Valve Tenders

Valve Tenders

Don Emilio Del Valle Memorial Hospital Tender

Electrical Cables And Wires...+1Electrical and Electronics
Philippines
Details: Description Project Title : Construction Of Isolation Building With Negative Pressure – Phase Iii Location : Devmh Compound, Bood, Ubay, Bohol Estimated Project Cost : Php 10,000,000.00 Terms Of Reference Summary Of Works A. General Requirements I. Mobilization/demobilization • The Work Consists Of The Mobilization And Demobilization Of The Contractor’s Forces And Equipment Necessary For Performing The Work Required Under The Contract. Ii. Permits And Licenses • Process And Submit Electrical Design Review Including Sign And Seal Of Electrical Plans, Electrical Review, Analysis, Computations And Signature Of Pee On Electrical Plans And Including All Forms And Plans For The Application Of Permit To Construct (ptc) For Doh Licensing. Design And Analysis Should Be Submitted Prior To Commencement Of Civil Works. Iii. Temporary Facilities • Temporary Facilities Shall Be Provided During The Construction Period And Will Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. The Contractor Shall Provide And Maintain Temporary Power & Lighting, Temporary Water Service & Security Within The Construction Site. Iv. Health, Safety & Environment Control (complete Ppe, Safety Equipment & Devices & Safety Accessories And Signages) • Safety/warning Signage Must Be Placed By The Contractor On The Construction Area With Clear Demarcation Of Construction Zones To Prevent Unauthorized Access. • Detours And Closures: Provide Directions For Alternate Routes And Notice Of Any Closed Areas. • Hazard Notifications: Provide Signs Indicating Potential Dangers In Construction Areas (e.g., "hard Hat Area," "no Entry"). • Emergency Information: Clear Guidance On Emergency Exits And Procedures During Construction. • Fall Protection: Always Use Safety Harnesses And Guardrails. • Weather Conditions: Avoid Dismantling In High Winds, Rain, Or Extreme Temperatures. • Team Communication: Maintain Clear Communication Among Team Members And Healthcare Facility Engineering Team To Coordinate Movements And Tasks. V. As-built (record) Drawings & Related Documents • Submit One (1) Completed Set Of Signed And Sealed As-built Plans (whiteprint Copy) • Submit One (1) Set Of Electronic Files Of Signed And Sealed As-built Plans (cadd Editable File) • The Drawings Shall Be Supplemented With Descriptive Specification As Appropriate To Clearly Record The Exact Form And Content Of Work Described In This Specification And On The Drawings. • Maintain A Complete And Accurate Record Of All Changes Or Deviations To The Contract Documents And Shop Drawings In The Trade Contractor’s Field Office. Such Record Copy Shall Indicate The Work As Actually Constructed And Be Available For Hospital Appointed Engineer To Review. • Incorporate All Minor Revisions And Clarifications Noted Thru The Field Modification Process Which May Not Necessarily Be Shown On The Architectural Drawings Or Issued As Addenda, Bulletins, Or Change Orders. • Field Changes Shall Be Neatly And Correctly Shown On One Set Of Record Prints On A Daily Basis By The Foreman, Or Superintendent Of Ea • Ch Trade; And This Set Will Act As A Record Set At Completion Of The Work And Is Intended To Be Of Assistance To The Trade Contractor In Preparing Record Documents. Vi. Material Sustainability • The Contractor Shall Use At Least Ten Percent (10%) Locally Manufactured Materials For The Project. Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Avoid Using Building Materials/products That Contain Toxic Chemicals Or Use Materials That Are Low In Volatile Organic Compound. Please Refer To The Following Materials Specification As Stated On This Terms Of Reference. • The Contractor Shall Only Used Light Bulbs And Electrical Devices With More Efficient Models And Type As Specified On Approved And Signed Bill Of Quantities (e.g. Led Bulbs). Submit Purchase Order And Other Supporting Documents As Evidence. • The Contractor Shall Conform To The Following Painting And Other Wet Applied Materials (such As Coatings, Sealants) Requirements: 1. Only Qualified Products With Mpi "environmentally Friendly" E1 E2 E3 Rating Will Be Used. Paints, Coatings, Thinners, Solvents, Cleaners And Other Fluids Used In Repainting, Shall:  Not Contain Methylene Chloride, Chlorinated Hydrocarbons, Toxic Metal Pigments.  Be Manufactured Without Compounds Which Contribute To Ozone Depletion In The Upper Atmosphere.  Be Manufactured Without Compounds Which Contribute To Smog In The Lower Atmosphere. Be Manufactured In A Manner Where Matter Generating A 'biochemical Oxygen Demand' (bod) In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l.  Be Manufactured In A Manner Where The Total Suspended Solids (tss) Content In Undiluted Production Plant Effluent Discharged To A Natural Watercourse Or A Sewage Treatment Facility Lacking Secondary Treatment Does Not Exceed 15 Mg/l. 2. Paints And Coatings Must Be Manufactured And Transported In A Manner That Steps Of Processes, Including Disposal Of Waste Products Arising There From, Will Meet Requirements Of Applicable Governmental Acts, By-laws And Regulations In The Philippines. 3. Paints And Coatings Must Not Be Formulated Or Manufactured With Formaldehyde, Halogenated Solvents, Mercury, Lead, Cadmium, Hexavalent Chromium Or Their Compounds. Eco Labeled. 4. Anti-corrosive Coatings: Provide A Certification By The Manufacturer That Products Supplied Comply With The Volatile Organic Compound (voc) And Chemical Component Restrictions Of Green Seal Environmental Standard Gc-03, If The Product Is An Anti-corrosive Coating Applied Indoors And On-site. 5. Other Interior Coatings: If The Product Is Applied Indoors And On-site, And Not Covered By Both The Green Seal Environmental Standard Gs-11 And Standard Gc-03, Provide A Certification By The Manufacturer That Products Supplied Comply With The Chemical Component Restrictions Of The Green Seal Environmental Standard Gs-11, Paints, And Comply With The Volatile Organic Compound (voc) Restrictions Of The State Of California Air Resources Board (carb) Suggested Control Measure For Architectural Coatings, And The South Coast Air Quality Management District Rule 1113: Architectural Coatings B. Civil Works I. Site Works • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To The Healthcare Facility. • Work Includes But Is Not Limited To:  Dismantling Of Chb Walls For Windows 01, 02 & 03  Dismantling Of Chb Walls For Doors 01 & 02  Dismantling Of Ceiling Board For Installation Of Additional Mepfs Works  Scaffolding For Painting Works (installation & Dismantling)  Roof Deck Coring Works For Mepfs Ii. Structural & Concrete Works (refer Applicable Sections On Chapter 4 Of The Nscp, For Quality Of Materials, Workmanship, Execution, Acceptance, Etc.) Iii.1. General • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Slab On-grade, 3500 Psi (ground Floor Ramp Area Slab, Grid A-f, 1-2)  Concrete Countertop Sink, 3500 Psi  Stiffener Columns And Lintel Beams At Door And Window Openings, Every 3m Width And 2.1m Height Of Chb 2500 Psi Iii.2. Standards • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.3. Concrete • Structural Concrete – Monolithic Concrete Pouring Using Concrete Strength 3,500 Psi, Class Aa Ready Mix Or Job Mixed Concrete Together With The Concrete Cylinder Sample For Testing Materials. • Concrete Mix Shall Be Subject To Adjustment To Attain The Required Strength Or Desired Mix Consistency, Subject To Approval Of The Hospital Engineer. • Portland Cement, Type 1 • Manufactured Or River-run Run Gravel For Structural Concrete, ¾ “max Properly Graded” • Washed Sand For Structural Concrete • Water: Use Potable Water Free From Alkaline Or Deleterious Substance That May Affect The Strength Of Concrete. Use Of Rain Water Will Not Be Permitted. • All Materials Shall Be Free From Clay, Lumps Or Any Deleterious Object Or Matter That Will Impair The Strength Of Concrete. • Mixing Shall Be Thoroughly Done In A Mixer Of An Approved Size And Type To Insure A Uniform Distribution Of The Materials Throughout The Mass. • Site-mixed Concrete (job Mixed Concrete) - All Structural Concrete Shall Be Machine-mixed For At Least 1 ½ Minutes After All Materials Including Water Are In The Mixing Drum. No Hand Mixing Shall Be Allowed, Except In Case Of Emergency Of Breakdown During Pouring Operations. • Ready-mixed Concrete - Mixed And Delivered From A Plant Approved By The Project Manager, And Shall Be In Strict Compliance With The Requirements Set Forth In Astm C94. • Concrete Shall Be Placed Only After All Formworks, Materials To Be Embedded, And Preparation Of Surface Involved In The Placing Have Been Inspected And Approved By The Hospital Engineer. The Contractor Shall Provide Equipment And Shall Employ Methods That Will Minimize Separation Of Aggregates From The Concrete Mix. Concrete In Columns Shall Be Placed In One Continuous Operation. Concrete In Girders, Beams And Slabs In Superstructures Shall Be Poured In A Monolithic And Continuous Manner. No Construction Joint Shall Be Allowed On Any Part Of The Structure Without The Approval Of The Hospital Engineer. • Slump Of Concrete Shall Not Exceed 3 Inches • Placement Of Concrete Shall Be In Accordance To Standard Norms, When Using Portable Concrete Mixers. • Cure Concrete Sprinkling Water And Wetted Continuously For 7-day Period. Iii.4. Thermal Moisture Protection • Except As Modified By Governing Codes And By Contract Documents, Comply With The Provisions And Recommendations Of The Following, Latest Edition:  Ansi American National Standards Institute  Astm American Society For Testing Of Materials  Aci American Concrete Institute  Nbcp National Building Code Of The Philippines And Its Revised Irr  Nscp National Structural Code Of The Philippines Iii.5. Steel Reinforcements • Steel Reinforcements Shall Be Astm A615, Deformed Steel Bars, Grade 40. • Supply, Fabricate And Install Reinforcing Steel As Shown On Drawings. Placing Of Steel Reinforcements Shall Be In Accordance With Current Industry (local) Code (or Aci-347). • Secure The Reinforcements Using #16 G.i. Tie Wires. • Steel Reinforcement Shall Be Provided Together With All The Necessary Tie Wires, Spacers, Support And Other Necessary Devices. Reinforcing Steel Shall Be Accurately Cut And Bent In Accordance With The Approved Detailed Reinforcement Drawings. The Hospital Engineer May Require The Contractor To Prepare And Submit Bar Cutting Schedule Prior To Fabrication Of Reinforcing Steel Bars. • Steel Reinforcements Shall Be Free From Mill Scales, Rusts, Oils, Contamination That Will Impair The Bonding Property To Concrete. Iii.6. Structural Steel, Metal Works (refer Chapter 5 Of The Nscp) • Provide All Labor, Materials, Equipment, Transportation, And Services Required To Complete All Work Specified Herein Indicated Or As Shown On The Drawings. • Work Includes But Is Not Limited To:  Prefabrication Of Façade Louver Installation • Materials Steel And Metals For The Works Shall Meet The Requirements Of Astm A36, Hot-rolled Shapes And Plates. • All Steels Shall Be Primed With Epoxy-based Paint With -2- Finish Coats, Color Sample Must Be Submitted To Architect’s/engineer’s For Approval. Substrate Preparation Shall Meet The Requirements Of The Applicable Clauses Of The Steel Structures Painting Council, For Industrial Type Of Construction. All Surfaces Shall Be Free From Mill Scale, Rusts, Oils Or Any Contaminants Detrimental To Adhesion Of Paint. • Welding Works Shall Be In Accordance With Structural Welding Code (american Welding Society-d1.1, Latest Edition). Welding Electrodes Shall Be E6013 And E6012, Minimum, Meeting The Requirements Of Aws A.5. All Welders Shall Meet The Qualifications Under The Aws Codes And Standards. • All Works Under This Item Shall Be Subject To Verification By The Engineer Prior To Commencement Of Fabrication. Contractor Is To Submit Shop Drawings For Architect’s/engineer’s Review Prior To Execution. Iii.7. Formworks • All Forms Shall Be Designed By The Contractor For A Safe Construction Activity And Installed To Dimensions Shown On The Drawings. • Use Phenolic Boards On Formworks With Shoring Supports. • Forms Shall Be Used Whenever Necessary To Confine The Concrete And Shape It To The Required Lines And Dimensions, Or To Protect The Concrete From Contamination. Forms Shall Have Sufficient Strength To Withstand The Pressure Resulting From Placement And Vibration Of The Concrete, And Shall Be Maintained Rigidly In Correct Position. Forms Shall Be Sufficiently Tight To Prevent Loss Of Mortar From The Concrete. • Stripping Of Forms Shall Only Commence After The Concrete Has Gained Sufficient Strength (min Of 7 Days) For Major Structural Elements. C. Thermal Moisture Protection Furnish Materials And Labor And All Incidentals Necessary For The Completion Of All Thermal Moisture Protection Works Shown On Drawings And As Herein Specified. I. Moisture Protection – Cold Fluid Applied Waterproofing • Work Includes But Is Not Limited To:  Waterproofing Of All Toilet Floors  Waterproofing Of Roof Deck • Project Conditions:  Proceed With Waterproofing Operations Only After Substrate Construction And Penetrating Work Have Been Completed.  Proceed With Waterproofing Operations Only When Existing And Forecast Weather Conditions Will Permit Work To Be Performed In Accordance With Manufacturer’s Recommendations. Ii. Leak Plug: Rapid-setting Mortar For Plugging Leaks On Concrete & Sealant On Pipe Penetrations & Embedded Steel Ladder • Provide Leak Plug That Is An Ultra-rapid Set Plugging Mortar For Sealing Running Water Leaks Where Conventional Mortars Would Otherwise Be Washed Away. It Should Be Ideal For Sealing Leaks Before Applying Waterproof Renders In Cistern Tanks. Upon Setting, The Product Should Develop Excellent Structural Strength And Water Tightness. It Is Supplied As A Dry Powder That Needs Only The Addition Of Water. • Specifications:  Rapid-setting, Stopping Leaks Instantly  Easy To Use – Just Add Water  Durable – Provides Sufficient Strength  Chloride-free – Doesn’t Cause Corrosion, And Non-toxic • Uses For:  Sealing And Creating Coving On Corner Joints  Stopping Leaks  Filling Holes Before Waterproofing, Including The Cold-joints • Surface Preparation: Surfaces Should Be Brushed Clean To Remove Loose Material, Dust, And Laitance. Holes To Be Patched Should Be Cut Back To A Depth Of 20mm, And Feather Edges Must Not Be Allowed. Allowance Should Be Made For Wastage When Estimating. • General Application: Strictly Comply With Manufacturer's Written Installation Instructions, Including Preparation Of Substrate Surfaces, Detail Coatings Of Joints And Planar Changes In Substrate, And Priming Of Substrates. Apply The Mixed Leak Plug In Place, Ensuring Maximum Contact With The Substrate Before The Material Sets. If Being Used To Plug A Running Water Leak, The Mixed Leak Plug Should Be Held In Place Until It Reaches The Initial Set. Iii. Sealant On Pipe Penetrations • Provide A Heavy-duty Sealant That Is A Formulated Polymer Which Serves As A Multi-purpose Adhesive And Sealant. It Is A Rubber-like, Flexible, Single Component, Moisture Cure Adhesive, And Sealant That Is Engineered For The Bonding And Sealing Needs Of The Construction And Automotive Industry. • Specifications:  Heavy Duty Adhesive And Sealant  Excellent Adhesion To A Wide Variety Of Substrates  Interior / Exterior Application  Highly Flexible And Elastic  Durable With High Tensile And Shear Strength  Uv And Weather Resistance  Paintable  Easy Clean Up  Non-staining  No Solvent, Isocyanate, Voc Iv. Two-component, Flexible Cementitious Waterproofing Membrane • Provide A Two-component, Flexible Cementitious Waterproofing Membrane, Consisting Of A Selected Cement Blend With Well-graded Fillers And Synthetic Resin. • Specifications:  Flexible, Durable And Weather-resistant  Excellent Adhesion To Most Substrates  Excellent Waterproofing Qualities – Able To Withstand High Hydrostatic Pressure  Breathable Membrane – Permeable To Water Vapor And Yet Impermeable To Water  Bridge Hairline Cracks  Non-toxic – Suitable For Use In Waterproofing Of Potable Water Tanks  Can Be Applied Onto Damp Surfaces • General Applications: For Horizontal And Vertical Surfaces, A Roller And/or Paint Brush May Be Used To Apply The Slurry. Care Must Be Taken To Ensure That Air Is Not Entrapped In The Membrane. Apply The First Coat And Work Generously To Fill All The Pores And Honeycombs. Allow The Membrane To Dry For Approximately 2 To 3 Hours Before Application Of The Second Coat. The Second Coat Must Be Applied In A Crosswise Manner To Ensure An Even Coverage. Allow A Minimum Curing Time Interval Of 15 To 72 Hours Before Laying The Screed Or Performing A Ponding Test. Should The Ponding Test Exceed 4 Hours, A Minimum Curing Time Interval Of 72 Hours Is Recommended. Concrete Topping Is Recommended For Exposed Areas Subject To Regular Traffic. Apply A Thin Film Of Bonding Agent Before Applying The Concrete Topping. D. Architectural Works Furnish Materials And Labor And All Incidentals Necessary For The Completion Of All Architectural Works Shown On Drawings And As Herein Specified. I. Paint Finishes • Paint Materials And Samples Swatches Shall Be Approved By The Architect. • Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory. • Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film. • Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces. • Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition. • Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. I. Floor Finishes • Tile Works  General: All Surfaces To Receive Tiles, Shall Be Free From Loose Plaster, Where Required, Existing Setting Mortar Bed Shall Be Stripped, Removed To Allow Proper Setting Of Tiles To Desired Finished Elevation. No Separate Payment For Trimming Existing Mortar Bed And Shall Be Deemed Included Elsewhere.  Material Shall Be Subject To Review And Approval Of The Architect. Contractor To Submit Samples For Color And Texture Selection Prior To Delivery And Installation.  All Floor Cuttings On Both Ends Of The Walls Shall Be Of Equal Width.  Tile Grout Color To Match Color Of Tiles Or As Directed By The Architect.  Setting Bed Or Mortar Shall Be Dry Mixed, Sand-cement Mix With Water Added To Produce The Desired Consistency And Slurry Mix For Adhesion. Use Tile Adhesive For Areas That Are Less Than 1.5 Inches From Finish Floor Line.  All Exposed Corner Edges Shall Be Provided With Aluminum Stair Nosing.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Anti-bacterial Vinyl Sheet Works Work Includes But Is Not Limited To:  3mm Anti-bacterial Vinyl Sheets With Cove And Capping – All Areas As Indicated On Drawings.  Installation Materials: - Trowelable Leveling And Patching Compounds: Latex-modified, Portland Cement Based Or Blended Hydraulic Cement-based Formulation Provided Or Approved By Resilient Product Manufacturer For Applications Indicated. - Adhesives: Water-resistant Type Recommended By Manufacturer To Suit Floor Tile And Substrate Conditions  Installation Should Be Carried In Accordance With Local Standards. Subfloor To Be Smooth, Hard, Clean And Dry Prior To Laying.  Project Condition: - Maintain Temperatures Within Range Recommended By Manufacturer, But Not Less Than Deg C Or More Than 35 Deg C, In Spaces To Receive Floor Tile During The Following Time Periods: 1. 48 Hours Before Installation. 2. During Installation. 3. 48 Hours After Installation. - After Post-installation Period, Maintain Temperatures Within Range Recommended By Manufacturer, But Not Less Than 13 Deg C Or More Than 35 Deg C. - Close Spaces To Traffic During Floor Covering Installation. - Close Spaces To Traffic For 48 Hours After Floor Covering Installation. - Install Resilient Products After Other Finishing Operations, Including Painting, Have Been Completed.  Color And Patterns: - Colors And Patterns: As Selected By The Healthcare Facility From Manufacturer's Full Range.  Positioning: - As Far As Possible, And Depending On The Width Of The Rolls, Seams Between Strips Should Be Kept Away From Areas Of Heavy Load. - Within Rooms, Strips Should Be Laid Towards The Main Window Or In A Lengthwise Direction. - Within Corridors, Strips Should Be Laid In The Direction Of Pedestrian Traffic Unless Otherwise Stated In The Contract Specifications. Apply The Flooring Along The Chalk Line. - Mark A Longitudinal Axis For Reference To Place Strips. - Unroll Fully Material. - Check That The Edge Of Strips Is Straight. Align The Edge Of The First Strip To Longitudinal Axis To Have A Straight Reference. - Leave A Gap Of 1 Cm Between Every Strip To Let Possible Full Material Acclimation In Its Length As In Its Width. If Area Is Too Small, It Is Possible To Overlap Fully Two Strips. Welding Joints: Leave A Space Of Max 1 Mm Between The Strips Cold Seaming: Overlap The Strips In Order To Cut Edges Flush - Let Material Relax During 24h. Material Will Be In The Best Conditions To Be Glued And Material Tensile Or Bubbles Will Be Mostly Released.  Gluing And Fitting: - This Is Done 24 Hours After Having Unrolled And Laid Out The Lengths. - The Application Is Done By Priming And Using Acrylic Emulsifying Adhesives With A Finely Toothed Spatula Or Trowel A2 Norm Tkb Or 1/16” X 1/16” X 1/16” Square Notch (1.6 Mm X 1.6 Mm X 1.6 Mm). Coverage Rate Is 300 Gr/sqm. To Achieve This Coverage, It Is Necessary To Change The Spatula Regularly. Important: - Forbid Any Trafficking For 48 Hours After Laying As Well As Any Furniture Movement. - Follow Carefully The Recommendations Of The Adhesive Manufacturer. - Closely Follow The Adhesive Manufacturer’s Instructions With Particular Regard To Its Waiting Time (the Interval Between Application Of Adhesive And Laying Of Flooring). - Room Temperature And Humidity, Sub-floor Absorption And Adhesive Coverage Are Important In Order To Achieve Perfect Adhesion. Fold Back Half Of The Strips When Applying Glue To The Floor  Rolling Out: - Rolling Out Should Be Done In Two Stages: 1. Manually, Using A Cork Smoothing Press 2. By Rolling Over The Entire Surface With A 50kg Roller When Installation Is Complete. Stage 1: Pressing Down Manually Stage 2: Using A 50kg Roller - Trimming The Edge: 1. Use Of Coving As A Skirting System.  Welding: - Heat Welding Requires A Small Gap 1 Mm Max To Be Left Between The Sheets During The Gluing Process. Cold Welding Requires Perfectly Straight Edges. Employ An Overlap Cutting Method During The Gluing Process.  Putting Into Service – Allowing Traffic: After Installation: - For Normal Pedestrian Traffic, Allow 48 Hours - Before Moving Or Installing Furniture, Allow 72 Hours • Resinous Floor Coating System Works  Work Includes But Is Not Limited To: - Non-skid Polyurethane Floor Coating (ff-4) – Of Ramp, Mid-landing, Landing And Janitor’s Closet At 3rd Floor , And As Indicated On Drawings.  Product: - Performance Requirements: Non-skid Polyurethane Floor Coating (ff-4) – Provide A Modified Polyurethane Floor Coating Formulated For High Performance And Resistance To Abrasion. Special Kinds Of Aggregates Were Added To Offer Anti-slip For Protection Against Harmful Or Dangerous Slips On Dry And Wet Floorings. Low-emitting Materials: Flooring System Shall Comply With The Testing And Product Requirements Of The California Department Of Public Health's (formerly, The California Department Of Health Services') "standard Method For The Testing And Evaluation Of Volatile Organic Chemical Emissions From Indoor Sources Using Environmental Chambers." - Specifications: - Better Anti-slip Grip - Durable And Excellent Color Retention - Low Odor And Non-toxic - Excellent Adhesion On Surfaces - Non-flammable - Recommended Paint System: - Primer: 1 Coat Of A Two-component, 100% Solids Epoxy Specially Formulated As A High-strength Primer For Use In Priming All Concrete Surface And Steel Prior To The Application Of Any Resin-based Floor Coatings And Toppings. - High-protective Coating - Pigmented Binder For Seamless Broadcast Flooring - System - Low-viscosity Binder For Trowel Applied Mortar - Flooring - High-quality Concrete Epoxy Primer - For Damp Surfaces - Topcoat: 2 Coats Of Non-skid Polyurethane Floor Coating - General Application: Measure The Floor Area To Be Painted And Buy Enough Paint For The Entire Project. Stir Well. Apply Liberally. Avoid Light Foot Traffic For The Next 24 Hours. Do Not Apply When Surface Or Air Temperature Is Below 20°c Or If Rain Is Expected Within 5 Hours. Apply Liberally With A 3/8” Nap Roller, But Avoid Excessive Brushing Or Spreading Too Thinly. Do Not Let Water Sit On The Painted Surfaces Before 14 Days To Ensure Proper Curing. • Floor Tile Works  Toilets And Janitor’s Closet – 30cmx30cm Non-skid Homogeneous Floor Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims.  No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. Ii. Wall & Ceiling Finishes • Wall Tile Works  All Toilets – 30cmx60cm Glossy/polished Ceramic Tiles.  Cuttings On Both Ends Of The Walls Shall Be Of Equal Width With The Floor Finish.  All Exposed Corner Edges Shall Be Provided With Pvc Tile Trims. - No Human Traffic Or Construction Loads Shall Be Applied To All Newly Installed Tiles, And Allow Setting Mortar And Adhesive To Cure Prior. • Painting Works  Paint Materials And Samples Swatches Shall Be Approved By The Architect.  Examine Substrate And Conditions Under Which Painting Will Be Performed. Proceed With The Work Only When Conditions Are Satisfactory.  Do Not Paint Over Dirt, Rust, Scale, Grease, Moisture, Scuffed Surfaces, Or Conditions Otherwise Detrimental To Formation Of A Durable Paint Film.  Clean Surfaces To Be Painted Before Applying Paint Or Surface Treatments. Remove Oil And Grease Prior To Mechanical Cleaning. Program Cleaning And Painting So That Contaminants From Cleaning Process Will Not Fall Into Wet, Newly-painted Surfaces.  Perform Preparation And Cleaning Procedures In Accordance With Paint Manufacturer’s Instructions And As Herein Specified, For Each Particular Substrate Condition.  Ferrous Metals: Clean Non-galvanized Ferrous-metal Surfaces That Have Not Been Shop Coated; Remove Mortar, Plaster, Grease, Dirt, Rust, Loose Mill Scale And Other Foreign Substances By Solvent Or Mechanical Cleaning Methods That Comply With The Recommendations Of The Steel Structures Painting Council, Before Priming Coat Is Applied. • Painting Systems  Exterior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Interior Surfaces: - Concrete, Concrete Masonry, Rendered Smooth - Concrete Neutralizer – One (1) Coat, Dry For 6 Hours. - Putty Surface Imperfections, Hairline Cracks With Patching Compound Using Putty Knife. - Prime – Two (2) Coats Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of Semi-gloss Latex, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent – Water - Application – By Brush, Roller, Or Airless Spray  Ceiling & Drywall Surfaces: - Repair Surface Imperfections With Putty Using Putty Knife, Dry For 2 Hours And Sand. - Apply Mesh Tape On Board Joints And Seal Gaps With Patching Compound. Dry For Two (2) Hours And Sand. - Primer – Flat Latex, Dry For Two (2) Hours. - Topcoat – Two (2) Coats Of White Flat Latex Paint, Two (2) Hours Interval Between Coats. - Thinning / Clean-up Solvent - Water - Application – By Brush, Roller, Or Airless Spray  Cabinetries, Closets, Counters, Doorjambs And Doors: - Primer: One (1) Coat Of Lacquer Primer Surfacer - When Necessary, Putty Surface Imperfections, Hairline Cracks With Lacquer Spot Putty Using Putty Knife. Dry For 4 Hours And Sand. - Primer: One (1) Coat Of Lacquer Primer Surfacer - Topcoat – Two (2) Coats Of Automotive Lacquer Paint Finish, One (1) Hour Interval Between Coats. - Thinning / Clean-up Solvent – Lacquer Thinner - Application – By Airless Spray • Dry Walls & Interior Wall Claddings  Walls - Fiber Cement Board In 12.00mm X 1.2m X 2.4m  Fiber Cement Board Shall Be Stored In Elevated And Well Protected Area. Boards With Broken Edges, Lacerations Etc. Will Not Be Permitted To Be Installed.  Framing - 2”x4” 0.5mm Thick Metal Studs Spaced At 0.40m X 0.40m On Centers And 2”x4” 0.5mm Thick Metal Tracks. • Dry Ceiling  Ceiling - Fiber Cement Board In 4.50mm X 1.2m X 2.4m  Fiber Cement Board Shall Be Stored In Elevated And Well Protected Area. Boards With Broken Edges, Lacerations Etc. Will Not Be Permitted To Be Installed.  Framing - On 0.40mm Thick, 19mm X 50mm Double Furring, And 0.80mm Thick, 12mmx38mm Carrying Channel With Vertical Hanger, Spaced At 0.40m X 0.40m On Centers. • Rendering To Chb Or Concrete Surfaces  All Surfaces To Be Rendered Or Cement Plastered Shall Be Clean From Any Loose Material Or Contamination To Provide Strong Bond Between Plaster And The Surface.  Mix Proportion Shall Not Be Less Than 1 Part Of Cement To 4 Parts Of Screened Sand. Necessary Adjustments Shall Be Made To Provide A Strong And Consistent Mix, Free From Cracking Due To Rapid Hydration Of Plaster Mix.  Tampering Of Previously Mix Concrete Will Not Be Permitted.  All Surfaces To Receive Paint Finish Shall Be Smooth Whilst Surfaces To Receive Tiles Shall Be Rough To Provide Better Adhesion Or Bond. • Doors And Windows  Glass Door (glass/glazing) – 10mm Thk. Tempered Clear Glass On 50mm X 100mm Powder-coated Aluminum Framed Sliding Door With 2" X 6" Powder Coated Aluminum Jamb With Complete Hardware Accessories.  Glass Partitions (glass/glazing) – 6.00mm Thk. Clear Tempered Glass Fixed Glass On Powder-coated Aluminum Frame W/ Complete Hardware Accessories.  Windows (glass/glazing) – 6.00mm Thk. Clear Glass Awning Type Analok Aluminum Frame W/ Complete Hardware Accessories And Window Frame Weatherstripping.  All Metal Doors And Jambs – Hollow Core Metal Flush Type Swinging Door With 2" X 6" Steel Jamb – All In Paint Finish By Spray, W/ Complete Hardware And Door Accessories, Including Door & Jamb Seals As Indicated On Drawings, Completely Operational  All Doors And Jambs – Provide All Door Keys With Key Chains And Key Tags With Color And Specifications Subject For Approval Of The Healthcare Facility. • Specialties  Concrete Countertop Sink - Finish – Countertop Granite Slab, 0.60x2.40mm, Full Bullnose Edge On All Areas As Indicated On Drawings - Inclusions – Countertop Backsplash And Aprons At 0.10m - Thickness – 32mm - Finish And Color – As Selected By Healthcare Facility - Do Not Use Defective Pavers That Might Be Visible Or Cause Staining In Finished Work. - Cut Unit To Provide Pattern Indicated And In A Manner That Will Provide Clean, Sharp, Unchipped Edges.  Supply And Installation Of Built-in Cabinets And Shelves - Finish – As Indicated On Drawings - Work Includes But Is Not Limited To: - 3rd Floor Icu Nurse Station - 3rd Floor Icu-med Prep Room - 3rd Floor Nurse Station - 3rd Floor Nurse Station-med Prep Room - 3rd Floor Nurse Station-clean Linens Room - Miscellaneous  Building/room Signages/wayfinding Systems  Third Floor - Signages - Room Identification Sign (for Patient Rooms) - "isolation Room 17", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "isolation Room 18", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "isolation Room 19", 6mm Thick Frosted Acrylic - Room Identification Sign (for Patient Rooms) - "intensive Care Unit", 6mm Thick Frosted Acrylic - Area Identification (sticker Mounted) - "icu Unit 1/2/3", Frosted Sticker Mounted On Glass Surface - Room Identification Sign (for Service Rooms) - "dirty Utility", 6mm Thick Frosted Acrylic - Room Identification Sign (for Service Rooms) - "nurse Station", 6mm Thick Frosted Acrylic - Room Identification Sign (for Service Rooms) - "medicine Preparation Room", 6mm Thick Frosted Acrylic - Regulatory Sign With Room Label (authorized Personnel Only) – “electrical Room”, 6mm Thick Frosted Acrylic - Regulatory Special Signs (access Ramp Sign), 6mm Thick Frosted Acrylic - Restroom Identification – “all Gender Toilet”, 6mm Thick Frosted Acrylic - 3rd Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic - Way Finder Sign, 6mm Thick Frosted Acrylic - Smoke Free Building Sign, 6mm Thick Frosted Acrylic  Ground To Second Floor - Signages - 2nd Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic - 1st Floor - Emergency Exit Plan, 6mm Thick Frosted Acrylic  Supply And Installation Of Left Façade Enclosure - Work Includes But Is Not Limited To: - All Wall Areas As Indicated On Drawings (specifically On Left Façade)  Material Specification: - Fixed Framings In Paint Finish - Miscellaneous To Complete All Works G. Plumbing Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Sanitary And Waterline Piping Works  Furnish And Install Complete Water Distribution System Including Incoming Supply Pipes And Connections, Pipes, Valves, Faucets, Accessories, Etc.  Storage, Delivery, Protection Before Installation And Connection Of Sanitary Line Accessories.  All Sanitary Pipes And Fittings To Be Used Shall Be Made Of Polyvinyl Chloride (pvc Pipes) Series 1000  All Waterline Pipes And Fittings To Be Used Shall Be Made Polypropylene Random Co-polymer (ppr Pipes)  Connections From Existing Water Supply And Existing Catch Basins.  Pressure Testing Of The Installed Water Distribution System.  Leakage Testing Of Soil, Waste, Vent, And Catch Basins And Septic Tank  Disinfections Of Water Distribution System.  Furnish And Install All Required Consumable Materials And Materials Tube Installed.  Investigation Of All Conflicts Of This Work And Coordination With Other Trades. • Plumbing Fixtures, Toilet & Sink Accessories * Submit Samples For Approval Prior To Installation" ** Faucets, Valves & Other Accessories Shall Be Japan, U.s., & E.u. Made  Two-piece Water Closet/s (push Button,4/6 Liters Water Saver) With Wall-mounted Semi-recessed Ceramic Tissue Holder, Wall-mounted Semi-recessed Ceramic Soap Holder, Complete Accessories  Wall Hung Lavatory W/ Complete Fittings & Accessories  Wall Hung Lavatory W/ Half-pedestal W/ Complete Fittings & Accessories  Stainless Steel 304 Lavatory Faucet  Stainless Steel 304 Two-way Faucet W/ Telephone Shower  50x45x20 Cm Stainless Steel 304 Single Bowl Surface Mounted Kitchen Sink W/ Complete Fittings & Accessories  Surface-mounted Long Neck Faucet For Kitchen Sink (med. Prep. Room)  Hand Bidet  Ss 304 Towel Bar  Stainless Steel Floor Drain, 6"x6" H. Electrical Works Provide All Labor, Materials And Equipment And Perform All The Work Necessary For The Complete Execution Of All The Work As Shown On Drawings And Specified In This Specification. Scope Of Works Shall Include But Does Not Be Limited To The Following Major Items Of Work: • Panel Boards And Circuit Breakers At 3rd Floor 3 Blower (exhaust & Supply Blower Panelboard) Assembled In Nema 1 Enclosure, Wall Mounted, Swing Dead Front, Powder Coated With Terminal Lugs In Crimping Type Ready, With Grounding Busbar Main: 60at,3p, 100af, 10 Kaic, 230 V, Mccb Branches: 4 - 30at/100af, 2p, 230 V, Mcb 2 - 20at/100af, 2p, 230 V, Mcb • Roughing-ins  20mm Dia.upvc Pipe  20mm Dia. Upvc Male Adapter With Locknut  25mm Dia.upvc Pipe  25mm Dia. Upvc Male Adapter With Locknut  20mm Corrugated Electrical Flexible Hose  20mm Electrical Flexible Hose Connector  Junction Box With Cover  Utility Box  Square Box  Consumables • Wires And Cables  Thhn/thwn Wire - 2.0mm², 3.5mm², 5.5mm², 14.0mm², 60.0mm² • Wiring Devices  Single Pole Switch With Led Indicator, Flush Type Modern Series  Duplex Switch With Led Indicator Flush Type Modern Series  Triplex Switch With Led Indicator Flush Type Modern Series  Three-way Switch Two Gang  Duplex Universal Convenience Outlet, 3 Prong Modern Series, 16a, 230v  Duplex Universal Outlet, Floor Mounted Type, 16a, 230v  Acu Outlet, Universal, 30a, 230v W/ Grounding-type • Lighting Fixtures  4"ø Downlight, With 11w Led Recessed Mounted  60 X 60 Square Type Recessed Led Panel  Emergency Light  Exit Light  30 Watts Led Flood Light I. Auxiliary Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Auxiliary Plan And Specification And As Indicated On Detailed Cost Estimates: • Fire Alarm And Detection System  Roughing-ins / Wires: - 15mmø Emt Pipe, Coupling, Connector - Pullbox - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box W/ Cover - Utility Box - Conduit Supports / Hangers - 1.25mm2 Twisted Pair - Consumables - Equipment: - Smoke Detector • Paging System  Roughing-ins / Wires: - 15mmø Upvc Pipe, Male Adapter With Locknut - Metal Flexible Conduit 1/2" - Straight Connector 1/2" - Junction Box With Cover - 1.25mm2 Twisted Pair - Consumables - Equipment: - Ceiling Speaker • Cctv System  Roughing-ins / Wires: - 15mmø Upvc Pipe - 15mm Dia. Upvc Male Adapter With Locknut - Junction Box With Cover - Utility Box With Cover - Utp Cat 6 4pairs - 1 Gang Outlet - Consumables  Equipment: - Ip Camera Dome Type J. Fire Protection Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Fire Protection Plan And Specification. • Black Iron Pipes, Fittings, Valves And Accessories: - Bi Pipes Schedule 40 @ 6m, Seamless (also Including Drain Pipe Riser And Auto Sprinkler Riser) And All Fittings, Valves And Accessories As Indicated On Detailed Cost Estimates • Sprinkler Heads And Accessories - Pendent Type: 135 Degrees To 165 Degrees - Sidewall Type: Standard Coverage • Others – Hangers And Supports, Miscellaneous And Consumables (including Painting And Tagging) • Testing And Commissioning – Configuration, Testing And Commissioning, Documentation, Training And Orientation K. Mechanical Works To Include Fixing And Installation; Complete Accessories And Necessary Consumables; All In Accordance With Mechanical Plan And Specification And As Indicated On Detailed Cost Estimates: • Air-conditioning Works - 3.0 Hp Split Type Aircon, Inverter Type, - 2.0 Hp Split Type Aircon, Inverter Type - 1.0 Hp Split Type Aircon, Inverter Type - Consumables • Ventilation Works - Bag/s In Bag/s Out Exhaust Blower Equipment - Panel Carbon Filter 16"x16"x2" - Hepa Filter With Aluminum Separator - Ducting L. Request For Final Inspection • Contractor Shall Submit Its Written Request For A Final Inspection Of The Project To The Medical Center Chief Office At Least Seven (7) Days Prior To Project Inspection & Turn-over. M. Tools And Equipment • Various Basic And Advanced Masonry/electrical/carpentry Tools • Measuring And Layout Tools • Waterproofing Application And Miscellaneous Tools • Safety Equipment • Utility Vehicle General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital. Time Of Completion • The Completion Of The Project Shall Be One-hundred Twenty (120) Calendar Days From The Date Of Effectivity.
Closing Soon5 Nov 2024
Tender AmountPHP 10 Million (USD 172.6 K)

