Software Tenders
Software Tenders
EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Tender
Others
United States
Description: 12/31/2024-the Purpose Of This Amendment A0001 Are As Follows: Attach Questions And Answers For Rfq #45310025q0011- Excel Conference; Revision Of Sample Of Lodging Nights (2025 & 2026); And Added Language To The Clin 0005 - Audio/visual (a/v) Requirements (rental) , A/v For Breakout Rooms , "the Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Projector Screen...." See Attachment Sf30_amendment_45310025q0011_a0001_rfq Excel Conference_jdaiisigned
______________________________________
statement Of Work (sow)
examining Conflicts In Employment Laws (excel) Training Conference Fy 2025 & Fy 2026
the U.s. Equal Employment Opportunity Commission (eeoc), Revolving Fund Division, Eeoc Training Institute (hereinafter Referred To As The Institute) Has A Requirement For A Contractor To Provide A Full-service Training Facility To Include Lodging, Meeting And Exhibitor Space, Food And Beverage Service, Audio/visual Equipment, Limited Audio/visual Support Services And Business Center Support To Conduct The Annual Examining Conflicts In Employment Laws (excel) Training Conference (hereinafter Referred To As The Conference). This Annual Conference Provides Training To Federal Agencies And Private Employers On The Laws Enforced By The Eeoc. The Institute Anticipates A Minimum Of 600 Registrants With A Maximum Of 1,000 Registrants, Plus An Additional 100 Attendees Consisting Of Other Staff, Presenters, And Exhibitors Who Provide Support For The Conference.
the Excel Training Conference Will Be Held For Four (4) Days. The Preferred Schedule Is Pre- Conference Registration Will Be Held On Sunday And The Pre-conference Sessions On Monday. Full Conference Registration Will Be Held On Sunday And Monday. Pre-conference Sessions Will Be Held On Monday (day 1) From 8:00am – 5:00pm. The Full Conference Will Be Held From Tuesday (day 2) At 8:00am, Ending On Thursday (day 4) At 5:00pm. The Plenary Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4).
breakout Sessions Will Be Held On The Mornings Of Tuesday (day 2), Wednesday (day 3), And Thursday (day 4) After The Plenary Sessions Until 5:00pm. Food And Beverage Service Is Required For Continental Breakfast And For A Light Lunch For Three (3) Days, Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). The Institute Also Requires Morning And Afternoon Breaks Each Day (tuesday-thursday), And A Conference Reception On One Day During The Conference (the Exact Date And Time Will Be Determined Later By The Institute). The Institute May Offer Six (6) Pre- Conference And Post-conference Workshops For Up To 300 People Outside Of The Tuesday - Thursday Conference.
requirments For Location And Dates
the Contract Must Be Able To Provide A Facility For The Entire Scope Of The Contract. The Eeoc Will Only Accept Quotations For Following Dates And Locations.
the Preferred Dates And Locations For The 2025 Excel Training Conference In Each Fiscal Year As Follows:
the Preferred Dates And Location For The 2025 Excel Training Conference Are:
location:
atlanta, Georgia
dates:
july 12 - July 17, 2025
august 9 - August 15, 2025
august 16 - August 21, 2025
august 23 - August 28, 2025
august 30 - September 4, 2025
the Preferred Dates And Locations For The 2026 Excel Training Conference Are:
locations:
detroit, Michigan (1st Preference)
minneapolis, Minnesota (2nd Preference)
chicago, Illinois (3rd Preference)
denver, Colorado (4th Preference)
phoenix, Arizona (5th Preference)
san Diego, California (6th Preference)
palm Springs, California (7th Preference)
dates:
june 6 - June 11, 2026
june 13 - June 18, 2026
june 20 - June 25, 2026
june 27 - July 2, 2026
july 11 - July 16, 2026
july 18 - July 23, 2026
august 22 – August 27
august 29 - September 3, 2026
the Pre-conference And Full Conference Will Be Held From 8:00am – 5:00pm. We Will Require The Use Of The Registration Area For The Pre-conference And Assembling Of Materials One Day Prior To The Pre-conference From The Hours Of 8:00am – 5:00pm.
please Indicate Availability For Each Date In The Technical Portion Of The Quotation. No Other Dates Or Combination Of Dates Will Be Considered By The Government.
the Government Contemplates The Award Of A Firm-fixed Price (ffp) Contract.
the Following Requirements For The Training Facility Are Specified In Terms Of Minimum Requirements. The Contractor Must Meet The Following Minimum Requirements:
the Quotation Package Shall Include The Following Line Items In A Written Quotation:
schedule Of Supplies And Services Fy 2025:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $ , Total For Clin 0001 $ .
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ ,
$ , Total For Clin 0002 $ .
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $ .
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ , Per Person Per Day, Total For Clin 0004 $ .
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $ .
total Price For Clins 0001 Through 0005: $ . Fy 2026:
clin 0001, Lodging - Quantity Four 4 Days Each (see Below List Of Lodging Requirements), Unit Price $, Total For Clin 0001 $
clin 0002, Rental Of Conference Meeting Space - Quantity 4 Days Each (see Below List Of Conference Meeting Space Requirements), Unit Price $ , Total For Clin 0002 $
clin 0003, Business Center Services Expenses - Quantity 4 Days, (see Below List Of Business Center Requirements), Unit Price $ , Total For Clin 0003 $
clin 0004, Food And Beverage Services - Quantity 4 Days (see Below List Of Food And Beverage Requirements), Unit Price $ Per Person Per Day, Total For Clin 0004 $
clin 0005, Rental Of Audio/visual Equipment And Technical Support - Quantity 4 Days Each (see Below List Of Audio/visual Requirements), Unit Price $ , Total For Clin 0005 $
total Price For Clins 0001 Through 0005: $ .
a Contract Will Be Awarded To The Responsible Quoter Whose Quotation Represents The Best Value To The Government. The Quoter Must Be Registered In The System For Award Management (sam) Database At The Time The Quotation Is Submitted. Registration Is Free And Can Be Completed On-line Http://www.sam.gov. Each Quotation Must Clearly Indicate The Capability Of The Quoter To Meet The Requirements Specified In This Combined Synopsis/solicitation.
conference General Requirements
the Contractor Shall Be A High Quality “full-service” Provider With A Past Performance History That Includes A Minimum Of 3 Years Of Experience As A Primary Contractor With A Professional Staff To Execute The Requirements Specified In This Statement Of Work. All Staff Provided By The Contractor Shall Be Either Direct Employees Of The Contractor Or Employees Of An Approved Subcontractor. The Primary Contractor Shall Have Full Responsibility For The Contractor And Subcontractor Staff And Shall Make Direct Contact With The Contracting Officer’s Representative (cor) To Ensure That All Arrangements Are Mutually Understood Concerning Any Logical And/or Financial Arrangements That May Impact The Eeoc.
the Contractor Shall Provide Meeting Space, Food And Beverage And Lodging To Serve 600 To 1,000 Registrants And To Provide Business Services.
the Contractor Shall Provide Professional Staff To Organize, Coordinate, And Handle Any Last- Minute Requests, As Well As Execute All Logistical Requirements As Specified In This Sow. The Contractor Shall Make Direct Contact With The Host To Ensure That All Arrangements Are Mutually Understood Concerning Arrival Times, Accommodations, Official Functions, Financial Arrangements, And Any Other Special Information That May Impact This Event. The Contractor Or Their Approved Subcontractors Shall Coordinate And Implement All Logistical Arrangements For This Event.
logistical Support May Include, But Is Not Limited To, Coordination Of Meeting Accommodations, Customer Service Or Front Desk Information Service, Conference Rooms, Meal Arrangement/catering, Dedicated Internet, And Audio/visual Equipment.
americans With Disabilities Act (ada) Requirements
all Facilities, Including Restrooms, Recreational Areas, Dining Space, Registration Area, Meeting Space, Hotel Rooms, Exhibitor Space, Office Space, And Audio/visual Equipment Must Meet Ada Requirements For Accessibility. Accommodations For Individuals With Disabilities May Include, But Are Not Limited To Accessible Hotel Rooms, Parking Spaces, Elevators, And Sound Systems, Wide Aisles, And Wheelchair Ramps. Eeoc Will Perform Site Visits Prior To The Award Of The Contract. The Site Visit Will Include An Ada Assessment Of The Property By The Disability Business And Technical Assistance Centers (dbtac) Prior To Award Of The Contract.
clin 0001 – Lodging Requirements
the Contractor Shall Provide A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Working The Event. Space Must Be Available Friday Prior To The Conference Through Friday After The Conference. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. The Contractor Will Be Paid For A Minimum Of 400 Hotel Room Nights For Speakers And Eeoc Staff Directly Under This Contract.
the Contractor Shall Provide A Room Block For Up To 2000 Hotel Room Nights For Registrants And Exhibitors. The Contractor Shall Provide Hotel Rooms At Or Below The Federal Government’s Per Diem Rate For Lodging. These Individuals Will Be Responsible For Direct Payment To The Contractor.
the Institute Will Manage The Hotel Room Block And Will Turn Back Any Unused Rooms To The Contractor, Without Penalty, By A Cutoff Date To Be Determined Upon Award Of The Contract. The Institute Will Provide The Contractor With A List Of Registrants, Exhibitors, Speakers And Eeoc Staff.
the Institute Requires The Contractor To Block Up To 400 Room Nights At Or Below The
federal Government Per Diem Rate For Lodging During The Week Before And After The Conference For Seminar Registrants And Other Conference Personnel. These Individuals Are Responsible For Paying The Contractor Directly For Lodging Costs. All Room Nights Booked By The Institute Or Conference Registrants Will Be Credited To The Conference’s Sole Account.
clin 0002 – Conference Meeting, Exhibitor And Office Space Requirements
all Meeting Space Must Be Set Up In Classroom Style With 6' Tables, No More Than 2 People Per Table, Or Round Tables With No More Than 10 People Per Table, Mints, One (1) Pitcher Of Water And
a Glasses Per Person At The Table Or Set Up Using Classroom Style. A Podium And Two (2) Tables Located In The Front Of The Classroom Are Required For The Presenters. Rooms Must Have Additional Space To Accommodate A/v Equipment.
plenary Room: A Plenary Room That Can Accommodate A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff In Classroom Style Seating Or Can Accommodate Up To 1,000 Registrants And 100 Presenters/staff Using Round Tables That Seat 10 People And 2 To 4 Comfortable Chairs For The Eeoc’s Chair And Keynote Speakers (large/high Back Chairs) Is Required On Tuesday (day 2) From 8:00am To 12:00pm, On Wednesday (day 3), And On Thursday (day 4) From 8:00am To 10:00am. The Plenary Room Must Have Additional Space To Accommodate A Raised Platform That Is Ada Accessible. This Includes A Platform Which Is No More Than 24” High And Is Wheelchair Accessible On At Least One Side. If A Wheelchair Ramp Is Used, The Ramp Must Have Railings On Both Sides And The Rise Over Run Cannot Be More Than 8.3%. The A/v Requirements Will Be Discussed Below.
dining Space (ballroom): A Dining Space Area Within A Separate Ballroom Or Event Space That Can Accommodate Speakers As Well As A Minimum Of 600 Registrants Up To 1,000 Registrants And 100 Presenters/staff. Exhibitor Floor Room Are Not Acceptable Unless Approved. The Ballroom Will Be Set Up In Banquet Rounds Of Ten (10) With An Appropriately Sized Riser To Hold A Podium With Podium Microphone. This Space Is Required On Tuesday (day 2) - Thursday (day 4) From 12:00pm To 1:30pm. Please See The Internet And A/v Sections For Additional Specific Requirements. The Plenary Room And Dining Space (ballroom) Functions Cannot Be Held In The Same Room.
breakout Session Rooms: The Breakout Session Rooms Are Required For Monday (day 1), Pre- Conference From 8:00am - 5:00pm Is Six (6) Breakout Rooms As Follows: Four (4) Rooms To Accommodate Up To 100 Registrants, And Two (2) Rooms To Accommodate Up To 75 Registrants. On Tuesday (day 2) From 1:30pm - 5:00pm, On Wednesday (day 3), And On Thursday (day 4) From 10:30am - 5:00pm, The Following Breakout Rooms For The Full Conference Are Required: Two (2) Rooms To Accommodate Up To 300 Registrants; Two (2) Rooms To Accommodate Up To 200 Registrants, And Five (5) Rooms To Accommodate Up To 150 Registrants, And One (1) Room To Accommodate 75 People. The Plenary Session Room Can Also Serve As A Breakout Session Room If Space Is Configured With Air Walls And The Necessary A/v Equipment Is Functional To Accommodate The Full Agenda.
speaker-ready Room
the Speaker Ready Room Will Be Used By Institute Speakers To Prepare For Their Respective Presentations From 8:00am-5:00pm On Monday – Thursday. The Room Should Be Equipped With
2 Small Tables With Chairs, Lounge Chairs, And Comfortable Seating. The Area Should Be Stocked With Coffee, Tea, And Water Pitchers With Glasses. In Addition, The Speaker Ready Room Should Have A Small Refrigerator And Microwave For Use By The Speakers.
exhibitor Space
exhibitors Will Be At The Excel Training Conference. Exhibitor Space For Up To 20 Exhibitors Is Required For Monday – Thursday In A Foyer Area Near The Plenary Session, Registration Area Or Dining Space (ballroom) That Accommodate The Am/pm Break Services. Ten (10) Exhibitor Spaces Shall Be Equipped With Two (2) 6’ Tables, Two (2) Chairs And Ten (10) Exhibitor Spaces Shall Be Equipped With One (1) 6’ Table, Two (2) Chairs. The Contractor Will Furnish Tablecloth And Drape For The Front Of The Tables And A Wastebasket Per Exhibitor. The Exhibitors Will Be Responsible For All Additional Equipment And Booth Requirements And Will Work Directly With The Hotel.
pre-function Room
the Pre-function Room Will Be Used To Assemble Up To Ten (10) Pallets Of Conference Materials And Supplies. This Room Needs To Be Available From 8:00am On The Friday Before The Start Of The Conference Through Friday At 5:00pm The Day After The Conference Ends. The Room Needs To Be Equipped With Carts To Transport Completed Conference Materials To The Registration Areas For The Conference. The Contractor Also Needs To Provide A Secured Office That Can Be Used To Store Laptops, A/v Equipment, And Conference Materials During The Same Time. Only Eeoc Staff Should Have Access To The Secured Office. The Pre-function Room And Secured Office Shall Be Adjoining And Shall Have At Least Eight (8) Tables, Twenty (20) Chairs, Wastebaskets, And Water Pitchers With Glasses.
registration And Office Areas
the Contractor Needs To Provide Two (2) Registration Areas. One Registration Area Must Be Available From Sunday Afternoon 12:00pm – 6:00pm To Accommodate Pre-conference Registration And From Monday 7:30am – Thursday 6:00pm To Accommodate Registrants, And The Other Registration Area Is Needed From Tuesday – Thursday 7:30am – 6:00pm To Register Staff, Presenters And Exhibitors. Each Area Shall Have Six (6) Tables With Four (4) Chairs Per Table.
directional Signage Will Be Provided By The Contractor To The Registration Area.
clin 0003 – Business Center Requirements
the Contractor Must Be Able To Handle Mailing, Copying, And Faxing Limited Course Materials On- Site. The Institute Typically Receives Four (4) Pallets Of Course Materials, 25 To 30 Packages And A/v Equipment, And Sends Out 50 Packages At The Completion Of The Conference. Contractor Must Provide A List Of All Business Center Charges To Include Labor Charges.
clin 0004 – Food And Beverage Requirements
the Contractor Shall Provide A Copy Of The Final Price List As Submitted In Response To The Solicitation Food And Beverages For The Conference As Follows: Continental Breakfast, Light Lunch, Breaks (am And Pm) On Tuesday (day Two), Wednesday (day Three) And Thursday (day Four) And One (1) Evening Reception. Pricing For Food And
beverage Shall Include The Price For The Item, Plus The Gratuity (service Charge), And A Statement From The Contractor Indicating Whether, And Under What Conditions The U.s. Government Is Exempt From State Tax.
tuesday Evening Kick-off Reception: The Food At The Reception Will Consist Of Hors D’oeuvres, Carving Stations, And Finger Foods. The Space Designated For The Reception Must Accommodate Approximately 800 People With Social Seating Available Throughout The Area And The Duration Of The Reception Will Be Approximately 1 Hour, From 5:30pm - 6:30pm. A Cash Bar Will Be Available For All Drinks.
continental Breakfast Is Served For 1 Hour From 7:00am - 8:00am Tuesday Through Thursday. The Contractor Must Provide Table Rounds To Accommodate Up To 1,000 People On Tuesday (day 2), Wednesday (day 3), And Thursday (day 4). A Typical Continental Breakfast Shall Consist Of Juice, Fruit, Yogurt, Assorted Breakfast Pastries, Protein, Bagels, Or Croissants, Regular And Decaffeinated Coffee, Tea Bags And Hot Water For Tea, Iced Tea, And Large Containers Of Water.
lunch Is Served For 1½ Hours From 12:00pm – 1:30pm. The Contractor Must Provide Table Rounds For Ten (10) And Accommodate 1,000 People. The Dining Space Can Be Used For Breakout Room And/or Meeting Space. A Light Lunch Is Provided On Tuesday (day 2), Wednesday (day 3) And Thursday (day 4). This Can Be Plated, Buffet Or Salad Bar Type Lunch Which Provides A Protein- Based Entrée, A Fruit Or Vegetable, Dessert, Lemonade And Iced Tea. The Entrée Must Not Include Pork, Beef Or Shellfish.
30-minute Am And Pm Breaks Is Required For A Maximum Of 1,000 People. The Am Break Menu Shall Consist Of The Following Beverages (regular And Decaf Coffee, Hot And Iced Tea, And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Pm Break Menu Shall Consist Of The Following Beverages And Pitchers Of Water With Glasses) And A Light Snack (cookies, Pretzels, Protein, Etc.). The Am And Pm Breaks Are Scheduled For 30 Minutes Each, Tuesday (day 2) - Thursday (day 4).
the Institute Will Pay The Contractor For Meals, Breaks, And Reception Based On The Actual Number Of Meals Served.
clin 0005 – Audio/visual (a/v) Requirements (rental)
a/v For Plenary Sessions: The Contractor Shall Provide The Following Items To Support The Plenary Session: Lcd Projectors, Projection Screens, Scan Converters, Video Cameras, A/v Mixers, A/v Drops, Vcr -1, Vgada And Voa Splitter, Cables To Run Two Projectors And Laptops Provided By The Institute, Projection Carts, Pipe And Drape, Stage Wash, Lighting, Podium With Wired Microphones, Wired Table Microphones W/stands, Wireless Floor Microphones W/stands. The Institute Requires Internet Access In Plenary Sessions And All Breakout Sessions. The Contractor Must Provide Internet Service In The Plenary Room. The Contractor Must Setup, Breakdown And Provide Technical Support Of The A/v Equipment During The Plenary Sessions.
a/v For Breakout Rooms: The Institute Will Provide All Laptops And In-focus Projectors Used In The Breakout Rooms. The Contractor Must Provide The Following Equipment: Microphones (1 Wireless And 1 Wired In Each Breakout Room), Flip Chart/ Paper And Markers, Gender Adapters, Electronic Signage Or Tripods Outside Breakout Sessions, And Projection Cart With A/v Connection. The Institute Requires Internet Access Throughout The Entire Breakout Rooms. The Contractor Must
provide Projected Cost For The Internet Service In The Breakout Rooms.
registration Area: The Institute Requires An Internet Connection Which Will Be Used With A Hub Throughout The Conference To Include Registration, A/v Connection, And Phone For Local Calls Within The Conference Space. In Addition, The Institute Requires A Multifunction-colored Printer To Be Used Through The Conference To Include Registration.
common Registration Area: The Institute Requires An Internet Connection Near Registration To Be Used With A Hub For The Completion Of Conference Evaluations. This Will Be Set Up To Support At Least (6) To (8) Laptops Which Will Be Provided By The Institute.
reporting Requirements
pre-conference Reporting: The Contractor Will Provide The Institute’s Contracting Officer’s Representative (cor) With An Electronic List Of All Hotel Confirmation Numbers For All Participants, Staff And Presenters On A Weekly Basis Starting Eight (8) Weeks Prior To The Conference. The Institute Cor Will Manage The Conference Room Block Up To 15 Calendar Days Prior To The Conference. From Fourteen (14) Calendar Days Before The Conference Through The Duration Of The Conference, The Contractor Will Manage The Conference Room Block.
during The Conference Requirements
a Pre-conference Meeting Will Be Conducted With The Contractor And Key Institute Staff Within Five (5) Business Days Prior To The Conference.
daily Event Meeting Will Be Conducted With The Contractor And Key Institute Staff Daily As Agreed.
signature Authority: All On-site Charges Must Be Approved And Signed Only By The Institute’s Cor And/or The Eeoc Contracting Officer.
daily Reconciliation: The Contractor Shall Provide A Daily Reconciliation List To The Institute Cor By 9:00am The Following Business Day After The Charges Are Incurred. These Charges Include Lodging Paid By Eeoc, Food And Beverage, A/v Equipment And Labor, And Business Center.
post-conference: The Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After The Completion Of The Conference. A Detailed Report Should Be Submitted With The Invoice And Should Consist Of A Detailed Banquet/event Order (beo) Form. The Beo Must Provide The Following Information: Room Usage By Date; Detailed Lodging Charges For All Registrants, Staff And Presenters For The Conference; Detailed Breakdown, By Day, For All Food And Beverage Charges; A Detailed Breakdown By Day And Room Number, For All A/v Equipment Rental Charges And A/v Support Charges; All Business Center Cost; And All Miscellaneous Costs To Include But Not Limited To Internet Connections, Re-keying Charges, Electrical Hook-ups, Etc.
