Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Tender Results of Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator Adif

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Nov 2024
Contract AmountEUR 160 K (USD 168.5 K)
Supply of structured cabling material for Adif's construction and spare parts needs.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Nov 2024
Contract AmountEUR 9.5 K (USD 10 K)
Services for the "ce" verification of interoperability and the issuance of the corresponding certificates by NOBO of the "infrastructure", "energy" and "control-command and signalling on land" subsystems, in the implementation of new electronic interlocking and associated blocking at the Oviedo station, line 130 Gijón Sanz Crespo- Venta de Baños.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Nov 2024
Contract AmountEUR 119.9 K (USD 126.3 K)
Preventive and corrective maintenance service for electrical installations at freight transport terminals within the scope of the Northeast Logistics Services Subdirectorate

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Nov 2024
Contract AmountEUR 302.2 K (USD 318.3 K)
PLO-LAC standardisation project to adapt them to NAE 112. Updating obsolete PLO-LAC stations with substation. Double track León-Palencia. Torneros-Sahagún section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date15 Nov 2024
Contract AmountEUR 372.6 K (USD 392.5 K)
Construction project for the renewal of the contact wire of line 700 Casetas-Bilbao (Abando) in the Llodio-Bilbao section

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Nov 2024
Contract AmountEUR 122.9 K (USD 129.4 K)
Project for the replacement of the AT cabins in AC of the traction groups and mobile SE of the l'Ametlla Substation

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Nov 2024
Contract AmountEUR 425.3 K (USD 448 K)
Sixth order against the framework agreement of contract annex to 4.20/27520.0108 (lot 1). Project for actions to improve the gauge and repair damage to the La Anchada metal bridge with upper bracing on the L200 Madrid - Barcelona line. Kilometer point 248/680.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Nov 2024
Contract AmountEUR 749.1 K (USD 789 K)
Execution of the works of the construction project for the removal of the temporary speed limit by means of renewing the superstructure and electrifying the main tracks at PK 243+ 006 of the La Roda station in Albacete. Line 300: Madrid Chamartín- Valencia Estación del Norte

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Nov 2024
Contract AmountEUR 1.2 Million (USD 1.3 Million)
Execution of works to renew the secondary tracks at the Bárcena de Pie de Concha station.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date14 Nov 2024
Contract AmountEUR 1.7 Million (USD 1.8 Million)
Execution of works for the construction project to remove level crossings at PPKK 74/000, 74/286, 74/412, 74/555 and 74/661 on Line 230 of the General Interest Railway Network (RFIG) Plana Picamoixon – Reus, Municipal District of Alcover (Tarragona).
1-10 of 1644 active Tender Results