U S COAST GUARD USA Tender

Civil Works Others
United States
Details: ***see Attached For Full Text Notice*** this Is A Sources Sought Notice / Request For Information; Not A Pre-solicitation Notice Or Solicitation For Proposals/quotations. the Applicable Naics Code Is 336611, Ship Building And Repairing, And The Size Standard Is 1,300 Employees. requirement: This Notice Is Issued By The U.s. Coast Guard, Surface Forces Logistics Center, And Alameda, Ca To Identify Sources Capable Of Providing The Following: Contractor Shall Provide All Necessary Labor, Materials, Services, Equipment, Supplies, Power, Accessories, Special Tools And Such Other Things As Are Necessary To Perform Drydock Maintenance To The U.s. Coast Guard Cutter, Uscgc Saginaw (wlic-803) Fy25 A 160’ Buoy Tender. uscgc Saginaw (wlic-803) Drydock Availability Fy2025. anticipated Naics Code/size Standard: The Applicable Naics Code Is336611, Ship Building And Repairing And The Size Standard Is 1,300 Employees. geographical Restriction: n/a place Of Performance:contractor’s Facility description Of Work: this Requirement Is For The Contractor To Provide All Necessary Facilities, Materials, Equipment, Personnel, And Other Such Things Necessary To Perform Dry-dock Repairs To The U.s. Coast Guard Cutter (uscgc) Saginaw (wlic-803), A 160’ Inland Construction Tender. This Vessel’s Homeport Is At 1500 15th Street Mobile, Al 36615. All Work Is To Be Performed At The Contractor’s Facility. The Required Performance Period Is 70 Days. The Performance Period Is 25 March 2025 – 02 June 2025 To Accommodate Coast Guard Cutter Operational Needs. description: This Dry Dock Will Consist Of Approximately Seventy-one (71) Work Items, Not Limited To: Hull Plating Ultrasonic Testing, Underwater Body Preserve, Propeller Removal And Inspect, Propulsion Shaft Remove, Inspect And Reinstall, Rudders Remove, Inspect, Reinstall And Preserve, Construction Deck 100% Preserve, Tanks Clean And Inspect, And Boat Davit Inspect. item description d-001 fire Prevention Requirements d-002 hull Plating, U/w Body, Inspect d-003 hull Plating, U/w Body, Ultrasonic Testing d-004 hull Plating, Freeboard, Ultrasonic Testing d-005 u/w Body, Preserve, 100 Percent d-006 u/w Body, Preserve, Partial, Condition A o-007 u/w Body, Preserve, Partial, Condition B o-008 u/w Body, Preserve, Partial, Condition C o-009 hull Plating Freeboard, Preserve, Partial o-010 hull Plating Freeboard, Preserve, 100 Percent d-011 appendages, U/w, Leak Test d-012 propulsion Shaft Rope Guards, Inspect d-013 appendages, U/w, Internal, Preserve d-014 voids, Non-accessible, Leak Test d-015 voids, Non-accessible, Internal Surfaces, Preserve d-016 tanks, Mp Fuel Service, Clean And Inspect d-017 tanks, Potable Water, Clean And Inspect d-018 tanks, Ballast, Clean And Inspect d-019 propulsion Shafting, Strain Gage Alignment, Inspect d-020 propulsion Shaft Seals (mechanical), Clean And Inspect d-021 propulsion Shaft Seals (inflatable), Overhaul And Inflatable Renewal d-022 propulsion Shafting; Remove, Inspect, And Reinstall d-023 propulsion Shaft Bearings, External, Check Clearances o-024 propulsion Shaft Bearings, External, Renew d-025 stern Tube Interior Surfaces, Preserve, 100 Percent d-026 propeller S, Remove, Inspect, And Reinstall d-027 keel Coolers, Clean, Inspect And Hydro d-028 fathometer Transducer, Renew d-029 sea Strainers, All Sizes, Renew d-030 sea Strainers, Duplex, All Sizes, Overhaul d-031 point Of Use Potable Water Filters, Install d-032 rudder Assembly, Remove, Inspect And Reinstall d-033 rudders, Preserve, 100 Percent d-034 hull Fittings, Weight Handling Rigging Hardware, Inspect And Test d-035 spuds, Overhaul d-036 spud Wells, Preserve d-037 spud Wells, Inspect d-038 boat Davit, Inspect & Service d-039 sewage Holding Tanks, Clean And Inspect d-040 sewage Piping, Clean And Flush o-041 tanks (sewage Holding), Preserve, 100 Percent o-042 tanks (sewage Holding), Preserve, Partial o-043 tanks, Ballast, Preserve, 100 Percent o-044 tanks, Ballast, Preserve, Partial o-045 tanks, Mp Fuel Storage And Overflow, Preserve, Partial o-046 tanks, Potable Water Preserve, 100 Percent o-047 tanks, Potable Water, Preserve, Partial, d-048 decks – Exterior (buoy Or Construction Deck), Preserve 100% d-049 drydock d-050 temporary Services, Provide - Tender d-051 sea Trial Performance, Support, Provide d-052 lube Oil Storage Tank, Install d-053 remote Firemain Gauge Install o-054 buoy And Cargo Handling Crane, Shrink Wrap d-055 weather Deck Drain, Renew d-056 ballast Tank Striker, Renew d-057 cathodic Protection, Zinc Anodes, Renew, d-058 engine Room Alarm System, Groom o-059 lead-based Paint, 100% Abatement, Perform d-060 longitudinal Stiffener, Renew d-061 upper Level Deck, Repair d-062 sea Chest Vent Piping, Renew d-063 deck Covering, Interior, Wet And Dry, Renew d-064 watertight Scuttle, External, Renew d-065 watertight Door, External, Renew d-066 overhaul Mk-27 Gyrocompass d-067 liferail Stanchion, Renew d-068 engine Room Ventilation Fans, Overhaul d-069 propulsion Shafts Tachometer, Install d-070 fuel Oil (fo) Manifold Valves, Renew d-071 02 Level Deck Repair anticipated Period Of Performance: 03 March 2025 Through 02 June 2025 (subject To Change At The Discretion Of The Government). If The Company Is Unable To Meet This Period Of Performance, It Is Incumbent Upon The Company To Propose An Alternative 70 Calendar Day Period Of Performance. submission Of Information: Companies Having Capabilities Necessary To Meet Or Exceed The Stated Requirements Are Invited To Provide Information To Contribute To This Market Survey/sources Sought Notice Including Commercial Market Information And Company Information. Companies May Respond To This Sources Sought Notice Via E-mail To Poc Listed In The Sam.gov Announcement With The Following Information/documentation: Ou Saephanh @ Ou.t.saephanh@uscg.mil And Diego Avila @ Diego.j.avila@uscg.mil No Later Than 8:00 Am Pacific Time 01 November 2024, Withallof The Following Information/documentation: 1. Name Of Company, Address And Duns Number. 2. Point Of Contact And Phone Number. 3. Business Size Applicable To The Naics Code: 8(a) Small Business Concern; B. Hubzone Small Business Concern; C. Service-disabled Veteran Owned Small Business Concern (sdvosbc); D. Veteran Owned Small Business Concern (vosbc); E. Ed Woman Owned Small Business Concern (edwosb); F. Woman Owned Small Business Concern (wosbc); G. Small Business Concern; H. Large Business Concern 4. Documentation Verifying Small Business Certification: Please Provide The Following Documentation As It Applies To Your Company. a. If Claiming8(a) Status, Provide A Copy Of Your 8(a) Certificate From Sba. b. If Claiminghubzone Status, Provide A Copy Of Your Hubzone Certificate From Sba. c. If Claimingsdvosb Status, Provide Documentation That Shows The Service Disable Veteran (sdv) Unconditionally Owns 51 % Of The Business, Controls The Management And Daily Operations, And Holds The Highest Officer Position In The Company. Documentation Should Also Be Provided To Show That The Sdv Has A Service-connected Disability That Has Been Determined By The Department Of Defense Or Department Of Veteran Affairs. Finally, Provide Documentation That Shows The Business Is Small Under The Naics Code 336611. d. If Claimingvosbstatus, Provide Documentation That Shows The Veteran Unconditionally Owns 51% Of The Business, Controls The Management And Daily Operation, Make Long-term Decisions For The Business, And Holds The Highest Officer Position In The Company That Works At The Business Fulltime During Normal Working Hours. The Documentation Should Also Show The Business Is Small Under The Naics Code 336611. e. If Claimingedwosbstatus, Provide Documentation That Shows The Company Is At Least 51% Owned By One Or More Women Who Are "economically Disadvantaged", And Primarily Managed By An Economically Disadvantaged Woman That Make Long-term Decisions For The Business, Hold The Highest Officer Position In The Business And Work At The Business Full-time During Normal Working Hours. The Documentation Should Also Show The Business Is Small Under The Naics Code 336611. A Woman Is Presumed Economically Disadvantaged If She Has A Personal Net Worth Of Less Than $750,000 (with Some Exclusions), Her Adjusted Gross Yearly Income Averaged Over The Three Years Preceding The Certification Less Than $350,000, And The Fair Market Value Of All Her Assets Is Less Than $6 Million. f. If Claimingwoman Owned Small Business (wosb)status, Provide Documentation That Shows The Company Is At Least 51% Owned And Controlled By One Or More Women, And Primarily Managed By One Or More Women That Make Long-term Decisions For The Business And Hold The Highest Officer Position In The Business And Work At The Business Full Time During Normal Working Hours. The Women Must Be U.s. Citizens. The Documentation Should Also Show The Business Is Small Under The Naics Code 336611. g. If Claimingsmall Business Status, Provide Documentation To Show The Business Is Small Under Naics Code 336611. 5. Statement Of Proposal Submission: Statement That Your Company Will Submit A Proposal As A Prime Contractor If A Solicitation Is Issued As A Result Of This Sources Sought Notice. 6. Past Performance Information: Evidence Of Experience In Work Similar In Type And Scope To Include Contract Numbers, Project Titles, And Dollar Amounts, Points Of Contact And Telephone Numbers. If Two Companies Are Planning To Conduct Business And Submit An Offer As A Joint Venture Or Similar Type Of Teaming Agreement, They Are Requested To Provide Past Performance Information On Projects Of Similar Scope That They Have Performed Together As A Joint Venture, If Available. Providing Individual Past Performance Documentation From Each Company On Separate Projects Where The Two Did Not Work Together May Be Considered Less Relevant. sam: Interested Parties Should Register At The System For Award Management (sam) Website As Prescribed In Far Clause 52.204-7 System For Award Management (oct 2018). Sam Can Be Obtained By Accessing The Internet At Https://www.sam.gov/sam/ Or By Calling 1-866-606-8220. disclaimer And Important Notes: This Sources Sought Notice Is For Market Research Purposes Only And Does Not Constitute A Request For Proposal/quotation; And, It Is Not Considered To Be A Commitment By The Government To Award A Contract Nor Will The Government Pay For Any Information Provided; No Basis For Claim Against The Government Shall Arise As A Result From A Response To This Sources Sought Notice Or Government Use Of Any Information Provided. Failure To Respond Or Submit Information In Sufficient Detail May Result In A Company Not Being Considered A Likely Offeror When Making A Decision On Whether Or How To Set Aside A Solicitation For Restricted Competition.
Closing Soon1 Nov 2024
Tender AmountRefer Documents 

Wasser Und Abwasserverband Rathenow Tender

Chemical Products
Germany
Details: New construction of equalization storage and optimization of P-elimination at the Rathenow sewage treatment plant, Lot 3: Technological equipment and EMSR systems: - Submersible sewage pump, 12.0 kW, 200 m³/h at Fh 10m, - Ball check valve DN150, - 4m sewage pressure pipe PE-HD 180x16.4mm, - 9m sewage pressure pipe PE-HD 225x13.4mm, - 6m pipe heating and insulation, - 2 agitators for equalization storage with lifting device, - 1 arched staircase with intermediate platform, L= 11m, galvanized steel, - 32m railing made of stainless steel V4a, - 1 connection column for pump station, - 1 control cabinet for agitators - 1 Mid DN200 Profibus interface, - 3 level measurements radar explosion protection, - 1 1 piece. Ultrasonic clamp-on flow measurement for DN400, - 1 piece. Hydrostatic pressure measurement, - 1 piece. External lightning protection system equalization reservoir, - Potential equalization pump station and equalization reservoir.
Closing Soon7 Nov 2024
Tender AmountRefer Documents 

