Survey Tenders

Survey Tenders

Municipality Of Loay, Bohol Tender

Healthcare and Medicine
Corrigendum : Closing Date Modified
Philippines
Details: Description Medical Oxygen Tank (w/ Content) Size: Height 79 Cm X Diameter 13 Cm Capacity 10 Liters Cordless Sabre Saw Type: Cordless Sabre Saw (reciprocating Saw) Voltage: 18v Battery Type: Lithium-ion Stroke Length: 28 Mm Cutting Speed: Up To 0-3000 Strokes Per Minute (spm) Cutting Capacity: Wood: Up To 200 Mm Metal: Up To 10 Mm Weight: Approximately 3 Kg (may Vary By Model) Blade Type: Compatible With Standard Sabre Saw Blades Tool-less Blade Change: Yes Variable Speed Control: Yes Led Work Light: Yes Vibration Control: Yes 18v Battery Voltage: 18v Battery Type: Lithium-ion Capacity: Available In Various Amp-hour (ah) Ratings, Commonly: 2.0 Ah 4.0 Ah 5.0 Ah 8.0 Ah Dimensions: Varies By Capacity, Generally Compact And Lightweight Weight: Varies Based On Capacity: 2.0 Ah: Approximately 0.6 Kg 4.0 Ah: Approximately 1.1 Kg 5.0 Ah: Approximately 1.2 Kg 8.0 Ah: Approximately 1.5 Kg Tripod Stand Height Adjustment: Minimum Height: Approximately 65 Cm (25.6 Inches) Maximum Height: Approximately 160 Cm (63 Inches) Adjustment Mechanism: Quick-release Clamps For Easy Height Adjustment. Material: Construction: Sturdy Aluminum For Lightweight Durability. Weight: Approximately 2.4 Kg (5.3 Lbs.), Making It Portable Yet Stable. Base: Legs: Three Adjustable Legs For Stability On Uneven Surfaces. Foot Design: Equipped With Rubber Feet For Traction, With Some Models Having Spikes For Soft Ground. Compatibility: Compatible With Various Bosch Laser Levels And Other Surveying Instruments Featuring A Standard 1/4-inch Or 5/8-inch Mounting Thread. Foldable Design: Easily Folds For Convenient Storage And Transport. Load Capacity: Supports Tools Weighing Up To 5 Kg (11 Lbs.), Suitable For Various Laser Levels And Equipment. Storage And Carrying: Typically Comes With A Carrying Case For Easy Transportation. Sabre Saw Power Supply: Battery Voltage: 12v Motor: Power Output: Approximately 500 W (equivalent To Performance Level) No-load Stroke Rate: Up To 0 2,200 Strokes Per Minute (spm) Stroke Length: Stroke Length: Approximately 20 Mm Cutting Capacity: Wood: Up To 120 Mm Metal: Up To 10 Mm Blade Type: Compatible With Standard Sabre Saw Blades For Various Materials. Weight: Approximately 1.5 Kg (without Battery), Making It Lightweight And Easy To Handle. Design Features: Ergonomic Handle: Designed For Comfort And Reduced Fatigue During Extended Use. Tool-less Blade Change: Quick And Easy Blade Changes Without Additional Tools. Led Light: Integrated Led Work Light For Improved Visibility In Dark Or Confined Spaces. Vibration Control: Features To Reduce Vibration For Enhanced User Comfort. Battery And Charging: Compatible With Bosch 12v Lithium-ion Batteries. Battery And Charger Typically Sold Separately. Cordless Blower Battery Voltage: 18v Motor Type: Brushless Motor Air Speed: Up To 200 Km/h (approximately 124 Mph) Air Volume: Up To 200 M³/h (approximately 118.9 Cfm) Weight: Approximately 3.5 Kg (7.7 Lbs) Without Battery Noise Level: Approximately 90 Db(a) Vibration Level: Typically Low, Around 2.5 M/s² Battery Compatibility: Compatible With Bosch 18v Lithium-ion Batteries Charging Time: Depending On The Battery Charger Used, Typically Around 1 Hour For Standard Batteries. Sds & Shank Flak 14x250mm Shank Size: 14 Mm Diameter Length: 250 Mm (may Include Total Length Of The Shank And Working Part) Material: Typically, High-speed Steel (hss) Or Carbide-tipped For Durability Application: Suitable For Drilling Into Concrete, Brick, And Masonry Flute Design: Spiral Flute Design For Efficient Debris Removal Working End: May Have A Chiseling Or Cutting Tip Designed For Heavy-duty Applications Drill Bit Metal (1.5) Cobalt & Metal (2.5) Cobalt & Metal (6.5) Cobalt & Metal (8.0) Cobalt & Metal (3.0) Cobalt & Metal (10) Cobalt & Metal Material: Cobalt High-speed Steel (hss) For Enhanced Durability And Heat Resistance. Tip Angle: 135° Split Point For Faster Penetration And Reduced Walking. Sizes: Available In Various Sizes, Often Ranging From 1 Mm To 13 Mm In Diameter. Coating: Typically, Uncoated Or May Have A Titanium Or Nitride Coating For Additional Wear Resistance. Usage: Ideal For Drilling In Stainless Steel, Alloy Steel, And Other Hard Metals. Flute Design: Spiral Flute Design For Efficient Chip Removal And Improved Cutting Performance. Shank Type: Usually Available In Both Standard And Reduced Shank Sizes For Compatibility With Various Drills. Drill Bit Metal (7.0) (4.0) Material: Cobalt High-speed Steel (hss) With 5% To 8% Cobalt Content For Increased Strength And Heat Resistance. Tip Design: Point Angle: 135° Split Point Design For Improved Penetration And Reduced Walking On Metal Surfaces. Tip Type: Available In Standard, Taper, Or Other Configurations Depending On The Specific Drill Bit Model. Sizes: Available In A Wide Range Of Diameters, Commonly From 1 Mm To 13 Mm Or Larger, Catering To Various Drilling Needs. Coating: Typically, Uncoated Or With A Titanium Or Nitride Coating To Enhance Wear Resistance And Reduce Friction. Usage: Ideal For Drilling In Tough Metals Such As Stainless Steel, Tool Steel, And Other High-strength Alloys. Flute Design: Spiral Flute Design For Effective Chip Removal And Reduced Heat Buildup During Drilling. Flutes Often Designed To Help With Cooling, Enhancing Performance During Extended Use. Shank Type: Generally, Comes In Standard Round Shanks For Compatibility With Most Drill Chucks. Drill Bit Metal (6.5) Multi 6mm Material: Made From High Speed Steel (hss) With A Titanium Coating For Enhanced Durability And Wear Resistance. Diameter: Size: 6.5 Mm (this Is The Nominal Diameter Of The Drill Bit). Tip Design: Point Angle: Typically Features A 118° Or 135° Split Point Design For Efficient Penetration And Reduced Walking On Surfaces. Designed For Multi-material Applications, Including Metal, Wood, Masonry, And Plastic. Flute Design: Spiral Flute Design: Provides Effective Chip Removal And Cooling, Enhancing Performance During Drilling. Shank Type: Standard Round Shank: Compatible With Most Drills And Drill Chucks. Usage: Suitable For Drilling In Various Materials, Including: Metal (mild Steel, Aluminum) Wood Masonry (brick, Concrete) Plastics Designed For Versatility In Diy And Professional Applications. Performance Features: Durability: Engineered For Long Life, Even In Tough Applications. Precision: Provides Accurate Drilling With Minimal Burr Formation. Versatility: Can Be Used For A Wide Range Of Materials, Making It A Great All-purpose Drill Bit. Packaging: Often Available In Blister Packs Or Sets, With Clear Labeling For Easy Identification Of Size And Type. Drill Bit Mason (7.0) Drill Bit Mason (8.0) Drill Bit Mason (4.0) Drill Bit Mason (3.0) Drill Bit Mason (10) Material: Typically Made From Carbide-tipped Steel Or High Speed Steel (hss) For Durability And Strength. Diameter: Size: 7.0 Mm (nominal Diameter Of The Drill Bit). Tip Design: Tip Type: Usually Features A Carbide Tip Designed Specifically For Masonry Applications, Which Provides Excellent Cutting Performance. Point Angle: Often Has A Sharp Point Designed For Effective Penetration Into Hard Materials. Flute Design: Spiral Flute Design: Helps In The Efficient Removal Of Debris While Drilling, Which Is Crucial For Maintaining Cutting Efficiency. Cooling: The Flute Design May Aid In Heat Dissipation During Drilling. Shank Type: Sds Plus Or Standard Round Shank: Depending On The Model, It May Have An Sds Shank For Compatibility With Rotary Hammers Or A Standard Round Shank For Use In Regular Drills. Usage: Designed For Drilling Into: Masonry: Brick, Concrete, And Stone. Other Hard Materials: Ideal For Use In Construction And Renovation Projects. Performance Features: Durability: Built To Withstand High-impact Drilling In Tough Materials, Ensuring A Longer Lifespan. Precision: Provides Clean Holes With Minimal Breakout Or Chipping In Masonry Surfaces. Packaging: Usually Available In Individual Packaging Or Sets, Clearly Labeled For Easy Identification Of Size And Type. Impact Drill Power: Voltage: 18v Battery Type: Lithium-ion Battery Capacity: Typically, 2.0 Ah Or 4.0 Ah (depending On The Version). Motor: Power Output: 600 W (approximate) Speed: No-load Speed: 0 - 1,700 Rpm (depending On The Gear Setting) Impact Rate: Up To 27,000 Blows Per Minute. Torque: Max Torque: Soft Torque: 30 Nm Hard Torque: 50 Nm Torque Settings: 20+1 Adjustable Torque Settings For Precise Control. Drilling Capacity: Wood: Up To 35 Mm Steel: Up To 13 Mm Masonry: Up To 20 Mm Chuck: Chuck Type: Keyless Chuck Chuck Capacity: 1.5 – 13 Mm Weight: Tool Weight: Approximately 1.6 Kg (without Battery). Dimensions: Length: 215 Mm Height: 235 Mm Width: 60 Mm Features: Compact Design: Lightweight And Compact For Easy Handling And Maneuverability. Led Light: Integrated Led Light For Better Visibility In Dark Areas. Electronic Motor Protection (emp): Prevents Overheating And Extends The Tool's Lifespan. Soft Grip: Ergonomic Handle For Comfort During Prolonged Use. Two-speed Gearbox: For Versatile Drilling And Screwing Applications. Applications: Suitable For Drilling And Screwdriving In Various Materials, Including Wood, Metal, And Masonry. Ideal For Both Professional And Diy Applications. Max Cutting Capacity 42mm (pvc) Material: Typically Made From High Speed Steel (hss) Or Carbide Tipped For Enhanced Durability And Cutting Performance In Plastic Materials. Diameter: Max Cutting Capacity: 42 Mm (this Refers To The Maximum Diameter The Drill Bit Can Effectively Cut). Tip Design: Point Type: Often Features A Brad Point Or Split Point Design For Precise Drilling Without Wandering. Tip Angle: Designed Specifically For Optimal Cutting Through Pvc And Other Plastics. Flute Design: Flute Type: Usually, Spiral Flutes Designed To Facilitate Efficient Chip Removal, Reducing Clogging While Drilling. Cooling Features: May Include Design Elements That Help Dissipate Heat, Which Is Important When Drilling Through Plastics To Prevent Melting. Shank Type: Shank Design: Commonly Features A Standard Round Shank For Compatibility With Most Drill Chucks. Usage: Specifically Designed For Drilling Into Pvc, But Can Also Be Used On Other Plastics And Softer Materials. Ideal For Applications In Plumbing, Construction, And Diy Projects Where Plastic Materials Are Prevalent. Performance Features: Durability: Engineered For Long Lasting Performance, Especially In High-speed Drilling Applications. Precision: Provides Clean Holes With Minimal Burr Formation, Ensuring A Professional Finish. Packaging: Often Sold Individually Or In Sets, With Clear Labeling For Easy Identification Of Size And Type. Handsaw Type: Crosscut Saw: Designed For Cutting Across The Grain Of Wood. Rip Saw: Made For Cutting Along The Grain Of Wood. Panel Saw: A Versatile Saw For General Purpose Cutting. Back Saw: Typically Used For Precision Cuts, Featuring A Reinforced Spine. Blade Length: Common Lengths Range From 12 Inches To 26 Inches (300 Mm To 660 Mm), Depending On The Type Of Saw And Intended Use. Blade Material: Usually Made From High-carbon Steel For Durability And Sharpness. Some May Have A Stainless-steel Blade For Corrosion Resistance. Tooth Configuration: Teeth Per Inch (tpi): Fewer Teeth (e.g., 5-7 Tpi) For Faster Cuts In Rough Wood. More Teeth (e.g., 10-12 Tpi) For Smoother Cuts In Finer Materials. Tooth Design: Raker Teeth: Alternating Teeth For A More Aggressive Cut. Side Set Teeth: Teeth Angled To Reduce Friction And Facilitate Cutting. Kerf Width: The Width Of The Cut Made By The Saw, Typically Ranging From 0.025 Inches To 0.05 Inches (0.64 Mm To 1.27 Mm) Depending On The Blade Thickness. Handle: Material: Wood, Plastic, Or Rubber For A Comfortable Grip. Design: Usually Ergonomically Shaped To Reduce Hand Fatigue. Grip Type: May Have A Straight Or D-shaped Handle For Better Control. Weight: Weight Varies Depending On The Materials And Size, Usually Between 1 Lb To 3 Lbs (0.45 Kg To 1.36 Kg). Applications: Suitable For Woodworking, Carpentry, And General-purpose Cutting Tasks. Ideal For Both Professional And Diy Applications. Ppvc25 Material: Wheel Material: Polypropylene (pp), Known For Its Durability And Resistance To Chemicals And Moisture. Frame Material: Often Made From Steel Or Plastic, Depending On The Specific Model. Wheel Diameter: Diameter: 25 Mm (approximately 1 Inch). Load Capacity: Weight Capacity: Typically Rated For Loads Ranging From 50 Kg To 100 Kg (approximately 110 Lbs To 220 Lbs), Depending On The Specific Design And Application. Type: Type: Usually Designed As A Swivel Caster, Allowing For Easy Maneuverability. May Also Come In A Fixed Configuration For Straight-line Movement. Mounting Type: Mounting Plate: Commonly Features A Square Or Rectangular Mounting Plate With Holes For Easy Attachment To Carts, Furniture, Or Other Equipment. Stem Type: Some Models May Have A Stem For Mounting Directly Into A Socket. Braking System: Brake: Some Variants May Include A Brake Mechanism For Locking The Wheel In Place, Providing Additional Stability When Needed. Environmental Resistance: Resistant To Moisture, Making It Suitable For Use In Damp Or Humid Environments. Applications: Ideal For Use In Light-duty Applications Such As: Office Furniture (like Chairs And Desks). Carts And Trolleys. Material Handling And Logistics. Ceiling Sealant Steel Brush Battery 6.0 Ah Battery Type: Chemistry: Lithium-ion (li-ion) Series: Typically, Part Of The Bosch Professional Line, Compatible With Their 18v Tools. Capacity: Amp Hour (ah): 6.0 Ah Provides Extended Runtime For Demanding Applications. Voltage: Nominal Voltage: 18v Weight: Approximate Weight: 0.65 Kg (about 1.43 Lbs) Dimensions: Size: Typically, Around 115 Mm X 75 Mm X 50 Mm (4.5 In X 3 In X 2 In), Depending On Design. Charging Time: With Fast Charger (e.g., Bosch Gal 18v 40): Approximately 30-45 Minutes For A Full Charge. Standard Charger: Typically, 1-2 Hours For A Full Charge. Compatibility: Compatible Tools: Works With A Wide Range Of Bosch 18v Cordless Power Tools, Including Drills, Impact Drivers, Saws, And More. Features: Electronic Cell Protection (ecp): Protects Against Overload, Overheating, And Deep Discharge, Extending Battery Life. Bosch Coolpack Technology: Helps Dissipate Heat, Reducing Heat Buildup And Prolonging Battery Life. Led Charge Level Indicator: Built-in Leds Indicate The Remaining Battery Charge Level For Better Visibility. Durability: Impact Resistant: Designed To Withstand Tough Job Site Conditions. Weather Resistant: Suitable For Use In Various Environmental Conditions, Although Prolonged Exposure To Extreme Conditions Should Be Minimized. Applications: Ideal For Professional And Diy Applications Requiring High Performance And Longevity, Such As Construction, Woodworking, And Other Demanding Tasks.
Closing Soon26 Nov 2024
Tender AmountPHP 250 K (USD 4.2 K)

Moravskoslezsky Region Road Administration, Contribution Organization Tender

Others
Czech Republic
Details: The subject of the public contract is the conclusion of a contract with one contractor for the processing of project documentation at the stage of documentation for the application for the issuance of a decision on the permission of the construction intention (dpz) and the project documentation of the construction, which will be used for the selection of the contractor and for the implementation of the construction (dps), for both stages Furthermore, only Project Documentation (pd), On the Construction of "road Iii/46427 Construction of the New Bridge Ev. No. 46427-1 Via Potok Bílovka, After the Flood of 2024" And Engineering Activities For This Action In The Scope Of Ensuring All Discussions, Surveys, Statements Of State Administration Bodies Essentially Necessary For Proceedings On Planning Permits And Related Proceedings. The subject of the Public Contract is also the provision of property law preparation for the issuance of a decision on the permission of the intention. The Content of the Subject of Performance Is the Delivery of the Complete Agreed Project Documentation (pd) Including All Relevant Permits and Decisions. The object composition will be the subject of documentation at the Dpz and Dps level. Bridge Ev. No. 46427-1 Was Destroyed In Flood 09/2024, For This Reason It Is Not Necessary To Carry Out Its Diagnostic Survey. The construction of a new Tubosider-type bridge is expected, whereby the length of the bridging will be based on the flow rate required by the Bílovka stream manager. The Bridge List of the Original Bridge is an Annex to the Tender Documentation.
Closing Soon28 Nov 2024
Tender AmountCZK 578.5 K (USD 24 K)

VIVEA Tender

Agriculture or Forestry Works
France
Details: For several years, we have been witnessing an evolution in the profession of agricultural business managers, making their work more intense, difficult and complex. Living and Working Conditions Characterized by “Strong Physical Constraints, Large Working Hours, Significant Economic Pressure, Environmental and Climatic Constraints”, Without Forgetting “Significant Professional and Social Isolation” Suffered by a Good Number of Agricultural Farmers , Weaken them. In such a context, we are witnessing an increase in situations of unease and a loss of meaning in one's profession. This subject is today at the heart of debates. The Prime Minister, Jean Castex, in March 2020, requested a report on the unhappiness and suicide of farmers from MP Olivier Damaisin. The Report Highlights the Interest in Taking Humans into Account “The Human Side Really Needs to Be Put Back in Place”, “The Entire Human Side is Completely Absent”. It is important that the business manager takes pleasure in his activity and is fulfilled in order to be able to adapt his business to the various changes and sustain his activity. Adasea De La Marne, in partnership with Alice Martinet, Master's student in Occupational Psychology, carried out a study on "The Meaning of Work in Agriculture": 319 Farmers responded to the survey. 49% of farmers surveyed are in a fragile situation: 18% are identified as burn-out and 31% are at risk of burn-out. Thus, the elected officials of the Vivea Champagne-ardenne Committee have decided to launch a specific call for tenders falling within Priority 4 “Developing efficiency and quality of life at work” of Vivea's 2021-2026 Strategic Plan. The objective is to develop training that addresses the connection between efficiency and well-being at work while maintaining company performance.
Closing Date31 Jan 2025
Tender AmountRefer Documents 

YOU ARE THE CITY OF SKVOREC Tender

Corrigendum : Closing Date Modified
Czech Republic
Details: The subject of the Public Contract is Construction Work and Related Supplies and Services Consisting of the Implementation of a New Building of a Civic Facilities Facility Serving Preschool Education in the Township of Škvorec in the Central Bohemian Region, on Plot No. 50/25 A 1389 in K.ú. Škvorec, Including the Necessary Preparation of Areas, Paved Areas, Terrain Improvements, Realization of Overlays, Construction of Connections and Engineering Networks, Construction Works and Technological Objects and Other Construction Components, Using the Design & Build Method. Therefore, Projection Work is also the subject of Public Procurement. The architectural and structural solution is described in more detail in the Architectural Study entitled: "Škvorec Kindergarten", which is part of this Tender Documentation. Part of the construction is the execution of clean floor surfaces, tiling and paving, but not the delivery of interior equipment and outdoor garden equipment. Indoor equipment and outdoor equipment of the garden will be part of a separate procurement procedure. Part of the Subject of Fulfillment of the Public Contract Is In particular: 1. Project Documentation, which will include the following parts: A. Documentation for the Construction Permit in the Planning Permit Procedure, B. Documentation for the Implementation of the Construction, C. Documentation of the Actual Implementation of the Construction Incl. Geometrical Plan and Focus of the Actual Construction, D. Operational Documentation, E. Documentation for the Needs of the Cadastral Office. 2. Provision of Engineering Services; 3. Construction of the New Building of the Civic Facilities Facility Serving Preschool Education in the Town of Škvorec, i.e. Execution of construction works and technological objects in accordance with this procurement documentation. The Project Documentation Listed in Point 1. Above Must Be Prepared in Compliance with the New Construction Act No. 283/2021 Coll., Construction Act, As Amended and According to the Relevant Implementing Legal Regulations, in particular with Decree No. 131/2024 Coll., Decree On Construction Documentation and Decree 146/2024 Coll., On Construction Requirements. Part of the provision of engineering services in point 2. It includes Also Legalization of Existing Wells Located at the Place of Fulfillment of the Public Contract, If This Is Necessary, Including Securing Permits for Water Absorption. In order to process the next stages of the project documentation, it is necessary to ensure the processing of the following surveys and studies, which are also part of the scope of the Public Contract: A. Lighting and Sunlight Studies, B. Acoustic Studies, C. Detailed Engineering-Geological Survey, D. Detailed Hydrogeological Survey , E. Determination of Radon Index of Land, F. Pumping Test and Laboratory Assessment of Water Quality of Existing Well and Including Its Use for Irrigation and/or Toilet Flushing (Primarily Water Should be Used for Toilet Flushing), G. Thermal Technical Construction Solution and Certificate Energy Requirements of Buildings. The contracting authority also requires that part of the subject of the performance of the public contract also includes the management of rainwater, including the construction of an accumulation or retention tank for the further use of this water, e.g. For Irrigation. More detailed information is provided in other parts of the Public Procurement Terms and Conditions, which are an integral part of the Tender Documentation of this Public Procurement, i.e. In the Architectural Study With the Title: "Škvorec Kindergarten", the Protocol and Certificate of the Energy Performance of the Building Pursuant to Decree No. 264/2020 Coll. With the Name: "Škvorec Kindergarten", Specification of Standards With the Name: "Škvorec Kindergarten" and a Binding Sample Contract.
Closing Date9 Dec 2024
Tender AmountRefer Documents 

Philippine Merchant Marine Academy Tender

Others
Philippines
Details: Description Quantity Unit Item Description 1 Lot Procurement Of Integrated Full Mission Bridge And Engine Room Simulator With Desktop Station Full Mission Bridge Simulator (fmbs) And Mini Bridge Stations’ Features And Applications, Major Components, Bridge Simulator Performance Standards And Hardware 1. Major Components The Full Mission Bridge Simulators That Can Be Integrated With Engine Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Bridge Station With 270° Horizontal Display (class A Configuration); B. Seven (7) Mini Bridge Stations With 120° Horizontal Display (class B Configuration); C. One (1) Server Station; D. One (1) Instructor Station; E. One (1) Simulator Scenario Development Station; And F. One (1) Briefing/ Debriefing Station. 2. Features And Applications 2.1 The Bridge Simulator Should Provide A Realistic, Ship-like Environment Based On Real Hardware Consoles And High-quality Visualization. The Systems Include Major Components Such As Conning, Radar/ Arpa And Ecdis, Gmdss, Navigation Equipment, Bearing Finder, Steering Control Console, Engine Control, Auto Pilot System, Overhead Display, Etc. 2.2 The Bridge Simulator Product Shall Be Certified And Compliant As Class A (full Mission), B (multi-task), C (limited Task), And D (cloud-based Distant Learning) Type-approved Maritime Simulator System By An Internationally Recognized Classification Society. The Compliance With Classification Shall Be Reflected In The Certificate Of The Product. 2.3 The Simulator Can Be Utilized To A Variety Of Navigation Techniques Under Different Environmental Conditions, Serving A Wide Range Of Purposes As Follows: 1. Control Of The Ship While Navigating In The Operational And Emergency Modes In Various Weather Conditions With The Possibility Of Setting Wind And Current Parameters; 2. Analysis Of The Above-water Situation In Day And Night Conditions; In Poor Visibility By Visible Navigation Lights And Information Received From Radar/ Arpa; 3. Use Of The Electronic Chart-based Navigational Information System (ecdis); 4. Practical Use Of Radio Equipment And Global Maritime Distress And Safety System (gmdss) Facilities; 5. Application Of The International Regulations For Preventing Collisions At Sea; 6. Ship Control During Anchoring And Mooring; 7. Ship Control During Towing Operations; 8. Ship Control During Maneuvers "man Overboard"; 9. Rational Methods Of Ship Control In Case Of Main Engines (me) And Ship And Navigation Equipment Failures During Movement; 10. Eye Survey Of Above-water And Radar Situation, Determination Of Vessel Movement Elements; 11. Navigational Situation Assessment By Visual Observation During Daytime, By Lights At Night Time And By Observation Of Transmission Of Echo Signals On Ppi Simulators In Conditions Of Limited Visibility; 12. Visual Determination Of Vessel Movement Patterns, Maneuvering Capabilities And Dimensions; 13. Selection And Execution Of Collision Avoidance Maneuvers In Open Sea, During Night And In Limited Visibility Conditions Using Radar/arpa; 14. Evaluation Of Accuracy Of Primary And Secondary Information Received From Arpa, Consideration Of Factors Affecting Accuracy Of Arpa And Delay In Formation Of Secondary Radar Information; 15. Orientation Of Ships In Complex Navigation Conditions In Daytime And Nighttime And In Conditions Of Limited Visibility; 16. Use Of Ecdis For Preliminary And Executive Plotting, Practicing Correct Response To Emergency Signals Produced By Ecdis, Solution Of Chart-metric Tasks And Ensuring Safety Of Navigation With The Use Of Information Received From Ecdis; 17. Use Of Basic Capabilities Of Marine Mobile Service And Marine Mobile Satellite Service. 2.4 The Bridge Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate. · Table A-ii/1.1 - Plan And Conduct A Passage And Determine Position. • Table A-ii/1.2 - Maintain A Safe Navigational Watch. • Table A-ii/1.3 - Use Of Radar And Arpa To Maintain Safety Of Navigation. § Table A-ii/1.4 - Use Of Ecdis To Maintain The Safety Of Navigation. • Table A-ii/1.5 - Respond To Emergencies. • Table A-ii/1.6 - Respond To A Distress Signal At Sea. • Table A-ii/1.8 - Transmit And Receive Information By Visual Signaling. • Table A-ii/1.9 - Manoeuvre The Ship. • Table A-ii/2.1 - Plan A Voyage And Conduct Navigation. • Table A-ii/2.2 - Determine Position And The Accuracy Of Resultant Position Fix By Any Means. • Table A-ii/2.3 - Determine And Allow For Compass Errors. • Table A-ii/2.4 - Co-ordinate Search And Rescue Operations. • Table A-ii/2.5 - Establish Watchkeeping Arrangements And Procedures. • Table A-ii/2.6 - Maintain Safe Navigation Through The Use Of Information From Navigation Equipment And Systems To Assist Command Decision-making. • Table A-ii/2.7 - Maintain The Safety Of Navigation Through The Use Of Ecdis And Associated Navigation Systems To Assist Command Decision Making. • Table A-ii/2.10 - Maneuver And Handle A Ship In All Conditions. • Table A-ii/2.11 - Operate Remote Controls Of Propulsion Plant And Engineering Systems And Services. • Table A-ii/3.1 - Plan And Conduct A Coastal Passage And Determine Position. • Table A-ii/3.2 - Maintain A Safe Navigational Watch. • Table A-ii/3.3 - Respond To Emergencies. • Table A-ii/3.4 - Respond To A Distress Signal At Sea. • Table A-ii/3.5 - Manoeuvre The Ship And Operate Small Ship Power Plants. • Table A-ii/4.1 - Steer The Ship And Also Comply With Helm Orders In The English Language. • Table A-ii/4.2 - Keep A Proper Look-out By Sight And Hearing. § Table A-ii/5.2 - Contribute To Berthing, Anchoring And Other Mooring Operations. • Table A-v/4-1.1 - Contribute To Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-1.2 - Monitor And Ensure Compliance With Legislative Requirements. • Table A-v/4-1.3 - Apply Safe Working Practices, Respond To Emergencies. • Table A-v/4-1.4 - Ensure Compliance With Pollution-prevention Requirements And Prevent Environmental Hazards. • Table A-v/4-2.1 - Plan And Conduct A Voyage In Polar Waters. • Table A-v/4-2.2 - Manage The Safe Operation Of Vessels Operating In Polar Waters. • Table A-v/4-2.3 - Maintain Safety Of The Ship's Crew And Passengers And The Operational Condition Of Life- Saving, Firefighting And Other Safety Systems. 2.5 The Bridge Simulator Shall Allow For Training And Certification Of Watch Officers, Chief Officers, Captains, And Pilots Serving On Commercial And Fishing Vessels Of 500 Gross Tonnage Or More In Accordance With The Requirements Of The Imo Stcw Convention And Model Courses: · 1.07 – Radar Navigation, Radar Plotting And Use Of Arpa; · 1.08 – Radar, Arpa, Bridge Teamwork And Search & Rescue; · 1.22 – Ship Simulator And Bridge Teamwork; · 1.27 – Operational Use Of Electronic Chart Display And Information System (ecdis); · 1.32 – Operational Use Of Integrated Bridge System; · 1.34 – Operational Use Of Ais; · 2.02 – Maritime Sar Coordinator; · 3.11 – Marine Accident And Incident Investigation With Compendium; · 3.19 – Ship Security Officer; · 3.23 – Actions To Be Taken To Prevent Acts Of Piracy And Armed Robbery; · 7.01 – Master And Chief Mate; · 7.03 – Officer In Charge Of Navigational Watch; · 7.05 – Officer In Charge Of Navigational Watch Of Fishing Vessel; · 1.25 – General Operator’s Certificate For The Gmdss; · 1.26 – Restricted Operator’s Certificate For The Gmdss. 2.6 The Bridge Simulator Shall Have All The Ownship Models, Target Ship Models , Objects And Exercise Areas Available In The Database Of The Simulator Product. It Shall Also Include Polar Areas, The Existing Models And Areas In Current Simulator, Naval And Coast Guard Ship Models, Ship Models Ready For Integration With Engine Simulators And Ship/engine Models Using Future Fuels. 2.7 The Simulator Shall Have Intercom Installed In The Instructor Station And All Bridge Stations. 2.8 The Simulator Shall Have An Evaluation And Assessment Method Designed For The Evaluation And Assessment Of A Range Of Predefined Assessment Parameters From The Following Categories: • Planning And Conducting A Passage And Determine Position; • Maintain Safe Navigational Watch; • Using Radar And Arpa To Maintain Navigational Safety; • Ability To Operate And Analyze Information Obtained From Arpa; • Respond To Emergencies; • Use Imo Standard Marine Communication Phrases And Use English Inwriting And Speaking; • Transmit And Receive Information Using Visual Signals; • Maneuver The Ship; • Colreg. 2.9 The Simulator Shall Have The Ability To Set Up A Scoring And Grading System To Evaluate The Operator’s Performance. The Program Allows The Instructor To Monitor The Results Of The Bridge Team / Operator Workstation Performance. 2.10 The Simulator Shall Be Capable Of Simulating Ship Operation In Polar Waters Or Ice Navigation According To The Polar Code And Shall Have The Following Training Capabilities: - Ice Management Of Offshore Installations In An Arctic Environment, - Use Of Radar Data And Ice Charts In Ecdis While Navigating In Ice Conditions, - Following Of Icebreakers, - Offshore Loading Operations To Include Mooring To Single Point Mooring And Floating Production Storage And Offloading Equipment In Ice Conditions, And - Navigation In Shattered Ice, Along Hard Ice Edges, Bumping Against Ice Edges, In Open Pack Ice, In Ice Holes, And Spots Of Ice-free Water. 2.11 The Ice Navigation Environment Shall Have The Following Characteristics: - Capable Of Ice Accumulation On Ship Superstructure, - Ship’s Tracks On Ice Fields Re-freeze As Programmed By The User, - Ice Mounds And Channels Can Be Added By The User, - Characteristics Of Ice Resistance Are Based On The Type Of Ice, Thickness, And Accumulation, - Capable Of Traversing Large Ice Areas, And - Realistic Representation Of Iceberg Objects. 3. Bridge Simulator Performance Standards 3.1 Physical Realism The Bridge Simulator Stations Shall Have The Following Physical Realism: A. The Equipment, Consoles, And Workstations Shall Be Installed, Mounted, And Arranged In A Manner That Mimics An Actual Bridge Of A Ship. B. The Workstations Shall Have Standard Rubber Mat Flooring. The Simulator Shall Have The Following Equipment: C. Controls Of Propulsion Plant Operations, Including Engine Telegraph, Pitch-control And Thrusters. There Shall Be Indicators For Shaft(s) Revolutions And Pitch Of Propeller(s). There Shall Be Controls For At Least One Propeller And One Bow Thruster. D. Controls Of Propulsion Plant For Mooring Operations. By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Operation Of Such Controls. E. Controls Of Auxiliary Machinery. There Shall Be Controls For At Least Two Auxiliary Engines, Including Electric Power Supply Control. F. Steering Console, Including Equipment For Hand Steering And Automatic Steering With Controls For Switchover. There Shall Be Indicators Of Rudder Angle And Rate Of Turn. G. Steering Compass And Bearing Compass (or Repeater) With An Accuracy Of At Least 1 Degree. H. At Least One Radar/arpa Display/unit (automatic Radar Plotting Aid). It Shall Be Possible To Simulate Both A 10 Cm (s-band) And A 3 Cm (x-band) Radars. The Radar Shall Be Capable To Operate In The Stabilised Relative-motion Mode And Sea- And Ground-stabilised True-motion Modes (see Stcw Section A-1/12.4.1 And 1/12.5 And Paragraph 2 Of Section B-i/12). I. Communication Equipment Per Gmdss (global Maritime Distress Safety System) Framework, Covering At Least The Requirements For The Relevant Area. J. The Simulator Shall Include A Communications System That Will Allow For Internal Ship Communications To Be Conducted. K. Ecdis (electronic Chart Display And Information System) Displaying Selected Information From A System Electronic Navigational Chart (senc) With Positional Information From Navigation Sensors Like Ais And Radar To Assist The Mariner In Route Planning And Route Monitoring, And By Displaying Additional Navigation-related Information. (see Stcw Section B-i/12). L. Gps (global Positioning System), Echo-sounder And Speed Log Showing Speed Through The Water (1 Axis) For Ships Below 50,000 Grt And In Addition Speed And Distance Over Ground In Forward And Athwart Ship Direction For Ships Above 50,000 Grt. M. Instrument (anemometer) For Indication Of Relative Wind- Direction And Force. N. Ship Sound Signal Control Panel According To Colreg. O. Instrument For Indication Of Navigational Lights. P. Function For Transmitting Visual Signals (morse Light). Q. Control System For General Alarm And Fire Detection/alarm And Other Alarms. R. Ais (automatic Identification System). S. Ship-borne Meteorological Instrument. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: T. Controls For Propulsion Plant Operations, Including Engine Telegraph, Pitch Control, And Thrusters. There Shall Be Indicators For Shaft Revolutions And Pitch Of Propeller. There Shall Be Controls For At Least One Propeller And One Bow Thruster. U. Two Speed And Distance Measuring Devices. Each Device Should Operate On A Different Principle, And At Least One Device Should Be Capable Of Being Operated In Both The Sea And The Ground Stabilized Mode. V. Searchlight Controllable From Conning Positions. W. Manually Operated Flashing Red Light Visible From Astern To Indicate When The Ship Is Stopped. X. Vdr (voyage Data Recorder) Or Capability For Vessel History Track And Learner Actions Log From The Instructor And The Assessor Position. Y. Equipment Capable Of Receiving Ice, Icing Warnings, And Weather Information Charts. Z. Anchoring And Towing Arrangements. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Aa. Workstation For Navigating, Maneuvering And Monitoring Consisting Of: · Radar/arpa · Ecdis · Conning Display · Binoculars Control · Autopilot Control · Observer Position/ Visual Control · Information On Position-fixing Systems · Information On Ship Automatic Identification System (ais) · Heading Control System · Flags, Daytime Shapes And Sound Signals · Control For The Main Engine Including Emergency Stop · Control For The Main Rudder Using Helm · Controls For Thruster · Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Internal Communication Equipment · Public Address System · Vhf With Channel Selector · Remote Control For Searchlight · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Illumination Of Equipment And Displays In The Surrounding Darkness · Sound Reception System · Acknowledgment Of The Watch Alarm · Controls For Console Lighting · Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light Bb. Workstation For Manual Steering (wheelhouse) Consisting Of: · Steering Wheel · Rudder Pump Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn Cc. Workstation For Planning And Documentation Consisting Of: · Ecdis Including Navigation Planning Station · Route Planning Devices · Chart Table · Paper Charts · Plotting Aids Dd. Workstation For Communications Consisting Of: · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer Ee. All Systems Related To The Integrated Bridge System Shall Include Failure Control(s) And Method(s) To Train And Assess The Learner In The Use Of Advanced Equipment, Technology And Enable Familiarization And Training To Understand The Limitations Of Automatic Systems. 3.2 Behavioral Realism The Bridge Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulation Of Ownship Shall Be Based On A Mathematical Model With 6 Degrees Of Freedom. B. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Open Water Conditions, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. C. