Water Tenders
Water Tenders
Eastern Railway - ER Tender
Ireps
India
Closing Date13 Feb 2025
Tender AmountRefer Documents
Description: Sc. Cut Of Parts Of Cond. Coach, Type-wgaccw [icf], 1] Er 021090 Ab, 2] Er 042052 Ab, 3] Er 042053 Ab, Type-wgaccw [rcf], 1] Er 012051 Ab, Type-wgaccn [rcf], 1] Nr 041393 Ab, 2] Er 061055 Ab, 3] Er 022118 Ab, 4] Er 032103 Ab, 5] Er 042110 Ab. Condition- A] Sold Along With Electrical Fittings But Without Mechanical Excluded Fittings As Available 1] Wheel Sets With Rb And Axle Box, 2] Bogie, 3] Helical Spring Of Sorts, 4] Distributor Valve, 5] Common Pipe Bracket, 6] Control Reservoir, 7] Brake Cylinder, 9] Buffer Plunger, 10] Wearing Piece [bronze], 11] Aluminium/zinc Water Tank, B] Cutting Allowed, C] Purchaser Should Comply The Special Condition For Dismantling Of Wagons-coaches As Per Annexure To Cte No. : Wbpcb/1968513/2022 Issued By Wbpcb. D] Please Check Special Condition And Detailed Conditions / Amendments / Modifications If Any In Depot Condition Before Bidding.
U S COAST GUARD USA Tender
Machinery and Tools
United States
Closing Soon6 Feb 2025
Tender AmountRefer Documents
Details: General Requirements 1. Scope 1.1 Intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.
2. References
coast Guard Drawings
none.
coast Guard Publications surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements other References none. 3. Requirements 3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract. 3.2 Period Of Performance. The Period Of Performance For This Work Is 24mar2025-05may2025 3.3 Location. The Contractor Must Perform The Work While The Uscgc Waesche Is Alongside The Pier At U.s. Coast Guard Base Alameda, Coast Guard Island, Alameda Ca 94501. 58310_mla_1124_418 item 1: Folding Boom Cranes, Biennial Maintenance, Perform 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Inspect, Perform Maintenance, And Test Folding Boom Cranes Listed In Table 1. table 1 – List Of Folding Boom Cranes crane location manufacturer / Model Number coast Guard Tech Pub crane No. 2 main Deck, Port Side, Aft Of Frame 95 appleton Marine Inc. / Fb90-28 7903 crane No. 4 main Deck, Port Side, Aft Of Frame 90 appleton Marine Inc. / Fb90-28 7903 crane No. 3 main Deck, Stbd Side appleton Marine Inc. / Fb90-28 7903 1.2 Government-furnished Property. mti item Description nsn/pn qty estimated Cost ($/unit) y *cb-oth Mark Iv (coast Guard Drawing 26b-cb-iv-801-001) n/a 1 Ea. n/a y *long Range Interceptor Ii (lri-ii) Cutter Boat
(coast Guard Drawing 35-lri-ii-801-001) n/a 1 Ea. n/a 2. References coast Guard Drawings coast Guard Drawing 26b-cb-iv-801-001, Rev -, Booklet Of General Plans coast Guard Drawing 35-lri-ii-801-001, Rev -, General Arrangement coast Guard Drawing 418a-wmsl 801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes coast Guard Drawing 750-wmsl-583-508, Rev -, Installations Iwo Aft Folding Cranes coast Guard Fleet Drawing Fl-1702-11, Rev -, Inspection Of Sheaves coast Guard Publications coast Guard Technical Publication (tp) 7903, Swbs 583, Oct 2021, Aft Boat Handling System –model Fb90-28 surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 5000 (sflc Std Spec 5000), 2022, Auxiliary Machine Systems surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References the Society For Protective Coatings (sspc) Surface Preparation Specification No.11 (sspc-sp 11), 2020, Power Tool Cleaning To Bare Metal 3. Requirements 3.1 General. 