Tenders of Rail Wheel Factory
Tenders of Rail Wheel Factory
Sorry!
No Active
Tenders of Rail Wheel Factory
foundCheck archived
Tenders of Rail Wheel Factory
Rail Wheel Factory - RWF Tender
Automobiles and Auto Parts
Ireps
Bengaluru, Karnataka
Closing Date13 Sep 2023
Tender Amount₹ 5 Lac This is an estimated amount, exact amount may vary.
Piston Pump
Rail Wheel Factory - RWF Tender
Ireps
Bengaluru, Karnataka
Closing Date29 Aug 2023
Tender Amount₹ 5 Lac This is an estimated amount, exact amount may vary.
Welding Electrode Size 3.14 Mm
Rail Wheel Factory - RWF Tender
Scraps
Ireps
Karnataka
Closing Date5 Dec 2023
Tender AmountRefer Documents
Lot Consisting Of Condemned Foundry Slag Cake With Or Without Embedded Scrap Ferrous And Refractory Items As Available In The Lot Area. Loose Ferrous Items And Ferrous Foundry Skull, Which Are Available In And Around The Lot Area, Are Not Permitted For Loading. However, Ferrous Foundry Skull And Loose Ferrous Items Embedded With The Slag Cake, Which Cannot Be Removed Ordinarily By Hand Shall Be Permitted For Loading. Note : Purchaser Can Inspect The Materials Thoroughly Before E-auction. Purchaser Are Requested To Take Sufficient Safety Measures While Loading And Purchaser Should Arrange All Safety Equipment For Workers Engaged While Loading Into The Trucks. Side Assets : East : Ms Turning And Boring, West : Concrete Road, North : Ward30 Compound And South : Kachha Road. Delivery Unit : In Mt.
Rail Wheel Factory - RWF Tender
Energy, Oil and Gas
GEM
Bengaluru Urban, Karnataka
Closing Date2 Dec 2023
Tender AmountRefer Documents
CATEGORY: Internal Combustion Engine Crankcase Oils for Automotive
Application (Diesel and gasoline) as per IS: 13656 (Q2)
Rail Wheel Factory - RWF Tender
Automobiles and Auto Parts
Ireps
Bengaluru, Karnataka
Closing Date14 Aug 2023
Tender Amount₹ 5 Lac This is an estimated amount, exact amount may vary.
Steering Cylinder Assembly To Godrej Par [steering Cylinder
assembly To Godrej Part No Mh39400332 For The Use Of Godrej 8
ton Forklift. 1) Warranty/guarantee Period Shall Be For A Period
of 6 Months From The Date Of Fitment Or 9 Months From The Date
of Supply Whichever Is Early Against Quality Manufacturing
defects And Workmanship For The Item Supplied. 2) Authorisation
from Oem Is To Be Enclosed Along With The Offer. 3) Offers Are To
quote Both Make And Model Number/part Number With Out Which
the Offers Will Be Summararily Rejected.] Total= 04 Items