Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 250 K (USD 264.1 K)
Request No. 10 against the Framework Agreement for the provision of design, implementation and communication consulting services for events, presentations, social networks, and protocol acts of the Communication and Corporate Reputation Department
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 254.1 K (USD 267.8 K)
Drafting of the construction project and execution of the works for the automatic protection of the class "A3" level crossing at PK 389/942 of the 770 Oviedo-Santander line, in the municipality of Parres (Asturias).
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 21.6 K (USD 22.8 K)
«CE» verification services for interoperators and corresponding issuance certificates by NoBo of the subsists "Infraest" and "Control-Command and Signaling on the ground" in actions "Rehabilitation and replacement of the telephone lock (BT) by automatic blocking of a single track (BAU) in the Bobadilla-Ronda section, PPKK 0+000 to 70+475 Line 420, Bif. Las Maravillas-Algeciras”
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Spain
Contract DateNA
Contract AmountEUR 7.7 K (USD 8.1 K)
Organi Desi verification of compliance with notified national regulations, with the issuance of Certificates by DeBo for actions derived from "Demolition of slab and assembly of ballast track in Orcasitas", Madrid, line 920, Móstoles-El Soto-Parla and "Improving accessibility Train-Andén Recoletos, Madrid", line 900, Madrid Atocha Cercanías to Chamartín
1761-1770 of 2250 active Tender Results