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Restricted Waterways, Including Shallow Water And Bank Effects, Interaction With Other Ships And Direct, Counter And Sheer Currents. D. The Simulator Shall Include Mathematical Models Of Different The Types Of Ownships. E. The Simulator Shall Include Tug Models That Can Realistically Simulate Tug Assistance During Maneuvering And Escort Operations. It Shall Be Possible To Simulate Pull, Push, Reposition Towing And Escorting. F. The Simulator Shall Include Exercise Areas Including Correct Data For Landmass, Depth, Buoys, Tidal Streams And Visual As Appropriate To The Nautical Chart And Publication Used For The Relevant Training Objectives. G. The Radar Simulation Equipment Shall Be Capable Of Model Weather, Tidal Streams, Current, Shadow Sectors, Spurious And False Echoes And Other Propagation Effects, And Generate Coastlines, Navigational Buoys And Search And Rescue Transponders. H. The Arpa Simulation Equipment Shall Incorporate The Facilities For: - Manual And Automatic Target Acquisition - Fast Track Information - Use Of Exclusion Areas - Vector/graphic Time-scale And Data Display - Trial Maneuvers. I. The Ecdis Simulation Equipment Shall Incorporate The Facilities For: - Integration With Other Navigation Systems - Own Position - Sea Area Display - Mode And Orientation - Chart Data Displayed - Route Monitoring - User-created Information Layers - Contacts (when Interfaced With Ais And/or Radar Tracking) - Radar Overlay Functions. J. The Simulator Shall Provide An Own Ship Engine Sound, Reflecting The Power Output. K. The Simulator Shall Provide Capabilities For Realistically Conduct Anchoring Operations. L. The Model Shall Realistically Simulate Own Ship Hydrodynamics In Interaction With Applicable Anchor And Chain Dimensions With Different Bottom Holding Grounds, Including The Effects Of Wind Forces, Wave Forces, Tidal Stream And Currents. M. The Simulator Shall Provide Capabilities For Realistically Simulate The Function Of Mooring And Tug Lines And How Each Line Functions As Part Of An Overall System Taking Into Account The Capacities, Safe Working Loads, And Breaking Strengths Of Mooring Equipment Including Mooring Wires, Synthetic And Fiber Lines, Winches, Anchor Windlasses, Capstans, Bitts, Chocks And Bollards. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: N. The Own Ship Model Shall Realistically Simulate Hydrodynamics In Interaction With Solid Ice Edge. O. The Own Ship Model Shall Realistically Simulate Hydrodynamics And Ice Pressure In Interaction With Solid And Packed Ice. Ship Motion In Solid Ice Should Affect At Least Ship Speed And Turning Radius. P. The Own Ship Model Shall Realistically Simulate The Effects Of Reduced Stability As A Consequence Of Ice Accretion. Q. It Shall Be Possible To Simulate The Effect Of The Following Ice Conditions With Variations: - Ice Type - Ice Concentration - Ice Thickness. R. It Shall Be Possible To Realistically Simulate The Towing Of Ownship – Ownship, And Own Ship Target Ship And Target Ownship. It Shall Be Possible To Introduce Different Towing Gear Like Rope Or Steel Wire With Different Strength And Elasticity, Forward, Stern And Side Towing. S. It Shall Be Possible To Realistically Simulate The Interaction Between The Ships Propeller Wash And The Ice. T. It Shall Be Possible To Realistically Simulate Ice Drift. U. The Simulator Shall Be Equipped With Iceberg Targets Of At Least Six Different Sizes Including Realistic Underwater Bodies Which Interacts With The Sea Bottom. The Icebergs Should Be Visible On The Ship's Radar. V. Motion Through Ice Hummocks Should Be Simulated Realistically Considering Ship Icebreaking Capabilities And Affect Ship's Speed, Roll And Pitch. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation System: W. The Integrated Navigation System Should Combine Process And Evaluate Data From All Sensors In Use. The Integrity Of Data From Different Sensors Should Be Evaluated Prior To Distribution. X. The Integrated Navigation System Shall Ensure That The Different Types Of Information Are Distributed To The Relevant Parts Of The System, Applying A Consistent Common Reference System For All Types Of Information. Y. The Integrated Navigation System Shall Provide Information On Position, Speed, Heading, And Time. Z. The Integrated Navigation System Shall Be Able To Automatically, Continually And Graphically Indicate The Ship's Position, Speed And Heading And, Where Available, Depth In Relation To The Planned Route As Well As To Known And Detected Hazards. Aa. The Integrated Navigation System Shall, In Addition, Provide Means To Automatically Control Heading, Track Or Speed, And Monitor The Performance And Status Of These Controls. Bb. Alarms Shall Be Displayed So That The Alarm Reason And The Resulting Functional Restrictions Can Be Easily Understood. 3.3 Operating Environment The Bridge Simulator Shall Exhibit The Following Operating Environment: A. The Simulator Shall Be Able To Present Different Types Of Target Ships, Each Equipped With A Mathematical Model, Which Accounts For Motion, Drift And Steering Angles According To Forces Induced By Current, Wind Or Wave. B. The Targets Shall Be Equipped With Navigational And Signal-lights, Shapes, And Sound Signals, According To Rules Of The Road. The Signals Shall Be Individually Controlled By The Instructor, And The Sound Signals Shall Be Directional And Fade With Range. Each Ship Shall Have An Aspect Recognizable At A Distance Of 6 Nautical Miles In Clear Weather. A Ship Underway Shall Provide Relevant Bow- And Stern Wave. C. The Simulator Shall Be Equipped With Targets Enabling Search And Rescuing Persons From The Sea, Assisting A Ship In Distress And Responding To Emergencies Which Arise In Port. Such Targets Shall At Least Be: · Rocket Parachute Flares · Hand Flares · Buoyant Smoke Signals · Sart (search And Rescue Transponder) · Satellite Epirb (emergency Position Indicating Radio Beacon) · Lifeboat · Life Raft · Rescue Helicopter · Rescue Aircraft · People In Water. D. The Simulator Shall Be Able To Present At Least 20 Target Ships At The Same Time, Where The Instructor Shall Be Able To Programme Voyage Routes For Each Target Ship Individually. (see Stcw Section A-1/12.4.3) E. The Simulator Shall Provide A Realistic Visual Scenario By Day, Dusk Or By Night, Including Variable Meteorological Visibility, Changing In Time. It Shall Be Possible To Create A Range Of Visual Conditions, From Dense Fog To Clear Conditions. F. The Visual System And/or A Motion Platform Shall Replicate Movements Of Own Ship According To 6 Degrees Of Freedom. G. The Projection Of The View Shall Be Placed At Such A Distance And In Such A Manner From The Bridge Windows That Accurate Visual Bearings May Be Taken To Objects In The Scene. It Shall Be Possible To Use Binocular Systems For Observations. H. The Visual System Shall Present The Outside World By A View Around The Horizon (360°). The Horizontal Field Of View May Be Obtained By A View Of 270° And Where The Rest Of The Horizon May Be Panned (to Move The “camera”). (applicable Only To Full Mission Bridge Station With 270° Horizontal Display) I. The Visual System Shall Present The Outside World By A View Of At Least 120° Horizontal Field Of View. In Addition, At Least The Horizon From 120° Port To 120° Starboard Shall Be Able To Be Visualised By Any Method. (applicable Only To Mini Bridge Station With 120° Horizontal Display). J. The Visual System Shall Present A Vertical View From The Workstations For Navigation, Traffic Surveillance And Manoeuvring Enabling The Navigator To Detect And Monitor Objects Visually On The Sea Surface Up To The Horizon Within The Required Horizontal Field Of View When The Ship Is Pitching And Rolling. In Addition, By Any Method, It Shall Be Possible To Observe The Ship's Side And The Dock During Mooring Operations. K. The Visual System Shall Present All Navigational Marks According To Charts Used. L. The Visual System Shall Show Objects With Sufficient Realism (detailed Enough To Be Recognized As In Real Life). M. The Visual System Shall Show Mooring And Towing Lines With Sufficient Realism In Accordance With The Forces Effecting The Tension. N. The Visual System Shall Provide A Realistic Set Of Bow Wave, Sea Spray And Wakes In Accordance With Ships Power Output, Speed And Weather Conditions. O. The Visual System Shall Provide A Realistic Set Of Flue Gas Emission And Waving Flag Effect In Accordance With Ships Power Output, Speed And Weather Conditions. P. The Simulator Shall Be Capable Of Providing Environmental Sound According To Conditions Simulated. Q. The Navigated Waters Shall Include A Current Pattern, Changeable In Time, According To The Charts Used. Tidal Waters Shall Be Reflected. R. The Simulation Shall Include The Depth According To Charts Used, Reflecting Water Level According To Tidal Water Situation. S. The Simulator Shall Provide At Least Two Different Wave Spectra, Variable In Direction Height And Period. T. The Visual System Shall Provide A Realistic Set Of Wind Waves Including White Caps According To The Beaufort Wind Force Scale. The Simulator Shall Have The Following Additional Requirements For Training In Ice Navigation: U. The Visual System Shall Be Capable Of Showing Concentrations Of Solid And Broken Ice Of Different Thickness. V. The Visual System Shall Be Capable Of Showing The Result Of Icebreaking Including Opening, Twin Breaking And Compacting Channel. W. The Visual System Shall Be Capable Of Showing The Effects Of Searchlight. X. The Visual System Shall Be Capable Of Showing The Effects Of The Ice Accretion To The Own Ship Model. The Simulator Shall Have The Following Additional Requirements For Training In Integrated Bridge Systems Including Integrated Navigation Systems: Y. There Shall Be A Field Of View Around The Vessel Of 360° Obtained By An Observer Moving Within The Confines Of The Wheelhouse Or May Be Panned (to Move The Camera). 4. Hardware Requirements 1 Set 4.1 Full Mission Bridge Simulator (horizon Field View Of 270 Degrees) A. Steel Fabrication Of Main Bridge Consoles Consisting Of: I. Conning/maneuvering Console Ii. Radar Console Iii. Ecdis Console Iv. Bearing Console V. Navigation Aid Equipment Console Vi. Gmdss Console Vii. Steering Stand/console Viii. Chart Table Ix. Overhead Panel X. Gyro Repeater With Pelorus Stand Xi. Binoculars Xii. The Console Must Made Of Steel W/ Handrails B. Visual Specification (minimum Requirements) I. 9x 70” Visual Screens Led Backlit 1. Pc Visual Channel 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Hdmi Cable 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator C. 1x Conning Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) 8. Instrument Adds On Conning Console. D. 2x Ecdis Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) E. 2x Radar / Arpa Console (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Monitor 24” 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 7. Console Made Of Steel (tct 0.8 Mm To 2 Mm) F. Binocular And Instrument (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2. Ssd 4. Rtx 4070 Or Higher 5. Keyboard/mouse 6. 2x 24" Monitor 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator 8. Console Made Of Steel (tct 0.8 Mm To 2 Mm) G. Overhead Panel Display 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. At Least 1width And 0.4height 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator H. Radar/arpa I. Radar/arpa Keyboard (1 Set) Specifications: 1. Usb Interface 2. Console Mount Type I. Handset I. Handset Includes: 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box J. 1x Chart Table Console 1300mm X 1312mm (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 2x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Parallel Ruler Iii. 1x One-hand Compass Divider Steel Iv. 10x Plotting Triangle With Handle V. 1x Deck Log Book Vi. 1x Night Order Book Vii. 1x Bell Book Viii. 1x Chronometer Ix. Admiralty Paper Charts Related To Installed Maps In Simulator K. Gyro Repeater With Pelorus Stand 1. Bearing Repeater Compass 2. Pelorus Stand 3. Power: 24vd 4. Signal: Rs422 Nmea L. Weather Instruments 1. 1x Ships Clock 2. 1x Aneroid Barometer 3. 1x Hygrometer. M. Speaker With Subwoofer I. Channel Sound System Specification: 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 450watts Speaker With Subwoofer 4. Port: Mini Jack 7 Sets 4.2 Mini Bridge Simulator (horizon Field View Of 120 Degrees) A. Consoles Made In Formica Laminated Board Fabrication Of Main Bridge Consoles Consisting Of: I. Conning Console Ii. Radar Console Iii. Ecdis Console Iv. Maneuvering Console V. Chart Table With Gooseneck Dimming Light B. Mini Bridge Desktop Station (bridge Image Generator Computer For Visual, Conning, Radar, Maneuvering And Overhead Display) I. 3x 45” 4k Display For Visual (minimum Requirements) Ii. 1x Computer (minimum Requirements) 1. 256 M.2 Ssd 2. Rtx 4070 Or Higher 3. 1 X Keyboard/mouse 4. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iii. 1 X Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. Keyboard/mouse 5. 24” Monitor 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Iv. 1 X Overhead Panel Display V. 1 X Speakers (minimum Requirements) 1. Interface With Visual Pc 2. Realization Of 3d Sound Effect System 3. Atleast 150 Watts Speaker With Subwoofer 4. Port: Mini Jack Vi. 1 X Goose Neck Microphone Vii. 1 X Set Desktop Instrument Console Including: 1. Steering System / Autopilot / Nfu 2. Steering Wheel Viii. Dual Telegraph 1. 1 X Console Tables 2. 1 X Handheld Uhf Equipment 3. 1 X Console Made In Formica Laminated Board (tct 3/4 Inches) Ix. Chart Table And Plotting Aids (minimum Requirements) 1. Intel Core I5 Processor 2. 8 Gb Ram 3. 256 M.2 Ssd 4. 1x Monitor 24” 5. Keyboard/mouse 6. Ups 1kva A. Surge Protection B. W/ Automatic Voltage Regulator X. 1x Parallel Ruler Xi. 1x One-hand Compass Divider Steel Xii. 1x Plotting Triangle With Handle Xiii. 1x Chart Table At Least 1000mm X 700mm Xiv. 1x Deck Log Book Xv. 1x Night Order Book Xvi. 1x Bell Book Xvii. 1x Chronometer 1 Set 4.3 Bridge Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Handset 1. Handset 2. Cradle With A Ptt Switch 3. Usb Interface Board 4. Handset Box Iii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iv. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel V. 1x Drone View Monitor W/ Smart Tv 55” Tv Led (environment View Of Instructor) Vi. 1x Smart Tv 55” Tv Led For Cctv Vii. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Viii. Instructor Station Table Specification: Ix. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard X. Intercom Telephone / Public Announcement System Xi. 9x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Xii. 1x Ergodynamic Chair Xiii. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Bridge Simulator Scenario Development Station B. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations. I. 1x Computer (minimum Requirements) 1. 2x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Rtx 4070 Or Higher 6. Keyboard/mouse 7. Ups 1.5kva 1. Surge Protection 2. W/ Automatic Voltage Regulator Ii. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Iii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Bridge Simulator The Full Mission Bridge Simulator Shall Have The Following Software And Controls For The Following Workstations: A. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Ecdis Slave Software · One (1) Conning Display Software · One (1) Radar/arpa 3cm · One (1) Radar/arpa 10cm · Nine (9) Realistic Visualization Software With 270° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · Two (2) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Gyro Repeater/pelorus Stand That Can Display Magnetic And Gyro Compass · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light B. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) – Track Control/auto Navigation C. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer · Weather Facsimile D. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.2 Mini Bridge Simulator The Mini Bridge Simulators Shall Have Each Of The Following Software And Controls For The Following Workstations: E. Workstation For Navigating, Maneuvering And Monitoring Consisting: · One (1) Ecdis Master Software · One (1) Conning Display Software · One (1) Radar/arpa Interchangeable To 3cm & 10cm · Three (3) Realistic Visualization Software With 120° Field Of View · Keyboard And Trackball Controls For Ecdis, Radar Apra And Conning Display · One (1) Vhf Dsc Radio W Ch16 · One (1) Overhead Panel Display · One (1) Main Engine Telegraph Including Emergency Stop Control With Printer · One (1) Bow And Stern Thruster Control · One (1) Gps Software · One (1) Bridge Navigational Watch Alarm System (bnwas) · One (1) Echo Sounder · One (1) Speed Log · One (1) Vr Binoculars · One (1) Observer Position/ Visual Control · One (1) Anchor Gear And Mooring Operations Control · One (1) Towing Control · One (1) Tugs Control · One (1) Autopilot Control System · Nfu/ Fu Controls · One (1) Tiller Controls · One (1) Information On Ship Automatic Identification System (ais) · One (1) Intercom Telephone Capable For Public Address System · One (1) Conference Microphone · One (1) Control For Searchlight · One (1) Vdr Remote Alarm Panel · One (1) Bearing Finder · One (1) Alarm System Panel For General Alarm, Fire Alarm, And Other Alarms · Navigation Lights Control · Flags, Daytime Shapes And Sound Signals Control · One (1) Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection · Sound Reception System · Acknowledgment Of The Watch Alarm · Information Indicators For: - Propeller Revolutions (actual And Desired) - Main Engine Rpm - Main Engine Revolution In The Case Of Reduction Geared Engine - Propeller Pitch In The Case Of Controllable Pitch Propeller - Torque - Starting Air - Lateral Thrust - Log Speed And Speed Over The Ground - Bow And Stern Speed - Athwartship Speed - Rudder Angle - Rate-of-turn - Gyro Compass Heading - Magnetic Compass Heading - Heading Reminder (pre-set Heading) - Water Depth Including Depth Warning Adjustment - Vessel Time - Wind Direction And Velocity - Air And Water Temperature - Clinometer - Alarms - Pilot Card - Maneuvering Characteristics - Scoring Exercise/ Assessment · Signal Transmitter For: - Whistle - Automatic Device For Fog Signals - Alarms, (general Alarm, Emergency Alarm, Etc.) - Morse Signaling Light F. Workstation For Manual Steering (wheelhouse) Consisting Of: · One (1) Steering Wheel · Rudder Pump Selector Switch · Steering Mode Selector Switch · Steering Position Selector Switch · Indications For: - Gyro Compass Heading - Magnetic Compass Heading - Pre-set Heading - Rudder Angle - Rate Of Turn - Steering Mode (fu/nfu) G. Workstation For Route Planning And Documentation Consisting Of: · Computer For Route Planning Devices (ecdis) · Chart Table With Drawers For Paper Charts, Flags And Pennants · Paper Charts · Plotting Aids · Chronometer H. Workstation For Communications Consisting Of: · One (1) Handset For Radiotelephone · Gmdss Equipment As Required For The Applicable Sea Area · Vhf-dsc, Radiotelephone · Mf-dsc, Radiotelephone · Mf/hf-dsc, Nbdp, Radiotelephone · Mf/hf Mf/hf Radio Telex · Inmarsat-ses, Egc Rx With Lrit And Ssas · Navtex/egc/hf Direct Printing Telegraph · Fbb/iridium · Cospas-sarsat Epirb · Sart · Ais Sart · Main Station For Two-way Vhf Radiotelephone · Aircraft Vhf Radiotelephone · Gmdss Alarm Panel · Radio Direction Finder Rt-500-m (marine) · Power Switchboard · Battery Charger · Virtual Printer 5.3 Instructor Station 1. The Instructor Workstation Is An Integral Part Of The Simulator And Is Designed To Control The Training Complex, Design (develop) Exercises, Perform Exercises In Real Time, Control Exercise Performance By Trainees, Change Environmental Conditions And Sailing Circumstances, As Well As Enter Own Ship Failure Variables, Document, And Archive The Position And Activity Of The Ship Involved In The Exercise. The Instructor Station Software Should Contain Navigation Areas As Well As Sub-tasks For Each Area, Allowing The Control Of All Active Vessels And Target Ships. 2. Navigation Instructor Software Includes: · Navigation Instructor · Evaluation And Assessment · Tug And Mooring · Radar/arpa · Electronic Navigational Chart: · Bird Eye Of Instructor · Debriefing System 3. Simulator Session(s) Control: • Exercise(s) Start, Pause, Re-start After The Pause, Stop On Bridge(s); • Setting The Initial Position For Own Ships; • Entering Faults Of Navigation Systems, Steering Gear, Propulsion Plant, Fire And General Alarm; • Ability To Set Faults Of Navigational Equipment; • Pulling Apart Ships That Have Collided Or Run Aground; • Control Of Target Vessels, Hoisting Flags Of The International Code Of Signals, Turning Their Sound Signals On And Turning Their Lights On/off; 4. The Software Modules Should Provide A Possibility To Flexibly Configure The Required Bridge Configuration. General: · An Integrated Application For Exercise Editing, Conducting And Debriefing; · Highly Accurate Data Representation Based On Vector Diagrams (ability To Automatically Load All Diagrams Related To The Selected Game Area); · Tools For Creating Exercises And Automatic Competency Assessment Scenarios; · Displaying Of The Actual Ship Contours; · Display Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamps; · Using The Mouse Wheel For Chart Scaling; · Control Of Simulator Session(s); · Continuous Automatic Recording Of Data During Exercise (main, Audio And Video Log Files); · Real Time, Slow Time, And Fast Time Modes; · Ability To Display And Print A New Pilot Card And A Table Of Maneuvering Characteristics Of The Ship; · Setting Parameters And Faults Of Navigation Equipment: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; · Setting Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases (ecdis); · Working With Measuring Tools: - Ability To Set Erbl; - Ability To Attach, Move Or Delete Erbl During An Exercise; 9. Ability To Attach Sart To The Life Raft; 5. Ability To Move Own Ship During Exercise Without Grounding Or Collision; 6. Ability To Apply Virtual Tug Force To 8 Points Of The Vessel’s Hull In Any Direction; 7. Display Of Actual Ship's Contours; 8. Continuous Display Of Parameters Of Vessel Movement And Environment Conditions: Course And Speed Of The Vessel, Course Over The Ground, Transversal Component Of Speed On The Bow And On The Stern, Gyro Heading, Rate Of Turn, Speed And Direction Of The Current And Wind, Height And Direction Of A Wave, Depth; 9. Independent Instructor Control For Wind And Swell Components Of The Wave; 10. Ability To Set Sea State Spectrum: · Pierson-moskowitz; · Phillips; · Ittc (international Towing Tank Conference); · Jonswap (joint North Sea Wave Project); · User. 11. Ability To Exclude Hydrodynamic Interaction With Mooring Walls In The Required Area; 12. Ability To Create A Template Containing A Set Of Objects (ships), Save And Use This Template In Other Exercises; 13. Ability To Save Environment Settings As A Template And Load A Previously Saved Template In Any Exercise And Area; 14. Mooring Operations: · Ability To Set The Rope Material; · Ability To Set The Initial State Of The Mooring Winch (render, Slack Away, Stop); · Ability To Set Mooring Winch Parameters (speed, Pulling Force, Holding Force); · Ability To Operate The Mooring Winch At The Instructor Workplace. 15. Anchor Operations: · Ability To Set User Ground Type With Required Anchor Holding Force Coefficients; · Display Of Anchor Position On The Instructor's Chart On The Ground. 16. Control Of Navigational Lights And Shapes: · Ability To Control The Navigational Lights; · Ability To Switch On/off Deck Lights On Target Ships. 17. Loading/discharging Of Own Ship During Exercises; 18. Weather Conditions Manager: · Ability To Set Predefined Weather Conditions By Beaufort Number (wind, Wave, Whitecaps And Foam, 3d Clouds, Cloud Layer, Visibility) On The Fly; · Ability To Set Customized Weather Conditions; · Visual Effects: Rain And Snow (low, Medium, High), Lightning, Reflection, Translucency, Sea With White Caps, Foam, Splashes, Bow-wave; · Separate Settings For Wind Wave And Swell; · Manual Control Of Wind Direction And Strength; · Adjustment Of Atmospheric Parameters – Temperature, Humidity, Pressure; · Ability To Use Thunderstorm, Precipitation; · Automatic Calculation Of The Position Of The Sun, Moon, Major Stars (up To 100) And Constellations, The Angle And Phase Of The Moon; · Ability To Set Wave Spectrum Type: Pierson-moskowitz; Jonswap (joint North Sea Wave Project); Phillips; User-defined; · Ability To Use Thunderstorm, Precipitation. 19. Rcc, Ship And Coast Stating Assignment; 20. Log Module With Possibility To Print Out And Create Archives; 21. Window For Listening/monitoring Of The Radiotelephone Traffic Including Possibilities To Interfere With Radiotelephone Traffic; 22. Ability To Introduce Background Noise From A List And Instrument Faults To The Trainee Stations. 23. Ability To Change Names, Call Signs, Mmsi, Telex Numbers And Inmarsat Mobile Numbers Of All Emulated Ship Stations And Coast Station According To The Needs Of Different Exercises; 24. Electronic Chart With Vessel Position Indication And The Ability To Change Position, Course And Speed; 25. Ability To Display And Instantly Change Trainee Station Positions On The Electronic Map For Search And Rescue (sar) Exercises; 26. Full Monitoring Of Any Trainee Workstation – The Ability To Monitor The Status Of Each Gmdss Unit And Listen To The Radio Traffic Of Each Trainee Station; 27. Connection To An External Printer; 28. Connection To An Active Speaker For Simultaneous Viewing Of Channels; 29. Providing Functions Of A Coast Telex Or Telephone Subscriber, Coast Radio Station And Rcc Operator From The Log Window; 30. Status Window For All Instruments At Any Workstation; 31. Ability To Log Communication And Trainee Actions For Playback And Later Review; 32. Database Of Coastal Stations, Navtex And Msi Stations And Inmarsat Shore-based Stations Plotted On The Chart; 33. Information About The Gmdss Sea Areas On The Chart; 34. Approximate Estimation Of Radio Wave Propagation In The Selected Frequency Range; 35. Evaluation And Assessment Module; 36. Navtex Functionality: · Ability To Send Navtex Messages On Behalf Of A Navtex Station; · Ability To Edit And Use The Navtex Station Used-defined List; · Ability To Save And Use Navtex Message Templates. 37. “intercom” Panel. To Monitor Intercom Communication, Execute Voice Messages From The Instructor's Side. 38. Vhf Radio Station Module. To Monitor Vhf Communication, Send Voice Messages From The Instructor’s Side, Play Pre-recorded *.wav Files. 39. Coastal Radio Station Module. Screen Layout: 40. Use Of The Mouse Wheel For Chart Centering And Scaling; 41. On-screen Display Of Mooring Walls And Piers; 42. On-screen Display Of Actual Contours Of Any Ship; 43. On-screen Display Of The Object’s Route Line And Its Actual Track; 44. On-screen Display Of The True And Relative Speed Vectors; 45. Selectable Display Mode: True Motion, Relative Motion, Course Up Or North Up; 46. Display Of Prompt And Other Information In The Status Bar: · Bearing And Distance From The Current Cursor On-chart Position To The Reference Point; · Coordinates Of The Current Cursor On-chart Position; · Depth In The Current Cursor Position; · Current Exercise Time (absolute And Relative). 47. Displaying Of Object Tracks: Contour Or Point With Selectable Resolution, Track History And Time Stamp; 48. Displaying Of Walls And Piers; 49. Use Of A Mouse Wheel For Chart Centering And Scaling; 50. User Configurable Workplace; 51. Different Panels For The Control And Monitoring Of The Exercise Fulfillment: · Reports Panel – To Form And Print Exercise Fulfillment Reports; · Ship Info Panel – To Display Courses, Longitudinal And Transverse Speeds, Rates Of Turn For All The Ships Involved In The Exercise. · Evaluation And Assessment Module Panel; · Target Panel – To Control Vessel Target And Flight And Sar Objects; · Objects Panel – To Promptly Select An Object On The Chart From The List Of All The Objects Available In The Exercise; · Flags Panel – To Hoist/lower Ics Flag Signals On Any Of The Ships, Including Ability To Set And Keep Flag Templates · Events Panel – For The Automatic Recording Of Any Important Events Related To The Incorrect Trainee Actions; · Flash Light Panel – To Send Light Signals From Target Vessels, Including Automated Translation Into Morse Code; · Magnetic Deviation Panel – To Configure The Magnetic Deviation Panel For The Vessels, Participating In The Exercise, Save The Panel And Apply Desired Template To Any Own Vessel, Print The Magnetic Deviation Table; · Procedural Alarms Panel – For Defining User Set Of Alarm For Dedicated Vessels. 52. Setting Navigational Equipment Parameters And Faults: Radar, Gps, Loran C, Log, Gyro, Echo Sounder, Uais; 53. Setting The Exercise Weather And Bathymetric Conditions: Global And Local Zones, Import Of Tide And Current Databases; 54. Observing Own Ships And Targets On The Chart: Ship Info Panel, Cpatcpa Panel, Events Panel; 55. Control Of Own Ships And Targets On The Chart: Direct Control Of Steering And Propulsion Systems, Autopilot, Mooring Lines, Anchors; 56. Setting Faults Of Navigational Equipment, Steering And Propulsion System, Fire And General Alarms; 57. Continuous Data Logging During Exercises; 58. Playback Of Recorded Exercises In Real And Fast-time Modes; 59. Performing Preliminary Exercises On The Map To Check Their Suitability For Training On The Simulator; 60. Distress Signals (flare, Smoke Signals, Dye Markers); 61. Adding New Target Ships; 62. Changing Weather Conditions; 63. Moving Buoys, Turning Off Lights On Them And Hiding Them On Both The Visualization System And Radar; 64. Control Of Automatic Tugboats On Commands From The Bridge Or From The Instructor; 65. Generating And Printing Exercise Reports 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section A 5.5.3) B. Full Mission Engine Room Simulator (fmers) And Mini Er Stations’ Features And Applications, Major Components And Engine Room Simulator Performance Standards 1. Major Components The Full Mission Engine Simulators That Can Be Integrated With Bridge Simulators Shall Consist Of The Following Major Components: A. One (1) Full Mission Engine Room Station (class A Configuration) B. Ten (10) Mini Engine Room Stations (class B Configuration) C. One (1) Server Station D. One (1) Instructor Station E. One (1) Simulator Scenario Development Station F. One (1) Briefing/ Debriefing Station 2. Features And Applications 2.1 The Man Electronic Engine Model Simulates A Suez Max Crude Oil Carrier With A Man Slow Speed Turbo Charged Diesel Engine As Propulsion Unit Modeled With Fixed Propeller. The Main Engine Models Respond Dynamically To Variations In Operation And Conditions Of The Ship Model, And The Ship Models Have Mutual Responses To The Main Engine Models. The Model Is Based On Real Engine Data That Makes The Dynamic Behavior Of The Simulator Close To Real Engine Response. In Addition To The Man Engine, The Vessel Has An Electrical Power Plant Including Three 1125 Kva Diesel Generators And One 250 Kva Emergency Generator. The Steam Plant Includes Two D-type Steam Boilers, Based On Alfa Laval And One Composite Boiler (aalborg), 3 Cargo Turbines, Condensing And Feed Water Systems. Control Room Operator Station, Bridge And Steering Panels Are Included. The System Shall Also Be Connected To The High Voltage Engine Simulator. 2.2 The Simulator Models Complies With The Requirements In The Stcw Convention, Regulation 1/12 And Fulfill The Standards Of An Internationally Recognized Classification Society For Maritime Simulator Systems. 2.3 The Engine Model Main Specifications High Fidelity Engine Room Systems Include: - Sea & Lt/ht Fresh Water Systems, Incl. Fw Generator - Electrical Power Plant, Incl. Diesel Generators And Power Management - Start & Service Air Compressors, Incl. Compressor Intermediate Coolers And Emergency Compressor - Integrated Automation System, Incl. Vessel Performance Monitor - Steam Plant Incl. D-type Oil Fired Boilers And Combined Exhaust/oil Fired Boiler - Diesel/heavy Fuel/oil Systems, Incl. Hfo, Lshfo And Mdo Tanks, Separators, Viscometers - Lubricating Oil Systems, Incl. Separator - Stern Tube Systems - Steering Gear - Main Engine Control System (man) - Main Engine Remote Control System (ac 600) - Main Engine Maneuvering System - Main Engine Hydraulic Oil System - Main Engine Hydraulic Cylinder Units System - Cylinder Indication Diagrams - Air Ventilation System - Bilge Wells & Bilge Separator - Sewage Treatment Plant - Incinerator Plant - Inert Gas System - Ballast System - Refrigeration System - Ship Loading System - Fire Detection System - Fire Fighting System - Remote Co2 Release, Emergency Stops And Quick Release Valves - Emission Control System (water Scrubbing And Me Low Nox Mode) 2.4 The Engine Simulator Product Shall Be Able To Address The Following Stcw Competencies And Shall Be Reflected In The Certificate: · Table A-iii/1.1 – Maintain Safe Engineering Watch · Table A-iii/1.3 – Used Of Internal Communication Systems · Table A-iii/1.4 – Operate Main And Auxiliary Machinery And Associated Controls · Table A-iii/1.5 – Operate Fuel, Lubrication, Ballast And Other Pumping Systems And Associated Control Systems · Table A-iii/1.6 – Operate Electrical, Electronic And Control Systems · Table A-iii/1.7 – Maintenance And Repair Of Electrical And Electronic Equipment · Table A-iii/1.11 – Maintain Seaworthiness Of The Ship 2.5 Interface To Engine Room High Voltage System - The Engine Room Model Will Be Interfaced To A Corresponding High Voltage Simulator And Gas Turbine Installed In The Academy. 3. Engine Room Simulator Performance Standards 3.1 Physical Realism The Engine Simulator Stations Shall Have The Following Physical Realism: A. Equipment And Consoles Shall Be Installed, Mounted, And Arranged In A Ship-like Manner B. The Control Room Consoles Shall Include Control And Monitoring Of The Main Engine, Auxiliary Engines And Electrical Power Generation, Steam Boiler, Pump, Compressors And All Other Alarms. C. The Remote Monitoring And Control Systems Shall Be In Compliance With The Functional Requirements Of The Classification Societies For Periodically Unattended Machinery Spaces. D. The Main Engine Remote Control Console Shall Include Command Functions And Status Indication Normally Found On Board Ships. E. The Electric Power Generation Shall Be Under Automatic Or Manual Control. Such System Should Be Able To Constantly Monitor Demand And Supply. When Deviation From Pre-set Limits Arises, The System Should Be Able To Act In Order To Normalize The Situation. The System Shall Also Perform Continuous Control Of The Frequency And Load Sharing. F. The Electric Power Supply System Shall Be Operated Either From The Switchboard Or The Power Management System. - Remote Start/stop Of Auxiliary Diesel Generators - Operation For Shaft Generator - Connect/ Disconnect Of All Generators - Automatic And Priority Selection - Non-essential Systems Trip - Constant Frequency Mode - Different Control Modes Of Load Sharing G. The Main Switchboard Shall Be A Full Scale Model Of A Typical Switchboard, And Comprise The Necessary Controls And Indicators Usually Available Of Real Generators. H. The Remote Control And Automation System Must Include Control Of The Following Equipment: - Me Lubricating Oil Pumps - Me Fresh Water Cooling Pumps - Me Sea Water Cooling Pumps - Me Auxiliary Blowers - Fuel Oil System And Pumps - Air Compressors - Steering Gear Pumps - Fire Pump Each Of The Above Individual Units Shall Allow Manual Start And Stop From The Control Room Consoles. It Shall Also Be Possible To Use Automatic Start And Stop Where Applicable. I. The Alarm Monitoring System Shall Consist Of A Typical Shipboard Alarm System. J. An Alarm Shall Be Announced By Sound And By Flashing Light In The Control Room. K. A Printer Or A Computer In The Engine Room Control Shall Be Used As An Alarm Log And Event Log. L. “dead Man Alarm System” The Simulator Shall Have The Following Additional Requirements For Low Speed Engine: M. The Simulated Engine Room Shall As A Minimum Reflect Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Low Speed Engine: - Main Engine Including Turbocharger System - 2 Auxiliary Diesel Generators - Lubrication Oil Separator - Steering Gear System - Fire Pump - Shaft Generator - Cooling Water System Including Freshwater Generation System - Turbo Generator - Fuel Oil Bunkering System - Fuel Oil Settling And Service Systems - 2 Heavy Fuel Oil Separators - 1 Diesel Oil Separator - Steam Generation Plant Including Exhaust And Oil-fired Boilers - Diesel Oil And Heavy Fuel Oil Supply To Main And Auxiliary Engines - Main Engine Operation From Engine Room, Engine Control Room And Bridge - Turbocharger System - Air Ventilation System For Engine And Control Room - Bilge Water System Including Oily Water Treatment Systems - Stern Tube System - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall Have The Following Additional Requirements For Medium And High Speed Engine: N. The Simulated Engine Room Shall Consist Of Typical Machinery Found On Merchant Ships. The Following Main Components Shall Be Simulated And All Necessary Sub-systems Included For A Medium And High Speed Engine: - One Or More Main Engines - Main Sw System - 2 Auxiliary Engines - Fuel Oil Tanks - Fuel Oil Separator - Lubrication Oil Separator - Main Engine(s), Including: • Fresh Water System • Lubrication System • Turbocharger System • Me Sw System - Reduction Gear System - Controllable Propeller Pitch Were Applicable - Steam Generation System As Applicable - Freshwater Generator - Bilge Wells And Bilge Separation System - 2 Air Compressors - Steering Gear System - Fire Pump - Electrical Power Plant - Deck Machinery Applicable To The Ship Model - Ballast System - Sewage Treatment System The Simulator Shall At Least Have The Following Additional Requirements For Machinery Spaces: O. The Simulated Machinery Spaces Shall At Least Include One Dedicated Room For This Purpose. P. At Least The Following Main Components Of The Machinery Spaces Shall Be Graphically Presented Or Represented By Mock-ups Or In Realistic Visualization (to Illustrate Physical Presence) In The Simulated Machinery Spaces: - Main Engine - Auxiliary Diesel Generators - Steam Boiler - Fire Pump Q. The Facilities For Local Operation In The Simulated Machinery Spaces Shall Consist Of Local Operating Stations For Each System. Each Station Shall Be Furnished With Start/stop (open/closed) Buttons And Status Lights, Various Numbers Of Pressure -, Temperature Indicators, Etc. The Local Operating Stations Shall At Least Give Means To Operate The Following: - Main Engine (me) - Me Lubricating Oil Systems Including Separator - Me Fresh Water Cooling System - Me Sea Water Cooling System - Me Auxiliary Blowers - 2 Auxiliary Diesel Generators - Steam Boiler - Fuel Oil System (diesel And Heavy Fuel Oil) Including Separator - 2 Air Compressors - Steering Gear System - Bilge Water System - Fire Pump R. All Valves Typically Associated With The Operation Of Above Machinery May Be Operated At The Computer Screen In A 3d Visual Form Or Mouse Operated By The Candidate. S. Internal Communication System. 