All Tenders

All Tenders

Community of Communes Lyon Saint Exupéry En Dauphiné Tender

Others
France
Closing Date3 Mar 2025
Tender AmountRefer Documents 
Supply of new wheeled bins and collection of used wheeled bins for recycling

Public Works Department - PWD Tender

Works
Bangladesh
Closing Date13 Feb 2025
Tender AmountRefer Documents 
180/d-4/vi Of 2024-25

Amgueddfa Cymru National Museum Wales Tender

Others...+2Civil And Construction, Civil Works Others
United Kingdom
Closing Date17 Feb 2025
Tender AmountRefer Documents 
Interpretation And Exhibition Design - Riba 4-7 - Redevelopment Of National Slate Museum, Ll

Public Works Department - PWD Tender

Works
Bangladesh
Closing Date20 Feb 2025
Tender AmountRefer Documents 
190/d-4/vi Of 2024-25

Prince Sultan Cardiac Center Tender

Saudi Arabia
Closing Soon2 Feb 2025
Tender AmountRefer Documents 
Suture Polyester 2-0 Non Absorbable 25mm Needle Braided

KazMunayGas Aero Limited Liability Partnership Tender

Kazakhstan
Closing Soon5 Feb 2025
Tender AmountKZT 120 K (USD 230)
Banner Matte

The Kingdom Of Sardinia Tender

Italy
Closing Soon4 Feb 2025
Tender AmountEUR 72.12915 (USD 75)
From Nursery Schools to Universities Investment 1.4: Extraordinary Intervention Aimed at Reducing Territorial Gaps in Lower and Upper Secondary Schools and Fighting School Dropout. Tutoring and Training Interventions to Reduce Gaps in Learning and Combat School Dropout (Ministerial Decree 2 February 2024, No. 19).

Montanna Department Of Administration Tender

Civil And Construction...+1Road Construction
United States
Closing Date25 Feb 2025
Tender AmountRefer Documents 
Courtesy Posting- Road Stability Evaluation And Remediation Study Canal Road

