Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 876 K (USD 945.7 K)
Drafting of project and execution of work AMI - 1513 "Trench treatment between pp.kk. 144+500 to 145+100 left bank line Mérida - Los Rosales. Province: Seville.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 879.7 K (USD 957.1 K)
Consulting and technical assistance services for the drafting of construction projects to improve the fire protection, evacuation and ventilation conditions in the event of fire at the Pirámides and Valdebebas Cercanías stations.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 880.8 K (USD 928.3 K)
Supply and transport of a track system in slabs of precast concrete blocks independent of the surrounding concrete pavement, of multipurpose gauge and mixed gauge, for the remodeling of the A Coruña – San Cristóbal station terminal

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 883.7 K (USD 972.5 K)
Supply and assembly for a second transformer at the Sequeiros supply center. Line León - A Coruña, section: Monforte-Covas

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 890 K (USD 974.6 K)
Development and implementation of a security management model in suppliers and third parties for ADIF and ADIF-Alta Velocity

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 898.1 K (USD 946.5 K)
Execution of the works of the construction project of the control system of civil protection and security facilities of the urban tunnel of Cádiz

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 900 K (USD 980 K)
Repair and supply of material for hot box detectors and stuck brakes with Phoenix technology

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 902.1 K (USD 975.6 K)
Execution of the works for the repair project of the Guadalvácar bridge located at kilometer point 511+150 of line 400 Alcázar de San Juan-Cádiz. Province of Seville.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 929.2 K (USD 979.3 K)
Consulting and technical assistance for environmental processing and drafting of construction projects for traction electrical substations, associated self-transformation centers, high-voltage connection lines, overhead contact line and remote power control of the Illescas-Talayuela section of the L500 Madrid - Extremadura line

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 948 K (USD 1 Million)
Development, migration, deployment and support services for the new mobile circulation book (LCM) system, applicable to the entire railway network of general interest.