City Of Bayawan Tender

Civil And Construction...+1Construction Material
Philippines
Details: Description Invitation To Bid The City Of Bayawan, Through Its Bids And Awards Committee (bac), Invites Suppliers / Manufacturers / Distributors / Contractors To Bid For The Hereunder Projects: Lot No. I Cement And Additives 1 1075 Bag Cement, Portland (40kgs/bag), Type 1 Lot No. Ii Aggregates 2 114 Cu.m. Sand, Washed Mixing/screened 3 83 Cu.m. Round Gravel, (screened & Washed), Max. Size 20mm Dia 4 15 Cu.m. Round Gravel, (screened & Washed), Max. Size 38mm Dia Lot No. Iii Bar And Rebar 5 1228 Length Deformed Steel Bar, 10mm Ø X 6m, Grade 33 6 59 Length Deformed Steel Bar, 12mm Ø X 6m, Grade 33 7 526 Length Deformed Steel Bar, 16mm Ø X 6m, Grade 40 8 130 Length Deformed Steel Bar, 20mm Dia X 6m Grade 40 9 4 Length Angle Bar, 6mm X 38mm X 38mm X 6m 10 26 Length Angle Bar, 6mm X 50mm X 50mm X 6m) Lot No. Iv Commercial Lumber 11 15 Piece Lumber, G-melina Mahogany And Equivalent 50mm X 50mm X 2.4m 12 15 Piece Lumber, G-melina Mahogany And Equivalent 50mm X 75mm X 2.4m 13 8 Piece Commercial Lumber, G-melina, Mahogany And Equivalent, 50mm X 75mm X 3.0m Lot No. V Construction Tools And Devices 14 35 Piece Shoring Jack, G.i. S40 Inner Pipe: 40mm X Outer Pipe: 50mm Up To 3.4m Full Extension 2.2 Tons Load Cap. Heavy Duty Lot No. Vi Cutting Tools And Supplies 15 2 Tank Acetylene Gas , Refill 16 1 Tank Oxygen Gas , Refill 17 3 Piece Drill Bit, Masonry 3/16" Dia 18 3 Piece Drill Bit, 3/16" Dia. For Steel 19 3 Piece Drill Bit, Masonry, 1/4" Dia 20 3 Piece Drill Bit, 1/4" Dia. For Steel Lot No. Vii Steel Sheets And Mesh 21 14 Sheet Steel Deck, Effective Width=0.995m, Ga. Thickness=0.80mm, Length=1.85m 22 21 Sheet Steel Deck, Effective Width=0.995, Ga. Thickness=0.80mm, Length=3.5m 23 3 Sheet Steel Plate, G.i., Gauge # 18 X 1.20m X 2.40m 24 1 Sheet Steel Plate, 10mm X 1.2m X 2.4m 25 3 Liner Meter Screen/mesh Wire, 3mm Eyehole X 0.90m Width (m) Lot No. Viii Electrical Supplies And Materials 26 1 Pack Cable Tie, 250mm (100pcs/pack) Long 27 1 Piece Pvc Tee, 57.15mm Dia Orange Inside Dia., Sanitary, S-1000 28 2 Pack C-clamp/clip, Pvc, 20mm Diameter, With Concrete Nails (100s/pack) 29 1 Pack C-clamp/clip, Pvc, 25mm Diameter, With Concrete Nails (100s/pack) 30 45 Piece Junction Box, 100mm X 100mm, W/ Cover & Screw, Octagonal 31 5 Set Square Box, Pvc, 150mm X 150mm X 100mm With Cover & Screw 32 40 Piece Utility Box, Pvc, 50mm X 100mm, Flush Type 33 60 Length "electrical Pvc Pipe, 20mm Dia X 3m Thickwall Orange " 34 40 Length Electrical Pvc Pipe, 25mm Dia X 3m Orange Thickwall 35 2 Length "electrical Pvc Pipe, 32mm Dia X 3m Thickwall Orange " 36 1 Pack "pipe Connector, Pvc, Electrical, 20mm Dia (100s/pack) " 37 1 Pack "pipe Connector, Pvc, Electrical, 25mm Dia (100s/paclk) " 38 2 Piece Service Entrance Cap, Size 32mm Dia, Clip Type 39 1 Piece Ground Rod, Steel Galv. 16mm Dia X 3m W/ Ground Clamp 40 3 Set Secondary Rack, W/ Single Spool Insulator Medium 41 7 Roll Electrical Tape, Vinyl, 177mm X 3/4inch / 19mm X 16m, Flame Retardant, 600v 42 150 Meter Service Drop Wire, # 4 Awg (m) 43 6 Piece Service Grip Wire, # 4 44 25 Meter "thw Wire, # 6 (14mm2) Stranded(m) Black " 45 25 Meter Thw Wire, # 6 (14mm2) Stranded(m) White 46 30 Meter Thw Wire, # 8 (8mm2) Stranded (m) Green 47 1 Roll Thw Wire, # 8 (8mm2), Stranded (150m/roll), Black 48 4 Roll Thw Wire,, #12 (3.5mm2), Stranded (150m/roll), Black 49 4 Roll Thw Wire, #12 (3.5mm2), Stranded (150m/roll), White 50 1 Roll Thw Wire, #12 (3.5mm²), Stranded (150m/box), Green 51 8 Piece Downlight, Lighting Fixture, Led, Round , 15w, Surface Slim Type, 220v, Day Light 52 13 Piece Downlight, Lighting Fixture, Led, Round, 24w, Surface Slim Type, 220v, Day Light 53 1 Set Kw-hr Meter, Digital, Class 200, 240v, Single Phase, 4 Jaws, 2-wire With Socket, Edmi Type 54 1 Set Distribution Panel Board, Cen. Main, 100a, Bolt-on Type, 2 Pole, Branches 10 Units, Single Phase, Flush Type 55 22 Set Convenience Outlet, Flush Type 2 Gang 3 Prong Grounding W/ Plates Bracket Cover & Screw Universal Type H. Duty 56 5 Set Switch, Light, Flush Type, Single Gang, W/ Plate, Bracket, Cover & Screw 57 5 Set Switch, Light, Flush Type, 2 Gang, With Plate, Bracket, Cover & Screw 58 2 Set Switch, Light, 3 Way, Flush Type, W/ Plate, Bracjket, Cover & Screw, Single Gang 59 4 Piece Circuit Breaker, 15a 2 Pole Bolt-on 60 4 Piece Circuit Breaker, 20a 2 Pole Bolt-on 61 1 Piece Circuit Breaker, 30a 2 Pole Bolt-on 62 1 Piece Circuit Breaker, 60a 2 Pole Bolt-on 63 1 Set Circuit Breaker, 100a, 2 Pole, W/ Nema 3r Metallic Enclosure Lot No. Ix Glass, Door And Window Supplies 64 2 Set Door Knob, Chrome Polished Adjustable Tubular Latch Type, Good Quality 65 3 Set Hinges, Steel 100mm X 100mm Loose Pin W/ Screws Excellent Quality 66 39 Lot "fixed Window Glass, Labor And Materials - , Height: 1.96m, Width: 0.97m, 1/4"" Tempered Glass Bronze, Aluminum Frame (analok), With Complete Accessories " 67 35 Lot Awning Type Window Glass, Labor And Materials - Width: 0.97m X Height: 0.42m, 1 Panel With U Bars Hinge, 1/4", Tempered Glass Bronze, Aluminum Frame (analok), With Complete Accessories 68 4 Lot Awning Type Window Glass, Labor And Materials - Width: 0.97m X Height: 0.37m, 1 Panel With U Bars Hinge, 1/4", Tempered Glass Bronze, Aluminum Frame (analok), With Complete Accessories 69 7 Lot "awning Type Window Glass, Labor And Materials - Width: 0.98m X Height: 0.66m, 1 Panel With U Bars Hinge, 1/4"", Tempered Glass Bronze, Aluminum Frame (analok), With Complete Accessories " 70 4 Lot Glass Door, Labor And Materials - Single Swing, H=2.10m X W=0.97m, Aluminum Frame, Analok, 6mm Thk. Tempered Glass Bronze W/ Complete Access. Lot No. X Paints, Tools And Supplies 71 1 Can Epoxy, (a And B), 1/4 Liter/can 72 2 Gallon Enamel Paint, Flatwall, White 73 6 Can Acrylic Spray Paint, Flat Black(400cc/can) 74 2 Can Acrylic Spray Paint, Maroon(400cc/can) 75 2 Can Acrylic Spray Paint, Yellow(400cc/can) 76 2 Can Acrylic Spray Paint, Blue(400cc/can) 77 2 Can Acrylic Spray Paint, Red(400cc/can) 78 2 Can Acrylic Spray Paint, Green(400cc/can) 79 2 Can Acrylic Spray Paint, Brown(400cc/can) 80 2 Can Latex Paint, Flat Yellow (l/can) 81 2 Can Latex Paint, Flat Red (l/can) 82 3 Piece Paint Brush, 50mm (2") Hair Type 83 3 Piece Paint Brush, 100mm (4") Hair Type 84 3 Piece Paint Roller, 175mm (7") W/ Handle) Lot No. Xi Personal Protective Equipment 85 4 Pair Rain Boots, Worker/construction Boots, Waterproof Pvc Non Slip, High Cut, Good Quality Size: 6 86 4 Pair Rain Boots, Worker/construction Boots, Waterproof Pvc Non Slip, High Cut, Good Quality Size: 7 87 4 Pair Rain Boots, Worker/construction Boots, Waterproof Pvc Non Slip, High Cut, Good Quality Size: 8 88 4 Pair Rain Boots, Worker/construction Boots, Waterproof Pvc Non Slip, High Cut, Good Quality Size: 9 Lot No. Xii Plumbing Supplies 89 24 Length Gi Pipe, 50mm Dia X 6m Sched 40 Wt=4.0mm Outside Dia= 60.30 5.553kg/m Heavy Gauge 90 30 Length Gi Pipe, 65mm Dia X 6m Sched 40 Wt=5.20mm Outside Dia= 73.00 8.694kg/m Heavy Gauge 91 2 Length Gi Pipe, 80mm Dia X 6m Sched 40 Wt=5.50mm Outside Dia= 88.90 11.312kg/m Heavy Gauge 92 2 Set Water Closet, W/ Fittings & Complete Access. Jumbo Size White 93 2 Set Lavatory, White, Wall Hung, With P-trap, Faucet, 1/2" X 1/2" Flexible Hose And Angle Valve And Expansion Bolts 94 2 Set Bidet Spray, Pvc W/ Complete Accessories 95 2 Set "urinal, Wall Hung W/ Fittings & Complete Accessories " 96 2 Piece Faucet, Stainless, 20mm Outside Dia, One Way Type (on/off), Good Quality 97 2 Piece Floor Drain, 100mm X 100mm Dia, Stainless 98 10 Length Pipe, Upvc, 20mm Outside Dia, Wt=1.8min, L=3.0m, Blue 99 18 Piece Upvc Elbow, 20mm Inside Dia X 90 Deg. Bend Plain Blue 100 4 Piece Upvc Elbow, 20mm Inside Dia X 90 Deg. Bend One End Threaded Blue 101 10 Piece Tee, Upvc, 20mm Inside Dia, Blue 102 9 Length Pipe, Pvc, 57.15mm Outside Dia X T=2.54mm X L=3.0m, S-1000, Orange 103 4 Piece Pvc Elbow, 57.15mm Dia X 45 Deg Bend Orange S-1000 104 6 Piece Pvc Elbow, 57.15mm Dia X 90 Deg. Bend Orange S-1000 105 4 Piece Pvc Wye, 57.15mm Dia Orange Inside Dia, S-1000 106 8 Length Pvc Pipe, 107.10mm Outside Dia X T=3.81mm X L=3.0m Orange S-1000 107 4 Piece Pvc Wye, 57.15mm Dia Orange Inside Dia., S-1000 108 3 Piece Pvc Elbow, 107.10mm Inside Dia X 90 Deg. Bend Orange S-1000 109 9 Piece Pvc Elbow, 107.10mm Inside Dia X 45 Deg. Bend Orange S-1000 110 5 Piece Pvc Tee, Sanitary 107.10mm Dia Orange Inside Dia., S-1000 111 8 Piece Pvc Clean-out, 107.10mm Dia W/ Cover Nominal Size, With O-ring, S-1000 112 1 Can Solvent Cement, Pvc (1lit/can) 113 1 Can Solvent Cement, Pvc (250cc/can 114 2 Can Solvent Cement, Pvc (500 Cc/can) Lot No. Xiii Roof, Wall And Ceiling Supplies 115 35 Length C-purlins, 1.2mm X 50mm X 75mm X 6.0m 116 30 Meter Sack Cloth, 3.0m Width (m) Blue 117 10 Sheet "roofing, Long Span, Curve Roof, Rib Type, Min. T=.40mm, Min. Eff. W=1.040m, Min Rib H=22mm, L=6.25m, Color: Terracotta Orange " 118 10 Sheet "roofing, Long Span, Curve Roof, Rib Type, Min. T=.40mm, Min. Eff. W=1.040m, Min Rib H=22mm, L=9.00m, Color: Terracotta Orange " 119 20 Sheet Corrugated Sheet, G.i. 0.27mm X 3.0m) Lot No. Xiv Steelwork Supplies And Devices 120 5 Box Rod/electrode, Welding, E6013, 1/8" (bx)) (matchless Quality, Iso 9001, 2000 Certified, 20 Kg/box) Lot No. Xv Carpentry Tools And Supplies 121 21 Sheet Phenolic Board, 12mm X 1.22m X 2.44m 122 16 Sheet Plywood, Marine, 4.5mm X 1.2m X 2.4m, Type I, Grade A/a 123 20 Piece Scaffolding Clamp, Swivel 50mm X 50mm 124 24 Piece Adjustable Base Jack, 32mm X 400mm 125 299 Kilo Tie Wire, # 16 126 492 Piece Blade, Hacksaw, 12mm X 300mm, 18tpi, (excellent Quality) 127 2 Kilo Nails, Common Wire, 38mm 128 6 Kilo Nails, Common Wire 62mm 129 10 Kilo Nails, Common Wire, 100mm (4") 130 5 Kilo Nails, Umbrella/roofing, 62mm 131 3 Pack "sealant, Elastomeric/roof (1/4kg/pk) " 132 2 Can Sealant, Elastomeric/roof (1 Liter/can) 133 1 Box Blind Rivets, 3mm Dia. X 9mm Long (1000 Pcs/box) 134 7 Kilo Welding Rod, E6013, 1/8"ø (kg) (matchless Quality, Iso 9001, 2000 Certified) Electrode 135 20 Pair Gloves, Working, Rubber & Cloth Combination, Good Quality 136 1 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, White 137 6 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Blue 138 10 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Yellow 139 1 Piece Hard Hat, High Quality And Heavy Duty For Industrial/construction, Safety Helmet, Uv-resistant, Hdpe, Ce En397, W/ Chin Strap, Green 140 15 Piece Safety Glasses, Smoke, Polycarbonate Single Lens Glasses, Soft Flat Spatula Type Arms, Integrated Polycarbonate Nose Piece, Easy To Use With Safety Helmet And Ear Defenders, Side Protection, Uv 400, Anti-scratch, Ce, Ansi Z87.1, En166, En172 Lot No. Xvi Bolt And Screw 141 1150 Piece "tex Screw, 63mm For Steel " 142 8 Set Lag Screw, 3/16" Dia. X 1-1/2" With Expansion Shield 143 52 Piece Anchor Bolt, 12mm Dia X 37.5mm X 125mm, W/ Nut & Washer 144 100 Piece Gypsum Screw, 3.5mm Dia X 25mm (pc) Lot No. Xvii Other Supplies 145 1 Kilo Nylon, # 100 146 1 Set Toilet Bowl, Pail Type, Porcelain, W/o Cover 147 5 Roll Tape, Thread Seal, 20mm X 10m 148 10 Piece Vest, Reflectorized, Safety, Green 149 10 Piece Vest, Reflectorized, Safety, Orange 150 2 Roll Caution Tape, Yellow, 3 Inches X 1,000 Feet 151 2 Roll Danger Tape, Red, 3 Inches X 1,000 Feet 152 1 Roll "sticker, Reflectorized, 50mm Wide, 10m/roll, Red " 153 1 Roll Sticker, Reflectorized, 50mm Wide, 10m/roll, Yellow 154 1 Roll Sticker, Reflectorized, 50mm Wide, 10m/roll, White *** Nothing Follows *** Bid Documents Shall Be Available At The Bac Office, New City Hall, Lgu Bayawan City Upon Payment Of Prescribed Non-refundable Fee In The Amount Of Php 5,000.00 Bidders Shall Drop Their Technical And Financial Proposals In The Bid Box At The Bac Office, Bayawan City On Or Before The Deadline Of Submission Of Bids As Shown Below. All Particulars Relative To Eligibility Process, Opening And Evaluation Of Bids, Postqualification And Award Of Contract Shall Be Governed By The Applicable Provisions Of Ra. 9184. The City Of Bayawan Reserves The Right To Reject Any Or All Bids, To Waive Any Defects Or Formality Therein And To Accept Bids Considered Responsive And Most Advantageous To The Government. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule Issuance Of Bid Documents October 15, 2024 To November 4, 2024@ 5:00 P.m. Pre-bid Conference October 22, 2024@ 9:00 Am Deadline/opening Of Bids November 5, 2024@ 9:00 Am Post Qualification November 12, 2024@ 9:00 Am Awarding Of Bids November 21, 2024@ 9:00 Am Approved: (sgd)virginia D. Sadiasa City Civil Registrar Bac Chairman
Closing Soon5 Nov 2024
Tender AmountPHP 3 Million (USD 52.6 K)

Department Of Environment And Natural Resources - DENR Tender

Philippines
Details: Description Roll Acetate (plastic Cover), Gauge#8, 50 Meters Length 2 Packet Battery, Size Aaa, Alkaline 2 Pcs/packet-expiration Date: June 30, 2027 Or Beyond 50 Packet Battery, Size Aa, Alkaline 2 Pcs/packet-expiration Date: June 30, 2027 Or Beyond 55 Packet Battery, Size Aa Rechargeable, 2 Pcs./packet -expiration Date: June 30, 2027 Or Beyond 49 Piece Battery Charger- 4 Pieces Capacity 10 Box Binder Clip-51 Mm 40 Box Binder Clip-41 Mm 40 Box Binder Clip- 1 Inch 60 Roll Binding Tape 2" 15 Pair Book Ends, 9" 30 Box Carbon Paper Long- Blue 3 Pack Cartolina Assorted Colors (color: Red, Yellow, Light Green, Dark Green, Orange, Blue, Violet) 6 Piece Carpeta 3000 Piece Calculator, 12 Digit, Heavy Duty 7 Piece Cash Book (bank) General Form 104 12 Piece Certificate Holder, Legal, Color Green 10 Piece Certificate Holder, A4, Color Green 10 Piece Clip Board With Cover 40 Piece Cork Board Aluminum Frame, 2ft X 3ft, Plywood Backing 3 Piece Cork Board Aluminum Frame, 4ft X 3ft, Plywood Backing 3 Piece Correction Tape, 12mx5mm 380 Piece Cutter, Big, Heavy Duty 8 Piece Cutter Blade- Big, Ordinary 20 Piece Cutter Blade- Small, Ordinary 20 Piece Gun Tacker , T50 High Quality 4 Box Gun Tacker Wire , T50 1/2 24 Piece Document File Folder Long With Fastener (color: Green) 20 Piece Envelope, Expanding, Plastic W/handle & Push Lock 45 Piece Envelope, Expanding, Kraft, Legal Size, Brown (envelope With Tie) 300 Piece Envelope, Mailing 3000 Piece Eraser, Rubber, Heavy Duty 20 Piece Eraser, Felt. For Blackboard Or Whiteboard 8 Box Fastener, Plastic 40 Box Fastener, Metal 60 Pack File Divider, A4 26 Piece Folder, Expanding (emerald Green) 1900 Piece Folder, Expanding (blue) 300 Piece Folder, Expanding (red) 300 Set Fluorescent Light,40w W/ Complete Accessories 12 Piece Fluorescent Light, Refill 40w 7 Unit Filing Cabinet, Steel, 4 Drawers 9 Unit Filing Cabinet, Steel, 5 Drawers, Map Size (records), High Quality 3 Bottle Glue, 300ml 30 Pack Index Card 5*8 (100pieces/pack) 12 Pack Index Card 4*6 (100pieces/pack) 15 Piece Glue Gun, Medium Size 5 Piece Glue Gun Stick, Medium Size 150 Piece Laminating Film, A4, Thickness: 250 Microns 600 Piece Led Bulb, 15-20 Watts 100 Piece Led T8 Tube, 9w, 6500k *(fsl), High Quality (replacement) 15 Pack Linen Paper A4, Specialty Paper, 10 Pcs/pack 30 Piece Magazine Box, Single Compartment Color: Navy Blue 115 Piece Magazine Box, Double Compartment 55 Case Map Pin, Round Head (100pcs/case) 6 Piece Marking Pen , Whiteboard, Black (broad) 96 Piece Marking Pen , Whiteboard, Black (fine) 96 Piece Marking Pen, Whiteboard, Red (fine) 58 Piece Marking Pen, Whiteboard, Blue (fine) 58 Roll Masking Tape 48mm 20 Piece Memory-ddr 4, 2400mhz Sodimm, 8gb Ram(for Laptop-amor) 1 Piece Notebook- Steno 70 Ream Paper, A3, 80gsm 10 Piece Paper Sticker, Legal Size 250 Box Paper Clip, Jumbo, 48mm 50 Box Paper Clip, Small 50 Piece Paper Cutter-metal For Legal Size Paper 1 Pad Paper Yellow Pad, Thick 50 Piece Pencil, Lead With Eraser, High Quality 110 Ream Parchment Paper, Legal 1 Piece Pencil , Mechanical, .5 2 Piece Pencil , Mechanical (refill), .5 5 Piece Pencil Sharpener, Rotary 4 Piece Permanent Marker (green, Fine), Branded 22 Piece Permanent Marker (black, Fine) , Branded 144 Piece Permanent Marker (blue, Fine) , Branded 34 Piece Permanent Marker (red, Fine) , Branded 34 Piece Permanent Marker (black, Broad) , Branded 108 Piece Permanent Marker (blue, Broad) , Branded 24 Piece Permanent Marker (red, Broad) , Branded 24 Piece Philippine National Flag, Size:36" X 70" / Regular Size (big) 15 Piece Philippine National Flag ,flaglet, Nylon,with Stick Size: 11"x8" 40 Pack Photo Paper, A4 (20 Pcs / Pack) 60 Pad Post-it/ Sticky Note Pad, 3 X 4", Bright Color 130 Piece Pincher (staple Wire Remover), Flier Type 11 Piece Puncher, Big, Heavy Duty 9 Case Push Pin, With Diff.color Head, Flat Head Type 11 Box Pvc Cover, A4, 200mic Or Higher, (100pcs/box) 6 Box Pvc Cover , Legal ,200mic Or Higher, (100pcs/box) 3 Book Record Book 200 Pp.size: 176mm X 285mm 15 Book Record Book, 300 Pages , 25 Piece Record Book, 500 Pages, 214mm X 278mm 25 Piece Ring Binder, 3/4" 15 Piece Ring Binder 1/2" 15 Piece Ring Binder 1" 15 Piece Ruler -plastic , High Quality 16 Piece Ruler -metal , High Quality (24 Inches) 7 Piece Metric Scale, Regular 5 Piece Metric Scale, 6 Inches 5 Piece Styrofoam Board (1 Inch Thick) 5 Piece Styrofoam Board (1/2 Inch Thick) 5 Pair Scissors , Heavy Duty, Big 40 Piece Super Glue/instant Glue For Plastic, Ceramic, Leather, Rubber, And Other Materials. 20 Piece Signpen ( .5) , Black 300 Piece Signpen ( .5) ,blue 84 Piece Signpen ( .5) ,red 30 Piece Signpen (.7), Black 276 Box Signpen Grip 1.0, Branded 17 Piece Special Paper, Board Paper , (pale Cream), A4, 200gsm 400 Piece Special Paper, Board Paper , (pale Cream), Legal , 200gsm 600 Piece Highlighting Pen (color : Orange, Yellow And Green) 40 Piece Stamping Dater 4 Piece Stamp Pad , #1 13 Bottle Stamp Pad Ink Refill, Color: Green 9 Bottle Stamp Pad Ink Refill, Color: Black 20 Bottle Stamp Pad Ink Refill, Color: Red 9 Bottle Stamp Pad Ink Refill, Color: Violet 24 Bottle Stamp Pad Ink Refill, Color: Blue 11 Piece Stamp Pad , Felt Pad,66mm X 100mm 7 Box Rubber Band #18 11 Piece Stapler #35 With Staple Wire Remover, Heavy Duty 28 Box Staple Wire # 35 100 Box Staple Wire For #0399 (8mm) 12 Box Staple Wire For #0399 (10mm) 12 Box Storage File Box (large Size) 19 Piece Tape Dispenser , Table Top 6 Roll Tape , Double Sided ,1 Inches Wide 45 Roll Tape , Double Sided With Foam 25 Roll Tape, Masking 24mm 45 Roll Tape, Transparent 24mm, 50 Meters 125 Roll Tape , Transparent, 48mm, 50meters 30 Piece Extension Wire, 10 Meters With Switch 9 Piece Digital Clock 7 Piece Wall Clock 6 Piece Wooden Box For Index Cards, (for Cards 4x6 Size) 2 Piece Wooden Box For Index Cards, (for Cards 5x8 Size) 6 Piece White Board 2x3ft 3 Piece White Board 4x3ft 2 Piece White Board 4x6ft 2 Piece White Plotter Paper (24inches X 50 Yards 5 Gallon Alcohol, 70%, Isoprohyl 70 Bottle Air Freshener 280-300 Ml. 79 Piece Bathroom Soap 57 Gal Bleaching Liquid 26 Bundle Broom-hard-thick (walis Ting-ting) 40 Piece Broom-soft-thick, Heavy Duty 30 Piece Brush For Toilet Bowl, High Quality (with Holder) 46 Piece Brush For Toilet/ Bathroom Flooring With Long Handle , High Quality 10 Yard Coil Matting (rubber Doormat) 8 Pack Detergent Bar, Jumbo 30 Pack Detergent Powder, 1kg/pack All Purpose, High Quality 55 Piece Dipper (tabo), High Quality 28 Jar Dishwashing Paste, Branded, 500 Grams 60 Can Disinfectant Spray , 510g Or More (kills Germs,molds & Mildew), Branded 52 Piece Doormat, Cloth, High Quality 144 Piece Doormat, Rubberized 24 Piece Dust Pan, Steel Heavy Duty 12 Piece Duster 16 Pack Fabric Conditioner, 800ml 55 Gallon Floorwax Liquid, Red 6 Piece Furniture Cleaner, 300ml 29 Bottle Glass Cleaner Spray, 500ml 53 Piece Hand Brush For Wall Tiles 27 Pair Hand Gloves, Rubber, High Quality 25 Bottle Hand Sanitizer, 500ml 35 Bottle Hand Soap, Liquid, Anti Bacterial 85 Can Insecticide, 600ml, Odorless, Branded 95 Bottle Liquid Soap Dispenser (plastic, Ordinary) 10 Rolls Microfilm 100 Microns (42"x20"), Branded, High Quality 5 Gallon Muriatic Acid 18 Piece Pail , Medium, High Quality, 24l 16 Piece Pail , Medium, High Quality, 12l 14 Roll Plastic Twine, 1 Kg 12 Piece Rags 140 Piece Sack-big, 50kls 380 Piece Scouring Pad With Foam, Economy Size 67 Piece Scrub (cleaner For Sink With Handle) 20 Piece Trash Bag, Plastic Drum Size, Xl 1200 Bottle Toilet Bowl & Urinal Cleaner 68 Piece Toilet Rubber Force Pump 18 Piece Toilet Deodorant Cake 80 Rolls Toilet Tissue (individually Packed) 280 Set Tornado Mop W/ Extra Mop 11 Piece Trash Bin, 100l, With Foot Pedal And Wheels 18 Piece Soap Holder,plastic, High Quality 28 Piece Steel Wool, High Quality 20 Piece Spray Bottle (for Alcohol), 500ml 40 Piece Adaptor, 3 Gang To 2 Gang Flat 31 Piece Dvd Rewritable, 4x Speed,4.7 Gb Capacity 170 Piece External Hardrive Disk, 2 Tb 7 Piece Extension Wire, 10 Meters With Switch ( 2cpl, Planning) 12 Piece Flash Drive, 16 Gb 20 Piece Flash Drive, 32 Gb 23 Piece Micro Sd Card, 128gb Ultra Hd Class 10 (for Drone, Camera And Voice Recorder) 20 Piece Solid State Drive 1tb 3 Piece Mouse Pad, W/ Arm Rest 25 Piece Mouse Pad, W/o Arm Rest, Ordinary 15 Bottle Brother Printer Ink, Bt5000 (cyan), (genuine) -expiration Date: June 30, 2028 Or Beyond 23 Bottle Brother Printer Ink, Bt5000 (magenta), (genuine) -expiration Date: June 30, 2028 Or Beyond 23 Bottle Brother Printer Ink, Bt5000 (yellow), (genuine) -expiration Date: June 30, 2028 Or Beyond 23 Bottle Brother Printer Ink, Btd60 (black), (genuine) -expiration Date: June 30, 2028 Or Beyond 30 Unit Computer Table (tempered Glass) 3 Unit Document Color Duplex Scanner Scanner Type:sheet-fed, One-pass Duplex Color Scanner Photoelectric Device:color Contact Image Sensor (cis)optical Resolution:300 Dpicolor Bit Depth:30-bit Inputgrayscale Bit Depth:24-bit Outputlight Source:3-color Rgb Ledscanning Speed:35 Ppm/70 Ipm: 300 Dpi Black & White, Color, Gray1 Capacity: 50 Sheets, Document Sizes:, Paper Size Minimum: 2" X 2" Paper Size Maximum: 8.5" X 240, Daily Duty Cycle: 4,000 Sheets 4 Piece Document Monitor, 24", 75hz Fresh Rate W/ Hdmi Post & Cable Ips Panel (cpl & Cbfm ) 1 Piece Hdmi Cables, 5.0 M, High Quality (for Laptop, Projector) (for Cpl) 6 Bottle Ink Refill, Epson 003-black (genuine), (new Epson Seal) -expiration Date: June 30, 2028 Or Beyond 220 Bottle Ink Refill, Epson 003-cyan (genuine), (new Epson Seal) -expiration Date: -expiration Date: June 30, 2028 Or Beyond 85 Bottle Ink Refill, Epson 003-magenta (genuine), (new Epson Seal) -expiration Date: -expiration Date: June 30, 2028 Or Beyond 85 Bottle Ink Refill, Epson 003-yellow (genuine), (new Epson Seal) -expiration Date: -expiration Date: June 30, 2028 Or Beyond 85 Bottle Ink Refill, Epson 008-black (genuine), (new Epson Seal) -expiration Date: June 30, 2028 Or Beyond 5 Bottle Ink Refill, Epson 008-cyan (genuine), (new Epson Seal) -expiration Date: June 30, 2028 Or Beyond 3 Bottle Ink Refill, Epson 008-magenta (genuine), (new Epson Seal) -expiration Date: June 30, 2028 Or Beyond 3 Bottle Ink Refill, Epson 008-yellow (genuine), (new Epson Seal) -expiration Date: June 30, 2028 Or Beyond 3 Cartridge Ink Cartridge (hp Officejet Pro 7720) Black (955) Genuine -expiration Date: June 30, 2028 Or Beyond 4 Cartridge Ink Cartridge (hp Officejet Pro 7720) Cyan (955) Genuine -expiration Date: June 30, 2028 Or Beyond 4 Cartridge Ink Cartridge (hp Officejet Pro 7720) Magenta (955) Genuine -expiration Date: June 30, 2028 Or Beyond 4 Cartridge Ink Cartridge (hp Officejet Pro 7720) Yellow (955) Genuine -expiration Date: June 30, 2028 Or Beyond 4 Cartridge Ink Cartridge (hp Designjet T83) Black (728b) Genuine , 300ml -expiration Date: June 30, 2028 Or Beyond 1 Cartridge Ink Cartridge (hp Designjet T83) Cyan (728) Genuine -expiration Date: June 30, 2028 Or Beyond 1 Cartridge Ink Cartridge (hp Designjet T83) Magenta (728) Genuine -expiration Date: June 30, 2028 Or Beyond 1 Cartridge Ink Cartridge (hp Designjet T83) Yellow (728) Genuine -expiration Date: June 30, 2028 Or Beyond 1 Piece Laptop Backpack, High Quality 4 Piece Laptop Charger For Acer Aspire 3 A315-56-596k 2 Piece Laptop Li-on Battery Pack For Laptop Hp Probook, 450 G5 Battery(rr03xl) 1 Unit Megaphone, 50w W/ Recording And Sirens 2 Roll Typewritter Ribbon (big) 7 Piece Type C Usb Hub(design W/o Cable,4 Ports (for Iec) 2 Cartridge Epson Lx310 Ribbon Refill-expiration Date: June 30, 2026 Or Beyond 1 Piece Mouse, Optical, Usb Connection Type Connection 21 Piece Mouse, Wireless, Branded 5 Unit Printer, 3 In 1 W/ C.i.s Built-in. 8 Piece Projector White Screen With Tripod 3 Unit Active Portable Trolley Speaker 600w Max Power Bluetooth + Tws Usb & Sd Playback Fm Radio Line-in & Line-out 2 Guitar Input 2 Wired Mic Input 180 Channels Mic Priority High Quality Lead Acid 12ah Battery 12v Dc Input Dimensions : (l) 36.5cm (w) 40cm (h) 67.5cm 2 Free Wireless Mic 1 Piece Ups (backup) 625 Va Or Higher 19 Piece Ups (backup) 1600 Va Upc Limited 1 Piece Voice Recorder, Specs.: Digital Voice Recorder With 4gb Built-in Memory (expandable To 32gb Via Microsd), Supports Pcm And Mp3 Formats, Features Noise-cut, Auto Voice Recording, And Focus/wide-stereo Options, Has A Usb Direct Connection, And Offers Up To 55 Hours Of Battery Life Using 2 Aaa Batteries. 3 Piece Wireless/laser Pointer For Power Point Presentation, Heavy Duty 2 For Bams Set Binocular With Bag (special Feature:lightweight & Waterproof/objective Lens Diameter :50milimters/magnification Maximum:10x Bushnell -ultra High Power- Tres Forte Puissance -potencia Ultra-alta, Besonders Starke Vergroberung -60x90 Long Eye Relier , 231ft At 1000yds, 71m At 10000m 4 Piece Tree Diameter Tape 50meters 2 Piece Open Reel Fiberglass Long Tape Measure (60 Meters) 2 Piece Trowel 15 Piece Insect Net/mist Net 2 Piece Hollow Bar 10mm 2 Piece Snake Hook (heavy Duty) 2 Piece Snake Tong (heavy Duty) 2 Piece Dip Net 2 Rain Boots (high Quality) Men Sizes Piece 10" 8 Piece 9" 14 Piece 8" 29 Piece 7" 1 Women Sizes Piece 10" 1 Piece 9" 2 Piece 8" 3 Piece 7" 16 Piece 6" 10 Raincoat, Rubberized (high Quality) Men Sizes Piece Free Size 6 Piece 3xl 1 Piece 2xl 3 Piece Xl 11 Piece L 20 Piece M 17 Women Sizes Piece Free Size 1 Piece 2xl 2 Piece Xl 1 Piece L 2 Piece M 6 Piece S 14 Set First Aid Kit (set) 45 2 Absorbent Compress Dressings (5 X 9 Inches) 25 Adhesive Bandages (assorted Sizes) 1 Adhesive Cloth Tape (10 Yards X 1 Inch) 1 Antibiotic Ointment Packets (approximately 10 Grams) 5 Packs Antiseptic Wipe Packets (10s) 2 Packets Of Aspirin (81 Mg Each) 1 Emergency Blanket 1 Breathing Barrier (with One-way Valve) 1 Instant Cold Compress 2 Pair Of Nonlatex Gloves (size: Large) 2 Hydrocortisone Ointment Packets (approximately 1 Gram Each) 1 3 In. Gauze Roll (roller) Bandage 1 Roller Bandage (4 Inches Wide) 5 3 In. X 3 In. Sterile Gauze Pads 5 Sterile Gauze Pads (4 X 4 Inches) Oral Thermometer (non-mercury/nonglass) 2 Triangular Bandages Tweezers Emergency First Aid Instructions With Bag Set Portable Emergency Rescue Stretcher, Heavy Duty 8 Piece Finger Clip Pulse Oximeter Blood Oxygen Monitor Finger Pulse Heart Rate Meter, High Precision 8
Closing Date21 Nov 2024
Tender AmountPHP 2 Million (USD 36.2 K)