3.2 Behavioral Realism The Engine Simulator Stations Shall Have The Following Behavioral Realism: A. The Simulator Models Shall Be Able To Replicate The Dynamic Behaviour Of The Machinery Systems And All Its Visual Parameters As Well As The Interactions Between The Sub-systems. B. The Simulator Models Shall Simulate The Engine Room Components With Their Procedures, As Well As Modelled Controller Systems (sensors, Controllers, Actuators, And Valves) Connected To The Processes. C. When Simulating Real Equipment The Behaviour Of Such Simulated Equipment Should Behave As Identical Aw Possible As The Original. Critical Parameters Of The Behaviour Shall Be Documented D. The Simulator Model Shall Make Applicable Controllers Available And Adjustable With Regards To Pid (proportional-integral-derivative Controller) Parameters. E. The Simulator Model Shall Provide Facilities To Allow The Injection And Resetting Of Malfunctions At Appropriate Times During Operation As Necessary. F. It Shall Be Possible To Simulate Change In Seawater Temperature And Demonstrate How This Affects The Complete Simulation Model. G. It Shall Be Possible To Simulate A Change In Air Temperature And Demonstrate How This Affects The Complete Simulation Model. H. The Simulator Shall Have All Heat Exchangers Available And Adjustable With Regards To Their Parameters (heat-transfer Factor, Heat Dissipation Are Etc.) I. The Simulator Shall Make All Pumps Available And Adjustable With Regards To Their Parameters (pump Capacity, Wear, Etc.) J. It Shall Be Possible To Demonstrate Systematically The Tests That Are Made On The Ums (unmanned Machinery Space) Alarm System. K. It Shall Be Possible To Simulate Auto Slow-down And Emergency Shut Down L. It Shall Be Possible To Simulate Safe Methods To Test Inert Gas Generator (ig) Alarms And Control. M. It Shall Be Possible To Simulate Testing Of The 24v D.c. Power Supply To The Navigation, Communication And Engine Room Control Console In Event Of Power Failure. N. It Shall Be Possible To Simulate Safe Method Of Testing The Insulation For Rotor And Stator. O. It Shall Be Possible To Simulate Of Reading A Power Factor Meter With Reference To Four Segments P. It Shall Be Possible To Simulate Testing Of The Devices And Relays Provided For Generator Protection Q. It Shall Be Possible To Simulate Tests Related To Avr (automatic Voltage Regulator) R. It Shall Be Possible To Simulate Methods Of Cooling And Checking Of Air Gap S. It Shall Be Possible To Simulate The Precautionary Measures When Megger Testing The Rotor Of A Brushless Generator T. It Shall Be Possible To Simulate Routine Tests On An Emergency Generator U. It Shall Be Possible To Simulate How A Generator Circuit Breaker Ocr (over Current Relay) Is Set And Tested. V. It Shall Be Possible To Simulate The Process Of Connecting A Shaft Generator On Load And Specific Conditions For Taking Off Load. W. It Shall Be Possible To Simulate The Procedure For Megger Testing A High Voltage System X. It Shall Be Possible To Simulate The Maintenance And Checks Carried Out On An Acb (air Circuit Breaker) Y. It Shall Be Possible To Simulate Recovery From “dead Ship” Condition. Z. It Shall Be Possible To Simulate Methods Test The “preferential Tripping Sequence” Aa. It Shall Be Possible To Simulate Methods To Tests Auto “cut In” Of Stand Fault Bb. It Shall Be Possible To Simulate Methods Of Diagnosing Single Phasing Fault. Cc. It Shall Be Possible To Simulate Operation And Maintenance Of Variable Speed Motor Starters. Dd. It Shall Be Possible To Simulate Operational Test Methods Of Oily Water Separator Monitors Ee. It Shall Be Possible To Simulate Test Methods For Level Alarms And Function Tests Of Bilge Pumping Arrangement Ff. It Shall Be Possible To Simulate The Functional Tests Of Odmcs (oil Discharge Monitoring And Control System) And Odme (oil Discharge Monitoring Equipment) System Gg. It Shall Be Possible To Simulate The Function Test Of Ows (oily Water Separator) And Ppm (parts Per Million) Unit. 3.3 Operating Environment The Engine Simulator Stations Shall Have The Following Operating Environment: A. It Shall Be To Adjust The Noise Level In The Simulated Machinery Spaces Infinite From No Added Noise Up To Minimum 100 Db(a). The Noise Shall Have A Frequency Distribution Typical For Machinery Spaces. Headset Is Provided For Each Workstation. B. It Shall Be Possible To Simulate The Sea Water Temperature At Least Infinite Between +1ºc And +30 ºc C. An Alarm Can Be Heard Through Headset Of A Candidate And By Flashing Light In The Machinery Spaces 4. Hardware Requirements 1 Set 4.1 Full Mission Engine Room Simulator A. Engine Control Room Consoles I. Ecr Pump Compressor And Power Management Console 1. 1 X Console 2. 1 X Computer 3. 2 X 24 Touch Monitors Ii. Ecr2 Alarm, Monitoring And Remote-control Console: 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Iii. Ecr3 Main Engine Remote Control And Indication Console 1. 2 X Console 2. 1 X Computer 3. 3 X 24” Touch Monitors 4. 1 X Speed Set Lever For Main Engine Remote Control And 5. Indication Console 6. Dead Man Alarm (dma) 7. Engineers Reset 8. Included Power Relay To Which Illumination In Engine Control Room And Engine Room Can Be Connected, Causing Lights In The Rooms To Go Out During A Blackout To Increase Realism. Iv. Simulated Cctv Touch Monitor 1. 1 X Computer 2. 1 X 24 Monitor V. Internal Telephone At The Following Locations 1. Instructors Station 2. Engine Control Room 3. Engine Room 4. Emergency Generator Room Vi. Main Switchboard 1. 14 X Touch Screen Monitors 2. 7 X Computers 3. 1 Set Of Speakers 4. Installed In A Switchboard Manner Vii. Engine Room Equipment 1. 4 Dome Type Virtual Walkthrough 2. 4 X High Resolution Short Throw Projector 3. 4 X Computer With Graphics Card 4. 4 X Controller Viii. Local Operating Station Console 1. 1 X Console 2. 1 X Computer 3. 1 X Keyboard 4. 1 X 24” Touch Monitor 5. 1 X Industrial Tracker Ball Ix. Engine Room Sound 1. 1 X Sub Woofer 2. 4 X Satellite Speaker X. Alarm Horn And Lamp 1. 1 X Column With Lights And Sirens Xi. Emergency Generator Room 1. 1 X Dome Type Virtual Walkthrough 2. 1 X High Resolution Short Throw Projector 3. 1 X Computer With Graphics Card 4. 1 X Controller 5. With Sound System B. All Computers Must Be The Latest Generation This Includes Processors, Memory, Graphics Card And Storage. I. Monitors: Full Hd Resolution Ii. Storage: Solid-state Drive (ssd) Iii. Processor Generation: Must Be From The Latest Generation Of Processors Iv. Graphics: Integrated Graphics Dedicated Gpu If Needed. C. Touchscreens For Durability, Responsiveness, And Multi-touch Support. D. Each Computer Must Be Paired With A Ups Unit Rated For At Least 1.5 Kva And Automatic Voltage Regulation To Handle Voltage Fluctuations. E. The Engine Control Console Must Be Made From Steel W/ Handrails 10 Sets 4.2 Mini Engine Room Simulator A. 1x Computer Specification (minimum Requirement) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 256 M.2. Ssd 4. Video Card 5. Keyboard/mouse 6. 2x At Least 24" Monitor (touchscreen) 7. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm C. 1x Chairs 1 Set 4.3 Engine Instructor Station A. Instructor Station I. 1x Computer (minimum Requirements) 1. 3x 24” Monitor 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 256 M.2 Ssd 5. Keyboard/mouse 6. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator Ii. 1x Speaker 1. Type: Desktop 2. Port: Mini Jack Iii. 1x Steel Cabinet W/ Lock 1. Metal Drawer Office Drawer 2. File Cabinet Storage With Wheel Iv. 1x Smart Tv 55” Tv Led For Cctv V. 1x Printer 1. Laser Printer A4 2. A4 Print Speed Up To 48 Ppm 3. Auto 2-sided (duplex) Printing, 1-line Lcd 4. Wifi, Airprint, Mopria, Wifi Direct, Lan, Usb 2.0 5. Colored Printer Vi. Instructor Station Table Specification: Vii. 11x Two-way Vhf Radiotelephone (walkie-talkie) With Charging Connection Viii. 1x Table Size: At Least L 1700 X W 700 X H 750 Mm 1. Material: Formica Matt Laminate On Chipboard Ix. 1x Ergodynamic Chair X. 1x Document Metal Cabinet With Glass Sliding Door 1. Size: 1850x 400mmx 900mm 2. Door Lock 1 Set 4.4 Engine Simulator Scenario Development Station A. Scenario Development Station As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 1. 1x Computer (minimum Requirements) 2. 2x 24” Monitor 3. Intel Core I5 Processor 4. 16 Gb Ram 5. 256 M.2 Ssd 6. Rtx 4070 Or Higher 7. Keyboard/mouse 8. Ups 1.5kva A. Surge Protection B. W/ Automatic Voltage Regulator B. 1x Table Size: At Least L 1200 X W 800 X H 750 Mm I. Material: Formica Matt Laminate On Chipboard Ii. 1x Ergodynamic Chair 5. Software Requirements 5.1 Full Mission Engine Room Simulator 5.2 Mini Engine Room Simulator 5.3 Instructor Station 5.4 Simulator Scenario Development Station 1. The Simulator Scenario Development Station Shall Be Integrated With All Engine Stations And Instructor Stations, And Can Act As An Instructor Station Capable Of Deploying Scenarios To Other Stations (bridge And Engine) 2. The Simulator Scenario Development Station Shall Have The Same Software And Control Capabilities As The Instructor Station. (see Section B 5.5.3) 1 Set C. Briefing/ Debriefing Station For Bridge And Engine A. 2x Computer (minimum Requirements) 1. 1 X Pc 2. Intel Core I5 Processor 3. 16 Gb Ram 4. 500gb Ssd 5. Low Profile Video Card 6. 1x Keyboard/mouse 7. 1x Ups 1kva 8. 1x W/ Computer Table Size: At Least L 1700 X W 700 X H 750 Mm 9. Briefing And Debriefing Rooms With Playback Capability (playing Of Recorded Exercise And Assessment In Simulator B. 50x Chairs C. 1x Solid Round Table (at Least 6100 X 1220 Mm) (for Bridge Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) D. 1x Solid Round Table (at Least 4880 X 1220 Mm) (for Engine Briefing/debriefing) I. (metal Legs With Laminate Board Or Solid Wood Table) E. 1x Smart Tv At Least 70" 4k 1. Wall Mounted. 2. 2x Hdmi 10meters F. 4x Bridge And 4x Engine) Hardware For Virtual Bridge Familiarization (minimum Requirements) 1. Display: A. Type: Lcd B. Resolution: 2064 X 2208 Per Eye C. Refresh Rate: 120 Hz D. Field Of View: E. Horizontal: 97 Degrees F. Vertical: 93 Degrees 2. Processor: A. Chipset: Qualcomm Snapdragon Xr2 Gen 2 3. Ram: 12gb 4. Storage: A. Options: 128gb, 256gb, And 512gb Variants 5. Audio: 6. Hand Tracking: Improved Hand Tracking Capability 7. Controllers: A. Type: Meta Touch Pro Controllers B. Features: Haptic Feedback, Improved Ergonomics, Rechargeable Batteries 8. Battery: A. Headset: Approximately 2-3 Hours Of Active Use B. Charging: Usb-c Fast Charging 9. Connectivity: A. Wireless: Wi-fi 6e Support B. Bluetooth: 5.2 10. Inclusions: A. Headset B. Touch Pro Controllers (pair) C. Charging Cable (usb-c) D. Power Adapter W/ Extra 1 Battery Each E. Controller Lanyards F. Glasses Spacer Ii. Add On’s: 1. 2x Strap With Battery 2. 8x Silicone Cover Face Cover 3. 4x Silicone Protective Case 4. 8x Silicone Case For Controller 5. 3 Row Vr Storage Cabinet With Lock G. The Virtual Reality Bridge Must Be Complete With Hotspots, Identification Tags And Descriptions. It Shall Also Be Available On An Offline System, Navigable. H. Playback Capability With The Following Functions: · Loading A Previously Created Exercise On A Chart Or In Engine Room; · Playing The Exercise To Explain The Task; · Uploading A Sample Log Of The Same Exercise To Explain The Correct Actions. I. Virtual Bridge Familiarization W/ Virtual Reality Device The Vr System Aims To Simulate The Overhauling Process, Enabling Immersive, Hands-on Learning And Pre-assessment Without Direct Physical Intervention On The Engine. This Approach Will Enhance Technical Skills, Reduce Risk, And Improve Efficiency In Real-world Engine Maintenance And Overhauling. The Supplier Shall Provide A Virtual Bridge And Engine With The Use Of Virtual Reality Providing The Following Visualizations: 1. Bridge Wing Equipment 2. Speaker Mic 3. Rate Of Turn 4. Engine Rpm 5. Quick Release Lifebouy 6. Remote Panel 7. Gyro Compass Repeater 8. Fire Box 9. Hatch For Maintenance 10. Thermometer Ii. Main Bridge 1. Epirb 2. Sart 3. Clear View Screen 4. Location Of Fire Extinguishers 5. Pantry With Equipment 6. Pilot Chair 7. Smoke Detectors 8. Damage Control Plans 9. Radar 1 And 2 And 3 10. Gps With Other Equipment 11. Helm Wheel 12. Indicator Control 13. Deck Light Control 14. Admiralty And Other Maritime Publications 15. Fireplan 16. Rudder Angle Indicator 17. Voice Recorder 18. Whistle Horn 19. Water Tight Door Indicators 20. Window Wipers 21. Pa Systems 22. Cargo Hold Fan Control 23. Smoke Alarm System 24. Fire Alarm System 25. General Alarm System 26. Vhf System 27. Log Books And Other Documentation 28. Ecdis Voyage Planner 29. Pressure Recorder 30. Portable Uhfs 31. Lifejackets, Rocket Flare, And Rocket Line 32. Location Of Immersion Suits 33. Barometer 34. Utc Clock 35. Radio Room Configuration 36. Posters 37. Charts 38. Compass Deck / Monkey Island 39. Radar Equipment 40. Antennas 41. Anemometer 42. And Other Equipment On The Monkey Bridge Iii. The Me-b Main Engine Vr Overhauling System Cover The Following Features Full-scale, Interactive Models Allowing For A Detailed Exploration Of All Engine Components, Including: Iv. Connection Rod & Crosshead Assembly V. Stuffing Box Assembly Vi. Piston Assembly Vii. Cylinder Liner Assembly Viii. Cylinder Cover Assembly Ix. Exhaust Valve Assembly X. The Vr Simulation Guides Users Through Disassembling, Inspecting, And Reassembling The Exhaust Valve, Focusing On Critical Tasks Like Checking Valve Seats, Spindle Condition, And Wear On Sealing Surfaces. Users Can Also Simulate Tasks Such As Lapping The Valve, Inspecting Hydraulic Actuators, And Ensuring Proper Seating Of The Valve During Reassembly. 1 Set D. Server Station For Bridge And Engine A. 2x Set Computer (minimum Requirements) 1. Intel Core I5 Processor 2. 16 Gb Ram 3. 4x 500 Ssd 4. Keyboard/mouse 5. License Operating System B. 1x Nas And Exercise Server 1. 4 Bay Nas Disk Station Quadcore Processor 2. 4x 4 Tb Hdd C. 1x Server Rack 1. Server Rack At Least 32u 2. W/ Fan D. 1x Ups 1. 5kva (5kw) 2. Sealed Lead-acid (sla) Or Lithium-ion 3. Output Voltage: 230v Ac 4. Surge Protection 5. Stabilizes Incoming Voltage Without Switching To Battery Mode 25 Sets E. Cloud Simulator-ready Computers A. Laptop 1. 13th Gen Intel Core I5-1335u 2. 16 Gb, 2 X 8 Gb, Ddr4. 2666 Mhz 3. 512 Gb, M2, Pcie Nvme, Ssd 4. Intel Iris Xe Graphics 5. Windows 11 Pro License 6. Wi-fi 6 Wireless Lan And Bluetooth 7. Keyboard With Numeric Keypad 8. 15.6", Fhd 1920x1080, 120hz, Wva, Non-touch, Anti-glare, 250 Nit, Narrow Border, Led-backlit 9. Ports: Usb 2.0, Headset Jack, Power Jack,hdmi 1.4, Usb 3.2 Gen 1 Type-a, Usb 3.2 Gen 1 Type-c™ 10. Power Adapter: 220v Ac Input, 65w 11. Accessories: Wireless Mouse 1 Set F. Network And Cctv A. 1 X High Speed Router For Remote Support B. Network Switch 1. Network Switch Specifications Manage: 2. 4x 24 Ports 10/100/1000mbps Rj45 Ports 3. 1x 8 Ports 10/100/1000mbps Rj45 Ports C. Set Cctv Monitoring 1. 1x Nvr At Least 32 Channel 2. 20x 6 Mp Fixed Dome Network Camera With Mic 3. 3x 6tb Storage (design For Cctv) D. Network Requirements: I. 72x Lan Port Ii. 1x Lot: Of Upvc, Conduit, Pull Box, Fittings, Hanger, And Support And Other Materials If Needed. Including Utp Cat6 Shielded Pure Copper, Fiber Optic Cable, Patch Panels. Iii. Installation, Engineering Labor For Entire Project. Iv. Cable Laying, Labeling, Harnessing V. Mobilization And Di-mobilization Vi. All Cabling Will Be Endpoint At Server Room (back Of Full Mission Bridge Simulator) E. Structured Cabling Systems Standard I. Stations Must Include Lan Outlets And Patch Cords. Ii. Backbone Cabling Will Be Using The Cable Tray For Lan Distribution. Iii. Lan Outlets Must Have Network Labeling Iv. Patch Panels Are Required G. Civil Works A. Program Of Work Separate Documents (attached) Part Ii. Other General Requirements 1 Ea. Project Billboard/signboard 1 L.s Occupational Safety And Health Program 1 L.s Mobilization/demobilization Part Iii. Civil, Mechanical, Electrical, & Sanitary/plumbing Works Part A. Earthworks 1 L.s Removal Of Structures And Obstruction Part C. Finishings And Other Civil Works 179.71 M² Wall, Metal Frame, Fiber Cement Board 6mm 37.92 M² Tempered Glass Door, 12mm, Reflective 23.04 M² Aluminum Glass Window 4.05 M² Doors, Solid Panel 406.28 M² Acoustical Ceiling Panel 745.2 M² Painting Works, Masonry/concrete 4.05 M² Painting Works, Wood 48.38 M² 150mm Chb Nonload Bearing(including Reinforcing Steel) 48.38 M² Plain Cement Plaster Finish 116 M² Floor Tiles, Imo Rubber, On Finish Floor 211.6 M² Floor Tiles, Imo Rubber, On Raised Floor System Part D. Electrical 1 L.s Panelboard With Main And Branch Breakers 1 L.s Wires And Wiring Devices 1 L.s Lighting Fixtures And Lamps 1 L.s Conduit, Boxes, And Fittings 1 L.s Pole Mounted Power Transformer (oisc) 1 L.s Network Cabling Part E. Mechanical 1 L.s. Door Access And Card Reader System Part F. Simulator Equipment 1 L.s Airconditioning, Package/split Type H. Terms And Conditions 1. A 3-year Warranty For The Computer Hardware And Console Peripherals 2. All Workstations Shall Have Imo Standard Rubber Mat Flooring. 3. The Software Comes With A 3-year Warranty Inclusive Of New Updates. 4. The Project Will Be Implemented Within 150 Cd. Liquidating Damages Will Be Applicable For Any Delays. 5. A Comprehensive Guide Will Be Provided, Offering Detailed Instructions On System Operation And Maintenance Activities, Facilitating Ease Of Use And System Upkeep. 6. Onsite Training Sessions Will Be Conducted By Certified Instructors And Technical Experts, Facilitating Smooth Knowledge Transfer And Ensuring Proficient System Operation. Certificates Will Be Provided Upon Completion Of Training Sessions. 7. Structured Cabling Standards To Establish A Reliable And Efficient Network Infrastructure. 8. The Simulator Manufacturer Should Be An Iso 9001:2015 And Iso 14001:2015 Certified Business. 9. The Simulator Should Be Certified By An Internationally Recognized Classification Society And May Also Be Certified By National Authorities. 10. The Software Must Be Perpetual License. 11. The Supplier Shall Conduct An Annual Face-to-face Maintenance Session To Ensure The System's Optimal Functionality And Performance. 12. The Supplier Must Resolve Any Software Or Hardware Issues Within 2 To 5 Cd Of Their Occurrence To Minimize Downtime And Disruptions. 13. All Hardware Installations Must Adhere To Software Specifications To Guarantee Seamless Integration And Operation. 14. The Computer Hardware Supplied Must Be Sourced From Proven Technology Hardware Companies, Quality And Performance Standards To Ensure Optimal Functionality And Compatibility With The Software. 15. Bidders Are Required To Offer Continuous Retraining Sessions Free Of Charge During The Warranty Period To Ensure Users' Proficiency With The System. 16. Bidders Should Provide Manufacturer Authorization Or Exclusivity Certificate To Ensure The Authenticity And Legality Of The Supplied Products. 17. The Bidder Is Responsible For Performing A Thorough Site Inspection, And A Site Inspection Certificate Issued By The Agency Shall Be Submitted As Part Of The Eligibility Requirements. 18. The Bridge Simulator Shall Be Integrated With The Engine Simulator Ensuring Compatibility And Functionality. 19. All Simulator Stations Can Connect And Enable Them To Interact With Each Other In A Coordinated Scenario. 20. The Simulator Scenario Development Station Shall Be Capable Same As An Instructor Station Capable Of Deploying Scenarios To Other Stations. 21. All Other Simulator Specifications And Capabilities Not Indicated Herein, The Simulator Shall Comply With The Simulator Performance Standards As Required In Maritime Industry Authority (marina) Evaluation Instrument For Full Mission Bridge And Engine Simulator. 22. The Bidders Should Provide A Breakdown Of The Unit Prices Of The Major Components In The Original Of Duly Signed And Accomplished Price Schedule(s) Under Financial Component Envelope Upon Bid Submission. Furthermore, They Should Provide A More Detailed Breakdown As A Condition For Issuance Of Notice To Proceed. ~~~~nothing Follows~~~~
Closing Date9 Dec 2024
Tender AmountPHP 79.9 Million (USD 1.3 Million)

Municipality Of Badiangan, Iloilo Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Section Ii. Instructions To Bidders A. General 1. Scope Of Bid 1.1 The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi- Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2 The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1 The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) (v) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2 Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3 Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1 All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2 In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) (d) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And If The Bidder Is A Cooperative, To All Its Officers, Directors, And Controlling Shareholders Or Members; And (de If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1 Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2 The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3 Government Owned Or Controlled Corporations (goccs) May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Attached Agencies Of The Procuring Entity. 5.4 Unless Otherwise Provided In The Bds, The Bidder Must Have An Experience Of Having Completed A Single Largest Completed Contract (slcc) That Is Similar To The Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The Philippine Statistics Authority (psa) Consumer Price Index. However, Contractors Under Small A And Small B Categories, Without Similar Experience On The Contract To Be Bid May Be Allowed To Bid If The Cost Of Such Contract Is Not More Than Fifty Percent (50%) Of The Allowable Range Of Contract Cost (arcc) Of Their Registration Based On The Guidelines As Prescribed By The Pcab. For This Purpose, Contracts Similar To The Project Shall Be Those Described In The Bds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5 Unless Otherwise Provided In The Bds, The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc), Which Must Be At Least Equal To The Abc To Be Bid, As Calculated As Follows: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 15 The Values Of The Bidder’s Current Assets And Current Liabilities Shall Be Based On The Latest Audited Financial Statements Submitted To The Bir, Through Its Electronic Filing And Payment System (efps). 6. Bidders Responsibilities 6.1 The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix – Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2 The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb, By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting. (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Participate, Submit The Bid, And To Sign And Execute The Ensuing Contract And/or To Represent The Bidder In The Bidding, Accompanied By The Duly Notarized Special Power Of Authority (spa) And The Duly Notarized Secretary’s Certificate, Board/ Partnership Resolution Whichever Is Applicable Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Ra 9184 In Relation To Other Provisions Of Republic Act 3019; And (j) (k) (l) Complying With Existing Labor Laws And Standards, If Applicable Ensuring That It Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Of Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3 The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site And Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. Unless Otherwise Indicated In The Bds, Failure To Furnish All Information Or Documentation Required In This Bidding Documents Shall Result In The Rejection Of The Bid And The Disqualification Of The Bidder. 6.4 It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5 The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. However, The Procuring Entity Shall Ensure That All Information In The Bidding Documents, Including Bid/supplemental Bid Bulletin/s Issued, Are Correct And Consistent. 6.6 Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7 The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8 Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services Unless Otherwise Indicated In The Bds, There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1 Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2 Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed 8.3 The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid B. Contents Of The Bidding Documents 9. Pre-bid Conference 9.1 If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. 9.2 Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents Discussed During The Pre-bid Conference. 9.3 Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1 Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2 Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3 Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids 11.1 The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components. 12.1 Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents - Class "a" Documents: (i) Philgeps Platinum Certificate Of Registration And Membership With Annex A In Accordance With Section 8.5.2 Of The Irr. (ii) Statement Of All Its Ongoing Government And Private Contracts From The Submission Of Bids, Unless Otherwise Stated In The Bds, Including Contracts Awarded But Not Yet Started, If Any. Statement Of The Bidder's Single Largest Completed Contract (slcc) Similar To The Contract To Be Bid, In Accordance With Itb Clause 5.4, Within The Relevant Period As Provided In The Bds. The Two Statements Required Shall Indicate For Each Contract The Following: (ii.1) (ii.2) (ii.3) (ii.4) (ii.5) (ii.6) (ii.7) (ii.8) (ii.9) (ii.10) (ii.11) (ii.12) (ii.13) Name Of The Contract; Date Of The Contract; Contract Duration; Owner’s Name And Address; Nature Of Work; Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; Total Contract Value At Award; Date Of Completion Or Estimated Completion Time; Total Contract Value At Completion, If Applicable; Percentages Of Planned And Actual Accomplishments, If Applicable; Value Of Outstanding Works, If Applicable; The Statement Of The Bidder's Slcc Shall Be Supported By The Notices Of Award And/or Notices To Proceed, Project Owner's Certificate Of Final Acceptance Issued By The Owner Other Than The Contractor Or The Contractors Performance Evaluation System (cpes) Final Rating, Which Must Be At Least Satisfactory. In Case Of Contracts With The Private Sector, An Equivalent Document Shall Be Submitted Issued By The Owners; And Unless Otherwise Provided In The Bds, A Valid Special Pcab. License In Case Of Joint Ventures, And Registration For The Type And Cost Of The Contract For The Project; And (iii) Nfcc Computation In Accordance With Itb Clause 5.5; And Class "b" Document: (iv) If Applicable, Valid Joint Venture Agreement (jva) In Accordance With Ra 4566 Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents - (i) Bid Security In Accordance With Itb Clause 18. If The Procuring Entity Requires The Bidders To Submit The Bid Security In The Form Of: (i.1) Cash Or Cashier’s/ Manager’s Check Issued By A Universal Or Commercial Bank, Or (i.2) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Universal/ Commercial Bank And If Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.3) A Surety Bond Accompanied By A Certification Coming From The Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (i.4) Bid Securing Declaration (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data. These Personnel Must Meet The Required Minimum Years Of Experience Set In The Bds, And (ii.3) List Of Contractor’s Major Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Proof Of Ownership, Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project As The Case May Be, Which Must Meet The Minimum Requirements For The Contract Set In The Bds, And (iii) Sworn Statement In Accordance With Section 25.3 Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix – Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1 Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form Which Includes Bid Prices And The Bill Of Quantities, In Accordance With Itb Clause 15.1 And 15.3; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2 Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted 14. Alternative Bids 14.1 Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2 Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3 Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1 The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder 15.2 The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3 All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4 Unless Otherwise Provided In The Bds, All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Indicated In The Bds And Specified In Gcc Clause 48 And Its Corresponding Scc Provision. 16. Bid Currencies 16.1 All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2 If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3 Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1 Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2 In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1 The Procuring Entity Shall Prescribe In The Bds The Acceptable Forms Of Bid Security That Bidders May Opt To Use, Which Shall Include The Bid Securing Declaration (bsd) Or Any Other Form Of Bid Security And The Amount Of Which Shall Be Not Less Than The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (not Less Than The Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Five Percent (5%) For Biddings Conducted By Lgus, The Procuring Entity May Also Require Bidders To Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Instrument. The Bid Securing Declaration Mentioned Above Is An Undertaking Which States, Among Others, That The Bidder Shall Enter Into Contract With The Procuring Entity And Furnish The Performance Security Required Under Itb Clause 33.2, From Receipt Of The Notice Of Award, And Committing To Pay The Corresponding Fine, And Be Suspended For A Period Of Time From Being Qualified To Participate In Any Government Procurement Activity In The Event It Violates Any Of The Conditions Stated Therein As Provided In The Guidelines Issued By The Gppb. 18.2 The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3 No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4 Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5 The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) (iv) Has A Finding Against The Veracity Of The Required Documents Submitted In Accordance With Itb Clause 28.2. Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; Or (v) Any Other Reason Stated In The Bds. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32; Or (iii) Any Other Reason Stated In The Bds. 19. Format And Signing Of Bids 19.1 Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix – Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2 Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3 The Bidder Shall Prepare And Submit An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Machine Copies, The Original Shall Prevail 19.4 Each And Every Page Of The Bid Form, Including The Bill Of Quantities, Under Section Ix Hereof, Shall Be Signed By The Duly Authorized Representative Of The Bidder. Failure To Do So Shall Be A Ground For The Rejection Of The Bid. 19.5 Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1 Unless Otherwise Indicated In The Bds, Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid” 20.2 Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3 The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s 20.4 All Envelopes Shall (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 20.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Itb Clause 1.2; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5 Bid Envelopes That Are Not Properly Sealed And Marked As Required In The Bidding Documents, Shall Not Be Rejected, But The Bidder Or Its Duly Authorized Representative Shall Acknowledge Such Condition Of The Bid As Submitted. The Bac Or The Procuring Entity Shall Assume No Responsibility For The Misplacement Of The Contents Of The Improperly Sealed Or Marked Bid, Or For Its Premature Opening. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity 23. Modification And Withdrawal Of Bids 23.1 The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2 A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Letter Of Withdrawal Must Be Executed By The Authorized Representative Of The Bidder Identified In The Omnibus Sworn Statement, A Copy Of Which Should Be Attached To The Letter. 23.3 Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract 23.4 No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1 24.2 The Bac Shall Open The Bids In Public, Immediately After The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. In Case The Bids Cannot Be Opened As Scheduled Due To Justifiable Reasons, The Bac Shall Take Custody Of The Bids Submitted And Reschedule The Opening Of Bids On The Next Working Day Or At The Soonest Possible Time Through The Issuance Of A Notice Of Postponement To Be Posted In The Philgeps Website And The Website Of The Procuring Entity Concerned, If Available. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed” 24.3 Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13,2, The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.4 24.5 Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. All Members Of The Bac Who Are Present During Bid Opening Shall Initial Every Page Of The Original Copies Of All Bids Received And Opened. 24.6 If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.7 In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.8 Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance 24.9 24.10 The Procuring Entity Shall Prepare The Minutes Of The Proceedings Of The Bid Opening That Shall Include, As A Minimum: (a) Names Of Bidders, Their Bid Price, Bid Security, Findings Of Preliminary Examination; And (b) Attendance Sheet. The Bac Members Shall Sign The Abstract Of Bids As Read. The Bidders Or Their Duly Authorized Representatives May Attend The Opening Of Bids. The Bac Shall Ensure The Integrity, Security, And Confidentiality Of All Submitted Bids. The Abstract Of Bids As Read And The Minutes Of The Bid Opening Shall Be Made Available To The Public Upon Written Request And Payment Of A Specified Fee To Recover Cost Of Materials. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1 Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless Otherwise Allowed In The Bds Or In The Case Of Itb Clause 26. 25.2 Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered. 27. Detailed Evaluation And Comparison Of Bids 27.1 The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2 In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3 The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. Unless Otherwise Specified In The Bds, The Bac Shall Consider The Following In The Evaluation Of Bids (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) Or A Dash (-) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors, Omissions, And Other Bid Modifications, If Allowed In The Bds, To Enable Proper Comparison Of All Eligible Bids. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4 Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered. 27.5 Unless Otherwise Indicated In The Bds, The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form, Which Includes The Bill Of Quantities. 27.6 Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1 The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2 Within A Non-extendible Period Of Five (5) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Latest Income And Business Tax Returns Filed And Paid Through The Bir Electronic Filing And Payment System (efps) And, (b) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Above Requirements On Time Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security In Accordance With Section 69 Of The Irr Of Ra 9184 And Disqualification Of The Bidder For Award. 28.3 The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. Which Shall Be Completed Within A Period Of Twelve (12) Calendar Days. 28.4 If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5 A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6 28.7 Within A Period Not Exceeding Fifteen (15) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Event Of Disapproval, Which Shall Be Based On Valid, Reasonable, And Justifiable Grounds As Provided For Under Section 41 Of The Irr Of Ra 9184, The Hope Shall Notify The Bac And The Bidder In Writing Of Such Decision And Grounds For It. When Applicable, The Bac Shall Conduct A Post-qualification Of The Bidder With The Next Lowest Calculated Bid. A Request For Reconsideration May Be Filed By The Bidder With The Hope In Accordance With Section 37.1.3 Of The Irr Of Ra 9184. 29. Reservation Clause 29.1 Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2 Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3 In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made In Accordance With Section 40 Of The Irr Of Ra 9184. F. Award Of Contract 30. Contract Award 301. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb) 30.2 Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3 Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions (a) Submission Of The Following Documents Within Ten (10) Calendar Days From Receipt Of The Notice Of Award. (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv). (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required, As Provided In Section 37.3 Of The Irr Of Ra 9184. 31. Signing Of The Contract 31.1 At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2 Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity 31.3 The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4 The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Notice Of Award Of Contract; And (f) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1 To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2 The Procuring Entity Shall Prescribe At Least One (1) Acceptable Form Of Performance Security Taken From The Categories Below That Bidders May Opt To Use, Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Not Less Than The Percentage Of The Total Contract Price In Accordance With The Following Schedule: Form Of Performance Security Amount Of Performance Security (not Less Than The Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Performance Securing Declaration (psd) None 32.2 Performance Security As Indicated In Section 17.1 (k) And 39 Of The 2016 Revised Irr Of Ra No. 9184, While Includes The Performance Securing Declaration (psd) As An Alternative Performance Security During A State Of Calamity Or Imposition Of Community Quarantine Pursuant To Gppb Resolution No. 09-2020. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1 Within Seven (7) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed Together With A Copy Or Copies Of The Approved Contract To The Successful Bidder. All Notices Called For By The Terms Of The Contract Shall Be Effective Only At The Time Of Receipt Thereof By The Successful Bidder. 34.2 The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Five (5) Calendar Days From The Issuance Of The Notice To Proceed. 