Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.3 Million (USD 2.5 Million)
Emergency works to repair the Gavà interlocking affected by the fall of the contact wire on track 3 of the Gavà station, on May 1, 2023.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.3 Million (USD 2.5 Million)
Consulting and assistance for the control of the works of the "Construction project of the new Valladolid railway complex. Phase II".

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.3 Million (USD 2.5 Million)
Consulting and assistance contract for the control of the works of the "Platform Construction Project for the new Southern railway access to the Port of Castellón. Section II (4+698 - 8+ 295.28)

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.3 Million (USD 2.5 Million)
Technical assistance services for the control and monitoring of construction projects for the expansion of the suburban network from Madrid to Soto del Real. Phase 1. Infrastructure, track and overhead contact line, and effects on security facilities in the Colmenar Viejo-Soto del Real section.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.5 Million)
Contract annexed to 4.22/28520.0013. Repair and improvement of concrete bridges and factory of the network managed by ADIF. Lot 3: Central-South Zone. Framework agreement for actions to improve the bridges

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.5 Million)
Third order against the Framework Agreement for the control of vegetation on the platform and margins and facilities of Adif's conventional and metric gauge lines 6 lots. Lot 5-Sub-directorate of Center Operations.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.6 Million)
Fourth request against Framework Agreement for the control of vegetation on the platform and margins and facilities of Adif's Conventional and Metric Gauge lines 6 lots. lot 5-Subdirectorate of Operations Center

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.6 Million)
Services for the drafting of the construction project to adapt gauges and rationalize stations on the section: Illescas-Talayuela.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.6 Million)
Implementation, operation and maintenance services of a solution with the ability to self-discover assets, connectivity topologies and anomaly detection in Adif operating environments. Phase 1: analysis of the current situation, detailed engineering and initial deployment.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract DateNA
Contract AmountEUR 2.4 Million (USD 2.5 Million)
Technical assistance for the control and surveillance of "drafting of the construction project and execution of the works for the suppression of the telephone blockade between Villanueva de la Serena - Brazatortas/Veredas"
1501-1510 of 1874 active Tender Results