Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 775.4 K (USD 817.2 K)
Action for the Improvement of Infrastructure (AMI) "Drafting of the project and execution of the slope treatment work on line 400, Alcázar de San Juan to Cádiz. Section Santa Cruz de Mudela-Venta de Cárdenas. pp.kk. 239 +680-241+080"

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 498.9 K (USD 525.8 K)
Drafting of the project and execution of trench stabilization work after a landslide in the La Miranda tunnel, tunnel no. 1, line 144, San Juan de Nieva-Villabona de Asturias

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 74.9 K (USD 79 K)
Maintenance service for the facilities in the stations of Granada, Loja, Antequera Santa Ana, Ronda and Bobadilla

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 351.2 K (USD 370.2 K)
Execution works of the simplified project of the conditioning works of the second floor of the Delicias computer building

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 1 Million (USD 1.1 Million)
Comprehensive management service for civil protection facilities in the tunnel belonging to the high-speed line Madrid-Castilla la Mancha -Valencian Community-Murcia region Monforte del Cid-Murcia section.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 187 K (USD 197 K)
Consulting and assistance for the definition and economic structuring of the addition rates to the railway canon

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 400 K (USD 421.5 K)
Supply of fiber optic cables for the needs of corrective maintenance and works in the fiber optic network

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 712.9 K (USD 751.3 K)
Emergency for track repair works and services and hillside consolidation due to rockfall that derailed Alvia 623 train at kilometer 340+000 on August 26, 2022. San Clodio Quiroga-Freixeiro section, line 800 León-A Shit.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 262 K (USD 276.1 K)
Drafting of the construction project and execution of work for the automatic protection of the class "A2" level crossing, at kilometer point 220/465 of line 500 fork in the Planetario-Valencia de Alcántara, in the municipality of Toril (Cáceres).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 120 K (USD 126.4 K)
Repair of spare parts for REVENGA technology level crossings
1841-1850 of 2250 active Tender Results