general Requirements
transportation: The Contractor Shall Provide A Price List Of All Local Transportation Options To And From The Airport And Rail Station, If Applicable. The Contractor Shall Indicate In Its Quotation Whether It Provides Free Or Low-cost Shuttle Services. The Contractor Shall List All Facility Parking Discounts And Cost Options. The Contractor Shall Provide A List Of All Local Restaurants Located Within A Ten (10) Minute Walk From The Contractor’s Facility.
security: The Contractor Should Identify If They Have Paid Security Within The Facility And Provide A List Of Additional Security Measures Taken By The Contractor To Provide For The Safety Of Conference Registrants, Staff, Presenters And Equipment.
list Of Deliverables
logistical Support Plan: Within Seven (7) Business Days Of The Contract Award, The Contractor Shall Comprise A Detailed Logistical Support Plan For Provision Of All Required Support. The Plan Will Include A Proposed Budget And Detailed Schedule As Applicable. The Eeoc Shall Review The Logistical Support Plan And Provide Acceptance And/or Comments To The Contractor. The Contractor Shall Be Available To Eeoc For Weekly Status Reports To Facilitate The Coordination Of Evolving Operational And Logistical Issues Regarding The Tasks Outlined In The Sow.
account Reconciliation: Eeoc Requests That The Hotel Bill Be Prepared In A Logical And Chronological Sequence And That Backup Data Accompany The Bill. The Contractor Shall Complete Its Accounting Of The Conference Within Five (5) Days Of The Conclusion Of The Conference.
invoicing: The Contractor Shall Invoice The Eeoc At The Agreed Upon Rates For Lodging, Conference Space, Rental Of Audio/visual Equipment And Technical Support, Food And Beverage Service, And Business Center Services. Charges For Food And Beverage Service Shall Be Reflected On The Invoice As The Cost Incurred Per Person.
the Contractor Shall Submit A Final Invoice Of All Charges Within Five (5) Business Days After Completion Of The Conference To The Cor And The Cor Shall Be Provided At Least Five Business Days To Review The Invoice Charges And Services Provided For Acceptance.
contract Administration
contracting Officer’s Representative (cor) – Tbd Method Of Payment
pursuant To Far Clause 52.232-33 Entitled, “payment By Electronic Funds Transfer – System For Award Management (oct 2018)”, The Government Intends To Make A Payment Via Electronic Funds Transfer Using Information Provided In The System For Award Management (sam) Database.
cancellation
should Eeoc Elect To Cancel This Contract, Eeoc Will Provide A Written Notification To The
contractor No Later Than Sixty (60) Calendar Days Prior To The Scheduled Event. By Receipt Of This Cancellation Notice, The Contractor Agrees To Release Eeoc From Any Cancellation Penalties Or Charges. If There Is A Cancellation Within Sixty (60) Calendar Days Of The Scheduled Event Date, Paragraph (l) Termination For The Government’s Convenience Or (m) Termination For Cause Of Far Clause 52.212-4, Contract Terms And Conditions – Commercial Products And Commercial Services Will Govern.
submission Of Quotation: All Interested Parties Shall Submit With Their Quotation A Detailed Breakdown Of All Costs To Include Conference Space, Rental Of Audiovisual Equipment And Technical Support, Food And Beverage Service, Business Services, And Any Other Miscellaneous Services And Equipment Which Are Necessary For The Success Of The Conference.
quotations Shall Be Submitted In Three (3) Separate Volumes As Follows: Volume 1 - Technical Capability; Volume 2 - Past Performance; And Volume 3 - Price. Pricing Must Be Submitted Using The Line-item Structure In The Above Schedule Of Supplies And Services Of This Rfq. A Separate Attachment May Be Included In Volume 3 For Pricing Information On Menu Items, Transportation, Parking, Applicable Tax Rates, And Sleeping Room Rates. Your Quotation In Response To Solicitation Number 45310025q0011 Is Due January 15, 2025, At 10:00 A.m. Et (washington, D.c. Local Time). Quotations Will Be Accepted Via E-mail. One (1) Electronic Copy Of The Quotation May Be Submitted Via E-mail, Addressed To John.adams@eeoc.gov And R.rashelle.anderson@eeoc.gov.
questions: Questions Regarding This Request For Quotation Should Be Submitted To John Adams, Contract Specialist Via E-mail At John.adams@eeoc.gov And Gov Contracting Officer At R.rashelle.anderson@eeoc.gov Telephone Inquiries Or Responses Are Not Acceptable. The Deadline For Submission Of Questions Regarding Solicitation Number 45310025q0011 Is Due December 20, 2024, 10:00 A.m. Et (washington, D.c. Local Time). Any Questions Received After The Above- Mentioned Date And Time Will Not Be Considered. The Government Will Not Reimburse Interested Parties For Any Cost Associated With Responding To This Business Opportunity. All Responsible Sources May Submit A Quotation Which Shall Be Considered By The Agency. The Anticipated Contract Award Date Is On Or Before March 18, 2025.
basis For Award: The Government Intends To Award A Firm Fixed-price Contract To The Responsible Quoter Whose Quotation Is Responsive To The Solicitation And Is Determined To Be The Best Value To The Government, Using The Tradeoff Approach. Selection Of The Best Value To The Government Will Be Achieved Through A Process Of Evaluating The Strengths And Weaknesses Of Each Quoter’s Quotation Against The Below Described Evaluation Criteria. In Determining The Best Value To The Government, The Technical Capability And Past Performance Evaluation Criteria, When Combined, Are More Important Than The Evaluated Price. The Government Is More Concerned About Obtaining A Superior Technical Capability Quotation Than Making An Award At The Lowest Evaluated Price. However, The Government Will Not Make An Award At A Price Premium It Considers Disproportionate To The Benefits Associated With The Evaluated Superiority Of One Technical And Management Quotation Over Another. Thus, To The Extent That Quoter’s Technical And Past Performance Quotations Are Evaluated As Close Or Similar In Merit, The Evaluated Price Is More Likely To Be A Determining Factor.
evaluation Factors For Award: The Following Factors Shall Be Used To Evaluate Quotations. These Factors Are Listed In Their Relative Order Of Importance: Technical Capability, Past Performance, And Price.
factor I – Technical Capability:
contract Requirements: Quotations Will Be Evaluated On The Quoter’s Ability To Provide All The Contract Requirements Relating To Lodging, Meeting Space, Food And Beverage, Av Support And Equipment, Business Center, And Comply With The Reporting Requirements. Quotations Must Address The Quoter’s Ability To Comply With The Americans With Disability Act (ada) As It Relates To Lodging And Meeting Space. Quotations Will Be Evaluated On The Quality Of The Customer Services Provided And The Quality Of The Facilities Reflected In Maintenance And Upkeep Of The Facilities.
location: Quotations Will Be Evaluated On The Ability Of Quoter To Provide A Centrally Located Facility With Inexpensive Transportation Options To And From The Airport. Additionally, Restaurants Must Be Within A Short Walking Distance Of (ten (10) Minutes Or Less) Of The Proposed Facility.
quotations Must Address Safety And Security Issues Both Within The Hotel Complex And The Surrounding Area.
availability Of Dates: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Services On The Dates Requested. Additional Consideration Will Be Given To Quotations Which Demonstrate Availability Of Facilities On The Preferred Dates In Order Of Preference (i.e., 1st Choice Date, 2nd Choice Date, 3rd Choice Date, Etc.)
factor Ii – Past Performance:
the Quoter Must Provide References For A Minimum Of Three (3) Government Or Non-government Contracts Which Provide The Same Or Similar Services; Contracts Must Have Been Awarded Within The Past (3) Years. The Information For Each Reference Shall Include The Following:
name And Address Of Government Agency And Other Non-government Client;
name, Title, Email And Telephone Number Of Contracting Officer Or Other Point Of Contact;
name, Title, Email, And Telephone Number Of Client’s Program Manager, If Applicable;
contract Number, Period Of Performance, And Total Dollar Value Of Contract; And
description Of Services Provided.
list Any Problems Encountered On Each Contract And The Quoter’s Corrective Actions. Eeoc Will Evaluate Past Performance Based On Timeliness, Customer Service And Corrective Actions Taken (if Necessary).
a Quoter Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Will Not Be Evaluated Favorably Or Unfavorably On Past Performance.
factor Iii – Price:
the Price Quotation Will Be Evaluated Against The Independent Government Price Estimate. Evaluations Of Quotations Will Consider The Following Pricing Information: Pricing Provided For All Line Items Listed In The Schedule Of Supplies And Services Of This Rfq In The Units And Format Provided.
site Visits: The Eeoc Will Conduct A Site Visit Of All Quoters Who Are Rated To Be Technically Acceptable. The Site Visit Will Review And Evaluate The Same Technical Items Identified In The Technical Capabilities Portion Of The Technical Evaluation Factor.
supplemental Agreements
if Any Hotel Submitting A Quotation Has Any Supplemental Agreements, Those Agreements Must Be Submitted With Their Quotation. If The Hotel Requires Signature Of A Supplemental Agreement That Was Not Submitted With The Quotation, The Quotation Will Be Rejected.
notice: The Government Intends To Evaluate Quotations And Make Award Without Discussions (except Clarifications As Described In Far 15.306(a)). Therefore, The Quoter’s Initial Quote Should Contain The Vendor’s Best Terms From A Price And Technical Standpoint. The Government Reserves The Right To Conduct Discussions If The Contracting Officer Later Determines Them To Be Necessary.
period Of Performance
the Base Period Is From The Date Of The Award Through The Execution Of The Fy 2025 Excel Training Conference.
the Eeoc Is An Agency Of The U.s. Government. Contracts With The Eeoc Are Governed By The Federal Acquisition Regulation (far). To The Extent That Any Provision Of This Agreement Conflicts With The Far, The Far Must Control.
applicable Provisions And Clauses: The Provisions At 52.212-1, Instructions To Offerors - Commercial Products And Commercial Services Applies To This Acquisition. The Vendor Shall Include A Completed Copy Of The Provisions At 52.212-3, Offeror Representations And Certifications - Commercial Products And Commercial Services, With Your Quote.
the Contracting Officer Has Determined That Paragraph 52.212-3(k)(2) Which Pertains To Exemption From The Application Of The Service Contract Labor Standards Applies. The Clause 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services And Clause And 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Order-commercial Products And Commercial Services Are Incorporated By Reference.
clause 52.203-6 Restrictions On Subcontractor Sales To The Government Alternate I, Clause 52.203-17 Contractor Employee Whistleblower Rights
clause 52.203-19 Prohibition On Requiring Certain Internal Confidentiality Agreements Or Statements, Clause 52.204-10 Reporting Executive Compensation And First –tier Subcontract Awards, Clause 52.204-23 Prohibition On Contracting For Hardware, Software, And Services Developed Or Provided By Kaspersky Lab Covered Entities,
clause 52.204-12 Unique Entity Identifier Maintenance
clause 52.204-13 System For Award Management Maintenance
clause 52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment,
clause 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractors Debarred, Suspended, Or Proposed For Debarment,
clause 52.209-10 Prohibition On Contracting With Inverted Domestic Corporations,
clause 52.217-9 Option To Extend The Term Of The Contract, (a) The Government May Extend The Term Of This Contract By Written Notice To The Contractor Within 30 Days Prior To The Contract Expiration Date, Provided That The Government Gives The Contractor A Preliminary Written Notice Of Its Intent To Extend At Least 60 Days Before The Contract Expires. The Preliminary Notice Does Not Commit The Government To An Extension. (b) If The Government Exercises This Option, The Extended Contract Shall Be Considered To Include This Option Clause. (c) The Total Duration Of This Contract, Including The Exercise Of Any Options Under This Clause, Shall Not Exceed 36 Months.
(end Of Clause)
clause 52.222-3 Convict Labor,
clause 52.222-19 Child Labor – Cooperation With Authorities And Remedies, Clause 52.222-21, Prohibition Of Segregated Facilities
clause 52.222-26, Equal Opportunity,
clause 52.222-35 Equal Opportunity For Veterans,
clause 52.222-36 Equal Opportunity For Workers With Disabilities, Clause 52.222-37 Employment Reports On Veterans,
clause 52.222-40 Notification Of Employee Rights Under The National Labor Relations Acts,
clause 52.222-41 Service Contact Labor Standards, Clause 52.222-50 Combating Trafficking In Persons,
clause 52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving,
clause 52.225-13 Restrictions On Certain Foreign Purchases, Clause 52.232-1 Payments
clause 52.232-33, Payment By Electronic Funds Transfer – System For Award Management Clause 52.232-40, Providing Accelerated Payments To Small Business Subcontractors, Clause 52.233-3 Protest After Award,
clause 52.233-4 Applicable Law For Breach Of Contract Claim, And
clause 52.222-53 Exemption From Application Of The Service Contract Labor Standards To Contracts For Certain Services-requirements.
to Obtain The Above Provision/clauses In Full Text, Please Visit Https://www.acquisition.gov/far
see Attachment- Custom Clause For Electronic Invoicing
Closing Soon15 Jan 2025
Tender AmountRefer Documents
STATE, DEPARTMENT OF USA Tender
Others...+2Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
United States
Details: U.s. Embassy Malabo
date: December 20, 2024
request For Quotation # 19ek2025q0002
replacement Of On-compound Residential Solar Water Heaters
the U.s. Embassy In Malabo, Equatorial Guinea Invites Vendors To Submit A Quotation For The Replacement Of On-compound Residential Solar Water Heaters.
instructions To Quoters:
in Order For Your Quotation To Be Considered, Each Offer Must Include The Following:
completed Pricing Table – Section I - A.
completed Quoter’s Info – Section Ii.
completed Technical Requirements, To Include The Following Information Demonstrating The Quoter’s Ability To Perform:
name Of A Project Manager (or Another Liaison To The Embassy) Who Understands Written And Spoken English.
evidence That The Quoter Operates Established Business With A Permanent Address And Telephone Listing.
evidence That The Quoter Has The Necessary Personnel, Equipment, And Financial Resources Available To Perform The Work.
a Proof Showing That Contractor Has Already Started The Sam Registration Process. Sam Registration “system For Award Management” Is Required For Contracts Exceeding Us$30,000.00. See Exhibit A And The Following Link For Further Instructions: Https://www.fsd.gov/sys_attachment.do?sys_id=9a12412bdb7bbd90a8cb4a391396194f
contractor’s Certification Regarding The National Defense Authorization Act (ndaa) Clauses (52.204-24, 52-204-25 And 52-204-26). See Certification Instructions In Exhibit B.
your Quotation By Email To Malabop@state.gov No Later Than Close Of Business On Monday, Jan 6, 2025. No Quotation Will Be Accepted After This Time.
you Are Encouraged To Make Your Quotation Competitive. The Rfq Does Not Commit The American Embassy To Make Any Award. The Embassy May Cancel This Rfq Or Any Part Of It. The Embassy May Award Multi Contracts Against This Requirement And It Reserves The Right To Reject Proposals/quotations That Are Unreasonably Low Or High In Price.
direct Any Questions Regarding This Rfq By Email To Malabop@state.gov
thank You.
section I
pricing Table
no.
description
total Cost (usd)
1
replacement Of On-compound Residential Solar Water Heaters
grand Total:
b. Statement Of Work
introduction
overview & Description: The U.s. Embassy Malabo Requires The Replacement Of On-compound Residential Solar Water Heaters. The Solar Water Heaters Were Originally Installed During Initial Construction And Are At The End Of Their Useful Life. Many Have External Leaks And Are Isolated From The System.
location: The Facility, U.s. Embassy Is Located In The Capital Of Equatorial Guinea, Malabo. All Onsite Inspections Shall Be Requested Through The U. S. Embassy’s Facility Manager (fm) Or Contracting Officer Representative (cor).
objective: The Objective Of Solar Water Heater Replacement Is To Restore Efficiency To The Water Heating System And Reduce The Burden On Electrical Water Heaters, Effectively Extending Their Life.
communication: The Fac Team Maintain Contact With The Project Lead: Michael Macsay, Facility Manager (fm), U.s. Embassy Malabo, Email: Macsaymd@state.gov, Mobile: +240-555-000-306.
project Phases
receipt And Inspection: Once Solar Water Heaters Are Received, They Will Be
inspected By Facilities (fac) Personnel For Damage From Shipping.
removal And Installation: Old Solar Water Heaters Will Be Removed From The
system And Lowered To The Ground For Disposal. Replacement Water Heaters Will Be Raised To The Roof And Installed Per Manufacturer’s Instructions.
2.2.1 Note: A Crane And Rigging Will Be Required To Remove And Install
Solar Water Heaters.
commissioning: Upon Complete Installation, Solar Water Heaters Will Be Tested
and Commissioned Within The Guidelines Set By The Manufacturer.
general Requirements
work Shall Be Performed In Accordance With Overseas Building Operations (obo) Safety, Health, And Environmental Management (shem) Standards. Proper Lifting And Rigging Practices Shall Be Followed During Installation And Removal The Solar Water Heaters.
proper Ppe Shall Be Worn At All Times During The Removal/installation Process.
work Shall Be Performed In Accordance With The Manufacturer’s Guidelines To Ensure Warranty Is Not Voided.
any Damage To Grass And/or Vegetation During Removal And Installation Of Solar Water Heaters Shall Be The Responsibility Of The Fac Team To Replace. Precautions Shall Be Taken To Ensure Damage To Post’s Grass And Vegetation Is Minimized.
responsibilities Of The Fac Team
project Safety Plan (psp): Fm/posho And Aposho Will Develop A Project Safety Plan Using Us Army Corp Of Engineers (usace) Em385-1-1. The Plan Will Be Communicated To The Fac Staff Performing The Work.
fac Staff Shall Adhere To The Project Safety Plan Throughout The Duration Of The Project. Safety Violations And Injuries Shall Be Reported Immediately To The Posho/aposho.
quality Management Plan (qmp): Fm Shall Establish A Quality Management Plan To Include Inspection To Adherence With Installation Guide. Regular Inspections Between Coatings Will Be Conducted With The Designated Supervisor Of The Crew. The Crew Shall Repair Any Inconsistencies Found Within The Coatings As Defined By The Qmp.
pre-project Requirements
tooling & Materials: All Tooling And Materials Shall Be Inventoried Prior To The Start Of The Project To Ensure Efficiency And The Success Of The Project. All Tooling Will Be Approved By The Fm And Designated Project Supervisor Prior To Ordering.
storage: Storage Shall Be Maintained In Accordance With The Storage Instructions From The Manufacturer. Proper Storage Of Resurfacing Materials Is Essential, And A Space Shall Be Identified Prior To The Project Start.
all Workers Shall Review The Qmp To Understand The Standards To Be Met In The Application Of The Tennis Court Resurfacing. Any Deviation From The Installation Guide And Manufacturers Standards, May Cause The Resurfacing Materials To Degrade Or Fail Earlier Than Expected.
all Workers Shall Review The Psp Set By The Fm/posho To Ensure Standards Set Forth Can And Will Be Adhered To.
project Requirements
all Workers Shall Adhere To The Psp Set Forth By The Fm/posho.
all Workers Shall Adhere To The Qmp And Request Inspections Or Understand That Surprise Inspections Will Be Conducted To Ensure Quality Of Work.
supervisor And Workers Will Adhere To The Manufacturer’s Installation Guide.
technical Specifications: Refer To Appendix A For Technical Specifications Of The Solar Water Heater Requirements.
reference Material
work Shall Be Performed In Accordance With The Following References:
manufacturer’s Installation Guide.
usace 385-1-1.
post Quality Management Plan (qmp)
appendix A
technical Specifications
component
specification
collector Housing
uv Protected
cover
antireflex Glass (double Coated)
absorber/tank Capacity
40 Gal (150 Liter)
absorber/tank Construction
steel
section Ii
contractor’s Information & Signatures:
contractor’s Name
company Name
address
uei #
ncage #
office Tel #
fax #
mobile #
email
name Of Person Authorized To Sign: ___________________________________________________________
signature Of Person Authorized: ______________________________________________________________
the Penalty For Making False Statements Is Prescribed In The U.s. Criminal Code, 18 U.s.c. 1001
exhibit A
sam.gov Registration
the Federal Acquisition Regulation (far) - Clause # 52.204-7 - Requires All Contractors To Be Registered In The System For Award Management “sam” Database. Registration In Sam Is Mandatory Prior To Signing Any Contract That Exceeds $30,000. As We Would Like To Continue Working With You In The Near Future, We Suggest That You Start The Registration Process Asap As This Requirement Is Time Consuming.
the Registration Process Starts With Obtaining A Uei Number And A Ncage Code. You Should Be Prepared To Provide The Following Information:
(i) Company Legal Business.
(ii) Trade Style, Doing Business, Or Other Name By Which Your Entity Is Commonly Recognized.
(iii) Company Physical Street Address, City, State, And Zip Code.
(iv) Company Mailing Address, City, State And Zip Code (if Separate From Physical).
(v) Company Telephone Number.
(vi) Date The Company Was Started.
(vii) Number Of Employees At Your Location.
(viii) Chief Executive Officer/key Manager.
(ix) Line Of Business (industry).