35. Protest Mechanism Decision Of The Procuring Entity At Any Stage Of The Procurement Process May Be Questioned In Accordance With Section 55 Of The Revised Implementing Rules And Regulations Of Republic Act 9184. Section Iii – Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Barangay Odiongan, Badiangan, Iloilo. The Name Of The Contract Is: Improvement Of Water System, Brgy. Odiongan, Badiangan, Iloilo. Project Identification No. 2024-041-b-pa 2.0 The Funding Source Is Through The Provincial Aid From The Provincial Government Of Iloilo In The Amount Of P 800,000.00 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 The Prospective Bidder Must Have An Experience Of Having Completed At Least One (1) Contract That Is Similar To The Contract To Be Bid, And Whose Value, Adjusted To Current Prices Using The Psa Consumer Price Indices, Must Be At Least Fifty Percent (50%) Of The Abc To Be Bid. 5.5 No Further Instructions. 6.3 No Further Instructions. 7 No Further Instructions. 8.1 Subcontracting Is Not Allowed. 8.2 Not Applicable. 9.1 No Further Instructions. 10.1 The Procuring Entity’s Address Is: Badiangan Municipal Hall R.c. Tabiana St., Poblacion, Badiangan, Iloilo 5033 Contact Person: Mr. Humbert S. Recomono Head: Bac Secretariat Municipal Hall, Badiangan, Iloilo Tel. No. (033) 320-7809 C.p. No. 09198501252 12.1 The First Envelope Shall Contain The Eligibility And Technical Documents Stated In The Itb Clause. However, If The Bidder Maintains A Current And Updated File Of Its Class “a” Documents With The Bac Of The Local Government Of Badiangan, Iloilo, A Certification To That Effect Issued By Its Bac May Be Submitted In Lieu Of The Class “a” Documents. 12.1(a)(i) No Other Acceptable Proof Of Registration Is Recognized. 12.1(a)(iii) No Further Instructions. 12.1(a)(iv) No Further Instructions. 12.1(b)(ii.2) The Minimum Key Personnel Requirements For The Project Are: Construction Foreman Skilled Worker Laborer Itb Clause 12.1(b)(ii3) Following Is The Minimum Major Equipment Requirements, Which Are Owned, Leased And/or Under Purchase Agreement Which Are To Be Exclusively Used For The Project: None 13.1 (a) Financial Bid Shall Be Accompanied With Detailed Estimates Or Unit Cost Analysis. Otherwise It Will Be Considered Incomplete Bid. 13.1(b) This Shall Include All Of The Following Documents: 1.) Bid Prices In The Bill Of Quantities; 2.) Detailed Estimates, Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates, And Equipment Rentals Used In Coming Up With The Bid; And 3.) Cash Flow By Month Or Payment Schedule 13.2 The Abc Of This Project Is Php. 800,000.00 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 No Further Instructions. 15.2 All Unit Cost In The Bill Of Quantities Shall Be Filled Up In Words And In Figures. Otherwise It Will Be Considered Incomplete Bid. 15.4 Bid Prices Shall Be Fixed. Adjustable Price Proposals Shall Be Treated As Non-responsive And Shall Be Rejected. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 16.3 No Further Instructions. 17.1 Bids Will Be Valid Until 120 Calendar Days After Bidding. 18.1 The Bid Security Shall Be In The Form Of A Bid Securing Declaration (bsd), Or Any Of The Following Forms: 1. P (2% Of Abc), If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. P (5% Of Abc), If Bid Security Is In Surety Bond; 18.2 The Bid Security Shall Be Valid Until 120 Calendar Days After Bidding. 18.5(a)(iv) The Following Are Additional Grounds For Forfeiture Of Bid Security: 1. Submission Of Eligibility Requirements Containing False Information Or Falsified Documents. 2. Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding. 3. Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding. 4. Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid. 5. Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time. 6. Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification. 7. Any Documented Unsolicited Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor. 8. Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared As Successful. 9. All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. 18.5(b)(iii) No Further Instructions. 20.1 The Documents Enclosed In The Original Bid Should Be Original Copy Or Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 20.3 Each Bidder Shall Submit One (1) Original And Two (2) Copies Of The First And Second Components Of Its Bid. The Photocopied Copies Of The Documents Enclosed In The First And Second Components Of The Bid Should Be Duly Stamped Certified True/ Machine Copy With Printed Name And Signature Of The Owner Of The Company Or The Duly Authorized Representative Of The Company As Indicated In The Special Power Of Attorney (spa) Or Secretary’s Certificate. The Duly Authorized Representative Should Have A Specimen Signature In The Spa Or Secretary’s Certificate. 21 The Address For Submission Of Bids Is: Municipal Budget Office, Municipal Hall, Badiangan, Iloilo The Deadline For Submission Of Bid Is: November 25, 2024; 8:30 A.m. 24.1 The Place Of Bid Opening Is: Municipal Social Hall, Badiangan, Iloilo The Date And Time Of Bid Opening Is: November 25, 2024; 9:00 A.m. 25.1 No Further Instructions. 27.3 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.5 No Further Instructions. 28.2(b) Only Tax Returns Filed And Taxes Paid Through The Bir Electronic Filing And Payment System (efps) Shall Be Accepted. Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 31.4(g) The Additional Contract Documents Relevant To The Project That Are Required By The Procuring Entity Are: Construction Schedule And S-curve; Manpower Schedule; Construction Methods; Equipment Utilization Schedule; Construction Safety And Health Program Approved By The Department Of Labor And Employment; And Pert/cpm 32.2 The Procuring Entity Shall Prescribe At Least One (1) Acceptable Form Of Performance Security Taken From The Categories That Bidders May Opt To Use, Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Not Less Than The Percentage Of The Total Contract Price In Accordance With The Schedule In Itb Clause 32.2. 33.2 The Effective Date Of The Contract Is Five (5) Calendar Days After Bidders Receipt Of The Notice To Proceed. Section Iv. General Conditions Of Contract 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms: 1.1 The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2 Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums 1.3 The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4 The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5 The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6 Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7 The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded 1.8 The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9 Days Are Calendar Days; Months Are Calendar Months. 1.10 Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11 A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12 The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13 The Defects Liability Period Is The One Year Period Between Project Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14 Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15 Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16 The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17 Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18 The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19 Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20 Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21 The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc 1.22 The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract 1.23 The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24 Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25 Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26 Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27 The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates 1.28 A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29 Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30 Work(s) Refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2.0 Interpretation 2.1 In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2 If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works) 3. Governing Language And Law 3.1 This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2 This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1 On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2 If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3 The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4 The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligation 6.1 The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2 The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3 The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4 The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5 The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6 If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7 During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8 The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9 The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10 Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1 Unless Otherwise Specified In The Scc, Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2 The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3 The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4 The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5 The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extension. 7.6 In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7 The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1 Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2 Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3 Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1 The Contractor Shall Pay Liquidated Damages To The Procuring Entity At The Rate Per Day Stated In The Scc For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Total Amount Of Liquidated Damages Shall Not Exceed The Amount Defined In The Scc. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2 If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.1. 10. Site Investigations Report(s) The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works 12. Contractor’s Risk And Warranty Security 12.1 The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2 The Defects Liability Period For Infrastructure Projects Shall Be One Year From Project Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3 In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4 After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable 12.5 The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6 The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Amount Of Warranty Security Not Less Than The Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By A Universal Or Commercial Bank: Provided, However, That The Bank Guarantee Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security. Thirty Percent (30%) 12.7 The Warranty Security Shall Be Denominated In Philippine Pesos And Shall Remain Effective For One (1) Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8 In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1 From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity. (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1 The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2 The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3 The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4 If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5 In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6 The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1 The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2 Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3 Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4 The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5 All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity 17.1 The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18 Termination For Other Causes 18.1 The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2 The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3 Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive And Coercive Practices As Defined In Itb Clause 3.1(a); (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4 The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5 When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6 If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1 The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Implementing Unit Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Implementing Unit, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper To Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2 Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Constructor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1 For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2 If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3 If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4 After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5 The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1 If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2 If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3 Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr-a: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. Additional Instructions On Resolution Of Disputes, If Any, Shall Be Indicated In The Scc. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Scc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1 Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity’s. 23.2 The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1 All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2 The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3 The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4 The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1 When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2 If The Contractor’s Financial Proposals For Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1 The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. Unless Specified In The Scc, No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2 The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1 The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.1 Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractors Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1 Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Dayworks Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2 All Work To Be Paid For As Dayworks Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3 The Contractor Shall Be Paid For Dayworks Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1 The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2 The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative 31. Program Of Work 31.1 Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2 An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3 The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4 The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations; And If Allowed, Any Compensation Event. 31.5 When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6 All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conference 32.1 Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2 The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1 The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2 The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3 If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4 If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1 The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2 If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3 The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1 The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Begins At Completion Date Up To Final Acceptance By The Procuring Entity’s Unless Otherwise Specified In The Scc. The Defects Liability Period Shall Be Extended For As Long As Defects Remain To Be Corrected. 37.2 Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3 The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4 The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1 The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2 The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1 The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2 The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3 The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4 The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5 The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1 The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2 The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3 Payments Shall Be Adjusted By Deducting Therefrom The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. Unless Otherwise Indicated In The Scc, No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4 The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5 Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1 The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2 The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3 The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4 The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1 The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Scc Clause 42.2. 42.2 Progress Payments Are Subject To Retention Of Ten Percent (10%), Unless Otherwise Specified In The Scc, Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3 The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4 On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1 Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2 A Change Order May Be Issued By The Implementing Official To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3 An Extra Work Order May Be Issued By The Implementing Official To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4 Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5 In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1 The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2 The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor 45.3 In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment Termination 46.1 If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2 If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3 The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4 If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1 Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2 No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3 Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4 No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5 Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed Unless Otherwise Specified In The Scc. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1 If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. Section V – Special Conditions Of Contract Scc Clause 1.17 The Contract Duration For This Project Is Ninety (90) Calendar Days, The Completion Date Shall Be Determined After Contractors’ Receipt Of The Written Notice To Proceed. 1.22 The Procuring Entity Is Barangay Odiongan, Badiangan, Iloilo. 1.23 The Procuring Entity’s Representative Is Hon. Mario Hupanda, Punong Barangay. 1.24 The Site Of The Project Is At Brgy. Odiongan, Badiangan, Iloilo. 1.28 The Start Date Is Five (5) Days After Bidder’s Receipt Of The Notice To Proceed. 1.31 The Works Include Project Billbaord, Well Development & Purchase Of 2 Hp Submersible Motor Pump. 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon Effectivity Of The Contract. 6.5 The Contractor Shall Employ The Following Minimum Key Personnel: Construction Foreman Skilled Worker Laborer 7.1 No Further Instructions. 7.4(c) No Further Instructions. 8.1 No Further Instructions. 9.1 None 10 The Applicable Liquidated Damages Is At Least One Tenth (1/10) Of One Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Maximum Deduction Shall Be Ten Percent (10%) Of The Amount Of The Contract, The Procuring Entity Shall Rescind The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 12.5 Five (5) Years. 13 No Additional Provisions. If The Contractor Is A Joint Venture, All Partners To The Joint Venture Shall Be Jointly And Severally Liable To The Procuring Entity. 21.3 No Further Instructions. 26.1 No Further Instructions. 29.1 Dayworks Are Applicable At The Rate Shown In The Contractor’s Original Bid. Scc Clause 34.3 The Funding Source Is Through The Provincial Aid From The Provincial Government Of Iloilo. 37.1 No Further Instructions. 39.1 The Amount Of Advance Payment Shall Be Equivalent To Fifteen Percent (15%) Of The Total Contract Price. 40.1 No Further Instructions. 40.3 No Further Instructions. 42.2 No Further Instructions. 43 For Variation Orders, The Contractor Shall Be Paid For Additional Work Items Whose Unit Prices Shall Be Derived Based On The Following: A) For Additional/extra Works Duly Covered By Change Orders Involving Work Items Which Are Exactly The Same Or Similar To Those In The Original Contract, The Applicable Unit Prices Of Work Items Original Contract Shall Be Used. B) For Additional/extra Works Duly Covered By Extra Work Orders Involving New Work Items That Are Not In The Original Contract, The Unit Prices Of The New Work Items Shall Be Based On The Direct Unit Costs Used In The Original Contract (e.g, Unit Cost Of Cement, Rebars, Form Lumber, Labor Rate, Equipment Rental, Etc.). All New Components Of The New Work Item Shall Be Fixed Prices, Provided The Same Is Acceptable To Both The Government And The Contractor, And Provided Further That The Direct Unit Costs Of New Components Shall Be Based On The Contractor’s Estimate As Validated By The Procuring Entity Concerned Via Documented Canvass In Accordance With Existing Rules And Regulations. The Direct Cost Of The New Work Item Shall Then Be Combined With The Mark-up Factor (i.e., Taxes And Profit) Used By The Contractor In His Bid To Determine The Unit Price Of The New Work Item. 48 No Further Instructions. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is Twenty Five Thousand Pesos (p 25,000.00). Section Vi – Specifications Please Refer To The Attached Plans And Specifications Included As Part Of The Bidding Documents. Section Vii – Drawings Insert Here A List Of Drawings. The Actual Drawings, Including Sites Plans, Should Be Attached To This Section Or Annexed In A Separate Folder. Plans For Project Identification No. 2024 – 041 – B - Pa Are Attached. 7please See On This Folder Plan For Project Identification No. 2024 – 041 - B - Pa Section Viii – Bill Of Quantities Bid No. 2024 – 041 – B - Pa Improvement Of Water System, Brgy. Odiongan, Badiangan, Iloilo. Name Of Bidder ______________________________________________________ Project Identification Number __. Page Of . All Entries Must Be Computerized Or Typewritten Item No. Description Quantity Unit Unit Cost Total Cost I. Project Billboard 2 Each Pesos ……………………………………………… ………………………………………..………………….. ………………………………………….……………….. And ………………………………...……. Ctvs. (p …………………….…………) / Each P …………………………..…….. Total P Ii. Well Development W/ Grouted Riprap Spcl 1 Construction Of Dugwell 1 L.s. Pesos ……………………………………………… ………………………………………..………………….. ………………………………………….……………….. And ………………………………...……. Ctvs. (p …………………….…………) / L.s. P …………………………..…….. Total P Spcl 2 Construction Of Concrete Stairs, Slab And Dugwell 1 L.s. Pesos ……………………………………………… ………………………………………..………………….. ………………………………………….……………….. And ………………………………...……. Ctvs. (p …………………….…………) / L.s. P …………………………..…….. Total P Spcl 3 Pumping Test (96hrs., Continuous Pump Operation) 1 L.s. Pesos ……………………………………………… ………………………………………..………………….. ………………………………………….……………….. And ………………………………...……. Ctvs. (p …………………….…………) / L.s. P …………………………..…….. Total P Iii. Purchase Of 2 Hp Submersible Pump 1 Unit Pesos ……………………………………………… ………………………………………..………………….. ………………………………………….……………….. And ………………………………...……. Ctvs. (p …………………….…………) / Unit P …………………………..…….. Total P Total Bid Cost In Figures P …………………………..…….. Total Bid Cost In Words …………………………………………………………………………………………………………………………………………………………….. ……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………. Submitted By: __________________________________________ Printed Name And Signature Of Bidder’s Representative ____________________________________ Name Of Bidder ____________________________ Date Summary Of Costs Project Identification No. 2024 – 041 - B - Pa Improvement Of Water System, Brgy. Odiongan, Badiangan, Iloilo Name Of Bidder ________________________________________________________ Project Identification Number __. Page Of . All Entries Must Be Computerized Or Typewritten Item No. Bid Amount I) Project Billboard P Ii) Well Development W/ Grouted Riprap Ii.1) Construction Of Dugwell P I1.2) Construction Of Grouted Riprap P Ii.3) Construction Of Concrete Stairs, Slab And Dugwell P Ii.4) Pimping Test (96hrs., Continuous Pump Operation) P Iii) Purchase Of 2 Hp Submersible Pump P Total Bid Amount P Submitted By: __________________________________________ Printed Name And Signature Of Bidder’s Representative ____________________________________ Name Of Bidder ___________________________ Date Section Ix - Forms Bid Form (project Identification No. 2024 – 041 - B - Pa) _________________ Date To: [name And Address Of Procuring Entity] Sir/ Madam: We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Improvement Of Water System, Brgy. Odiongan, Badiangan, Iloilo. (name Of Project) 1. We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract, Specifications And Drawings Therein, Accompanying This Bid. The Total Price Of Our Bid For This Contract Based On The Unit Prices In The Said Bill Of Quantities, Excluding Any Discounts Offered In Item (d) Below Is: _______________( Amount In Words And Figures)________________________________. The Discounts Offered And The Methodology For Their Application For This Contract Are: None The Total Bid Price Includes The Cost Of All Taxes, Such As, But Not Limited To: (specify The Applicable Taxes, E.g. (i) Value Added Tax (vat), (ii) Income Tax, (iii) Local Taxes, And (iv) Other Fiscal Levies And Duties), Which Are Itemized Herein And Reflected In The Detailed Estimates, 2. Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; 3. If Our Bid Is Accepted And We Receive From You A Notice Of Award, We Commit Within Ten (10) Days After Our Receipt Of The Said Notice To Submit The Required Performance Security In The Form Of _______________, Which Is Equivalent To _______percent Of The Contract Price For The Due Performance Of The Contract And Other Documents Prescribed In The Bidding Documents And To Sign The Contract Agreement. 4. We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; 5. Our Firm, Its Facilities Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Local Government Of Badiangan, Iloilo; 6. We Understand That This Bid, Together With Your Written Acceptance Thereof Through Your Notice Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Agreement Is Prepared And Executed; And 7. We Understand That You Are Not Bound To Accept The Lowest Calculated Bid Or Any Other Bid That You May Receive. 8. We Certify/confirm That We Comply With The Eligibility Requirements As Per Itb Clause 5 Of The Bidding Documents 9. We Likewise Certify/ Confirm That The Undersigned, [ For Sole Proprietorships, Insert: As The Owner And Sole Proprietor Or Authorized Representative Of Name Of Bidder, Has The Full Power And Authority To Participate, Submit The Bid, And To Sign And Execute The Ensuring Contract. On The Latter's Behalf For The [name Of Project] [for Partnerships, Corporations, Cooperatives, Or Joint Ventures, Insert: Is Granted Full Power And Authority By The Name Of Bidder, To Participate, Submit The Bid, And To Sign And Execute The Ensuring Contract On The Latter's Behalf For [name Of Project] Of The [name Of The Procuring Entity] 10. We Acknowledge That Failure To Sign Each And Every Page Of This Bid Form, Including The Attached Schedule Of Prices And Bill Of Quantities, Shall Be A Ground For The Rejection Of Our Bid. Name: Legal Capacity : Signature: Duly Authorized To Sign The Bid In Behalf Of: Date : Omnibus Sworn Statement Republic Of The Philippines ) Iloilo City ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board By Itself Or By Relation, Membership, Association, Affiliation, Or Controlling Interest With Another Blacklisted Person Or Entity As Defined And Provided For In The Uniform Guidelines On Blacklisting. 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder] Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. 9. [ Name Of Bidder] Did Not Give Or Pay Directly Or Indirectly, Any Commission, Amount, Fee, Or Any Form Of Consideration, Pecuniary Or Otherwise, To Any Person Or Official, Personnel Or Representative Of The Government In Relation To Any Procurement Project Or Activity. 10. In Case Advance Payment Was Made Or Given, Failure To Perform Or Deliver Any Of The Obligations And Undertakings In The Contract Shall Be Sufficient Grounds To Constitute Criminal Liability For Swindling (estafa) Or The Commission Of Fraud With Unfaithfulness Or Abuse Of Confidence Through Misappropriating Or Converting Any Payment Received By A Person Or Entity Under An Obligation Involving The Duty To Deliver Certain Goods Or Services, To The Prejudice Of The Public And The Government Of The Philippines Pursuant To Article 315 Of Act No. 3815 S. 1930, As Amended, Or The Revised Penal Code. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ___________________________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] Checklist Of Bid Requirements First Envelope Eligibility Documents Class “a” Documents Legal Documents: 1 Certificate Of Philgeps Registration (platinum Membership) And Membership With Annex A In Accordance With Section 8.5.2 Of The Revised Irr. Technical Documents: 2 Statement Of All Its Ongoing Government And Private Contracts, Including Contracts Awarded But Not Yet Started, If Any Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include, For Each Contract, The Following: (a) Name/date Of The Contract; (b) Contract Duration, (c) Owner’s Name & Address (d) Nature Of Work, (e) Contractor’s Role, (f) Total Contract Value, (g) Percentages Of Planned And Actual Accomplishments, And (h) Value Of Outstanding Works. The Statement Shall Be Supported By A Notice Of Award Or Notice To Proceed Issued By The Owner. (latest) 3 Statement Of Its Single Largest Completed Government And Private Contracts Which Are Similar In Nature And Complexity To The Contract To Be Bid. The Statement Shall Include The Following: (a) Name/date Of The Contract; (b) Contract Duration, (c) Owner’s Name And Address (d) Nature Of Work, E) Contractor’s Role, And (f) Total Contract Value At Completion. The Statement Shall Be Supported By The Certificates Of Completion And Acceptance Issued By The Owner; Or Constructors Performance Evaluation System (cpes) Rating Sheets & Notice To Proceed Issued By The Owner. (latest) Financial Documents 4 The Prospective Bidder's Latest Computation For Its Net Financial Contracting Capacity (nfcc) Which Must Be At Least Equal To The Abc To Be Bid. (latest) Class “b” Documents 5 If Applicable, A Valid Joint Venture Agreement (jva) In Case The Joint Venture Is Already In Existence Or, In Lieu Thereof, A Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (latest) Technical Documents 1 Bid Security In The Prescribed Form, Amount And Validity Period And In Accordance With Itb Clause 18. 2 Organizational Chart For The Project 3 4 List Of Contractor’s Personnel (ex., Project Manager, Project Engineers, Materials Engineers, And Foremen, To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Data List Of Contractor's Equipment Units, Which Are Owned, Leased And/ Or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/ Vendor During The Duration Of The Project. 5 Authority Of The Signatory 6 7 8 Sworn Statement By The Propective Bidder Or Its Duly Authorized Representative In Accordance With Section 25.2(b)(iv) Of The Revised Irr Of Ra 9184 And As Indicated In The Omnibus Sworn Statement Of The Bidding Documents Using The Prescribed Form Issued By The Gppb. (latest) Affidavit Of Site Inspection. Duly Signed Construction Safety And Health Program. Note: Any Missing Document In The Above-mentioned Checklist Is A Ground For Outright Rejection Of The Bid. Second Envelope Financial Documents 1 Duly Signed Form Of Bid 2 3 4 Duly Signed Bid Prices In The Bill Of Quantities Duly Signed Detailed Estimates Duly Signed Cash Flow By Month And Payment Schedule
Closing Soon25 Nov 2024
Tender AmountPHP 800 K (USD 13.5 K)

Municipality Of Mapanas, Northern Samar Tender

Civil And Construction...+1Civil Works Others
Philippines
Details: Description Bidding Documents Procurement Of Infrastructure Projects Name Of Project: Repair And Rehabilitation Of Mapanas-rhu Barangay Del Norte, Mapanas Northern Samar Contract Reference No. 2024-11-094 Table Of Contents Section I. Invitation To Bid 3 Section Ii. Instructions To Bidders 7 Section Iii. Bid Data Sheet 35 Section Iv. General Conditions Of Contract 38 Section V. Special Conditions Of Contract 70 Section Vi. Specifications 72 Section Vii. Drawings 75 Section Viii. Bill Of Quantities Error! Bookmark Not Defined. Section Ix. Bidding Forms 77 Section X. Foreign-assisted Projects Error! Bookmark Not Defined. Section I. Invitation To Bid Bid Notice Abstract Invitation To Bid (itb) Republic Of The Philippines Province Of Northern Samar Municipality Of Mapanas Invitation To Bid For Project: Repair And Rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar. The Lgu- Mapanas, Northern Samar, Through The Ldrrm Fund Of Fy 2023 Intends To Apply The Sum Of One Million Forty Nine Thousand Pesos 57/100 Only (p1,049,465.57) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For : Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas N. Samar Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot B.7 Construction Safety And Health 1.00 Lot B.9 Mobilization And Demobilization 1.00 Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg 903 Formworks And Falseworks 53.38 Sq.m. 1047 Metal Structures 84.00 In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 1046 Masonry Works 75.60 Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. 1005 Doors And Windows 3.00 Sets 1002 Plumbing Works 1.00 Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. 1101 Wires And Wiring Devices 1.00 Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is 1103 Lighting Fixtures And Lamps 1.00 Is Spcl1 Signages 1.00 Lot Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 4. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 06, 2024-november 26, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 5. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On November, 15, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 6. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of November 26, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 7. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 8. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas, Northern Samar Mobile # 09778033758 Section Ii. Instructions To Bidders 1. The Bids Must Be Delivered On Or Before November 26, 2024 At 9:00 A.m And Failure To Submit The Bid Proposal May Ground For Disqualification Of The Bid. 2. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 1. The Lgu- Mapanas, Northern Samar Now Invites Bids For The Following Description Of Works To Be Procured: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot B.7 Construction Safety And Health 1.00 Lot B.9 Mobilization And Demobilization 1.00 Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg 903 Formworks And Falseworks 53.38 Sq.m. 1047 Metal Structures 84.00 In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 1046 Masonry Works 75.60 Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. 1005 Doors And Windows 3.00 Sets 1002 Plumbing Works 1.00 Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. 1101 Wires And Wiring Devices 1.00 Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is 1103 Lighting Fixtures And Lamps 1.00 Is Spcl1 Signages 1.00 Lot Completion Of The Works Is Required 90 Calendar Days. Bidders Should Have Completed, Within Ten (10) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 2. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Seventy Five Percent (75%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines. 3. Interested Bidders May Obtain Further Information From Lgu- Bac Mapanas, Northern Samar And Inspect The Bidding Documents At The Address Given Below From November 06, 2024-november 25, 2024, 8:00 A.m. To 5:00 Pm. A Complete Set Of Bidding Documents May Be Purchased By Interested Bidders From The Address Below And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P5,000.00. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Fee For The Bidding Documents Not Later That The Submission Of Their Bids. 4. The Lgu- Mapanas, Northern Samar Will Hold A Pre-bid Conference On November 15, 2024 At 10:00 A.m. At Executive Conference, 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar, Which Shall Be Open Only To All Interested Parties Who Have Purchased The Bidding Documents. 5. Bids Must Be Delivered To The Address Below On Or Before 9:00 A.m. Of November 26, 2024 At Bac Office, @ Municipal Planning & Development Office (mpdo), Mapanas, Northern Samar. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. Bids Will Be Opened In The Presence Of The Bidders’ Authorized Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. The Bidder May Request That The Bid Documents Be Sent To Them By Mail Or Courier, And For This, The Bidder Shall Pay The Amount In Philippine Peso To Cover The Cost Of Mail Or Courier Delivery. The Fee For Obtaining A Copy Of The Bid Documents And The Cost Of Mail Or Courier Shall Be Paid By The Bidder Thru S Cashier’s Check Or Manager’s Check Issued In Favor Of The Municipality Of Mapanas. 6. The Lgu- Mapanas, Northern Samar Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 7. For Further Information, Please Refer To: Reno C. Salazar Bac Secretary Mapanas, Northern Samar Mobile # 09459852914 Ma. Teresa L. Minguez Bac Chairperson Mapanas N. Samar Mobile # 09778033758 Table Of Contents A. General 11 1. Scope Of Bid 11 2. Source Of Funds 11 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 11 4. Conflict Of Interest 12 5. Eligible Bidders 14 6. Bidder’s Responsibilities 15 7. Origin Of Goods And Services 17 8. Subcontracts 17 B. Contents Of Bidding Documents 17 9. Pre-bid Conference 17 10. Clarification And Amendment Of Bidding Documents 18 C. Preparation Of Bids 18 11. Language Of Bids 18 12. Documents Comprising The Bid: Eligibility And Technical Components 18 13. Documents Comprising The Bid: Financial Component 21 14. Alternative Bids 21 15. Bid Prices 22 16. Bid Currencies 22 17. Bid Validity 23 18. Bid Security 23 19. Format And Signing Of Bids 25 20. Sealing And Marking Of Bids 26 D. Submission And Opening Of Bids 26 21. Deadline For Submission Of Bids 26 22. Late Bids 26 23. Modification And Withdrawal Of Bids 27 24. Opening And Preliminary Examination Of Bids 27 E. Evaluation And Comparison Of Bids 28 25. Process To Be Confidential 28 26. Clarification Of Bids 29 27. Detailed Evaluation And Comparison Of Bids 29 28. Post Qualification 30 29. Reservation Clause 31 F. Award Of Contract 32 30. Contract Award 32 31. Signing Of The Contract 33 32. Performance Security 33 33. Notice To Proceed 34 A. General 1. Scope Of Bid 1.1. The Procuring Entity As Defined In The Bds, Invites Bids For The Construction Of Works, As Described In Section Vi. Specifications. The Name And Identification Number Of The Contract Is Provided In The Bds. 1.2. The Successful Bidder Will Be Expected To Complete The Works By The Intended Completion Date Specified In Scc Clause 1.16. 