Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Management and execution service of the theoretical and practical training necessary to obtain certificates of specific knowledge of the infrastructures for which Adif driving personnel (engine drivers) are authorized to drive on high-speed lines
Contract DateNA
Contract AmountEUR 567 K (USD 613.1 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Order 18: supply of 17 SUVs for different Adif units against a framework agreement for the supply of vehicles through long-term renting, for the performance of operational and technical activities.
Contract DateNA
Contract AmountEUR 568.2 K (USD 622.3 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Execution of the works on the pedestrian walkway replacement project at pk 447/129 and removal of the level crossing at pk 446/350 of the León – La Coruña Line. Municipality of Rábade (Lugo)
Contract DateNA
Contract AmountEUR 574.6 K (USD 630.7 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Action for Infrastructure Improvement (AMI) "Project drafting and execution of the work to replace PR01 sleepers with monoblock sleepers. Line 300. Madrid Chamartín to Valencia Estación del Norte. Section: Ciempozuelos-Aranjuez. PP.KK 37+ 491 – 41+250. Tracks 1 and 2"
Contract DateNA
Contract AmountEUR 578.1 K (USD 625 K)
Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result
Result Stage: Awarded (AOC Available)
Spain
Action for Infrastructure Improvement (AMI) "Project drafting and execution of the superstructure improvement works on line 400, Alcázar from San Juan to Cádiz. Santa Cruz de Mudela - Venta de Cárdenas section. pp.kk. 240+360 – 241+980"
Contract DateNA
Contract AmountEUR 614.5 K (USD 655.6 K)
1531-1540 of 2063 active Tender Results