BULACAN AGRICULTURAL STATE COLLEGE Tender

Automobiles and Auto Parts
Philippines
Details: Description Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Procurement Of Goods Early Procurement Activity (epa) 2024-05g: 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas Sixth Edition July 2020 Preface These Philippine Bidding Documents (pbds) For The Procurement Of Goods Through Competitive Bidding Have Been Prepared By The Government Of The Philippines For Use By Any Branch, Constitutional Commission Or Office, Agency, Department, Bureau, Office, Or Instrumentality Of The Government Of The Philippines, National Government Agencies, Including Government-owned And/or Controlled Corporations, Government Financing Institutions, State Universities And Colleges, And Local Government Unit. The Procedures And Practices Presented In This Document Have Been Developed Through Broad Experience, And Are For Mandatory Use In Projects That Are Financed In Whole Or In Part By The Government Of The Philippines Or Any Foreign Government/foreign Or International Financing Institution In Accordance With The Provisions Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. The Bidding Documents Shall Clearly And Adequately Define, Among Others: (i) The Objectives, Scope, And Expected Outputs And/or Results Of The Proposed Contract Or Framework Agreement, As The Case May Be; (ii) The Eligibility Requirements Of Bidders; (iii) The Expected Contract Or Framework Agreement Duration, The Estimated Quantity In The Case Of Procurement Of Goods, Delivery Schedule And/or Time Frame; And (iv) The Obligations, Duties, And/or Functions Of The Winning Bidder. Care Should Be Taken To Check The Relevance Of The Provisions Of The Pbds Against The Requirements Of The Specific Goods To Be Procured. If Duplication Of A Subject Is Inevitable In Other Sections Of The Document Prepared By The Procuring Entity, Care Must Be Exercised To Avoid Contradictions Between Clauses Dealing With The Same Matter. Moreover, Each Section Is Prepared With Notes Intended Only As Information For The Procuring Entity Or The Person Drafting The Bidding Documents. They Shall Not Be Included In The Final Documents. The Following General Directions Should Be Observed When Using The Documents: A.all The Documents Listed In The Table Of Contents Are Normally Required For The Procurement Of Goods. However, They Should Be Adapted As Necessary To The Circumstances Of The Particular Procurement Project. B.specific Details, Such As The “name Of The Procuring Entity” And “address For Bid Submission,” Should Be Furnished In The Instructions To Bidders, Bid Data Sheet, And Special Conditions Of Contract. The Final Documents Should Contain Neither Blank Spaces Nor Options. C.this Preface And The Footnotes Or Notes In Italics Included In The Invitation To Bid, Bid Data Sheet, General Conditions Of Contract, Special Conditions Of Contract, Schedule Of Requirements, And Specifications Are Not Part Of The Text Of The Final Document, Although They Contain Instructions That The Procuring Entity Should Strictly Follow. D.the Cover Should Be Modified As Required To Identify The Bidding Documents As To The Procurement Project, Project Identification Number, And Procuring Entity, In Addition To The Date Of Issue. E.modifications For Specific Procurement Project Details Should Be Provided In The Special Conditions Of Contract As Amendments To The Conditions Of Contract. For Easy Completion, Whenever Reference Has To Be Made To Specific Clauses In The Bid Data Sheet Or Special Conditions Of Contract, These Terms Shall Be Printed In Bold Typeface On Sections I (instructions To Bidders) And Iii (general Conditions Of Contract), Respectively. F.for Guidelines On The Use Of Bidding Forms And The Procurement Of Foreign-assisted Projects, These Will Be Covered By A Separate Issuance Of The Government Procurement Policy Board. Table Of Contents Glossary Of Acronyms, Terms, And Abbreviations ………………………….4 Section I. Invitation To Bid……………………………………………………..7 Section Ii. Instructions To Bidders…………………………………………...10 1. Scope Of Bid ………………………………………………………………………. 11 2. Funding Information………………………………………………………………. 11 3. Bidding Requirements ……………………………………………………………. 11 4. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 5. Eligible Bidders…………………………………………………………………… 11 6. Origin Of Goods ………………………………………………………………….. 12 7. Subcontracts ……………………………………………………………………… 12 8. Pre-bid Conference ………………………………………………………………. 12 9. Clarification And Amendment Of Bidding Documents …………………………… 12 10. Documents Comprising The Bid: Eligibility And Technical Components …………. 12 11. Documents Comprising The Bid: Financial Component …………………………... 13 12. Bid Prices …………………………………………………………………………. 13 13. Bid And Payment Currencies ……………………………………………………… 14 14. Bid Security ………………………………………………………………………. 14 15. Sealing And Marking Of Bids ……………………………………………………… 14 16. Deadline For Submission Of Bids …………………………………………………. 14 17. Opening And Preliminary Examination Of Bids ………………………………….. 15 18. Domestic Preference ……………………………………………………………… 15 19. Detailed Evaluation And Comparison Of Bids ……………………………………. 15 20. Post-qualification ………………………………………………………………… 16 21. Signing Of The Contract …………………………………………………………… 16 Section Iii. Bid Data Sheet …………………………………………………..17 Section Iv. General Conditions Of Contract ……………………...………..19 1. Scope Of Contract ………………………………………………………………… 20 2. Advance Payment And Terms Of Payment ……………………………………….. 20 3. Performance Security ……………………………………………………………. 20 4. Inspection And Tests ……………………………………………………………… 20 5. Warranty …………………………………………………………………………. 21 6. Liability Of The Supplier ………………………………………………………….. 21 Section V. Special Conditions Of Contract ………………………………….22 Section Vi. Schedule Of Requirements ……………………………………....24 Section Vii. Technical Specifications …………………………………………26 Section Viii. Checklist Of Technical And Financial Documents …………..30 Glossary Of Acronyms, Terms, And Abbreviations Abc – Approved Budget For The Contract. Bac – Bids And Awards Committee. Bid – A Signed Offer Or Proposal To Undertake A Contract Submitted By A Bidder In Response To And In Consonance With The Requirements Of The Bidding Documents. Also Referred To As Proposal And Tender. (2016 Revised Irr, Section 5[c]) Bidder – Refers To A Contractor, Manufacturer, Supplier, Distributor And/or Consultant Who Submits A Bid In Response To The Requirements Of The Bidding Documents. (2016 Revised Irr, Section 5[d]) Bidding Documents – The Documents Issued By The Procuring Entity As The Bases For Bids, Furnishing All Information Necessary For A Prospective Bidder To Prepare A Bid For The Goods, Infrastructure Projects, And/or Consulting Services Required By The Procuring Entity. (2016 Revised Irr, Section 5[e]) Bir – Bureau Of Internal Revenue. Bsp – Bangko Sentral Ng Pilipinas. Consulting Services – Refer To Services For Infrastructure Projects And Other Types Of Projects Or Activities Of The Gop Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Gop To Undertake Such As, But Not Limited To: (i) Advisory And Review Services; (ii) Pre-investment Or Feasibility Studies; (iii) Design; (iv) Construction Supervision; (v) Management And Related Services; And (vi) Other Technical Services Or Special Studies. (2016 Revised Irr, Section 5[i]) Cda - Cooperative Development Authority. Contract – Refers To The Agreement Entered Into Between The Procuring Entity And The Supplier Or Manufacturer Or Distributor Or Service Provider For Procurement Of Goods And Services; Contractor For Procurement Of Infrastructure Projects; Or Consultant Or Consulting Firm For Procurement Of Consulting Services; As The Case May Be, As Recorded In The Contract Form Signed By The Parties, Including All Attachments And Appendices Thereto And All Documents Incorporated By Reference Therein. Cif – Cost Insurance And Freight. Cip – Carriage And Insurance Paid. Cpi – Consumer Price Index. Ddp – Refers To The Quoted Price Of The Goods, Which Means “delivered Duty Paid.” Dti – Department Of Trade And Industry. Exw – Ex Works. Fca – “free Carrier” Shipping Point. Fob – “free On Board” Shipping Point. Foreign-funded Procurement Or Foreign-assisted Project– Refers To Procurement Whose Funding Source Is From A Foreign Government, Foreign Or International Financing Institution As Specified In The Treaty Or International Or Executive Agreement. (2016 Revised Irr, Section 5[b]). Framework Agreement – Refers To A Written Agreement Between A Procuring Entity And A Supplier Or Service Provider That Identifies The Terms And Conditions, Under Which Specific Purchases, Otherwise Known As “call-offs,” Are Made For The Duration Of The Agreement. It Is In The Nature Of An Option Contract Between The Procuring Entity And The Bidder(s) Granting The Procuring Entity The Option To Either Place An Order For Any Of The Goods Or Services Identified In The Framework Agreement List Or Not Buy At All, Within A Minimum Period Of One (1) Year To A Maximum Period Of Three (3) Years. (gppb Resolution No. 27-2019) Gfi – Government Financial Institution. Gocc – Government-owned And/or –controlled Corporation. Goods – Refer To All Items, Supplies, Materials And General Support Services, Except Consulting Services And Infrastructure Projects, Which May Be Needed In The Transaction Of Public Businesses Or In The Pursuit Of Any Government Undertaking, Project Or Activity, Whether In The Nature Of Equipment, Furniture, Stationery, Materials For Construction, Or Personal Property Of Any Kind, Including Non-personal Or Contractual Services Such As The Repair And Maintenance Of Equipment And Furniture, As Well As Trucking, Hauling, Janitorial, Security, And Related Or Analogous Services, As Well As Procurement Of Materials And Supplies Provided By The Procuring Entity For Such Services. The Term “related” Or “analogous Services” Shall Include, But Is Not Limited To, Lease Or Purchase Of Office Space, Media Advertisements, Health Maintenance Services, And Other Services Essential To The Operation Of The Procuring Entity. (2016 Revised Irr, Section 5[r]) Gop – Government Of The Philippines. Gppb – Government Procurement Policy Board. Incoterms – International Commercial Terms. Infrastructure Projects – Include The Construction, Improvement, Rehabilitation, Demolition, Repair, Restoration Or Maintenance Of Roads And Bridges, Railways, Airports, Seaports, Communication Facilities, Civil Works Components Of Information Technology Projects, Irrigation, Flood Control And Drainage, Water Supply, Sanitation, Sewerage And Solid Waste Management Systems, Shore Protection, Energy/power And Electrification Facilities, National Buildings, School Buildings, Hospital Buildings, And Other Related Construction Projects Of The Government. Also Referred To As Civil Works Or Works. (2016 Revised Irr, Section 5[u]) Lgus – Local Government Units. Nfcc – Net Financial Contracting Capacity. Nga – National Government Agency. Philgeps - Philippine Government Electronic Procurement System. Procurement Project – Refers To A Specific Or Identified Procurement Covering Goods, Infrastructure Project Or Consulting Services. A Procurement Project Shall Be Described, Detailed, And Scheduled In The Project Procurement Management Plan Prepared By The Agency Which Shall Be Consolidated In The Procuring Entity's Annual Procurement Plan. (gppb Circular No. 06-2019 Dated 17 July 2019) Psa – Philippine Statistics Authority. Sec – Securities And Exchange Commission. Slcc – Single Largest Completed Contract. Supplier – Refers To A Citizen, Or Any Corporate Body Or Commercial Company Duly Organized And Registered Under The Laws Where It Is Established, Habitually Established In Business And Engaged In The Manufacture Or Sale Of The Merchandise Or Performance Of The General Services Covered By His Bid. (item 3.8 Of Gppb Resolution No. 13-2019, Dated 23 May 2019). Supplier As Used In These Bidding Documents May Likewise Refer To A Distributor, Manufacturer, Contractor, Or Consultant. Un – United Nations. Section I. Invitation To Bid Notes On The Invitation To Bid The Invitation To Bid (ib) Provides Information That Enables Potential Bidders To Decide Whether To Participate In The Procurement At Hand. The Ib Shall Be Posted In Accordance With Section 21.2 Of The 2016 Revised Irr Of Ra No. 9184. Apart From The Essential Items Listed In The Bidding Documents, The Ib Should Also Indicate The Following: A.the Date Of Availability Of The Bidding Documents, Which Shall Be From The Time The Ib Is First Advertised/posted Until The Deadline For The Submission And Receipt Of Bids; B.the Place Where The Bidding Documents May Be Acquired Or The Website Where It May Be Downloaded; C.the Deadline For The Submission And Receipt Of Bids; And D.any Important Bid Evaluation Criteria (e.g., The Application Of A Margin Of Preference In Bid Evaluation). The Ib Should Be Incorporated In The Bidding Documents. The Information Contained In The Ib Must Conform To The Bidding Documents And In Particular To The Relevant Information In The Bid Data Sheet. Bulacan Agricultural State College San Ildefonso, Bulacan 3010 Invitation To Bid (epa) Invitation To Bid For 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas 1.the Bulacan Agricultural State College, Through The National Expenditure Program For Fiscal Year 2025 Intends To Apply The Sum Of Two Million Five Hundred Thousand Pesos (php2,500,000.00) Being The Abc To Payments Under The Contract 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2.the Bulacan Agricultural State College Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Not Later Than Thirty (30) Calendar Days Upon Receipt Of Notice To Proceed. Awarding Of The Contract To The Winning Bidder However, Shall Be Issued Upon The Approval And Effectivity Of The General Appropriations Act (gaa) Or The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget As Provided In Appendix 31 (guidelines On The Implementation Of Early Procurement Activities (epa) Of The Updated Irr Of Ra 9184). Bidders Should Have Completed, Within Five (5) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3.bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4.prospective Bidders May Obtain Further Information From Bulacan Agricultual State College And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8am To 4:30pm Monday To Friday, Except Those Declared As Holidays. 5.a Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On October 14, 2024 To November 4, 2024 From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php2,500.00. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees By Presenting The Receipt Upon Submission Of Their Bid Documents. 6.the Bulacan Agricultural State College Will Hold A Pre-bid Conference[ May Be Deleted In Case The Abc Is Less Than One Million Pesos (php1,000,000) Where The Procuring Entity May Not Hold A Pre-bid Conference. ] On October 21, 2024, 09:00 Am Am Via Zoom Platform (meeting Id: 893 1280 1467, Passcode: 924000) Which Shall Be Open To Prospective Bidders. 7.bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below On Or Before 08:30 Am Of November 4, 2024. Late Bids Shall Not Be Accepted. 8.all Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9.bid Opening Shall Be On November 4, 2024, 09:00 Am At The Conference Room, Administration Building, Basc, San Ildefonso, Bulacan. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10.observers Will Be Invited To Attend And Witness The Bid Proceedings. 11.the Bulacan Agricultural State College Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12.for Further Information, Please Refer To: Rona Angela O. Clarin Bac Secretariat Head Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan (044) 697-1240 And 0923-108-1526 Ronaangela_clarin@basc.edu.ph Www.basc.edu.ph 13.you May Visit The Following Websites: For Downloading Of Bidding Documents: Http://www.basc.edu.ph October 14, 2024 Ronald Reagan T. Alonzo,ph.d. Bac Chairperson Section Ii. Instructions To Bidders Notes On The Instructions To Bidders This Section On The Instruction To Bidders (itb) Provides The Information Necessary For Bidders To Prepare Responsive Bids, In Accordance With The Requirements Of The Procuring Entity. It Also Provides Information On Bid Submission, Eligibility Check, Opening And Evaluation Of Bids, Post-qualification, And On The Award Of Contract. 1.scope Of Bid The Procuring Entity, Bulacan Agricultural State College Wishes To Receive Bids For The Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas With Identification Number 2024-5g. The Procurement Project (referred To Herein As “project”) Is Composed Of One (1`) Lot The Details Of Which Are Described In Section Vii (technical Specifications). 2.funding Information 2.1.the Gop Through The Source Of Funding As Indicated Below For The Fiscal Year 2024 In The Amount Of Two Million Five Hundred Thousand Pesos Only (php2,500,000.00). 2.2.the Source Of Funding Is: A.nga, The National Expenditure Program 3.bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4.corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5.eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. Not Applicable. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A.for The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7.subcontracts 7.1.the Procuring Entity Has Prescribed That: A.subcontracting Is Not Allowed. 8.pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Through Videoconferencing/webcasting As Indicated In Paragraph 6 Of The Ib. 9.clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.documents Comprising The Bid: Eligibility And Technical Components 10.1.the First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2.the Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3.if The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11.documents Comprising The Bid: Financial Component 11.1.the Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2.if The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3.any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4.for Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 12.bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A.for Goods Offered From Within The Procuring Entity’s Country: I.the Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii.the Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii.the Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv.the Price Of Other (incidental) Services, If Any, Listed In E. B.for Goods Offered From Abroad: I.unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii.the Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 13.bid And Payment Currencies 13.1.for Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2.payment Of The Contract Price Shall Be Made In Philippine Pesos. 14.bid Security 14.1.the Bidder Shall Submit A Bid Securing Declaration[ In The Case Of Framework Agreement, The Undertaking Shall Refer To Entering Into Contract With The Procuring Entity And Furnishing Of The Performance Security Or The Performance Securing Declaration Within Ten (10) Calendar Days From Receipt Of Notice To Execute Framework Agreement.] Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2.the Bid And Bid Security Shall Be Valid Until 120 Days From The Opening Of Bids. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 15.sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The Original Of The First And Second Components Of Its Bid And Plus Two (2) Copies Of Each Kind, Labeled As Copy 1 And Copy 2. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16.deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 17.opening And Preliminary Examination Of Bids 17.1.the Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2.the Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18.domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.detailed Evaluation And Comparison Of Bids 19.1.the Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. 19.2.if The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3.the Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4.the Project Shall Be Awarded As One Project Or Per Lot Having Several Items That Shall Be Awarded As One Contract. 19.5.except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20.post-qualification 20.1. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. 21.signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. Section Iii. Bid Data Sheet Notes On The Bid Data Sheet The Bid Data Sheet (bds) Consists Of Provisions That Supplement, Amend, Or Specify In Detail, Information, Or Requirements Included In The Itb Found In Section Ii, Which Are Specific To Each Procurement. This Section Is Intended To Assist The Procuring Entity In Providing The Specific Information In Relation To Corresponding Clauses In The Itb And Has To Be Prepared For Each Specific Procurement. The Procuring Entity Should Specify In The Bds Information And Requirements Specific To The Circumstances Of The Procuring Entity, The Processing Of The Procurement, And The Bid Evaluation Criteria That Will Apply To The Bids. In Preparing The Bds, The Following Aspects Should Be Checked: A.information That Specifies And Complements Provisions Of The Itb Must Be Incorporated. B.amendments And/or Supplements, If Any, To Provisions Of The Itb As Necessitated By The Circumstances Of The Specific Procurement, Must Also Be Incorporated. Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Supply Of Brand-new Motor Vehicles. B. Completed Within Five (5) Years Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed. 12 The Bid Prices Of Goods And Services Supplied From Outside Of The Philippines Shall Be Quoted In Philippine Pesos. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A.the Amount Of Not Less Than Php50,000.00. [(2%) Of The Abc] If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B.the Amount Of Not Less Than Php125,000.00. [(5%) Of The Abc], If Bid Security Is In Surety Bond. 19.3 The Project Will Be Awarded As A Single Project. 20.2 1. Income Tax Return (form 1701/1702) With Audited Financial Statement., 2. Business Tax Return (forms 2550m And 2550q) Prior To Opening Of Bids Filed Thru Electronic Filing And Payment System (efps). Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. 21.2 Not Applicable Section Iv. General Conditions Of Contract Notes On The General Conditions Of Contract The General Conditions Of Contract (gcc) In This Section, Read In Conjunction With The Special Conditions Of Contract In Section V And Other Documents Listed Therein, Should Be A Complete Document Expressing All The Rights And Obligations Of The Parties. Matters Governing Performance Of The Supplier, Payments Under The Contract, Or Matters Affecting The Risks, Rights, And Obligations Of The Parties Under The Contract Are Included In The Gcc And Special Conditions Of Contract. Any Complementary Information, Which May Be Needed, Shall Be Introduced Only Through The Special Conditions Of Contract. 1.scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2.advance Payment And Terms Of Payment 2.1.advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2.the Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. 3.performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184 4.inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5.warranty 6.1.in Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 6.2.the Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6.liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Notes On The Special Conditions Of Contract Similar To The Bds, The Clauses In This Section Are Intended To Assist The Procuring Entity In Providing Contract-specific Information In Relation To Corresponding Clauses In The Gcc Found In Section Iv. The Special Conditions Of Contract (scc) Complement The Gcc, Specifying Contractual Requirements Linked To The Special Circumstances Of The Procuring Entity, The Procuring Entity’s Country, The Sector, And The Goods Purchased. In Preparing This Section, The Following Aspects Should Be Checked: A.information That Complements Provisions Of The Gcc Must Be Incorporated. B.amendments And/or Supplements To Provisions Of The Gcc As Necessitated By The Circumstances Of The Specific Purchase, Must Also Be Incorporated. However, No Special Condition Which Defeats Or Negates The General Intent And Purpose Of The Provisions Of The Gcc Should Be Incorporated Herein. Special Conditions Of Contract Gcc Clause 1 Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: For Goods Supplied From Abroad, “the Delivery Terms Applicable To The Contract Are Ddp Delivered At The Bulacan Agricultural State College, Pinaod, San Ildefonso, Bulacan. In Accordance With Incoterms.” For Goods Supplied From Within The Philippines, “the Delivery Terms Applicable To This Contract Are Delivered At The Bulacan Agricultural State College, Pinaod, San Ildefonso, Bulacan. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is Ms. Rona Angela O. Clarin, Basc Property Officer. Incidental Services – No Further Instructions. Spare Parts – No Further Instructions. Packaging – No Further Instructions. Transportation – The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – No Further Instructions. 2.2 The Terms Of Payment Shall Be As Follows: Upon Certification Of Complete Delivery Of Items By The End User And Basc Inspection Team.” 4 The Inspections And Tests That Will Be Conducted Are: On Site Testing Of All Items To Be Procured. Section Vi. Schedule Of Requirements The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Motor Vehicle Dimension And Weight *overall Dimension (mm) Length X Width X Height – 5,320 X 2,020 X 1,880 Engine *engine Type - 2.8l Diesel, 4- Cylinder, 16 Valve Dohc Variable Nozzle Turbo With Air- Cooled Intercooler. *engine Displacement (cc)- 2755 *maximum Output (ps/rpm) – 224 / 3000 * Maximum Torque (nm/rpm) -550 / 1600 – 2800 Transmission *transmission – 6 Speed At Interior *driver Seat Type & Adjustment –8way Power Adjust *passenger Seat Type & Adjustment - 4way Manual Adjust *rear #1 Passenger Seat Type And Adjustment– 60/40 Separate *rear View Mirror- Auto -dimming * Audio System Function – Am/fm/bluetooth / Usb / Apple Car Play (wireless) / Android Auto (wireless) Exterior *headlamps- Led With Auto – Leveling * Daytime Running Lights – Led Function * Keyless Entry- Smart Entry *air Conditioning System – Dual Zone Automatic Climate Control * Hood Lift Assist – With Chasis *drive Train – 4x4 * Front Brake / Rare Brake - Front Ventilated Discs, Caliper / Rear: Disc Type * Tires – 265 * Wheels – 65 R17 Alloy * Suspension – Front: Double Wishbone + Monotube Shock Absorber / Rear: Leaf Spring Rigid Axle+ Monotube Shock Absorber. Safety And Security * Srs Air Bags – Driver+ Front Passenger + Side + Curtain Shield + Knee Airbag *blind Spot Monitor (bsm) – With * Rear Cross Traffic Alert (rcta)- With * Anti – Lock Brake System (abs) – With + Brake Assist + Ebd *vehicle Stability Control (vsc) – With * Hill- Start Assist Control (hac) – With * Camera – Panoramic View Monitor * Clearance And Back Soner – Front 2+ Rear :4 Others *speakers – 6 Service Center *within 40 Km Radius From Basc Together With * Deck Cover *all Weather Mat Front Set *all Weather Mat Rear *all Weather Mat Driver Side *side Moulding *hood Garnish *roof Rack *side Garnish *side Visor Imv3 -4pc *mirror Out Set *chrome Door Housing (design 2) (imv3) *door Handle Garnish *fuel Lid Garnish ( Design 1) *muffler Cutter *spare Wheel Locker Pad *12v Air Compressor *rubber Floor Mat *front Sunshade *wireless Charger Set *door Edge Protector *premium Horn *wheel Nut Set *gr Skid Plate *gr Side Visor 1 Not Later Than 30 Calendar Days To Be Delivered At The Bulacan Agricultural State College, Pinaod, San Ildefonso, Bulacan [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Section Vii. Technical Specifications Notes For Preparing The Technical Specifications A Set Of Precise And Clear Specifications Is A Prerequisite For Bidders To Respond Realistically And Competitively To The Requirements Of The Procuring Entity Without Qualifying Their Bids. In The Context Of Competitive Bidding, The Specifications (e.g. Production/delivery Schedule, Manpower Requirements, And After-sales Service/parts, Descriptions Of The Lots Or Items) Must Be Prepared To Permit The Widest Possible Competition And, At The Same Time, Present A Clear Statement Of The Required Standards Of Workmanship, Materials, And Performance Of The Goods And Services To Be Procured. Only If This Is Done Will The Objectives Of Transparency, Equity, Efficiency, Fairness , And Economy In Procurement Be Realized, Responsiveness Of Bids Be Ensured, And The Subsequent Task Of Bid Evaluation And Post-qualification Facilitated. The Specifications Should Require That All Items, Materials And Accessories To Be Included Or Incorporated In The Goods Be New, Unused, And Of The Most Recent Or Current Models, And That They Include Or Incorporate All Recent Improvements In Design And Materials Unless Otherwise Provided In The Contract. Samples Of Specifications From Previous Similar Procurements Are Useful In This Respect. The Use Of Metric Units Is Encouraged. Depending On The Complexity Of The Goods And The Repetitiveness Of The Type Of Procurement, It May Be Advantageous To Standardize The General Technical Specifications And Incorporate Them In A Separate Subsection. The General Technical Specifications Should Cover All Classes Of Workmanship, Materials, And Equipment Commonly Involved In Manufacturing Similar Goods. Deletions Or Addenda Should Then Adapt The General Technical Specifications To The Particular Procurement. Care Must Be Taken In Drafting Specifications To Ensure That They Are Not Restrictive. In The Specification Of Standards For Equipment, Materials, And Workmanship, Recognized Philippine And International Standards Should Be Used As Much As Possible. Where Other Particular Standards Are Used, Whether National Standards Or Other Standards, The Specifications Should State That Equipment, Materials, And Workmanship That Meet Other Authoritative Standards, And Which Ensure At Least A Substantially Equal Quality Than The Standards Mentioned, Will Also Be Acceptable. The Following Clause May Be Inserted In The Special Conditions Of Contract Or The Technical Specifications. Sample Clause: Equivalency Of Standards And Codes Wherever Reference Is Made In The Technical Specifications To Specific Standards And Codes To Be Met By The Goods And Materials To Be Furnished Or Tested, The Provisions Of The Latest Edition Or Revision Of The Relevant Standards And Codes Shall Apply, Unless Otherwise Expressly Stated In The Contract. Where Such Standards And Codes Are National Or Relate To A Particular Country Or Region, Other Authoritative Standards That Ensure Substantial Equivalence To The Standards And Codes Specified Will Be Acceptable. Reference To Brand Name And Catalogue Number Should Be Avoided As Far As Possible; Where Unavoidable They Should Always Be Followed By The Words “or At Least Equivalent.” References To Brand Names Cannot Be Used When The Funding Source Is The Gop. Where Appropriate, Drawings, Including Site Plans As Required, May Be Furnished By The Procuring Entity With The Bidding Documents. Similarly, The Supplier May Be Requested To Provide Drawings Or Samples Either With Its Bid Or For Prior Review By The Procuring Entity During Contract Execution. Bidders Are Also Required, As Part Of The Technical Specifications, To Complete Their Statement Of Compliance Demonstrating How The Items Comply With The Specification. Technical Specifications Item Specification Statement Of Compliance [bidders Must State Here Either “comply” Or “not Comply” Against Each Of The Individual Parameters Of Each Specification Stating The Corresponding Performance Parameter Of The Equipment Offered. Statements Of “comply” Or “not Comply” Must Be Supported By Evidence In A Bidders Bid And Cross-referenced To That Evidence. Evidence Shall Be In The Form Of Manufacturer’s Un-amended Sales Literature, Unconditional Statements Of Specification And Compliance Issued By The Manufacturer, Samples, Independent Test Data Etc., As Appropriate. A Statement That Is Not Supported By Evidence Or Is Subsequently Found To Be Contradicted By The Evidence Presented Will Render The Bid Under Evaluation Liable For Rejection. A Statement Either In The Bidder's Statement Of Compliance Or The Supporting Evidence That Is Found To Be False Either During Bid Evaluation, Post-qualification Or The Execution Of The Contract May Be Regarded As Fraudulent And Render The Bidder Or Supplier Liable For Prosecution Subject To The Applicable Laws And Issuances.] 1 Motor Vehicle Dimension And Weight *overall Dimension (mm) Length X Width X Height – 5,320 X 2,020 X 1,880 Engine *engine Type - 2.8l Diesel, 4- Cylinder, 16 Valve Dohc Variable Nozzle Turbo With Air- Cooled Intercooler. *engine Displacement (cc)- 2755 *maximum Output (ps/rpm) – 224 / 3000 * Maximum Torque (nm/rpm) -550 / 1600 – 2800 Transmission *transmission – 6 Speed At Interior *driver Seat Type & Adjustment –8way Power Adjust *passenger Seat Type & Adjustment - 4way Manual Adjust *rear #1 Passenger Seat Type And Adjustment– 60/40 Separate *rear View Mirror- Auto -dimming * Audio System Function – Am/fm/bluetooth / Usb / Apple Car Play (wireless) / Android Auto (wireless) Exterior *headlamps- Led With Auto – Leveling * Daytime Running Lights – Led Function * Keyless Entry- Smart Entry *air Conditioning System – Dual Zone Automatic Climate Control * Hood Lift Assist – With Chasis *drive Train – 4x4 * Front Brake / Rare Brake - Front Ventilated Discs, Caliper / Rear: Disc Type * Tires – 265 * Wheels – 65 R17 Alloy * Suspension – Front: Double Wishbone + Monotube Shock Absorber / Rear: Leaf Spring Rigid Axle+ Monotube Shock Absorber. Safety And Security * Srs Air Bags – Driver+ Front Passenger + Side + Curtain Shield + Knee Airbag *blind Spot Monitor (bsm) – With * Rear Cross Traffic Alert (rcta)- With * Anti – Lock Brake System (abs) – With + Brake Assist + Ebd *vehicle Stability Control (vsc) – With * Hill- Start Assist Control (hac) – With * Camera – Panoramic View Monitor * Clearance And Back Soner – Front 2+ Rear :4 Others *speakers – 6 Service Center *within 40 Km Radius From Basc Together With * Deck Cover *all Weather Mat Front Set *all Weather Mat Rear *all Weather Mat Driver Side *side Moulding *hood Garnish *roof Rack *side Garnish *side Visor Imv3 -4pc *mirror Out Set *chrome Door Housing (design 2) (imv3) *door Handle Garnish *fuel Lid Garnish ( Design 1) *muffler Cutter *spare Wheel Locker Pad *12v Air Compressor *rubber Floor Mat *front Sunshade *wireless Charger Set *door Edge Protector *premium Horn *wheel Nut Set *gr Skid Plate *gr Side Visor [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Section Viii. Checklist Of Technical And Financial Documents Notes On The Checklist Of Technical And Financial Documents The Prescribed Documents In The Checklist Are Mandatory To Be Submitted In The Bid, But Shall Be Subject To The Following: A.gppb Resolution No. 09-2020 On The Efficient Procurement Measures During A State Of Calamity Or Other Similar Issuances That Shall Allow The Use Of Alternate Documents In Lieu Of The Mandated Requirements; Or B.any Subsequent Gppb Issuances Adjusting The Documentary Requirements After The Effectivity Of The Adoption Of The Pbds. The Bac Shall Be Checking The Submitted Documents Of Each Bidder Against This Checklist To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion Pursuant To Section 30 Of The 2016 Revised Irr Of Ra No. 9184. Checklist Of Technical And Financial Documents I.technical Component Envelope Class “a” Documents Legal Documents ⬜ (a)valid Philgeps Registration Certificate (platinum Membership) (all Pages); Or ⬜ (b)registration Certificate From Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives Or Its Equivalent Document, And ⬜ (c)mayor’s Or Business Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located, Or The Equivalent Document For Exclusive Economic Zones Or Areas; And ⬜ (d)tax Clearance Per E.o. No. 398, S. 2005, As Finally Reviewed And Approved By The Bureau Of Internal Revenue (bir). Technical Documents ⬜ (f)statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (g)statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ (h)original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And ⬜ (i)conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (j)original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k)the Supplier’s Audited Financial Statements, Showing, Among Others, The Supplier’s Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; And ⬜ (l)the Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc); Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation. Class “b” Documents ⬜ (m)if Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Other Documentary Requirements Under Ra No. 9184 (as Applicable) ⬜ (n)[for Foreign Bidders Claiming By Reason Of Their Country’s Extension Of Reciprocal Rights To Filipinos] Certification From The Relevant Government Office Of Their Country Stating That Filipinos Are Allowed To Participate In Government Procurement Activities For The Same Item Or Product. ⬜ (o)certification From The Dti If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity. 25financial Component Envelope ⬜ (a)original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (b)original Of Duly Signed And Accomplished Price Schedule(s). Bid Form Date: ____________ Project Identification No. 2024-05g To: Bulacan Agricultural State College Brgy. Pinaod, San Ildefonso, Bulacan 3010 Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers______ [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas In Conformity With The Said Bidding Documents For The Sum Of __________________________________________________________(php____________)[total Bid Amount In Words And Figures] Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In The Bidding Documents Provisions And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below:[] Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And Your Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Name Of Project Of The Name Of The Procuring Entity] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Name Of Project Of The Name Of The Procuring Entity]. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2024. [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________ Price Schedule Name Of Bidder ____. Invitation To Bid Number 2024-53g Page _____ Of______. 1 2 3 4 5 6 7 8 9 10 Item Description Country Of Origin Quantity Unit Price Exw Per Item Transportation And Insurance And All Other Costs Incidental To Delivery, Per Item Sales And Other Taxes Payable If Contract Is Awarded, Per Item Cost Of Incidental Services, If Applicable, Per Item Total Price, Per Unit (col 5+6+7+8) Total Price Delivered Final Destination (col 9) X (col 4) 1. Motor Vehicle Dimension And Weight *overall Dimension (mm) Length X Width X Height – 5,320 X 2,020 X 1,880 Engine *engine Type - 2.8l Diesel, 4- Cylinder, 16 Valve Dohc Variable Nozzle Turbo With Air- Cooled Intercooler. *engine Displacement (cc)- 2755 *maximum Output (ps/rpm) – 224 / 3000 * Maximum Torque (nm/rpm) -550 / 1600 – 2800 Transmission *transmission – 6 Speed At Interior *driver Seat Type & Adjustment –8way Power Adjust *passenger Seat Type & Adjustment - 4way Manual Adjust *rear #1 Passenger Seat Type And Adjustment– 60/40 Separate *rear View Mirror- Auto -dimming * Audio System Function – Am/fm/bluetooth / Usb / Apple Car Play (wireless) / Android Auto (wireless) Exterior *headlamps- Led With Auto – Leveling * Daytime Running Lights – Led Function * Keyless Entry- Smart Entry *air Conditioning System – Dual Zone Automatic Climate Control * Hood Lift Assist – With Chasis *drive Train – 4x4 * Front Brake / Rare Brake - Front Ventilated Discs, Caliper / Rear: Disc Type * Tires – 265 * Wheels – 65 R17 Alloy * Suspension – Front: Double Wishbone + Monotube Shock Absorber / Rear: Leaf Spring Rigid Axle+ Monotube Shock Absorber. Safety And Security * Srs Air Bags – Driver+ Front Passenger + Side + Curtain Shield + Knee Airbag *blind Spot Monitor (bsm) – With * Rear Cross Traffic Alert (rcta)- With * Anti – Lock Brake System (abs) – With + Brake Assist + Ebd *vehicle Stability Control (vsc) – With * Hill- Start Assist Control (hac) – With * Camera – Panoramic View Monitor * Clearance And Back Soner – Front 2+ Rear :4 Others *speakers – 6 Service Center *within 40 Km Radius From Basc Together With * Deck Cover *all Weather Mat Front Set *all Weather Mat Rear *all Weather Mat Driver Side *side Moulding *hood Garnish *roof Rack *side Garnish *side Visor Imv3 -4pc *mirror Out Set *chrome Door Housing (design 2) (imv3) *door Handle Garnish *fuel Lid Garnish ( Design 1) *muffler Cutter *spare Wheel Locker Pad *12v Air Compressor *rubber Floor Mat *front Sunshade *wireless Charger Set *door Edge Protector *premium Horn *wheel Nut Set *gr Skid Plate *gr Side Visor 1 Grand Total (in Words) (in Figures) [signature] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas Location Of The Project : San Ildefonso, Bulacan List Of All Ongoing Government & Private Contracts Including Contracts Awarded But Not Yet Started Business Name : Business Address :______________________________________________________________________ Name Of Contract/ Project Cost A.owner’s Name B.address C.telephone Nos. Nature Of Work Bidder’s Role A.date Awarded B.date Started C.date Of Completion % Of Accomplishment Value Of Outstanding Works / Undelivered Portion Description % Planned Actual Government Private Note: This Statement Shall Be Supported With: Total Cost 1notice Of Award (for Government Projects) 2notice To Proceed (for Government Projects) 3contract Submitted By : (printed Name & Signature) Designation : Date : [bidder’s Letterhead] Name Of The Procuring Entity : Bulacan Agricultural State College Project: 2024-05g: Acquisition Of Motor Vehicle For Heavy Field Use In Rural And Remote Areas Location Of The Project : San Ildefonso, Bulacan Statement Of Single Largest Completed Contracts (slcc) In The Last Five (5) Years Business Name : Business Address : Name Of Contract A.owner Name B.address C.telephone Nos. Nature Of Work Contractor’s Role A.amount At Award B.amount At Completion C.duration A.date Awarded B.contract Effectivity C.date Completed Description % Government Private Attached Herewith Are The Following Documents: Contract Agreement, Notice Of Award, Notice To Proceed, Official Receipt/invoice, Certificate Of Final Inspection, Certificate Of Good Performance And Certificate Of Acceptance, As Evidences In Support Of The Foregoing Information. Submitted By : (printed Name & Signature) Designation : ____________________________________________ Contract Agreement Form This Agreement Made The _____ Day Of __________ 20_____ Between [name Of Procuring Entity] Of The Philippines (hereinafter Called “the Entity”) Of The One Part And [name Of Supplier] Of [city And Country Of Supplier] (hereinafter Called “the Supplier”) Of The Other Part: Whereas The Entity Invited Bids For Certain Goods And Ancillary Services, Viz., [brief Description Of Goods And Services] And Has Accepted A Bid By The Supplier For The Supply Of Those Goods And Services In The Sum Of [contract Price In Words And Figures] (hereinafter Called “the Contract Price”). Now This Agreement Witnesseth As Follows: 1. In This Agreement Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Referred To. 2. The Following Documents Shall Be Deemed To Form And Be Read And Construed As Part Of This Agreement, Viz.: (a) The Supplier’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g. Bidder’s Response To Clarifications On The Bid), Including Corrections To The Bid Resulting From The Procuring Entity’s Bid Evaluation; (b) The Schedule Of Requirements; (c) The Technical Specifications; (d) The General Conditions Of Contract; (e) The Special Conditions Of Contract; (f) The Performance Security; And (g) The Entity’s Notice Of Award. 3. In Consideration Of The Payments To Be Made By The Entity To The Supplier As Hereinafter Mentioned, The Supplier Hereby Covenants With The Entity To Provide The Goods And Services And To Remedy Defects Therein In Conformity In All Respects With The Provisions Of The Contract 4. The Entity Hereby Covenants To Pay The Supplier In Consideration Of The Provision Of The Goods And Services And The Remedying Of Defects Therein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of The Contract At The Time And In The Manner Prescribed By The Contract. In Witness Whereof The Parties Hereto Have Caused This Agreement To Be Executed In Accordance With The Laws Of The Republic Of The Philippines On The Day And Year First Above Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Supplier) Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1.select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2.select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached Duly Notarized Special Power Of Attorney; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For [name Of The Project] Of The [name Of The Procuring Entity], As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3.[name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4.each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5.[name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6.select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7.[name Of Bidder] Complies With Existing Labor Laws And Standards; And 8.[name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A)carefully Examine All Of The Bidding Documents; B)acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C)made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D)inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9.[name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ________ And His/her Community Tax Certificate No. _______ Issued On ____ At ______. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ * This Form Will Not Apply For Wb Funded Projec Bid Securing Declaration Form Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: [insert Name And Address Of The Procuring Entity] I/we[ ], The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Fifteen (15) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. [insert Name Of Bidder’s Authorized Representative] [insert Signatory’s Legal Capacity] Affiant Financial Documents For Eligibility Check Year 20 1 Total Assets 2 Current Assets 3 Total Liabilities 4 Current Liabilities 5 Net Worth (1-3) 6 Net Working Capital (2-4) The Net Financial Contracting Capacity (nfcc) Based On The Above Data Is Computed As Follows: Nfcc = [(current Assets – Current Liabilities) (15)] Minus Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts Including Awarded Contracts Yet To Be Started Coinciding With The Contract To Be Bid. The Values Of The Domestic Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir. Nfcc = Php Submitted By: Name Of Bidder Signature Of Authorized Representative Over Printed Name Date:
Closing Soon4 Nov 2024
Tender AmountPHP 2.5 Million (USD 43.1 K)

