbridge replacement - Bridge Supply Package 1-Conwy County Borough Council were seeking to procure a suitably qualified Supplier for the design and manufacture of three pre-fabricated footbridges (two of steel and one of timber) on rural footpaths to replace existing damaged or lost footbridges.
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Project Evaluator Amdani Conwy-Contract award notice. Conwy County Borough Council sought a suitably qualified Supplier to act as project evaluators for the Amdani Conwy project. The requirements included to support and guide the Amdani Conwy project to ensure compliance with funding requirements and partner aspirations. This includes establishing and gathering baseline data, formative and summative evaluation.
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
A470 Royal Welsh Way Subsidence-The project involved carrying out remedial works to the subsiding carriageway, located on the A470 Royal Welsh Way. The works included but not limited to: •Excavation of the existing carriageway, verge and embankment. •Removing existing carriageway and drainage. •Installation of kerbs. •Installation of a new full construction carriageway. •Installation of new drainage. •Apply thermoplastic road markings. •Vegetation clearance The works are located on the southbound lane b...
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Ysgol Glanwydden, Renewal of Slate Roof to the Original Building-The works comprised of the re-slating of approximately 40 % of the roof to the original built school building and approximately 60% of new slating to the remainder of the roof to the same building, together with associated new leadwork, works to rainwater goods etc
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
Venue Cymru, Llandudno - Renewal of External Doors-The works comprised of the undertaking of external door replacements to an existing Theatre and Conference centre complex in Llandudno , North Wales Works were to include the removal of a mixture of existing timber and metal fire exit and store doors , generally on all elevations. Fixed into openings of mainly rendered external walls.
Contract DateNA
Contract AmountNA
Conwy County Borough Council Tender Result
Result Stage: Under Evaluation
United Kingdom
ERCF2202S Hotspot 145 Llanrwst Road, Colwyn Bay-The works are located on a rural road just outside a residential area referred locally as Colwyn Heights, in the town of Colwyn Bay. The works comprised of two main elements of work. The first section involves installing a new drainage system and installing a new headwall. The second element of works were to install new kerbing to designed levels to improve existing cross-falls within the area. The road construction works were to be carried out by others.