Tender Results of Andhra Pradesh Power Generation Corporation Limited

Tender Results of Andhra Pradesh Power Generation Corporation Limited

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Building Construction...+5Civil And Construction, Drainage Work, Education And Training Services, Housekeeping Services, Road Construction
Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.5 K)
Up Keeping Of Training Institute Buildings, Roads And Drains Etc., In The Premises Of Training Institute Complex For The Period Of 12 Months I.e From 01.04.2019 To 31.03.2020

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.5 K)
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger plten coils of Units-5&6 boiler during annual overhaul period for the year 2016-17.

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.6 K)
Up keeping & Regular maintenance works of the Boilers, Mills, Airpreheaters, ID fans, FD fans, PA fans, Seal air fans, Scanner air fans, ESP's, Flue gas ducts, Primary & Secondary air ducts, Feeders and feeder floor etc and cleaning of areas at ground floors of Boiler & its auxiliaries of Unit III & IV Boilers during the period from 01-04-2018 to 31-03-2019.

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.7 K)
Various Miscellaneous Works Pertaining To Stage Iii&iv / Chp Which Includes Quenching Of Fires, Clearing Of Chute Jams And Cleaning Of The Stagnated Wet Coal And Its Coal Boulders At Wagon Tipplers-no 5&6, Pertaining To Stage-iii&iv/chp In Genl.sub-division Of Operation Division, Coal Handling Plant-stage-iii&iv/dr.nttps As And When Required During The Period From 01.04.2021 To 31.03.2022 Or Till Completion Of Work

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.7 K)
Regular and Periodical maintenance work of BM Division of Stage-III/RTPP

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Civil And Construction...+2Construction Material, Machinery and Tools
Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.3 Million (USD 28.7 K)
Overhaul Works On Boiler Pressure Parts For Replacement Of Eroded Water Wall ,dnp, Sh, Platen Sh Tubes, Carrying Out Cracked Fin Welding Where Ever Required During D Meter Survey At Unit-7/ Stage-iv During Annual Overhaul Period 2020-21

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.4 Million (USD 28.9 K)
Replacement of SHH-9 (LTSH Inlet Header) in Unit-II during Capital overhaul for the year 2017-18 under R&M works.

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Works
Machinery and Tools
Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.4 Million (USD 28.7 K)
Overhaul Works On Boiler Pressure Parts For Replacement Of Eroded Water Wall ,dnp,sh,platen Sh Tubes, Carrying Out Cracked Fin Welding Where Ever Required During D Meter Survey, Cleaning And Clearing The Debris And Inspecting The Orifices Inside The Bottom Ring Header Of Boiler Of Unit-7/stage-iv/dr.nttps During Annual Overhaul Period 2024-25.

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.4 Million (USD 28.9 K)
Up keeping and regular maintenance works of the Boiler, Mills, Air preheaters, ID fans, FD fans, PA fans, Seal air fans, Scanner air fans, ESP's, Flue gas ducts, Primary & secondary air ducts, Mill reject system, Feeders and Feeder floor etc. and sweeping of areas at ground floors of Boiler & its auxiliaries of Unit-III & IV Boilers during the period from 01-04-2017 to 31-03-2018.

Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender Result

Result Stage: Awarded  (AOC Available)
India
Contract DateNA
Contract AmountINR 2.4 Million (USD 29.1 K)
Picking Of Shale, Stone, Oversize Coal And Foreign Material From The Coal On Running Conveyor Belts Running At The Speed Of Around 3.5metres Per Second Pertains To Stage-1 &2 Of Chp And Transport Of Shale To Dump Yard Within The Premises Of Chp (distance: 0 To 5 Km) As And When Required During The Period From 01-04-2021 To 30-09-2021 Or Till The Exhaust Of Quantity.
4471-4480 of 5640 active Tender Results