2. Source Of Funds The Procuring Entity Has A Budget Or Has Applied For Or Received Funds From The Funding Source Named In The Bds, And In The Amount Indicated In The Bds. It Intends To Apply Part Of The Funds Received For The Project, As Defined In The Bds, To Cover Eligible Payments Under The Contract For The Works. 3. Corrupt, Fraudulent, Collusive, And Coercive Practices 3.1. Unless Otherwise Specified In The Bds, The Procuring Entity, As Well As Bidders And Contractors, Shall Observe The Highest Standard Of Ethics During The Procurement And Execution Of The Contract. In Pursuance Of This Policy, The Funding Source: (a) Defines, For Purposes Of This Provision, The Terms Set Forth Below As Follows: (i) "corrupt Practice" Means Behavior On The Part Of Officials In The Public Or Private Sectors By Which They Improperly And Unlawfully Enrich Themselves, Others, Or Induce Others To Do So, By Misusing The Position In Which They Are Placed, And Includes The Offering, Giving, Receiving, Or Soliciting Of Anything Of Value To Influence The Action Of Any Such Official In The Procurement Process Or In Contract Execution; Entering, On Behalf Of The Procuring Entity, Into Any Contract Or Transaction Manifestly And Grossly Disadvantageous To The Same, Whether Or Not The Public Officer Profited Or Will Profit Thereby, And Similar Acts As Provided In Republic Act 3019; (ii) "fraudulent Practice" Means A Misrepresentation Of Facts In Order To Influence A Procurement Process Or The Execution Of A Contract To The Detriment Of The Procuring Entity, And Includes Collusive Practices Among Bidders (prior To Or After Bid Submission) Designed To Establish Bid Prices At Artificial, Non-competitive Levels And To Deprive The Procuring Entity Of The Benefits Of Free And Open Competition; (iii) “collusive Practices” Means A Scheme Or Arrangement Between Two Or More Bidders, With Or Without The Knowledge Of The Procuring Entity, Designed To Establish Bid Prices At Artificial, Non-competitive Levels; And (iv) “coercive Practices” Means Harming Or Threatening To Harm, Directly Or Indirectly, Persons, Or Their Property To Influence Their Participation In A Procurement Process, Or Affect The Execution Of A Contract; (v) “obstructive Practice” Is (aa) Deliberately Destroying, Falsifying, Altering Or Concealing Of Evidence Material To An Administrative Proceedings Or Investigation Or Making False Statements To Investigators In Order To Materially Impede An Administrative Proceedings Or Investigation Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Into Allegations Of A Corrupt, Fraudulent, Coercive Or Collusive Practice; And/or Threatening, Harassing Or Intimidating Any Party To Prevent It From Disclosing Its Knowledge Of Matters Relevant To The Administrative Proceedings Or Investigation Or From Pursuing Such Proceedings Or Investigation; Or (bb) Acts Intended To Materially Impede The Exercise Of The Inspection And Audit Rights Of The Procuring Entity Or Any Foreign Government/foreign Or International Financing Institution Herein. (b) Will Reject A Proposal For Award If It Determines That The Bidder Recommended For Award Has Engaged In Corrupt Or Fraudulent Practices In Competing For The Contract; And (c) Will Declare A Firm Ineligible, Either Indefinitely Or For A Stated Period Of Time, To Be Awarded Contract Funded By The Funding Source If It At Any Time Determines That The Firm Has Engaged In Corrupt Or Fraudulent Practices In Competing Or, Or In Executing, A Contract Funded By The Funding Source. 3.2. Further, The Procuring Entity Will Seek To Impose The Maximum Civil, Administrative, And/or Criminal Penalties Available Under The Applicable Laws On Individuals And Organizations Deemed To Be Involved In Any Of The Practices Mentioned In Itb Clause 3.1(a). 3.3. Furthermore, The Funding Source And The Procuring Entity Reserve The Right To Inspect And Audit Records And Accounts Of A Contractor In The Bidding For And Performance Of A Contract Themselves Or Through Independent Auditors As Reflected In The Gcc Clause 34. 4. Conflict Of Interest 4.1. All Bidders Found To Have Conflicting Interests Shall Be Disqualified To Participate In The Procurement At Hand, Without Prejudice To The Imposition Of Appropriate Administrative, Civil, And Criminal Sanctions. A Bidder May Be Considered To Have Conflicting Interests With Another Bidder In Any Of The Events Described In Paragraphs (a) Through (c) And A General Conflict Of Interest In Any Of The Circumstances Set Out In Paragraphs (d) Through (g) Below: (a) A Bidder Has Controlling Shareholders In Common With Another Bidder; (b) A Bidder Receives Or Has Received Any Direct Or Indirect Subsidy From Any Other Bidder; (c) A Bidder Has The Same Legal Representative As That Of Another Bidder For Purposes Of This Bid; (d) A Bidder Has A Relationship, Directly Or Through Third Parties, That Puts Them In A Position To Have Access To Information About Or Influence On The Bid Of Another Bidder Or Influence The Decisions Of The Procuring Entity Regarding This Bidding Process. This Will Include A Firm Or An Organization Who Lends, Or Temporarily Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project If The Personnel Would Be Involved In Any Capacity On The Same Project; (e) A Bidder Submits More Than One Bid In This Bidding Process. However, This Does Not Limit The Participation Of Subcontractors In More Than One Bid; (f) A Bidder Who Participated As A Consultant In The Preparation Of The Design Or Technical Specifications Of The Goods And Related Services That Are The Subject Of The Bid; Or (g) A Bidder Who Lends, Or Temporary Seconds, Its Personnel To Firms Or Organizations Which Are Engaged In Consulting Services For The Preparation Related To Procurement For Or Implementation Of The Project, If The Personnel Would Be Involved In Any Capacity On The Same Project. 4.2. In Accordance With Section 47 Of The Irr Of Ra 9184, All Bidding Documents Shall Be Accompanied By A Sworn Affidavit Of The Bidder That It Is Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), Members Of The Technical Working Group (twg), Members Of The Bac Secretariat, The Head Of The Project Management Office (pmo) Or The End-user Unit, And The Project Consultants, By Consanguinity Or Affinity Up To The Third Civil Degree. On The Part Of The Bidder, This Clause Shall Apply To The Following Persons: (a) If The Bidder Is An Individual Or A Sole Proprietorship, To The Bidder Himself; (b) If The Bidder Is A Partnership, To All Its Officers And Members; (c) If The Bidder Is A Corporation, To All Its Officers, Directors, And Controlling Stockholders; And (d) If The Bidder Is A Joint Venture (jv), The Provisions Of Items (a), (b), Or (c) Of This Clause Shall Correspondingly Apply To Each Of The Members Of The Said Jv, As May Be Appropriate. Relationship Of The Nature Described Above Or Failure To Comply With This Clause Will Result In The Automatic Disqualification Of A Bidder. 5. Eligible Bidders 5.1. Unless Otherwise Indicated In The Bds, The Following Persons Shall Be Eligible To Participate In This Bidding: (a) Duly Licensed Filipino Citizens/sole Proprietorships; (b) Partnerships Duly Organized Under The Laws Of The Philippines And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; (c) Corporations Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Outstanding Capital Stock Belongs To Citizens Of The Philippines; (d) Cooperatives Duly Organized Under The Laws Of The Philippines, And Of Which At Least Seventy Five Percent (75%) Of The Interest Belongs To Citizens Of The Philippines; And (e) Persons/entities Forming Themselves Into A Jv, I.e., A Group Of Two (2) Or More Persons/entities That Intend To Be Jointly And Severally Responsible Or Liable For A Particular Contract: Provided, However, That, In Accordance With Letter Of Instructions No. 630, Filipino Ownership Or Interest Of The Joint Venture Concerned Shall Be At Least Seventy Five Percent (75%): Provided, Further, That Joint Ventures In Which Filipino Ownership Or Interest Is Less Than Seventy Five Percent (75%) May Be Eligible Where The Structures To Be Built Require The Application Of Techniques And/or Technologies Which Are Not Adequately Possessed By A Person/entity Meeting The Seventy Five Percent (75%) Filipino Ownership Requirement: Provided, Finally, That In The Latter Case, Filipino Ownership Or Interest Shall Not Be Less Than Twenty Five Percent (25%). For This Purpose Filipino Ownership Or Interest Shall Be Based On The Contributions Of Each Of The Members Of The Joint Venture As Specified In Their Jva. 5.2. The Procuring Entity May Also Invite Foreign Bidders When Provided For Under Any Treaty Or International Or Executive Agreement As Specified In The Bds. 5.3. Government Corporate Entities May Be Eligible To Participate Only If They Can Establish That They (a) Are Legally And Financially Autonomous, (b) Operate Under Commercial Law, And (c) Are Not Dependent Agencies Of The Gop Or The Procuring Entity. 5.4. (a) Unless Otherwise Provided In The Bds, The Bidder Must Have Completed, Within Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Fifty Percent (50%) Of The Abc Adjusted To Current Prices Using The National Statistics Office Consumer Price Index. (b) For Foreign-funded Procurement, The Procuring Entity And The Foreign Government/foreign Or International Financing Institution May Agree On Another Track Record Requirement, As Specified In The Bds. For This Purpose, Contracts Similar To The Project Shall Be Those Described In Thebds, And Completed Within The Period Stated In The Invitation To Bid And Itb Clause 12.1(a)(iii). 5.5. The Bidder Must Submit A Computation Of Its Net Financial Contracting Capacity (nfcc) Or A Commitment From A Universal Or Commercial Bank To Extend A Credit Line In Its Favor If Awarded The Contract For This Project (clc). The Nfcc, Computed Using The Following Formula, Must Be At Least Equal To The Abc To Be Bid: Nfcc = [(current Assets Minus Current Liabilities) (k)] Minus The Value Of All Outstanding Or Uncompleted Portions Of The Projects Under Ongoing Contracts, Including Awarded Contracts Yet To Be Started Coinciding With The Contract For This Project. Where: K = 10 For A Contract Duration Of One Year Or Less, 15 For A Contract Duration Of More Than One Year Up To Two Years, And 20 For A Contract Duration Of More Than Two Years. The Clc Must Be At Least Equal To Ten Percent (10%) Of The Abc For This Project. If Issued By A Foreign Bank, It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank. In The Case Of Local Government Units (lgus), The Bidder May Also Submit Clc From Other Banks Certified By The Bangko Sentral Ng Pilipinas (bsp) As Authorized To Issue Such Financial Instrument. 6. Bidder’s Responsibilities 6.1. The Bidder Or Its Duly Authorized Representative Shall Submit A Sworn Statement In The Form Prescribed In Section Ix. Bidding Forms As Required In Itb Clause 12.1(b)(iii). 6.2. The Bidder Is Responsible For The Following: (a) Having Taken Steps To Carefully Examine All Of The Bidding Documents; (b) Having Acknowledged All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; (c) Having Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; (d) Having Complied With Its Responsibility To Inquire Or Secure Supplemental/bid Bulletin/s As Provided Under Itb Clause 10.3. (e) Ensuring That It Is Not “blacklisted” Or Barred From Bidding By The Gop Or Any Of Its Agencies, Offices, Corporations, Or Lgus, Including Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Gppb; (f) Ensuring That Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; (g) Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative/s To Verify All The Documents Submitted; (h) Ensuring That The Signatory Is The Duly Authorized Representative Of The Bidder, And Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The Bidder In The Bidding, With The Duly Notarized Secretary’s Certificate Attesting To Such Fact, If The Bidder Is A Corporation, Partnership, Cooperative, Or Joint Venture; (i) Complying With The Disclosure Provision Under Section 47 Of The Act In Relation To Other Provisions Of Republic Act 3019; And (j) Complying With Existing Labor Laws And Standards, If Applicable. Failure To Observe Any Of The Above Responsibilities Shall Be At The Risk Of The Bidder Concerned. 6.3. The Bidder, By The Act Of Submitting Its Bid, Shall Be Deemed To Have Inspected The Site, Determined The General Characteristics Of The Contract Works And The Conditions For This Project And Examine All Instructions, Forms, Terms, And Project Requirements In The Bidding Documents. 6.4. It Shall Be The Sole Responsibility Of The Prospective Bidder To Determine And To Satisfy Itself By Such Means As It Considers Necessary Or Desirable As To All Matters Pertaining To This Project, Including: (a) The Location And The Nature Of The Contract, Project, Or Work; (b) Climatic Conditions; (c) Transportation Facilities; (c) Nature And Condition Of The Terrain, Geological Conditions At The Site Communication Facilities, Requirements, Location And Availability Of Construction Aggregates And Other Materials, Labor, Water, Electric Power And Access Roads; And (d) Other Factors That May Affect The Cost, Duration And Execution Or Implementation Of The Contract, Project, Or Work. 6.5. The Procuring Entity Shall Not Assume Any Responsibility Regarding Erroneous Interpretations Or Conclusions By The Prospective Or Eligible Bidder Out Of The Data Furnished By The Procuring Entity. 6.6. Before Submitting Their Bids, The Bidders Are Deemed To Have Become Familiar With All Existing Laws, Decrees, Ordinances, Acts And Regulations Of The Philippines Which May Affect The Contract In Any Way. 6.7. The Bidder Shall Bear All Costs Associated With The Preparation And Submission Of His Bid, And The Procuring Entity Will In No Case Be Responsible Or Liable For Those Costs, Regardless Of The Conduct Or Outcome Of The Bidding Process. 6.8. Bidders Should Note That The Procuring Entity Will Only Accept Bids Only From Those That Have Paid The Nonrefundable Fee For The Bidding Documents At The Office Indicated In The Invitation To Bid. 7. Origin Of Goods And Services There Is No Restriction On The Origin Of Goods, Or Contracting Of Works Or Services Other Than Those Prohibited By A Decision Of The United Nations Security Council Taken Under Chapter Vii Of The Charter Of The United Nations. 8. Subcontracts 8.1. Unless Otherwise Specified In The Bds, The Bidder May Subcontract Portions Of The Works To An Extent As May Be Approved By The Procuring Entity And Stated In The Bds. However, Subcontracting Of Any Portion Shall Not Relieve The Bidder From Any Liability Or Obligation That May Arise From The Contract For This Project. 8.2. Subcontractors Must Submit The Documentary Requirements Under Itb Clause 12 And Comply With The Eligibility Criteria Specified In The Bds. In The Event That Any Subcontractor Is Found By The Procuring Entity To Be Ineligible, The Subcontracting Of Such Portion Of The Works Shall Be Disallowed. 8.3. The Bidder May Identify The Subcontractor To Whom A Portion Of The Works Will Be Subcontracted At Any Stage Of The Bidding Process Or During Contract Implementation. If The Bidder Opts To Disclose The Name Of The Subcontractor During Bid Submission, The Bidder Shall Include The Required Documents As Part Of The Technical Component Of Its Bid. B. Contents Of Bidding Documents 9. Pre-bid Conference 9.1. (a) If So Specified In The Bds, A Pre-bid Conference Shall Be Held At The Venue And On The Date Indicated Therein, To Clarify And Address The Bidders’ Questions On The Technical And Financial Components Of This Project. (b) The Pre-bid Conference Shall Be Held At Least Twelve (12) Calendar Days Before The Deadline For The Submission Of And Receipt Of Bids. If The Procuring Entity Determines That, By Reason Of The Method, Nature, Or Complexity Of The Contract To Be Bid, Or When International Participation Will Be More Advantageous To The Gop, A Longer Period For The Preparation Of Bids Is Necessary, The Pre-bid Conference Shall Be Held At Least Thirty (30) Calendar Days Before The Deadline For The Submission And Receipt Of Bids, As Specified In The Bds. 9.2. Bidders Are Encouraged To Attend The Pre-bid Conference To Ensure That They Fully Understand The Procuring Entity’s Requirements. Non-attendance Of The Bidder Will In No Way Prejudice Its Bid; However, The Bidder Is Expected To Know The Changes And/or Amendments To The Bidding Documents As Recorded In The Minutes Of The Pre-bid Conference And The Supplemental/bid Bulletin. 9.3. Any Statement Made At The Pre-bid Conference Shall Not Modify The Terms Of The Bidding Documents Unless Such Statement Is Specifically Identified In Writing As An Amendment Thereto And Issued As A Supplemental/bid Bulletin. 10. Clarification And Amendment Of Bidding Documents 10.1. Bidders Who Have Purchased The Bidding Documents May Request For Clarification(s) On Any Part Of The Bidding Documents Or For An Interpretation. Such A Request Must Be In Writing And Submitted To The Procuring Entity At The Address Indicated In The Bds At Least Ten (10) Calendar Days Before The Deadline Set For The Submission And Receipt Of Bids. 10.2. Supplemental/bid Bulletins May Be Issued Upon The Procuring Entity’s Initiative For Purposes Of Clarifying Or Modifying Any Provision Of The Bidding Documents Not Later Than Seven (7) Calendar Days Before The Deadline For The Submission And Receipt Of Bids. Any Modification To The Bidding Documents Shall Be Identified As An Amendment. 10.3. Any Supplemental/bid Bulletin Issued By The Bac Shall Also Be Posted On The Philippine Government Electronic Procurement System (philgeps) And The Website Of The Procuring Entity Concerned, If Available. Unless, Otherwise Provided In The Bds, It Shall Be The Responsibility Of All Bidders Who Secure The Bidding Documents To Inquire And Secure Supplemental/bid Bulletins That May Be Issued By The Bac. However, Bidders Who Have Submitted Bids Before The Issuance Of The Supplemental/bid Bulletin Must Be Informed And Allowed To Modify Or Withdraw Their Bids In Accordance With Itb Clause 23. C. Preparation Of Bids 11. Language Of Bids The Bid, As Well As All Correspondence And Documents Relating To The Bid Exchanged By The Bidder And The Procuring Entity, Shall Be Written In English. Supporting Documents And Printed Literature Furnished By The Bidder May Be In Another Language Provided They Are Accompanied By An Accurate Translation In English Certified By The Appropriate Embassy Or Consulate In The Philippines, In Which Case The English Translation Shall Govern, For Purposes Of Interpretation Of The Bid. 12. Documents Comprising The Bid: Eligibility And Technical Components 12.1. Unless Otherwise Indicated In The Bds, The First Envelope Shall Contain The Following Eligibility And Technical Documents: (a) Eligibility Documents – Class "a" Documents: (i) Registration Certificate From The Securities And Exchange Commission (sec), Department Of Trade And Industry (dti) For Sole Proprietorship, Or Cooperative Development Authority (cda) For Cooperatives, Or Any Proof Of Such Registration As Stated In The Bds; (ii) Mayor’s Permit Issued By The City Or Municipality Where The Principal Place Of Business Of The Prospective Bidder Is Located; (iii) Statement Of All Its Ongoing And Completed Government And Private Contracts Within Ten (10) Years From The Submission Of Bids, Including Contracts Awarded But Not Yet Started, If Any. The Statement Shall Include, For Each Contract, The Following: (iii.1) Name Of The Contract; (iii.2) Date Of The Contract; (iii.3) Contract Duration; (iii.4) Owner’s Name And Address; (iii.5) Nature Of Work; (iii.6) Contractor’s Role (whether Sole Contractor, Subcontractor, Or Partner In A Jv) And Percentage Of Participation; (iii.7) Total Contract Value At Award; (iii.8) Date Of Completion Or Estimated Completion Time; (iii.9) Total Contract Value At Completion, If Applicable; (iii.10) Percentages Of Planned And Actual Accomplishments, If Applicable; (iii.11) Value Of Outstanding Works, If Applicable; (iii.12) The Statement Shall Be Supported By The Notices Of Award And/or Notices To Proceed Issued By The Owners; And (iii.13) The Statement Shall Be Supported By The Constructors Performance Evaluation System (cpes) Rating Sheets, And/or Certificates Of Completion And Owner’s Acceptance, If Applicable; (iv) Unless Otherwise Provided In The Bds, Valid Philippine Contractors Accreditation Board (pcab) License And Registration For The Type And Cost Of The Contract For This Project; (v) Audited Financial Statements, Showing, Among Others, The Prospective Total And Current Assets And Liabilities, Stamped “received” By The Bir Or Its Duly Accredited And Authorized Institutions, For The Preceding Calendar Year Which Should Not Be Earlier Than Two (2) Years From The Date Of Bid Submission; (vi) Nfcc Computation Or Clc In Accordance With Itb Clause 5.5; And Class "b" Document: (vii) If Applicable, Valid Joint Venture Agreement (jva) Or, In Lieu Thereof, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful Shall Be Included In The Bid. (b) Technical Documents – (i) Bid Security As Prescribed In Itb Clause 18. If The Bidder Opts To Submit The Bid Security In The Form Of: (i.1) A Bank Draft/guarantee Or An Irrevocable Letter Of Credit Issued By A Foreign Bank, It Shall Be Accompanied By A Confirmation From A Universal Or Commercial Bank; Or (i.2) A Surety Bond Accompanied By A Certification Coming From An Authorized Insurance Commission That A Surety Or Insurance Company Is Authorized To Issue Such Instrument; (ii) Project Requirements, Which Shall Include The Following: (ii.1) Organizational Chart For The Contract To Be Bid; (ii.2) List Of Contractor’s Personnel (viz, Project Manager, Project Engineers, Materials Engineers, And Foremen), To Be Assigned To The Contract To Be Bid, With Their Complete Qualification And Experience Data; And (ii.3) List Of Contractor’s Equipment Units, Which Are Owned, Leased, And/or Under Purchase Agreements, Supported By Certification Of Availability Of Equipment From The Equipment Lessor/vendor For The Duration Of The Project; And (iii) Sworn Statement In Accordance With Section 25.2(b)(iv) Of The Irr Of Ra 9184 And Using The Form Prescribed In Section Ix. Bidding Forms. 13. Documents Comprising The Bid: Financial Component 13.1. Unless Otherwise Stated In The Bds, The Financial Component Of The Bid Shall Contain The Following: (a) Financial Bid Form In Accordance With The Form Prescribed In Section Ix. Bidding Forms; And (b) Any Other Document Related To The Financial Component Of The Bid As Stated In The Bds. 13.2. (a) Unless Indicated In The Bds, All Bids That Exceed The Abc Shall Not Be Accepted. (b) Unless Otherwise Indicated In The Bds, For Foreign-funded Procurement, A Ceiling May Be Applied To Bid Prices Provided The Following Conditions Are Met: (i) Bidding Documents Are Obtainable Free Of Charge On A Freely Accessible Website. If Payment Of Bidding Documents Is Required By The Procuring Entity, Payment Could Be Made Upon The Submission Of Bids. (ii) The Procuring Entity Has Procedures In Place To Ensure That The Abc Is Based On Recent Estimates Made By The Engineer Or The Responsible Unit Of The Procuring Entity And That The Estimates Are Based On Adequate Detailed Engineering (in The Case Of Works) And Reflect The Quality, Supervision And Risk And Inflationary Factors, As Well As Prevailing Market Prices, Associated With The Types Of Works Or Goods To Be Procured. (iii) The Procuring Entity Has Trained Cost Estimators On Estimating Prices And Analyzing Bid Variances. In The Case Of Infrastructure Projects, The Procuring Entity Must Also Have Trained Quantity Surveyors. (iv) The Procuring Entity Has Established A System To Monitor And Report Bid Prices Relative To Abc And Engineer’s/procuring Entity’s Estimate. (v) The Procuring Entity Has Established A Monitoring And Evaluation System For Contract Implementation To Provide A Feedback On Actual Total Costs Of Goods And Works. 14. Alternative Bids 14.1. Alternative Bids Shall Be Rejected. For This Purpose, Alternative Bid Is An Offer Made By A Bidder In Addition Or As A Substitute To Its Original Bid Which May Be Included As Part Of Its Original Bid Or Submitted Separately Therewith For Purposes Of Bidding. A Bid With Options Is Considered An Alternative Bid Regardless Of Whether Said Bid Proposal Is Contained In A Single Envelope Or Submitted In Two (2) Or More Separate Bid Envelopes. 14.2. Bidders Shall Submit Offers That Comply With The Requirements Of The Bidding Documents, Including The Basic Technical Design As Indicated In The Drawings And Specifications. Unless There Is A Value Engineering Clause In The Bds, Alternative Bids Shall Not Be Accepted. 14.3. Each Bidder Shall Submit Only One Bid, Either Individually Or As A Partner In A Jv. A Bidder Who Submits Or Participates In More Than One Bid (other Than As A Subcontractor If A Subcontractor Is Permitted To Participate In More Than One Bid) Will Cause All The Proposals With The Bidder’s Participation To Be Disqualified. This Shall Be Without Prejudice To Any Applicable Criminal, Civil And Administrative Penalties That May Be Imposed Upon The Persons And Entities Concerned. 15. Bid Prices 15.1. The Contract Shall Be For The Whole Works, As Described In Itb Clause 1.1, Based On The Priced Bill Of Quantities Submitted By The Bidder. 15.2. The Bidder Shall Fill In Rates And Prices For All Items Of The Works Described In The Bill Of Quantities. Bids Not Addressing Or Providing All Of The Required Items In The Bidding Documents Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Government. 15.3. All Duties, Taxes, And Other Levies Payable By The Contractor Under The Contract, Or For Any Other Cause, Prior To The Deadline For Submission Of Bids, Shall Be Included In The Rates, Prices, And Total Bid Price Submitted By The Bidder. 15.4. All Bid Prices For The Given Scope Of Work In The Contract As Awarded Shall Be Considered As Fixed Prices, And Therefore Not Subject To Price Escalation During Contract Implementation, Except Under Extraordinary Circumstances As Specified In Gcc Clause 48. Price Escalation May Be Allowed In Extraordinary Circumstances As May Be Determined By The National Economic And Development Authority In Accordance With The Civil Code Of The Philippines, And Upon The Recommendation Of The Procuring Entity. Furthermore, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 16. Bid Currencies 16.1. All Bid Prices Shall Be Quoted In Philippine Pesos Unless Otherwise Provided In The Bds. However, For Purposes Of Bid Evaluation, Bids Denominated In Foreign Currencies Shall Be Converted To Philippine Currency Based On The Exchange Rate Prevailing On The Day Of The Bid Opening. 16.2. If So Allowed In Accordance With Itb Clause 16.1, The Procuring Entity For Purposes Of Bid Evaluation And Comparing The Bid Prices Will Convert The Amounts In Various Currencies In Which The Bid Price Is Expressed To Philippine Pesos At The Exchange Rate As Published In The Bsp Reference Rate Bulletin On The Day Of The Bid Opening. 16.3. Unless Otherwise Specified In The Bds, Payment Of The Contract Price Shall Be Made In Philippine Pesos. 17. Bid Validity 17.1. Bids Shall Remain Valid For The Period Specified In The Bds Which Shall Not Exceed One Hundred Twenty (120) Calendar Days From The Date Of The Opening Of Bids. 17.2. In Exceptional Circumstances, Prior To The Expiration Of The Bid Validity Period, The Procuring Entity May Request Bidders To Extend The Period Of Validity Of Their Bids. The Request And The Responses Shall Be Made In Writing. The Bid Security Described In Itb Clause 18 Should Also Be Extended Corresponding To The Extension Of The Bid Validity Period At The Least. A Bidder May Refuse The Request Without Forfeiting Its Bid Security, But His Bid Shall No Longer Be Considered For Further Evaluation And Award. A Bidder Granting The Request Shall Not Be Required Or Permitted To Modify Its Bid. 18. Bid Security 18.1. The Bid Security In The Amount Stated In The Bds Shall Be Equal To The Percentage Of The Abc In Accordance With The Following Schedule: Form Of Bid Security Amount Of Bid Security (equal To Percentage Of The Abc) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Two Percent (2%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Five Percent (5%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security For Biddings Conducted By Local Government Units, The Bidder May Also Submit Bid Securities In The Form Of Cashier’s/manager’s Check, Bank Draft/guarantee, Or Irrevocable Letter Of Credit From Other Banks Certified By The Bsp As Authorized To Issue Such Financial Statement. 18.2. The Bid Security Should Be Valid For The Period Specified In The Bds. Any Bid Not Accompanied By An Acceptable Bid Security Shall Be Rejected By The Procuring Entity As Non-responsive. 18.3. No Bid Securities Shall Be Returned To Bidders After The Opening Of Bids And Before Contract Signing, Except To Those That Failed Or Declared As Post-disqualified, Upon Submission Of A Written Waiver Of Their Right To File A Motion For Reconsideration And/or Protest. Without Prejudice On Its Forfeiture, Bid Securities Shall Be Returned Only After The Bidder With The Lowest Calculated Responsive Bid Has Signed The Contract And Furnished The Performance Security, But In No Case Later Than The Expiration Of The Bid Security Validity Period Indicated In Itb Clause 18.2. 18.4. Upon Signing And Execution Of The Contract, Pursuant To Itb Clause 31, And The Posting Of The Performance Security, Pursuant To Itb Clause 32, The Successful Bidder’s Bid Security Will Be Discharged, But In No Case Later Than The Bid Security Validity Period As Indicated In Itb Clause 18.2. 18.5. The Bid Security May Be Forfeited: (a) If A Bidder: (i) Withdraws Its Bid During The Period Of Bid Validity Specified In Itb Clause 17; (ii) Does Not Accept The Correction Of Errors Pursuant To Itb Clause 27.3(b); (iii) Fails To Submit The Requirements Within The Prescribed Period, Or A Finding Against Their Veracity, As Stated In Itb Clause 28.2; (iv) Submission Of Eligibility Requirements Containing False Information Or Falsified Documents; (v) Submission Of Bids That Contain False Information Or Falsified Documents, Or The Concealment Of Such Information In The Bids In Order To Influence The Outcome Of Eligibility Screening Or Any Other Stage Of The Public Bidding; (vi) Allowing The Use Of One’s Name, Or Using The Name Of Another For Purposes Of Public Bidding; (vii) Withdrawal Of A Bid, Or Refusal To Accept An Award, Or Enter Into Contract With The Government Without Justifiable Cause, After The Bidder Had Been Adjudged As Having Submitted The Lowest Calculated And Responsive Bid; (viii) Refusal Or Failure To Post The Required Performance Security Within The Prescribed Time; (ix) Refusal To Clarify Or Validate In Writing Its Bid During Post-qualification Within A Period Of Seven (7) Calendar Days From Receipt Of The Request For Clarification; (x) Any Documented Attempt By A Bidder To Unduly Influence The Outcome Of The Bidding In His Favor; (xi) Failure Of The Potential Joint Venture Partners To Enter Into The Joint Venture After The Bid Is Declared Successful; Or (xii) All Other Acts That Tend To Defeat The Purpose Of The Competitive Bidding, Such As Habitually Withdrawing From Bidding, Submitting Late Bids Or Patently Insufficient Bid, For At Least Three (3) Times Within A Year, Except For Valid Reasons. (b) If The Successful Bidder: (i) Fails To Sign The Contract In Accordance With Itb Clause 31; (ii) Fails To Furnish Performance Security In Accordance With Itb Clause 32. 19. Format And Signing Of Bids 19.1. Bidders Shall Submit Their Bids Through Their Duly Authorized Representative Using The Appropriate Forms Provided In Section Ix. Bidding Forms On Or Before The Deadline Specified In The Itb Clause 21 In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously. The First Shall Contain The Technical Component Of The Bid, Including The Eligibility Requirements Under Itb Clause 12.1, And The Second Shall Contain The Financial Component Of The Bid. 19.2. Forms As Mentioned In Itb Clause 19.1 Must Be Completed Without Any Alterations To Their Format, And No Substitute Form Shall Be Accepted. All Blank Spaces Shall Be Filled In With The Information Requested. 19.3. The Bidder Shall Prepare An Original Of The First And Second Envelopes As Described In Itb Clauses 12 And 13. In Addition, The Bidder Shall Submit Copies Of The First And Second Envelopes. In The Event Of Any Discrepancy Between The Original And The Copies, The Original Shall Prevail. 19.4. The Bid, Except For Unamended Printed Literature, Shall Be Signed, And Each And Every Page Thereof Shall Be Initialed, By The Duly Authorized Representative/s Of The Bidder. 19.5. Any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By The Duly Authorized Representative/s Of The Bidder. 20. Sealing And Marking Of Bids 20.1. Bidders Shall Enclose Their Original Eligibility And Technical Documents Described In Itb Clause 12, In One Sealed Envelope Marked “original - Technical Component”, And The Original Of Their Financial Component In Another Sealed Envelope Marked “original - Financial Component”, Sealing Them All In An Outer Envelope Marked “original Bid”. 20.2. Each Copy Of The First And Second Envelopes Shall Be Similarly Sealed Duly Marking The Inner Envelopes As “copy No. ___ - Technical Component” And “copy No. ___ – Financial Component” And The Outer Envelope As “copy No. ___”, Respectively. These Envelopes Containing The Original And The Copies Shall Then Be Enclosed In One Single Envelope. 20.3. The Original And The Number Of Copies Of The Bid As Indicated In The Bds Shall Be Typed Or Written In Indelible Ink And Shall Be Signed By The Bidder Or Its Duly Authorized Representative/s. 20.4. All Envelopes Shall: (a) Contain The Name Of The Contract To Be Bid In Capital Letters; (b) Bear The Name And Address Of The Bidder In Capital Letters; (c) Be Addressed To The Procuring Entity’s Bac Identified In Itb Clause 10.1; (d) Bear The Specific Identification Of This Bidding Process Indicated In The Invitation To Bid; And (e) Bear A Warning “do Not Open Before…” The Date And Time For The Opening Of Bids, In Accordance With Itb Clause 21. 20.5. If Bids Are Not Sealed And Marked As Required, The Procuring Entity Will Assume No Responsibility For The Misplacement Or Premature Opening Of The Bid. D. Submission And Opening Of Bids 21. Deadline For Submission Of Bids Bids Must Be Received By The Procuring Entity’s Bac At The Address And On Or Before The Date And Time Indicated In The Bds. 22. Late Bids Any Bid Submitted After The Deadline For Submission And Receipt Of Bids Prescribed By The Procuring Entity, Pursuant To Itb Clause 21, Shall Be Declared “late” And Shall Not Be Accepted By The Procuring Entity. 23. Modification And Withdrawal Of Bids 23.1. The Bidder May Modify Its Bid After It Has Been Submitted; Provided That The Modification Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. The Bidder Shall Not Be Allowed To Retrieve Its Original Bid, But Shall Be Allowed To Submit Another Bid Equally Sealed, Properly Identified, Linked To Its Original Bid Marked As “technical Modification” Or “financial Modification” And Stamped “received” By The Bac. Bid Modifications Received After The Applicable Deadline Shall Not Be Considered And Shall Be Returned To The Bidder Unopened. 23.2. A Bidder May, Through A Letter Of Withdrawal, Withdraw Its Bid After It Has Been Submitted, For Valid And Justifiable Reason; Provided That The Letter Of Withdrawal Is Received By The Procuring Entity Prior To The Deadline Prescribed For Submission And Receipt Of Bids. 23.3. Bids Requested To Be Withdrawn In Accordance With Itb Clause 23.1 Shall Be Returned Unopened To The Bidders. A Bidder May Also Express Its Intention Not To Participate In The Bidding Through A Letter Which Should Reach And Be Stamped By The Bac Before The Deadline For Submission And Receipt Of Bids. A Bidder That Withdraws Its Bid Shall Not Be Permitted To Submit Another Bid, Directly Or Indirectly, For The Same Contract. 23.4. No Bid May Be Modified After The Deadline For Submission Of Bids. No Bid May Be Withdrawn In The Interval Between The Deadline For Submission Of Bids And The Expiration Of The Period Of Bid Validity Specified By The Bidder On The Financial Bid Form. Withdrawal Of A Bid During This Interval Shall Result In The Forfeiture Of The Bidder’s Bid Security, Pursuant To Itb Clause 18.5, And The Imposition Of Administrative, Civil, And Criminal Sanctions As Prescribed By Ra 9184 And Its Irr. 24. Opening And Preliminary Examination Of Bids 24.1. The Bac Shall Open The First Bid Envelopes Of Bidders In Public As Specified In The Bds To Determine Each Bidder’s Compliance With The Documents Prescribed In Itb Clause 12. For This Purpose, The Bac Shall Check The Submitted Documents Of Each Bidder Against A Checklist Of Required Documents To Ascertain If They Are All Present, Using A Non-discretionary “pass/fail” Criterion. If A Bidder Submits The Required Document, It Shall Be Rated “passed” For That Particular Requirement. In This Regard, Bids That Fail To Include Any Requirement Or Are Incomplete Or Patently Insufficient Shall Be Considered As “failed”. Otherwise, The Bac Shall Rate The Said First Bid Envelope As “passed”. 24.2. Unless Otherwise Specified In The Bds, Immediately After Determining Compliance With The Requirements In The First Envelope, The Bac Shall Forthwith Open The Second Bid Envelope Of Each Remaining Eligible Bidder Whose First Bid Envelope Was Rated “passed”. The Second Envelope Of Each Complying Bidder Shall Be Opened Within The Same Day. In Case One Or More Of The Requirements In The Second Envelope Of A Particular Bid Is Missing, Incomplete Or Patently Insufficient, And/or If The Submitted Total Bid Price Exceeds The Abc Unless Otherwise Provided In Itb Clause 13.1(b), The Bac Shall Rate The Bid Concerned As “failed”. Only Bids That Are Determined To Contain All The Bid Requirements For Both Components Shall Be Rated “passed” And Shall Immediately Be Considered For Evaluation And Comparison. 