Offizielle Bezeichnung Gemeindevorstand Der Gemeinde Haina Kloster Tender

Civil And Construction...+2Others, Civil Works Others
Germany
Closing Date21 Feb 2025
Tender AmountRefer Documents 
Restricted invitation to tender with public participation competition Vob/a carpentry and timber construction work 1. The construction project involves the new extension of the fire station with 4 vehicle parking spaces and the necessary social rooms. The existing building will be partially demolished and ... More1. The construction project involves the new extension of the fire station with 4 vehicle parking spaces and the necessary social rooms. The existing building will be partially demolished and rebuilt. For the vehicle hall, the additional base including the foundation and upstands will be built using solid construction. The social wing on the ground floor and the building dividing wall to the hall will be rebuilt using solid construction. The upper floor of the social wing and the roof and walls of the vehicle hall will be built using timber construction. The "sports center" part of the existing building will be retained and in use during the construction period. Fire brigade access roads, the access to the building yard (fire brigade location during construction) and escape and rescue routes must be kept clear throughout the entire construction phase, see appendix. Everything else must be agreed upon with the construction management, particularly exceptions. 2. During the project, some work may be carried out by building yard employees and fire brigade members on their own. This may result in various items being eliminated altogether or quantities in parts of various items being reduced. The elimination or reduction in quantities of these items does not entitle the contractor to make claims for lost profits or claims for an increase in unit prices. The price request and required items must be filled out without fail, as it is possible that these items will also be implemented. The bidder acknowledges these preliminary remarks by signing the list of services. 3. The construction site toilet and break rooms must be provided by each contractor themselves. Energy, water and electricity are provided free of charge. 4.The following additional services are covered by the unit prices: - Participation in construction meetings by an authorized person, if necessary - Implementation planning, documentation services in accordance with the general terms and conditions of the contract - Participation in expert acceptances, if necessary 5.When accepting the order, the contractor recognizes the dates stated in the preliminary remarks and the construction schedule as binding and will, if necessary, also carry out necessary work outside of working hours at no extra cost in order not to jeopardize the deadlines for subsequent work. The contractor undertakes to provide the number of workers appropriate to the amount of work and the number of working days. 6.The contractually binding partial deadlines are set out in the attached construction schedule. 7.The work advertised must be carried out in partial deliveries in accordance with the construction progress. This does not give the contractor any right to assert additional claims. 8. Garbage and rubble disposal must be carried out every 2 days at most, in the same way as the work steps. Each contractor is responsible for this himself. 9. All other details can be found in the list of services. 10. Contrary to DIN 1961 Vob Part B § 13 (4), the limitation period for claims for defects is set at 5 years. 11. Services that exceed the contract amount require prior written approval - otherwise no payment will be made! Accordingly, supplementary offers must be approved in good time (at least 3 weeks) before execution. 12. Daily construction reports must be kept. The forms from "zweckform - daily construction reports no. 177" or an equivalent must be used as a template. These must be presented to the construction supervisor every 2-3 days for signature and countersignature. The work carried out, the number of workers and the hours worked must be entered here. 13. Depending on the trade, the following documents must be enclosed with the final invoice in paper form and digitally (copied onto a CD or data storage device). These can be different documents depending on the trade. 1. Working plans 2. Inventory plans 3. List of building materials for components with manufacturer, type, type number, colour, colour number, installation location 4. List of fittings for each movable part, otherwise as above 5. Pane sizes for windows, doors, etc., otherwise as above 6. General building approval for the building materials 7. Certificates of conformity for the products with a list of the respective installation location, such as room designations/numbers. Final payment will only be approved once the documents have been submitted. 14. Acceptance A formal acceptance in accordance with the VOB is expressly agreed. Acceptance through use is excluded. Acceptance requires that all services have been provided in accordance with the order letter or any subsequent order, that the necessary acceptances have taken place without any significant defects and that the documentation has been submitted at least once. 15. The work is planned as follows: See construction schedule in the appendix - technical description of the carpentry work - The attached "special contract conditions" are binding for the submission of offers, awarding, execution and invoicing of the work. The regulations of DIN 18 334 are decisive, unless changed below or in the service description. The unit prices of the items are to be calculated as net prices, i.e. without VAT. VAT is to be added after the subtotal. Additional technical regulations and additional services: In addition to the construction drawings, the tested static calculation is binding for the execution of the work; these can be viewed without request during construction. - The specified wood thicknesses apply to finished work. - Before the work is carried out, the shell dimensions must be checked on the construction site, and deviations must be reported to the construction management immediately. - The contractor is obliged to determine the exact rafter length etc. in conjunction with the roofer, in accordance with the Future roof tiles. If this changes the dimensions of the roof overhangs at the eaves shown in the drawing, the construction management must be informed before work is carried out. If this requirement is not followed, the costs for any eaves flashings etc. that may be required will be borne by the contractor. - The contractor is responsible for adequate anchoring of all wooden structures to the masonry, solid ceilings, wooden beam ceilings and jambs (e.g. to prevent them from lifting due to wind). The bricklayer must be given appropriate information about how to secure the anchors in the masonry or solid ceilings. - Supplying and installing hardware (anchoring thresholds etc.), unless special provisions are made for individual parts in the service description, is an additional service. - A 500 mm bitumen cardboard is to be placed as a barrier layer between the pieces of wood and their solid supports. The work is an additional service. - Delays in the work for which the contractor is responsible entitle the client to offset the corresponding costs for further provision of scaffolding against the claims. However, if further provision of scaffolding is no longer possible, the contractor is fully responsible for the necessary protective measures and must bear all costs incurred for this, including those for subsequent work.

Government Of Burkina Faso Tender

Burkina Faso
Closing Soon4 Feb 2025
Tender AmountRefer Documents 
Notice of Expression of Interest for Applications for the Establishment of a Database of Suppliers/Providers of Goods and Services as Part of its Procedures for Requesting Quotations and Consulting Consultants
9991-10000 of 10000 active Tenders