VETERANS AFFAIRS, DEPARTMENT OF USA Tender

Others
United States
Details: This Is A Sources Sought Notice For Elevator Maintenance & Repair Services As Identified In The Statement Of Work (sow) For The Detroit Va Medical Center In Detroit, Michigan. The Contractor Shall Furnish All Necessary Tools, Parts, Labor, Supplies, Materials, Equipment, Supervision And Transportation Necessary To Furnish The Services Noted Below. the Services Required Are Provided And Are Subject To Changes. A Draft Sow Is Attached To This Notice And Is Subject To Change Should A Solicitation Be Issued As A Result Of This Notice. Numbering And Lettering May Not Be Sequential To Reiterate, This Is Only A Draft Sow. please Respond If You Have The Ability And Actual Intention To Complete This Requirement. All Of The Following Information Is Required In Your Response: duns Number sam Uei Number capabilities Statement confirmation Of Actual Intent To Submit An Offer Should An Rfq Be Posted In Future company Name And Address point Of Contact Information (name, Phone, Email) socioeconomic Size Status (example: Large Business, Small Business, Wosb, Sdvosb, Etc.) this Sources Sought Notice Is Intended To Locate Any Business Capable Of Performance. the Anticipated Naics Code For This Requirement Is 238290. this Is Not A Request For Quotation And Quotes Shall Not Be Reviewed At This Time. the Government Shall Not Be Responsible For Any Costs Incurred By The Contractor Because Of This Sources Sought Notice. this Notice Shall Not Be Construed As A Commitment By The Government To Ultimately Award A Contract, Nor Does It Restrict The Government To Any Particular Acquisition Approach. All Information Submitted In Response To This Announcement Is Voluntary; The Government Will Not Pay For Information Requested Nor Will It Compensate Any Respondent For Any Cost Incurred In Developing Information Provided To The Government. responses Shall Be Submitted To Jeanne Ortiz At Jeanne.ortiz@va.gov By Monday, November 4, 2024, At 10:00 Am Eastern Time (et). Responses Must Include 36c25025q0074 In The Subject Line. Phone Calls Shall Not Be Accepted For This Notice. draft Statement Of Work 5. Contractor Shall Provide Services On Vamc Detroit S Twenty-four Vertical Transportation Systems: A. Eleven Gearless-traction Passenger Elevators: (1) Blue Pe1, Pe2, Pe3, And Pe4. (2) Yellow Pe8, Pe9, And Pe10. (3) Red Pe11, Pe12, Pe13, And Pe14. B. Four Service Elevators: (1) Blue Geared-traction Elevators Se5 And Se6. (2) Red Gearless-traction Elevators Se15 And Se16. C. One Hydraulic Freight Elevator: Fe7. D. Two Geared-traction Cart-lifts: (1) Cl7 For Clean Surgical Instruments. (2) Cl8 For Dirty Surgical Instruments. E. Six Gearless-traction Garage Elevators In Blue And Red Parking Structures. (1) Blue Ge1, Ge2, And Ge3. (2) Red Ge1, Ge2, And Ge3. ii. Description/specification/statement Of Work 6. Vertical Transportation Maintenance And Repair: A. Under The Terms And Conditions Of This Agreement, Subsequently Set Forth, The Contractor Shall Maintain The Vertical Transportation Systems At Vamc Detroit In Accordance With The Requirements Herein Described, Including All Associated Services, Procedures And Testing. B. The Term Vertical Transportation Systems In This Agreement Refers To And Includes All Of The Equipment Listed In The Next Section Of This Agreement. The Generic Term Elevator Is Also Assumed To Include All The Equipment Listed In The Next Section And May Be Used In This Agreement In Lieu Of Specific Equipment Nomenclature. C. This Is A Full Comprehensive Preventive And Repair Maintenance Agreement. The Absence Of A Particular Service, Component Coverage, Or Other Requirement Shall Not Alleviate The Contractor Of The Sole Responsibility To Provide Such Unless Specifically Excluded Herein. full Coverage Maintenance Contract Requirements: Contractor Shall Furnish Services At Vamc Detroit On The Following (twenty Four) Vertical Transportation Systems: A. Eleven Gearless Traction Passenger Elevators: (1) Pe1 . . . 4,000 Lbs. At 350 Fpm (7) Pe10 . . . 5,000 Lbs. At 350 Fpm (2) Pe2 . . . 4,000 Lbs. At 350 Fpm (8) Pe11 . . . 4,000 Lbs. At 350 Fpm (3) Pe3 . . . 4,000 Lbs. At 350 Fpm (9) Pe12 . . . 4,000 Lbs. At 350 Fpm (4) Pe4 . . . 4,000 Lbs. At 350 Fpm (10) Pe13 . . . 4,000 Lbs. At 350 Fpm (5) Pe8 . . . 5,000 Lbs. At 350 Fpm (11) Pe14 . . . 4,000 Lbs. At 350 Fpm (6) Pe9 . . . 5,000 Lbs. At 350 Fpm B. Two Geared Traction Service Elevators: (1) Se5 . . . 6,000 Lbs. At 350 Fpm (2) Se6 . . . 6,000 Lbs. At 350 Fpm C. Two Gearless-traction Service Elevators: (1) Se15 . . . 5,000 Lbs. At 350 Fpm (2) Se16 . . . 5,000 Lbs. At 350 Fpm D. One Hydraulic Freight Elevator: (1) Fe7 . . . 6,000 Lbs. At 50 Fpm E. Two Geared Traction Cart-lifts: (1) Cl7 . . . 1,000 Lbs. At 200 Fpm (2) Cl8 . . . 1,000 Lbs. At 200 Fpm F. Six Gearless-traction Garage Elevators: (1) Blue Parking Structure: (2) Red Parking Structure: Ge1 . . . 3,500 Lbs. At 300 Fpm Ge1 . . . 3,500 Lbs. At 300 Fpm Ge2 . . . 3,500 Lbs. At 300 Fpm Ge2 . . . 3,500 Lbs. At 300 Fpm Ge3 . . . 3,500 Lbs. At 300 Fpm Ge3 . . . 3,500 Lbs. At 300 Fpm 9. General Conditions: A. All Vertical Transportation Equipment Shall Be Maintained As Hereinafter Described, In Accordance With The Following Detailed Terms. Trained Employees Of The Contractor Shall Use All Reasonable Care To Keep The Systems In Proper Adjustment And In Safe Operating Condition, In Accordance With All Applicable Codes, Ordinances, And Regulations. The Requirements Are Specified In Either The Singular Or Plural With The Understanding That All Provisions Shall Be Applicable To All Units Indicated Unless Otherwise Specified. The Contractor Shall Provide All Labor, Equipment, And Supervision Necessary For The Contract Per Contract Documents. B. The Contractor Shall Provide On Call Service Of 40 Hours Per Week, Eight Hours Per Day, Monday Through Friday, Of Coverage For All Vertical Transportation Equipment. C. Following Are Maintenance Hours Required By This Contract, And The Contractor Shall Be On-site As Required By The Following: (1) Monthly: 96 Hours. (2) Weekly: 24 Hours. (3) Assigned Day: 8 Hours. Assigned Days Are Monday, Wednesday, And Friday. D. Worked Maintenance Hours, Required By This Contract, Shall Not Include Call-back Or Emergency/unscheduled Repair Hours. E. All Work Shall Be In Accordance With Applicable National, State And Local Codes So Having Jurisdiction. Additional Work Hours Required To Meet The Minimum Maintenance Requirement Detailed In This Paragraph May Be Scheduled At The Contractor S Convenience Subject To Cor Approval. F. Contractor Shall Provide Scheduled Weekly Examinations, Adjustments, Cleaning, And Lubrication Of All Machinery, Machinery Spaces, Hoistways, And Pits. G. Contractor Shall Maintain All Parts Of The Vertical Transportation Equipment Systems Consisting Of, But Not Limited To The Following: (1) Hoisting Machinery. (7) Operating And Signal Fixtures. (2) Wire Ropes. (8) Door Operating And Safety (3) Control Apparatus And Power Drives. Equipment. (4) Fixed Mechanical Equipment. (9) Auxiliary Apparatus (to Include (5) Electrical Wiring And Traveling Cables. Any Cart Ejection Systems) And (6) Mechanical And Electrical Safety Devices. Appertunances. H. Contractor Shall Ensure That Elevator Door Tracks Are Free From Dirt And Debris To Ensure Smooth, Proper Operation Of Elevator Doors. I. Contractor Shall Replace All Burned Out Light Bulbs Inside The Elevator Cabs To Maintain Proper Lighting At All Times. Vamc Detroit Will Provide The Light Bulbs For The Contractor. J. The Contracting Officer S Representative (cor) May Give Technical Assistance And Clarification On The Contract. However, The Cor Does Not Have Authority To Change Contract Requirements. K. Install As Used In The Work Required, Specifications And Drawings Shall Mean Furnish, Install, Connect, Adjust And Test Except Where Otherwise Specified. L. Brand Names Are Specified To Indicate Performance And Quality Characteristics. No Substitutes Of Specified Materials Shall Be Accepted. 10. Emergency Generator Test: Vamc Detroit Conducts Testing Of The Facility S Emergency Generators On The First Wednesday Of Each Month, From 6:15 Am To 6:45 Am. Duties To Be Performed Shall Include The Following: A. Before 6:00 Am: Be Present For Duty To Participate In The Test. B. No Later Than 6:05 Am: Assist Vamc Detroit Staff In Utilizing The Fire Recall System To Bring All Elevators To The First Floor. Note: Waiting Until Five Minutes After 6:00 Am Is To Give Biomedical Engineering Staff Necessary Time To Shut Down Biomedical Equipment Prior To Generator Testing. C. After 6:15 Am: When The Facility Disconnects From Detroit Edison At 6:15 Am, The Contractor Will Assist Vamc Detroit Staff In Turning Off The Fire Recall System And Ensure That At Least One Elevator Is Running At Each Elevator Bank For The Duration Of The Generator Test. D. Assist Va Staff In Performing Code Blue Testing On Selected Elevators During The Test. Different Elevators Will Be Selected By The Cor For Each Test. E. Be Available To Troubleshoot Any Problems Occurring With The Elevators When Normal Power Has Been Restored Upon The Conclusion Of The Test. 14. Hours Of Work: A. All Work Shall Be Performed During Regular Business Hours, Within A Window Of 6:00 Am To 4:30 Pm, Monday Through Friday, Except Federal Holidays. Contractor Shall Notify The Cor Upon Arrival And Departure At Vamc Detroit By Use Of An Agreed-upon Method. B. Repairs And/or Other Major Adjustment Procedures Necessitating Removal Of A Vertical Transportation Unit From Service For An Extended Period Of Time Must Be Scheduled Through The Cor. The Cor Retains The Right To Have Such Work Completed During Overtime Hours With The Understanding The Contractor Shall Pay For The Regular Labor Portion And Vamc Detroit S Obligation Is Premium Direct Labor Cost Only. C. The Contractor Shall Make Any And All Repairs Or Replacements Damaged By Contractor S Improper Repair, Negligent Or Willful Acts, Or Omissions. D. Compensation For Emergency Call-back Services Shall Be Included In The Monthly Lump Sum Price For Procedures Performed During Regular Working Hours Of Regular Working Days As Previously Described In This Agreement. 15. Sole Responsibility: The Maintenance Work Shall Be Performed Only By Employees Directly Employed And Supervised By The Contractor, Who Are Experienced And Skilled In Maintaining Vertical Transportation Systems Similar To Those To Be Maintained Under This Contract, And Shall Not Be Assigned Or Transferred To Any Agent Or Sub-contractor. 16. Quality Assurance: The Contractor Shall Be Regularly Engaged In The Business Of Servicing Equipment Similar To That Being Maintained Under This Contract, And Shall Have Done So For A Period Of At Least Five Years Prior To The Date Of The Solicitation For This Contract. The Contractor Shall Have A Permanent Service Branch Capable Of Providing Normal Service Within Two Hours After A Request Is Made And Emergency Call-back Service 17. Emergency Call-back Service: A. Provide Emergency Call Back Service Which Consists Of Promptly Dispatching Qualified employees In Response To Requests From The Cor, By Telephone Or Otherwise, For Emergency adjustment Or Minor Repairs On Any Day Of The Week, At Any Hour, Day Or Night. Emergency repairs Shall Be Made Within Four Hours To Restore The Equipment To Operating Order. If Repairs cannot Be Made Immediately, The Mechanic Shall Notify The Cor As To The Reason Why. B. Call-back Service Shall Be Provided Within One Hour During Regular Working Hours and Within Two Hours During Overtime Periods. Entrapment Calls Shall Be Responded To with A Sense Of Urgency, As Promptly As Possible, And Within The Time Constraints Referenced above Or Sooner If Possible. 18. Testing . . . Note: The Next Five Year Test Is Due In 2025. A. Monthly: Examine All Safety Devices And Governors. B. Quarterly: (1) Test The Communications And Elevator Fire Safety System. (2) The Fire Safety System Testing Includes Manual Recall (phase I) And Fireman S Elevator Operation (phase Ii). (3) Confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing. C. Annually . . . No-load Test Of Safety Mechanisms: (1) Conduct A No-load Test Of Safety Mechanisms, In Accordance With The American Society Of Mechanical Engineers, Asme/ans1 A17.1 (2010). (2) Confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing. D. Every Five Years . . . Full-load Test Of Safety Mechanisms. During The Full-load Test, The Following Shall Also Be Conducted: (1) Conduct A Full-load Test Of Safety Mechanisms, In Accordance With The American Society Of Mechanical Engineers, Asme/ans1 A17.1 (2010). (2) Inspect Car Balances. (3) Inspect The Governors. Set Them, Recalibrate Them, And Seal Them For Proper Tripping Speed. (4) Confirmation And Results Of All Tests Shall Be Forwarded To The Cor Upon Completion Of Testing. 19. Inspections: A. The Contractor Shall Provide Vertical Transportation System Efficiency And Maintenance Survey Inspections Annually. The Results Of These Inspections Shall Be Summarized With Appropriate Backup Material In An Annual Report To The Cor By The End Of The Month Following The Anniversary Date Of The Contract. This Report Shall Include The Following Performance Parameters And Summary Data For Each Vertical Transportation Unit As Appropriate: (1) Unit Speed Up And Oem Specification. (2) Unit Speed Down And Oem Specification. (3) Door Open Speed And Oem Specification. (4) Door Close Speed Normal And Code Limit. (5) Door Close Speed Reduced And Code Limit. (6) Door Closing Torque And Code Limit. (7) Door Dwell Time . . . Car Call. (8) Door Dwell Time . . . Hall Call. (9) Leveling Accuracy Summary And Oem Specification. (10) Date Of The Last Annual / Five Year Safety Test Completed. (11) Date Of The Last Annual Communications And Fire Recall System Test. (12) Annualized Call-back Rate With Backup Detail. (13) Dedicated Maintenance Hours For The Preceding Twelve Months. B. Semi-annual Inspections By Independent Consultant: Contractor Shall Accompany Cor Or Vamc Detroit S Independent Consultant On Inspections To Audit The Facility S Elevator Operations Every Six Months. (1) The Independent Consultant Shall Provide Semi-annual Inspection Reports To The Cor. (2) The Cor Shall Provide A Copy Of These Reports To The Contractor. The Contractor And Cor Will Determine Who Is Responsible For The Abatement Of Deficiencies Listed In The Semi-annual Reports. (3) The Cor Shall Provide A Copy Of These Reports To The Chief Of Facility Management Service. The Chief Of Facility Management Service Will Determine Abatement Procedures For Deficiencies That Are The Responsibility Of Vamc Detroit. (4) The Cor Shall Archive Corrective Actions Taken By Contractor And Chief Of Facility Management, For A File-retention Period Of Five Years. 20. Lubrication: Lubricate Monthly (12 Times Per Year At Regularly Scheduled Intervals) All Of Those Mechanical Parts Recommended To Be Lubricated By The Original Manufacturer Of The Vertical Transportation Equipment, Or Otherwise Lubricate As Often As Necessary And In The Manner Specified By Said Manufacturer. 21. Cleaning: The Contractor Shall, During The Course Of All Examinations, Remove And Discard Immediately All Accumulated Dirt And Debris From The Pit Areas, And Be Responsible For Maintaining The Cleanliness Of All Elevator Machine Rooms At All Times. Additionally, Prior To Each Annual Anniversary Date Of This Contract, Contractor Shall Thoroughly Clean Down The Entire Hoistway Of All Accumulated Dirt, Grease, Dust, And Debris. 22. Painting: The Contractor Shall Keep The Exterior Of The Machinery And Any Other Parts Of The Equipment Subject To Rust Properly Painted, Identified And Presentable At All Times. Motor Windings And Controller Coils Shall Be Periodically Treated With Proper Insulating Compound. The Machine Room Floor And All Storage Areas Shall Be Painted Annually With Good Quality Deck Enamel. 23. Repairs, Renewals, And Replacements: Repairs, Renewals, And Replacements Shall Be Made By The Contractor As Soon As Scheduled Or Other Examinations Reveal The Necessity Therefore, Or When The Cor So Advises The Contractor Under The Terms Of This Contract. It Is Understood And Agreed That Repairs, Renewals, And Replacements Shall Be Made In Accordance With High Standards Of Preventive Maintenance Practice. Repair And Renewals Of Parts Made Shall Be Equal In Design, Workmanship, Quality, Finish Fit, Adjustment, Operation And Appearance To The Original Installation And That Replacements Shall Be New And Genuine Parts Equal To Those Parts Supplied By The Manufacturer Of The Original Vertical Transportation System Equipment Or Its Successor, And Shall Apply To The Repairs, Renewal, Or Replacement Of All Mechanical, Electronic, And Electrical Parts, Including, But Not Limited To: a. Automatic Power And Manually Operated Door Systems, Car Door And Gate Hangers, Car Door And Gate Contact, Door Protective Device, Guides, Stops And Appurtenances, Car Safety Mechanism, Platform, Car Sills, Car Guide Shoes, Gibs Or Rollers And Appurtenances. B. Geared And Gearless Machinery, Worm, Gear, Bearings, Drive Sheave, Deflector Sheave, And Brake Assembly, Component Parts And All Associated Castings. C. Motor, Motor Generator, Motor Windings, Rotating Element, Stator, Bearings, Rotors, Starters, Solid-state Power Drives Complete And Associated Apparatus, Speed Monitoring Equipment And Attachments. D. Controller, Selector And Dispatching Equipment, All Relays, Solid State Components, Resistors, Condensers, Transformers, Contact Leads, Dashpots, Timing Devices, Computer Devices, Insulators, Solenoids, Resistance Grids, Mechanical And Electrical Driving Equipment, Diagnostics, Trouble Shooting Tools, Monitors And Associated Apparatus. E. Governor, Governor Sheave And Shaft Assembly, Bearings, Contacts And Governor Tension Sheave Assemblies. F. Overhead, 2:1, Deflector Or Secondary Sheaves, Bearings, Car And Counterweight Buffers, Car And Counterweight Guide Rails, Top And Bottom Limit Switches, Activating Cams, Compensating Equipment, Counterweight And Counterweight Guide Shoes Including Rollers Or Gibs. G. Hoistway Door Interlocks, Top Tracks, Hanger Rollers, Operating Linkages And Auxiliary Door Closing Devices, Hoistway Landing, Leveling And Encoding Systems Complete, And Power Door Clutch Engaging Systems Complete. H. Car And Hall Lanterns, Lobby Fixtures, Car Operating Panels, Car And Hall Position Indicators, Hall Push-button Fixtures, Audible/visible Signals And Controls Complete, Emergency Lighting, Communication Devices, Remote Operating And Signal Equipment Complete. I. The Contractor Shall Examine And Equalize Tension On All Wire Ropes And Renew Them Whenever Necessary To Ensure The Maintenance Of Adequate Safety Factor. Contractor Shall Also Shorten All Ropes As Required To Maintain Legal Bottom Clearances And Perform All Safety Code Reshackling Procedures Per Asme/ans1 A17.1 (2010). J. Contractor Shall Repair And/or Replace All Electrical Traveling Cables, Wiring And Conductors Extending To The Vertical Transportation Unit From Main Line Switch In The Machine Room And Outlets In The Hoistways. The Main Line Switch, Together With Fuses For Same, Is Excluded. K. Contractor Shall Be Responsible For Relamping All Lighting Fixtures In The Cab, Pit, Machine Room, And Hoistway As Required. Vamc Detroit Will Provide The Light Bulbs. L. Hydraulic Systems Components, Including But Not Limited To, Tanks, Valves, Pump, Cylinder Head, Above Ground Piping, Hoses, Fittings, Gauges, Seals, O-rings, Packing S, Belts, Recovery Devices, Overflow Devices, Rescuvator Or Other Emergency Operating And Signal Systems, Above Grade Cylinder And Plunger Assemblies Complete, Cathodic Protection Devices, Muffler, Heater And Shut-off Valves. m. The Following Items Of Equipment Are Excluded: Main Line Power Switch And Fuses, Car Enclosure, Car Doors, Hoistway Enclosures, Hoistway Doors, Door Frames And Hoistway Sills, Cart-lift Carts, Buried Hydraulic Piping, Cylinder And Conventional Below Grade Plunger Assemblies. 24. Performance Parameters: A. The Control System Shall Be Maintained To Provide Smooth Acceleration And Retardation. Contractor Shall Maintain All Vertical Transportation Systems In Accordance With The Original Equipment Manufacturer (oem) Design Specifications. The Door Close Pressure Must Never Exceed 30 Pounds. The Following Performance Schedule Shall Be Adhered To: (1) Contract Speed: The Contract Speed Shall Be Provided For Up Direction Travel With Full-capacity Load In The Elevator Car. The Speed In Either Direction Under Any Loading Condition Shall Not Vary More Than 5% Of The Contract Speed. (2) In Accordance With Asme/ans1 A 17.1 (2010), The Elevators Shall Be Maintained And Adjusted To Safely Lower, Stop And Hold The Car With A Load Of 125% Of The Rated Capacity. (3) Leveling Accuracy: The Elevator Shall Be Adjusted To Provide Accurate Leveling Within 1/4 ± Of The Floor Level Without Re-leveling Regardless Of Load. B. The Group Supervisory And Individual Unit Control Systems Shall Be Maintained To Provide Overall Satisfactory Service Levels As Designed By The O.e.m. (1) On An Annual Basis At The Request Of The Cor The Contractor Shall Provide A Computerized Traffic Study That Details Hall Waiting Times By Floor, Direction Of Travel And An Overall Summary. (2) The Contractor Shall Use A Delta Analyzer Or Similar Device. C. Call-backs: Any And All Call-backs Are Included In The Firm, Fixed Price Of The Contract. 25. Spare Parts: The Contractor Shall Provide And Maintain A Supply Of Contacts, Coils, Solid-state Boards And Associated Components, Leads, Brushes, Lubricants, Wiping Cloths, Rollers, Guides, Switches, And Other Minor Parts In The Vertical Transportation System(s) Machine Room(s) For The Performance Of Routine Preventive Maintenance. All Spare Parts Shall Be Kept In Storage Cabinets Provided By The Contractor. 27. Record Keeping: A. A Complete Permanent Record Of Maintenance Inspections And Routines, Repair Work, Lubrication, And Call Back Service Will Be Kept In The Machine Room. These Records Are To Be Available To The Cor At All Times. The Records Shall Indicate The Reason The Mechanic Was In The Building, Arrival And Departure Time, The Work Performed, Etc., And These Records Shall Be Property Of Vamc Detroit. Record Keeping Requirements Are The Responsibility Of Contractor-assigned Maintenance Personnel. B. A Contractor S Proprietary System That Fulfills The Requirements In The Above Paragraph Will Be Accepted In Lieu Of The Method Specified, Provided Annual Summary Reports (or At Any Time During The Term Of This Contract, Upon Written Request Of The Cor) Of The Requested Data Is Provided At The Same Time The Report Required In Paragraph 19 Entitled, Inspections Is Provided. 28. Non-payment: Vamc Detroit May Have The Vertical Transportation System S Maintenance Work And Performance Checked By An Independent Consultant To Ensure The Contractor Is Performing In Accordance With This Contract. If The Independent Consultant Determines That The Contractual Requirements Are Not Being Maintained, The Cor May Retain The Monthly Payment (or Have A Bill Of Collection Performed) To The Contractor Until The Consultant Verifies That The Work Performance Is Back To Standard. The Contractor Shall Pay Re-inspection Costs Incurred By Vamc Detroit For The Independent Consultant By Deduction From The Monthly Maintenance Fee. If Three Consecutive Inspections By The Independent Consultant Indicate That The Contractual Requirements Are Not Being Maintained, Vamc Detroit May Cancel The Contract. 36. Tests: A. Pre Test Electrical Equipment And Systems And Make Corrections Required For Proper Operation Of Such Systems Before Requesting Final Tests. Final Test Shall Not Be Conducted Unless Pre Tested. B. Conduct Final Tests Required In Various Sections Of Specifications In Presence Of An Authorized Representative Of The Contracting Officer. Contractor Shall Furnish All Labor, Materials, Equipment, Instruments, And Forms, To Conduct And Record Such Tests. C. Electrical Systems Shall Be Balanced, Controlled And Coordinated. A System Is Defined As The Entire Complex Which Must Be Coordinated To Work Together During Normal Operation To Produce Results For Which The System Is Designed. For Example, Air Conditioning Supply Air Is Only One Part Of Entire System Which Provides Comfort Conditions For A Building. Other Related Components Are Return Air, Exhaust Air, Steam, Chilled Water, Refrigerant, Hot Water, Controls And Electricity, Etc. D. All Related Components As Defined Above Shall Be Functioning When Any System Component Is Tested. Tests Shall Be Completed Within A Reasonably Short Period Of Time During Which Operating And Environmental Conditions Remain Reasonably Constant. E. Individual Test Results Of Any Component, Where Required, Shall Only Be Accepted When Submitted With The Test Results Of Related Components And Of The Entire System. 37. Relocated Equipment And Items: A. Contractor Shall Disconnect, Dismantle As Necessary, Remove And Reinstall In New Location, All Existing Equipment And Items Otherwise Indicated To Be Relocated By The Contractor. B. Perform Relocation Of Such Equipment Or Items At Such Times And In Such A Manner As Directed By The Cor. C. Suitably Cap Existing Service Lines, Such As Steam, Condensate Return, Water, Drain, Gas, Air, Vacuum And/or Electrical, Whenever Such Lines Are Disconnected From Equipment To Be Relocated. Remove Abandoned Lines In Finished Areas And Cap As Specified. D. Provide All Electrical Service Connections, Fittings, Fastenings And Any Other Materials Necessary For Assembly And Installation Of Replacement Equipment; And Leave Such Equipment In Proper Operating Condition. E. Contractor Shall Employ Services Of An Installation Engineer, Who Is An Authorized Representative Of The Manufacturer Of This Equipment To Supervise Assembly And Installation Of Existing Equipment, Required To Be Relocated. F. All Service Lines Such As Noted Above For Relocated Equipment Shall Be In Place At Point Of Relocation Ready For Use Before Any Existing Equipment Is Disconnected. Make Relocated Existing Equipment Ready For Operation Or Use Immediately After Reinstallation. G. Return All Removed Existing Hardware To Vamc Detroit. 38. Training: An Allotment Of 20 Hours Of Annual On-site Training Shall Be Provided To Train Selected Employees Of Vamc Detroit In The Use Of All Internal And External Controls Of All Passenger And Service Elevators, As Well As Entrapment Procedures In Case Of Extreme Emergency To Free Individuals Requiring Immediate Extraction.
Closing Soon4 Nov 2024
Tender AmountRefer Documents 