24.3. Letters Of Withdrawal Shall Be Read Out And Recorded During Bid Opening, And The Envelope Containing The Corresponding Withdrawn Bid Shall Be Returned To The Bidder Unopened. If The Withdrawing Bidder’s Representative Is In Attendance, The Original Bid And All Copies Thereof Shall Be Returned To The Representative During The Bid Opening. If The Representative Is Not In Attendance, The Bid Shall Be Returned Unopened By Registered Mail. The Bidder May Withdraw Its Bid Prior To The Deadline For The Submission And Receipt Of Bids, Provided That The Corresponding Letter Of Withdrawal Contains A Valid Authorization Requesting For Such Withdrawal, Subject To Appropriate Administrative Sanctions. 24.4. If A Bidder Has Previously Secured A Certification From The Procuring Entity To The Effect That It Has Previously Submitted The Above-enumerated Class “a” Documents, The Said Certification May Be Submitted In Lieu Of The Requirements Enumerated In Itb Clause 12.1(a), Items (i) To (vi). 24.5. In The Case Of An Eligible Foreign Bidder As Described In Itb Clause 5, The Class “a” Documents Enumerated In Itb Clause 12.1(a) May Be Substituted With The Appropriate Equivalent Documents, If Any, Issued By The Country Of The Foreign Bidder Concerned. 24.6. Each Partner Of A Joint Venture Agreement Shall Likewise Submit The Documents Required In Itb Clauses 12.1(a)(i) And 12.1(a)(ii). Submission Of Documents Required Under Itb Clauses 12.1(a)(iii) To 12.1(a)(vi) By Any Of The Joint Venture Partners Constitutes Compliance. 24.7. A Bidder Determined As “failed” Has Three (3) Calendar Days Upon Written Notice Or, If Present At The Time Of Bid Opening, Upon Verbal Notification Within Which To File A Request For Reconsideration With The Bac: Provided, However, That The Request For Reconsideration Shall Not Be Granted If It Is Established That The Finding Of Failure Is Due To The Fault Of The Bidder Concerned: Provided, Further, That The Bac Shall Decide On The Request For Reconsideration Within Seven (7) Calendar Days From Receipt Thereof. If A Failed Bidder Signifies His Intent To File A Request For Reconsideration, The Bac Shall Keep The Bid Envelopes Of The Said Failed Bidder Unopened And/or Duly Sealed Until Such Time That The Request For Reconsideration Or Protest Has Been Resolved. E. Evaluation And Comparison Of Bids 25. Process To Be Confidential 25.1. Members Of The Bac, Including Its Staff And Personnel, As Well As Its Secretariat And Twg, Are Prohibited From Making Or Accepting Any Kind Of Communication With Any Bidder Regarding The Evaluation Of Their Bids Until The Issuance Of The Notice Of Award, Unless N The Case Of Itb Clause 26. 25.2. Any Effort By A Bidder To Influence The Procuring Entity In The Procuring Entity’s Decision In Respect Of Bid Evaluation, Bid Comparison Or Contract Award Will Result In The Rejection Of The Bidder’s Bid. 26. Clarification Of Bids To Assist In The Evaluation, Comparison And Post-qualification Of The Bids, The Procuring Entity May Ask In Writing Any Bidder For A Clarification Of Its Bid. All Responses To Requests For Clarification Shall Be In Writing. Any Clarification Submitted By A Bidder In Respect To Its Bid And That Is Not In Response To A Request By The Procuring Entity Shall Not Be Considered 27. Detailed Evaluation And Comparison Of Bids 27.1. The Procuring Entity Will Undertake The Detailed Evaluation And Comparison Of Bids Which Have Passed The Opening And Preliminary Examination Of Bids, Pursuant To Itb Clause 24, In Order To Determine The Lowest Calculated Bid. 27.2. In Evaluating The Bids To Get The Lowest Calculated Bid, The Procuring Entity Shall Undertake The Following: (a) The Detailed Evaluation Of The Financial Component Of The Bids, To Establish The Correct Calculated Prices Of The Bids; And (b) The Ranking Of The Total Bid Prices As So Calculated From The Lowest To Highest. The Bid With The Lowest Price Shall Be Identified As The Lowest Calculated Bid. 27.3. The Procuring Entity's Bac Shall Immediately Conduct A Detailed Evaluation Of All Bids Rated “passed,” Using Non-discretionary “pass/fail” Criterion. The Bac Shall Consider The Following In The Evaluation Of Bids: (a) Completeness Of The Bid. Unless The Itb Specifically Allows Partial Bids, Bids Not Addressing Or Providing All Of The Required Items In The Schedule Of Requirements Including, Where Applicable, Bill Of Quantities, Shall Be Considered Non-responsive And, Thus, Automatically Disqualified. In This Regard, Where A Required Item Is Provided, But No Price Is Indicated, The Same Shall Be Considered As Non-responsive, But Specifying A "0" (zero) For The Said Item Would Mean That It Is Being Offered For Free To The Procuring Entity; And (b) Arithmetical Corrections. Consider Computational Errors And Omissions To Enable Proper Comparison Of All Eligible Bids. It May Also Consider Bid Modifications If Expressly Allowed In The Bds. Any Adjustment Shall Be Calculated In Monetary Terms To Determine The Calculated Prices. 27.4. Based On The Detailed Evaluation Of Bids, Those That Comply With The Above-mentioned Requirements Shall Be Ranked In The Ascending Order Of Their Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, To Identify The Lowest Calculated Bid. Total Calculated Bid Prices, As Evaluated And Corrected For Computational Errors, Discounts And Other Modifications, Which Exceed The Abc Shall Not Be Considered, Unless Otherwise Indicated In The Bds. 27.5. The Procuring Entity’s Evaluation Of Bids Shall Only Be Based On The Bid Price Quoted In The Financial Bid Form 27.6. Bids Shall Be Evaluated On An Equal Footing To Ensure Fair Competition. For This Purpose, All Bidders Shall Be Required To Include In Their Bids The Cost Of All Taxes, Such As, But Not Limited To, Value Added Tax (vat), Income Tax, Local Taxes, And Other Fiscal Levies And Duties Which Shall Be Itemized In The Bid Form And Reflected In The Detailed Estimates. Such Bids, Including Said Taxes, Shall Be The Basis For Bid Evaluation And Comparison. 28. Post Qualification 28.1. The Procuring Entity Shall Determine To Its Satisfaction Whether The Bidder That Is Evaluated As Having Submitted The Lowest Calculated Bid (lcb) Complies With And Is Responsive To All The Requirements And Conditions Specified In Itb Clauses 5, 12, And 13. 28.2. Within A Non-extendible Period Of Three (3) Calendar Days From Receipt By The Bidder Of The Notice From The Bac That It Submitted The Lcb, The Bidder Shall Submit The Following Documentary Requirements: (a) Tax Clearance Per Executive Order 398, Series Of 2005; (b) Latest Income And Business Tax Returns In The Form Specified In The Bds; (c) Certificate Of Philgeps Registration; And (d) Other Appropriate Licenses And Permits Required By Law And Stated In The Bds. Failure Of The Bidder Declared As Lcb To Duly Submit The Requirements Under This Clause Or A Finding Against The Veracity Of Such, Shall Be Ground For Forfeiture Of The Bid Security And Disqualification Of The Bidder For Award. 28.3. The Determination Shall Be Based Upon An Examination Of The Documentary Evidence Of The Bidder’s Qualifications Submitted Pursuant To Itb Clauses 12 And 13, As Well As Other Information As The Procuring Entity Deems Necessary And Appropriate, Using A Non-discretionary “pass/fail” Criterion. 28.4. If The Bac Determines That The Bidder With The Lowest Calculated Bid Passes All The Criteria For Post-qualification, It Shall Declare The Said Bid As The Lowest Calculated Responsive Bid, And Recommend To The Head Of The Procuring Entity The Award Of Contract To The Said Bidder At Its Submitted Price Or Its Calculated Bid Price, Whichever Is Lower, Subject To Itb Clause 30.3. 28.5. A Negative Determination Shall Result In Rejection Of The Bidder’s Bid, In Which Event The Procuring Entity Shall Proceed To The Next Lowest Calculated Bid To Make A Similar Determination Of That Bidder’s Capabilities To Perform Satisfactorily. If The Second Bidder, However, Fails The Post Qualification, The Procedure For Post Qualification Shall Be Repeated For The Bidder With The Next Lowest Calculated Bid, And So On Until The Lowest Calculated And Responsive Bid Is Determined For Contract Award. 28.6. Within A Period Not Exceeding Seven (7) Calendar Days From The Date Of Receipt Of The Recommendation Of The Bac, The Head Of The Procuring Entity Shall Approve Or Disapprove The Said Recommendation. In The Case Of Government Owned And Government-owned And/or -controlled Corporations (goccs) And Government Financial Institutions (gfis), The Period Provided Herein Shall Be Fifteen (15) Calendar Days. 29. Reservation Clause 29.1. Notwithstanding The Eligibility Or Post-qualification Of A Bidder, The Procuring Entity Concerned Reserves The Right To Review Its Qualifications At Any Stage Of The Procurement Process If It Has Reasonable Grounds To Believe That A Misrepresentation Has Been Made By The Said Bidder, Or That There Has Been A Change In The Bidder’s Capability To Undertake The Project From The Time It Submitted Its Eligibility Requirements. Should Such Review Uncover Any Misrepresentation Made In The Eligibility And Bidding Requirements, Statements Or Documents, Or Any Changes In The Situation Of The Bidder Which Will Affect Its Capability To Undertake The Project So That It Fails The Preset Eligibility Or Bid Evaluation Criteria, The Procuring Entity Shall Consider The Said Bidder As Ineligible And Shall Disqualify It From Submitting A Bid Or From Obtaining An Award Or Contract. 29.2. Based On The Following Grounds, The Procuring Entity Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding At Any Time Prior To The Contract Award, Or Not To Award The Contract, Without Thereby Incurring Any Liability, And Make No Assurance That A Contract Shall Be Entered Into As A Result Of The Bidding: (a) If There Is Prima Facie Evidence Of Collusion Between Appropriate Public Officers Or Employees Of The Procuring Entity, Or Between The Bac And Any Of The Bidders, Or If The Collusion Is Between Or Among The Bidders Themselves, Or Between A Bidder And A Third Party, Including Any Act Which Restricts, Suppresses Or Nullifies Or Tends To Restrict, Suppress Or Nullify Competition; (b) If The Procuring Entity’s Bac Is Found To Have Failed In Following The Prescribed Bidding Procedures; Or (c) For Any Justifiable And Reasonable Ground Where The Award Of The Contract Will Not Redound To The Benefit Of The Government As Follows: (i) If The Physical And Economic Conditions Have Significantly Changed So As To Render The Project No Longer Economically, Financially Or Technically Feasible As Determined By The Head Of The Procuring Entity; (ii) If The Project Is No Longer Necessary As Determined By The Head Of The Procuring Entity; And (iii) If The Source Of Funds For The Project Has Been Withheld Or Reduced Through No Fault Of The Procuring Entity. 29.3. In Addition, The Procuring Entity May Likewise Declare A Failure Of Bidding When: (a) No Bids Are Received; (b) All Prospective Bidders Are Declared Ineligible; (c) All Bids Fail To Comply With All The Bid Requirements Or Fail Post-qualification; Or (d) The Bidder With The Lowest Calculated Responsive Bid Refuses, Without Justifiable Cause To Accept The Award Of Contract, And No Award Is Made. F. Award Of Contract 30. Contract Award 30.1. Subject To Itb Clause 28, The Procuring Entity Shall Award The Contract To The Bidder Whose Bid Has Been Determined To Be The Lowest Calculated And Responsive Bid (lcrb). 30.2. Prior To The Expiration Of The Period Of Bid Validity, The Procuring Entity Shall Notify The Successful Bidder In Writing That Its Bid Has Been Accepted, Through A Notice Of Award Received Personally Or Sent By Registered Mail Or Electronically, Receipt Of Which Must Be Confirmed In Writing Within Two (2) Days By The Lcrb And Submitted Personally Or Sent By Registered Mail Or Electronically To The Procuring Entity. 30.3. Notwithstanding The Issuance Of The Notice Of Award, Award Of Contract Shall Be Subject To The Following Conditions: (a) Submission Of The Following Documents Within The Prescribed Period From Receipt By The Bidder Of The Notice That It Has The Lowest Calculated And Responsive Bid: (i) Valid Jva, If Applicable, Within Ten (10) Calendar Days; (ii) Valid Pcab License And Registration For The Type And Cost Of The Contract To Be Bid For Foreign Bidders, Within Thirty (30) Calendar Days, If Allowed Under A Treaty Or International Or Executive Agreement Mentioned In Itb Clause 12.1(a)(iv); (b) Posting Of The Performance Security In Accordance With Itb Clause 32; (c) Signing Of The Contract As Provided In Itb Clause 31; And (d) Approval By Higher Authority, If Required. 31. Signing Of The Contract 31.1. At The Same Time As The Procuring Entity Notifies The Successful Bidder That Its Bid Has Been Accepted, The Procuring Entity Shall Send The Contract Form To The Bidder, Which Contract Has Been Provided In The Bidding Documents, Incorporating Therein All Agreements Between The Parties. 31.2. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award, The Successful Bidder Shall Post The Required Performance Security, Sign And Date The Contract And Return It To The Procuring Entity. 31.3. The Procuring Entity Shall Enter Into Contract With The Successful Bidder Within The Same Ten (10) Calendar Day Period Provided That All The Documentary Requirements Are Complied With. 31.4. The Following Documents Shall Form Part Of The Contract: (a) Contract Agreement; (b) Bidding Documents; (c) Winning Bidder’s Bid, Including The Technical And Financial Proposals, And All Other Documents/statements Submitted; (d) Performance Security; (e) Credit Line In Accordance With Itb Clause 5.5, If Applicable; (f) Notice Of Award Of Contract; And (g) Other Contract Documents That May Be Required By Existing Laws And/or Specified In The Bds. 32. Performance Security 32.1. To Guarantee The Faithful Performance By The Winning Bidder Of Its Obligations Under The Contract, It Shall Post A Performance Security Within A Maximum Period Of Ten (10) Calendar Days From The Receipt Of The Notice Of Award From The Procuring Entity And In No Case Later Than The Signing Of The Contract. 32.2. The Performance Security Shall Be Denominated In Philippine Pesos And Posted In Favor Of The Procuring Entity In An Amount Equal To The Percentage Of The Total Contract Price As Stated In The Bds In Accordance With The Following Schedule: 33. 33.1. Form Of Performance Security Amount Of Performance Security (equal To Percentage Of The Total Contract Price) (a) Cash Or Cashier’s/manager’s Check Issued By A Universal Or Commercial Bank. Ten Percent (10%) (b) Bank Draft/guarantee Or Irrevocable Letter Of Credit Issued By A Universal Or Commercial Bank: Provided, However, That It Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank. (c) Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security; And/or Thirty Percent (30%) (d) Any Combination Of The Foregoing. Proportionate To Share Of Form With Respect To Total Amount Of Security 33.2. Failure Of The Successful Bidder To Comply With The Above-mentioned Requirement Shall Constitute Sufficient Ground For The Annulment Of The Award And Forfeiture Of The Bid Security, In Which Event The Procuring Entity Shall Initiate And Complete The Post Qualification Of The Second Lowest Calculated Bid. The Procedure Shall Be Repeated Until The Lowest Calculated And Responsive Bid Is Identified And Selected For Contract Award. However If No Bidder Passed Post-qualification, The Bac Shall Declare The Bidding A Failure And Conduct A Re-bidding With Re-advertisement. 34. Notice To Proceed 34.1. Within Three (3) Calendar Days From The Date Of Approval Of The Contract By The Appropriate Government Approving Authority, The Procuring Entity Shall Issue Its Notice To Proceed To The Bidder. 34.2. The Contract Effectivity Date Shall Be Provided In The Notice To Proceed By The Procuring Entity, Which Date Shall Not Be Later Than Seven (7) Calendar Days From The Issuance Of The Notice To Proceed. Section Iii. Bid Data Sheet Bid Data Sheet Itb Clause 1.1 The Procuring Entity Is Lgu- Mapanas, Northern Samar. The Name Of The Contract Is Repair/rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar The Identification Number Of The Contract Is Pr No-2024-11-094___ 2 The Funding Source Is: Trust Fund (edf) For Fy 2023. The Name Of The Project Is: Repair/rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas N. Samar. 3.1 No Further Instructions. 5.1 No Further Instructions. 5.2 Bidding Is Restricted To Eligible Bidders As Defined In Itb Clause 5.1. 5.4 For This Purpose, Similar Contracts Shall Refer To Bidder’s Annual Turnover From All Works Average Over The Last Three Years Shall Be Equal To 50% Of The Estimated Cost Of The Contract Being Procured. The Bidder Must Have Completed, Within The Past Ten (10) Years From The Submission Of Bids, A Single Contract That Is Similar To This Project, Equivalent To At Least Eighty Percent (80%) Of The Abc. 8.1 “subcontracting Is Not Allowed.” 8.2 “not Applicable”. 9.1 The Procuring Entity Will Hold A Pre-bid Conference For This Project On November 15, 2024 At 10:00 A.m. At Executive Conference 2nd Floor Of New Municipal Bldg. Mapanas, Northern Samar. 10.1 The Procuring Entity’s Address Is: The Municipality Of Mapanas, Province Of Northern Samar Ma. Teresa L. Minguez Lgu-bac Chairperson Tel. No. 09778033758 10.3 No Further Instructions. 12.1 Not Applicable 12.1(a)(i) “no Other Acceptable Proof Of Registration Is Recognized.” 12.1(a)(iv) No Further Instructions. 13.1 “no Additional Requirements” 13.1(b) The Abc Is Php1,049,465.57 Any Bid With A Financial Component Exceeding This Amount Shall Not Be Accepted. 14.2 “no Further Instructions.” 15.4 No Further Instruction. 16.1 The Bid Prices Shall Be Quoted In Philippine Pesos. 17.1 Bids Will Be Valid Until 120 Calendar Days After The Bid Submission Deadline Date As Prescribed By The Procuring Entity) 18.1 The Bid Security Shall Be In The Following Amount: 1. The Amount Of 20,989.31 If Bid Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of P52,473.28 If Bid Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. 18.2 The Bid Security Shall Be Valid Twenty Eight Days Beyond The Validity Period Of The Bid. 20.3 Each Bidder Shall Submit One Original And One Copy Of The First And Second Components Of Its Bid. 21 The Address For Submission Of Bids Is Ma. Teresa L. Minguez Lgu-bac Chairperson Bac Office @ Mpdo, 1st Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar The Deadline For Submission Of Bids Is 9:00 A.m. On November 26, 2024. 22 The Place Of Bid Opening Is Executive Conference Room, 2nd Floor, New Municipal Bldg. Municipality Of Mapanas, Northern Samar. The Date And Time Of Bid Opening Is November 26, 2024 At Exactly 10:00 A.m. 24.2 No Further Instructions. 27.3(b) Bid Modification Is Not Allowed. 27.4 No Further Instructions. 28.2(b) Bidders Have Option To Submit Manually Filed Tax Returns Or Tax Returns Filed Through The Electronic Filing And Payments System (efps). Note: The Latest Income And Business Tax Returns Are Those Within The Last Six Months Preceding The Date Of Bid Submission. 28.2(d) List Licenses And Permits Relevant To The Project And The Corresponding Law Requiring It. 1. Taxpayer’s Identification Number 2. Vat Registration 3. Philippine Contractors Accreditation Board (pcab) License The Requirements Are Applicable Only In A Case Where The Lowest Calculated Bid (lcb) Is Submitted By A Domestic Bidder, And If The Lowest Calculated Bid (lcb) Is Submitted By A Foreign Bidder, This Requirements Are Not Applicable 31.4(g) List Additional Contract Documents Relevant To The Project That May Be Required By Existing Laws And/or The Procuring Entity, Such As Construction Schedule And S-curve, Manpower Schedule, Construction Methods, Equipment Utilization Schedule, Construction Safety And Health Program Approved By The Department Of Labor And Employment, And Pert/cpm. 32.2 The Performance Security Shall Be In The Following Amount: 1. The Amount Of 10% Of Contract If Performance Security Is In Cash, Cashier’s/manager’s Check, Bank Draft/guarantee Or Irrevocable Letter Of Credit; 2. The Amount Of 30% Of Contract If Performance Security Is In Surety Bond; Or 3. Any Combination Of The Foregoing Proportionate To The Share Of Form With Respect To Total Amount Of Security. Section Iv. General Conditions Of Contract Table Of Contents 1. Definitions 41 2. Interpretation 43 3. Governing Language And Law 43 4. Communications 43 5. Possession Of Site 43 6. The Contractor’s Obligations 44 7. Performance Security 45 8. Subcontracting 46 9. Liquidated Damages 46 10. Site Investigation Reports 47 11. The Procuring Entity, Licenses And Permits 47 12. Contractor’s Risk And Warranty Security 47 13. Liability Of The Contractor 49 14. Procuring Entity’s Risk 49 15. Insurance 49 16. Termination For Default Of Contractor 51 17. Termination For Default Of Procuring Entity 51 18. Termination For Other Causes 52 19. Procedures For Termination Of Contracts 53 20. Force Majeure, Release From Performance 56 21. Resolution Of Disputes 56 22. Suspension Of Loan, Credit, Grant, Or Appropriation 57 23. Procuring Entity’s Representative’s Decisions 57 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 57 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 58 26. Extension Of The Intended Completion Date 58 27. Right To Vary 58 28. Contractors Right To Claim 59 29. Dayworks 59 30. Early Warning 59 31. Program Of Work 59 32. Management Conferences 60 33. Bill Of Quantities 60 34. Instructions, Inspections And Audits 61 35. Identifying Defects 61 36. Cost Of Repairs 61 37. Correction Of Defects 61 38. Uncorrected Defects 62 39. Advance Payment 62 40. Progress Payments 62 41. Payment Certificates 63 42. Retention 63 43. Variation Orders 64 44. Contract Completion 66 45. Suspension Of Work 66 46. Payment On Termination 67 47. Extension Of Contract Time 67 48. Price Adjustment 68 49. Completion 68 50. Taking Over 69 51. Operating And Maintenance Manuals 69 1. Definitions For Purposes Of This Clause, Boldface Type Is Used To Identify Defined Terms. 1.1. The Arbiter Is The Person Appointed Jointly By The Procuring Entity And The Contractor To Resolve Disputes In The First Instance, As Provided For In Gcc Clause 21. 1.2. Bill Of Quantities Refers To A List Of The Specific Items Of The Work And Their Corresponding Unit Prices, Lump Sums, And/or Provisional Sums. 1.3. The Completion Date Is The Date Of Completion Of The Works As Certified By The Procuring Entity’s Representative, In Accordance With Gcc Clause 49. 1.4. The Contract Is The Contract Between The Procuring Entity And The Contractor To Execute, Complete, And Maintain The Works. 1.5. The Contract Price Is The Price Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Procuring Entity To The Contractor For The Execution Of The Works In Accordance With This Contract. 1.6. Contract Time Extension Is The Allowable Period For The Contractor To Complete The Works In Addition To The Original Completion Date Stated In This Contract. 1.7. The Contractor Is The Juridical Entity Whose Proposal Has Been Accepted By The Procuring Entity And To Whom The Contract To Execute The Work Was Awarded. 1.8. The Contractor’s Bid Is The Signed Offer Or Proposal Submitted By The Contractor To The Procuring Entity In Response To The Bidding Documents. 1.9. Days Are Calendar Days; Months Are Calendar Months. 1.10. Dayworks Are Varied Work Inputs Subject To Payment On A Time Basis For The Contractor’s Employees And Equipment, In Addition To Payments For Associated Materials And Plant. 1.11. A Defect Is Any Part Of The Works Not Completed In Accordance With The Contract. 1.12. The Defects Liability Certificate Is The Certificate Issued By Procuring Entity’s Representative Upon Correction Of Defects By The Contractor. 1.13. The Defects Liability Period Is The One Year Period Between Contract Completion And Final Acceptance Within Which The Contractor Assumes The Responsibility To Undertake The Repair Of Any Damage To The Works At His Own Expense. 1.14. Drawings Are Graphical Presentations Of The Works. They Include All Supplementary Details, Shop Drawings, Calculations, And Other Information Provided Or Approved For The Execution Of This Contract. 1.15. Equipment Refers To All Facilities, Supplies, Appliances, Materials Or Things Required For The Execution And Completion Of The Work Provided By The Contractor And Which Shall Not Form Or Are Not Intended To Form Part Of The Permanent Works. 1.16. The Intended Completion Date Refers To The Date Specified In The Scc When The Contractor Is Expected To Have Completed The Works. The Intended Completion Date May Be Revised Only By The Procuring Entity’s Representative By Issuing An Extension Of Time Or An Acceleration Order. 1.17. Materials Are All Supplies, Including Consumables, Used By The Contractor For Incorporation In The Works. 1.18. The Notice To Proceed Is A Written Notice Issued By The Procuring Entity Or The Procuring Entity’s Representative To The Contractor Requiring The Latter To Begin The Commencement Of The Work Not Later Than A Specified Or Determinable Date. 1.19. Permanent Works All Permanent Structures And All Other Project Features And Facilities Required To Be Constructed And Completed In Accordance With This Contract Which Shall Be Delivered To The Procuring Entity And Which Shall Remain At The Site After The Removal Of All Temporary Works. 1.20. Plant Refers To The Machinery, Apparatus, And The Like Intended To Form An Integral Part Of The Permanent Works. 1.21. The Procuring Entity Is The Party Who Employs The Contractor To Carry Out The Works Stated In The Scc. 1.22. The Procuring Entity’s Representative Refers To The Head Of The Procuring Entity Or His Duly Authorized Representative, Identified In The Scc, Who Shall Be Responsible For Supervising The Execution Of The Works And Administering This Contract. 1.23. The Site Is The Place Provided By The Procuring Entity Where The Works Shall Be Executed And Any Other Place Or Places Which May Be Designated In The Scc, Or Notified To The Contractor By The Procuring Entity’s Representative As Forming Part Of The Site. 1.24. Site Investigation Reports Are Those That Were Included In The Bidding Documents And Are Factual And Interpretative Reports About The Surface And Subsurface Conditions At The Site. 1.25. Slippage Is A Delay In Work Execution Occurring When Actual Accomplishment Falls Below The Target As Measured By The Difference Between The Scheduled And Actual Accomplishment Of The Work By The Contractor As Established From The Work Schedule. This Is Actually Described As A Percentage Of The Whole Works. 1.26. Specifications Means The Description Of Works To Be Done And The Qualities Of Materials To Be Used, The Equipment To Be Installed And The Mode Of Construction. 1.27. The Start Date, As Specified In The Scc, Is The Date When The Contractor Is Obliged To Commence Execution Of The Works. It Does Not Necessarily Coincide With Any Of The Site Possession Dates. 1.28. A Subcontractor Is Any Person Or Organization To Whom A Part Of The Works Has Been Subcontracted By The Contractor, As Allowed By The Procuring Entity, But Not Any Assignee Of Such Person. 1.29. Temporary Works Are Works Designed, Constructed, Installed, And Removed By The Contractor That Are Needed For Construction Or Installation Of The Permanent Works. 1.30. Work(s)refer To The Permanent Works And Temporary Works To Be Executed By The Contractor In Accordance With This Contract, Including (i) The Furnishing Of All Labor, Materials, Equipment And Others Incidental, Necessary Or Convenient To The Complete Execution Of The Works; (ii) The Passing Of Any Tests Before Acceptance By The Procuring Entity’s Representative; (iii) And The Carrying Out Of All Duties And Obligations Of The Contractor Imposed By This Contract As Described In The Scc. 2. Interpretation 2.1. In Interpreting The Conditions Of Contract, Singular Also Means Plural, Male Also Means Female Or Neuter, And The Other Way Around. Headings Have No Significance. Words Have Their Normal Meaning Under The Language Of This Contract Unless Specifically Defined. The Procuring Entity’s Representative Will Provide Instructions Clarifying Queries About The Conditions Of Contract. 2.2. If Sectional Completion Is Specified In The Scc, References In The Conditions Of Contract To The Works, The Completion Date, And The Intended Completion Date Apply To Any Section Of The Works (other Than References To The Completion Date And Intended Completion Date For The Whole Of The Works). 3. Governing Language And Law 3.1. This Contract Has Been Executed In The English Language, Which Shall Be The Binding And Controlling Language For All Matters Relating To The Meaning Or Interpretation Of This Contract. All Correspondence And Other Documents Pertaining To This Contract Which Are Exchanged By The Parties Shall Be Written In English. 3.2. This Contract Shall Be Interpreted In Accordance With The Laws Of The Republic Of The Philippines. 4. Communications Communications Between Parties That Are Referred To In The Conditions Shall Be Effective Only When In Writing. A Notice Shall Be Effective Only When It Is Received By The Concerned Party. 5. Possession Of Site 5.1. On The Date Specified In The Scc, The Procuring Entity Shall Grant The Contractor Possession Of So Much Of The Site As May Be Required To Enable It To Proceed With The Execution Of The Works. If The Contractor Suffers Delay Or Incurs Cost From Failure On The Part Of The Procuring Entity To Give Possession In Accordance With The Terms Of This Clause, The Procuring Entity’s Representative Shall Give The Contractor A Contract Time Extension And Certify Such Sum As Fair To Cover The Cost Incurred, Which Sum Shall Be Paid By Procuring Entity. 5.2. If Possession Of A Portion Is Not Given By The Date Stated In The Scc Clause 5.1, The Procuring Entity Will Be Deemed To Have Delayed The Start Of The Relevant Activities. The Resulting Adjustments In Contact Time To Address Such Delay Shall Be In Accordance With Gcc Clause 47. 5.3. The Contractor Shall Bear All Costs And Charges For Special Or Temporary Right-of-way Required By It In Connection With Access To The Site. The Contractor Shall Also Provide At His Own Cost Any Additional Facilities Outside The Site Required By It For Purposes Of The Works. 5.4. The Contractor Shall Allow The Procuring Entity’s Representative And Any Person Authorized By The Procuring Entity’s Representative Access To The Site And To Any Place Where Work In Connection With This Contract Is Being Carried Out Or Is Intended To Be Carried Out. 6. The Contractor’s Obligations 6.1. The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Contractor's Equipment, Which May Be Required. All Materials And Plant On Site Shall Be Deemed To Be The Property Of The Procuring Entity. 6.2. The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Program Of Work Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Complete Them By The Intended Completion Date. 6.3. The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. 6.4. The Contractor Shall Carry Out All Instructions Of The Procuring Entity’s Representative That Comply With The Applicable Laws Where The Site Is Located. 6.5. The Contractor Shall Employ The Key Personnel Named In The Schedule Of Key Personnel, As Referred To In The Scc, To Carry Out The Supervision Of The Works. The Procuring Entity Will Approve Any Proposed Replacement Of Key Personnel Only If Their Relevant Qualifications And Abilities Are Equal To Or Better Than Those Of The Personnel Listed In The Schedule. 6.6. If The Procuring Entity’s Representative Asks The Contractor To Remove A Member Of The Contractor’s Staff Or Work Force, For Justifiable Cause, The Contractor Shall Ensure That The Person Leaves The Site Within Seven (7) Days And Has No Further Connection With The Work In This Contract. 6.7. During Contract Implementation, The Contractor And His Subcontractors Shall Abide At All Times By All Labor Laws, Including Child Labor Related Enactments, And Other Relevant Rules. 6.8. The Contractor Shall Submit To The Procuring Entity For Consent The Name And Particulars Of The Person Authorized To Receive Instructions On Behalf Of The Contractor. 6.9. The Contractor Shall Cooperate And Share The Site With Other Contractors, Public Authorities, Utilities, And The Procuring Entity Between The Dates Given In The Schedule Of Other Contractors Particularly When They Shall Require Access To The Site. The Contractor Shall Also Provide Facilities And Services For Them During This Period. The Procuring Entity May Modify The Schedule Of Other Contractors, And Shall Notify The Contractor Of Any Such Modification Thereto. 6.10. Should Anything Of Historical Or Other Interest Or Of Significant Value Be Unexpectedly Discovered On The Site, It Shall Be The Property Of The Procuring Entity. The Contractor Shall Notify The Procuring Entity’s Representative Of Such Discoveries And Carry Out The Procuring Entity’s Representative’s Instructions In Dealing With Them. 7. Performance Security 7.1. Within Ten (10) Calendar Days From Receipt Of The Notice Of Award From The Procuring Entity But In No Case Later Than The Signing Of The Contract By Both Parties, The Contractor Shall Furnish The Performance Security In Any The Forms Prescribed In Itb Clause 32.2. 7.2. The Performance Security Posted In Favor Of The Procuring Entity Shall Be Forfeited In The Event It Is Established That The Contractor Is In Default In Any Of Its Obligations Under The Contract. 7.3. The Performance Security Shall Remain Valid Until Issuance By The Procuring Entity Of The Certificate Of Final Acceptance. 7.4. The Performance Security May Be Released By The Procuring Entity And Returned To The Contractor After The Issuance Of The Certificate Of Final Acceptance Subject To The Following Conditions: (a) There Are No Pending Claims Against The Contractor Or The Surety Company Filed By The Procuring Entity; (b) The Contractor Has No Pending Claims For Labor And Materials Filed Against It; And (c) Other Terms Specified In The Scc. 7.5. The Contractor Shall Post An Additional Performance Security Following The Amount And Form Specified In Itb Clause 32.2 To Cover Any Cumulative Increase Of More Than Ten Percent (10%) Over The Original Value Of The Contract As A Result Of Amendments To Order Or Change Orders, Extra Work Orders And Supplemental Agreements, As The Case May Be. The Contractor Shall Cause The Extension Of The Validity Of The Performance Security To Cover Approved Contract Time Extensions. 7.6. In Case Of A Reduction In The Contract Value Or For Partially Completed Works Under The Contract Which Are Usable And Accepted By The Procuring Entity The Use Of Which, In The Judgment Of The Implementing Agency Or The Procuring Entity, Will Not Affect The Structural Integrity Of The Entire Project, The Procuring Entity Shall Allow A Proportional Reduction In The Original Performance Security, Provided That Any Such Reduction Is More Than Ten Percent (10%) And That The Aggregate Of Such Reductions Is Not More Than Fifty Percent (50%) Of The Original Performance Security. 7.7. Unless Otherwise Indicated In The Scc, The Contractor, By Entering Into The Contract With The Procuring Entity, Acknowledges The Right Of The Procuring Entity To Institute Action Pursuant To Act 3688 Against Any Subcontractor Be They An Individual, Firm, Partnership, Corporation, Or Association Supplying The Contractor With Labor, Materials And/or Equipment For The Performance Of This Contract. 8. Subcontracting 8.1. Unless Otherwise Indicated In The Scc, The Contractor Cannot Subcontract Works More Than The Percentage Specified In Itb Clause 8.1. 8.2. Subcontracting Of Any Portion Of The Works Does Not Relieve The Contractor Of Any Liability Or Obligation Under This Contract. The Contractor Will Be Responsible For The Acts, Defaults, And Negligence Of Any Subcontractor, Its Agents, Servants Or Workmen As Fully As If These Were The Contractor’s Own Acts, Defaults, Or Negligence, Or Those Of Its Agents, Servants Or Workmen. 8.3. Subcontractors Disclosed And Identified During The Bidding May Be Changed During The Implementation Of This Contract, Subject To Compliance With The Required Qualifications And The Approval Of The Procuring Entity. 9. Liquidated Damages 9.1. The Contractor Shall Pay Liquidated Damages To The Procuring Entity For Each Day That The Completion Date Is Later Than The Intended Completion Date. The Applicable Liquidated Damages Is At Least One-tenth (1/10) Of A Percent Of The Cost Of The Unperformed Portion For Every Day Of Delay. The Total Amount Of Liquidated Damages Shall Not Exceed Ten Percent (10%) Of The Amount Of The Contract. The Procuring Entity May Deduct Liquidated Damages From Payments Due To The Contractor. Payment Of Liquidated Damages Shall Not Affect The Contractor. Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of This Contract, The Procuring Entity Shall Rescind This Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 9.2. If The Intended Completion Date Is Extended After Liquidated Damages Have Been Paid, The Engineer Of The Procuring Entity Shall Correct Any Overpayment Of Liquidated Damages By The Contractor By Adjusting The Next Payment Certificate. The Contractor Shall Be Paid Interest On The Overpayment, Calculated From The Date Of Payment To The Date Of Repayment, At The Rates Specified In Gcc Clause 40.3. 10. Site Investigation Reports The Contractor, In Preparing The Bid, Shall Rely On Any Site Investigation Reports Referred To In The Scc Supplemented By Any Information Obtained By The Contractor. 11. The Procuring Entity, Licenses And Permits The Procuring Entity Shall, If Requested By The Contractor, Assist Him In Applying For Permits, Licenses Or Approvals, Which Are Required For The Works. 12. Contractor’s Risk And Warranty Security 12.1. The Contractor Shall Assume Full Responsibility For The Works From The Time Project Construction Commenced Up To Final Acceptance By The Procuring Entity And Shall Be Held Responsible For Any Damage Or Destruction Of The Works Except Those Occasioned By Force Majeure. The Contractor Shall Be Fully Responsible For The Safety, Protection, Security, And Convenience Of His Personnel, Third Parties, And The Public At Large, As Well As The Works, Equipment, Installation, And The Like To Be Affected By His Construction Work. 12.2. The Defects Liability Period For Infrastructure Projects Shall Be One Year From Contract Completion Up To Final Acceptance By The Procuring Entity. During This Period, The Contractor Shall Undertake The Repair Works, At His Own Expense, Of Any Damage To The Works On Account Of The Use Of Materials Of Inferior Quality Within Ninety (90) Days From The Time The Head Of The Procuring Entity Has Issued An Order To Undertake Repair. In Case Of Failure Or Refusal To Comply With This Mandate, The Procuring Entity Shall Undertake Such Repair Works And Shall Be Entitled To Full Reimbursement Of Expenses Incurred Therein Upon Demand. 