(x) Company Headquarters Name And Address (reporting Relationship Within Your Entity).
if A Contractor Does Not Become Registered In The Sam Database In The Time Prescribed By The Contracting Officer, The Contracting Officer Will Proceed To Award To The Next Otherwise Successful Registered Contractor.
if You Have Any Questions During The Registration Process, You Will Need To Contact The Customer Service For Sam By Registering Or Contacting The Following Website:
federal Service Desk
url: Www.fsd.gov
hours: 8am - 8pm (eastern Time)
us Calls: 866-606-8220
international Calls: 334-206-7828
dsn: 866-606-8220
exhibit B
ndaa Certification
the Us Embassy Must Comply With Section 889(a)(1)(b) Of The Fy2019 National Defense Authorization Act And Is Prohibited From Entering Into A Contract, Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless A Waiver Is Granted.
as Defined In Statute, Covered Telecommunications Equipment Or Services Means The Following: Telecommunications Equipment Produced By Huawei, Zte, Hikvision, Dahua, And Hytera, Or Their Subsidiaries Or Affiliates.
contractor’s Certification:
contractor’s Certification In Response To The National Defence Authorization Act (ndaa) Clauses (52.204-24, 52-204-25 And 52-204-26) – The Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment:
by Affixing Your Authorized Signature In Section Ii And Submitting This Certification, The Undersigned Certifies That Neither It, It’s Principals Nor Affiliates, Will Be Supporting The Us Embassy Using The Proscribed Equipment Or Services.
far Clauses Incorporated In Full Text:
52.204-24 Representation Regarding Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020)
the Offeror Shall Not Complete The Representation At Paragraph (d)(1) Of This Provision If The Offeror Has Represented That It “does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument” In The Provision At 52.204-26, Covered Telecommunications Equipment Or Services—representation, Or In Paragraph (v) Of The Provision At 52.212-3, Offeror Representations And Certifications-commercial Items.
(a) Definitions. As Used In This Provision-
backhaul, Covered Telecommunications Equipment Or Services, Critical Technology, Interconnection Arrangements, Reasonable Inquiry, Roaming, And Substantial Or Essential
component Have The Meanings Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
(b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract Or Extending Or Renewing A Contract With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract. Nothing In The Prohibition Shall Be Construed To—
(i) Prohibit The Head Of An Executive Agency From Procuring With An Entity To Provide A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(ii) Cover Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Cannot Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(c) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For “covered Telecommunications Equipment Or Services.”
(d) Representations. The Offeror Represents That—
(1) It [] Will, [] Will Not Provide Covered Telecommunications Equipment Or Services To The Government In The Performance Of Any Contract, Subcontract Or Other Contractual Instrument Resulting From This Solicitation. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(1) Of This Section If The Offeror Responds “will” In Paragraph (d)(1) Of This Section; And
(2) After Conducting A Reasonable Inquiry, For Purposes Of This Representation, The Offeror Represents That—
it [] Does, [] Does Not Use Covered Telecommunications Equipment Or Services, Or Use Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services. The Offeror Shall Provide The Additional Disclosure Information Required At Paragraph (e)(2) Of This Section If The Offeror Responds “does” In Paragraph (d)(2) Of This Section.
(e) Disclosures. (1) Disclosure For The Representation In Paragraph (d)(1) Of This Provision. If The Offeror Has Responded “will” In The Representation In Paragraph (d)(1) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Original Equipment Manufacturer (oem) Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Product Service Code (psc) Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(1) Of This Provision.
(2) Disclosure For The Representation In Paragraph (d)(2) Of This Provision. If The Offeror Has Responded “does” In The Representation In Paragraph (d)(2) Of This Provision, The Offeror Shall Provide The Following Information As Part Of The Offer:
(i) For Covered Equipment—
(a) The Entity That Produced The Covered Telecommunications Equipment (include Entity Name, Unique Entity Identifier, Cage Code, And Whether The Entity Was The Oem Or A Distributor, If Known);
(b) A Description Of All Covered Telecommunications Equipment Offered (include Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); And
(c) Explanation Of The Proposed Use Of Covered Telecommunications Equipment And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
(ii) For Covered Services—
(a) If The Service Is Related To Item Maintenance: A Description Of All Covered Telecommunications Services Offered (include On The Item Being Maintained: Brand; Model Number, Such As Oem Number, Manufacturer Part Number, Or Wholesaler Number; And Item Description, As Applicable); Or
(b) If Not Associated With Maintenance, The Psc Of The Service Being Provided; And Explanation Of The Proposed Use Of Covered Telecommunications Services And Any Factors Relevant To Determining If Such Use Would Be Permissible Under The Prohibition In Paragraph (b)(2) Of This Provision.
(end Of Provision)
52.204-25 Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment (aug 2020)
definitions. As Used In This Clause—
backhaul Means Intermediate Links Between The Core Network, Or Backbone Network, And The Small Subnetworks At The Edge Of The Network (e.g., Connecting Cell Phones/towers To The Core Telephone Network). Backhaul Can Be Wireless (e.g., Microwave) Or Wired (e.g., Fiber Optic, Coaxial Cable, Ethernet).
covered Foreign Country Means The People's Republic Of China.
covered Telecommunications Equipment Or Services Means—
(1) Telecommunications Equipment Produced By Huawei Technologies Company Or Zte Corporation (or Any Subsidiary Or Affiliate Of Such Entities);
(2) For The Purpose Of Public Safety, Security Of Government Facilities, Physical Security Surveillance Of Critical Infrastructure, And Other National Security Purposes, Video Surveillance And Telecommunications Equipment Produced By Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, Or Dahua Technology Company (or Any Subsidiary Or Affiliate Of Such Entities);
(3) Telecommunications Or Video Surveillance Services Provided By Such Entities Or Using Such Equipment; Or
(4) Telecommunications Or Video Surveillance Equipment Or Services Produced Or Provided By An Entity That The Secretary Of Defense, In Consultation With The Director Of National Intelligence Or The Director Of The Federal Bureau Of Investigation, Reasonably Believes To Be An Entity Owned Or Controlled By, Or Otherwise Connected To, The Government Of A Covered Foreign Country.
critical Technology Means—
(1) Defense Articles Or Defense Services Included On The United States Munitions List Set Forth In The International Traffic In Arms Regulations Under Subchapter M Of Chapter I Of Title 22, Code Of Federal Regulations;
(2) Items Included On The Commerce Control List Set Forth In Supplement No. 1 To Part 774 Of The Export Administration Regulations Under Subchapter C Of Chapter Vii Of Title 15, Code Of Federal Regulations, And Controlled—
(i) Pursuant To Multilateral Regimes, Including For Reasons Relating To National Security, Chemical And Biological Weapons Proliferation, Nuclear Nonproliferation, Or Missile Technology; Or
(ii) For Reasons Relating To Regional Stability Or Surreptitious Listening;
(3) Specially Designed And Prepared Nuclear Equipment, Parts And Components, Materials, Software, And Technology Covered By Part 810 Of Title 10, Code Of Federal Regulations (relating To Assistance To Foreign Atomic Energy Activities);
(4) Nuclear Facilities, Equipment, And Material Covered By Part 110 Of Title 10, Code Of Federal Regulations (relating To Export And Import Of Nuclear Equipment And Material);
(5) Select Agents And Toxins Covered By Part 331 Of Title 7, Code Of Federal Regulations, Part 121 Of Title 9 Of Such Code, Or Part 73 Of Title 42 Of Such Code; Or
(6) Emerging And Foundational Technologies Controlled Pursuant To Section 1758 Of The Export Control Reform Act Of 2018 (50 U.s.c. 4817).
interconnection Arrangements Means Arrangements Governing The Physical Connection Of Two Or More Networks To Allow The Use Of Another's Network To Hand Off Traffic Where It Is Ultimately Delivered (e.g., Connection Of A Customer Of Telephone Provider A To A Customer Of Telephone Company B) Or Sharing Data And Other Information Resources.
reasonable Inquiry Means An Inquiry Designed To Uncover Any Information In The Entity's Possession About The Identity Of The Producer Or Provider Of Covered Telecommunications Equipment Or Services Used By The Entity That Excludes The Need To Include An Internal Or Third-party Audit.
roaming Means Cellular Communications Services (e.g., Voice, Video, Data) Received From A Visited Network When Unable To Connect To The Facilities Of The Home Network Either Because Signal Coverage Is Too Weak Or Because Traffic Is Too High.
substantial Or Essential Component Means Any Component Necessary For The Proper Function Or Performance Of A Piece Of Equipment, System, Or Service.
(b) Prohibition. (1) Section 889(a)(1)(a) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2019, From Procuring Or Obtaining, Or Extending Or Renewing A Contract To Procure Or Obtain, Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System. The Contractor Is Prohibited From Providing To The Government Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104.
(2) Section 889(a)(1)(b) Of The John S. Mccain National Defense Authorization Act For Fiscal Year 2019 (pub. L. 115-232) Prohibits The Head Of An Executive Agency On Or After August 13, 2020, From Entering Into A Contract, Or Extending Or Renewing A Contract, With An Entity That Uses Any Equipment, System, Or Service That Uses Covered Telecommunications Equipment Or Services As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, Unless An Exception At Paragraph (c) Of This Clause Applies Or The Covered Telecommunication Equipment Or Services Are Covered By A Waiver Described In Far 4.2104. This Prohibition Applies To The Use Of Covered Telecommunications Equipment Or Services, Regardless Of Whether That Use Is In Performance Of Work Under A Federal Contract.
(c) Exceptions. This Clause Does Not Prohibit Contractors From Providing—
(1) A Service That Connects To The Facilities Of A Third-party, Such As Backhaul, Roaming, Or Interconnection Arrangements; Or
(2) Telecommunications Equipment That Cannot Route Or Redirect User Data Traffic Or Permit Visibility Into Any User Data Or Packets That Such Equipment Transmits Or Otherwise Handles.
(d) Reporting Requirement. (1) In The Event The Contractor Identifies Covered Telecommunications Equipment Or Services Used As A Substantial Or Essential Component Of Any System, Or As Critical Technology As Part Of Any System, During Contract Performance, Or The Contractor Is Notified Of Such By A Subcontractor At Any Tier Or By Any Other Source, The Contractor Shall Report The Information In Paragraph (d)(2) Of This Clause To The Contracting Officer, Unless Elsewhere In This Contract Are Established Procedures For Reporting The Information; In The Case Of The Department Of Defense, The Contractor Shall Report To The Website At Https://dibnet.dod.mil. For Indefinite Delivery Contracts, The Contractor Shall Report To The Contracting Officer For The Indefinite Delivery Contract And The Contracting Officer(s) For Any Affected Order Or, In The Case Of The Department Of Defense, Identify Both The Indefinite Delivery Contract And Any Affected Orders In The Report Provided At Https://dibnet.dod.mil.
(2) The Contractor Shall Report The Following Information Pursuant To Paragraph (d)(1) Of This Clause:
(i) Within One Business Day From The Date Of Such Identification Or Notification: The Contract Number; The Order Number(s), If Applicable; Supplier Name; Supplier Unique Entity Identifier (if Known); Supplier Commercial And Government Entity (cage) Code (if Known); Brand; Model Number (original Equipment Manufacturer Number, Manufacturer Part Number, Or Wholesaler Number); Item Description; And Any Readily Available Information About Mitigation Actions Undertaken Or Recommended.
(ii) Within 10 Business Days Of Submitting The Information In Paragraph (d)(2)(i) Of This Clause: Any Further Available Information About Mitigation Actions Undertaken Or Recommended. In Addition, The Contractor Shall Describe The Efforts It Undertook To Prevent Use Or Submission Of Covered Telecommunications Equipment Or Services, And Any Additional Efforts That Will Be Incorporated To Prevent Future Use Or Submission Of Covered Telecommunications Equipment Or Services.
(e) Subcontracts. The Contractor Shall Insert The Substance Of This Clause, Including This Paragraph (e), In All Subcontracts And Other Contractual Instruments, Including Subcontracts For The Acquisition Of Commercial Items.
(end Of Clause)
52.204-26 Covered Telecommunications Equipment Or Services-representation (dec 2019)
(a) Definitions. As Used In This Provision, “covered Telecommunications Equipment Or Services” Has The Meaning Provided In The Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment.
(b) Procedures. The Offeror Shall Review The List Of Excluded Parties In The System For Award Management (sam) (https://www.sam.gov) For Entities Excluded From Receiving Federal Awards For “covered Telecommunications Equipment Or Services”.
(c) Representation. The Offeror Represents That It □ Does, □ Does Not Provide Covered Telecommunications Equipment Or Services As A Part Of Its Offered Products Or Services To The Government In The Performance Of Any Contract, Subcontract, Or Other Contractual Instrument.
(end Of Provision)
Closing Date21 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
United States
Details: Page 2 Of 2
description: This Is A Pre-solicitation Notice For The Establishment Of An Architect-engineering (a-e) Contract With Services To Be Performed At The Salem Va Medical Center At 1970 Roanoke Blvd, Salem, Va 24153. This Requirement Is Being Executed Under A 100% Set-aside To Service-disabled Veteran Owned Small Business (sdvosb) Firms. This Announcement Is Not A Request For Proposal; No Solicitation Package Will Be Issued Until After An Evaluation Has Been Made On The Provided Sf-330s. The Sf-330 Can Be Downloaded Through The Gsa Forms Library At: Http://www.gsa.gov/portal/forms/type/top, Scroll Down To Locate And Click On The Sf-330 Hyperlink Entitled, Architect-engineer Qualifications. Interested Firms Should Submit Their Current Sf-330, Parts I And Ii, To Chanel.johnson@va.gov. The Sf-330s Are Due No Later Than 9:00 Am, Est, February 18, 2025.
scope Of Work:
intent
provide Professional Engineering Services To Include Option Analysis, Phasing Design, Investigative Surveys And Reports, Planning, Consultation And Visits, Design Work, Preparation Of Contract Drawings And Specifications, Preparation Of Cost Estimates And Provision Of Construction Period Services As Necessary For Project 658-24-109 Renovate Patient Restrooms, At Vamc Salem, Virginia. The Restrooms Identified For Renovation Shall Be Brought Up To Department Of Veterans Affairs (va) Standards And Specifications As Well As The Architectural Barriers Act Accessibility (abaa) Standards. There Are 18 Restrooms Currently Planned To Be In The Scope Of This Project. The Va Will Review The Cost Estimate At The Design Development Stage And Confirm Or Alter The List Of Restrooms. In No Case Will New Restrooms Be Added To The Scope But One Or More May Be Removed If Necessary To Meet The Available Funding. Â
The Project Intent Is To Develop A Complete Design Package That Addresses All Va And Abaa Requirements On Restrooms In Building 143. Restrooms To Be Brought Up To Standards Typically Require Expansion And Complete Renovation Of All Finishes And Fixtures.
design Efforts Shall Include:
conduct A Site Investigation Of All Identified Restrooms In Building 143. Identify Nonconformance Issues Using The Requirements Of All Applicable Va Standards And Specifications, And Of The Abaa Standards.
utilizing A Rating Or Scoring System, Identify The Restrooms That Are Priority Based On Greater Nonconformity With Standards. Ratings / Scoring Shall Be Documented In A Schedule Such That The Construction Can Be Phased Accordingly. For The Design Development (60%) Submission Review, The Va Will Review The Cost Estimate Submission And Confirm Or Alter The Restrooms That Will Be In Scope.
provide A Recommendation For Va Personnel To Follow Up, Regarding Requirements Of The Abaas For Wheelchair Accessible Toile Rooms In Existing Buildings. Specifically, Use F202 Existing Buildings And Facilities, Paragraph F213.2, Exception Number 4 To Determine Whether Va Policy And Requirements For Renovations May Take Advantage Of This Exception, And Recommend Methods To Comply To Include:
provision Of Two Wheelchair Accessible Unisex Single Use Toilet Rooms Per Floor. Recommend Other Renovations As Needed Such As Grab Bars And Clearance Of Fixtures, For The Other Single Use Toilet Rooms On Each Floor.
make A Recommendation On Whether To Provide On Each Floor One Wheelchair Accessible Unisex Single Use Toilet Room, And One Ambulatory Accessible Toilet Room Of A Lesser Minimum Square Footage.
examine Whether On The First Floor, The Single Use Toilet Rooms Constitute A Cluster Of Single Use Toilet Rooms And Are Therefore Subject To A Minimum Of 50% Wheelchair Accessible.
examine Potential Benefits Or Impacts On The Basement Floor Of Building 143, Where We Have Identified Five Single Use Toilet Rooms For Renovation. The Benefits To Examine Are The Expected Completion Of Four Wheelchair Accessible Toilet Rooms With More Than One Toilet (two Men S And Two Women S), Which Are Being Renovated And Brought Up To Abaas Compliance As Part Of Project# 658-24-104 Renovate Main Lobby. Specifically Make A Recommendation Whether The Completion Of Those Restroom Renovations Will Mean No Other Toilet Rooms Need Be Made Wheelchair Accessible But Only Meet Ambulatory Patient Requirements Such As Space In The Room And Clearance Of Fixtures, Provision Of Grab Bars, Etc. Examine According To The The Requirements Of F213.2 And Exception 4 But Also Any Applicable Va Policies And Standards Which Speak To The Issue.
provide A Complete Design Package Which Shall Include Drawings And Construction Specifications To Renovate All Restrooms Included In The Program. In Addition To The Overall Restoration Requirements, The Following Shall Also Be Required:
a/e Satisfy The Following Milestones:
schematic Design (30%)
drawings
outline Specifications And A Draft Of The Submittal Register
construction Cost Estimate
design Development Review Meeting
final Design Submission (95%). The Final Design Shall Be Complete, Free Of Errors And Ready In The A/e Firm S Judgment To Be Issued For Construction. The Purpose Of The Review Is A Check For Inadvertent Errors And No Further Design Is Anticipated Other Than Correction Of Errors In The Set.
drawings
full Specifications And The Submittal Register
construction Cost Estimate
design Development Review Meeting
construction Documents (100%)
drawings
full Specifications
construction Cost Estimate
construction Documents Review Meeting
.
the A/e Shall Complete The Project Design In Accordance With This A/e Scope, With All Applicable Va Standards And Specifications, And With Abaa Standards For Toilet Rooms In Healthcare Facilities Unless Otherwise Approved By The Va. The A/e Shall Retrieve All Va Design Information And Standards From The Va Facilities Web Site (http://www.va.gov/facmgt/standard). The A/e Shall Incorporate These Documents And All National, State And Local Codes Adopted And Used By The Va In The Design Of This Project. All Applicable Standards Shall Be Reflected In The Construction Cost Estimate. The Facility Record Drawings And Autocad Files Are Available For The A/e S Use. Note: Not All Record Drawings Are Available On Autocad. Additionally, The Accuracy Of Facility Record Drawings Must Be Field Verified By The A/e. At A Minimum, The A/e Shall Utilize The Following References, As Applicable, For Planning And Design Purposes.
national Cad Standards And Standard Details Pg-18-4
vha Program Guide Pg-18-3
va Master Construction Specifications Pg-18-1
h-18-8 Seismic Design Requirements
sanitary Design Manual For Hospital Projects
pg-18-13 Barrier Free Design Handbook
nfpa Codes
design Manuals Pg-18-10
cultural Resource Management D-7545 & H-7545
government-furnished Record Drawings (a/e To Field Verify Conditions)
pg-18-15 A/e Submission Requirements.
pg-18-12 Design Guides (graphical, By Function)
pg-18-14 Room Finishes, Door, And Hardware Schedules
facility Guidelines Institute (fgi)
american Institute Of Architects (aia)
a/e Shall Address The Following Items In The Design:
estimate Of Construction Project Costs And Duration Including Simplified Schedule To Include Progress And Final Inspections And All Work Required For The Base Bid And The Bid Alternatives. Revise Cost Estimates And Schedules For Each Design Submittal.
access To Buildings Must Remain Adequately Operational And Completely Protected During Site Investigations And Shall Be Phased To Minimize Impacts To Patients During The Construction Process.
contractor Shall Comply With All Applicable Records Management Laws And Regulations, As Well As National Archives And Records Administration (nara) Records Policies, Including But Not Limited To The Federal Records Act (44 U.s.c. Chs. 21, 29, 31, 33), Nara Regulations At 36 Cfr Chapter Xii Subchapter B, And Those Policies Associated With The Safeguarding Of Records Covered By The Privacy Act Of 1974 (5 U.s.c. 552a). These Policies Include The Preservation Of All Records, Regardless Of Form Or Characteristics, Mode Of Transmission, Or State Of Completion.
the A/e Has Responsibility For Duty To Report Any Fraud, Waste And Abuse Witnessed While On Va Premises To The Integrity And Compliance Officer.
the Following Quantities Of Design Review Material Are Required For The Schematic Design, Design Development, Final Design, And Construction Document Submissions:
one (1) Full Size, One (1) Half Size, And One (1) Electronic Set (pdf And Autocad 2022 Format) Of The Design Drawings.
two (2) Paper Copies And One (1) Electronic Copy (ms Word) Of Sample Edited And Marked-up (track Changes Enabled) Va Master Specifications.
two (2) Hardcopy Sets And One (1) Electronic Set Of Final Engineering Calculations.
provide Two (2) Hard Copies And One (1) Electronic Copy Each Of The Budgetary Cost Estimate And Preliminary Schedule.
in Addition To Those Items Listed Above In Item 5, For The Construction Document Submission The Following Quantities Of Review Materials Are Required. This Submission Shall Include Severable Components And The Overall Project As Described Above:
brief Description Of Work For Inclusion In Ifb (microsoft Word), Including Descriptions Of Deductive Alternates And Associated Completion Times.
list Of Sole Source Items With Justification (if Applicable).
list Of Or-equal Items With Justification (if Applicable).
schedule:
overall Period Of Performance: 210 Days From The Notice To Proceed.
site Investigation Report Is Due 45 Calendar Days From The Notice To Proceed.
schematic Design (30%) Submission Is Due 45 Calendar Days From The Receipt Of The Site Investigation Report
the Government Will Provide Review Comments 15 Calendar Days From Receipt Of The Design Submission.
design Development (60%) Submission Is Due 30 Calendar Days From The Date Schematic Design Comments Are Provided.
