Tender Results of Andhra Pradesh Township And Infrastructure Development Corporation
Tender Results of Andhra Pradesh Township And Infrastructure Development Corporation
Select Contract Period
2023 onwards
2021 onwards
All Time
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction...+1Drainage Work
Andhra Pradesh
Contract Date27 Jul 2022
Contract AmountRefer Documents
Providing Sewage Treatment Plants (stps) At The Locations Of 1) Ichapuram 0.10 Mld 2) Palasa 0.40 Mld In Srikakulam District 3) Appikonda 0.40 Mld 4) Mulagada 0.20 Mld 5) Nadipur 0.50 Mld 6) Sangivalasa 0.30 Mld And 7) Kondakoppaka 0.20 In Visakhapatnam District (total 2.10 Mld) Of Deputy Chief Technical Officer, Visakhapatnam Circle, Aptidco, Developed Affordable Housing Projects In Andhra Pradesh On Design, Engineering, Construction, Supply, Installation, Testing, Erection And Commissioning And Thereafter Operate And Maintain The Stps For 5 (five) Years Basis (including Defect Liability Period Of Two Years From The Date Of Completion Of Project) (3rd Call).
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction...+1Drainage Work
Andhra Pradesh
Contract Date27 Jul 2022
Contract AmountRefer Documents
Providing Sewage Treatment Plants (stps) At The Locations Of 1) Vellaturu Road Ii (0.70 Mld) In Vinukonda Ulb In Guntur District, 2) Chakirala Iii (0.50 Mld) In Kanigiri Ulb, 3) Modempalli Iii (0.60 Mld) In Giddaluru Ulb 4) Singarakonda Iii (0.50 Mld) In Addanki Ulb In Prakasam District (total 2.30 Mld) Of Deputy Chief Technical Officer, Guntur Circle, Aptidco, Developed Affordable Housing Projects In Andhra Pradesh On Design, Engineering, Construction, Supply, Installation, Testing, Erection And Commissioning And Thereafter Operate And Maintain The Stps For 5 (five) Years Basis (including Defect Liability Period Of Two Years From The Date Of Completion Of Project) (3rd Call)
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction...+1Drainage Work
Andhra Pradesh
Contract Date27 Jul 2022
Contract AmountRefer Documents
Providing Sewage Treatment Plants (stps) At The Locations Of 1) Bala Balaji 0.30 Mld, In Tanuku Ulb (2) Indiramma Colony Ii 0.20 Mld In Tanuku Ulb(3) Markendeyapuram Ii 0.40 Mld In Jangareddygudem Ulb, 4) Tirugudem Ii 0.50 Mld In Nidadavolu Ulb 5). Pedathallapunta Ii 0.30 Mld In Kovvuru Ulb 6) Ponangi Road 2.50 Mld And 7) (kotturu Road Ii) 0.20 Mld In Eluru Ulb In West Godavari District Total 4.40 Mld Of Dcto, Rajamahendravaram Circle, Aptidco Developed Affordable Housing Projects In Andhra Pradesh On Design, Engineering, Construction, Supply, Installation, Testing, Erection And Commissioning And Thereafter Operate And Maintain The Stps For 5 (five) Year Basis (including Defect Liability Period Of Two Years From The Date Of Completion Of Project) (3rd Call).
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction...+1Civil Works Others
Prakasam, Andhra Pradesh
Contract Date13 May 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 48.7 Cr
Construction Of Physical Infrastructure Such As Internal Roads, Kerb Walls, Storm Water Drains, Water Supply, Sewerage Network Etc., In The Approved Layouts Of Tidco Colonies At Ongole Municipal Corporation (koppolu) And Ongole Municipal Corporation (chintala) And Markapur (peddanagulavaram Road) Ulbs Of Prakasam District, Andhra Pradesh Under Ahp- Pmay Hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract Cum Reverse Tendering
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Guntur, Andhra Pradesh
Contract Date12 May 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 26.5 Cr
Construction Of Physical Infrastructure Such As Internal Roads, Kerb Walls, Storm Water Drains, Water Supply, Sewerage Network Etc., In The Approved Layouts Of Tidco Colonies At Piduguralla, Vinukonda And Repalle Ulbs Of Guntur District, Andhra Pradesh Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract Cum Reverse Tendering.( Percentage Tender).
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Kurnool, Andhra Pradesh
Contract Date21 Mar 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 22.5 Cr
Construction Of Physical Infrastructure Such As Internal Roads Storm Water Drains Water Supply Sewerage Network Court Yard Filling Etc In The Approved Layouts At Nandyal (ayyalurimetta Ph-i) Allagadda (chintakuntla Village Ph-iii) Yemmiganuru (sivanna Nagar Ph-ii) And Dhone (tailors Colony Ph-iii) Ulbs Of Kurnool District Andhra Pradesh Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract (percentage Tender)
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Anantapur, Andhra Pradesh
Contract Date21 Mar 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 35.6 Cr
Construction Of Physical Infrastructure Such As Internal Roads Storm Water Drains Water Supply Sewerage Network Court Yard Filling Etc In The Approved Layouts At Anantapuramu Guntakal And Rayadurgam Ulbs Of Anantapur District Andhra Pradesh Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract (percentage Tender)-phase-iii
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Anantapur, Andhra Pradesh
Contract Date21 Mar 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 53.2 Cr
Construction Of Physical Infrastructure Such As Internal Roads Storm Water Drains Water Supply Sewerage Network Court Yard Filling Etc In The Approved Layouts At Tadipatr (ii) Dharmavaram Pamidi Gooty Hindupur Puttaparthi And Kadiri Ulbs Of Anantapur District Andhra Pradesh Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract (percentage Tender)- Phase-ii
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Y.s.r., Andhra Pradesh
Contract Date21 Mar 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 59.8 Cr
Construction Of Physical Infrastructure Such As Internal Roads Storm Water Drains Water Supply Sewerage Network Court Yard Filling Etc In The Approved Layouts At Tadipatri(gannevaripalli) Kadapa Municipal Corporation (chinachowk And Chalamareddypalli) Jammalamadugu (gudemcheruvu) Rayachoti (sibiyala) And Yerraguntla (yerraguntla Rs Road) Ulbs Of Ysr Kadapa District Andhra Pradesh Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract (percentage Tender)
Andhra Pradesh Township And Infrastructure Development Corporation - APTIDCO Tender Result
Civil And Construction
Krishna, Andhra Pradesh
Contract Date13 Jan 2022 This is an estimated contract date, exact date may vary.
Contract Amount₹ 56.8 Cr
Construction Of Physical Infrastructure Such As Internal Roads, Storm Water Drains, Water Supply, Sewerage Network, Court Yard Filling, Trunk Mains Etc., In The Approved Layouts At Machilipatnam (gosala & Rudravaram) And Gudivada Ulbs In Krishna District Under Ahp-pmay-hfa (u) With 2 Years Defect Liability Period Under Lump Sum Contract (percentage Tender) Cum Reverse Tendering.
21-30 of 74 active Tender Results
Tender Results By Authorities
Indian Army Tender Results
Public Works Department Tender Results
Local Self Government Department Tender Results
Rural Development & Panchayati Raj Department Tender Results
Public Health Engineering Department Tender Results
Military Engineer Services Tender Results
Directorate Of Urban Local Bodies Tender Results
Northern Railway Tender Results
Urban Administration & Development Tender Results
Municipal Corporation Tender Results
Show More