Consumables Tenders
Consumables Tenders
Southern Railway - SR Tender
Works
Housekeeping Services
Ireps
Tiruchirappalli, Tamil Nadu
Details: Removal And Routing Out Of Jungle, Bushes Including Cutting And Clearing The Rank Vegetation Along Side Of The Track Upto Maximum Of 4.00m As Required ( Which Includes Cess Width And Some Sloping Length Of Formation From Edge Of The Shoulder) On Both Sides Of The Track On Up And Dn Lines Manually Or Mechanically To Keep The Track Neat And Tidy With Necessary Contractor's Lookout Men To Safeguard Against The Traffic, Duly Collecting The Removed Vegetation And Materials To Be Dumped After Collection Only At The Railway Nominated Places As Nominated By The Engineer-incharge And After Every Day's Work, It Has To Be Cleared By Deploying Contractor's Men & Machinery,
duly Trucking Out By Contractor's Own Road Vehicle Such As Trucks /tractor And Disposing The Same
away From The Railway Premises With Contractor's Men And Machinery, Without Infringing Track /
traffic Movements And Dumping Them Away From The Railway Limit With All Lead And Lift Etc. Complete
and As Directed By The Engineer-in-charge For A Period Of One Year. (all Labour, Tools And Plants,
machinery, Personal Safety Equipments Such As Safety Shoes, Gloves, Etc. Vehicles Like Trucks /
tractor And Consumable Stores, Fuel, Crew Are To Be Supplied By The Tenderer/contractor At His Own
cost). (sse/pway/alu - 260000 Sqm , Sse/pway/lli-260000 Sqm, Sse/works/lli-55120 Sqm) A) First
round Of Cleaning Of Bushes
Closing Soon9 Dec 2024
Tender Amount₹ 77.2 Lac
Indian Oil Corporation Limited - IOCL Tender
Works
Eprocure
Corrigendum : Pre-Bid Meeting Online VC Link Corrigendum
Jharsuguda, Odisha
Details: Group-B Mitigation of AC Interference due to overhead HT line crossings in Sambalpur-Khunti section of PRRPL from Ch.65 km to Ch.181 km under Jharsuguda Jurisdiction
NOTE:
1. Please enable macros before filling the rates to see the quoted figures in words.
2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off.
3. Only "Bidder Name", "Excess (+) or "At Par" or Less (-)" & "Percentage" are to be filled by the bidder in the designated "Sky Blue cells". For "At Par" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate.
4. "Excess (+)" or "At Par" or "Less (-)" can be selected from the dropdown menu by clicking on the cell.
5. No changes shall be made by the bidder to S.No., Unit, Quantity.
6. In case of any difference in item description/ unit/ quantity in BOQ, then the item description/ unit/ quantity given in the tender document shall prevail.
7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications.
8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in "Annexure 8". Statutory variation on Goods and Services Tax as applicable for the category/ service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules.
9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet.
Abbreviations of Units: EA - Each, KW - Kilo Watt, YR - Year, DAY - Days, CM - Centimeter, M - Meter, M2 - Square Meter, SQM - Square Meter, M3 - Cubic Meter, CUM - Cubic Meter, FT2 - Square Foot, BAG - Bag, KG - Kilogram, QN - Quintal, TO - Tonne, L - Liter
Closing Soon12 Dec 2024
Tender Amount₹ 1.3 Lac
This is an estimated amount, exact amount may vary.
Indian Oil Corporation Limited - IOCL Tender
Services
Manpower Supply
Eprocure
Sambalpur, Odisha
Details: Deployment of manpower for Motorbike Quick Response Team (QRT) for Monitoring & Surveillance of Pipeline Intrusion Detection and Warning System (PIDWS) alarms under SERPL Sambalpur base
NOTE
1. Please enable macros before filling the rates to see the quoted figures in words.
2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off.
3. Only "Bidder Name", "Excess (+) or "At Par" or Less (-)" & "Percentage" are to be filled by the bidder in the designated "Sky Blue cells". For "At Par" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate.
4. "Excess (+)" or "At Par" or "Less (-)" can be selected from the dropdown menu by clicking on the cell.
5. No changes shall be made by the bidder to S.No., Unit, Quantity.
6. In case of any difference in item description/ unit/ quantity in BOQ, then the item description/ unit/ quantity given in the tender document shall prevail.
7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications.
8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in "Annexure 8". Statutory variation on Goods and Services Tax as applicable for the category/ service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules.
9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet.
Abbreviations of Units: EA - Each, KW - Kilo Watt, YR - Year, DAY - Days, CM - Centimeter, M - Meter, M2 - Square Meter, SQM - Square Meter, M3 - Cubic Meter, CUM - Cubic Meter, FT2 - Square Foot, BAG - Bag, KG - Kilogram, QN - Quintal, TO - Tonne, L - Liter
Closing Date18 Dec 2024
Tender AmountRefer Documents
Indian Oil Corporation Limited - IOCL Tender
Works
Electrical Works...+1Electrical and Electronics
Eprocure
Corrigendum : Pre-Bid Meeting Online VC Link Corrigendum
Khunti, Jharkhand
Details: Group-C Mitigation of AC Interference due to overhead HT line crossings in Sambalpur-Khunti section of PRRPL from Ch.181 km to Ch.279 km under Khunti Jurisdiction
NOTE:
1. Please enable macros before filling the rates to see the quoted figures in words.
2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off.