3.1.1 Cir. The Contractor Must Submit A Cir For The Inspections Listed In The Following Paragraph(s): 3.3 Inspect And Repair Task Particulars (task #1, #2, #3 And #7) 3.1.2 Tech Rep. The Contractor Must Provide The Services Of A Qualified Technical Representative Who Is Familiar With The Folding Boom Cranes, Appleton Marine Inc. Model Fb90-28, To Accomplish The Following On Site: advise On Manufacturer's Proprietary Information Pertinent To The System. ensure Compliance With Manufacturer's Procedures And Standards During Inspections, Repairs, Calibration And Testing. 3.1.2.1 Ensure The Tech Rep Has Experience With The System/equipment Stated Above And Demonstrated On Their Résumé. 3.1.2.2 Submit The Name And Résumé Of The Tech Rep With The Contractors Bid. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.3.1 Protection Of Fine Surfaces. The Contractor Must Protect All Fine Surfaces In Accordance With Sflc Std. Spec 5000. 3.1.3.2 Hydraulic System Contamination Protection. The Contractor Must Maintain Existing Hydraulic Cleanliness In Accordance With Sflc Std. Spec 5000. 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: piping electrical Cables note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.3 Inspect And Repair Task Particulars. The Contractor With Tech Rep Support Must Perform Tasks Listed In Table 2 In Accordance With Sflc Std Spec 5000 And Tp 7903. See Applicable Drawings And Tech Pub In Section 2 For Technical Information And Installation Details. table 2 – Task List additional Requirements # task Type qty component Or Assembly appendix And Para. From Sflc Std Spec 5000 other tech Pub 7903 1 operate And Inspect 3 folding Boom Crane 3.2.1 submit A Cir. Document The Existing Software Program/version. note: There Is An Issue While Running Cranes #2 And #4 In Tandem (with A Load In Remote). While Hoisting, The Operator Receives Indication Crane #4 Is Overloading. Users Must Override To Operate The Cranes In Tandem. The Contractor Will Need To Conduct This “operate And Inspect” Task Under Load To Troubleshoot This Issue. 2 operate And Inspect 1 chest Pack (chest Pack Controls And Junction Boxes) 3.2.1 submit A Cir. note: There Is One Chest Pack. It Should Be Rotated Between All Three Cranes. 3 operate And Inspect 1 control Console 3.2.1 submit A Cir. 4 service & Inspect & groom & Lubricate 3 crane Assembly 3.2.2 perform All Preventive Maintenance Actions As Indicated On Table 4-1 Of Cg Tp 7903, Regardless Of Specified Interval. Inspect Hydraulic Hoses For Leaks, Abrasions, Swelling And Defects. Inspect Entire Folding Crane Assembly For Signs Of Leakage, Cracks, Structural Damage And Deformations. Submit A Cfr. note 1: Only Check The Torque Of 25% Of The Turntable Bearing Mounting Bolts (4-3.18.1) – Include A Diagram Of The Bolts That Were Checked In The Cfr For This Section.