the Government Will Provide Review Comments 15 Calendar Days From Receipt Of The Design Submission.
final Design (95%) Submission Is Due 30 Calendar Days From The Date Design Development Comments Are Provided.
the Government Will Provide Review Comments 15 Calendar Days From Receipt Of The Design Submission.
construction Documents Submission Is Due 15 Calendar Days From The Date Full Design Review Comments Are Provided.
the Government Will Accept The Construction Documents Within Five Calendar Days Of Receipt, Or Will Require Re-submission Of The Construction Documents If There Are Remaining Comments That Have Not Been Adequately Addressed.
any Delays To The Schedule Due To Re-submissions That May Be Required Upon Government Review, Is The Responsibility Of The A/e And Shall Not Result In A Claim For Delay.
evaluation Factors For Award
the Government Will Award A Contract Resulting From This Solicitation To The Responsible Offeror Whose Offer Conforming To The Solicitation Will Be Most Advantageous To The Government, And Other Factors Considered. Boards Will Evaluate Firms' Qualifications Strictly On The Basis Of The Announced Selection Criteria And Their Stated Order Of Importance. The Criteria Will Be Applied As Follows:
part I Technical Capability
the Following Criteria Will Be Used To By A Selection Board To Determine The Most Highly Qualified Firms In Respect To Their Technical Capability. Technical Capability Will Be Evaluated Based On The Following Factors:
specialized Experience And Technical Competence (far 36.602-1(a)(2)). Offerors Will Be Evaluated Based On The Specialized Experience Of A Firm On Similar Projects And The Technical Capabilities (such As Design Quality Management Procedures, Cadd/bim, And Equipment Resources,) Of The Prime Firm And Any Subcontractors. Evaluation Will Be Based On The Information Presented In The Architect-engineer Qualifications - Standard Form 330 (sf330). A Maximum Of Five (5) Example Projects May Be Submitted For Consideration Under Sf330, Part I, Section F. Example Projects Should Be Designs Completed Within Six (6) Years Of Solicitation Closing Date.
professional Qualifications (far 36.602-1(a)(1)). A Board Will Evaluate, As
appropriate, The Education, Training, Registration, Certifications (see Paragraph 3-4.d(4)), Overall And Relevant Experience, And Longevity With The Firm Of The Key Management And Technical Personnel. This Criterion Is Primarily Concerned With The Qualifications Of The Key Personnel And Not The Number Of Personnel, Which Is Addressed Under The Capacity Criterion. The Lead Designer In Each Discipline Must Be Registered As Required By Far 36.609-4 And 52.236-25 But Does Not Have To Be Registered In The Particular State Where The Project Is Located.
capacity (far 36.602-1(a)(3)). A Firm S Capacity Will Be Evaluated Based On Their Experience With Similar Size Projects, The Available Capacity Of Key Disciplines To Perform The Work In The Required Time, And A Primary Design Schedule. The Volume Of Work Awarded During The Previous 12 Months, Based On Data Extracted From The Federal Procurement Data System, Will Be Considered When Evaluating Capacity. Additionally, The Full Potential Value Of Any Current Indefinite Delivery Contracts That A Firm Has Been Awarded Will Be Considered When Evaluating Capacity.
knowledge Of The Locality (far 36.602-1(a)(5)). Firms Will Be Evaluated On Their Knowledge Of The Locality Such As Knowledge Of Local Historical Features, Climatic Conditions, And Local Construction Methods That Are Unusual Or Unique To The Area.
design Quality Control Plan. Firms Will Be Evaluated On Their Approach To Ensure Technical Quality And Accuracy Of Work Products. A Firm's Approach To Resolve Issues Of Quality Will Be Analyzed To Determine Its Ability To Provide Quality Design Products. Describe And Define The Processes Of The Firm's Quality Control Plan And List, By Name And Position, All Key Personnel Responsible For Its Execution. Quality Control Information Shall Also Address Safety Measures Particularly With Respect To Field Work And Site Investigations. Information Describing Quality Management May Be Presented In Sf330, Part I, Section H. A Design Quality Control Plan Shall Be Submitted As Part Of The Proposal.
experience In Construction Period Services. Firms Will Be Evaluated On Their Experience In Providing Construction Period Services To Include Professional Field Inspections During Construction, Review Of Construction Submittals, Support In Answering Request For Information, And Support Of Construction Contract Changes To Include Drafting Statements Of Work And Preparing Cost Estimates.
part Ii Past Performance
the Following Criteria Will Be Used To By A Selection Board To Determine The Most Highly Qualified Firms Based On A Firm S Past Performance.
past Performance (far 36.602-1(a)(4)). Firms Will Be Evaluated Based On Their Cpars For Past Projects.
part I Technical Capability
first, The Technical Capability Of All Offers Will Be Evaluated On An Adjectival Basis. Sub-factors Will Be Weighted Equally, And All Areas Must Have At Least A Satisfactory Rating.
evaluators Shall Assign A Rating From The Following Table Based On The Minimum Requirements Stated In Each Sub-factor Section.
adjectival Rating
definitions
exceptional
meets All Requirements And Exceed Majority Of Requirements. Overall The Proposal Meets And Significantly Exceeds, In All Aspects, The Standards For Evaluation: Very High Probability Of Success: No Significant Weaknesses.
very Good
meets All Requirements And Exceed Some Requirements. The Proposal Meets And, In Some Cases, Exceeds The Standards For Evaluation; High Probability Of Success; No Significant Weaknesses And Only Minor Correctable Deficiencies.
satisfactory
the Proposal Meets The Standard For Evaluation; Good Probability Of Success; Only Minor Weaknesses And Correctable Deficiencies.
marginal
lacks Material Information. The Proposal Fails To Meet Some Of The Standards For Evaluation; Low Probability Of Success; Major Weaknesses And/or Uncorrectable.
unacceptable
lacks Material Information. The Proposal Fails To Meet Some Or All Of The Standards For Evaluation; Need Major Revision To A New Submission To Make If Acceptable Or May Contain Uncorrectable Deficiencies.
sub-factor 1 Specialized Experience And Technical Competence
criteria: This Factor Will Evaluate The Offeror S Technical Competence, Based On Successful Completion Of Projects, In The Design Of Fire Protection Systems In A Hospital Environment.
minimum Standard Of Acceptability: The Minimum Standard Of Acceptability Is Met When The Offeror Provides A Minimum Of Three (3) And A Maximum Of Five (5) Examples Of Their Choice Of Completed Projects Or In Progress Of Similar Contracts In Size And Scope (hospital Remodel/renovation; Minimum Threshold Value Of $500,000). In Describing The Experience, Provide The Following Information:
project Title, Location And Brief Description Including The Building Use (medical Facility, Etc) And Contracting Method (design Build, Design Bid Construct, Cm At Risk, Turnkey, Etc).
project Owner And Name And Telephone Number Of Owner S Contact Person.
indicate Your Firm S Role As A Prime Contractor Or Subcontractor, Etc.
project Prime Contractor And Major Subcontractors And Name And Telephone Number Of Contact Person(s).
project Statistics Including Start And Completion Dates (original Vs. Actual) For Design; Cost (with Brief Explanation Of What Is Included In The Cost); Square Footage; And Any Awards (prizes) Received.
sub-factor 2 Professional Qualifications
criteria: This Factor Evaluates The Offerors Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team.
minimum Standard Of Acceptability: The Offeror Must Provide The Resumes For The Following Key Personnel Purposed For Assignment To The Project:
project/design Manager: Must Have A Minimum Of Five (5) Years Experience Successfully Managing Design Projects That Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above.
electrical Engineer: Must Have A Minimum Two (2) Years Experience Designing Electrical Systems Within A Hospital Environment. Projects Shall Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above.
mechanical Engineer: Must Have A Minimum Of Two (2) Years Experience Designing Hvac Systems Within A Hospital Environment. Projects Shall Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above.
civil Engineer: Must Have A Minimum Of Two (2) Years Experience Designing Hvac Systems Within A Hospital Environment. Projects Shall Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above.
architect: Must Have A Minimum Of Two (2) Years Experience Designing Projects That Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above
bim Manager: Must Have A Minimum Two (2) Years Experience Managing The Design Of Projects Using Building Information Modeling Software.
other Disciplines Proposed By The Offeror: Must Have A Minimum Of Two (2) Years Experience Successfully Designing Projects That Meet The Criteria For Similar Projects As Defined In Evaluation Factor 3 Above.
all Resumes Must Include The Following Information And May Not Exceed Two (2) Pages Per Resume, And Must Explain How The Proposed Key Personnel S Experience Meets The Minimum Qualification Requirements For This Contract, As Described Above:
name And Title
project Assignment
name Of Firm With Which Associated
sub-factor 3 Capacity
criteria: This Factor Will Evaluate The Offeror S Ability To Perform Both The Design And Construction Period Services. The Offeror Shall Demonstrate That Is Has The Capacity To Accomplish The Work In The Required Time. Additionally, The Offeror Shall Show That It Can Perform The Required Site Investigations, Design Services, And Construction Period Services Without Adversely Affecting The Project Schedule.
minimum Standard Of Acceptability: The Minimum Standard Of Acceptability Is Met When The Offeror Provides:
offeror Must Specify The Total Volume Of Work Awarded To The Firm Within Twelve (12) Months Of Solicitation Closing And Provide A Proposed Design Schedule Not To Exceed 215 Calendar Days. Prepare And Submit A Practicable Design Schedule Laying Out All Necessary Performance Elements Needed To Complete This Project Identified In The Solicitation In The Proposed Period Of Performance. The Schedule Must Be In The Form Of A Progress Chart Of Suitable Scale To Indicate Appropriately The Percentage Of Work Scheduled For Completion By Any Given Date During The Performance Period. In Addition, The Schedule Must Be Submitted In The Microsoft Project Format. Offerors Should Only Include The Work Elements Necessary To Complete The Required Work. It Is The Offeror S Responsibility To Identify All Necessary Project/work Elements And The Proposal Adequately Identifies Acceptable Critical Path Elements.
sub-factor 4 Knowledge Of The Locality
criteria: Identify Example Projects That Demonstrate The Firms Knowledge Of The Locality (i.e. Salem Va Medical Center).
minimum Standard Of Acceptability: The Minimum Standard Of Acceptability Is Met When The Offeror Provides:
firms Shall Demonstrate Knowledge Of Localities Per Example Projects. Knowledge Of The Va Visn 6 Service Area Will Hold Much Higher Weight And Evaluated More Favorably Than Projects Outside The Visn 6 Service Area. General Understanding Of The Local Conditions, Including Physical Environment, Local Engineering Criteria, And Construction Methods Will Be Evaluated. The Following Key Personnel Resumes Shall Also Be Evaluated For Knowledge Of Localities: Project Manager, Architectural, Mechanical, And Electrical. The Basis Of Evaluation For This Criterion Will Focus On The Information Provided In Sf330, Part I, Section E (resume Of Key Personnel), Section F (example Projects), And Section H (additional Information) That Provides Additional Information Describing Same/similar Qualifications As Deemed Relevant To Performance At The Salem Va Medical Center
sub-factor 5 Design Quality Control Plan
criteria: The Plan Shall Identify Personnel, Design Review Procedures, Site Investigation/confirmation Of Existing Conditions Plan, Tests Proposed, And Forms To Be Used. A Finalized, More Detailed Design Quality Control Plan (qcp) Will Be Required To Be Submitted And Approved After Contract Award.
minimum Standard Of Acceptability: The Minimum Standards Of Acceptability Are Met When The Offeror Provides:
a Description Of The Quality Control System, Including A Chart Showing Lines Of Authority And Acknowledgement That The Design Manager Shall Implement Control Measures For Verification Of All Design Activities.
the Names, Qualifications (in Resume Format), Duties, Responsibilities, And Authorities Of Each Person Assigned As Design Quality Control (qc) Manager. Any Replacements Must Have Similar Qualifications In Dealing With Projects Of Similar Size And Scope.
sub-factor 6 - Experience In Construction Period Services
criteria: Identify Example Projects That Demonstrate The Firms Experience Providing Construction Period Services. Will Be Evaluated On Their Experience In Providing Construction Period Services To Include Professional Field Inspections During Construction, Review Of Construction Submittals, Support In Answering Request For Information, And Support Of Construction Contract Changes To Include Drafting Statements Of Work And Preparing Cost Estimates.
minimum Standard Of Acceptability: The Minimum Standard Of Acceptability Is Met When The Offeror Provides A Minimum Of Three (3) And A Maximum Of Five (5) Examples Of Their Choice Of Completed Projects Of Similar Contracts In Size And Scope (hospital Remodel/renovation; Minimum Threshold Value Of $500,000) For Which Construction Period Services Were Provided.
part Ii Past Performance
next, The Government Will Evaluate The Offeror S Demonstrated Past Performance Of Projects In Order To Determine The Offeror S Ability To Perform The Contract Successfully And Help Determine Responsibility. As With Technical Capabilities, The Firms Will Be Evaluated With An Adjectival Rating System.
adjectival Rating
definitions
exceptional
meets All Requirements And Exceed Majority Of Requirements. Overall The Proposal Meets And Significantly Exceeds, In All Aspects, The Standards For Evaluation: Very High Probability Of Success: No Significant Weaknesses.
very Good
meets All Requirements And Exceed Some Requirements. The Proposal Meets And, In Some Cases, Exceeds The Standards For Evaluation; High Probability Of Success; No Significant Weaknesses And Only Minor Correctable Deficiencies.
satisfactory
the Proposal Meets The Standard For Evaluation; Good Probability Of Success; Only Minor Weaknesses And Correctable Deficiencies.
marginal
lacks Material Information. The Proposal Fails To Meet Some Of The Standards For Evaluation; Low Probability Of Success; Major Weaknesses And/or Uncorrectable.
unacceptable
lacks Material Information. The Proposal Fails To Meet Some Or All Of The Standards For Evaluation; Need Major Revision To A New Submission To Make If Acceptable Or May Contain Uncorrectable Deficiencies.
note: Offerors With No Relevant Past Performance History Will Not Be Evaluated Favorably Or Unfavorably On Past Performance And Will Be Given A Neutral Rating.
criteria: Offerors Must Provide A Minimum Of Three (3) And A Maximum Of Five (5) References Of Their Choice Of Projects Of Similar Contracts In Size And Scope (hospital Building Remodel/renovation; Minimum Construction Threshold Value Of $500,000). The Offeror Must Provide For Each Reference The Reference's Company Name, Pocs, Address, Contact Information To Include Phone Number And E-mail Address, Project Description, Dollar Value And Period Of Performance. The Government Will Consider And Evaluate Offeror's Past Performance Information, To Include The References, Which Are Deemed Recent And Relevant For The Requirements Of This Rfp.
recency Assessment: An Assessment Of The Past Performance Information Will Be Made To Determine If It Is Recent. To Be Recent, The Effort Must Be Ongoing Or Must Have Been Performed During The Past 6 Years From The Date Of Issuance Of This Solicitation. Past Performance Information That Fails This Condition Will Not Be Evaluated.
relevancy Assessment: An Evaluation Of All Recent Performance Information Obtained To Determine Whether The Provided Design Performed Under Those Contracts Relate To A Similar Size And Scope As Those Required By This Solicitation. In Determining The Relevancy Of Effort Performed Under Individual Past Performance Contracts, The Government Will Consider The Specific Effort Or Portion Consistent With That Proposed By The Prime Contractor And/or Subcontractors. The Past Performance Information Obtained From Sources Will Be Used To Establish The Relevancy Of Past Performance.
minimum Standard Of Acceptability: The Minimum Standard Of Acceptability Is Met When The Offeror Provides Minimum Of Three (3) And A Maximum Of Five (5) References Of Their Choice Of Projects Of Similar Contracts In Size And Scope (hospital Building Remodel/renovation; Minimum Threshold Value Of $500,000) In Which The Offeror Adhered To Period Of Performances. The Offeror Must Provide For Each Reference The Reference's Company Name, Pocs, Address, Contact Information To Include Phone Number And E-mail Address, Project Description, Dollar Value And Period Of Performance. The Government Will Consider And Evaluate Offeror's Past Performance Information, To Include The References, Which Are Deemed Recent And Relevant For The Requirements Of This Rfp.
-- End Of Item 8. Evaluation Criteria --
release Of Claims For Delivery Orders: Prior To The Final Payment Under Each Delivery Order Issued Under This Contract Or Prior To Settlement Upon Termination Of The Delivery Order, And As A Condition Precedent Thereto, The A/e Shall Execute And Deliver To The Contracting Officer A Release Of All Claims Against The Government Arising Under Or By Virtue Of This Contract, Other Than Such Claims, If Any, As May Be Specifically Excepted By The A/e From The Operation Of The Release In Stated Amounts To Be Set Forth Therein.
upon Completion Of Construction And Incorporation Of All Revisions Required To Complete The Record Drawings, The Following Items Shall Be Submitted:
a. 1 Set Of Reproducible Hard Copy As-built Plans (30 X 42 ) Plus An Electronic Set In Autocad Version 2022 (.dwg) And Pdf Format.
Closing Date18 Feb 2025
Tender AmountRefer Documents
DEPT OF THE NAVY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Details: It Is Anticipated That A Formal Solicitation Will Be Issued Within 30 Days Of This Pre-solicitation Notice. No Response Is Required For This Notice.
pre Solicitation Notice For N66604-23-rfpreq-npt-10-0243 Indefinite Delivery/indefinite Quantity (idiq) Contract For Multi‐ Discipline Architect‐engineer (a‐e) Services In Support Of Projects On Nuwc Facilities At Naval Undersea Warfare Center Newport Division (nuwcdivnpt), Newport, Ri.
description: All Information Needed For Interested Parties To Submit A Standard Form Sf 330, Architect Engineer Qualifications Is Contained Herein. There Is No Separate Request For Proposals (rfp) Package To Download.
background:
the Naval Undersea Warfare Center Newport Division (nuwcdivnpt) Requires A-e Services In Support Of Various Projects At Nuwcdivnpt. This Procurement Will Result In One Single-award Idiq Contract For Multi‐discipline A‐e Services For Planning, Design, Construction, Evaluation Of New Construction, And Renovation Projects. These Services Will Be Procured In Accordance With 40 United States Code (usc) Chapter 11, Selection Of Architects And Engineers, As Implemented By Federal Acquisition Regulation (far) Subpart 36.6. The Idiq Contract Will Be For A Five-year Ordering Period. The Maximum Value For The Contract Term, Including All Awards, Shall Not Exceed $5,000,000. The Guaranteed Minimum For The Contract Ordering Period Is $500 And Will Be Satisfied By Simultaneous Award Of The Initial Task Order With The Basic Contract. Firm‐fixed Price Task Orders Will Be Negotiated At The Task Order Level. In Accordance With Far 15.404-4(c)(4)(i)(b), The Contract Price Or The Estimated Cost And Fee For Production And Delivery Of Designs, Plans, Drawings, And Specifications Shall Not Exceed 6 Percent Of The Estimated Of Construction Of The Public Work Or Construction, Excluding Fees. There Will Be No Minimum Dollar Limits Per Task Order. The Maximum Dollar Limit Per Task Order Is $3,000,000.
this Proposed Contract Is Being Solicited As A Small Business Set-aside. The North American Industry Classification System (naics) Code Is 541310, Architectural Engineering Services, And The Small Business Size Standard Is $12,500,000. The Government Seeks The Most Highly Qualified Firm To Perform The Required Services, Based On The Demonstrated Competence And Qualifications, In Accordance With The Selection Criteria Included Herein.
comprehensive A‐e Services Are Required For The New Construction, Repair, Replacement, Demolition, Alteration, And/or Improvement Of Facility Projects. Projects May Include Single Or Multiple Disciplines, Such As: Structural, Civil, Mechanical, Electrical, Architectural, Planning, Environmental, Fire Protection, Cost Estimating, And/or Geotechnical. The Types Of Projects May Include: Building Renovations; Building Additions; Site Work Required To Support New Work; New Construction; Parking Areas; Foundations; Retaining Walls; Failure Investigation Including Destructive And Non‐destructive Testing; Seismic Evaluation And Design; Progressive Collapse Analysis; Blast Resistant Design; Structural Engineering Investigations; Utility Systems Including Sanitary And Storm; Mechanical Services; Electrical Services; Water Systems; Storm Water Management; Surveying; Pavement Design; And Civil Engineering Studies.
performance Location(s):
newport, Ri
requirements:
for Complete Details On This Requirement See Attachment 1, “saes.” Specific Types Of A‐e Services That May Be Required Under This Contract Include:
facility Planning And Project Development: Services May Include Work Such As The Following: Prepare Master Plans, Project/site Plans For Proposed Facility/infrastructure Projects. Facility Planning May Be Requested For Renovation, Addition, Repair And New Construction Projects.
development Of Design‐bid‐ Build (dbb) Packages: Services May Include Preparation Of Drawings And Specifications For Renovation, Addition, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design Solution(s) That Meet The Government’s Project Requirements.
development Of Design‐build (db) Request For Proposal (rfp) Packages: Services May Include Working With A Construction Manager As Part Of A Design-build Team To Prepare Drawings And Specifications For Renovation, Additions, Repair Or New Construction Projects. Design Meetings With The Government May Be Required In Order To Agree On Design-build Solution(s) That Meet The Government’s Project Requirements.
preparation Of Cost Estimates Using Unit Guidance And Parametric Cost Estimating: Services May Include Preparing Cost Estimates For Renovation, Addition, Repair And/or New Construction Projects Based On Prepared Design Documents.
development Of Alternatives And Economic Analysis: Service May Include Providing Alternate Design Solutions And Associated Economic Impacts For Renovation, Addition, Repair Or New Construction Projects.