Bureau Of Corrections Muntinlupa City Metro Manila Tender

Automobiles and Auto Parts
Corrigendum : Tender Amount Updated
Philippines
Details: Description Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Philippine Bidding Documents Supply And Delivery Of Bucor Vehicles (procurement/id No.022) Sixth Edition July 2020 Bids And Awards Committee 2024 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 6 Section Iii. Bid Data Sheet 16 Section Iv. General Conditions Of Contract 19 Section V. Special Conditions Of Contract 22 Section Vi. Schedule Of Requirements 27 Section Vii. Technical Specifications 29 Section Viii. Bidding Forms 37 Section I. Invitation To Bid Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Invitation To Bid For Supply And Delivery Of Bucor Vehicles 1. The Bureau Of Corrections, Through The General Appropriations Act (gaa) Of 2023 Continuing Appropriation (capital Outlay) Intends To Apply The Sum Of Eleven Million Two Hundred Eighty-nine Thousand Pesos Only (₱11,289,000.00) Being The Abc To Payments Under The Contract For Supply And Delivery Of Bucor Vehicles With Identification Number __22_. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. The Bureau Of Corrections Now Invites Bids For The Above Procurement Project. Delivery Of The Goods Is Required By Within Fifteen (15) Calendar Days. Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii (instructions To Bidders). 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra No. 5183. 4. Prospective Bidders May Obtain Further Information From The Bureau Of Corrections And Inspect The Bidding Documents At The Address Given Below During Monday To Friday From 8:00am To 5:00pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On _october 26, 2024 (08:00 Am To 05:00 Pm) To November 18, 2024 (08:00 Am To 02:29 Pm)__ From The Given Address And Website(s) Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Twenty-five (₱25,000.00) Thousand Pesos Only. The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees And Presented In Person. 6. The Bureau Of Corrections Will Hold A Pre-bid Conference On November 4, 2024 (02:30 Pm)_ At Bac Conference Room Nbp Reservation Muntinlupa City, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Below, On Or Before _november 18, 2024 (02:29 Pm)___. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On __november 18, 2024 (02:30 Pm)___ At The Given Address Below Bac Conference Room Nbp Reservation Muntinlupa City, Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend The Activity. 10. The Schedule Of Bidding Activities Shall Be As Follows: Activites Date/time Venue 1. Sale And Issuance Of Bid Documents October 26, 2024 (08:00 Am To 05:00 Pm) To November 18, 2024 (08:00 Am To 02:29 Pm) Supply Division Bureau Of Corrections Muntinlupa City 2. Pre-bid Conference November 4, 2024 (02:30 Pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 3. Submission And Opening Of Bid Documents November 18, 2024 (02:30 Pm) Bac Conference Room Bureau Of Corrections Muntinlupa City 4. The Bureau Of Corrections Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Maria Adoracion I. Viñas Office Of The Bac Secretariat Supply Office, Bureau Of Corrections, Muntinlupa City Tel # 02-8809-8587/02-8478-0907 Bacsec2022@gmail.com 13. You May Visit The Following Websites: For Downloading Of Bidding Documents: Bucor.gov.ph Date Of Issue: _______________ Ccsupt. Celso S. Bravo Chairperson Bids And Awards Committee Section Ii. Instructions To Bidders 1. Scope Of Bid The Procuring Entity, Bureau Of Corrections Wishes To Receive Bids For The Supply And Delivery Of Bucor Vehicles {[insert, If Applicable:] Under A Framework Agreement}, With Identification Number [indicate Number]. [note: The Project Identification Number Is Assigned By The Procuring Entity Based On Its Own Coding Scheme And Is Not The Same As The Philgeps Reference Number, Which Is Generated After The Posting Of The Bid Opportunity On The Philgeps Website.] The Procurement Project Supply And Delivery Of Bucor Vehicles Is Composed Of One (1) Lot, The Details Of Which Are Described In Section Vii (technical Specifications). 2. Funding Information 2.1. The Gop Through The Source Of Funding As Indicated Below For General Appropriations Act (gaa) Of 2023 Continuing Appropriation (capital Outlay) In The Amount Of Eleven Million Two Hundred Eighty-nine Thousand Pesos Only (₱11,289,000.00). 2.2. The Source Of Funding Is: A. Nga, The General Appropriations Act Or Special Appropriations. 3. Bidding Requirements The Bidding For The Project Shall Be Governed By All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including Its Generic Procurement Manuals And Associated Policies, Rules And Regulations As The Primary Source Thereof, While The Herein Clauses Shall Serve As The Secondary Source Thereof. Any Amendments Made To The Irr And Other Gppb Issuances Shall Be Applicable Only To The Ongoing Posting, Advertisement, Or Ib By The Bac Through The Issuance Of A Supplemental Or Bid Bulletin. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Verified And Accepted The General Requirements Of This Project, Including Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 4. Corrupt, Fraudulent, Collusive, And Coercive Practices The Procuring Entity, As Well As The Bidders And Suppliers, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. They Or Through An Agent Shall Not Engage In Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices Defined Under Annex “i” Of The 2016 Revised Irr Of Ra No. 9184 Or Other Integrity Violations In Competing For The Project. 5. Eligible Bidders 5.1. Only Bids Of Bidders Found To Be Legally, Technically, And Financially Capable Will Be Evaluated. 5.2. [select One, Delete Other/s] A. Foreign Ownership Exceeding Those Allowed Under The Rules May Participate Pursuant To: I. When A Treaty Or International Or Executive Agreement As Provided In Section 4 Of The Ra No. 9184 And Its 2016 Revised Irr Allow Foreign Bidders To Participate; Ii. Citizens, Corporations, Or Associations Of A Country, Included In The List Issued By The Gppb, The Laws Or Regulations Of Which Grant Reciprocal Rights Or Privileges To Citizens, Corporations, Or Associations Of The Philippines; Iii. When The Goods Sought To Be Procured Are Not Available From Local Suppliers; Or Iv. When There Is A Need To Prevent Situations That Defeat Competition Or Restrain Trade. B. Foreign Ownership Limited To Those Allowed Under The Rules May Participate In This Project. 5.3. Pursuant To Section 23.4.1.3 Of The 2016 Revised Irr Of Ra No.9184, The Bidder Shall Have An Slcc That Is At Least One (1) Contract Similar To The Project The Value Of Which, Adjusted To Current Prices Using The Psa’s Cpi, Must Be At Least Equivalent To: A. For The Procurement Of Non-expendable Supplies And Services: The Bidder Must Have Completed A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc. 5.4. The Bidders Shall Comply With The Eligibility Criteria Under Section 23.4.1 Of The 2016 Irr Of Ra No. 9184. 6.origin Of Goods There Is No Restriction On The Origin Of Goods Other Than Those Prohibited By A Decision Of The Un Security Council Taken Under Chapter Vii Of The Charter Of The Un, Subject To Domestic Preference Requirements Under Itb Clause 18. 7. Subcontracts 7.1. The Bidder May Subcontract Portions Of The Project To The Extent Allowed By The Procuring Entity As Stated Herein, But In No Case More Than Twenty Percent (20%) Of The Project. The Procuring Entity Has Prescribed That: A. Subcontracting Is Not Allowed. 7.2. [if Procuring Entity Has Determined That Subcontracting Is Allowed During The Bidding, State:] The Bidder Must Submit Together With Its Bid The Documentary Requirements Of The Subcontractor(s) Complying With The Eligibility Criteria Stated In Itb Clause 5 In Accordance With Section 23.4 Of The 2016 Revised Irr Of Ra No. 9184 Pursuant To Section 23.1 Thereof. 7.3. [if Subcontracting Is Allowed During The Contract Implementation Stage, State:] The Supplier May Identify Its Subcontractor During The Contract Implementation Stage. Subcontractors Identified During The Bidding May Be Changed During The Implementation Of This Contract. Subcontractors Must Submit The Documentary Requirements Under Section 23.1 Of The 2016 Revised Irr Of Ra No. 9184 And Comply With The Eligibility Criteria Specified In Itb Clause 5 To The Implementing Or End-user Unit. 7.4. Subcontracting Of Any Portion Of The Project Does Not Relieve The Supplier Of Any Liability Or Obligation Under The Contract. The Supplier Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants, Or Workmen As Fully As If These Were The Supplier’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants, Or Workmen. 8. Pre-bid Conference The Procuring Entity Will Hold A Pre-bid Conference For This Project On The Specified Date And Time And Either At Its Physical Address Bac Conference Room Nbp Reservation, Poblacion, Muntinlupa, City And/or Through Videoconferencing/webcasting} As Indicated In Paragraph 6 Of The Ib. 9. Clarification And Amendment Of Bidding Documents Prospective Bidders May Request For Clarification On And/or Interpretation Of Any Part Of The Bidding Documents. Such Requests Must Be In Writing And Received By The Procuring Entity, Either At Its Given Address Or Through Electronic Mail Indicated In The Ib, At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10. Documents Comprising The Bid: Eligibility And Technical Components 10.1. The First Envelope Shall Contain The Eligibility And Technical Documents Of The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 10.2. The Bidder’s Slcc As Indicated In Itb Clause 5.3 Should Have Been Completed Within The Last Four (4) Years Prior To The Deadline For The Submission And Receipt Of Bids. 10.3. If The Eligibility Requirements Or Statements, The Bids, And All Other Documents For Submission To The Bac Are In Foreign Language Other Than English, It Must Be Accompanied By A Translation In English, Which Shall Be Authenticated By The Appropriate Philippine Foreign Service Establishment, Post, Or The Equivalent Office Having Jurisdiction Over The Foreign Bidder’s Affairs In The Philippines. Similar To The Required Authentication Above, For Contracting Parties To The Apostille Convention, Only The Translated Documents Shall Be Authenticated Through An Apostille Pursuant To Gppb Resolution No. 13-2019 Dated 23 May 2019. The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 11. Documents Comprising The Bid: Financial Component 11.1. The Second Bid Envelope Shall Contain The Financial Documents For The Bid As Specified In Section Viii (checklist Of Technical And Financial Documents). 11.2. If The Bidder Claims Preference As A Domestic Bidder Or Domestic Entity, A Certification Issued By Dti Shall Be Provided By The Bidder In Accordance With Section 43.1.3 Of The 2016 Revised Irr Of Ra No. 9184. 11.3. Any Bid Exceeding The Abc Indicated In Paragraph 1 Of The Ib Shall Not Be Accepted. 11.4. For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Conditions Are Met Under Section 31.2 Of The 2016 Revised Irr Of Ra No. 9184. 11.5. [include If Framework Agreement Will Be Used:] Financial Proposals For Single Or Multi-year Framework Agreement Shall Be Submitted Before The Deadline Of Submission Of Bids As Prescribed In The Ib. For Multi-year Framework Agreement, Evaluation Of The Financial Proposal During This Stage Is For Purposes Of Determining Eligibility And Whether Or Not Such Financial Proposal Is Within The Abc. 12. Bid Prices 12.1. Prices Indicated On The Price Schedule Shall Be Entered Separately In The Following Manner: A. For Goods Offered From Within The Procuring Entity’s Country: I. The Price Of The Goods Quoted Exw (ex-works, Ex-factory, Ex-warehouse, Ex-showroom, Or Off-the-shelf, As Applicable); Ii. The Cost Of All Customs Duties And Sales And Other Taxes Already Paid Or Payable; Iii. The Cost Of Transportation, Insurance, And Other Costs Incidental To Delivery Of The Goods To Their Final Destination; And Iv. The Price Of Other (incidental) Services, If Any, Listed In E. B. For Goods Offered From Abroad: I. Unless Otherwise Stated In The Bds, The Price Of The Goods Shall Be Quoted Delivered Duty Paid (ddp) With The Place Of Destination In The Philippines As Specified In The Bds. In Quoting The Price, The Bidder Shall Be Free To Use Transportation Through Carriers Registered In Any Eligible Country. Similarly, The Bidder May Obtain Insurance Services From Any Eligible Source Country. Ii. The Price Of Other (incidental) Services, If Any, As Listed In Section Vii (technical Specifications). 12.2. [include If Framework Agreement Will Be Used:] For Framework Agreement, The Following Should Also Apply In Addition To Clause 12.1: A. For A Single Year Framework Agreement, The Prices Quoted By The Bidder Shall Be Fixed During The Bidder’s Performance Of The Contract And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. B. For A Multi-year Framework Agreement, The Prices Quoted By The Bidder During Submission Of Eligibility Documents Shall Be The Ceiling And The Price Quoted During Mini-competition Must Not Exceed The Initial Price Offer. The Price Quoted During Call For Mini-competition Shall Be Fixed During The Bidder’s Performance Of That Call-off And Not Subject To Variation Or Escalation On Any Account. Price Schedules Required Under Clause 12.1 Shall Be Submitted With The Bidding Documents. 13. Bid And Payment Currencies 13.1. For Goods That The Bidder Will Supply From Outside The Philippines, The Bid Prices May Be Quoted In The Local Currency Or Tradeable Currency Accepted By The Bsp At The Discretion Of The Bidder. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies, Shall Be Converted To Philippine Currency Based On The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 13.2. Payment Of The Contract Price Shall Be Made In: A. Philippine Pesos. 14. Bid Security 14.1. The Bidder Shall Submit A Bid Securing Declaration Or Any Form Of Bid Security In The Amount Indicated In The Bds, Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Schedule In The Bds. 14.2. The Bid And Bid Security Shall Be Valid Until [indicate Date]. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 14.3. [include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, Other Than The Grounds For Forfeiture Under The 2016 Revised Irr, The Bid Security May Also Be Forfeited If The Successful Bidder Fails To Sign The Framework Agreement, Or Fails To Furnish The Performance Security Or Performance Securing Declaration. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Posting Of Performance Security Or Performance Securing Declaration, As The Case May Be, By The Winning Bidder Or Compliant Bidders And The Signing Of The Framework Agreement. 15. Sealing And Marking Of Bids Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. The Procuring Entity May Request Additional Hard Copies And/or Electronic Copies Of The Bid. However, Failure Of The Bidders To Comply With The Said Request Shall Not Be A Ground For Disqualification. If The Procuring Entity Allows The Submission Of Bids Through Online Submission Or Any Other Electronic Means, The Bidder Shall Submit An Electronic Copy Of Its Bid, Which Must Be Digitally Signed. An Electronic Copy That Cannot Be Opened Or Is Corrupted Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. 16. Deadline For Submission Of Bids 16.1. The Bidders Shall Submit On The Specified Date And Time And Either At Its Physical Address Or Through Online Submission As Indicated In Paragraph 7 Of The Ib. 16.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, The Submission Of Bids Shall Be For The Initial Evaluation Of Their Technical And Financial Eligibility. Thereafter, Those Declared Eligible During The Said Initial Eligibility Evaluation And Entered Into A Framework Agreement With The Procuring Entity Shall Submit Anew Their Best Financial Offer At The Address And On Or Before The Date And Time Indicated In The Call For Each Mini-competition. 17. Opening And Preliminary Examination Of Bids 17.1. The Bac Shall Open The Bids In Public At The Time, On The Date, And At The Place Specified In Paragraph 9 Of The Ib. The Bidders’ Representatives Who Are Present Shall Sign A Register Evidencing Their Attendance. In Case Videoconferencing, Webcasting Or Other Similar Technologies Will Be Used, Attendance Of Participants Shall Likewise Be Recorded By The Bac Secretariat. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Rescheduling Requirements Under Section 29 Of The 2016 Revised Irr Of Ra No. 9184 Shall Prevail. 17.2. The Preliminary Examination Of Bids Shall Be Governed By Section 30 Of The 2016 Revised Irr Of Ra No. 9184. 18. Domestic Preference 18.1. The Procuring Entity Will Grant A Margin Of Preference For The Purpose Of Comparison Of Bids In Accordance With Section 43.1.2 Of The 2016 Revised Irr Of Ra No. 9184. 18.2. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, Determination Of Margin Of Preference Shall Be Conducted Every Call For Mini-competition. 19. Detailed Evaluation And Comparison Of Bids 19.1. The Procuring Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary Pass/fail Criteria. The Bac Shall Consider The Conditions In The Evaluation Of Bids Under Section 32.2 Of The 2016 Revised Irr Of Ra No. 9184. [include The Following Options If Framework Agreement Will Be Used:] A. In The Case Of Single-year Framework Agreement, The Lowest Calculated Bid Shall Be Determined Outright After The Detailed Evaluation; B. For Multi-year Framework Agreement, The Determination Of The Eligibility And The Compliance Of Bidders With The Technical And Financial Aspects Of The Projects Shall Be Initially Made By The Bac, In Accordance With Item 7.4.2 Of The Guidelines On The Use Of Framework Agreement. 19.2. If The Project Allows Partial Bids, Bidders May Submit A Proposal On Any Of The Lots Or Items, And Evaluation Will Be Undertaken On A Per Lot Or Item Basis, As The Case Maybe. In This Case, The Bid Security As Required By Itb Clause 15 Shall Be Submitted For Each Lot Or Item Separately. 19.3. The Descriptions Of The Lots Or Items Shall Be Indicated In Section Vii (technical Specifications), Although The Abcs Of These Lots Or Items Are Indicated In The Bds For Purposes Of The Nfcc Computation Pursuant To Section 23.4.2.6 Of The 2016 Revised Irr Of Ra No. 9184. The Nfcc Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 19.4. The Project Shall Be Awarded As Follows: Option 1 – One Project Having Several Items That Shall Be Awarded As One Contract. 19.5. Except For Bidders Submitting A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation, All Bids Must Include The Nfcc Computation Pursuant To Section 23.4.1.4 Of The 2016 Revised Irr Of Ra No. 9184, Which Must Be Sufficient For The Total Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. For Bidders Submitting The Committed Line Of Credit, It Must Be At Least Equal To Ten Percent (10%) Of The Abcs For All The Lots Or Items Participated In By The Prospective Bidder. 20. Post-qualification 20.1. [include If Framework Agreement Will Be Used:] For Multi-year Framework Agreement, All Bidders Initially Determined To Be Eligible And Financially Compliant Shall Be Subject To Initial Post-qualification. The Bac Shall Then Recommend The Execution Of A Framework Agreement Among All Eligible, Technically And Financially Compliant Bidders And The Procuring Entity And Shall Be Issued By Hope A Notice To Execute Framework Agreement. The Determination Of The Lowest Calculated Bid (lcb) Shall Not Be Performed By The Bac Until A Mini-competition Is Conducted Among The Bidders Who Executed A Framework Agreement. When A Call For Mini-competition Is Made, The Bac Shall Allow The Bidders To Submit Their Best Financial Proposals On Such Pre-scheduled Date, Time And Place To Determine The Bidder With The Lcb. 20.2. Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, {[include If Framework Agreement Will Be Used:] Or In The Case Of Multi-year Framework Agreement, That It Is One Of The Eligible Bidders Who Have Submitted Bids That Are Found To Be Technically And Financially Compliant,}the Bidder Shall Submit Its Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. {[include If Framework Agreement Will Be Used:] For Every Mini-competition In Framework Agreement, The Lcb Shall Likewise Submit The Required Documents For Final Post Qualification.} 21. Signing Of The Contract 21.1. The Documents Required In Section 37.2 Of The 2016 Revised Irr Of Ra No. 9184 Shall Form Part Of The Contract. Additional Contract Documents Are Indicated In The Bds. [include The Following Clauses If Framework Agreement Will Be Used:] 21.2. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Framework Agreement Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 21.3. Within Ten (10) Calendar Days From Receipt Of The Notice To Execute Framework Agreement With The Procuring Entity, The Successful Bidder Or Its Duly Authorized Representative Shall Formally Enter Into A Framework Agreement With The Procuring Entity For An Amount Of One Peso To Be Paid To The Procuring Entity As A Consideration For The Option Granted By The Procuring Entity To Procure The Items In The Framework Agreement List When The Need Arises. 21.4. The Procuring Entity Shall Enter Into A Framework Agreement With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 21.5. The Following Documents Shall Form Part Of The Framework Agreement: A. Framework Agreement Form; B. Bidding Documents; C. Call-offs; D. Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted (e.g., Bidder’s Response To Request For Clarifications On The Bid), Including Corrections To The Bid, If Any, Resulting From The Procuring Entity’s Bid Evaluation; E. Performance Security Or Performance Securing Declaration, As The Case May Be; F. Notice To Execute Framework Agreement; And G. Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 5.3 For This Purpose, Contracts Similar To The Project Shall Be: A. Motor Vehicle. B. Completed Within The Last Four (4) Years Equivalent To At Least Fifty Percent (50%) Of The Abc, Prior To The Deadline For The Submission And Receipt Of Bids. 7.1 Subcontracting Is Not Allowed 12 The Price Of The Goods Shall Be Quoted Ddp Bureau Of Corrections Nbp Reservation Muntinlupa City Or The Applicable International Commercial Terms (incoterms) For This Project. 14.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration, Or Any Of The Following Forms And Amounts: A. The Amount Of Not Less Than Two Percent (2%) Of Abc, If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; Or B. The Amount Of Not Less Than Five Percent (5%) Of Abc If Bid Security Is In Surety Bond. 19.3 One Project Having Several Items That Shall Be Awarded As One Contract. 20.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lowest Calculated Bid, The Bidder Shall Submit Its; 1. Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) 2. Supporting Documents For The Slcc (sales Invoice Or Official Receipt Or End-users Acceptance) 3. Certified True Copy Coming From The Issuing Agency Of Valid And Current Registration Certificate (sec Certificate Of Registration For Corporation Or Dti Certificate Of Registration For Sole Proprietorship Or Cda Certificate Of Registration For Cooperative) 4. Valid And Current Mayor’s Or Business Permit 5. Valid And Current Tax Clearance 6. Audited Financial Statement 7. 2 Sets Photo Copy Of Eligibility And Financial Envelope Marked As “copy 1” And “copy 2” 21.2 No Additional Contract Documents. Section Iv. General Conditions Of Contract 1. Scope Of Contract This Contract Shall Include All Such Items, Although Not Specifically Mentioned, That Can Be Reasonably Inferred As Being Required For Its Completion As If Such Items Were Expressly Mentioned Herein. All The Provisions Of Ra No. 9184 And Its 2016 Revised Irr, Including The Generic Procurement Manual, And Associated Issuances, Constitute The Primary Source For The Terms And Conditions Of The Contract, And Thus, Applicable In Contract Implementation. Herein Clauses Shall Serve As The Secondary Source For The Terms And Conditions Of The Contract. This Is Without Prejudice To Sections 74.1 And 74.2 Of The 2016 Revised Irr Of Ra No. 9184 Allowing The Gppb To Amend The Irr, Which Shall Be Applied To All Procurement Activities, The Advertisement, Posting, Or Invitation Of Which Were Issued After The Effectivity Of The Said Amendment. Additional Requirements For The Completion Of This Contract Shall Be Provided In The Special Conditions Of Contract (scc). 2. Advance Payment And Terms Of Payment 2.1. Advance Payment Of The Contract Amount Is Provided Under Annex “d” Of The Revised 2016 Irr Of Ra No. 9184. 2.2. The Procuring Entity Is Allowed To Determine The Terms Of Payment On The Partial Or Staggered Delivery Of The Goods Procured, Provided Such Partial Payment Shall Correspond To The Value Of The Goods Delivered And Accepted In Accordance With Prevailing Accounting And Auditing Rules And Regulations. The Terms Of Payment Are Indicated In The Scc. [include The Following Clauses If Framework Agreement Will Be Used:] 2.3. For A Single-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier In Its Bid. 2.4. For Multi-year Framework Agreement, Prices Charged By The Supplier For Goods Delivered And/or Services Performed Under A Call-off Shall Not Vary From The Prices Quoted By The Supplier During Conduct Of Mini-competition. 3. Performance Security Within Ten (10) Calendar Days From Receipt Of The Notice Of Award By The Bidder From The Procuring Entity But In No Case Later Than Prior To The Signing Of The Contract By Both Parties, The Successful Bidder Shall Furnish The Performance Security In Any Of The Forms Prescribed In Section 39 Of The 2016 Revised Irr Of Ra No. 9184.{[include If Framework Agreement Will Be Used:] In The Case Of Framework Agreement, The Bidder May Opt To Furnish The Performance Security Or A Performance Securing Declaration As Defined Under The Guidelines On The Use Of Framework Agreement.