note 2: Take Off Removable Hose Sleeves And Hose Fitting Tape For Inspection, If Applicable. Reinstall Hose Sleeves And Fitting Tape Upon Completion Of Inspection 5 service And Inspect 3 cranes (mechanical/hydraulic) 3.2.2 inspect Swing Drives, Swing Motor, Swing Manifold, Hydraulic Swivel, Slew Bearing, Slew Bearing Gear, Slew Bearing Bolts, Slew Bearing Wear Inspection, Main Control Manifold, Wire Rope, Elr Manifold, Heel Pins, Jib Pins, Telescope Cylinders, Slide Pads, Jib And Luffing Cylinders, Sheaves, Crane Block Assembly, 10 Ton Hook, Snatch Block, Winch, Constant Tension System, Overhaul Ball. Fasteners, Submit A Cfr. 6 partially Preserve 3 folding Boom Crane Assembly 3.2.4, 3.2.4.3.2, 3.2.4.4, And 3.2.4.5.1 7 hydraulic Lube Oil Analysis 3 hydraulic System c2.1.3.1 submit A Cir. 8 service And Inspect 1 hydraulic Power Unit (hpu) 3.2.2 inspect Prime Mover/link Motor, Hpu Pumps, Hpu Reservoir, Hpu Tank Heaters, Oil Cooler, Hpu Manifold And Hoses. Hpu Temperature Transmitter, Hpu Display, Hpu Controls, Joysticks And Control Cabinet In Accordance With Tp 7903. 9 system Relief Valves, Switches And Indicators 1 hydraulic System in Accordance With Tp 7903, Verify Set Points, Adjustment And Calibration On: pump Compensator Relief Valve system Relief Valve. winch Limit Adjustment. load Monitor Indicators crane Position Indicators submit A Cfr. 10 disassemble And Inspect 1 hydraulic Oil Heat Exchanger 3.2.3 disassemble To The Minimum Extent Necessary To Clean The Heat Exchanger. 11 service And Inspect 2 hydraulic System crane Motor A And B 3.2.2 perform Insulation Resistance Test In Accordance With Ansi/easa Ar 100-2020.and Section 3 Of Tp 7903 Submit A Cfr. 12 service And Inspect 3 cranes (electrical) 3.2.2 inspect Load Pin, Boom Angle Transducer, Jib Angle Transducer, Swing Angle Encoder, Length Transducer, Turret Enclosure, Flood Lights And Electrical Cables 13 operational And Weight Test 3 folding Boom Crane Assembly perform In Accordance With Paragraph 3.5 Of This Work Item. 14 fabricate And Install 3 label Plate b2.9 name Plate Must Also Include Additional Information Of Dynamic Load Test, Brake Test And Wll Weights. 3.3.1 Materials. The Contractor Must Provide All Parts (i.e. All Greases, Lubricating Oils, Hydraulic Fluid, Hydraulic Oil Filters, Tank Breather Elements And Other Miscellaneous Materials) And Materials Including, But Not Limited To, The Items Listed In Table 3 Below, To Conduct The Required Maintenance Actions Listed Above. table 3 – List Of Parts quantity part Number description source Of Supply 1 ymd-8861-r hpu Hydraulic Return Filter appleton Marine Inc. 1 ymd-10416 hpu Hydraulic Return Filter 2 ymd-12209-r pressure Filters (for Crane No.2 & 4) 1 ymd-12234-r (0280d005bh4hc) pressure Filters (for Crane No.3) 1 ymd-12234-r (0060d005bh4hc) pressure Filters (for Crane No.3) 3.3.2 Hose Inspection. The Contractor Must Visually Inspect The Condition Of All Flexible Hoses; Tp7903 Has A Comprehensive List Of Hoses And Their Locations. Submit A Cfr With The Following: hose Number hose Physical Condition service Life Dates (date For Required Hose Renewal; If Not Specified, Add Twelve Years To Installation Date) 3.3.2.1 If Not Present, The Contractor Must Provide New Hose Tags, In Accordance With Sflc Std Spec 5000, Paragraph C2.2.1.4. Ensure Tag Color Coding Of Black On Natural Or Black On White. Ensure That Tags Must Be Attached Using Materials That Will Not Damage Hose Assembly In Any Way Or Interfere With The Normal Flexing Motion Of The Hose. 3.3.2.2 The Contractor Must Stamp, Engrave, Or Etch The Following Information On Each Tag. Handwritten Information On Each Tag Is Not Acceptable. Utilize The Cutter’s Hose Log For Information As Necessary. hose Log Item Number (serial Number) hydrostatic Test Pressure (psi) hydrostatic Test Date (dd/mm/yy) service Life (replacement Date) Date (qtr "q"/fy) 3.4 Preservation Requirements. The Contractor Must Perform The Following Work To Accomplish The First Bulleted Requirement Of Sflc Std Spec 5000 (para 3.2.4.3.2). 