condition Assessment: Services May Include Performing Studies Of Existing Buildings And/or Components Of Buildings To Validate Existing Conditions That May Then Be Used To Inform Future Proposed Design Solutions. Site Visits May Be Required To Document Existing Facility/infrastructure Conditions.
field Investigations (including Utility And Geotechnical): Services May Include Conducting Field Surveys/investigations Of Existing Sites, Buildings Or Specific Components Of A Building (i.e Hvac Or Electrical Systems) In Order To Document Current Status Of A Facility’s Infrastructure. The Results Of Any Field Investigations May Then Be Used To Assist With The Preparation Of Design Documents For A Particular Project.
surveying And Mapping: Services May Include Surveying And/or Mapping Of Existing Or Proposed Sites For A New Construction Project Or Building Addition. Survey Work May Be Required In Order To Document Existing Site Conditions To Support Site/civil Design Solutions.
preparation Of Engineering Evaluations: Services May Include Performing Engineering Calculations To Support Civil, Mechanical, Electrical, Plumbing Or Fire Protection Design Solutions.
incorporation Of Sustainable Engineering Design Practices: Services May Include Incorporation Of Design Principles For Renovation, Addition, Repair And/or New Construction Projects To Support Sustainable Design Solutions.
consultations: Services May Include Collaborating With Other Specialty Design Professionals To Offer And Propose Design Solutions Required To Respond To Unique Project Requirements.
energy Computations; Services May Include Preparation Of Energy Calculations To Verify Proposed Design Solutions Comply With Required Building Codes, Federal, State And/or Local Energy Requirements.
soil Borings: Services May Include Conducting Soil Boring Testing In Order To Identify Minimum Design Requirements For New Construction Projects Or Building Additions.
obtaining Permits And Regulatory Approvals: Services May Include Submitting Design Documents To Local, State And/or Federal Jurisdictions For Review And Approval Prior To Proceeding With Renovation/construction Work.
environmental Investigation And Consultation: Services May Include Providing Design Services Required To Meet Environmental/epa Regulations On Facility/infrastructure Projects And Providing Consultation(s)/collaboration With The Government To Discuss Acceptable Environmental Design Alternatives And Solutions.
review Of Contractor Submittals: Services May Include Review Of Project Submittals (such As Product Data Or Product Samples) In Order To Validate Proposed Materials/products Comply With Design Drawings And/or Specifications.
field Consultation And Inspection During Construction: Services May Include Responding To Contractor Rfi’s During Construction In Order To Address Design Questions That May Arise During Construction/renovation Projects.
commissioning: Services May Include Supporting The Commissioning Process By Attending Commissioning Meetings In Order To Validate Engineered Design Solutions Are Incorporated Into The Project In Accordance With Design Specifications.
operation And Maintenance Support Information (omsi): Services May Include Providing The Government With O&m Documentation And Training, Where Applicable, Based On The Final Design Solution And Construction.
as‐built Drawing Preparation: Services May Include Updating Design Documents Including Drawings And Specifications To Accurately Reflect Construction Field Changes And Document Final As-built Construction/renovation Projects.
functional Analysis Concept Development (facd)/design Charrette/other Design And Construction Related Workshops And Meetings: Services May Require Attendance At Design Meetings To Collaborate With Government Representatives To Consider Design Options And Build Consensus Regarding Preferred Design Solution(s).
document Deliverable Requirements:
cdrl Number
title
sub-title
cdrl A001
contractor’s Personnel Roster
contractor Personnel
cdrl A002
hazardous Materials Management Program (hmmp) Plan
facility Operations Inventory Hmmp Plan
cdrl A003
monthly Status Report
monthly Status Report
cdrl A004
product Drawings/models And Associated Lists
drawing Package
cdrl A005
manhour Estimate, Technical Cost Proposal
estimates And Proposal
cdrl A001 – Contractor’s Personnel Roster
within Ten Business Days Of Task Order Issue, The Contractor Shall Submit A List Of All Employees Working On The Project To The Contracting Officer. This List Shall Include Each Employee's Name, And Work Assignment. Changes To The Personnel List Shall Be Submitted At Least Ten Business Days In Advance. In Emergency Situations And Cases Of Adverse Actions Where Ten Business Days’ Notice Is Not Possible, The Contractor Shall Submit The Required Information Regarding The Change In Writing To The Contracting Officer Representative (cor) Not Later Than 24 Hours After The Replacement Employee Is On Board.
cdrl A002 – Hazardous Materials Management Program (hmmp) Plan
the Contractor Shall Submit A Hazardous Material Management Plan (hmmp) As Addressed In Paragraph 3.2 Of The Saes.
cdrl A003 – Monthly Status Report
contractor Shall Provide A Monthly Status Report For Each Project In Which The Support Was Provided. The Report Shall Discuss Major Impacts, Issues, And Steps For Remediation Of Issues, Proposals To Improve Operational Efficiencies, Effectiveness, Quality, Or The Customer Experience.
cdrl A004 – Product Drawings/models And Associated Lists
the Contractor Shall Develop And Deliver Drawings, Specifications, Architect / Engineering Reports, To The Technical Point Of Contact Upon Request.
cdrl A005 – Manhour Estimate, Technical Cost Proposal Insert Title
a‐e Firms Shall Prepare Cost Estimates Utilizing The Micro‐computer Aided Cost Estimating System (mcaces) Mii Estimating System. Specifications Shall Be Prepared In The Specifications‐kept‐intact (specsintact) Program. Design‐build Rfps Shall Be Prepared Utilizing Design‐build Masters, And Drawings Shall Be Prepared In Autocad (2016 Or Higher) Utilizing The National Computer‐aided Design And Drafting (cadd) Standards Format. Three‐dimension (3‐d) And Bim Modeling May Also Be Required. The Contractor Shall Provide Documents In Pdf Format. Final Documents Shall Be Electronically Signed By The Assigned Architect Or Engineer. All Projects Shall Be Designed In The Modern International Standard Version Of The Metric International System Of Units (si), Unless Specifically Exempted By The Statement Of Work At The Task Order Level.
other Special Considerations:
as Defined By Paragraph 1‐5 Of United Facilities Criteria (ufc) 3‐ 600‐01, Fire Protection Engineering For Facilities, This Contract Requires The Services Of A Licensed Fire Protection Engineer Or Consultant.
asbestos And/or Lead‐based Paint Assessments May Be Required On This Contract To Determine The Presence Of Hazardous Material During Removals/demolition Or At Utility Points Of Connections. Work On And Around Waterfront Structures, Including Under Deck And Underwater, And Work In Confined Spaces May Be Required On This Contract. A‐e Firms Must Be Able To Accept Work That Involves Asbestos, Lead Paint, Poly‐chlorinated Biphenyls (pcb)s, And Other Hazardous Materials, Work On And Under Waterfront Structures, And In Confined Spaces.
all Engineering And Design Services Shall Comply With The Most Current Edition Of Facilities Criteria (fc) 1‐300‐09n Design Procedures, And Other Requirements As Indicated On The Whole Building Design Guide (wbdg) Web Site (www.wbdg.org). The Selected A-e Contractor Shall Have Online Access To Web‐based Support Programs Capable Of Creating Auto-cad Documents For Government Review, And Email Via The Internet For Routine Exchange Of Correspondence. The Selected A-e Contractor Shall Submit And Maintain An A‐e Accident Prevention Plan (app) In Accordance With U.s.army Corp Of Engineers (usace) Em 385‐1‐1 For Each Project On This Contract And Activity Hazard Analysis (aha) For Each In‐field Action. Key Personnel, Including Consultants, Must Be U.s. Citizens.
a‐e Firms Are Advised That The Selected Firm, Its Subsidiaries Or Affiliates, And Its Consultants Which Design, Prepare, Or Provide Engineering Services In Support Of Construction Contract Documents Cannot Provide Construction Services For The Same Contract. This Includes Concept Design, Preparation Of Project Programming Documents (dd Form 1391), Facility Siting Studies, Environmental Assessments, Geotechnical Services, Engineering Studies And Services, Design‐build Request For Proposals (rfps), Or Other Activities That Result In Identification Of Project Scope And Cost. The Awarded Contract Will Be Subject To Specific Provisions Addressing The Avoidance Of Organizational Conflicts Of Interest, Including Naval Facilities Acquisition Supplement (nfas) 5252.209‐9300, Organizational Conflicts Of Interest. The Prime Firm For This Contract Will Be Required To Perform Throughout The Contract Term.
submission Requirements:
a‐e Firms Desiring To Be Considered For This Contract Shall Submit A Completed Sf 330 Package By Email To The Contracting Officer And The Contract Specialist. The Sf 330 Shall Be Typed, At Least 11 Point Times New Roman Or Larger. Part I Shall Not Exceed 100 Single‐sided 8.5 By 11 Inch Pages (the Page Limit Does Not Include Individual Subcontracting Reports (isr)s, Certificates Licenses, Nor Does The Page Limit Include Cover Sheets Or Dividers, Provided That These Do Not Contain Any Substantive Information Submitted In Response To The Synopsis Or Intended To Demonstrate The Qualifications Of The Firm). Part I Pages Shall Be Numbered Sequentially. Introductions Shall Be Included In Sections E And F. A-e Firm Submissions Shall Include Its Dun & Bradstreet (duns), Commercial And Government Entity (cage), And Taxpayer Identification Number (tin) Numbers In Block 30 Of The Sf 330.
all Contractors Are Advised That Registration In System For Award Management (sam) Database Is Required Prior To Award Of A Contract. Failure To Register In The Sam Database May Render Your Firm Ineligible For Award. For More Information, Check The Sam Web Site: Https://www.sam.gov.
in Accordance With The Federal Acquisition Regulations (far) 36.601‐4(b), The A‐e Firm Must Be A Registered And Licensed Architectural And/or Engineering Firm In Rhode Island To Be Eligible For Award. A-e Firms Shall Provide Proof That The Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering, (e.g., State Registration Number, Or A Brief Explanation Of The Firm’s Licensing In Jurisdictions That Do Not Register Firms, Etc.). Failure To Submit The Required Proof Will Result In A Firm’s Elimination From Consideration.
firms Who Are Offering As A Joint Venture Should Include With Their Submission A Copy Of The Joint Venture Agreement. Failure To Include The Joint Venture Agreement Will Result In The Firm’s Elimination From Further Evaluation.
if An Sf 254/sf 255 Is Submitted For This Solicitation, It Will Not Be Reviewed Or Considered. As Required Above, Provide Verifiable Evidence That Your Firm Is Permitted By Law To Practice The Professions Of Architecture Or Engineering (e.g., State Registration Number).
interested Firms Shall Submit Proposals To Both The Contract Specialist And The Contracting Officer At The Email Addresses Listed Below.
sf 330 Submissions Are Due No Later Than Xx Xxxxx 2023 At Xx:xx Pm (est). Late Responses Will Be Handled In Accordance With Federal Acquisition Regulations (far) 52.215‐1. The Points Of Contact For This Acquisition Are Contract Specialist, Xxxxx Xxxxxx, At Xxxxxxxxx@navy.mil And Xxxxx Xxxxxxx, Contracting Officer, At Xxxxxxx@navy.mil. (to Be Provided Within Formal Solicitation)
the Total Maximum File Size For Email Proposal Submission Is Limited To 10mb. If The Submission Will Exceed 10mb, It Is Acceptable For The Submission To Be Broken Up Into Multiple Emails Or The Firm Should Coordinate With The Identified Government Poc's To Obtain A Dod Safe Request For Submission. Failure Of The Firm To Coordinate A Dod Safe Request For Submission In A Timely Manner, To Allow Sufficient Time For Submission Of The Required Documents Before The Required Response Date, Will Not Be Acceptable Justification For The Government Allowing Or Considering A Late Submission. A Timely Manner Is Defined As Requesting Such Dod Safe Information From The Identified Government Poc's No Later Than 10 Calendar Days In Advance Of The Response Date Of The Synopsis.
if The Firm Chooses To Complete Multiple Email Submissions, Emails Shall Clearly Indicate The Number Of Email Submissions The Government Should Expect To Receive And Shall Be Numbered To Indicate Which Email Of The Submission Each Email Received Is (i.e.: Email 1 Of 3; Email 2 Of 3; Email 3 Of 3).
inquiries Concerning This Procurement Should Reference The Solicitation Number And Title And Be Forwarded Via Email To The Points Of Contact Identified Above. Questions Pertaining To This Requirement Are Due No Later Than Fourteen (14) Days After Posting Of This Requirement On Sam.gov.
list Of Attachments:
scope Of Architect-engineer (a-e) Services (saes) (draft)
cdrls (draft)
selection Criteria:
firms Responding To This Synopsis Will Be Evaluated To Determine The Most Highly Qualified Firms To Perform The Required Services In Accordance With The Published Selection Criteria.
failure To Comply With Instructions, Or Provide Complete Information May Affect The Firm’s Evaluation Or Disqualify The Firm From Further Consideration. Evaluation Criteria (1) Through (4) Are Considered Most Important And Are Equal Among Themselves; Criteria (5) Through (6) Are Less Important And Are Equal Among Themselves; Criteria (7) Will Only Be Used As A Tie‐breaker Among Technically Equal Firms. Specific Selection Criteria Include:
specialized Experience
professional Qualifications And Technical Competence
past Performance
quality Control
program Management And Capacity
firm Location
volume Of Work
criterion 1 —specialized Experience (sf 330, Part I, Section F):
firms Will Be Evaluated On Specialized Experience In Performance Of Services Similar To Those Anticipated Under This Contract Through Evaluation Of Experience In:
infrastructure/facility Design Utilizing The Following Criteria, Including, But Not Limited To, Unified Facilities Criteria (ufc’s) And Military Standard (milstd);
conducting On‐site Design Development Workshops, Charrettes, Functional Analysis, Schematic Design, Or Space Programming, Including Supporting Budgetary Or Parametric Cost Estimating;
demonstrated Ability To Design To Project Budget And Schedule;
experience Preparing Design‐bid‐build;
experience Preparing Design‐build Rfp Packages; And
designing Projects In Accordance With Dod, Navy, Or Other Government Agencies’, Or Private Industry Criteria.
firms May Be Considered More Favorably Under Criterion 1 By Demonstrating The Following:
experience In The Delivery Of Multiple Types Of A‐e Services Identified In The Requirements Above.
experience On Multiple Facility Types, Such As Business, Educational, Industrial, Assembly, Health Care, Residential, Storage, Laboratory, And Mixed-use Occupancies, Identified In The Requirements Above.
demonstrated Experience Using The Micro Computer Aided Cost Estimating System Second Generation (mii) Cost Estimating Software.
demonstrated Experience On Navy Bases Within The Primary Geographic Area Of The Contract.
demonstrated Experience Designing Modifications To Existing Structures And Developing Construction Phasing While Associated Facilities Are Required To Remain In Service.
demonstrated Experience Specific To Navy Facility Projects, Illustrating The Capability Of The A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Consultants) To Work Within The Navy Project Planning Process Including:
dd Form 1391 Development In The Navy’s Electronic Procurement Generator (epg),
dd Form 1391 Validation Procedures Including Cost Validation.
demonstrated Understanding Of Procedures And Timely Submission Of Base Access Documents In Adherence With Security, Safety, Environmental, And Accident Prevention Regulations In Order To Support A‐e Activities And Maintain Project Schedules.
experience Of A‐e Firm And Individual Design Team Members (a‐e Staff, Key Personnel, Sub‐ Consultants) With Facilities Located In Historic Areas That Will Require Consultation With State Historic Preservation Officer (shpo) Throughout The Design Process.
criterion 1 Submission Requirements:
provide Up To A Maximum Of Ten (10) Projects Completed (project Completion To Be Defined As Receiving Final Design Acceptance From Client) Within The Past Seven (7) Years Immediately Preceding The Date Of Issuance Of This Notice That Best Demonstrate Specialized Experience Of The Proposed Team In The Areas Outlined Above. Sufficient Information To Determine The Date Of Completion Of The Project Must Be Included In The Project Description Or The Project Will Not Be Considered. If More Than The Maximum Number Of Projects Is Submitted, The Government Will Only Evaluate Projects Up To The Maximum Number Authorized In The Order Submitted.
all Projects Provided In The Sf 330 Must Be Completed By The Actual Office/branch/regional Office/ Individual Team Member Proposed To Manage And Perform Work Under This Contract. Projects Not Meeting This Requirement Will Be Excluded From Consideration In The Evaluation. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf 330 Part I, Section F, Block 25, “firm Name.” Include A Contract Number Or Project Identification Number In Block 21. Include An E‐ Mail Address And Phone Number For The Point Of Contact In Block 23(c). In Block 24, Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, And A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. For Projects Performed As A Sub-contractor Or A Joint Venture Involving Different Partners, Specifically Indicate The Value Of The Work Performed As A Subcontractor Or By Those Firms Proposed For This Contract, And Identify The Specific Roles And Responsibilities Performed As A Sub-contractor Or By Those Firms On The Project Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Firm Will Be Eliminated From Award Consideration.
note: If The Firm Is A Joint Venture, Projects Performed By The Joint Venture Should Be Submitted; However, If There Are No Projects Performed By The Joint Venture, Projects Must Be Submitted For Each Joint Venture Partner, Not To Exceed A Total Of Ten (10) Projects. Firms Failing To Provide Projects From All Joint Venture Partners Will Be Considered To Have Not Met The Requirements Of The Criterion.
projects Shall Be Submitted On The Sf 330 At Part I, Section F And Shall Be Completed Projects. Projects Not Completed Will Be Excluded From Evaluation Consideration. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand‐alone Contract Award. Do Not Submit An Idiq Contract As An Example Project. Instead, List Relevant Task Orders Or Stand‐alone Contract Awards That Fit Within The Definition Above. The Government Will Not Evaluate Information Provided For An Idiq Contract. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated.
all Information For Criterion 1 Shall Be Submitted In The Sf 330, Part I, Section F. The Government Will Not Consider Information Submitted In Addition To Part I, Section F In The Evaluation Of Criterion 1.
criterion 2—professional Qualifications And Technical Competence (sf 330, Part I, Sections E & G):
firms Will Be Evaluated On Professional Qualifications, Competence, And Experience Of The Proposed Key Personnel In Providing Services To Accomplish The Tasks Required Under This Contract, Including Participation In Example Projects In The Sf 330, Part I, Section G. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Specific Disciplines That Must Be Included In Key Personnel Are:
project Manager(s)
senior Architect
senior Civil Engineer
senior Structural Engineer
senior Mechanical Engineer
senior Electrical Engineer
senior Quality Control Manager
senior Fire Protection Engineer (a Licensed Fire Protection Engineer Is Required)
key Personnel, Including Consultants, Shall Be U.s. Citizens.
submissions Must Demonstrate Key Personnel Relevant Experience, Formal Education (e.g. Bachelor’s Or Master’s Degrees), And Relevant Professional Development Or Professional Certifications.
criteria 2 Submission Requirements:
sf 330, Part I, Section E – Provide Resumes For All Proposed Key Personnel That Illustrate Experience In The Type Of Work Proposed Under This Contract. Resumes Are Limited To Three Pages And Should Indicate: Professional Registration, Certification, Licensure And/or Accreditation In Appropriate Disciplines; Cite Recent (within The Past 10 Years) Project‐specific Experience In Work Relevant To The Services Required Under This Contract; And Indicate Proposed Role In This Contract. Indicate Participation Of Key Personnel In Example Projects In The Sf 330, Part I, Section G.
criterion 3—past Performance (sf 330, Part I, Section H):
firms Will Be Evaluated On Past Performance With Government Agencies And Private Industry In Terms Of Work Quality, Compliance With Schedules, Cost Control, And Stakeholder/customer Satisfaction.
evaluating Past Performance And Experience Will Include Information Provided In The Contract Performance Assessment Reporting System (cpars) / Architect-engineer Contract Administration Support System (acass) For Criterion 1 Projects And May Include Customer Inquiries, Government Databases, And Other Information Available To The Government Including Contacts With Points Of Contact In Other Criteria. Failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Considered Less Qualified.
criteria 3 Submission Requirements:
submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If Cpars Or Acass Evaluations Are Not Available For The Projects Identified Under Criterion 1, Then The Firm Shall Provide A Point Of Contact Reference From The Requiring Organization Familiar With The Project Who Can Confirm The Quality Of The Offeror’s Work On The Project. Those References Shall Include Contract/task Order Number, Project Title, Point Of Contact Name, Telephone Numbers, And Email Addresses For The Reference.
firms May Provide Any Information On Problems Encountered And The Corrective Actions Taken On Projects Submitted Under Criterion 1—specialized Experience. Firms May Also Address Any Adverse Past Performance Issues. Information Shall Not Exceed Two Double‐sided Pages (or Four Single‐sided Pages) In Total.
awards, Letters Of Commendation, Certificates Of Appreciation, Etc. Shall Not Be Submitted And Will Not Be Considered In The Evaluation.
criterion 4—quality Control Program (sf 330, Part I, Section H):
firms Will Be Evaluated On The Strength Of The Quality Control Program Proposed By The Firm To Ensure Quality Products And Services Under This Contract, And Means Of Ensuring Quality Services From Their Consultants/subcontractors.
criteria 4 Submission Requirements:
describe The Quality Control Program That Will Be Utilized For All Deliverables Of This Contract And The Management Approach For Quality Control Processes And Procedures. The Description Shall:
describe Specific Quality Control Processes And Procedures Proposed For This Contract To Achieve Technical Accuracy Of And Assurance Of Overall Coordination Of Plans And Specifications, And Engineering And Design Services.
provide A Quality Control Process Chart Showing The Inter‐relationship Of The Management And Team Components.
identify The Key Personnel (submitted Under Criterion 2—professional Qualifications And Technical Competence) Responsible For The Quality Control Program And A Description Of Their Roles And Responsibilities.
describe How The Firm’s Quality Control Program Extends To Management Of Sub-contractors.
explain The Quality Control Program Including An Example Of How The Plan Has Worked For One Of The Projects Submitted As Part Of Sf 330, Section F Or How The Plan Will Work If It Has Not Been Used Previously.
criterion 5—program Management And Capacity (sf 330, Part I, Section H):
firms Will Be Evaluated On The Firm’s Ability To Plan For And Manage Work Under The Contract And The Capacity To Accomplish The Work In The Required Time.
criteria 5 Submission Requirements:
provide An Organizational Chart For The Team And Discuss The Management Plan For This Contract And Personnel Roles In The Organization. Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff, Sub-contractors And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable.
describe The Firm’s Present Workload And The Availability Of The Project Team (including Consultants) For The Specified Contract Performance Period. Describe The Workload/availability Of The Key Personnel During The Anticipated Contract Performance Period And The Ability Of The Firm To Provide Qualified Backup Staffing For Key Personnel To Ensure Continuity Of Services. General Statements Of Availability/capacity May Be Considered Less Favorably.
describe The Firm’s Ability To Sustain The Loss Of Key Personnel While Accomplishing Work Within Required Time Limits, To Ensure Continuity Of Services And Ability To Meet Surges In Unexpected Project Demands And Ability To Adhere To Schedules And Budgets.
criterion 6—firm Location (sf 330, Part I, Section H)
firms Will Be Evaluated On The Locations Of Their Office Or Offices That Will Be Performing The Work Under This Contract And Demonstrated Knowledge Of The General Geographic Areas In Which Projects Could Be Located. Evaluation Of Firms Will Include Consideration Of Their Location Within The General Geographic Area Of The Anticipated Projects (primarily At Naval Undersea Warfare Center Newport Division, Newport, Ri).
criteria 6 Submission Requirements:
indicate Location Of The Office(s) That Will Be Performing The Work, Including Main Offices, Branch Offices, And Offices Of Team Members.
provide A Narrative Describing The Team’s Knowledge And Previous Experience Of The Primary Geographic Areas To Be Covered By This Contract.
provide A Narrative To Describe The Team’s Ability To Provide Timely Response To Requests For On‐site Support. Provide Timelines And Examples Of The Team’s Success In Providing This Response. Include Both Primary And Sub‐contractor Support As Required. Teams With A Demonstrated History Of Providing Timely Support May Be Considered More Favorably.
criterion 7—volume Of Work (sf 330, Part 1, Section H) (tie-breaker)
in The Event Of A Tie Among Equally Rated Firms, Those Firms Will Be Evaluated In Accordance With Dod Federal Acquisition Regulation Supplement (dfars) Procedures, Guidance And Information (pgi) 236.602‐1, From Data Extracted From The Federal Procurement Data System (fpds). Firms Will Be Evaluated In Terms Of Work Previously Awarded To The Firm By Dod Within The Past Twelve (12) Months With The Objective Of Effecting An Equitable Distribution Of Contracts Among Qualified A‐e Firms Including Small, Disadvantaged Business Firms, And Firms That Have Not Had Prior Dod A‐e Contracts.
criterion 7 Submission Requirements:
firms Shall Not Submit Data For This Factor.