12.3. Unless Otherwise Indicated In The Scc, In Case The Contractor Fails To Comply With The Preceding Paragraph, The Procuring Entity Shall Forfeit Its Performance Security, Subject Its Property (ies) To Attachment Or Garnishment Proceedings, And Perpetually Disqualify It From Participating In Any Public Bidding. All Payables Of The Gop In His Favor Shall Be Offset To Recover The Costs. 12.4. After Final Acceptance Of The Works By The Procuring Entity, The Contractor Shall Be Held Responsible For “structural Defects”, I.e., Major Faults/flaws/deficiencies In One Or More Key Structural Elements Of The Project Which May Lead To Structural Failure Of The Completed Elements Or Structure, Or “structural Failures”, I.e., Where One Or More Key Structural Elements In An Infrastructure Facility Fails Or Collapses, Thereby Rendering The Facility Or Part Thereof Incapable Of Withstanding The Design Loads, And/or Endangering The Safety Of The Users Or The General Public: (a) Contractor – Where Structural Defects/failures Arise Due To Faults Attributable To Improper Construction, Use Of Inferior Quality/substandard Materials, And Any Violation Of The Contract Plans And Specifications, The Contractor Shall Be Held Liable; (b) Consultants – Where Structural Defects/failures Arise Due To Faulty And/or Inadequate Design And Specifications As Well As Construction Supervision, Then The Consultant Who Prepared The Design Or Undertook Construction Supervision For The Project Shall Be Held Liable; (c) Procuring Entity’s Representatives/project Manager/construction Managers And Supervisors – The Project Owner’s Representative(s), Project Manager, Construction Manager, And Supervisor(s) Shall Be Held Liable In Cases Where The Structural Defects/failures Are Due To His/their Willful Intervention In Altering The Designs And Other Specifications; Negligence Or Omission In Not Approving Or Acting On Proposed Changes To Noted Defects Or Deficiencies In The Design And/or Specifications; And The Use Of Substandard Construction Materials In The Project; (d) Third Parties - Third Parties Shall Be Held Liable In Cases Where Structural Defects/failures Are Caused By Work Undertaken By Them Such As Leaking Pipes, Diggings Or Excavations, Underground Cables And Electrical Wires, Underground Tunnel, Mining Shaft And The Like, In Which Case The Applicable Warranty To Such Structure Should Be Levied To Third Parties For Their Construction Or Restoration Works. (e) Users - In Cases Where Structural Defects/failures Are Due To Abuse/misuse By The End User Of The Constructed Facility And/or Non–compliance By A User With The Technical Design Limits And/or Intended Purpose Of The Same, Then The User Concerned Shall Be Held Liable. 12.5. The Warranty Against Structural Defects/failures, Except Those Occasioned On Force Majeure, Shall Cover The Period Specified In The Scc Reckoned From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity. 12.6. The Contractor Shall Be Required To Put Up A Warranty Security In The Form Of Cash, Bank Guarantee, Letter Of Credit, Gsis Or Surety Bond Callable On Demand, In Accordance With The Following Schedule: Form Of Warranty Minimum Amount In Percentage (%) Of Total Contract Price (a) Cash Or Letter Of Credit Issued By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Five Percent (5%) (b) Bank Guarantee Confirmed By Universal Or Commercial Bank: Provided, However, That The Letter Of Credit Shall Be Confirmed Or Authenticated By A Universal Or Commercial Bank, If Issued By A Foreign Bank Ten Percent (10%) (c) Surety Bond Callable Upon Demand Issued By Gsis Or Any Surety Or Insurance Company Duly Certified By The Insurance Commission Thirty Percent (30%) 12.7. The Warranty Security Shall Be Stated In Philippine Pesos And Shall Remain Effective For One Year From The Date Of Issuance Of The Certificate Of Final Acceptance By The Procuring Entity, And Returned Only After The Lapse Of Said One Year Period. 12.8. In Case Of Structural Defects/failure Occurring During The Applicable Warranty Period Provided In Gcc Clause 12.5, The Procuring Entity Shall Undertake The Necessary Restoration Or Reconstruction Works And Shall Be Entitled To Full Reimbursement By The Parties Found To Be Liable For Expenses Incurred Therein Upon Demand, Without Prejudice To The Filing Of Appropriate Administrative, Civil, And/or Criminal Charges Against The Responsible Persons As Well As The Forfeiture Of The Warranty Security Posted In Favor Of The Procuring Entity. 13. Liability Of The Contractor Subject To Additional Provisions, If Any, Set Forth In The Scc, The Contractor’s Liability Under This Contract Shall Be As Provided By The Laws Of The Republic Of The Philippines. 14. Procuring Entity’s Risk 14.1. From The Start Date Until The Certificate Of Final Acceptance Has Been Issued, The Following Are Risks Of The Procuring Entity: (a) The Risk Of Personal Injury, Death, Or Loss Of Or Damage To Property (excluding The Works, Plant, Materials, And Equipment), Which Are Due To: (i) Any Type Of Use Or Occupation Of The Site Authorized By The Procuring Entity After The Official Acceptance Of The Works; Or (ii) Negligence, Breach Of Statutory Duty, Or Interference With Any Legal Right By The Procuring Entity Or By Any Person Employed By Or Contracted To Him Except The Contractor. (b) The Risk Of Damage To The Works, Plant, Materials, And Equipment To The Extent That It Is Due To A Fault Of The Procuring Entity Or In The Procuring Entity’s Design, Or Due To War Or Radioactive Contamination Directly Affecting The Country Where The Works Are To Be Executed. 15. Insurance 15.1. The Contractor Shall, Under His Name And At His Own Expense, Obtain And Maintain, For The Duration Of This Contract, The Following Insurance Coverage: (a) Contractor’s All Risk Insurance; (b) Transportation To The Project Site Of Equipment, Machinery, And Supplies Owned By The Contractor; (c) Personal Injury Or Death Of Contractor’s Employees; And (d) Comprehensive Insurance For Third Party Liability To Contractor’s Direct Or Indirect Act Or Omission Causing Damage To Third Persons. 15.2. The Contractor Shall Provide Evidence To The Procuring Entity’s Representative That The Insurances Required Under This Contract Have Been Effected And Shall, Within A Reasonable Time, Provide Copies Of The Insurance Policies To The Procuring Entity’s Representative. Such Evidence And Such Policies Shall Be Provided To The Procuring Entity’s Through The Procuring Entity’s Representative. 15.3. The Contractor Shall Notify The Insurers Of Changes In The Nature, Extent, Or Program For The Execution Of The Works And Ensure The Adequacy Of The Insurances At All Times In Accordance With The Terms Of This Contract And Shall Produce To The Procuring Entity’s Representative The Insurance Policies In Force Including The Receipts For Payment Of The Current Premiums. The Above Insurance Policies Shall Be Obtained From Any Reputable Insurance Company Approved By The Procuring Entity’s Representative. 15.4. If The Contractor Fails To Obtain And Keep In Force The Insurances Referred To Herein Or Any Other Insurance Which He May Be Required To Obtain Under The Terms Of This Contract, The Procuring Entity May Obtain And Keep In Force Any Such Insurances And Pay Such Premiums As May Be Necessary For The Purpose. From Time To Time, The Procuring Entity May Deduct The Amount It Shall Pay For Said Premiums Including Twenty Five Percent (25%) Therein From Any Monies Due, Or Which May Become Due, To The Contractor, Without Prejudice To The Procuring Entity Exercising Its Right To Impose Other Sanctions Against The Contractor Pursuant To The Provisions Of This Contract. 15.5. In The Event The Contractor Fails To Observe The Above Safeguards, The Procuring Entity May, At The Contractor’s Expense, Take Whatever Measure Is Deemed Necessary For Its Protection And That Of The Contractor’s Personnel And Third Parties, And/or Order The Interruption Of Dangerous Works. In Addition, The Procuring Entity May Refuse To Make The Payments Under Gcc Clause 40 Until The Contractor Complies With This Clause. 15.6. The Contractor Shall Immediately Replace The Insurance Policy Obtained As Required In This Contract, Without Need Of The Procuring Entity’s Demand, With A New Policy Issued By A New Insurance Company Acceptable To The Procuring Entity For Any Of The Following Grounds: (a) The Issuer Of The Insurance Policy To Be Replaced Has: (i) Become Bankrupt; (ii) Been Placed Under Receivership Or Under A Management Committee; (iii) Been Sued For Suspension Of Payment; Or (iv) Been Suspended By The Insurance Commission And Its License To Engage In Business Or Its Authority To Issue Insurance Policies Cancelled; Or (v) Where Reasonable Grounds Exist That The Insurer May Not Be Able, Fully And Promptly, To Fulfill Its Obligation Under The Insurance Policy. 16. Termination For Default Of Contractor 16.1. The Procuring Entity Shall Terminate This Contract For Default When Any Of The Following Conditions Attend Its Implementation: 16.2. Due To The Contractor’s Fault And While The Project Is On-going, It Has Incurred Negative Slippage Of Fifteen Percent (15%) Or More In Accordance With Presidential Decree 1870, Regardless Of Whether Or Not Previous Warnings And Notices Have Been Issued For The Contractor To Improve His Performance; 16.3. Due To Its Own Fault And After This Contract Time Has Expired, The Contractor Incurs Delay In The Completion Of The Work After This Contract Has Expired; Or 16.4. The Contractor: (a) Abandons The Contract Works, Refuses Or Fails To Comply With A Valid Instruction Of The Procuring Entity Or Fails To Proceed Expeditiously And Without Delay Despite A Written Notice By The Procuring Entity; (b) Does Not Actually Have On The Project Site The Minimum Essential Equipment Listed On The Bid Necessary To Prosecute The Works In Accordance With The Approved Program Of Work And Equipment Deployment Schedule As Required For The Project; (c) Does Not Execute The Works In Accordance With This Contract Or Persistently Or Flagrantly Neglects To Carry Out Its Obligations Under This Contract; (d) Neglects Or Refuses To Remove Materials Or To Perform A New Work That Has Been Rejected As Defective Or Unsuitable; Or (e) Sub-lets Any Part Of This Contract Without Approval By The Procuring Entity. 16.5. All Materials On The Site, Plant, Equipment, And Works Shall Be Deemed To Be The Property Of The Procuring Entity If This Contract Is Rescinded Because Of The Contractor’s Default. 17. Termination For Default Of Procuring Entity The Contractor May Terminate This Contract With The Procuring Entity If The Works Are Completely Stopped For A Continuous Period Of At Least Sixty (60) Calendar Days Through No Fault Of Its Own, Due To Any Of The Following Reasons: (a) Failure Of The Procuring Entity To Deliver, Within A Reasonable Time, Supplies, Materials, Right-of-way, Or Other Items It Is Obligated To Furnish Under The Terms Of This Contract; Or (b) The Prosecution Of The Work Is Disrupted By The Adverse Peace And Order Situation, As Certified By The Armed Forces Of The Philippines Provincial Commander And Approved By The Secretary Of National Defense. 18. Termination For Other Causes 18.1. The Procuring Entity May Terminate This Contract, In Whole Or In Part, At Any Time For Its Convenience. The Head Of The Procuring Entity May Terminate This Contract For The Convenience Of The Procuring Entity If He Has Determined The Existence Of Conditions That Make Project Implementation Economically, Financially Or Technically Impractical And/or Unnecessary, Such As, But Not Limited To, Fortuitous Event(s) Or Changes In Law And National Government Policies. 18.2. The Procuring Entity Or The Contractor May Terminate This Contract If The Other Party Causes A Fundamental Breach Of This Contract. 18.3. Fundamental Breaches Of Contract Shall Include, But Shall Not Be Limited To, The Following: (a) The Contractor Stops Work For Twenty Eight (28) Days When No Stoppage Of Work Is Shown On The Current Program Of Work And The Stoppage Has Not Been Authorized By The Procuring Entity’s Representative; (b) The Procuring Entity’s Representative Instructs The Contractor To Delay The Progress Of The Works, And The Instruction Is Not Withdrawn Within Twenty Eight (28) Days; (c) The Procuring Entity Shall Terminate This Contract If The Contractor Is Declared Bankrupt Or Insolvent As Determined With Finality By A Court Of Competent Jurisdiction. In This Event, Termination Will Be Without Compensation To The Contractor, Provided That Such Termination Will Not Prejudice Or Affect Any Right Of Action Or Remedy Which Has Accrued Or Will Accrue Thereafter To The Procuring Entity And/or The Contractor. In The Case Of The Contractor's Insolvency, Any Contractor's Equipment Which The Procuring Entity Instructs In The Notice Is To Be Used Until The Completion Of The Works; (d) A Payment Certified By The Procuring Entity’s Representative Is Not Paid By The Procuring Entity To The Contractor Within Eighty Four (84) Days From The Date Of The Procuring Entity’s Representative’s Certificate; (e) The Procuring Entity’s Representative Gives Notice That Failure To Correct A Particular Defect Is A Fundamental Breach Of Contract And The Contractor Fails To Correct It Within A Reasonable Period Of Time Determined By The Procuring Entity’s Representative; (f) The Contractor Does Not Maintain A Security, Which Is Required; (g) The Contractor Has Delayed The Completion Of The Works By The Number Of Days For Which The Maximum Amount Of Liquidated Damages Can Be Paid, As Defined In The Gcc Clause 9; And (h) In Case It Is Determined Prima Facie By The Procuring Entity That The Contractor Has Engaged, Before Or During The Implementation Of The Contract, In Unlawful Deeds And Behaviors Relative To Contract Acquisition And Implementation, Such As, But Not Limited To, The Following: (i) Corrupt, Fraudulent, Collusive, Coercive, And Obstructive Practices As Defined In Itb Clause 3.1(a), Unless Otherwise Specified In The Scc; (ii) Drawing Up Or Using Forged Documents; (iii) Using Adulterated Materials, Means Or Methods, Or Engaging In Production Contrary To Rules Of Science Or The Trade; And (iv) Any Other Act Analogous To The Foregoing. 18.4. The Funding Source Or The Procuring Entity, As Appropriate, Will Seek To Impose The Maximum Civil, Administrative And/or Criminal Penalties Available Under The Applicable Law On Individuals And Organizations Deemed To Be Involved With Corrupt, Fraudulent, Or Coercive Practices. 18.5. When Persons From Either Party To This Contract Gives Notice Of A Fundamental Breach To The Procuring Entity’s Representative In Order To Terminate The Existing Contract For A Cause Other Than Those Listed Under Gcc Clause 18.3, The Procuring Entity’s Representative Shall Decide Whether The Breach Is Fundamental Or Not. 18.6. If This Contract Is Terminated, The Contractor Shall Stop Work Immediately, Make The Site Safe And Secure, And Leave The Site As Soon As Reasonably Possible. 19. Procedures For Termination Of Contracts 19.1. The Following Provisions Shall Govern The Procedures For The Termination Of This Contract: (a) Upon Receipt Of A Written Report Of Acts Or Causes Which May Constitute Ground(s) For Termination As Aforementioned, Or Upon Its Own Initiative, The Procuring Entity Shall, Within A Period Of Seven (7) Calendar Days, Verify The Existence Of Such Ground(s) And Cause The Execution Of A Verified Report, With All Relevant Evidence Attached; (b) Upon Recommendation By The Procuring Entity, The Head Of The Procuring Entity Shall Terminate This Contract Only By A Written Notice To The Contractor Conveying The Termination Of This Contract. The Notice Shall State: (i) That This Contract Is Being Terminated For Any Of The Ground(s) Afore-mentioned, And A Statement Of The Acts That Constitute The Ground(s) Constituting The Same; (ii) The Extent Of Termination, Whether In Whole Or In Part; (iii) An Instruction To The Contractor To Show Cause As To Why This Contract Should Not Be Terminated; And (iv) Special Instructions Of The Procuring Entity, If Any. The Notice To Terminate Shall Be Accompanied By A Copy Of The Verified Report; (c) Within A Period Of Seven (7) Calendar Days From Receipt Of The Notice Of Termination, The Contractor Shall Submit To The Head Of The Procuring Entity A Verified Position Paper Stating Why The Contract Should Not Be Terminated. If The Contractor Fails To Show Cause After The Lapse Of The Seven (7) Day Period, Either By Inaction Or By Default, The Head Of The Procuring Entity Shall Issue An Order Terminating The Contract; (d) The Procuring Entity May, At Anytime Before Receipt Of The Bidder’s Verified Position Paper Described In Item (c) Above Withdraw The Notice To Terminate If It Is Determined That Certain Items Or Works Subject Of The Notice Had Been Completed, Delivered, Or Performed Before The Contractor’s Receipt Of The Notice; (e) Within A Non-extendible Period Of Ten (10) Calendar Days From Receipt Of The Verified Position Paper, The Head Of The Procuring Entity Shall Decide Whether Or Not To Terminate This Contract. It Shall Serve A Written Notice To The Contractor Of Its Decision And, Unless Otherwise Provided In The Said Notice, This Contract Is Deemed Terminated From Receipt Of The Contractor Of The Notice Of Decision. The Termination Shall Only Be Based On The Ground(s) Stated In The Notice To Terminate; And (f) The Head Of The Procuring Entity May Create A Contract Termination Review Committee (ctrc) To Assist Him In The Discharge Of This Function. All Decisions Recommended By The Ctrc Shall Be Subject To The Approval Of The Head Of The Procuring Entity. 19.2. Pursuant To Section 69(f) Of Ra 9184 And Without Prejudice To The Imposition Of Additional Administrative Sanctions As The Internal Rules Of The Agency May Provide And/or Further Criminal Prosecution As Provided By Applicable Laws, The Procuring Entity Shall Impose On Contractors After The Termination Of The Contract The Penalty Of Suspension For One (1) Year For The First Offense, Suspension For Two (2) Years For The Second Offense From Participating In The Public Bidding Process, For Violations Committed During The Contract Implementation Stage, Which Include But Not Limited To The Following: (a) Failure Of The Contractor, Due Solely To His Fault Or Negligence, To Mobilize And Start Work Or Performance Within The Specified Period In The Notice To Proceed (“ntp”); (b) Failure By The Contractor To Fully And Faithfully Comply With Its Contractual Obligations Without Valid Cause, Or Failure By The Contractor To Comply With Any Written Lawful Instruction Of The Procuring Entity Or Its Representative(s) Pursuant To The Implementation Of The Contract. For The Procurement Of Infrastructure Projects Or Consultancy Contracts, Lawful Instructions Include But Are Not Limited To The Following: (i) Employment Of Competent Technical Personnel, Competent Engineers And/or Work Supervisors; (ii) Provision Of Warning Signs And Barricades In Accordance With Approved Plans And Specifications And Contract Provisions; (iii) Stockpiling In Proper Places Of All Materials And Removal From The Project Site Of Waste And Excess Materials, Including Broken Pavement And Excavated Debris In Accordance With Approved Plans And Specifications And Contract Provisions; (iv) Deployment Of Committed Equipment, Facilities, Support Staff And Manpower; And (v) Renewal Of The Effectivity Dates Of The Performance Security After Its Expiration During The Course Of Contract Implementation. (c) Assignment And Subcontracting Of The Contract Or Any Part Thereof Or Substitution Of Key Personnel Named In The Proposal Without Prior Written Approval By The Procuring Entity. (d) Poor Performance By The Contractor Or Unsatisfactory Quality And/or Progress Of Work Arising From His Fault Or Negligence As Reflected In The Constructor's Performance Evaluation System (“cpes”) Rating Sheet. In The Absence Of The Cpes Rating Sheet, The Existing Performance Monitoring System Of The Procuring Entity Shall Be Applied. Any Of The Following Acts By The Contractor Shall Be Construed As Poor Performance: (i) Negative Slippage Of 15% And Above Within The Critical Path Of The Project Due Entirely To The Fault Or Negligence Of The Contractor; And (ii) Quality Of Materials And Workmanship Not Complying With The Approved Specifications Arising From The Contractor's Fault Or Negligence. (e) Willful Or Deliberate Abandonment Or Non-performance Of The Project Or Contract By The Contractor Resulting To Substantial Breach Thereof Without Lawful And/or Just Cause. In Addition To The Penalty Of Suspension, The Performance Security Posted By The Contractor Shall Also Be Forfeited. 20. Force Majeure, Release From Performance 20.1. For Purposes Of This Contract The Terms “force Majeure” And “fortuitous Event” May Be Used Interchangeably. In This Regard, A Fortuitous Event Or Force Majeure Shall Be Interpreted To Mean An Event Which The Contractor Could Not Have Foreseen, Or Which Though Foreseen, Was Inevitable. It Shall Not Include Ordinary Unfavorable Weather Conditions; And Any Other Cause The Effects Of Which Could Have Been Avoided With The Exercise Of Reasonable Diligence By The Contractor. 20.2. If This Contract Is Discontinued By An Outbreak Of War Or By Any Other Event Entirely Outside The Control Of Either The Procuring Entity Or The Contractor, The Procuring Entity’s Representative Shall Certify That This Contract Has Been Discontinued. The Contractor Shall Make The Site Safe And Stop Work As Quickly As Possible After Receiving This Certificate And Shall Be Paid For All Works Carried Out Before Receiving It And For Any Work Carried Out Afterwards To Which A Commitment Was Made. 20.3. If The Event Continues For A Period Of Eighty Four (84) Days, Either Party May Then Give Notice Of Termination, Which Shall Take Effect Twenty Eight (28) Days After The Giving Of The Notice. 20.4. After Termination, The Contractor Shall Be Entitled To Payment Of The Unpaid Balance Of The Value Of The Works Executed And Of The Materials And Plant Reasonably Delivered To The Site, Adjusted By The Following: (a) Any Sum To Which The Contractor Is Entitled Under Gcc Clause 28; (b) The Cost Of His Suspension And Demobilization; (c) Any Sum To Which The Procuring Entity Is Entitled. 20.5. The Net Balance Due Shall Be Paid Or Repaid Within A Reasonable Time Period From The Time Of The Notice Of Termination. 21. Resolution Of Disputes 21.1. If Any Dispute Or Difference Of Any Kind Whatsoever Shall Arise Between The Parties In Connection With The Implementation Of The Contract Covered By The Act And This Irr, The Parties Shall Make Every Effort To Resolve Amicably Such Dispute Or Difference By Mutual Consultation. 21.2. If The Contractor Believes That A Decision Taken By The Procuring Entity’s Representative Was Either Outside The Authority Given To The Procuring Entity’s Representative By This Contract Or That The Decision Was Wrongly Taken, The Decision Shall Be Referred To The Arbiter Indicated In The Scc Within Fourteen (14) Days Of The Notification Of The Procuring Entity’s Representative’s Decision. 21.3. Any And All Disputes Arising From The Implementation Of This Contract Covered By The R.a. 9184 And Its Irr Shall Be Submitted To Arbitration In The Philippines According To The Provisions Of Republic Act No. 876, Otherwise Known As The “ Arbitration Law” And Republic Act 9285, Otherwise Known As The “alternative Dispute Resolution Act Of 2004”: Provided, However, That, Disputes That Are Within The Competence Of The Construction Industry Arbitration Commission To Resolve Shall Be Referred Thereto. The Process Of Arbitration Shall Be Incorporated As A Provision In This Contract That Will Be Executed Pursuant To The Provisions Of The Act And Its Irr: Provided, Further, That, By Mutual Agreement, The Parties May Agree In Writing To Resort To Other Alternative Modes Of Dispute Resolution. 22. Suspension Of Loan, Credit, Grant, Or Appropriation In The Event That The Funding Source Suspends The Loan, Credit, Grant, Or Appropriation To The Procuring Entity, From Which Part Of The Payments To The Contractor Are Being Made: (a) The Procuring Entity Is Obligated To Notify The Contractor Of Such Suspension Within Seven (7) Days Of Having Received The Suspension Notice. (b) If The Contractor Has Not Received Sums Due It For Work Already Done Within Forty Five (45) Days From The Time The Contractor’s Claim For Payment Has Been Certified By The Procuring Entity’s Representative, The Contractor May Immediately Issue A Suspension Of Work Notice In Accordance With Gcc Clause 45.2. 23. Procuring Entity’s Representative’s Decisions 23.1. Except Where Otherwise Specifically Stated, The Procuring Entity’s Representative Will Decide Contractual Matters Between The Procuring Entity And The Contractor In The Role Representing The Procuring Entity. 23.2. The Procuring Entity’s Representative May Delegate Any Of His Duties And Responsibilities To Other People, Except To The Arbiter, After Notifying The Contractor, And May Cancel Any Delegation After Notifying The Contractor. 24. Approval Of Drawings And Temporary Works By The Procuring Entity’s Representative 24.1. All Drawings Prepared By The Contractor For The Execution Of The Temporary Works, Are Subject To Prior Approval By The Procuring Entity’s Representative Before Its Use. 24.2. The Contractor Shall Be Responsible For Design Of Temporary Works. 24.3. The Procuring Entity’s Representative’s Approval Shall Not Alter The Contractor’s Responsibility For Design Of The Temporary Works. 24.4. The Contractor Shall Obtain Approval Of Third Parties To The Design Of The Temporary Works, When Required By The Procuring Entity. 25. Acceleration And Delays Ordered By The Procuring Entity’s Representative 25.1. When The Procuring Entity Wants The Contractor To Finish Before The Intended Completion Date, The Procuring Entity’s Representative Will Obtain Priced Proposals For Achieving The Necessary Acceleration From The Contractor. If The Procuring Entity Accepts These Proposals, The Intended Completion Date Will Be Adjusted Accordingly And Confirmed By Both The Procuring Entity And The Contractor. 25.2. If The Contractor’s Financial Proposals For An Acceleration Are Accepted By The Procuring Entity, They Are Incorporated In The Contract Price And Treated As A Variation. 26. Extension Of The Intended Completion Date 26.1. The Procuring Entity’s Representative Shall Extend The Intended Completion Date If A Variation Is Issued Which Makes It Impossible For The Intended Completion Date To Be Achieved By The Contractor Without Taking Steps To Accelerate The Remaining Work, Which Would Cause The Contractor To Incur Additional Costs. No Payment Shall Be Made For Any Event Which May Warrant The Extension Of The Intended Completion Date. 26.2. The Procuring Entity’s Representative Shall Decide Whether And By How Much To Extend The Intended Completion Date Within Twenty One (21) Days Of The Contractor Asking The Procuring Entity’s Representative For A Decision Thereto After Fully Submitting All Supporting Information. If The Contractor Has Failed To Give Early Warning Of A Delay Or Has Failed To Cooperate In Dealing With A Delay, The Delay By This Failure Shall Not Be Considered In Assessing The New Intended Completion Date. 27. Right To Vary 27.1. The Procuring Entity’s Representative With The Prior Approval Of The Procuring Entity May Instruct Variations, Up To A Maximum Cumulative Amount Of Ten Percent (10%) Of The Original Contract Cost. 27.2. Variations Shall Be Valued As Follows: (a) At A Lump Sum Price Agreed Between The Parties; (b) Where Appropriate, At Rates In This Contract; (c) In The Absence Of Appropriate Rates, The Rates In This Contract Shall Be Used As The Basis For Valuation; Or Failing Which (d) At Appropriate New Rates, Equal To Or Lower Than Current Industry Rates And To Be Agreed Upon By Both Parties And Approved By The Head Of The Procuring Entity. 28. Contractor's Right To Claim If The Contractor Incurs Cost As A Result Of Any Of The Events Under Gcc Clause 13, The Contractor Shall Be Entitled To The Amount Of Such Cost. If As A Result Of Any Of The Said Events, It Is Necessary To Change The Works, This Shall Be Dealt With As A Variation. 29. Dayworks 29.1. Subject To Gcc Clause 43 On Variation Order, And If Applicable As Indicated In The Scc, The Day Works Rates In The Contractor’s Bid Shall Be Used For Small Additional Amounts Of Work Only When The Procuring Entity’s Representative Has Given Written Instructions In Advance For Additional Work To Be Paid For In That Way. 29.2. All Work To Be Paid For As Day Works Shall Be Recorded By The Contractor On Forms Approved By The Procuring Entity’s Representative. Each Completed Form Shall Be Verified And Signed By The Procuring Entity’s Representative Within Two Days Of The Work Being Done. 29.3. The Contractor Shall Be Paid For Day Works Subject To Obtaining Signed Dayworks Forms. 30. Early Warning 30.1. The Contractor Shall Warn The Procuring Entity’s Representative At The Earliest Opportunity Of Specific Likely Future Events Or Circumstances That May Adversely Affect The Quality Of The Work, Increase The Contract Price, Or Delay The Execution Of The Works. The Procuring Entity’s Representative May Require The Contractor To Provide An Estimate Of The Expected Effect Of The Future Event Or Circumstance On The Contract Price And Completion Date. The Estimate Shall Be Provided By The Contractor As Soon As Reasonably Possible. 30.2. The Contractor Shall Cooperate With The Procuring Entity’s Representative In Making And Considering Proposals For How The Effect Of Such An Event Or Circumstance Can Be Avoided Or Reduced By Anyone Involved In The Work And In Carrying Out Any Resulting Instruction Of The Procuring Entity’s Representative. 31. Program Of Work 31.1. Within The Time Stated In The Scc, The Contractor Shall Submit To The Procuring Entity’s Representative For Approval A Program Of Work Showing The General Methods, Arrangements, Order, And Timing For All The Activities In The Works. 31.2. An Update Of The Program Of Work Shall The Show The Actual Progress Achieved On Each Activity And The Effect Of The Progress Achieved On The Timing Of The Remaining Work, Including Any Changes To The Sequence Of The Activities. 31.3. The Contractor Shall Submit To The Procuring Entity’s Representative For Approval An Updated Program Of Work At Intervals No Longer Than The Period Stated In The Scc. If The Contractor Does Not Submit An Updated Program Of Work Within This Period, The Procuring Entity’s Representative May Withhold The Amount Stated In The Scc From The Next Payment Certificate And Continue To Withhold This Amount Until The Next Payment After The Date On Which The Overdue Program Of Work Has Been Submitted. 31.4. The Procuring Entity’s Representative’s Approval Of The Program Of Work Shall Not Alter The Contractor’s Obligations. The Contractor May Revise The Program Of Work And Submit It To The Procuring Entity’s Representative Again At Any Time. A Revised Program Of Work Shall Show The Effect Of Any Approved Variations. 31.5. When The Program Of Work Is Updated, The Contractor Shall Provide The Procuring Entity’s Representative With An Updated Cash Flow Forecast. The Cash Flow Forecast Shall Include Different Currencies, As Defined In The Contract, Converted As Necessary Using The Contract Exchange Rates. 31.6. All Variations Shall Be Included In Updated Program Of Work Produced By The Contractor. 32. Management Conferences 32.1. Either The Procuring Entity’s Representative Or The Contractor May Require The Other To Attend A Management Conference. The Management Conference Shall Review The Plans For Remaining Work And Deal With Matters Raised In Accordance With The Early Warning Procedure. 32.2. The Procuring Entity’s Representative Shall Record The Business Of Management Conferences And Provide Copies Of The Record To Those Attending The Conference And To The Procuring Entity . The Responsibility Of The Parties For Actions To Be Taken Shall Be Decided By The Procuring Entity’s Representative Either At The Management Conference Or After The Management Conference And Stated In Writing To All Who Attended The Conference. 33. Bill Of Quantities 33.1. The Bill Of Quantities Shall Contain Items Of Work For The Construction, Installation, Testing, And Commissioning Of Work To Be Done By The Contractor. 33.2. The Bill Of Quantities Is Used To Calculate The Contract Price. The Contractor Is Paid For The Quantity Of The Work Done At The Rate In The Bill Of Quantities For Each Item. 33.3. If The Final Quantity Of Any Work Done Differs From The Quantity In The Bill Of Quantities For The Particular Item And Is Not More Than Twenty Five Percent (25%) Of The Original Quantity, Provided The Aggregate Changes For All Items Do Not Exceed Ten Percent (10%) Of The Contract Price, The Procuring Entity’s Representative Shall Make The Necessary Adjustments To Allow For The Changes Subject To Applicable Laws, Rules, And Regulations. 33.4. If Requested By The Procuring Entity’s Representative, The Contractor Shall Provide The Procuring Entity’s Representative With A Detailed Cost Breakdown Of Any Rate In The Bill Of Quantities. 34. Instructions, Inspections And Audits 34.1. The Procuring Entity’s Personnel Shall At All Reasonable Times During Construction Of The Work Be Entitled To Examine, Inspect, Measure And Test The Materials And Workmanship, And To Check The Progress Of The Construction. 34.2. If The Procuring Entity’s Representative Instructs The Contractor To Carry Out A Test Not Specified In The Specification To Check Whether Any Work Has A Defect And The Test Shows That It Does, The Contractor Shall Pay For The Test And Any Samples. If There Is No Defect, The Test Shall Be A Compensation Event. 34.3. The Contractor Shall Permit The Funding Source Named In The Scc To Inspect The Contractor’s Accounts And Records Relating To The Performance Of The Contractor And To Have Them Audited By Auditors Appointed By The Funding Source, If So Required By The Funding Source. 35. Identifying Defects The Procuring Entity’s Representative Shall Check The Contractor’s Work And Notify The Contractor Of Any Defects That Are Found. Such Checking Shall Not Affect The Contractor’s Responsibilities. The Procuring Entity’s Representative May Instruct The Contractor To Search Uncover Defects And Test Any Work That The Procuring Entity’s Representative Considers Below Standards And Defective. 36. Cost Of Repairs Loss Or Damage To The Works Or Materials To Be Incorporated In The Works Between The Start Date And The End Of The Defects Liability Periods Shall Be Remedied By The Contractor At The Contractor’s Cost If The Loss Or Damage Arises From The Contractor’s Acts Or Omissions. 37. Correction Of Defects 37.1. The Procuring Entity’s Representative Shall Give Notice To The Contractor Of Any Defects Before The End Of The Defects Liability Period, Which Isone (1) Year From Project Completion Up To Final Acceptance By The Procuring Entity’s. 37.2. Every Time Notice Of A Defect Is Given, The Contractor Shall Correct The Notified Defect Within The Length Of Time Specified In The Procuring Entity’s Representative’s Notice. 37.3. The Contractor Shall Correct The Defects Which He Notices Himself Before The End Of The Defects Liability Period. 37.4. The Procuring Entity Shall Certify That All Defects Have Been Corrected. If The Procuring Entity Considers That Correction Of A Defect Is Not Essential, He Can Request The Contractor To Submit A Quotation For The Corresponding Reduction In The Contract Price. If The Procuring Entity Accepts The Quotation, The Corresponding Change In The Scc Is A Variation. 38. Uncorrected Defects 38.1. The Procuring Entity Shall Give The Contractor At Least Fourteen (14) Days Notice Of His Intention To Use A Third Party To Correct A Defect. If The Contractor Does Not Correct The Defect Himself Within The Period, The Procuring Entity May Have The Defect Corrected By The Third Party. The Cost Of The Correction Will Be Deducted From The Contract Price. 38.2. The Use Of A Third Party To Correct Defects That Are Uncorrected By The Contractor Will In No Way Relieve The Contractor Of Its Liabilities And Warranties Under The Contract. 39. Advance Payment 39.1. The Procuring Entity Shall, Upon A Written Request Of The Contractor Which Shall Be Submitted As A Contract Document, Make An Advance Payment To The Contractor In An Amount Not Exceeding Fifteen Percent (15%) Of The Total Contract Price, To Be Made In Lump Sum Or, At The Most Two, Installments According To A Schedule Specified In The Scc. 39.2. The Advance Payment Shall Be Made Only Upon The Submission To And Acceptance By The Procuring Entity Of An Irrevocable Standby Letter Of Credit Of Equivalent Value From A Commercial Bank, A Bank Guarantee Or A Surety Bond Callable Upon Demand, Issued By A Surety Or Insurance Company Duly Licensed By The Insurance Commission And Confirmed By The Procuring Entity. 39.3. The Advance Payment Shall Be Repaid By The Contractor By An Amount Equal To The Percentage Of The Total Contract Price Used For The Advance Payment. 39.4. The Contractor May Reduce His Standby Letter Of Credit Or Guarantee Instrument By The Amounts Refunded By The Monthly Certificates In The Advance Payment. 39.5. The Procuring Entity Will Provide An Advance Payment On The Contract Price As Stipulated In The Conditions Of Contract, Subject To The Maximum Amount Stated In Scc Clause 39.1. 40. Progress Payments 40.1. The Contractor May Submit A Request For Payment For Work Accomplished. Such Request For Payment Shall Be Verified And Certified By The Procuring Entity’s Representative/project Engineer. Except As Otherwise Stipulated In The Scc, Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Not Be Included For Payment. 40.2. The Procuring Entity Shall Deduct The Following From The Certified Gross Amounts To Be Paid To The Contractor As Progress Payment: (a) Cumulative Value Of The Work Previously Certified And Paid For. (b) Portion Of The Advance Payment To Be Recouped For The Month. (c) Retention Money In Accordance With The Condition Of Contract. (d) Amount To Cover Third Party Liabilities. (e) Amount To Cover Uncorrected Discovered Defects In The Works. 40.3. Payments Shall Be Adjusted By Deducting There From The Amounts For Advance Payments And Retention. The Procuring Entity Shall Pay The Contractor The Amounts Certified By The Procuring Entity’s Representative Within Twenty Eight (28) Days From The Date Each Certificate Was Issued. No Payment Of Interest For Delayed Payments And Adjustments Shall Be Made By The Procuring Entity. 40.4. The First Progress Payment May Be Paid By The Procuring Entity To The Contractor Provided That At Least Twenty Percent (20%) Of The Work Has Been Accomplished As Certified By The Procuring Entity’s Representative. 