Tender Results of Farakka Barrage Project
Tender Results of Farakka Barrage Project
Select Contract Period
2023 onwards
2021 onwards
All Time
Farakka Barrage Project Tender Result
Civil And Construction...+1Drainage Work
Eprocure
Murshidabad, West Bengal
Contract DateNA
Contract Amount₹ 1 Cr This is an estimated amount, exact amount may vary.
Anti Erosion Works At Upstream Left Bank Of River Ganga Near Birnagar Area In Reach 3 Between Ch 1200.00 M And Ch 3200.00 M. Total Working Length 250.00 M.
Farakka Barrage Project Tender Result
Civil And Construction...+1Civil Works Others
Eprocure
Murshidabad, West Bengal
Contract DateNA
Contract Amount₹ 8.8 Cr This is an estimated amount, exact amount may vary.
Bank Protection Work At The Upstream Left Bank Of River Ganga Near Birnagar Area From Ch 2820 M To Ch 3120 M. Total Working Curve Length 335 M. Reach 5
Farakka Barrage Project Tender Result
Civil And Construction...+1Water Storage And Supply
Eprocure
NA
Contract DateNA
Contract AmountRefer Documents
Power supply to newly constructed pump house of FBP at the bank of Feeder Canal through 11KV underground cable from the DP near B.C. Roy statue.
Farakka Barrage Project Tender Result
Civil And Construction...+1Drainage Work
Eprocure
NA
Contract DateNA
Contract AmountRefer Documents
Special repair of left bank inspection road of Feeder Canal including repair, reconstruction of side and cross drainage systems in between RD 9.00 and RD 30.00
Farakka Barrage Project Tender Result
Eprocure
Murshidabad, West Bengal
Contract DateNA
Contract AmountRefer Documents
Making Flatter Profile Of Bank And Repairing Of Rain Cuts At Downstream Left Bank Of River Ganga Near Hossainpur Area Ch 6570 M To Ch 6900 M. Total Working Length 330 M
Farakka Barrage Project Tender Result
Civil And Construction...+1Drainage Work
Eprocure
Malda, West Bengal
Contract DateNA
Contract AmountRefer Documents
Anti erosion works at or near Chakbahadurpur on the left bank of river Ganga, downstream of Farakka Barrage in the District of Malda from Ch 3650 m to Ch 4200 m. Total working length 550 m, Reach-2
171-180 of 183 active Tender Results
Tender Results By Authorities
Indian Army Tender Results
Public Works Department Tender Results
Zilla Parishad Tender Results
Local Self Government Department Tender Results
Directorate Of Urban Local Bodies Tender Results
Public Health Engineering Department Tender Results
Military Engineer Services Tender Results
Municipal Corporation Tender Results
Rural Development Department Tender Results
Panchayati Raj Department Tender Results
Show More