Closing Date31 Jan 2025
Tender AmountRefer Documents
The City of All Tender
Software and IT Solutions
Czech Republic
Details: The formal purpose of this public contract is to conclude a contract for works and a related service contract with one selected bidder. The material purpose of this public contract is then the supply of infrastructure and software applications and their implementation and mutual integration for the purpose of increasing the security of the information environment of the city of Vsetín. Furthermore, the provision of support and service services for the implemented technologies throughout the sustainability period of the project "Increasing the Cybersecurity of the City of Vsetín", i.e. after a period of 60 months from the acceptance of the performance of the supplies. The key objective of the project "increasing the Cybersecurity of the City of Vsetín" is to increase Cybersecurity in accordance with Act No. 181/2014 Coll. The Primary Objectives of the Implementation of New Technologies, Which Will Be Implemented Within the Framework of the Public Contract, Are Based on the Identified Needs of the Contracting Authority, When These Needs Will Be Fulfilled by the Implementation of Selected Technical Measures According to Sections 18, 22, 23 and 27 of Decree 82/2018 Coll. The Subject of the Public Contract Is Co-financed by the European Union Through the Ministry of the Interior of the Czech Republic, Which Is the Guarantor of the National Recovery Plan. The Title of the Project Is "Increasing Cybersecurity of the City of Vsetín", Registration Number Cz.31.2.0/0.0/0.0/23_093/0008398. The Awarding of This Public Contract Is Also Subject to the Relevant Instructions and Rules of the Above-Mentioned Subsidy Program. The Subject of the Public Contract is Supplies and Services, Including the Supply and Implementation of the Required Technologies for Increasing the Cybersecurity of Information Systems (IS) and Communication Systems (KS) Operated by the Contracting Authority in Compliance with Cybersecurity Standards. The Subject of the Public Contract is Specified in the Tender Documentation, In Particular the Technical Specification as One of the Annexes to the Public Contract. A Detailed Specification of the Individual Items of This Supply Is Given in Annex No. 1 to This Call, Entitled Technical Specification.
Closing Date20 Jan 2025
Tender AmountCZK 4.9 Million (USD 202.9 K)
DEPT OF THE NAVY USA Tender
Machinery and Tools
Corrigendum : Closing Date Modified
United States
Details: Contact Information|4|n742.10|wv4cc|n/a|madison.m.gray4.civ@us.navy.mil|
item Unique Identification And Valuation (jan 2023)|19||||||||||||||||||||
higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001|
inspection Of Supplies--fixed-price (aug 1996)|2|||
inspection/acceptance Point|6|||||||
time Of Delivery (june 1997)|20|clin 0001|eighteen (18)|121||||||||||||||||||
stop-work Order (aug 1989)|1||
repair Delivery (firm Fixed Price)|1|121|
wide Area Workflow Payment Instructions (jan 2023)|16|material - Invoice And Receiving Report (combo) Certifications - Stand-alone Receiving Report|material - Inspect & Accept At Source|tbd|n00104|tbd|tbd|n50286|tbd|n/a|n/a|n/a|n/a|n/a|n/a|see Dd Form 1423|port_pt
nh_wawf_notification@navy.mil|
note For Contractor/administrative Contracting Officer|3||||
navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|wss|
firm Fixed Price Repair Purchase Orders|1|tbd|
value Engineering (jun 2020)|3||||
equal Opportunity (sep 2016)|2|||
integrity Of Unit Prices (nov 2021)|1||
warranty Of Supplies Of A Noncomplex Nature (june 2003)|6|one Year From Date Of Delivery|one Year From Date Of Delivery|||||
warranty Of Data--basic (mar 2014)|2|||
small Business Subcontracting Plan (sep 2023)|4|||||
equal Opportunity For Workers With Disabilities (jun 2020)|2|||
transportation Of Supplies By Sea (jan 2023)|2|||
progress Payments (nov 2021)|4|||||
limitations On Pass-through Charges (jun 2020)|1||
alternate A, Annual Representations And Certifications (nov 2023)|13||||||||||||||
buy American-balance Of Payments Program Certificate-basic (feb 2024)|1||
annual Representations And Certifications (may 2024)|13|332911|750 (# Of Employees)||||||||||||
cost Accounting Standards Notices And Certification (deviation 2018-o0015)(may 2018))|1||
type Of Contract (apr 1984)|1|firm-fixed Price|
notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x|
1. This Amendment Shall Be Issued To Update The Tdp And Extend The Closing Date Of The Solicitation.
2. The Tdp Has Been Updated From Version 022 To Version 023.
3. The Hour And Date Specified For Receipt Of Offers Has Been Extended To 4:30pm Est On 21 January 2025.
4. All Other Terms And Conditions Remain The Same.
\
1. This Is A Submarine Corporate Component Repairs Program (ccrp) Sole Source Repair Requirement.
2. Please Provide A Firm-fixed Price (ffp) Qualifying Proposal For The Full Repair Effort Of The Requirement. Please Include The Cost Of New, Or Estimated Cost Of New, With The Submitted Proposal.
3. When Submitting A Proposal, Specify Any Exceptions (i.e., Mil-std Packaging, Mil-std Labeling, Inspection & Acceptance Locations, Packaging House, Surplus Material, Etc.). If No Exceptions Are Indicated Or Received, Award Shall Be Based Upon Solicitation
requirements. Changes Or Requests For Changes After Award Shall Be Subject To Consideration Costs Deducted From The Unit Price.
4. In Repair Price, Include All Costs Associated With Receipt And Complete Repair Of The Material That May Be In Unwhole Condition, Missing Hardware, Damaged, Handling Damage, Missing Parts, Wear Damage, And Cav Reporting. Also Provide The Following Information:
4.1. Teardown & Evaluation Rate:
4.2. Repair Turn Around Time (rtat):
4.3. Throughput Constraint:
4.4. Induction Expiration Date:
5. Repair Turn Around Time (rtat) - The Resultant Contractual Delivery Requirement Is Measured From The Asset Return To The Asset Acceptance Under The Terms Of The Contract. For Purposes Of This Section, Return Is Defined As Physical Receipt Of The F-condition
asset At The Contractor's Facility As Reflected In The Action Date Entry In The Commercial Asset Visibility (cav) System. In Accordance With The Cav Statement Of Work, The Contractor Is Required To Accurately Report All Transactions By The End Of The Fifth Regular
Business Day After Receipt, And The Action Date Entered In Cav Must Be Dated To Reflect The Actual Date Of Physical Receipt. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Contract.
5.1. Requested Rtat: 121 Days
5.2. Proposals Shall Reference The Proposed Rtat And Any Capacity Constraints.
6. Price Reductions - Any Asset For Which The Contractor Does Not Meet The Required Rtat Will Incur A Price Reduction Of (tbd Price) Per Unit. This Adjustment Will Be Implemented Via A Reduction Modification At The End Of Contract Performance. Price Reductions
made Pursuant To This Section Shall Not Limit Other Remedies Available To The Government For Failure To Meet Required Rtats, Including But Not Limited To The Government's Right To Terminate For Default.
7. If Requirement Will Be Packaged At A Location Different From The Offeror's Address, The Offeror Shall Provide The Company Name, Street Address And Cage Of The Packaging Facility.
8. If The Offeror Is Not The Original End Manufacturer (oem) Of The Material Called Out In The Requirement, The Oem Must Be Stated (company Name And Cage), And The Offeror Must Be Able To Provide A Signed Letter Of Authorization To Perform Repairs From The Oem On
the Company's Letterhead.
9. All Contractual Documents (i.e., Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be "issued" By The Government When Copies Are Either Deposited In The Mail, Transmitted By
facsimile, Or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To "issue" Contractual Documents As Detailed Herein.
10. The Contractor Must Obtain Final Inspection And Acceptance By The Government For All Assets Within The Rtat Established In The Resulting Contract.
11. Any Contract Awarded As A Result Of This Solicitation Will Be Do Certified For National Defense Under The Defense Priorities And Allocations System (dpas). Provision 52.211-14, Notice Of Priority Rating For National Defense, Emergency Preparedness, And Energy
program Use, Shall Be Inserted In Solicitations When The Contract To Be Awarded Will Be A Rated Order.
12. Data Item A001 (inspection And Test Plan) May Be Waived If Already On File At Navsup Wss Mechanicsburg.
\
1. Scope
1.1 The Material Covered In This Contract/purchase Order Will Be Used In A Crucial Shipboard System. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In Serious Personnel Injury, Loss Of Life, Loss Of Vital
shipboard Systems, Or Loss Of The Ship Itself. Therefore, The Material Has Been Designated As Special Emphasis Material (level I, Scope Of Certification, Or Quality Assured) And Special Control Procedures Are Invoked To Ensure Receipt Of Correct Material.
2. Applicable Documents
2.1 Order Of Precedence - In The Event Of A Conflict Between The Text Of This Contract/purchase Order And The References And/or Drawings Cited Herein, The Text Of This Contract/purchase Order Must Take Precedence. Nothing In This Contract/purchase Order,
however, Must Supersede Applicable Laws And Regulations Unless A Specific Exemption Has Been Obtained.
2.2 Applicable Documents - The Document(s) Listed Below Form A Part Of This Contract/purchase Order Including Modifications Or Exclusions.
2.2.1 "document References" Listed Below Must Be Obtained By The Contractor. Ordering Information Is Included As An Attachment To This Contract/purchase Order.
2.2.2 Specification Revisions - The Specification Revisions Listed Under "documents References" Below Are The Preferred Revision. Older And/or Newer R Evisions Are Acceptable When Listed Within Contract Support Library Reference Number Csd155 In Ecds (electric
contractor Data Submission) At: Ht Tps://register.nslc.navy.mil/. This Is To Allow Contractors To Use Certain Acceptable Older Specification Revisions To Purge Their Existing Stock Of Material Certified To Those Older Revisions Or To Use Newer Specification
revisions When Material Is Certified To Newly Released Revisions,without Requiring The Submittal Of Waiver/deviation Requests For Each Specification Revision On Every Contract. Revisions Of Specifications Reflecting Editorial And/or Re-approval (e.g. E2009,
r2014, Etc.) Are Considered Inconsequential, But Are Acceptable When Their Revisions Are Listedwithin Csd155 Or Elsewhere Within This Contract.
2.2.3 The Documents And Drawings Listed Below Under Drawing No. Are Not Provided With This Contract/purchase Order.
drawing No Cage Rev Distr Cd
;280912-0004 99657 B B
233985-0001 99657 M B
236001-0003 99657 F B
281015-0001 99657 G B
235445-0002 99657 C B
283538 99657 J B
284031-0001 99657 C B
236463 99657 A B
236461 99657 C B
233029 99657 L B
atp280912-0004 99657 L B
233985-0003 99657 A B;
document Ref Data=astm-b21 | | | |200401|a| | |
document Ref Data=astm-b21 | | |a |191001|a| | |
document Ref Data=fed-std-h28 | | |b |190424|a| | |
document Ref Data=fed-std-h28 |0020| |b |941221|a| |01|
document Ref Data=ff-s-86 | | |g |210127|a| | |
document Ref Data=ansi/asq Z1.4 | | | |080101|a| | |
document Ref Data=astm-b171 | | | |040501|a| | |
document Ref Data=astm-a276 | | | |170315|a| | |
document Ref Data=qq-n-281 | | |d |851023|a| 2| |
document Ref Data=astm-b283 | | |a |191001|a| | |
document Ref Data=astm-a574 | | | |211201|a| | |
document Ref Data=astm-a581 | | |b |950910|a| | |
document Ref Data=astm-a582 | | | |211101|a| | |
document Ref Data=astm-f606 | | | |191115|a| | |
document Ref Data=qq-b-639 | | |c |160219|a| | |
document Ref Data=mil-std-792 | | |f |060519|a| | |
document Ref Data=mil-dtl-1222 | | |j |001208|a| | |
document Ref Data=sae Ams 5640 | | |v |160201|a| | |
document Ref Data=sae Ams-s-7720 | | | |970901|a| | |
document Ref Data=iso_9001 | | | |081115|a| | |
document Ref Data=iso10012 | | | |030415|a| | |
document Ref Data=mil-dtl-15024 | | |g |180303|a| | |
document Ref Data=iso/iec 17025 | | | |050515|a| | |
document Ref Data=mil-i-45208 | | |a |810724|a| 1| |
document Ref Data=mil-std-45662 | | |a |880801|a| | |
document Ref Data=sae Ams-qq-s-763 | | |d |150301|a| | |
document Ref Data=ansi/ncsl Z540.3 | | | |130326|a| | |
document Ref Data=0900-lp-001-7000 | | | |810101|c| |01|
document Ref Data=s9074-aq-gib-010/248 | | |1 |191112|a| | |
document Ref Data=t9074-as-gib-010/271 | | |1 |140911|a| | |
document Ref Data=s9074-ar-gib-010a/278 (chg A) | | | |130214|a| | |
3. Requirements
3.1 Refurbished Material Statement Of Work (repair Sow) -
3.1.1 Inspection - Clean And Determine If Refurbishment Is Possible. At Disassembly, The Contractor Must Record All Identifying Markings Found On The Parts Of Each Assembly. The Contractor Must Maintain Traceability Of These Markings To Each Unit Throughout
refurbishment.
3.1.2 Identifying Markings - Part Must Have A Mic (material Identification A And Control) Code, Heat/heat Lot Code, Or Unique Contractor Traceability Number/code That Is Visible On The Part. See Material Traceability In Paragraph 3 (quality Assurance
provisions) Of This Contract For Traceability Requirements. The Mic Code Can Consist Of A 2, 3, Or 4 Letter Material Identifier, 4 Or 5 Digit Julian Date, 3 Digit Lot Serial Number, And Certifying Activity Designator (cad) Which Will Be 1 Or 2 Letters; The 4
parts Are Normally Separated By Hyphens; Examples: Tia-3089-30-qq And St-06262-506-a.
3.1.3 Re-useable Parts -
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), That Are Properly Marked As Identified Above, And That Have Material Certifications Available May Be Utilized As Initially Supplied. Certifications Are Not Required To Be
resubmitted By The Contractor.
- Any Parts Of The Original Assembly That Are Useable (replacement Is Not Necessary), Are Properly Marked As Identified Above, But Material Certifications Are Not Available At The Contractor's Facility, A Waiver Must Be Submitted In Accordance With
waiver/deviation (configuration Control) Requirements Specified Elsewhere In The Contract.
3.1.4 Non-useable Parts -
-any Parts Of The Original Assembly That Are Not Properly Marked As Identified Above Must Be Replaced And The Required Certifications Must Be Submitted.
- Any Parts Of The Original Assembly That Are Not Usable (replacement Is Necessary) Must Be Replaced And The Required Certifications Must Be Submitted.
3.1.5 Refurbishment - Upon Completion Of Inspection, This Item Must Be Refurbished To Be In Accordance With ;marotta Drawing 280912-0004, Part Number 280912-0004, Assembly Model Spv83 And Ms 5950-081-091 Rev - Chg 16 (csd609); , Except As Amplified Or Modified
herein. This Applies To All "parts Requiring Certification" As Identified Elsewhere In This Contract/purchase Order.
3.1.6 Additional Sow Requirements -
;n/a;
3.2 ;for The Potting Compound, Item 93 On Marotta Drawing 284031-0001, The Use Of Dow Silastic Rtv-3110 In Lieu Of Rtv 751 Or 501 Is Acceptable.;
3.3 Contract Support Library - Additional Requirements For This Item Are Identified As Contract Support Library Reference Number ;csd609; In Ecds At Https://register.nslc.navy.mil/
3.4 Material For Parts Requiring Certification - Quantitative Chemical And Mechanical Analysis Is Required For The Parts Listed Below Unless Specifically Stated Otherwise:
;drawing 280912-0004 (firing Valve Assembly);
part - ;body, Item 13; Cover, Item 14; And Fitting, Item 15;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screws, Items 86 And 87;
material - ;cres 300 Series Per Ff-s-86 (mechanical Properties As Modified By General Note 13 Of Drawing 280912-0004);
;drawing 233985-0001, Part Number 233985-0001 Or Drawing 233985-0003, Part Number 233985-0003 (differential Pressure Indicator);
part - ;body, Part Number 233985-0001 On Drawing 233985-0001 Or Body, Part Number 233985-0003 On Drawing 233985-0003;
material - ;qq-n-281 Or Cres 300 Series Per Astm-a581 Or Astm-a582 Or Sae-ams-qq-s-763 Or Sae-ams-5640;
;drawing 236001-0003 (dome System Assembly);
part - ;retainer, Item 25; Body, Item 36; And Plug, Item 81;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;housing, Item 28;
material - ;astm-b21, Alloy C46400, Temper H02;
part - ;socket Head Cap Screw, Item 83;
material - ;cres Per Ff-s-86;
;drawing 281015-0001 (relief Valve Assembly);
part - ;retainer, Item 17 And Body, Item 18;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
;drawing 235445-0002 (compensator Assembly);
part - ;housing, Item 12 And Cover, Item 13;
material - ;qq-n-281;
part - ;socket Head Cap Screw, Item 60;
material - ;cres 300 Series Per Sae-ams-s-7720 Or Sae-ams-qq-s-763 Or Astm-a276 Or Ff-s-86;
;drawing 283538, Part Number 283538-1344 (hand Valve Assembly);
part - ;retainer Screw, Item 13;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;stem, Item 15;
material - ;sae-ams-qq-s-763, Class 316, Condition A;
;drawing 284031-0001 (pilot Valve Assembly);
part - ;nut, Item 25;
material - ;astm B21, Uns C46400, Temper H04 Or H02 With The Following Minimum Properties: Yield Strength: 30,000 Psi
tensile Strength: 58,000 Psi
elongation: Per Astm B21 For The Starting Material Size And Temper;
part - ;body, Item 32;
material - ;sae-ams-qq-s-763, Class 316;
;drawing 236463 (interlock Assembly);
part - ;adapters, Items 20 And 25;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;body, Item 22;
material - ;qq-b-639, Alloy 464 Or Astm-b171, Alloy C46400 Or Astm-b21, Alloy C46400, Temper H02;
;drawing 236461 (regulator Assembly);
part - ;guide, Item 15; Body, Item 26; Cover, Item 28; And Plug, Item 85;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
part - ;socket Head Cap Screw, Item 82;
material - ;cres Per Ff-s-86 (mechanical Properties As Modified By Note 12 Of Drawing 236461);
;drawing 233029, Part Number 233029-0001 (screw Assembly);
part - ;screw, Item 12;
material - ;cres 300 Series Per Sae-ams-qq-s-763 Or Sae-ams 5640 Or Astm-a581 Or Astm-a582;
3.5 Testing Certification - Certifications Are Required For The Following Tests On The Items Listed Below. Additional Testing On Other Piece Parts (if Any) Per Applicable Drawings And Specifications Is Still Required, But Certifications Are Only Required As
listed Below.
test - Non-destructive Tests
item - ;weld Repair And/or Production Weld (as Applicable);
performance - Per Applicable Fabrication Specification
acceptance - Per Applicable Fabrication Specification
test - Intergranular Corrosion Test (only For Sae-ams-qq-s-763, Classes 304-condition A, 304l, 316-condition A, 316l, 317-condition A, 321 And 347 Material. Test Must Be Performed Prior To Fabrication/machining)
item - ;body, Item 13, Cover, Item 14, And Fitting, Item 15 On Drawing 280912-0004; Body On Drawing 233985-0001 Or 233985-0003; Retainer, Item 25, Body, Item 36, And Plug, Item 81 On Drawing 236001-0003; Retainer, Item 17 And Body, Item 18 On Drawing
281015-0001; Socket Head Cap Screw , Item 60 On Drawing 235445-0002; Retainer Screw, Item 13 And Stem, Item 15 On Drawing 283538; Body, Item 32 On Drawing 284031-0001; Adapters, Items 20 And 25 On Drawing 236463; Guide, Item 15, Body, Item 26, Cover, Item 28,
and Plug, Item 85 On Drawing 236461; And Screw, Item 12 On Drawing 233029;
performance - Sae-ams-qq-s-763
acceptance - Sae-ams-qq-s-763
test - ;liquid Penetrant Inspection;
item - ;items 86 And 87 Of Drawing 280912-0004, Item 83 Of Drawing 236001-0003, Item 82 Of Drawing 236461, And Item 60 Of Drawing 235445-0002;
performance - T9074-as-gib-010/271; Sampling Must Be Per Mil-dtl-1222
acceptance - Mil-dtl-1222
test - ;acceptance Test;
item - ;each Assembly;
performance - ;atp280912-0004;
acceptance - ;atp280912-0004;
3.6 The Pressure Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This Contract, The
following Must Be Used:
For Pressure Tests Below 100 Psig, The Pressure Tolerance Must Be +1 Psig / -0 Psig.