3.4.1 All Other Requirements As Specified From Sflc Std Spec 5000 Regarding “partially Preserve” Remain Applicable. 3.4.2 In Addition To Partial Preservation, Abrade Entire Crane Surface And Provide Aesthetic Topcoat. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. note certain Water Weight Bags May Be Too Large To Fit Within The Notch. Ensure Test Weights Are Able To Fit Within The Notch To Accomplish All Testing. caution do Not Exceed The Working Load Limit (wll) Of The Cranes For Any Of The Tests Listed In Appendix A, Cg Tp 7903. Exceeding The Wll Could Result In Equipment Damage And/or Personnel Injury. 3.5 Operational And Weight Testing. The Contractor Must Perform The Appleton Marine Inc. “start-up And Overhaul Test Procedure”, Appendix A Of Cg Tp 7903 Items 1-10. Static Load Test (item 2.1) Is Not Required. Perform All Testing With Cutter At Or Near 0-degree Trim And 0-degrees List. Record And Provide All Testing Data Of Appendix A, Cg Tp 7903 Via A Cfr. Utilize Test Weights That Will Ensure The Boom Can Be Extended Horizontal In The Notch. 3.5.1 The Contractor Must Supply Weights And A Certified Dynamometer To Conduct Load Testing, Submit Cfr With Certification Details. Perform All Testing In The Presence Of The Coast Guard Inspector And The Tech Rep. 3.5.2 Upon Successful Completion Of The Load Testing, Operational Testing Must Be Performed Using The Various Gfp Small Boats In Accordance With The Test Procedure Detailed In Appendix A, Cg Tp 7903. 3.6 Bearing Wear Inspection. The Contractor Must Conduct A Bearing Wear Inspection Of The Turntable Bearing, For All Cranes In Table 1, In Accordance With Cg Tp 7903 Appendix B. Submit A Cfr With Test Results As Compared With The Baseline Measurements In Table 4. table 4 – Cgc Waesche Turntable Bearing Baseline (15july2018) 3.7 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.8 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Exterior And Interior Surfaces To Match Existing Adjacent Surfaces, In Accordance With Sflc Std Spec 6310. Abide By All Touch-up Requirements Outlined In Sflc Std Spec 6310. 4. Notes this Section Is Not Applicable To This Work Item.
U S COAST GUARD USA Tender
Chemical Products
United States
Closing Date12 Feb 2025
Tender AmountRefer Documents
Description: Annual Water Treatment For Cooling Towers At Uscg Base Portsmouth
Tower Hamlets Tender
United Kingdom
Closing Date3 Mar 2025
Tender AmountGBP 1.5 Million (USD 1.8 Million)
Details: This Project Aims To Establish A Dedicated Women’s Resource Centre With A Culturally Sensitive Approach Towards Meeting The Needs Of Bangladeshi Women, Who Have Been Identified As One Of The Most Marginalised Members Of The Community. The Centre Will Be Open To Women Of All Backgrounds. The Women’s Resource Centre Will Offer A Safe Space For Learning And Developing, With On-site Childcare Facilities. The Centre Will Also Be A Dedicated Space For Women Seeking Support And Advice On A Range Of Issues, Especially Support For Violence Against Women And Girls (vawg). 61 Vallance Road In Whitechapel Has Been Identified As The Site Which Will Be Converted Into A Women’s Resource Centre (with Focus On Bangladeshi Women), By Undertaking Internal Refurbishment Works. High Level Project Scope 1. Strip-out Works · Demolition & Removal: O Removal Of Selected Existing Internal Finishes, Including Walls, Ceilings, Flooring, And Any Obsolete Fixtures Or Fittings As Per Demolition Drawings. O Removal Of Existing M&e Installations (where Applicable) Including Lighting, Power Outlets, Hvac Components, And Plumbing. O Safe Removal And Disposal Of Waste Materials In Accordance With Environmental And Regulatory Guidelines. 