} 4. Inspection And Tests The Procuring Entity Or Its Representative Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Project {[include If Framework Agreement Will Be Used:] Or Framework Agreement} Specifications At No Extra Cost To The Procuring Entity In Accordance With The Generic Procurement Manual. In Addition To Tests In The Scc, Section Iv (technical Specifications) Shall Specify What Inspections And/or Tests The Procuring Entity Requires, And Where They Are To Be Conducted. The Procuring Entity Shall Notify The Supplier In Writing, In A Timely Manner, Of The Identity Of Any Representatives Retained For These Purposes. All Reasonable Facilities And Assistance For The Inspection And Testing Of Goods, Including Access To Drawings And Production Data, Shall Be Provided By The Supplier To The Authorized Inspectors At No Charge To The Procuring Entity. 5. Warranty 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. 5.2 The Procuring Entity Shall Promptly Notify The Supplier In Writing Of Any Claims Arising Under This Warranty. Upon Receipt Of Such Notice, The Supplier Shall, Repair Or Replace The Defective Goods Or Parts Thereof Without Cost To The Procuring Entity, Pursuant To The Generic Procurement Manual. 6. Liability Of The Supplier The Supplier’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. If The Supplier Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. Section V. Special Conditions Of Contract Special Conditions Of Contract Gcc Clause 1 [list Here Any Additional Requirements For The Completion Of This Contract. The Following Requirements And The Corresponding Provisions May Be Deleted, Amended, Or Retained Depending On Its Applicability To This Contract:] Delivery And Documents – For Purposes Of The Contract, “exw,” “fob,” “fca,” “cif,” “cip,” “ddp” And Other Trade Terms Used To Describe The Obligations Of The Parties Shall Have The Meanings Assigned To Them By The Current Edition Of Incoterms Published By The International Chamber Of Commerce, Paris. The Delivery Terms Of This Contract Shall Be As Follows: The Delivery Terms Applicable To This Contract Are Delivered To Bureau Of Corrections Nbp Reservation Muntinlupa City. Risk And Title Will Pass From The Supplier To The Procuring Entity Upon Receipt And Final Acceptance Of The Goods At Their Final Destination.” Delivery Of The Goods Shall Be Made By The Supplier In Accordance With The Terms Specified In Section Vi (schedule Of Requirements). For Purposes Of This Clause The Procuring Entity’s Representative At The Project Site Is The Acting Director, Directorate For Engineering Services. Incidental Services – The Supplier Is Required To Provide All Of The Following Services, Including Additional Services, If Any, Specified In Section Vi. Schedule Of Requirements: A. Furnishing Of A Detailed Operations And Maintenance Manual For Each Appropriate Unit Of The Supplied Goods; The Contract Price For The Goods Shall Include The Prices Charged By The Supplier For Incidental Services And Shall Not Exceed The Prevailing Rates Charged To Other Parties By The Supplier For Similar Services. Spare Parts – The Supplier Is Required To Provide All Of The Following Materials, Notifications, And Information Pertaining To Spare Parts Manufactured Or Distributed By The Supplier: A. Such Spare Parts As The Procuring Entity May Elect To Purchase From The Supplier, Provided That This Election Shall Not Relieve The Supplier Of Any Warranty Obligations Under This Contract; And B. In The Event Of Termination Of Production Of The Spare Parts: I. Advance Notification To The Procuring Entity Of The Pending Termination, In Sufficient Time To Permit The Procuring Entity To Procure Needed Requirements; And Ii. Following Such Termination, Furnishing At No Cost To The Procuring Entity, The Blueprints, Drawings, And Specifications Of The Spare Parts, If Requested. The Spare Parts And Other Components Required Are Listed In Section Vi (schedule Of Requirements) And The Cost Thereof Are Included In The Contract Price. The Supplier Shall Carry Sufficient Inventories To Assure Ex-stock Supply Of Consumable Spare Parts Or Components For The Goods For A Period Of [indicate Here The Time Period Specified. If Not Used Indicate A Time Period Of Three Times The Warranty Period]. Spare Parts Or Components Shall Be Supplied As Promptly As Possible, But In Any Case, Within [insert Appropriate Time Period] Months Of Placing The Order. Packaging – The Supplier Shall Provide Such Packaging Of The Goods As Is Required To Prevent Their Damage Or Deterioration During Transit To Their Final Destination, As Indicated In This Contract. The Packaging Shall Be Sufficient To Withstand, Without Limitation, Rough Handling During Transit And Exposure To Extreme Temperatures, Salt And Precipitation During Transit, And Open Storage. Packaging Case Size And Weights Shall Take Into Consideration, Where Appropriate, The Remoteness Of The Goods’ Final Destination And The Absence Of Heavy Handling Facilities At All Points In Transit. The Packaging, Marking, And Documentation Within And Outside The Packages Shall Comply Strictly With Such Special Requirements As Shall Be Expressly Provided For In The Contract, Including Additional Requirements, If Any, Specified Below, And In Any Subsequent Instructions Ordered By The Procuring Entity. The Outer Packaging Must Be Clearly Marked On At Least Four (4) Sides As Follows: Name Of The Procuring Entity Name Of The Supplier Contract Description Final Destination Gross Weight Any Special Lifting Instructions Any Special Handling Instructions Any Relevant Hazchem Classifications A Packaging List Identifying The Contents And Quantities Of The Package Is To Be Placed On An Accessible Point Of The Outer Packaging If Practical. If Not Practical The Packaging List Is To Be Placed Inside The Outer Packaging But Outside The Secondary Packaging. Transportation – Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip, Or Ddp, Transport Of The Goods To The Port Of Destination Or Such Other Named Place Of Destination In The Philippines, As Shall Be Specified In This Contract, Shall Be Arranged And Paid For By The Supplier, And The Cost Thereof Shall Be Included In The Contract Price. Where The Supplier Is Required Under This Contract To Transport The Goods To A Specified Place Of Destination Within The Philippines, Defined As The Project Site, Transport To Such Place Of Destination In The Philippines, Including Insurance And Storage, As Shall Be Specified In This Contract, Shall Be Arranged By The Supplier, And Related Costs Shall Be Included In The Contract Price. Where The Supplier Is Required Under Contract To Deliver The Goods Cif, Cip Or Ddp, Goods Are To Be Transported On Carriers Of Philippine Registry. In The Event That No Carrier Of Philippine Registry Is Available, Goods May Be Shipped By A Carrier Which Is Not Of Philippine Registry Provided That The Supplier Obtains And Presents To The Procuring Entity Certification To This Effect From The Nearest Philippine Consulate To The Port Of Dispatch. In The Event That Carriers Of Philippine Registry Are Available But Their Schedule Delays The Supplier In Its Performance Of This Contract The Period From When The Goods Were First Ready For Shipment And The Actual Date Of Shipment The Period Of Delay Will Be Considered Force Majeure. The Procuring Entity Accepts No Liability For The Damage Of Goods During Transit Other Than Those Prescribed By Incoterms For Ddp Deliveries. In The Case Of Goods Supplied From Within The Philippines Or Supplied By Domestic Suppliers Risk And Title Will Not Be Deemed To Have Passed To The Procuring Entity Until Their Receipt And Final Acceptance At The Final Destination. Intellectual Property Rights – The Supplier Shall Indemnify The Procuring Entity Against All Third-party Claims Of Infringement Of Patent, Trademark, Or Industrial Design Rights Arising From Use Of The Goods Or Any Part Thereof. 2.2 Not Applicable 4 The Inspections And Tests That Will Be Conducted Are: Partial/complete Goods Shall Be Inspected By The Tiac Technical Inspection And Acceptance Committee. Representative From Supply Division To Be Witnessed By: Coa Representative The Goods Shall Be Accepted By The End User After Passing The Inspection Of The Tiac (technical Inspection And Acceptance Committee). 5.1 In Order To Assure That Manufacturing Defects Shall Be Corrected By The Supplier, A Warranty Shall Be Required From The Supplier As Provided Under Section 62.1 Of The 2016 Revised Irr Of Ra No. 9184. Section Vi. Schedule Of Requirements Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Section Vi. Schedule Of Requirements Supply And Delivery Of Bucor Vehicles The Delivery Schedule Expressed As Weeks/months Stipulates Hereafter A Delivery Date Which Is The Date Of Delivery To The Project Site. Item Number Description Quantity Delivered, Weeks/months 1 Patrol And Search Vehicle 3 15 Calendar Days 2 Shuttle Service Van 3 15 Calendar Days I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Schedule. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Vii. Technical Specifications Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 1 Patrol And Search Vehicle Overall Dimensions L X W X H (mm): 5,645 X 1,855 X 2,415 Engine Transmission Model: 2gd-ftv (high) Type: 2.4l Diesel, 4-cylinder, 16-valve Dohc Variable Nozzle Turbo With Air-cooled Intercooler Displacement (cc) 2393cc Maximum Output (ps/rpm) 150/3,400 Maximum Torque (nm/rpm): 400/1,600῀2,000 Fuel Type: Diesel Emission Rating: Euro-4 Transmission: 6-speed Mt Chassis Suspension Front: Double Wishbone Rear: Leaf Spring Rigid Axle +rl Brakes Front: Ventilated Discs Rear: Drum Type Tires/wheels: 265/ 65 R17 Steel Exterior Headlamps: Multi-reflector Halogen Front Fog Lamps: Led Rear Combination Lamp: Bulb Outside Rear View Mirror: Power Features-power Adjust + Power Folr Windshield Wiper: Intermittent Over Fenders: Wide Interior Seat Material: Fabric Seat Type And Adjustment-front: D: 4-way Manual Adjust /p: 4-way Manual Adjust Multi-information Display (mid): 4.2"tft Steering Type: Power Steering + Variable Flow Control Steering Wheel Material: Urethane Switch Audio + Phone + Voice Command + Mid Siren Pa System Blinkers (top, Front And Rear) Inside Rear View Mirror: Day & Night Door Trim: Fabric + Silver Cup/ Bottle Holder Front Cup Holder: 4 + Bottle Holder: 2 Rear: Bottle Holder: 2 Illuminated Entry System With Function Keyless Entry Ignition System: Rotary Type Power Features Windows D: Auto Up/down + Jam Protect Tinted Windows Including Windshield (full Tint) Door Locks: Speed-sensing Air-conditioning System: Manual Control Audio System Type: 8" Display Audio Smartphone Connectivity: Apple Car Play + Android Auto + Smart Device Link (sdl) Function: Am/fm/bluetooth/usb Speakers: '4 Accessory Outlet (12v): '2 Safety & Security Srs Airbags: Driver + Front Passenger + Knee (dr) Abs (anti-lock Brake System) With + Brake Assist + Ebd Vehicle Stability Control (vsc) Hill-start Assist Control (hac) Seatbelts Front Seats: 3pt. Elr + Pretensioner +force Limiter Rear Seats: 3pt. Elr X 3 Emergency Brake Signal Vehicle Security System (vss): Immobilizer + Horn Camera: Reverse Camera Body Structure (dimension) Length: Approximately 6ft. Width: Cab Level Height: Approximately 5 Ft. Materials Bended G.i. Sheet #18 For Roofing Bended G.i. Sheet #16 For Post (4 Corner) And Side Skirt Stainless Sheet #14 For Floor Joist Stainless Checkered Flooring Other Features Acryl-pad Roof Ceiling Stainless Tube Passenger Assists Roof (hand Grab) Fixed Glass On Body Front Windows Acrylic Body Paint Folding/self Holding Bench Type Seat Assembly, Back-to-back Reversible Plastic Trapal With Snap All Around Blinkers (top, Front And Rear) Inside Rear View Mirror: Day & Night Door Trim: Fabric + Silver Cup/ Bottle Holder Front Cup Holder: 4 + Bottle Holder: 2 Rear: Bottle Holder: 2 Illuminated Entry System With Function Keyless Entry Ignition System: Rotary Type Power Features Windows D: Auto Up/down + Jam Protect Strobe Light On Top, Mounted At Cab Roof With Ski Rack Type Holder Additional Shackles On Both Side Body Painting Color: Camouflage Metal Treatment: Five Step Phosphating Process Primer: Zinchromate Yellow Primer Top Coat: Polyurethane 2k Paint (request By Client) Undercoat: Included Others: Warranty: Three (3) Years Or First 100,000kms. Whichever Comes First Registration: Lto Registration Under Bureau Of Corrections Insurance: Tpl & Comprehensive Insurance __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Patrol And Search Vehicle _________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Item Specification Statement Of Compliance 2 Shuttle Service Van Overall Length Mm: 4,4440 Overall Width Mm: 1,695 Overall Height Mm: 1,915 Wheel Base Mm: 2,350 Ground Clearance Mm: 195 Maximum Gross Vehicle Weight Kg:2,345 Curb Weight Kg: 1,130 Engine Type: (6n14) 2.2l 4 In-line 16-valve Dohc With Turbocharged Intercooler System Fuel System: Electric Common Ball Direct Injection Displacement Cc: 2268 Fuel Tank Capacity Liters: 55 Maximum Power Ps: 99.25/3500 Maximum Torque Nm: 200/1000-3500 Suspension Front: Independent Wishbone And Coil Spring Rear: Semi-espitic Leaf Spring Brakes Front: 10" Ventilated Disc Rear: 10" Leading And Trailing Drums Steering Gear Type: Ball And Nut Gear Type With Power Steering Steering Wheel: 2-spoke Polypropylene Tires: 185r14c - 8pr Wheels: 14 X 5.01 Steel Rims Other Modification: Body Color: Camouflage With Agency Name And Logo Inside Blinker Siren Others: Registration: Initial 3 Years Lto Registration Under Bureau Of Corrections Warranty: Three (3) Years Or 100,000kms. Whichever Comes First Tpl And Comprehensive Insurance • Bidder Must Have A Certificate Of Dealership • List Of Service Centers Nationwide • Certificate Of Availability Of Spare Parts • Brochure __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Technical Specifications Shuttle Service Van __________________________________________ Specify The Brand Name And Model Being Offered I/we Hereby Commit To Comply And Deliver All The Requirement In Accordance With The Above Stated Specifications. Conforme: Name Of Company In Print Signature Printed Name Of Authorized Representative Date Section Viii. Checklist Of Technical And Financial Documents Checklist Of Technical And Financial Documents I. Eligibility Component Envelope Class “a” Documents Legal Documents ⬜ (a) Valid Philgeps Registration Certificate (platinum Membership) (all Pages); Technical Documents ⬜ (b) Statement Of The Prospective Bidder Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any, Whether Similar Or Not Similar In Nature And Complexity To The Contract To Be Bid; And ⬜ (f) Statement Of The Bidder’s Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, Bidders Should Have Completed, Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project Equivalent To At Least Fifty Percent (50%) Of The Abc, Except Under Conditions Provided For In Sections 23.4.1.3 And 23.4.2.4 Of The 2016 Revised Irr Of Ra No. 9184, Within The Relevant Period As Provided In The Bidding Documents; And ⬜ Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And ⬜ (g) Original Copy Of Bid Security. If In The Form Of A Surety Bond, Submit Also A Certification Issued By The Insurance Commission; Or Original Copy Of Notarized Bid Securing Declaration; And (h) Conformity With The Schedule Of Requirements; And ⬜ (i) Conformity With The Technical Specifications, Which May Include Production/delivery Schedule, Manpower Requirements, And/or After-sales/parts, If Applicable; And A. Certificate Of Dealership B. List Of Service Centers Nationwide C. Certificate Of Availability Of Spare Parts D. Brochure And ⬜ (j) Original Duly Signed Omnibus Sworn Statement (oss); And If Applicable, Original Notarized Secretary’s Certificate/board Resolution In Case Of A Corporation, Partnership, Or Cooperative; Or Original Special Power Of Attorney Of All Members Of The Joint Venture Giving Full Power And Authority To Its Officer To Sign The Oss And Do Acts To Represent The Bidder. Financial Documents ⬜ (k) The Prospective Bidder’s Computation Of Net Financial Contracting Capacity (nfcc) At Least Equal To The Abc; Or A Committed Line Of Credit From A Universal Or Commercial Bank In Lieu Of Its Nfcc Computation At Least Equal To Ten Percent (10%) Of The Abc. Class “b” Documents ⬜ (l) If Applicable, A Duly Signed Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence; Or Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful. Each Partner Of The Joint Venture Shall Submit Their Respective Philgeps Certificates Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Eligibility Documents By Any Of The Joint Venture Partners Constitutes Compliance: Provided, That The Partner Responsible To Submit The Nfcc Shall Likewise Submit The Statement Of All Of Its Ongoing Contracts And Audited Financial Statements Ii. Financial Component Envelope ⬜ (m) Original Of Duly Signed And Accomplished Financial Bid Form; And ⬜ (n) Original Of Duly Signed And Accomplished Price Schedule(s). Bidding Forms Company Letterhead Statement Of Ongoing Government & Private Contracts Supply And Delivery Of Bucor Vehicles Statement Of All Its Ongoing Government And Or Private Contracts Including Contracts Awarded But Not Yet Started, If Any Whether Similar Or Not Similar In Nature. Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Value Of Outstanding Contract Total Value Of Outstanding Contract: Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Statement Of Single Largest Completed Contract Supply And Delivery Of Bucor Vehicles Statement Of Single (1) Largest Completed Contract Of Similar In Nature Within The Last Four (4) Years From The Date Of Submission And Receipt Of Bids Amounting To At Least Fifty Percent (50%) Of The Approved Budget Of The Contract (abc) Name Of Contract Date Of Contract Contract Duration Owner’s Name And Address Kind Of Goods Amount Of Contract Amount Of Completed Contracts, Adjusted By The Bidder To Current Prices Using Psa’s Consumer Price Index, If Necessary Date Of Delivery Certified Correct: Name And Signature Of Authorized Representative Position Date Company Letterhead Supply And Delivery Of Bucor Vehicles Certificate Of Net Financial Contracting Capacity (please Show Figures At How You Arrived At The Nfcc) This Is To Certify That Our Net Financial Contracting Capacity (nfcc) Is _____________________ (p____________) Which Is At Least Equal To The Total Ceiling Price We Are Bidding. The Amount Is Computed As Follows: (please Show Computation Of Nfcc) Nfcc = (ca-cl) (15) – C Where: Ca = Current Assets Cl = Current Liabilities C = Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Going Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project Note: The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Audited Financial Statement Submitted To The Bir. Issued This _________________day Of ________________, 2024 _______________________________________________ Name & Signature Of Authorized Representative ____________________ Position _______________ Date Company Letterhead Supply And Delivery Of Bucor Vehicles Republic Of The Philippines) City Of _______________________) S.s. X------------------------------------------------------x Bid Securing Declaration Invitation To Bid: [insert Reference Number] To: Bureau Of Corrections I/we, The Undersigned, Declare That: 1. I/we Understand That, According To Your Conditions, Bids Must Be Supported By A Bid Security, Which May Be In The Form Of A Bid-securing Declaration. 2. I/we Accept That: (a) I/we Will Be Automatically Disqualified From Bidding For Any Contract With Any Procuring Entity For A Period Of Two (2) Years Upon Receipt Of Your Blacklisting Order; And, (b) I/we Will Pay The Applicable Fine Provided Under Section 6 Of The Guidelines On The Use Of Bid Securing Declaration, Within Ten (10) Days From Receipt Of The Written Demand By The Procuring Entity For The Commission Of Acts Resulting To The Enforcement Of The Bid Securing Declaration Under Sections 23.1(b), 34.2, 40.1 And 69.1, Except 69.1(f), Of The Irr Of Ra 9184; Without Prejudice To Other Legal Action The Government May Undertake. 3. I/we Understand That This Bid Securing Declaration Shall Cease To Be Valid On The Following Circumstances: (a) Upon Expiration Of The Bid Validity Period, Or Any Extension Thereof Pursuant To Your Request; (b) I Am/we Are Declared Ineligible Or Post-disqualified Upon Receipt Of Your Notice To Such Effect, And (i) I/we Failed To Timely File A Request For Reconsideration Or (ii) I/we Filed A Waiver To Avail Of Said Right; (c) I Am/we Are Declared The Bidder With The Lowest Calculated Responsive Bid, And I/we Have Furnished The Performance Security And Signed The Contract. In Witness Whereof, I/we Have Hereunto Set My/our Hand/s This ____ Day Of [month] [year] At [place Of Execution]. ______________________________________________________ [insert Name Of Bidder’s Authorized Representative] _____________________________ [insert Signatory’s Legal Capacity] Affiant Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ Issued On ______________ At ___________________________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Bucor Vehicles Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Or Authorized Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: A) If A Sole Proprietorship: As The Owner And Sole Proprietor, Or Authorized Representative Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Bucor Vehicles Of The Bureau Of Corrections, As Shown In The Attached Duly Notarized Special Power Of Attorney; B) If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract For Supply And Delivery Of Bucor Vehicles Of The Bureau Of Corrections, As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate, Board/partnership Resolution, Or Special Power Of Attorney, Whichever Is Applicable;)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting ; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: The Owner Or Sole Proprietor Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7 [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The Supply And Delivery Of Bucor Vehicles. 9. [name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 2024 At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory Subscribed And Sworn To Before Me This ___ Day Of [month] [year] At [place Of Execution], Philippines. Affiant/s Is/are Personally Known To Me And Was/were Identified By Me Through Competent Evidence Of Identity As Defined In The 2004 Rules On Notarial Practice (a.m. No. 02-8-13-sc). Affiant/s Exhibited To Me His/her [insert Type Of Government Identification Card Used], With His/her Photograph And Signature Appearing Thereon, With No. ____________ And Issued On ____________________ At _____________________. Witness My Hand And Seal This ___ Day Of [month] [year]. Name Of Notary Public Serial No. Of Commission _______________ Notary Public For _______ Until __________ Roll Of Attorneys No. __________________ Ptr No. ______ [date Issued], [place Issued] Ibp No. ______ [date Issued], [place Issued] Doc. No. _____ Page No. _____ Book No. _____ Series Of _____ Company Letterhead Supply And Delivery Of Bucor Vehicles Bid Form Date: Invitation To Bid No: [insert Reference Number] To: Bids And Awards Committee Bureau Of Corrections Nbp Reservation Muntinlupa City Gentlemen And/or Ladies: Having Examined The Bidding Documents Including Bid Bulletin Numbers [insert Numbers], The Receipt Of Which Is Hereby Duly Acknowledged, We, The Undersigned, Offer To Supply And Delivery Of Bucor Vehicles In Conformity With The Said Bidding Documents For The Sum Of ________________________________________₱_________________ Or Such Other Sums As May Be Ascertained In Accordance With The Schedule Of Prices Attached Herewith And Made Part Of This Bid. We Undertake, If Our Bid Is Accepted, To Deliver The Goods In Accordance With The Delivery Schedule Specified In The Schedule Of Requirements. If Our Bid Is Accepted, We Undertake To Provide A Performance Security In The Form, Amounts, And Within The Times Specified In The Bidding Documents. We Agree To Abide By This Bid For The Bid Validity Period Specified In Bds Provision For Itb Clause 17.1 And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period. Commissions Or Gratuities, If Any, Paid Or To Be Paid By Us To Agents Relating To This Bid, And To Contract Execution If We Are Awarded The Contract, Are Listed Below: Name And Address Of Agent Amount And Currency Purpose Of Commission Or Gratuity (if None, State “none”) Until A Formal Contract Is Prepared And Executed, This Bid, Together With Your Written Acceptance Thereof And You’re Notice Of Award, Shall Be Binding Upon Us. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Bid You May Receive. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents. We Likewise Certify/confirm That The Undersigned, [for Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract, On The Latter’s Behalf For The Supply And Delivery Of Bucor Vehicles Of The Bureau Of Corrections. [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract On The Latter’s Behalf For Supply And Delivery Of Bucor Vehicles Of The Bureau Of Corrections. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Shall Be A Ground For The Rejection Of Our Bid. Dated This ________________ Day Of ________________ 2024. [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of ____________________________ Republic Of The Philippines Department Of Justice Bureau Of Corrections Muntinlupa City Schedule Of Prices Supply And Delivery Of Bucor Vehicles Quantity Units Agency Specification Abc Unit Price Total Bid Price Inclusive Of Vat 3 Units Patrol And Search Vehicle ₱8,865,000.00 3 Units Shuttle Service Van ₱2,424,000.00 Total: ₱11,289,000.00 Total Bid Price Inclusive Of Vat In Words [signature Over Printed Name] [in The Capacity Of] Duly Authorized To Sign Bid For And On Behalf Of _______________________________ Sixth Edition July 2020 Bids And Awards Committee 2024
Closing Date18 Nov 2024
Tender AmountPHP 11.2 Million (USD 194.9 K)