For Pressure Tests At Or Above 100 Psig Up To And Including 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 50 Psig.
For Pressure Tests Above 2500 Psig, The Pressure Tolerance Must Be +2% / -0 Psig, Rounded Off To The Nearest Multiple Of The Smallest Graduation On An Analog Test Pressure Gauge, Not To Exceed 200 Psig.
the Pressure Test Time Tolerance Must Be As Specified In The Assembly Drawing, Detail Drawing, Design Specification Or Elsewhere In This Contract. Where Pressure Test Time Tolerances Are Not Provided By Drawings, Specifications Or Specified Elsewhere In This
contract, The Following Must Be Used:
For A Test Duration Up To And Including 1 Hour, The Tolerance Must Be +5 Minutes / - 0 Minutes.
For A Test Duration Of More Than 1 Hour Up To And Including 24 Hours, The Tolerance Must Be +30 Minutes / - 0 Minutes.
For A Test Duration Of More Than 24 Hours, The Tolerance Must Be +60 Minutes / - 0 Minutes.
3.7 Wedge Tensile Test Specimens (headed Fasteners) - A Wedge Tensile Test Must Be Conducted On A Full Size Fastener For Each Production Lot And Reported Aspart Of The Mechanical Properties. The Required Specimens For The Wedge Tensile Test Must Be Separate
fasteners From Those Required For The Yield Test.
3.7.1 Testing For Socket Head Cap Screws Must Be In Accordance Mil-dtl-1222, Paragraphs 4.5.2.3 And 4.5.2.3.1.
3.7.2 Testing For All Other Headed Fasteners With A Nominal Diameter Greater Than 1/4-inch Must Be In Accordance With Astm-f606 For Grades 5, 8, B7, And B16.for All Other Grades, The Following Wedge Angles Must Be Used.
a. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Of 1/4-inch Through 1-inch (inclusive) Must Be Tested With A Ten Degree Wedge.
b. Except As Specified In Item C Below, Fasteners With A Nominal Diameter Over 1-inch Must Be Tested With A Six Degree Wedge.
c. Fasteners That Are Of Grades 8, B7, B16, 410, 416, 416se, 431, And 630 And Are Threaded Within One Diameter To The Underside Of The Head Must Be Tested As Follows:
sizes 1/4 Inch Through 3/4 Inch (inclusive) Use A Six Degree Wedgesizes Over 3/4 Inch Use A Four Degree Wedge
d. Fasteners Which Have Passed Testing With Wedge Angles Greater Than Those Specified Should Be Considered Acceptable.
3.7.3 For Fasteners Having A Length Less Than The Minimum Specified In Table 1 Of Astm-f606, One "test Specimen Fastener" Must Be Manufactured From Each Lot Of Fasteners And Tested To Represent That Lot. The Length Of These Test Specimen Fasteners Must Meet
the Minimum Specified In Table 1 Of Astm-f606 But Must Not Exceed It By More Than 1/4 Inch. Test Specimen Fasteners Must Be The Same Type, Style, And Diameter As The Production Lot And Must Be Manufactured From The Same Starting Material, Using The Same
manufacturing Techniques As The Production Lot, And Must Be Heat Treated (if Required) Along With The Production Lot.
3.8 Ff-s-86 Mechanical Property And Metallographic Testing Sample Sizes Must Use Asq Z1.4 Inspection Level S-1 With Aql = 1.0.note: The Sample Size Values Must Conform To Ff-s-86e And Earlier Revisions.
3.9 Internal Threads - All Internal Threads Must Be Formed By Cutting. Cold Forming Of Internal Threads Is Not Acceptable.
3.10 Thread Inspection Requirements - All Threads On Threaded Parts Must Be Inspected Using Appropriate Inspection Methods, Inspection Systems, And Inspection Gages/instruments In Accordance With Fed-std-h28 Series. Substitution Of Thecommercial Equivalent
inspection In Accordance With Asme B1 Series Is Acceptable.
3.10.1 System 21 Of Fed-std-h28/20 Must Be Used As A Minimum Inspection Requirement For Threads When The Design Drawing Or Design Specification Does Not Specify An Inspection Requirement.
3.10.2 For Navy And Shipyard Drawings, System 21 Of Fed-std-h28/20 May Be Substituted For System 22 Without Further Navy Approval When The Design Drawing Invokes System 22 And Does Not Cite Governing Specifications That Specifically Require System 22. System
22 Of Fed-std-h28/20 Must Be Used When The Drawing References Other Governing Specifications That Specifically Require System 22, Such As Certain Thread Types Of Mil-dtl-1222.
3.10.3 A Written Request For Concurrence Must Be Submitted When Utilizing Alternative Measuring Equipment Or Measuring Systems Not Applicable To The Specified Inspection System.
3.11 Specification Change - For Qq-n-281, Class B Material:
1 - Footnote 9 To Table Ii Of Qq-n-281 Does Not Apply.
2 - When Starting Material Is Round Bar Greater Than 3" Dia,
The Mechanical Properties Of Hex Bar Apply.
3.12 O-ring Grooves And Mating Sealing Surfaces Must Be Inspected Per The Contractually Invoked Drawings Or Specifications. When The Drawings Or Specifications Do Not Provide Specific Defect Criteria Or State That No Defects Are Allowed, The General
acceptance Criteria (gac) Standard Must Be Used For Inspecting O-ring Grooves And Mating Sealing Surfaces Only. Repairs To Sealing Surfaces And O-ring Grooves With Unacceptable Defects May Be Accomplished Within The Limits Of The Size And Tolerances Provided
in The Applicable Drawing. Repairs Thatwould Exceed These Limits Require Approval (including Final Dimensions). The Data That Is Red Lined (crossed Out) Is Excluded From The Gac For This Contract And Is Not To Be Used For Acceptance Or Rejection Criteria.
the Gac Document Is Identified As Contract Support Library Reference Number Csd008 At Https://register.nslc.navy.mil/
3.13 Component Identification Description (cid) - When Applicable Drawing(s) And/or Specification(s) Specify That A Nameplate Or Identification Plate Is Required, The Cid Number ( ;cid 887245330; ) Must Be Added. When No Plate Is Specified, An Identification
plate In Accordance With Mil-dtl-15024, Type "c" On Brass Or Type "h" On Aluminum Must Be Securely Attached To Each Assembly Showing The Above Cid Number. No Assembly Must Be Shipped Without The Cid Number Attached.
3.14 Welding Or Brazing - When Welding, Brazing, And Allied Processes Are Required, As Invoked By Section C Paragraph 3 Requirements, They Must Be In Accordance With S9074-ar-gib-010a/278, 0900-lp-001-7000 For Brazing Of Piping And Pressure Vessel
applications, Or S9074-aq-gib-010/248 For Brazing Of Other Applications. For All Production And Repair Welding And Brazing Personnel And Procedures Must Be Qualified Under S9074-aq-gib-010/248 Or 0900-lp-001-7000, As Applicable. Procedures And Qualification
data Must Be Submitted For Review And Approval Prior To Performing Any Welding Or Brazing.
3.15 Certificate Of Compliance - (special Emphasis Material) The Contractor Must Prepare And Submit A Certificate Of Compliance Certifying That The Items/components Furnished Under This Contract Comply With The Requirements Of The Procurement Document,
including Any/all Invoked Specifications And Drawings.
3.16 Configuration Control - The Contractor Must Maintain The Total Equipment Baseline Configuration. For Items Of Proprietary Design, Contractor Drawings Showing The Latest Assembly Configuration Must Be Provided To The Government In Electronic (c4) Format.
definitions Are Provided Elsewhere In The Contract/purchase Order.
3.16.1 Waivers/deviations - All Waivers And Deviations, Regardless Of Significance Or Classification Require Review And Approval By The Contracting Officer. Waivers And Deviations Must Be Designated As Critical, Major, Or Minor. The Contractor Must Provide
a Copy Of This Request To The Qar. Requests Must Include The Information Listed Below.
A. A Complete Description Of The Contract Requirement Affected
And The Nature Of The Waiver/deviation (non-conformance),
Including A Classification Of Critical, Major, Or Minor.
B. Number Of Units (and Serial/lot Numbers) To Be Delivered In This
Configuration.
C. Any Impacts To Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel Or Impacts To The Operational Use Of The Product.
D. Information About Remedial Action Being Taken To Prevent Reoccurrence
Of The Non-conformance.
3.16.2 All Requests For Waivers/deviations On Navsup-wss Contracts Must Be Submitted To The Navsup Wss Contracting Specialist Via Email.
3.16.3 Ecps - The Government Will Maintain Configuration Control And Change Authority For All Modifications Or Changes Affecting Form, Fit, Function, Or Interface Parameters Of The Equipment And Its Sub-assemblies. The Contractor Must Submit An Engineering
change Proposal (ecp) For Any Class I Or Ii Changes That Impact The Equipment Covered By This Contract. Ecps Must Be Prepared In Contractor Format, And Must Include The Following Information:
A. The Change Priority, Change Classification (class I Or Class Ii),
And Change Justification.
B. A Complete Description Of The Change To Be Made And The Need For
That Change.
C. A Complete Listing Of Other Configuration Items Impacted By The
Proposed Change And A Description Of The Impact On Those Cis.
D. Proposed Changes To Documents Controlled By The Government.
E. Proposed Serial/lot Number Effectivities Of Units To Be
Produced In, Or Retrofitted To, The Proposed Configuration.
F. Recommendations About The Way A Retrofit Should Be Accomplished.
G. Impacts To Any Logistics Support Elements (such As Software,
Manuals, Spares, Tools, And Similar) Being Utilized By Government
Personnel In Support Of The Product.
H. Impacts To The Operational Use Of The Product.
I. Complete Estimated Life-cycle Cost Impact Of The Proposed Change.
J. Milestones Relating To The Processing And Implementation Of The
Engineering Change.
3.17 Mercury Free - Mercury And Mercury Containing Compounds Must Not Be Intentionally Added Or Come In Direct Contact With Hardware Or Supplies Furnished Under This Contract. Mercury Contamination Of The Material Will Be Cause For Rejection.
3.18 Navsea 0948-lp-045-7010 - Any Applicable Requirements Of Navships 4410.17,navsea 0948-lp-045-7010, Or 0948-045-7010 Which The Contractor Must Meet Are Included In This Contract/purchase Order. The Above Documents Are For Governmentuse Only. Further
application Of The Above Documents Is Prohibited.prohibited.
3.18.1 Marking Of Material With A Material Designator Per The Drawing Is Also Prohibited, With The Exception Of Fasteners. Fasteners Must Be Marked With A Material Symbol/designator As Specified Elsewhere In This Contract.
^ Quality Assurance Requirements ^
3.19 See Cdrl Di-misc-80678 (test Certification) - A Statement Of Tests Performed, Listing The Pieces Tested Must Be Furnished Along With A Copy Of The Test Results. Certification Must Include The Contractor's Name, Address And Date, Quantity Inspected,
identified To The Contract/purchase Order And Item Number, And The Contractor's Or Authorized Personnel's Signature. Test Certifications Must Reference The Standard/specification, Including The Revision, To Which The Testing Was Performed And The Acceptance
criteria Used. Test Procedure Numbers May Also Be Referenced On Test Reports. Test Reports On Weldments Must Be Identified To Weld Joint And Layer.
3.20 Welding Requirements - When Production Or Repair Welding Is Required, The Applicable Welding Procedure(s) And Qualification Data Must Be Submitted For Review And Approval. In Addition, The Consumed Weld Metal C Of C As Defined Below Must Be Submitted As
part Of The Certification Oqe Package Submitted By The Contractor.
note: These Requirements Do Not Apply To Tack/spot Welds.
3.20.1 Approval Of The Contractor's Qualification Data Must Be Obtained Prior To Performing Any Welding (production Or Repair).
3.20.2 If The Contractors Qualification Data Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Procedures And Qualification Data Report To Expedite The Approval Process. The
approval Letter Must Reference The Applicable Welding Procedure And Qualification Data Report Identification/number. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. As Far As Practical, All Procedures For The Contract Must Be
submitted At The Same Time. Welding Procedures And Qualification Data Must Be Submitted In A Commercially Available Electronic Format Such As Adobe Acrobat Pdf. The Contractor Must State The Applicability Of Each Weld Procedure And Qualification Data Submitted,
citing The Drawing Number And Pieces To Be Welded. (i.e. ''wp-123 And Qd-123 Are Submitted For The Weld Joint Between Pieces 1 And 2 On Drawing Abc'.' Wp-456 And Qd-456 Are Submitted For The Hardfacing Of Piece 3 On Drawing Xyz'')
3.20.3 The Pco's Authorization For The Use Of Weld Procedure(s) And Qualification Data For The Specific Application As Submitted Does Not Mitigate The Vendors Responsibility To Comply With The Requirements Of S9074-aq-gib-010, S9074-ar-gib-010a/278,248d The
contract.
3.20.4 Authority For The Repair Of Special Repairs In Castings, The Repair Of Wrought Material, Or The Repair Of Forged Material Must Be Obtained Via Request For Waiver From The Procurement Contracting Officer. This Request Must Describe The Defect; Including
size, Depth, Location, And A Description Of The Proposed Repair. Repairs Deemed Minor Or Nominal In Accordance With S9074-ar-gib-010/278 Can Be Made At Contractor Discretion In Accordance With S9074-ar-gib-010/278 Requirements; However, Weld Procedure
specification (wps) And Procedure Qualification Record (pqr) Submittals Are Still Required. This Request For Navsup-wss Contracts Must Be Submitted Via The Electronic Contractor Data Submission (ecds) Application.
3.20.5 Any New Procedure Qualification Performed Under This Contract Will Require The Vendor To Provide A Minimum 72 Hour Notification To Dcma With An Offer To Observe The Welding Of The Test Assemblies. The 72 Hour Time Limit May Be Modified Upon Mutual
agreement Between The Vendor And Dcma.
3.20.6 When Drawings Require Hardfacing Surface Iron Or Nickel Content Not To Exceed 5%, The Contractor Must Verify Surface Iron Or Nickel Content By Performing Chemical Testing As Defined By The Applicable Drawing. The Chemical Test Results Must Be Submitted
as Part Of The Qualification Data.
3.20.7 Additional Qualification Requirements For Production Hardfacing Thickness Less Than 1/8-inch: Macro-etch (or Legible Photomacrographs Clearly Showing The Fusion Area) Must Be Submitted For Review And Show Consistent, Minimized Dilution. All Essential
elements And Any Elements Not Listed In S9074-aq-gib-010/248 That Influence Dilution Must Be In The Qualification Data And Weld Procedure, With Strict Limits Placed On Each Essential Element.
3.20.8 Preparation And Retention Of Weld Records Is Required, As Specified By Paragraph 4.1.3 Of S9074-ar-gib-010a/278.
3.20.9 When Production Or Repair Welding Is Required On Titanium Materials, Theapplicable Fabrication Plan, Facilities Procedure, Training Plan, And Active Welder Qualification Must Also Be Submitted For Review And Approval.
3.20.10 If The Contractor's Fabrication Plan, Facilities Procedure, Training Plan, Or Active Welder Qualification Has Previously Been Approved By The Navy For Other Contracts, A Copy Of The Original Approval Letter May Be Submitted Along With The Applicable
documentation To Expedite The Approval Process. The Approval Letter Must Reference The Applicable Documentation. Prior Approval Does Not Guarantee Acceptance For This Or Any Future Contracts. The Contractor's Fabrication Plan, Facilities Procedure, Training
plan, And Active Welder Qualification Must Be Submitted At The Same Time As The Applicable Welding Procedure(s) And Weld Procedure Qualification Data. All Documentation Must Be Submitted In A Commercially Available Electronic Format, Such As Adobe Acrobat Pdf.
3.20.11 A Certificate Of Compliance Is Required For All Weld Filler Metals Used For Production Or Repair Welding, And Must Include The Following:
a) Filler Metal Lot Number(s)
b) Specification And Type
c) A Positive Statement That The Vendor Has Obtained Oqe And Verified That Each Lot Of Weld Filler Material Conforms To Specification Requirements.
d) A Positive Statement Verifying That The Weld Filler Metals Were The Correct Material Type Or Grade Prior To Consumption.
3.20.12 When Production Welds Or Repair Welds Are Performed By A Subcontractor, The Requirement For Submission Of All Certification Documentation Required Herein Must Be Passed Down To The Subcontractor.
3.21 Quality System Requirements - The Contractor Furnishing Items Under This Contract/purchase Order Must Provide And Maintain A Quality System In Accordance With Iso-9001 As Amplified Or Modified Herein, With The Calibration System Requirements Of Iso-10012
or Ansi-z540.3 With Iso-17025. A Quality System In Accordance With Mil-i-45208, With The Calibration System Requirements Of Mil-std-45662, Is Acceptable As An Alternate.
3.21.1 The Contractor's Quality System And Products Supplied Under The System Are Subject To Evaluation, Verification Inspection, And Acceptance/nonacceptance By The Government Representative To Determine The System's Effectiveness In Meeting The Quality
requirements Established In The Contract/purchase Order.
3.21.2 The Contractor's Quality System Must Be Documented And Must Be Available For Review By The Contracting Officer Or His Representative Prior To Initiation Of Production And Throughout The Life Of The Contract. The Prime Contractor Must, Upon
notification, Make His Facilities Available For Audit By The Contracting Officer Or His Authorized Representative.
3.21.3 See Cdrl Di-qcic-81110 (inspection System Procedures) - All Suppliers Of Level I/subsafe (li/ss) Material Are Required To Submit A Copy Of Their Current Documented Quality System Procedures To The Procurement Contracting Officer (pco) Prior To Award Of
any Contract/purchase Order. Suppliers That Have A Copy Of Their Current Quality System Procedures On File At The Procuring Activity May Request The Pco Waive This Requirement.
3.21.4 This Contract Provides For The Performance Of Government Quality Assurance At Source. The Place Or Places Of Performance May Not Be Changed Without The Authorization Of The Procurement Contracting Officer. Upon Receipt Of This Order, Promptly
notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest Defense Contract Management Agency
(dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately.
3.21.5 Any Changes Made By The Contractor To A Qualified Quality System Will Require Re-submittal To The Pco And Concurrence By The Government Quality Assurance Representative Prior To Adoption.
3.22 Contractor Inspection Requirements - The Contractor Must Maintain Adequate Records Of All Inspections And Tests. The Records Must Indicate The Nature And Number Of Observations Made, The Number And Type Of Deficiencies Found, The Quantities Approved And
rejected And The Nature Of Corrective Action Taken As Appropriate. Inspection Records Must Be Traceable To The Material Inspected.
3.22.1 The Supplier's Gages, Measuring And Test Equipment Must Be Made Available For Use By The Government Representative When Required To Determine Conformance With Contract Requirements. When Conditions Warrant, The Supplier's Personnel Must Be Made
available For Operations Of Such Devices And For Verification Of Their Accuracy And Condition.
3.22.2 All Documents And Reference Data Applicable To This Contract Must Be Available For Review By The Government Representative. Copies Of Documents Required For Government Inspection Purposes Must Be Furnished In Accordance With The Instructions Provided
by The Government Representative.
