Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 400 K (USD 421.5 K)
Supply of fiber optic cables for the needs of corrective maintenance and works in the fiber optic network

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 400 K (USD 431.8 K)
Centralized supply of non-recycled paper for ADIF and ADIF AV, on an open order basis.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 400 K (USD 434.7 K)
Health insurance for Adif employees displaced to Saudi Arabia for the Haramain project, on an open order basis.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 401.5 K (USD 424.6 K)
Project drafting and work execution AMI 4504. Embankment consolidation pk 145+500 Line: Jaen-Espeluy L-402

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 408.1 K (USD 440.1 K)
Adaptation work on mobile substations number-21 and number-31 for use in the metric gauge network at 1500v

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 408.4 K (USD 438.1 K)
Supply and installation of gsm-r telecommunications equipment at the Portbou station and its border section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 413 K (USD 448.7 K)
Technical assistance services for the control and surveillance in the execution of the work for the extension of section roads up to a useful length of 750 m. in stations on the Zaragoza-Tarragona section through Caspe. Chiprana, Nonaspe and Flix stations.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 420.2 K (USD 457.2 K)
Technical assistance services for the control and monitoring of the completion of the execution works of the construction project of the Railway Access to the Port of Sagunto.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 420.9 K (USD 455.1 K)
Action for the Improvement of Infrastructure (AMI) "Project drafting and execution of the work of actions in clearing of line 520 Ciudad Real - Badajoz. Brazatortas - Almadenejos Almadén section"

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 423.2 K (USD 446 K)
Drafting of Project and Execution of Work: Replacement of lanes due to wear, in the Buñol-Loriguilla Section. L/ Utiel-Valencia
1661-1670 of 2250 active Tender Results