3. Only "Bidder Name", "Excess (+) or "At Par" or Less (-)" & "Percentage" are to be filled by the bidder in the designated "Sky Blue cells". For "At Par" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate.
4. "Excess (+)" or "At Par" or "Less (-)" can be selected from the dropdown menu by clicking on the cell.
5. No changes shall be made by the bidder to S.No., Unit, Quantity.
6. In case of any difference in item description/ unit/ quantity in BOQ, then the item description/ unit/ quantity given in the tender document shall prevail.
7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications.
8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in "Annexure 8". Statutory variation on Goods and Services Tax as applicable for the category/ service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules.
9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet.
Abbreviations of Units: EA - Each, KW - Kilo Watt, YR - Year, DAY - Days, CM - Centimeter, M - Meter, M2 - Square Meter, SQM - Square Meter, M3 - Cubic Meter, CUM - Cubic Meter, FT2 - Square Foot, BAG - Bag, KG - Kilogram, QN - Quintal, TO - Tonne, L - Liter
Closing Soon12 Dec 2024
Tender Amount₹ 1.3 Lac
This is an estimated amount, exact amount may vary.
Indian Oil Corporation Limited - IOCL Tender
Works
Electrical Works...+1Electrical and Electronics
Eprocure
Corrigendum : Pre-Bid Meeting Online VC Link
Sambalpur, Odisha
Details: Group-A Mitigation of AC Interference due to overhead HT line crossings in Sambalpur-Khunti section of PRRPL from Ch.0 km to Ch. 65 km under Sambalpur Jurisdiction
NOTE:
1. Please enable macros before filling the rates to see the quoted figures in words.
2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off.
3. Only "Bidder Name", "Excess (+) or "At Par" or Less (-)" & "Percentage" are to be filled by the bidder in the designated "Sky Blue cells". For "At Par" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate.
4. "Excess (+)" or "At Par" or "Less (-)" can be selected from the dropdown menu by clicking on the cell.
5. No changes shall be made by the bidder to S.No., Unit, Quantity.
6. In case of any difference in item description/ unit/ quantity in BOQ, then the item description/ unit/ quantity given in the tender document shall prevail.
7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications.
8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in "Annexure 8". Statutory variation on Goods and Services Tax as applicable for the category/ service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules.
9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet.
Abbreviations of Units: EA - Each, KW - Kilo Watt, YR - Year, DAY - Days, CM - Centimeter, M - Meter, M2 - Square Meter, SQM - Square Meter, M3 - Cubic Meter, CUM - Cubic Meter, FT2 - Square Foot, BAG - Bag, KG - Kilogram, QN - Quintal, TO - Tonne, L - Liter
Closing Soon12 Dec 2024
Tender Amount₹ 1.3 Lac
This is an estimated amount, exact amount may vary.
East Central Railway - ECR Tender
Works
Civil And Construction...+1Water Storage And Supply
Ireps
Ramgarh - Jharkhand, Ranchi - Jharkhand
Details: Description:- Drilling And Sinking Of Deep Tubewell Of Size 250x200mm, Dia In All Classes Of Soil
including Supplying And Sinking Of Standard High Density Polytheylene (upvc) Casin Pipe Of Per Is
4985 Of Sige 200mm Internal Dia In Loose Starta Extended Minimum 1m (one ) Metre Inside Hard Rock
to Prevent Collapsing Of Bore. The Bottom Bore Hole Should Be Of Size 200,mm Dia Clear Internal Dia
for A Minimum Defth Of 100m Below Ground Level. The Rate Shall Include Supplying And Fixing M.s.cap
at Top Of Bore Well, Labour, Machinery, Materials, Consumable Item, Eading, Loading, Unloading, Lead,
lift, In All Respect Complete. The Rate Shall Also Include Development Of Bore By Compressor And
testing Of Yield 03 Consecutive Days For A Minimum 07 Hrs. On Each Day Continuously With Minimum
3000gph The Pump Will Be Supplied By Contractor For Testing The Yield. Note Payment Shall Be Made
onlyforsuccessfulboresofanassuredwatersupplyofminimum3000gallonsperhours.for
unsuccessful Bores No Payment Shall Be Made I.e. No Water No Payment Hence, While Quoting The
rate. It Should Be Kept In Mind And Rate Should Include The Cost Of Sub Soil Water By Electrical
resistivity Method Or Any Suitable Method Including Testing Bore Of 4.5 Inches Dia If Required. The
detail Of Bore Log Should Also Be Given To The Engineer At Site.
Closing Date17 Dec 2024
Tender Amount₹ 4.2 Cr
551-560 of 556 active Tenders