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|n743.18|wvq|7176054066|karen.a.palm.civ@us.navy.mil| item Unique Identification And Valuation (jan 2023)|19|no Fill Ins||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Sections C And E| inspection Of Supplies--fixed-price (aug 1996)|2|no Fills Ins|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo); Certifications - Stand-alone Receiving Report|n/a|tbd|n00104|tbd|material-s4306a; Certifications-n39040|n50286|tbd|133.2|n/a|n/a|s4306a - Material|n/a|n/a|see Dd14 23|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery||||| warranty Of Data--basic (mar 2014)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| the Closing Date Has Been Extended To 07 Nov 2024. \ 1. Please Disregard The Remarks Regarding First Article Testing (fat) On The Original Solicitation. This Item Does Not Require Fat. 2. Drawings Can Be Downloaded From Www.sam.gov. Search By The Solicitation Number. After Requesting Access, Send An Email To The Primary Poc Listed On The Solicitation. \ 1. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg. 2. The Resultant Award Of This Solicitation Shall Be Issued Bilaterally, Requiring The Contractors Written Acceptance Prior To Execution. 3. The Following Proposed Delivery Schedule Applies: first Article Test Report (fat) 180 Days After Date Of Contract review(approval/disapproval) Of Fat Report 90 Days After Receipt. submission Of Certification Data Cdrls Will Be On Or Before 20 Days Prior To Scheduleddelivery. Pnsy Review/acceptance Of Certification Cdrls 6 Working Days After Receipt Of Certification Dd 1423 Cdrls. final Delivery Of Material Will Be On Or Before 200 Days After Effective Date Of The Resulting Contract. 4. Any Contract Awarded As A Result Of This Solicitation Will Be Do Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). 5. This Solicitation Requires First Article Testing. See Far 52.209-3 First Article Approval Contractor Testing For More Details. 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. 2.2.3 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. drawing Data=5959306 |53711| E| |d|0001 | E|00026|0000000 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=astm-b150 | | | |190401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=mil-dtl-1222 | | |j |001208|a| | | document Ref Data=mil-std-2035 | | |a |950515|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a| 1| | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;bonnet Ring Union For Size 1 Inch Globe Valve To Be In Accordance With Navsea Drawing 803-5959306, Item 3, Part Number 803-5959306-2xx-03, Except As Amplified Or Modified Herein.; 3.2 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;bonnet Ring Union; material - ;astm-b150, Alloy C63200; 3.3 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;dye Penetrant Inspection Per Note 5.b(1) Of Drawing 803-5959306; item - ;bonnet Ring Union; performance - T9074-as-gib-010/271 acceptance - Mil-std-2035 3.4 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel Applications, or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification Data Must Be submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.5 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.6 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.6.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.6.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.6.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.7 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.7.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. 3.8 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.9 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.9.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide A copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.9.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.9.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.10 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. ^ Quality Assurance Requirements ^ 3.11 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.12 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.12.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.12.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'') 3.12.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The contract. 3.12.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.12.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.12.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.12.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.12.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.12.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.12.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.12.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.12.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.13 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-4 3.13.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.13.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.13.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.13.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly Notify the Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.13.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.14 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.14.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.14.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.15 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.15.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.15.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.15.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.15.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.15.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.16 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.16.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.16.2 Inspection For Completeness And Proper Type. 3.16.3 Verification Of Material Quality Received. 3.16.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.16.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.16.6 Identification And Protection From Improper Use Or Disposition. 3.16.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.16.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.16.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.17 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.17.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.18 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.18.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.18.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.18.3 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking Area To Be As Shown On Drawing.; 3.19 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.19.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.19.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, The original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Marking Used With The Altered Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number ____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.19.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And contract Requirements. Transcription Of Certification Data Is Prohibited. 3.19.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.19.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.20 Material Handling - The Written Material Control Process Must Include The Following: 3.20.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.20.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.20.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.20.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.20.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.20.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.21 Receiving Inspection - 3.21.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.21.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.22 Discrepancy Reporting - 3.22.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.23 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.23.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.23.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.23.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.23.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.24 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- 10/20/2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 20 2022 - Removed Requirement For Vender To Submit Waivers/deviations In Ecds - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.1, 10.2.2, 10.2.3, 10.3, And 10.4 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance. date Of First Submission=asreq block 4 - Paragraphs 10.2.2, 10.2.3, 10.2.4, And 10.3 Of Di-misc-80678 Do Not Apply. block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wawf_notification@navy.mil no Material Is To Be Shipped Prior To The Receipt Of Acceptance.
Closing Soon7 Nov 2024
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|see Specification Section C| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice & Receiving Report (combo) Certifications - Stand-alone Receiving Report |material - Inspection & Acceptance At Source Certifications - Inspection At Destination & Acceptance At Other |tbd |n00104|tbd|certifications - N39040; Material -s4306a |n50286|tbd|133.2|na|na|certifications N39040|na|na|see Dd Form 1423|port_ptnh_wawf_notification@navy.mil| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From The Date Of Delivery |one Year From The Date Of Delivery ||||| warranty Of Data--basic (mar 2014)|2||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (nov 2023)|13|||||||||||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (feb 2024)|13|334514|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| this Amendment Is Issued To Extend The Closing Date To 20nov2024. poc Updated To Benjamin.t.spangler.civ@us.navy.mil \ 1. The Resultant Award Of This Solicitation Will Be Issued Bilaterally, Requiring The Contractor's Written Acceptance Prior To Execution. 2. Any Contract/order Awarded As A Result Of This Solicitation Will Be A "do" Rated Order Certified For National Defense Use Under The Defense Priorities And Allocations System (dpas). See 52.211-14, Notice Of Priority Rating For National Defense, Emergency preparedness, And Energy Program Use. 3. If Drawings Are Included In The Solicitation, Access Must Be Requested On The Individual Solicitation Page On Contract Opportunities Via The Government's Sam.gov Website. Include Your Cage Code In Your Request. 4. Unless Otherwise Stated On The Dd1423, Submission Of Dd1423 Certification Data (cdrls) Will Be On Or Before 20 Days Prior To The Material Delivery Date. Pnsy Review/acceptance Of Cdrls Shall Be 6 Working Days After Receipt Of Cdrls. Final Delivery Of Material will Be On Or Before 365 Days After The Effective Date Of The Contract. \ 1. Scope 1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material. 2. Applicable Documents 2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order, however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained. 2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions. 2.2.1 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009, r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract. 2.2.2 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order. 2.2.3 Documents, Drawings, And Publications Supplied Are Listed Under "drawing Number". These Items Should Be Retained Until An Award Is Made. drawing Data=2620-063x01 |96169| Z| |d|0001 | Z|49998|1188959 drawing Data=2620-063x01 |96169| Z| |d|0002 | K|49998|0055092 drawing Data=2620-063x01 |96169| Z| |d|0002.1 | U|49998|0051784 drawing Data=2620-063x01 |96169| Z| |d|0002.2 | Z|49998|0041964 drawing Data=2620-063x01 |96169| Z| |d|0003 | Z|49998|0050739 drawing Data=2620-063x01 |96169| Z| |d|0003.1 | Y|49998|0061088 drawing Data=2620-063x01 |96169| Z| |d|0004 | E|49998|0025743 drawing Data=2620-063x01 |96169| Z| |d|0005 | V|49998|0034080 drawing Data=2620-063x01 |96169| Z| |d|0006 | E|49998|0024816 drawing Data=2620-063x01 |96169| Z| |d|0007 | T|49998|0023186 drawing Data=2620-063x01 |96169| Z| |d|0008 | Z|49998|0031671 drawing Data=2620-063x01 |96169| Z| |d|0009 | E|49998|0013277 drawing Data=2620-063x01 |96169| Z| |d|0010 | G|49998|0052230 drawing Data=2620-063x01 |96169| Z| |d|0011 | V|49998|0026855 drawing Data=2620-063x01 |96169| Z| |d|0012 | L|49998|0019598 drawing Data=2620-063x01 |96169| Z| |d|0014 | N|49998|0023569 drawing Data=2620-063x01 |96169| Z| |d|0015 | N|49998|0026756 drawing Data=2620-063x01 |96169| Z| |d|0016 | Y|49998|0040392 drawing Data=2620-063x01 |96169| Z| |d|0017 | W|49998|0026167 drawing Data=2620-063x01 |96169| Z| |d|0019 | S|49998|0043231 drawing Data=2620-063x01 |96169| Z| |d|0020 | R|49998|0027157 drawing Data=2621-625-03 |96169|al| |d|0001 |al|00026|0000000 drawing Data=2621-826-01 |96169| L| |d|0001 | L|49998|0056754 drawing Data=2621-826-01 |96169| L| |d|0001.1 | K|49998|0087603 drawing Data=2621-826-01 |96169| L| |d|0001.2 | F|49998|0048315 drawing Data=2621-826-01 |96169| L| |d|0001.3 | K|49998|0040831 drawing Data=2621-826-01 |96169| L| |d|0002 | J|49998|0115015 drawing Data=2621-826-01 |96169| L| |d|0002.1 | L|49998|0078365 drawing Data=2621-826-01 |96169| L| |d|0003 | L|49998|0095443 drawing Data=2621-826-01 |96169| L| |d|0003.1 | L|49998|0061346 drawing Data=2621-826-01 |96169| L| |d|0004 | J|49998|0049359 drawing Data=2621-826-01 |96169| L| |d|0004.1 | J|49998|0055857 drawing Data=2621-826-01 |96169| L| |d|0004.2 | G|49998|0056977 drawing Data=2621-826-01 |96169| L| |d|0005 | G|49998|0045921 drawing Data=2621-826-01 |96169| L| |d|0005.1 | J|49998|0051959 drawing Data=2621-826-01 |96169| L| |d|0005.2 | J|49998|0026953 drawing Data=2621-826-01 |96169| L| |d|0006 | J|49998|0039854 drawing Data=2621-826-01 |96169| L| |d|0006.1 | J|49998|0049544 drawing Data=2621-826-01 |96169| L| |d|0007 | J|49998|0055631 drawing Data=2621-826-01 |96169| L| |d|0007.1 | J|49998|0043854 drawing Data=2621-826-01 |96169| L| |d|0008 | L|49998|0057162 drawing Data=2621-826-01 |96169| L| |d|0009 | J|49998|0038265 drawing Data=2621-826-01 |96169| L| |d|0009.1 | J|49998|0046414 drawing Data=2621-826-01 |96169| L| |d|0010 | J|49998|0055882 drawing Data=2621-826-01 |96169| L| |d|0011 | J|49998|0038680 drawing Data=2621-826-01 |96169| L| |d|0011.1 | J|49998|0048318 drawing Data=2621-826-01 |96169| L| |d|0012 | J|49998|0054340 drawing Data=2621-826-01 |96169| L| |d|0013 | -|49998|0042497 drawing Data=2621-826-01 |96169| L| |d|0014 | J|49998|0041679 drawing Data=2621-826-01 |96169| L| |d|0014.1 | J|49998|0045464 drawing Data=2621-826-01 |96169| L| |d|0015 | J|49998|0065125 drawing Data=2621-826-01 |96169| L| |d|0016 | J|49998|0050107 drawing Data=2621-826-01 |96169| L| |d|0017 | J|49998|0056740 drawing Data=2621-826-01 |96169| L| |d|0020 | J|49998|0039272 drawing Data=2621-826-01 |96169| L| |d|0020.1 | J|49998|0052709 drawing Data=2621-826-01 |96169| L| |d|0021 | J|49998|0051755 drawing Data=2621-826-01 |96169| L| |d|0022 | J|49998|0050796 drawing Data=2621-826-01 |96169| L| |d|0023 | J|49998|0055526 drawing Data=2621-826-01 |96169| L| |d|0024 | J|49998|0051328 drawing Data=2621-826-01 |96169| L| |d|0025 | J|49998|0051540 drawing Data=2621-826-01 |96169| L| |d|0026 | J|49998|0051775 drawing Data=2621-826-01 |96169| L| |d|0027 | J|49998|0051245 drawing Data=2621-826-01 |96169| L| |d|0028 | J|49998|0051640 drawing Data=2621-826-01 |96169| L| |d|0029 | J|49998|0051471 drawing Data=2621-826-01 |96169| L| |d|0030 | J|49998|0052425 drawing Data=2621-826-01 |96169| L| |d|0031 | J|49998|0053087 drawing Data=2621-826-01 |96169| L| |d|0032 | J|49998|0052840 drawing Data=2621-826-01 |96169| L| |d|0033 | J|49998|0053676 drawing Data=2621-826-01 |96169| L| |d|0034 | J|49998|0041353 drawing Data=2621-826-01 |96169| L| |d|0034.1 | J|49998|0054701 drawing Data=2621-826-01 |96169| L| |d|0035 | J|49998|0045398 drawing Data=2621-826-01 |96169| L| |d|0035.1 | J|49998|0041062 drawing Data=2621-826-01 |96169| L| |d|0036 | J|49998|0039718 drawing Data=2621-826-01 |96169| L| |d|0036.1 | J|49998|0054579 drawing Data=2621-826-01 |96169| L| |d|0037 | J|49998|0050272 drawing Data=2621-826-01 |96169| L| |d|0038 | J|49998|0040014 drawing Data=2621-826-01 |96169| L| |d|0038.1 | J|49998|0056214 drawing Data=2621-826-01 |96169| L| |d|0039 | J|49998|0055923 drawing Data=2621-826-01 |96169| L| |d|0040 | J|49998|0066638 drawing Data=2621-826-01 |96169| L| |d|0041 | K|49998|0037606 drawing Data=2621-826-01 |96169| L| |d|0041.1 | K|49998|0051430 drawing Data=2621-826-01 |96169| L| |d|0042 | K|49998|0043620 drawing Data=2621-826-01 |96169| L| |d|0043 | L|49998|0041012 drawing Data=2621-826-01 |96169| L| |d|0043.1 | L|49998|0037785 drawing Data=2621-826-01 |96169| L| |d|0043.2 | L|49998|0037958 drawing Data=2621-826-01 |96169| L| |d|0044 | L|49998|0046862 drawing Data=2621-826-01 |96169| L| |d|0044.1 | L|49998|0041040 document Ref Data=fed-std-h28 | | |b |190424|a| | | document Ref Data=fed-std-h28 |0020| |b |941221|a| |01| document Ref Data=ansi/asq Z1.4 | | | |080101|a| | | document Ref Data=qq-n-281 | | |d |851023|a|2 | | document Ref Data=astm-b369 | | | |200401|a| | | document Ref Data=mil-std-792 | | |f |060519|a| | | document Ref Data=sae Ams 5520 | | |e |980401|a| | | document Ref Data=iso_9001 | | | |081115|a| | | document Ref Data=iso10012 | | | |030415|a| | | document Ref Data=iso/iec 17025 | | | |050515|a| | | document Ref Data=mil-i-45208 | | |a |810724|a|1 | | document Ref Data=mil-std-45662 | | |a |880801|a| | | document Ref Data=a-a-59004 | | |b |081118|a| | | document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | | document Ref Data=0900-lp-001-7000 | | | |810101|c| |01| document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | | document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | | document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | | 3. Requirements 3.1 ;the Venturi Meter Must Be Made In Accordance With General Dynamics Electric Boat Division Drawing 2621-826-01 Assembly 43a, Except As Amplified Or Modified Herein.; 3.2 ;retainer Ring From Assembly 43a Of Drawing 2621-826-01 Must Be Made From Sae Ams 5520.; 3.3 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise: part - ;venturi Body, Piece 44a Of Drawing 2621-826-01; material - ;astm B369, Uns C96400; part - ;venturi Valve, Piece 8a Of Drawing 2621-826-01; material - ;qq-n-281 With Mechanical Properties In Accordance With Note 18 Of Drawing 2621-826-01; part - ;hex Head Plug, Piece 7a Of Drawing 2621-625-03; material - ;qq-n-281 With Mechanical Properties In Accordance With Note 16 Of Drawing 2621-625-03; 3.4 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As listed Below. test - Non-destructive Tests item - ;weld Repair And/or Production Weld (as Applicable); performance - Per Applicable Fabrication Specification acceptance - Per Applicable Fabrication Specification test - ;hydrostatic Pressure Test; item - ;venturi Body, Piece 44a Of Drawing 2621-826-01; performance - ;note 9 Of Drawing 2621-826-01; acceptance - ;note 9 Of Drawing 2621-826-01; test - Weldability Test Of Astm-b369 Material item - ;venturi Body, Piece 44a Of Drawing 2621-826-01; performance - Astm-b369 acceptance - Astm-b369 test - Dye Penetrant Inspection part - Body Weld Ends In Final Machined Condition Including 1/2" Of Base Material performance - T9074-as-gib-010/271 acceptance - S9074-ar-gib-010a/278 3.5 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The following Must Be Used: For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig. For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig. For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig. the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This contract, The Following Must Be Used: For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes. For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes. For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes. 3.6 Specification Change - For Qq-n-281, Class B Material: 1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply. 2 - When Starting Material Is Round Bar Greater Than 3" Dia, The Mechanical Properties Of Hex Bar Apply. 3.7 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General Acceptance criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided In The applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria. The Gac document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/ 3.8 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent inspection In Accordance With Asme B1 Series Is Acceptable. 3.8.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement. 3.8.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System 22 of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222. 3.8.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System. 3.9 Thread Lubricant - Thread Lubricants Containing Molybdenum Disulfide Must Not Be Used On This Material. Bacteria In Water, Especially Seawater, Causes Molybdenum Disulfide To Break Down. The By-products Of The Breakdown Form Compounds Which Attack The fasteners. Anti-galling Compound A-a-59004 Must Be Used As A Replacement When Thread Lubricant Is Required For Assembly. 3.10 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable. 3.11 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing. 3.12 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document, including Any/all Invoked Specifications And Drawings. 3.13 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format. definitions Are Provided Elsewhere In The Contract/purchase Order. 3.13.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below. A. A Complete Description Of The Contract Requirement Affected And The Nature Of The Waiver/deviation (non-conformance), Including A Classification Of Critical, Major, Or Minor. B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This Configuration. C. Any Impacts To Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel Or Impacts To The Operational Use Of The Product. D. Information About Remedial Action Being Taken To Prevent Reoccurrence Of The Non-conformance. 3.13.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email. 3.13.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information: A. The Change Priority, Change Classification (class I Or Class Ii), And Change Justification. B. A Complete Description Of The Change To Be Made And The Need For That Change. C. A Complete Listing Of Other Configuration Items Impacted By The Proposed Change And A Description Of The Impact On Those Cis. D. Proposed Changes To Documents Controlled By The Government. E. Proposed Serial/lot Number Effectivities Of Units To Be Produced In, Or Retrofitted To, The Proposed Configuration. F. Recommendations About The Way A Retrofit Should Be Accomplished. G. Impacts To Any Logistics Support Elements (such As Software, Manuals, Spares, Tools, And Similar) Being Utilized By Government Personnel In Support Of The Product. H. Impacts To The Operational Use Of The Product. I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change. J. Milestones Relating To The Processing And Implementation Of The Engineering Change. 3.14 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection. 3.15 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further application Of The Above Documents Is Prohibited.prohibited. 3.15.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract. ^ Quality Assurance Requirements ^ 3.16 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected, identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer. 3.17 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012 or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate. 3.17.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality requirements Established In The Contract/purchase Order. 3.17.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative. 3.17.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement. 3.17.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately. 3.17.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption. 3.18 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected. 3.18.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition. 3.18.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided by The Government Representative. 3.19 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately." 3.19.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document. 3.19.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services specified In The Purchase Order Or Contract. 3.19.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The purchased Product On The End Item Represented By This Contract. 3.19.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be established. Records Of This Effort Must Be Available For Review By The Government. 3.19.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier. 3.20 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following: 3.20.1 Visual Examination Upon Receipt To Detect Damage During Transit. 3.20.2 Inspection For Completeness And Proper Type. 3.20.3 Verification Of Material Quality Received. 3.20.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage. 3.20.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation. 3.20.6 Identification And Protection From Improper Use Or Disposition. 3.20.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And necessity For Withholding The Material From Use. 3.20.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On bailed Property Must Be Maintained. 3.20.9 Material Returned To The Contractor Must Be Handled As Gfm. 3.21 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3, section C Of This Contract/purchase Order. 3.21.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order. 3.22 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component. 3.22.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing. 3.22.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And the Tag Securely Affixed To The Material. 3.22.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part number, Piece Number, Traceability Number, And The Location Of The Permanent Mark. 3.22.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ; ; 3.23 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply: 3.23.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The material Supplied. 3.23.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered, the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below. traceability Marking ________________________________________________ (marking On Finished Item) is Fabricated From Raw Material Identified To heat/lot Number ______________ And Heat Treat Number _____________________ (when Applicable) _________________________________________ Date _____________________ (name And Signature Of Auth. Co. Rep.) 3.23.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract requirements. Transcription Of Certification Data Is Prohibited. 3.23.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable. 3.23.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected. 3.24 Material Handling - The Written Material Control Process Must Include The Following: 3.24.1 All Raw Materials Must Have Traceability Markings (except As Specified Below). 3.24.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability. 3.24.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process. 3.24.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors. 3.24.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material. 3.24.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing. 3.25 Receiving Inspection - 3.25.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To another Location. 3.25.2 Receiving Inspection Must Include As A Minimum - verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports. verification That Certification Test Reports Are Legible And Complete. verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements. 3.26 Discrepancy Reporting - 3.26.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar). 3.27 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance. 3.27.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code), table Iia (for Sample Size). small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot. 3.27.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above. 3.27.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification test Reports Must Also Be 100% Inspected For Completeness And Legibility. 3.27.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible. 3.28 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As part Of The Certification Oqe Package Submitted By The Contractor. note: These Requirements Do Not Apply To Tack/spot Welds. 3.28.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair). 3.28.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted, citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'') 3.28.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The contract. 3.28.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application. 3.28.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual agreement Between The Vendor And Dcma. 3.28.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted as Part Of The Qualification Data. 3.28.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element. 3.28.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278. 3.28.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval. 3.28.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf. 3.28.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following: a) Filler Metal Lot Number(s) b) Specification And Type c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements. d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption. 3.28.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor. 3.29 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information: 1. Contractor's Name, Address And Date. 2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12) 3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic (for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable). 4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable). 5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable). 6. Manufacturer's Compound Number ("n/a" When Not Applicable). 7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable). 8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed satisfactorily. 9. Contractor's Or Authorized Personnel's Signature. 4. Quality Assurance 4.1 Notes To Dcma Qar And The Contractor - 4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition. 4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco. 4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements. 4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders. 4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At: https://register.nslc.navy.mil/ 5. Packaging 5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item. 6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd (contract Support Document) Library Within Ecds. 6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life. 6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation). 6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements. 6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program. 6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The contracting Agency As Important, Are Observed And Evaluated. 6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government representative Prior To Shipment. 6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied conforms To The Specified Requirements. 6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits, center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order. 6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated. 6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement. 6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following: - The Requirements Of This Contract/purchase Order. - Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.). - Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards. - Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government. 6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is or After Repair By An Approved Method. 6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method. 6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety. 6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving: - Performance - Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts - Health Or Safety - Effective Use Or Operation - Weight, Stability, Or Structural Integrity - System Design Parameters As Schematics, Flows, Pressures Or Temperatures - Compartment Arrangements Or Assigned Function 6.1.17 Minor Waiver/deviation - This Waiver/deviation Consists Of A Departure Which Does Not Involve Any Of The Factors Listed As Critical Or Major. 6.1.18 Engineering Change (ec) - A Change To The Current Approved Configuration Documentation Of A Configuration Item At Any Point In The Life Cycle Of The Item. 6.1.19 Engineering Change Proposal (ecp) - A Proposed Engineering Change And The Documentation By Which The Change Is Described, Justified, And Submitted To The Government For Approval Or Disapproval. 6.1.20 Class I Ecp - A Class I Ecp Is Approved By The Government's Configuration Control Board And Authorized With A Contract Modification. 6.1.21 Class Ii Ecp - A Class Ii Change Is Typically Reviewed For Concurrence In Classification By The Local Government Representative, Unless Otherwise Specified Elsewhere In The Contract/purchase Order. 6.2 In Accordance With Opnavinst 5510.1 All Documents And Drawings Provided By The U.s. Navy To Perspective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. 6.2.1 There Are 7 (seven) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. x... Distribution Is Authorized To Us Government Agencies And Private Individuals Or Enterprises Eligible To Obtain Export Controlled Technical Data In Accordance With Opnavinst 5510.161. 6.3 Ordering Information For Document References - The Department Of Defense Single Stock Point (dodssp), Website Http://www.dsp.dla.mil/, Provides Product Information For The Department Of Defense Index Of Specifications And Standards (dodiss) (i.e.military/federal Specifications And Standards), Data Item Descriptions (dids), And Other Dodssp Products. Most Specifications Can Obtained Directly From Http://quicksearch.dla.mil/ a. Availability Of Cancelled Documents - The Dodssp Offers Cancelled Documentsthat Are Required By Private Industry In Fulfillment Of Contractual Obligationsin Paper Format. Documents Can Be Requested By Phoning The Subscription Services Desk. b. Commercial Specifications, Standards, And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. Theymay Be Obtained From The Publishers Of The Applicable Societies. c. Ordnance Standards (os), Weapons Specifications (ws), And Navord Ostd 600 Pages - These Type Publications May Be Obtained By Submitting A Request To: commander, Indian Head Division, Naval Surface Warfare Center code 8410p, 101 Strauss Avenue indian Head, Md 20640-5035 d. On Post-award Actions, Requests For "official Use Only" And "noforn" (not Releasable To Foreign Nationals) Documents Must Identify The Government Contractnumber, And Must Be Submitted Via The Cognizant Defense Contract Management Command (dcmc) For certification Of Need For The Document. On Pre-award Actions Such Requests Must Be Submitted To The Pco For Certification Of Need For The Document. e. Noforn Military Specifications And Standards (including Amendments, Change Notices And Supplements, But Not Interim Changes) To Be Ordered From: contracting Officer navsup-wss code 87321 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 f. Nuclear Reactor Publications Assigned Navsea Documents And Identification Numbers (i.e. Navsea Welding Standard, Navsea 250-1500-1) Are To Be Ordered Enue: commanding Officer navsup-wss code 009 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 g. Technical Manuals Assigned Navsea Identification Numbers (i.e. Navsea Welding And Brazing Procedure, Navsea S9074-aq-gib-010/248) Are To Be Ordered From: commanding Officer navsup-wss code 1 Support Branch 700 Robbins Avenue philadelphia, Pa. 19111-5094 h. Interim Changes And Classified Specifications Must Be Obtained By Submitting A Request On Dd Form 1425 To Navsup-wss. 6.4 Recent Updates - A Short Description Of Recent Updates To The Technical Requirements Of This Item Are Listed Below, Along With An Implementation Date For Each Issue. The Notes Below Are Only A Generic Quick Reference And Are Provided For Convenience only, Detailed Requirements Will Be Defined Elsewhere In The Technical Sections Of This Contract/purchase Order. ;- Oct 20 2016 - Updated Ecds Url - Feb 26 2009 - Clarified Testing And Certs Only Apply To Pieces Listed - Oct 29 2010 - Added Sampling Std For Li In-process Testing - Sep 30 2008 - Thread Inspection Requirements Were Clarified - Dec 17 2011 - Began Using Ecds For Submissions - Jan 05 2012 - Added Wawf To Forward Approved Waivers/deviations With Final Oqe - Dec 17 2011 - Moved Quality Assurance Text Location For Readability - Apr 15 2009 - Clarified The Sample Size For Large And Small Lot Sizes - Jan 19 2011 - Added Notification Of Dcma Upon Contract Award - May 02 2009 - Added Lubricants And Sealants To The C Of C - Aug 27 2014 - Took Out Contractor's Phone Number Requirement - Dec 01 2011 - Moved "notes To Dcma Qar" To Qa Section - Jan 5 2017 - Ecds/csd Info Was Added To Definitions In The Notes Section; date Of First Submission=asreq paragraph 10.4 Of Di-qcic-81110 Does Not Apply. date Of First Submission=asreq block 12 - Certification Data Must Be Submitted To Portsmouth Naval Shipyard For Review And Acceptance Prior To Each Shipment Of Material. Certification Documentation Must Be Submitted Via Wawf (wide Area Work Flow). enter In Wawf As Follows: "ship To" N50286 "inspect By" N39040 "accept By" N39040 and Email Notification Field: Port_ptnh_wa
Closing Date20 Nov 2024
Tender AmountRefer Documents 
3261-3270 of 3276 active Tenders