2. Light-touch Fit-out Works · Flooring: O Supply And Installation Of New Floor Finishes (carpet, Vinyl, Or Tile) As Per Client Specifications. · Wall Finishes: O Application Of Paint Or Other Finishes To Existing Or Newly Constructed Surfaces. · Partitions: O Installation Of New Internal Partitions To Create Rooms Or Reconfigure The Layout As Required. O Ensure Proper Integration With Existing Structural Elements And M&e Systems. · Suspended Ceilings: O Supply And Installation Of New Suspended Ceiling System (tiles, Grid, Or Equivalent), Ensuring Compliance With Acoustic And Aesthetic Requirements As Per Agreed Drawings. 3. Mechanical And Electrical (m&e) Works · Mechanical Systems: O Upgrades Or Modifications To Heating And Ventilation (hvac) Systems To Ensure Compliance With Current Standards. · Electrical Works: O Installation Or Upgrading Of Lighting, Power Outlets, And Data Cabling As Per Layout Drawings. O Install New Fire Alarm Systems, And Security Systems As Required. · Plumbing: O Minor Plumbing Works To Install Or Upgrade Taps, Sinks, Or Toilets In Line With The Fit-out Requirements. O Ensure Water Systems Are Tested And Meet Health And Safety Regulations. 4. Minor External Works · Nursery Playground: O Install Appropriate Safety Surfacing, Such As Rubber Matting, Artificial Grass, Or Loose-fill Rubber, To Meet Child Safety Standards. O Supply And Install Secure Boundary Fencing Around The Nursery Playground And Any Other Designated Areas, Ensuring Compliance With Safety And Security Requirements. · Parking Space Markings: O Mark Parking Bays In Accordance With The Required Dimensions And Layout For The Site, Using High-quality, Durable Road Paint Or Thermoplastic Markings.
DEPT OF THE AIR FORCE USA Tender
Environmental Service...+1Chemical Products
United States
Closing Date13 Feb 2025
Tender AmountRefer Documents
Description: Sources Sought Synopsis (not A Notice Of Solicitation) fa860125r0012. the United States Air Force, Lcmc/ Operational Contacting Division, Wright-patterson Afb, Ohio Is Seeking Capabilities Packages Of Potential Sources, Including Small Business (sb), 8(a), Hubzone, Women-owned (wo) And Service-disabled Veteran-owned (sdvo) Small Businesses That Are Capable Performing Chemical Testing Of Water And Hazardous Waste (hw) Characterization Testing Defined In The Attached Performance Work Statement (pws). The Contractor Shall Perform Chemical Testing Of Water Samples For Compliance With National Pollutant Discharge Elimination System (npdes) Permit Requirements Based On Ohio Environmental Protection Agency (oepa) Standards And The Standards Specified In The Pws. The Contractor Shall Supply Shipping Containers, Packing Materials, Ice/refrigerants, Preservatives, Labels, Proper Markings/identification, Sample Collection Instructions, Custody Seals, And Chain-of Custody Forms For All Samples To Be Analyzed. Firms That Respond Shall Specify That Their Capabilities Meet The Specifications Provided Below And In The Attachment And Provide Detailed Information To Show Clear Technical Compliance. Additionally, Performance History, Including Recent Commercial Customers, Shall Be Included To Determine Commerciality. This Is A Blanket Purchase Agreement. detailed Specifications Are Listed In The Attachment Identified Below: performance Work Statement “water Lab Analysis” all Interested Firms Shall Submit A Response Demonstrating Their Capability To Provide This Service To The Primary Point Of Contact Listed Below. As Stipulated In Far 15.201, Responses To This Notice Are Not Considered Offers And Cannot Be Accepted By The Government To Form A Binding Contract. No Solicitation (request For Proposal) Exists; Therefore, Do Not Request A Copy Of The Solicitation. The Decision To Solicit For A Contract Shall Be Solely Within The Government's Discretion. the Naics Code Assigned To This Is 541380, “testing Laboratories”, With A Small Business Size