40.5. Items Of The Works For Which A Price Of “0” (zero) Has Been Entered Will Not Be Paid For By The Procuring Entity And Shall Be Deemed Covered By Other Rates And Prices In The Contract. 41. Payment Certificates 41.1. The Contractor Shall Submit To The Procuring Entity’s Representative Monthly Statements Of The Estimated Value Of The Work Executed Less The Cumulative Amount Certified Previously. 41.2. The Procuring Entity’s Representative Shall Check The Contractor’s Monthly Statement And Certify The Amount To Be Paid To The Contractor. 41.3. The Value Of Work Executed Shall: (a) Be Determined By The Procuring Entity’s Representative; (b) Comprise The Value Of The Quantities Of The Items In The Bill Of Quantities Completed; And (c) Include The Valuations Of Approved Variations. 41.4. The Procuring Entity’s Representative May Exclude Any Item Certified In A Previous Certificate Or Reduce The Proportion Of Any Item Previously Certified In Any Certificate In The Light Of Later Information. 42. Retention 42.1. The Procuring Entity Shall Retain From Each Payment Due To The Contractor An Amount Equal To A Percentage Thereof Using The Rate As Specified In Itb Sub-clause 42.2. 42.2. Progress Payments Are Subject To Retention Of Ten Percent (10%), Referred To As The “retention Money.” Such Retention Shall Be Based On The Total Amount Due To The Contractor Prior To Any Deduction And Shall Be Retained From Every Progress Payment Until Fifty Percent (50%) Of The Value Of Works, As Determined By The Procuring Entity, Are Completed. If, After Fifty Percent (50%) Completion, The Work Is Satisfactorily Done And On Schedule, No Additional Retention Shall Be Made; Otherwise, The Ten Percent (10%) Retention Shall Again Be Imposed Using The Rate Specified Therefore. 42.3. The Total “retention Money” Shall Be Due For Release Upon Final Acceptance Of The Works. The Contractor May, However, Request The Substitution Of The Retention Money For Each Progress Billing With Irrevocable Standby Letters Of Credit From A Commercial Bank, Bank Guarantees Or Surety Bonds Callable On Demand, Of Amounts Equivalent To The Retention Money Substituted For And Acceptable To The Procuring Entity, Provided That The Project Is On Schedule And Is Satisfactorily Undertaken. Otherwise, The Ten (10%) Percent Retention Shall Be Made. Said Irrevocable Standby Letters Of Credit, Bank Guarantees And/or Surety Bonds, To Be Posted In Favor Of The Government Shall Be Valid For A Duration To Be Determined By The Concerned Implementing Office/agency Or Procuring Entity And Will Answer For The Purpose For Which The Ten (10%) Percent Retention Is Intended, I.e., To Cover Uncorrected Discovered Defects And Third Party Liabilities. 42.4. On Completion Of The Whole Works, The Contractor May Substitute Retention Money With An “on Demand” Bank Guarantee In A Form Acceptable To The Procuring Entity. 43. Variation Orders 43.1. Variation Orders May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities, Including The Introduction Of New Work Items That Are Not Included In The Original Contract Or Reclassification Of Work Items That Are Either Due To Change Of Plans, Design Or Alignment To Suit Actual Field Conditions Resulting In Disparity Between The Preconstruction Plans Used For Purposes Of Bidding And The “as Staked Plans” Or Construction Drawings Prepared After A Joint Survey By The Contractor And The Procuring Entity After Award Of The Contract, Provided That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. The Addition/deletion Of Works Should Be Within The General Scope Of The Project As Bid And Awarded. The Scope Of Works Shall Not Be Reduced So As To Accommodate A Positive Variation Order. A Variation Order May Either Be In The Form Of A Change Order Or Extra Work Order. 43.2. A Change Order May Be Issued By The Procuring Entity To Cover Any Increase/decrease In Quantities Of Original Work Items In The Contract. 43.3. An Extra Work Order May Be Issued By The Procuring Entity To Cover The Introduction Of New Work Necessary For The Completion, Improvement Or Protection Of The Project Which Were Not Included As Items Of Work In The Original Contract, Such As, Where There Are Subsurface Or Latent Physical Conditions At The Site Differing Materially From Those Indicated In The Contract, Or Where There Are Duly Unknown Physical Conditions At The Site Of An Unusual Nature Differing Materially From Those Ordinarily Encountered And Generally Recognized As Inherent In The Work Or Character Provided For In The Contract. 43.4. Any Cumulative Variation Order Beyond Ten Percent (10%) Shall Be Subject Of Another Contract To Be Bid Out If The Works Are Separable From The Original Contract. In Exceptional Cases Where It Is Urgently Necessary To Complete The Original Scope Of Work, The Head Of The Procuring Entity May Authorize A Positive Variation Order Go Beyond Ten Percent (10%) But Not More Than Twenty Percent (20%) Of The Original Contract Price, Subject To The Guidelines To Be Determined By The Gppb: Provided, However, That Appropriate Sanctions Shall Be Imposed On The Designer, Consultant Or Official Responsible For The Original Detailed Engineering Design Which Failed To Consider The Variation Order Beyond Ten Percent (10%). 43.5. In Claiming For Any Variation Order, The Contractor Shall, Within Seven (7) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Condition(s) Leading To The Extra Cost, And Within Twenty-eight (28) Calendar Days Deliver A Written Communication Giving Full And Detailed Particulars Of Any Extra Cost In Order That It May Be Investigated At That Time. Failure To Provide Either Of Such Notices In The Time Stipulated Shall Constitute A Waiver By The Contractor For Any Claim. The Preparation And Submission Of Variation Orders Are As Follows: (a) If The Procuring Entity’s Representative/project Engineer Believes That A Change Order Or Extra Work Order Should Be Issued, He Shall Prepare The Proposed Order Accompanied With The Notices Submitted By The Contractor, The Plans Therefore, His Computations As To The Quantities Of The Additional Works Involved Per Item Indicating The Specific Stations Where Such Works Are Needed, The Date Of His Inspections And Investigations Thereon, And The Log Book Thereof, And A Detailed Estimate Of The Unit Cost Of Such Items Of Work, Together With His Justifications For The Need Of Such Change Order Or Extra Work Order, And Shall Submit The Same To The Head Of The Procuring Entity For Approval. (b) The Head Of The Procuring Entity Or His Duly Authorized Representative, Upon Receipt Of The Proposed Change Order Or Extra Work Order Shall Immediately Instruct The Technical Staff Of The Procuring Entity’s To Conduct An On-the-spot Investigation To Verify The Need For The Work To Be Prosecuted. A Report Of Such Verification Shall Be Submitted Directly To The Head Of The Procuring Entity Or His Duly Authorized Representative. (c) The, Head Of The Procuring Entity Or His Duly Authorized Representative, After Being Satisfied That Such Change Order Or Extra Work Order Is Justified And Necessary, Shall Review The Estimated Quantities And Prices And Forward The Proposal With The Supporting Documentation To The Head Of Procuring Entity For Consideration. (d) If, After Review Of The Plans, Quantities And Estimated Unit Cost Of The Items Of Work Involved, The Proper Office Of The Procuring Entity Empowered To Review And Evaluate Change Orders Or Extra Work Orders Recommends Approval Thereof, Head Of The Procuring Entity Or His Duly Authorized Representative, Believing The Change Order Or Extra Work Order To Be In Order, Shall Approve The Same. (e) The Timeframe For The Processing Of Variation Orders From The Preparation Up To The Approval By The Head Of The Procuring Entity Concerned Shall Not Exceed Thirty (30) Calendar Days. 44. Contract Completion Once The Project Reaches An Accomplishment Of Ninety Five (95%) Of The Total Contract Amount, The Procuring Entity May Create An Inspectorate Team To Make Preliminary Inspection And Submit A Punch-list To The Contractor In Preparation For The Final Turnover Of The Project. Said Punch-list Will Contain, Among Others, The Remaining Works, Work Deficiencies For Necessary Corrections, And The Specific Duration/time To Fully Complete The Project Considering The Approved Remaining Contract Time. This, However, Shall Not Preclude The Claim Of The Procuring Entity For Liquidated Damages. 45. Suspension Of Work 45.1. The Procuring Entity Shall Have The Authority To Suspend The Work Wholly Or Partly By Written Order For Such Period As May Be Deemed Necessary, Due To Force Majeure Or Any Fortuitous Events Or For Failure On The Part Of The Contractor To Correct Bad Conditions Which Are Unsafe For Workers Or For The General Public, To Carry Out Valid Orders Given By The Procuring Entity Or To Perform Any Provisions Of The Contract, Or Due To Adjustment Of Plans To Suit Field Conditions As Found Necessary During Construction. The Contractor Shall Immediately Comply With Such Order To Suspend The Work Wholly Or Partly. 45.2. The Contractor Or Its Duly Authorized Representative Shall Have The Right To Suspend Work Operation On Any Or All Projects/activities Along The Critical Path Of Activities After Fifteen (15) Calendar Days From Date Of Receipt Of Written Notice From The Contractor To The District Engineer/regional Director/consultant Or Equivalent Official, As The Case May Be, Due To The Following: (a) There Exist Right-of-way Problems Which Prohibit The Contractor From Performing Work In Accordance With The Approved Construction Schedule. (b) Requisite Construction Plans Which Must Be Owner-furnished Are Not Issued To The Contractor Precluding Any Work Called For By Such Plans. (c) Peace And Order Conditions Make It Extremely Dangerous, If Not Possible, To Work. However, This Condition Must Be Certified In Writing By The Philippine National Police (pnp) Station Which Has Responsibility Over The Affected Area And Confirmed By The Department Of Interior And Local Government (dilg) Regional Director. (d) There Is Failure On The Part Of The Procuring Entity To Deliver Government-furnished Materials And Equipment As Stipulated In The Contract. (e) Delay In The Payment Of Contractor’s Claim For Progress Billing Beyond Forty-five (45) Calendar Days From The Time The Contractor’s Claim Has Been Certified To By The Procuring Entity’s Authorized Representative That The Documents Are Complete Unless There Are Justifiable Reasons Thereof Which Shall Be Communicated In Writing To The Contractor. 45.3. In Case Of Total Suspension, Or Suspension Of Activities Along The Critical Path, Which Is Not Due To Any Fault Of The Contractor, The Elapsed Time Between The Effective Order Of Suspending Operation And The Order To Resume Work Shall Be Allowed The Contractor By Adjusting The Contract Time Accordingly. 46. Payment On Termination 46.1. If The Contract Is Terminated Because Of A Fundamental Breach Of Contract By The Contractor, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done And Materials Ordered Less Advance Payments Received Up To The Date Of The Issue Of The Certificate And Less The Percentage To Apply To The Value Of The Work Not Completed, As Indicated In The Scc. Additional Liquidated Damages Shall Not Apply. If The Total Amount Due To The Procuring Entity Exceeds Any Payment Due To The Contractor, The Difference Shall Be A Debt Payable To The Procuring Entity. 46.2. If The Contract Is Terminated For The Procuring Entity’s Convenience Or Because Of A Fundamental Breach Of Contract By The Procuring Entity, The Procuring Entity’s Representative Shall Issue A Certificate For The Value Of The Work Done, Materials Ordered, The Reasonable Cost Of Removal Of Equipment, Repatriation Of The Contractor’s Personnel Employed Solely On The Works, And The Contractor’s Costs Of Protecting And Securing The Works, And Less Advance Payments Received Up To The Date Of The Certificate. 46.3. The Net Balance Due Shall Be Paid Or Repaid Within Twenty Eight (28) Days From The Notice Of Termination. 46.4. If The Contractor Has Terminated The Contract Under Gcc Clauses 17 Or 18, The Procuring Entity Shall Promptly Return The Performance Security To The Contractor. 47. Extension Of Contract Time 47.1. Should The Amount Of Additional Work Of Any Kind Or Other Special Circumstances Of Any Kind Whatsoever Occur Such As To Fairly Entitle The Contractor To An Extension Of Contract Time, The Procuring Entity Shall Determine The Amount Of Such Extension; Provided That The Procuring Entity Is Not Bound To Take Into Account Any Claim For An Extension Of Time Unless The Contractor Has, Prior To The Expiration Of The Contract Time And Within Thirty (30) Calendar Days After Such Work Has Been Commenced Or After The Circumstances Leading To Such Claim Have Arisen, Delivered To The Procuring Entity Notices In Order That It Could Have Investigated Them At That Time. Failure To Provide Such Notice Shall Constitute A Waiver By The Contractor Of Any Claim. Upon Receipt Of Full And Detailed Particulars, The Procuring Entity Shall Examine The Facts And Extent Of The Delay And Shall Extend The Contract Time Completing The Contract Work When, In The Procuring Entity’s Opinion, The Findings Of Facts Justify An Extension. 47.2. No Extension Of Contract Time Shall Be Granted The Contractor Due To (a) Ordinary Unfavorable Weather Conditions And (b) Inexcusable Failure Or Negligence Of Contractor To Provide The Required Equipment, Supplies Or Materials. 47.3. Extension Of Contract Time May Be Granted Only When The Affected Activities Fall Within The Critical Path Of The Pert/cpm Network. 47.4. No Extension Of Contract Time Shall Be Granted When The Reason Given To Support The Request For Extension Was Already Considered In The Determination Of The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection. 47.5. Extension Of Contract Time Shall Be Granted For Rainy/unworkable Days Considered Unfavorable For The Prosecution Of The Works At The Site, Based On The Actual Conditions Obtained At The Site, In Excess Of The Number Of Rainy/unworkable Days Pre-determined By The Procuring Entity In Relation To The Original Contract Time During The Conduct Of Detailed Engineering And In The Preparation Of The Contract Documents As Agreed Upon By The Parties Before Contract Perfection, And/or For Equivalent Period Of Delay Due To Major Calamities Such As Exceptionally Destructive Typhoons, Floods And Earthquakes, And Epidemics, And For Causes Such As Non-delivery On Time Of Materials, Working Drawings, Or Written Information To Be Furnished By The Procuring Entity, Non-acquisition Of Permit To Enter Private Properties Within The Right-of-way Resulting In Complete Paralyzation Of Construction Activities, And Other Meritorious Causes As Determined By The Procuring Entity’s Representative And Approved By The Head Of The Procuring Entity. Shortage Of Construction Materials, General Labor Strikes, And Peace And Order Problems That Disrupt Construction Operations Through No Fault Of The Contractor May Be Considered As Additional Grounds For Extension Of Contract Time Provided They Are Publicly Felt And Certified By Appropriate Government Agencies Such As Dti, Dole, Dilg, And Dnd, Among Others. The Written Consent Of Bondsmen Must Be Attached To Any Request Of The Contractor For Extension Of Contract Time And Submitted To The Procuring Entity For Consideration And The Validity Of The Performance Security Shall Be Correspondingly Extended. 48. Price Adjustment Except For Extraordinary Circumstances As Determined By Neda And Approved By The Gppb, No Price Adjustment Shall Be Allowed. Nevertheless, In Cases Where The Cost Of The Awarded Contract Is Affected By Any Applicable New Laws, Ordinances, Regulations, Or Other Acts Of The Gop, Promulgated After The Date Of Bid Opening, A Contract Price Adjustment Shall Be Made Or Appropriate Relief Shall Be Applied On A No Loss-no Gain Basis. 49. Completion The Contractor Shall Request The Procuring Entity’s Representative To Issue A Certificate Of Completion Of The Works, And The Procuring Entity’s Representative Will Do So Upon Deciding That The Work Is Completed. 50. Taking Over The Procuring Entity Shall Take Over The Site And The Works Within Seven (7) Days From The Date The Procuring Entity’s Representative Issues A Certificate Of Completion. 51. Operating And Maintenance Manuals 51.1. If “as Built” Drawings And/or Operating And Maintenance Manuals Are Required, The Contractor Shall Supply Them By The Dates Stated In The Scc. 51.2. If The Contractor Does Not Supply The Drawings And/or Manuals By The Dates Stated In The Scc, Or They Do Not Receive The Procuring Entity’s Representative’s Approval, The Procuring Entity’s Representative Shall Withhold The Amount Stated In The Scc From Payments Due To The Contractor. Section V. Special Conditions Of Contract Gcc Clause 1.16 The Intended Completion Date Is 90 Cd From Ntp. 1.21 The Procuring Entity Is Lgu- Mapanas, Northern Samar. 1.22 The Procuring Entity’s Representative Is Atty. Ronn Michael L. Tejano Municipal Mayor Municipality Of Mapanas Province Of Northern Samar 1.23 The Site Is Located At Mapanas, Northern Samar. 1.27 The Start Date Is: Upon Receipt Of Notice To Proceed. 1.30 The Works Consist Of: Item No. Scope Of Work Quantity Unit Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte, Mapanas, N. Samar. B. 5 Project Billboard/signboard 1.00 Lot Lot B.7 Construction Safety And Health 1.00 Lot Lot B.9 Mobilization And Demobilization 1.00 Lot Lot 801(7)a Removal Of Structures And Obstruction 1.00 Is Is 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. Cu.m. 902(1) A Reinforcing Steel, Deformed Grade 40 541.72 Kg. Kg 903 Formworks And Falseworks 53.38 Sq.m. Sq.m. 1047 Metal Structures 84.00 In.m. In.m 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. Sq.m. 1046 Masonry Works 75.60 Sq.m. Sq.m. 1003 Carpentry And Joinery Works 38.78 Sq.m. Sq.m. 1005 Doors And Windows 3.00 Sets Sets 1002 Plumbing Works 1.00 Lot Lot 1032 Painting Varnishing And Other Related Works 411.00 Sq.m. Sq.m. 1101 Wires And Wiring Devices 1.00 Is Is 1002 (1) Panel Board With Main Breaker And Branc 1.00 Is Is 1103 Lighting Fixtures And Lamps 1.00 Is Is Spcl1 Signages 1.00 Lot Lot 2.2 Note: The Items To Follow 5.1 The Procuring Entity Shall Give Possession Of All Parts Of The Site To The Contractor Upon The Issuance Of Notice To Proceed. 6.5 The Contractor Shall Employ The Following Key Personnel: Key Personnel Number Civil Engineer 1 Construction Foreman 1 Skilled Workers 3 Welder 3 7.4(c) “no Further Instructions”. 7.7 No Further Instructions. 8.1 No Further Instructions. 10 The Site Investigation Reports Are: None 12.3 No Further Instructions. 12.5 In Case Of Semi-permanent Structures, Such As Buildings Of Types 1, 2, And 3 As Classified Under The National Building Code Of The Philippines, Concrete/asphalt Roads, Concrete River Control, Drainage, Irrigation Lined Canals, River Landing, Deep Wells, Rock Causeway, Pedestrian Overpass, And Other Similar Semi-permanent Structures: Five (5) Years. 13 “no Additional Provision.” 18.3(h)(i) No Further Instructions. 21.2 The Arbiter Is: Construction Industry Arbitration Commission 29.1 No Day Works Are Applicable To The Contract. 31.1 The Contractor Shall Submit The Program Of Work To The Procuring Entity’s Representative Within 15days Of Delivery Of The Letter Of Acceptance. 31.3 The Period Between Program Of Work Updates Is 15days. The Amount To Be Withheld For Late Submission Of An Updated Program Of Work Is P 1,000.00. 34.3 The Funding Source Is Coming From Nia 39.1 The Amount Of The Advance Payment Is 15% Of The Contract Price (lump Sum) And Shall Be Release Once Upon Presentation Of The Following Documents As Required: 1. Letter Request For Advance Payment From The Contractor 2. Bank Guarantee For Advance Payment 40.1 Materials And Equipment Delivered On The Site But Not Completely Put In Place Shall Be Included For Payment. 51.1 The Date By Which Operating And Maintenance Manuals Are Required Is Not Applicable. The Date By Which “as Built” Drawings Are Required Is 20 Days Upon Completion Of The Subproject. 51.2 The Amount To Be Withheld For Failing To Produce “as Built” Drawings And/or Operating And Maintenance Manuals By The Date Required Is P1,000.00. Section Vi. Specifications Project Name: Repair/rehabilitation Of Mapanas Rhu Location : Brgy. Del Norte, Mapanas, Northern Samar Item No. Description Qty. Unit. B.5 Project Billborad/signboard 1.00 Lot A. Material A. Tarpaulin ( 4’x8’) 1.00 Set B. Plywood Marine (1/4”x1.2mx2.44) 1.00 Pc C. Coco Lumber, 2”x3”x12” 42.00 Bd.ft. D. Common Nails Assorted 0.50 Kg B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) (1 Gang = Foreman 1 Carpenter, 1 Laborer 1.00 1.00 E. Labor Requirement Foreman 1.00 1.00 Skilled Carpenter 1.00 1.00 Unskilled 1.00 1.00 B. 7 Construction Safety And Health 1.00 Lot A Material A. Safety Helmet 5.00 Pc B. Safety Shoes 5.00 Pc C. Safety Vest 5.00 Pc D. Working Gloves 5.00 Pc E. Face Mask (surgical/cloth) 5.00 Box F. Eye Goggles 5.00 Pc G. Sanitizing Solution 3.00 Lit H. Ethyl Alcohol 3.00 Lit I. Disinfectant Spray 3.00 Can J. Liquid Hand Soap 3.00 Lit B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) E. Labor Requirement A. Safety Officer 1.00 15.00 B. Health Personnel (full Time First Aider) 1.00 15.00 C. Sanitation Aide 1.00 15.00 B. 9 Mobilization And Demobilization 1.00 Lot A. Material B. Freight And Handling C. Name And Capacity Equipment Cargo/service Truck (2-5mt) 1.00 2.00 D. Labor Derivation (subsidiary Work Description) E. Labor Requirement 900(1)c1 Structural Concrete (class A), 28 Days 9.15 Cu.m. A. Material A Portland Cement, Typ1 1 83.00 Bag B. Gravel, ¾” 8.00 Cu.m. C. Sand, Washed 5.00 Cu.m. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) E. Labor Requirement Foreman 1.00 2.00 Skilled Mason 2.00 2.00 Unskilled 8.00 2.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) Iii A. Material A. Rsb, Deformed, 10mmo 34 Pcs B. Rsb, Deformed, 12mmo 78 Pcs. C. Tie Wire# 16 10.00 Kg B. Freight And Handling C. Name And Capacity Of Equipment Bar Cutter, Single Phase 1.00 2.00 D. Labor Derivation (subsidiary Work Description) (1 Gang=1-foreman, 1 Steelman, 1-laborer 80kgs/day/gang 541.72 80.00 E. Labor Requirement Foreman 1 2.00 Skilled Steel Man 4.00 2.00 Unskilled 4.00 2.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit, Cost (8-10%) Vat (5%) 1047 Metal Structures A. Material A. Tubular 2”x4”x6m 14.00 Pc B. Sliding Mechanism 1.00 Set C. Grinding Desk 8.00 Pc D. Cutting Desk 20.00 Pc E. Welding Rod 25.00 Kg F. Paint Red Lead 1.00 Gal G. Paint Brush, 2” 4.00 Pc H. Epoxy Paint Finish 2.00 Gal I. Barrel Bolt Set Padlock 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment Welding Machine, Electric Driven/dc Outpit 1.00 10.00 D. Labor Derivation (subsidiary Work Description) 84.00 9.00 E. Labor Requirement Foreman 1.00 10.00 Skilled Welder 2.00 10.00 Unskilled 3.00 10.00 I Total Estimated Direct Cost Ii Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. A. Pre-painted Metal Roofing Sheet Ga. 24x2.44m.) 9.00 In.m. B. J Bolt 1/4x21”, With Nut And Bonded Washer 72.00 Pc. C. Touchup Paint 4.00 L D. Paint Brush, 2” 2.00 Pc E. Pre-painted Metal Ridge Cap Ga. 24x2.44m 6.00 Pc F. Pre-painted Metal End Wall Flashing Ga. 24x2.44m 3.00 Pc G. Pre-painted Metal Gutter Ga. 24x2.44m 18.00 Pc B. Freight And Handling C. Name And Capacity Of Equipment A.scaffolding 1.00 3.00 D. Labor Derivation (subsidiary Work Description) Roofing Sheets Installation Install: 1 Gang= 1foreman, 1 Carpenter, 3- Laborers 9.00 20.00 Roofing Gutter, Wall Flashing And Ridge Cap Installation Install: 1 Gang=1-foreman, 1-carpenter, 3-laborers Capability: 12 Pcs/day/gang 27.00 12.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Carpenter 1.00 3.00 Unskilled 3.00 3.00 I. Total Estimated Direct Cost Ii. Indirect Cost Ocm (up To 12-15%) Contractor’s Profit Cost (8-10%) Vat (5%) 1046 Masonry Works 75.60 Sq.m. A Material Chb Laying A. Chb Ordinary, 4” 331.00 Pc. B. Portland Cement, Type I 20.00 Bag C. Sand, Washed 1.00 Cu.m. D. Rsb, Deformed, 10mmo 18.00 Pcs. E. Tie Wire # 16 5.00 Kg F. Hacksaw Blade, Heavy Duty 2.00 Pc. G. Concrete Baluster 306 Pcs. Plastering A. Portland Cement, Type 1 10.00 Bag B. Sand, Washed 1.00 Cu.m. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Chb Laying Install 1 Gang= 1-foreman, 2 Mason, 3 Laborers Capacity, 230 Pcs. Chb /day/gang 331.00 1.00 Chb Plastering Install: 1 Gang= 1 Foreman, 2-mason, 3 Laborers Capability: 12 Sq.m/day/gang 50.00 1.00 Baluster Laying Install: 1 Gang=1 Foreman, 2-mason, 3-laborers Capability: 130 Pcs Chb/day/gang 306.00 1.00 E. Labor Requirement Chb Laying Foreman 1.00 2.00 Skilled Mason 2.00 2.00 Unskilled 3.00 2.00 Chb Plastering Foreman 1.00 5.00 Skilled Mason 2.00 5.00 Unskilled 2.00 5.00 Baluster Laying Foreman 1.00 3.00 Skilled Mason 2.00 3.00 Unskilled 3.00 3.00 1003 Carpentry And Joinery Works 38.78 Sq.m. A. Material Ceiling A. Plywood Marine (1/4”x1.2mx2.44m) 14.00 Pc. B. Lumber Good ( Joist) 179.00 Bd.ft. C. Assorted Cwn (1 Kg.)/100 Bd. Ft. Of Lumber) 2.00 Kg D. Assorted Finishing Nails 2.00 Kg. E. Concrete Nails Assorted 1.00 Kg. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Ceiling Installation Install: 1 Gang=1 Foreman, 2-carpenters , 2 Laborers Capacity: 15 Sq.m/day/gang 38.78 15.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Carpenter 2.00 3.00 Unskilled 2.00 3.00 1005 Doors And Windows 3.00 Sets A. Material Doors A. D1-powder Coated Aluminum Casement Door (2.1mx2.1m, W/0.4m. Transom) Aluminum Glass Door 4.41 2.00 Sets D2-panel Door For Pwd C.r. With Kick Plate (0.9mx2.1m, W/0.4m Transom) Flush Door 1.89 1.00 Sets 8.82 1.89 Sq.m. Sq.m. B. Lever-type Plush Botton Door Knob 5.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Door Installation Install: 1 Gang = 1-foreman, 1-skilled, 1 Laborer Capability: 10 Sq.m. (doors)day/gang 15.71 10.00 Jamb Installation Install:1 Gang= 1 Foreman, 1 Skilled, 1 Laborer Capability: 4 Sets (jamb) Day/gang 4.00 Window Installation Install: 1 Gang= 1-foreman, 1 Skilled, 1 Laborer Capability: 2.88 Sq.m. (window) /day/gang 2.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Carpenter 1.00 2.00 Unskilled 1.00 2.00 1002 Plumbing Works 1.00 Lot A. Material Cold Water Line A. Pvc Pipes (25.4mm D) 2.00 Pc B. Pvc Pipes (12.7mm D) 6.00 Pc. C. Pvc Coupling (12.7mm D) 3.00 Pc Sewer Line Works D Pvc Elbow (50mm D) 16.00 Pc E. Upvc Pipe, 50mm Dia.x 3m, 5-1000 32.00 Pc F. Solvent Cement, 400cc 2.00 Can Fixtures G. Grab Bar Inwall Support W/ Lift Up Function 32 1.00 Set H. Wall Faucet, ½”x 4”, Stainless Steel 6.00 Pc I. Tissue Holder, Stainless Steel 304, Wall Mounted 1.00 Set J. Soap Holder 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Plumbing Installation Install: 1 Gang = 1-foreman, 1 Plumber, 1-laborer Capacity: 8 Pcs. Pipes /day/gang E. Labor Requirement Foreman 1.00 6.00 Skilled Plumber 1.00 6.00 Unskilled 1.00 6.00 1032 Painting, Varnishing And Other Related Works A. Material Concrete/masonry Walls/ceiling A. Concrete Neutralizer 9.00 Gal B. Skimcoat, 20kg 11.00 Bag C. Acrylic, Solvent Based Paint 14.00 Gal D. Paint Latex Flat Elastomeric 14.00 Gal E. Sand Paper 125.00 Pc. F. Paint Brush, 2” 20.00 Pc. G. Paint Roller 20.00 Pc. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Plumbing Installation Install : 1 Gang = 1 Foreman, 1-paintor, 1-laborer, Capability: 30 Sq.m. (roller)/day/gang 411.21 30.00 E. Labor Requirement Foreman 1.00 7.00 Skilled Painter 2.00 7.00 Unskilled 2.00 7.00 1101 Wires And Wiring Devices A. Material A. Electric Wires Thnn/thhn 3.5 Mm2 150.00 M B. Electric Wires Thwn/thhn 5.5mm2 50.00 M Wiring Devices E Electrical Tape ¾”x20yds 2.00 Pc. B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Wirings Install: 1 Gang= 1 Foreman, 1electrician, 1 Laborer Capability: 144m/day/gang 200.00 144.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Electrician 1.00 2.00 Unskilled 1.00 2.00 1002 (1) Panel Board With Main Breaker And Branches A. Material A. Panel Board & Cabinets, 2p Main With 6br/2p Bolt On Type 1.00 Set B. Rated 60amp-manual Transfer Switch Breaker Type Nema3 Enclosure 1.00 Set C. 15at,2p,60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set D. 20at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set E. 30at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 2.00 Set F. 60at, 2p, 60hz, 230vac Plug In Type Mechanical Lug Circuit Breaker 1.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Panel Board Installation Install: 1gang = 1foreman, 1-electrician, 1-laborer Capability : 1 Set/day/gang 2.00 1.00 E. Labor Requirement Foreman 1.00 2.00 Skilled Electrician 1.00 2.00 Unskilled 1.00 2.00 1103 Lighting Fixtures And Lamps 1.00 Is A. Material A. Solar Lights Lantern Type 22.00 Set B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Lighting Fixtures Installation Install: 1 Gang =1-foreman, 1-electrician, 1 Laborer Capacity: 8 Pcs/day/gang 22.00 8.00 E. Labor Requirement Foreman 1.00 3.00 Skilled Electrician 1.00 3.00 Unskilled 1.00 3.00 801 (7) A Removal Of Structures And Obstruction 1.00 Is A. Material B. Freight And Handling C. Name And Capacity Of Equipment Welding Machine, Electric Driven/dc Output 1.00 3.00 Cutting Output 1.00 3.00 Cargo/service Truck (2-5 Mt) 1.00 1.00 D. Labor Derivation (subsidiary Work Description) Removal Of Steel Railings Install: 1 Gang = 1foreman, 1 Electrician, 1 Laborer 17.00 8.00 Removal Of Ceiling, Gutter And Roofing Install : 1 Gang= 1 Foreman, 1 Electrician, 1-laborer Capacity: 25 Sq.m./day/gang E. Labor Requiremnt Foreman 1.00 16.00 Skilled Electrician 1.00 16.00 Unskilled 1.00 16.00 Spcl-1 Signages 1.00 Lot A. Material Municipal Signages Pana Flex W/ Electrical Wiring 1.00 Lot B. Freight And Handling C. Name And Capacity Of Equipment D. Labor Derivation (subsidiary Work Description) Installation Of Signages Install: 1 Gang= 1foreman: 1-electrician, 1 Laborer Capability: 4 Set/day/gang 8.00 4.00 Wirings Install: 1 Gang= 1 Foreman, 1-electrician, 1-laborer Capability: 144m/day/gang 150.00 144.00 E. Labor Requirement Foreman 1.00 4.00 Skilled Electrician 1.00 4.00 Unskilled 1.00 4.00 Section Vii. Drawings Bill Of Quantities Item No. Scope Of Work Quantity Unit Unit Cost Total Amount 1.) Repair And Rehabilitation Of Mapanas Rhu, Brgy. Del Norte, Mapanas, N. Samar B.5 Project Billboard 1.00 Lot 5,364.36 5,364.36 B.7 Construction Safety And Haelth 1.00 Lot 39,087.00 39,087.00 B.9 Mobilization And Demobilization 1.00 Lot 12,528.00 12,528.00 801(7)a Removal Of Structures And Obstruction 1.00 Is 44,152.56 44,152.56 900(1)c.1 Structural Concrete (class A), 28 Days 9.15 Cu.m. 7,460.98 68,268.00 902(1) A Reinforcing Steel Deformed Grade 40 541.72 Kg. 75.61 40,958.24 903 Formworks And Falseworks 53.38 Sq.m, 633.38 33,806.56 1047 Metal Structures 84.00 In.m. 1,316.02 110,546.00 1013 Corrugated Metal Roofing, Gauge 24 9.00 Sq.m. 3,893.42 35,040.80 1046 Masonry Works 75.60 Sq.m. 1,946.65 147,166.40 1003 Carpentry And Joinery Works 38.78 Sq.m. 815.55 31,626.84 1005 Doors And Windows 3.00 Sets 18,342.24 55,026.72 1002 Plumbing Works 1.00 Lot 31,754.16 31,754.16 1032 Painting, Varnishing, And Other Related 411.21 Sq.m. 146.77 60,351.96 1101 Wires And Wiring Devices 1.00 Is 12,046.72 12,046.72 1002(1) Panel Board With Main Breaker And Brand 1.00 Is 11,434.72 11,434.72 1103 Lighting Fixtures And Lamps 1.00 Is 52,550.08 52,550.08 Spcl1 Signages 1.00 Lot 36,853.44 36,853.44 Total 828,562.56 Total Cost Of All Line Item Includes Cost Of Contractor’s Profit, Taxes And Ocm. Attached Detailed Cost Estimates Section Ix. Bidding Forms Table Of Contents Bid Form 79 Form Of Contract Agreement 81 Omnibus Sworn Statement 83 Bid Form Date: Iaeb No: To: Lgu-mapanas Northern Samar Address: Mapanas Northern Samar We, The Undersigned, Declare That: We Have Examined And Have No Reservation To The Bidding Documents, Including Addenda, For The Contract Repair/rehabilitation Of Mapanas Rhu, Barangay Del Norte , Mapanas N. Samar (a) We Offer To Execute The Works For This Contract In Accordance With The Bid And Bid Data Sheet, General And Special Conditions Of Contract Accompanying This Bid; The Total Price Of Our Bid, Excluding Any Discounts Offered In Item (d) Below Is: [insert Information]; The Discounts Offered And The Methodology For Their Application Are: [insert Information]; (b) Our Bid Shall Be Valid For A Period Of 120 Days From The Date Fixed For The Bid Submission Deadline In Accordance With The Bidding Documents, And It Shall Remain Binding Upon Us And May Be Accepted At Any Time Before The Expiration Of That Period; (c) If Our Bid Is Accepted, We Commit To Obtain A Performance Security In The Amount Of [insert Percentage Amount] Percent Of The Contract Price For The Due Performance Of The Contract; (d) Our Firm, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Have Nationalities From The Following Eligible Countries: [insert Information]; (e) We Are Not Participating, As Bidders, In More Than One Bid In This Bidding Process, Other Than Alternative Offers In Accordance With The Bidding Documents; (f) Our Firm, Its Affiliates Or Subsidiaries, Including Any Subcontractors Or Suppliers For Any Part Of The Contract, Has Not Been Declared Ineligible By The Funding Source; (g) We Understand That This Bid, Together With Your Written Acceptance Thereof Included In Your Notification Of Award, Shall Constitute A Binding Contract Between Us, Until A Formal Contract Is Prepared And Executed; And (h) We Understand That You Are Not Bound To Accept The Lowest Evaluated Bid Or Any Other Bid That You May Receive. Name: In The Capacity Of: Signed: Duly Authorized To Sign The Bid For And On Behalf Of: Date: ___________ Form Of Contract Agreement This Agreement, Made This [insert Date] Day Of [insert Month], [insert Year] Between [name And Address Of Procuring Entity](hereinafter Called The “entity”) And [name And Address Of Contractor] (hereinafter Called The “contractor”). Whereas, The Entity Is Desirous That The Contractor Execute [name And Identification Number Of Contract] (hereinafter Called “the Works”) And The Entity Has Accepted The Bid For [insert The Amount In Specified Currency In Numbers And Words] By The Contractor For The Execution And Completion Of Such Works And The Remedying Of Any Defects Therein. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Conditions Of Contract Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) General And Special Conditions Of Contract; (b) Drawings/plans; (c) Specifications; (d) Invitation To Apply For Eligibility And To Bid; (e) Instructions To Bidders; (f) Bid Data Sheet; (g) Addenda And/or Supplemental/bid Bulletins, If Any; (h) Bid Form, Including All The Documents/statements Contained In The Bidder’s Bidding Envelopes, As Annexes; (i) Eligibility Requirements, Documents And/or Statements; (j) Performance Security; (k) Credit Line Issued By A Licensed Bank, If Any; (l) Notice Of Award Of Contract And The Bidder’s Conforme Thereto; (m) Other Contract Documents That May Be Required By Existing Laws And/or The Entity. 3. In Consideration Of The Payments To Be Made By The Entity To The Contractor As Hereinafter Mentioned, The Contractor Hereby Covenants With The Entity To Execute And Complete The Works And Remedy Any Defects Therein In Conformity With The Provisions Of This Contract In All Respects. 4. The Entity Hereby Covenants To Pay The Contractor In Consideration Of The Execution And Completion Of The Works And The Remedying Of Defects Wherein, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Times And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Signed, Sealed, Delivered By The (for The Entity) Signed, Sealed, Delivered By The (for The Contractor). Binding Signature Of Procuring Entity ________________________________________________ Binding Signature Of Contractor _____________________________________________ [addendum Showing The Corrections, If Any, Made During The Bid Evaluation Should Be Attached With This Agreement] Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of ______ ) S.s. Affidavit I, [name Of Affiant], Of Legal Age, [civil Status], [nationality], And Residing At [address Of Affiant], After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. Select One, Delete The Other: If A Sole Proprietorship: I Am The Sole Proprietor Of [name Of Bidder] With Office Address At [address Of Bidder]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am The Duly Authorized And Designated Representative Of [name Of Bidder] With Office Address At [address Of Bidder]; 2. Select One, Delete The Other: If A Sole Proprietorship: As The Owner And Sole Proprietor Of [name Of Bidder], I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Bidding For [name Of The Project] Of The [name Of The Procuring Entity]; If A Partnership, Corporation, Cooperative, Or Joint Venture: I Am Granted Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary And/or To Represent The [name Of Bidder] In The Bidding As Shown In The Attached [state Title Of Attached Document Showing Proof Of Authorization (e.g., Duly Notarized Secretary’s Certificate Issued By The Corporation Or The Members Of The Joint Venture)]; 3. [name Of Bidder] Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 4. Each Of The Documents Submitted In Satisfaction Of The Bidding Requirements Is An Authentic Copy Of The Original, Complete, And All Statements And Information Provided Therein Are True And Correct; 5. [name Of Bidder]is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 6. Select One, Delete The Rest: If A Sole Proprietorship: I Am Not Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Partnership Or Cooperative: None Of The Officers And Members Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; If A Corporation Or Joint Venture: None Of The Officers, Directors, And Controlling Stockholders Of [name Of Bidder] Is Related To The Head Of The Procuring Entity, Members Of The Bids And Awards Committee (bac), The Technical Working Group, And The Bac Secretariat, The Head Of The Project Management Office Or The End-user Unit, And The Project Consultants By Consanguinity Or Affinity Up To The Third Civil Degree; 7. [name Of Bidder] Complies With Existing Labor Laws And Standards; And 8. [name Of Bidder] Is Aware Of And Has Undertaken The Following Responsibilities As A Bidder: A) Carefully Examine All Of The Bidding Documents; B) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Contract; C) Made An Estimate Of The Facilities Available And Needed For The Contract To Be Bid, If Any; And D) Inquire Or Secure Supplemental/bid Bulletin(s) Issued For The [name Of The Project]. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of ___, 20__ At ____________, Philippines. _____________________________________ Bidder’s Representative/authorized Signatory [jurat] * This Form Will Not Apply For Wb Funded Projects.
Closing Date3 Dec 2024
Tender AmountPHP 1 Million (USD 17.8 K)
2761-2770 of 2767 active Tenders