Standard Of $19.0m. Firms Responding Should Indicate Their Size In Relation To This Size Standard, And Indicate Socio-economic Status (sb, 8(a), Sdvo, Wo, And Hubzone Small Business). Respondents Are Further Requested To Indicate Their Status As A Foreign-owned/foreign-controlled Firm And Any Contemplated Use Of Foreign National Employees On This Effort. The Government Reserves The Right To Consider A Small Business Set-aside Based Upon Responses Hereto For Any Subsequent Action. All Prospective Contractors Must Be Registered In The System For Award Management (www.sam.gov) Database To Be Awarded A Dod Contract. No Set-aside Decision Has Been Made. Note That A Key Factor In Determining An Acquisition To Be A Small Business Set Aside Is That Small Business Prime Contractors Must Perform At Least 50% Of The Effort, As Defined In Federal Acquisition Regulation (far) Clause 52.219-14. any Information Submitted By Respondents To This Sources Sought Synopsis Is Voluntary. This Sources Sought Notice Is Not To Be Construed As A Commitment By The Government, Nor Will The Government Reimburse Any Costs Associated With The Submission Of Information In Response To This Notice. Respondents Will Not Be Individually Notified Of The Results Of Any Government Assessments. The Government's Assessment Of The Capability Statements Received Will Factor Into Whether Any Forthcoming Solicitation Will Be Conducted As A Full And Open Competition Or As A Set-aside For Small Business, Or Any Particular Small Business Program. capabilities Package:
interested Parties Shall Submit A Capabilities Package, With A Cover Letter, That Is Brief And Concise, Yet Clearly Demonstrates Ability To Meet The Stated Requirements With Sufficiently Qualified Personnel, As Outlined In The Attached Draft Pws. Capability Packages Must Not Exceed 25 Pages. responses Should Include The Following: 1. Company Name, Physical And Mailing Address: 2. Point Of Contact With Phone Number And Email Address: 3. Statement Of Your Intention To Submit A Bid For This Requirement As A Prime Contractor: 4. A Statement As To Whether Your Company Is Domestically Or Foreign Owned Or Controlled (if Foreign, Please Indicate The Country), And Whether Use Of Any Foreign National Employees Are Contemplated On This Effort: 5. If Subcontracts Are To Be Used, Provide Anticipated Percentage Of Effort To Be Subcontracted And Whether Small Or Large Businesses Will Be Used. Teaming And/or Subcontracting Arrangements Should Be Clearly Delineated And Previous Experience In Teaming Must Be Provided: 6. Statement As To Your Capability (including Financial) And Capacity To Perform And Manage The Work: 7. Statement Explaining How Your Company Will Perform This Work: 8. Statement Of Business Size In Relation To The Size Standard Stated Above: 9. Statement Of Socio-economic Status (e.g. Large, Small, 8(a), Hubzone, Service-disabled Veteran-owned Small Business, Etc): 10. Unique Entity Identifier (uei) Number And Commercial And Government Entity (cage) Code: advertising Or Marketing Information Is Not Appropriate.
responses May Be Submitted Electronically To Ssgt Brandon Bolen At The Following E-mail Address: Brandon.bolen.2@us.af.mil. All Correspondence Sent Via Email Shall Contain A Subject Line That Reads " Fa860125r0012 Water Lab Analysis." If This Subject Line Is Not Included, The Email May Not Get Through Email Filters At Wright-patterson Afb. Filters Are Designed To Delete Emails Without A Subject Or With A Suspicious Subject Or Attachments. Attachments With Files Ending In .zip Or .exe Are Not Allowable And Will Be Deleted. Ensure Only .pdf, .doc, .docx, .xsls Or .xls Documents Are Attached To Your Email. responses Are Due Not Later Than 13 February 2025 By 2:00 Pm Est. Direct All Questions Concerning This Acquisition To Ssgt Brandon Bolen: Brandon.bolen.2@us.af.mil.
11-20 of 10000 active Tenders