3.23 Subcontractor Inspection Requirements - The Government Has The Right To Inspect At Source, Any Supplies Or Services That Were Not Manufactured Or Performed Within The Contractor's Facility. Such Inspection Can Only Be Requested By Or Under Authorization
of The Government Representative. Any Purchasing Documents To A Subcontractor Must Cite The Applicable Portions Of The Contractually Invoked Quality System (e.g. Calibration Requirements), Plus Any Product Requirements That Apply To The Supplies Being
purchased. When The Government Elects To Perform Source Inspection At The Subcontractor's Facility, Applicable Purchase Documents Must Be Annotated With The Following Statement: "a Government Inspection Is Required Prior To Shipment From Your Plant. Upon
receipt Of This Order, Promptly Notify The Government Representative Who Normally Services Your Plant So That Appropriate Planning For Government Inspection Can Be Accomplished. If You Do Not Have An Assigned Government Representative, Notify The Nearest
defense Contract Management Agency (dcma) Office. In The Event That A Local Government Representative Or Dcma Office Cannot Be Located, Our Purchasing Agent Should Be Notified Immediately."
3.23.1 The Prime Contractor's Program Must Include Procedures To Assess The Capability Of The Prospective Suppliers To Produce The Products Or Supply The Services In Accordance With The Contract, Prior To The Issuance Of Any Purchase Document.
3.23.2 Each Sub-tier Supplier Of Material Or Services For Items In Section 3 Of This Contract Must Be Subjected To A Periodic Review Or Audit By The Prime To Determine The Continued Capability Of The Supplier To Control The Quality Of The Products Or Services
specified In The Purchase Order Or Contract.
3.23.3 The Prime Contractor Must Ensure That The Purchased Product Conformsto Specified Purchase Requirements And This Contract. The Type And Extent Of Control Applied To The Supplier And The Purchased Product Must Be Dependent Upon The Effect Of The
purchased Product On The End Item Represented By This Contract.
3.23.4 The Prime Contractor Must Evaluate The Requirements Of The Contractand Select Suppliers Based On Their Ability To Supply The Product In Accordance With The Prime Contractor's Requirements And The Contract. Criteria For Selection And Evaluation Must Be
established. Records Of This Effort Must Be Available For Review By The Government.
3.23.5 The Prime Contractor's Supplier Quality Assurance Program Must Provide For A Review Of Purchase Documents To Assure Applicable Quality Requirements Are Included Or Referenced In The Documentation For Compliance By The Supplier.
3.24 Government Furnished Material And/or Equipment (gfm/gfe) - When Material Or Equipment Is Furnished By The Government, The Contractor Must Develop Documented Control Procedures That Require At Least The Following:
3.24.1 Visual Examination Upon Receipt To Detect Damage During Transit.
3.24.2 Inspection For Completeness And Proper Type.
3.24.3 Verification Of Material Quality Received.
3.24.4 Periodic Inspection And Precautions To Assure Adequate Storage Conditions And To Guard Against Damage From Handling And Deterioration During Storage.
3.24.5 Functional Testing, Either Prior To Or After Installation, Or Both, As Required By The Contract To Determine Satisfactory Operation.
3.24.6 Identification And Protection From Improper Use Or Disposition.
3.24.7 Reporting To The Government, Any Gfm Or Gfe Property Found Damaged, Malfunctioning, Or Otherwise Unsuitable For Use. In The Event Of Damage Or Malfunction During Or After Installation, The Supplier Must Determine And Record Probable Cause And
necessity For Withholding The Material From Use.
3.24.8 For Gfe Material, And As Required By The Terms Of The Bailment Agreement, The Supplier Must Establish Procedures For Adequate Storage, Maintenance, And Inspection Of Bailed Government Material. Records Of All Inspection And Maintenance Performed On
bailed Property Must Be Maintained.
3.24.9 Material Returned To The Contractor Must Be Handled As Gfm.
3.25 Traceability And Certification Requirements - To Assure That Correct Materials Are Installed In Level I/subsafe Systems, It Is Imperative That Traceability Be Maintained From The Material To The Material Certification Test Report And Other Required
objective Quality Evidence (oqe). The Material Certification Report Must Completely And Accurately Reflect That The Material Supplied Meets The Specified Requirements. Materials Requiring Traceability And Certification Data Are Identified Within Paragraph 3,
section C Of This Contract/purchase Order.
3.25.1 The Following Provides The Minimum Requirements For Maintaining Material Traceability And Supplements The Requirements Specified In Di-misc-81020 And Elsewhere In The Contract/purchase Order. The Contractor Must Develop Written Procedures That
implement The Material Control Requirements Stated Herein And Elsewhere In This Contract/purchase Order.
3.26 Material Traceability - The Certification Data Report Must Be Identified Through A Unique Traceability Number, Heat-lot Number, Or Heat-treat Number, As Applicable, Which Must Also Be Marked On The Material. This Traceability Marking On The Material Must
provide Direct Traceability To The Material's Chemical Composition And Mechanical Properties Certification Data. For Material Produced By Batch, Continuous Cast, Or Continuous Pour Processes, Samples Must Be Taken No Less Than Once In Every Eight Hours Of
operation For The Purpose Of Validating Proper Chemical Composition And Mechanical Properties. Traceability Must Be Maintained Through All Process Operations Including Any Subcontracted Operations, To The Finished Component.
3.26.1 Material Marking For Traceability And Identification - The Following Are The Minimum Marking Requirements. Additional/alternate Marking Requirements, If Applicable, Will Be Specified Elsewhere In The Contract/purchase Order. In Addition To The
marking Requirements On Applicable Drawings And/or Specifications, Marking For Traceability Is Required. All Traceability Markings Must Be Permanently Applied In Accordance With Mil-std-792 (except As Specified Below). An Alternate Marking Method Is
permissible Provided It Is An Available Option In The Contractually Invoked Specification Or Drawing, Except In Instances Where The Material Has Been Modified By This Contract/purchase Order And Differs From That Specified In The Specification Or Drawing.
3.26.2 Traceability Markings For Items With Precision Machined Or Plated Surfaces, Or Material With Suitable Marking Surface Areas Less Than 3/8 Inches Square (either 3/8" X 3/8" Or An Area Equal To 0.1406 Inches Square) Must Be Applied To A Durable Tag And
the Tag Securely Affixed To The Material.
3.26.3 Traceability Markings Must Be Maintained Through Assembly, And Whenever Possible Must Be Visible After Assembly. For Items Where The Marking Is Not Visible After Assembly, A Durable Tag Must Be Securely Attached To The Assembly Identifying The Part
number, Piece Number, Traceability Number, And The Location Of The Permanent Mark.
3.26.4 Marking Must Be Legible And Must Be Located So As To Not Affect The Form, Fit, And Function Of The Material. ;marking To Be As Shown On Drawings.;
3.27 See Cdrl Di-misc-81020 (chemical And Mechanical) - Material Certification - In Addition To The Certification Data Requirements Specified In Di-misc-81020, The Following Material Certification Requirements Apply:
3.27.1 Quantitative Chemical And Mechanical Analysis Of Material Traceable To Traceability Markings Is Required. Material Certification Test Reports Must Include The Class, Form, Condition, Grade, Type, Finish, And/or Composition, As Applicable, Of The
material Supplied.
3.27.2 Re-identification And Re-certification Of Material Is Required When The Material Is Subjected To A Process Which Alters It's Properties. If The Starting Material Or Raw Stock Is Processed In A Manner That Will Not Affect Its Chemical Composition Or
mechanical Properties, The Original Certifications For The Chemical Composition And Mechanical Properties, As Required By The Material Specification, Are Acceptable. Re-certification Of The Chemical Or Mechanical Properties Is Required If A Process Is Used
during Fabrication That Alters The Original Properties Of The Material (e.g. Alloying, Heat Treating, Or Forming). In These Instances, The Properties Of The Material Must Be Re-determined And Documented To Reflect The Altered Condition. The Altered Material
must Be Uniquely Re-identified. The Properties Thus Determined And Documented, Are Required For Final Certification And Must Conform To The Material Specification Or The Contract/purchase Order Requirements. When Only The Mechanical Properties Are Altered,
the Original Certification Forchemical Composition Must Be Overstamped And Annotated With The Unique Traceability Material And At A Minimum Contain The Information Below.
traceability Marking ________________________________________________
(marking On Finished Item)
is Fabricated From Raw Material Identified To
heat/lot Number ______________ And Heat Treat Number _____________________
(when Applicable)
_________________________________________ Date _____________________
(name And Signature Of Auth. Co. Rep.)
3.27.3 Material Certification Data Forwarded By The Manufacturer Must Contain A Signed Certification That The Report Results Represent The Actual Attributes Of The Material Furnished And Indicate Full Compliance With All Applicable Specification And Contract
requirements. Transcription Of Certification Data Is Prohibited.
3.27.4 Statements On Material Certification Documents Must Be Positive And Unqualified. Disclaimers Such As "to The Best Of Our Knowledge" Or "we Believe The Information Contained Herein Is True" Are Not Acceptable.
3.27.5 If Material Is Received Without The Required Certification Papers Or With Incorrect/missing Data On The Certification Papers, The Material Will Be Rejected.
3.28 Material Handling - The Written Material Control Process Must Include The Following:
3.28.1 All Raw Materials Must Have Traceability Markings (except As Specified Below).
3.28.2 Stored Raw Materials Requiring Traceability Must Be Segregated To Preclude Intermingling With Materials Not Requiring Traceability.
3.28.3 When Traceability Markings Will Be Removed By A Manufacturing Or Fabrication Process, The Marking Must Be Recorded Prior To Removal And Be Immediately Restored Upon Completion Of The Process. If This Cannot Be Done Or Is Impractical, An Appropriate
material Control Procedure (such As A Bag And Tag, Tagging, And/or Tote Box Control) Must Be Employed. The Material Control Procedure Must Provide A Method Of Positive Control To Preclude Commingling Of Heats/lots Or Loss Of Traceability. The Traceability
marking Must Be Reapplied Upon Completion Of The Final Manufacturing Process.
3.28.4 Brazing Or Weld Filler Metals For Strength Welds Forming Or Integral With Pressure Containing Components Or Assemblies Requiring Traceability Must Be Verified To Be The Correct Material, And Type Or Grade, As Applicable, Prior To Consumption. At A
minimum, Material Verification Must Consist Of Inspection Of Material Test Reports For Conformance To Specified Requirements. Control Of Welding And Brazing Filler Metals Must Be Maintained To The Point Of Consumption To Assure Use Of The Correct Type And
grade. Markings And Traceability Requirements Do Not Apply To Brazing And Weld Filler Metals After Consumption. It Is The Responsibility Of The Prime Contractor To Ensure Conformance With The Above Requirements On Welds Performed By Their Subcontractors.
3.28.5 Purchase Orders For Raw Material Must Specify That The Material Be Traceable To Material Certification Test Reports By Traceability Markings On The Material And Identified On The Test Reports. The Certification Data Requirements Contained In
di-misc-81020 Must Be Invoked By The Prime Contractor On All Subcontractors Supplying Level I Material.
3.28.6 The Material Control Process Must Include Requirements For The Maintenance Of Traceability For Items Sent Out For Subcontracted Operations. If Such Operations Would Remove Traceability Markings, Purchase Or Work Orders Must Specify A Method And Marking
location For Remarking. The Contractor Must Also Ensure That Subcontractor Production Controls Are Adequate To Preclude Commingling Of Materials During Processing.
3.29 Receiving Inspection -
3.29.1 Products And Services Produced By Sub-tier Suppliers For Incorporation In The Contract End Item Must Be Subject To Inspection Or Audit At The Time Of Receipt By The Prime Prior To Further Processing Within The Prime Contractor's Plant Or Shipment To
another Location.
3.29.2 Receiving Inspection Must Include As A Minimum -
verification That The Traceability Marking On The Material Agrees With That On The Certification Test Reports.
verification That Certification Test Reports Are Legible And Complete.
verification That The Contents Of The Certification Test Reports Are In Compliance With The Contractually Invoked Specifications And Requirements.
3.30 Discrepancy Reporting -
3.30.1 Nonconforming Products From Sub-tier Suppliers Must Be Identified And Processed In Accordance With The Prime Contractor's Procedures For Controlling Nonconforming Products. The Prime Contractor Must Report The Receipt Of Any Nonconforming Products To
the Responsible Sub-tier Supplier In Accordance With Established Procedures. Nonconforming Material Records Must Be Maintained And Available For Review By The Government Quality Assurance Representative (qar).
3.31 Final Inspection - The Following Inspections Must Be Performed Prior To Government Inspection And Acceptance.
3.31.1 Material Sampling - Material Must Be Inspected For Form, Fit, And Function. Lot Acceptance Must Be Based On Zero Defects And Lot Rejection Based On One Defect. The Sample Size Must Be In Accordance With The Sampling Plan(s) In The Applicable Military
specification Or Standard, Federal Specification Or Standard, Or Drawing To Which The Material Was Manufactured. In The Absence Of Such Sampling Plans, Sampling Inspection Must Be Per Ansi/asq-z1.4, General Inspection Level Ii (for Sample Size Selection Code),
table Iia (for Sample Size).
small Lot Sizes - For Lot Sizes Of Fifty Or Less, The Minimum Sample Size Must Be Eight Units. For Lot Sizes Of Eight Or Less, The Sample Size Must Be One Hundred Percent Of The Lot.
3.31.2 The Manufacturer May Elect To Use Statistical Process Control (spc) To Assure Product Quality In Lieu Of The Above Attribute Sampling Plan, Provided That The Spc Methodology/system Used Provides Acceptable Products To The Government. However, The
government/navy Receipt Inspection Activity May Perform Their Acceptance Inspection Of The Material Using The Attribute Sampling Plan Outlined Above.
3.31.3 All Data Concerning Material Verification (chemical, Mechanical Or Physical Properties), Traceability (material Certifications To Material Marking), And Nondestructive Test (ndt) Certifications For Material Must Be 100% Inspected. The Certification
test Reports Must Also Be 100% Inspected For Completeness And Legibility.
3.31.4 All Material Requiring Traceability Must Be 100% Inspected For Traceability Marking And That The Marking Is Legible.
3.32 Additional Marking For Fasteners - Fasteners Must Be Marked In Accordance With ;mil-dtl-1222; . The Method Of Marking Must Be Types I, Ii, Iii, V, Viii Or Ix Of Mil-std-792 Except For Grades 410, 416 And 431 In The H Condition And Grades 8, 630, A574,
and 4340 Which Must Be Marked By Method Ii When Marking Is Applied After The Final Heat Treatment. Markings On Fasteners That Are To Be Coated Must Be Marked Prior To Coating And Have A Minimum Depth Of 4 Mils. Traceability Marking Must Be Legible After The
application Of Protective Compounds.
3.32.1 Marking Is Required For All Fasteners Regardless Of Size And Must Include The Material Symbol, The Manufacturer's Identification Symbol, And The Traceability Marking. Marking Must Be Applied On The Head Of Headed Fastener (top Preferred, Side
location If Necessary). Self-locking Screws Must Also Be Marked With Six Dots. Where No Contract Invoked Specification Requirement Exists For This Marking, Self-locking Fasteners Must Be Marked With Six Dots Approximately .032" Diameter, Raised Or Depressed
by Approximately .010" Located On The Top Perimeter Of The Head Of The Fastener In An Arc Or Circular Pattern. The Six Dots Must Be Distinguishable From All Other Required Markings.
3.33 See Cdrl Di-misc-80678 (special Emphasis C Of C) - The Certificate Of Compliance Must Show Traceability To The Marking Applied On Each Individual Item, And Must Contain The Following Information:
1. Contractor's Name, Address And Date.
2. The Contract/purchase Order Number (for Example: N00104-11-p-fa12)
3. The National Stock Number (nsn). The 18 Character National Stock Number For Special Emphasis Material Includes The Two Digit Cog, The Four Digit Fsc, The 9 Digit Niin, And The Two Digit Smic
(for Example: 1h 4820 012345678 L1) ("n/a" When Not Applicable).
4. Lubricants, Sealants, Anti-seize, And/or Thread Locking Compounds ("n/a" When Not Applicable).
5. Certification That O-rings, Packing, Gaskets, Or Other Elastomeric Products Were Installed In A Compressed State Within An Assembly Or Sub-assembly, Prior To Expiration Of The Shelf Life ("n/a" When Not Applicable).
6. Manufacturer's Compound Number ("n/a" When Not Applicable).
7. When Weld Procedure Submittal Is Required By The Contract, A Statement That The Approval Date Of The Qualification Data Precedes Any Production Or Repair Welding Performed On This Contract. ("n/a" When Not Applicable).
8. A Statement To The Effect That All Items Furnished On This Contract Are In Full Compliance With The Specifications And Requirements And List Each Contractually Invoked Conformance/compliance Test Performed By Name And That It Was Performed
satisfactorily.
9. Contractor's Or Authorized Personnel's Signature.
4. Quality Assurance
4.1 Notes To Dcma Qar And The Contractor -
4.1.1 Dcma Qar And The Contractor For Proprietary Designs - Departures From Contractor Imposed Requirements, Not Specifically Covered By The Contract, Must Be Judged Individually On The Basis Of The Effect, If Any, On Contractual Requirements. When There Is A
disagreement Between The Contractor And The Government Representative As To The Effect On Contractual Requirements, The Departure Must Be Considered A Nonconformance And Be Submitted To The Pco For Disposition.
4.1.2 Dcma Qar And The Contractor For Proprietary Designs - All Records Of Departures From Contractor Imposed Requirements Must Be Maintained And Available For Review At The Contractor's Facility. A Copy Must Be Given To The Local Government Representative. A
record Of These Departures, Traceable To The Applicablepart Number And Contract Number Must Be Submitted To The Pco.
4.1.3 Dcma Qar And The Contractor For Proprietary Designs - For Proprietary Designs, The Contractor's Part Numbers Are Acceptable For Reference Only. The Delivered Material Must Conform To All Drawings, Specifications, And Other Contractual Requirements.
4.1.4 Dcma Qar - It Is The Responsibility Of Dcma Qar To Review Non-destructive Testing (ndt) Procedures For Navsup Contracts/purchase Orders.
4.1.5 Dcma Qar And The Contractor - The Ecds (electronic Contractor Data Submission) System Is Available For Certain Data Submissions And To Submit Questions And Clarifications, And Waiver Requests On Contracts And Solicitations. Ecds Can Be Found At:
https://register.nslc.navy.mil/
5. Packaging
5.1 Preservation, Packaging, Packing And Marking - Preservation, Packaging, Packing And Marking Must Be In Accordance With The Contract/purchase Order Schedule And As Specified Below.
mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule
6. Notes
6.1 Several Definitions Of Terms That Apply To Csi Items Are Listed Below. All Terms May Not Apply To Every Item.
6.1.1 The Ecds (electronic Contractor Data Submission) System Is At: Https://register.nslc.navy.mil/ This Application Will Require Advance Registration Using A Pki Digital Certificate On A Cac. A Vendor User Guide Is Available As Csd001 In The Csd
(contract Support Document) Library Within Ecds.
6.1.2 Critical Safety Item (csi) - Any Ship Part, Assembly, Or Support Equipment Containing A Critical Characteristic Whose Failure, Malfunction, Or Absence Of Which Could Cause A Catastrophic Or Critical Failure Resulting In Loss Of, Or Serious Damage To The
ship, Or Unacceptable Risk Of Personal Injury Or Loss Of Life.
6.1.3 Critical Process - As Determined By The Twh, Any Process, Operation Or Action Performed On A Ship Csi That Serves To Establish A Critical Characteristic (such As Welding, Soldering, Machining, Polishing, Cleaning, Or Assembling) Or Confirm That A
critical Characteristic Is Within Drawing Or Specification Compliance (such As, Testing, Measurement, Or Non-destructive Evaluation).
6.1.4 First Article - Pre-production Models, Initial Product Samples, Test Samples Produced To Ensure A Manufacturer's Capability To Meet Full Specification Requirements.
6.1.5 First Article Test (fat) - Contractually Required Testing And Inspection Of A Supplier's Pre-production, Production, Or "production Representative" Specimens To Evaluate A Manufacturer's Ability To Produce Conforming Product Prior To The Government's
commitment To Receive Subsequent Production Items. First Article Testing Is Product Specific And Does Not Assess Manufacturing Process Controls Nor Does It Assure The Effectiveness Of The Manufacturer's Quality Program.
6.1.6 Government Source Inspection (gsi) - Gsi Is Independent Oversight Performed By A Government Representative Usually A Dcma Quality Assurance Representative (qar)) To Assure That Those Unique Product Quality And System Elements, Identified By The
contracting Agency As Important, Are Observed And Evaluated.
6.1.7 Quality Assurance Letter Of Instruction (qali) - A Qali Is A Formal Document Initiated By A Contracting Activity That Provides Essential Requirements And Instructions For Contracted Materials To Be Independently Verified And Accepted By A Government
representative Prior To Shipment.
6.1.8 Objective Quality Evidence (oqe) - The Quantitative And Qualitative Data Of All Mechanical, Chemical, And Performance Tests Performed (as Required By The Applicable Specification, Drawing, Or Purchase Document) To Prove That The Material Supplied
conforms To The Specified Requirements.
6.1.9 Surface Discontinuity - Any Surface Irregularity, Marking, Or Localized Change In Physical Character Of The Surface, Other Than Dimensional, That Exists Infrequently At One Or Several Places. (examples: Burrs, Dents, Nicks, Scratches, Gouges, Pits,
center-punches, Scribes, And Tool Marks) Surface Discontinuities Less Than 0.005-inch In Depth Are Acceptable Provided They Do Not Violate Any Other Design Requirements Specified In This Contract/purchase Order.
6.1.10 Traceability Code - A Code Or Number Providing Traceability To The Actual Chemical And Mechanical Properties Of The Specified Heat, Batch, Or Form From Which The Material Originated.
6.1.11 Verification - An Examination Performed To Determine Compliance With A Specific Requirement.
6.1.12 Nonconformance - A Nonconformance Is Defined As Affecting Or Violating The Following:
- The Requirements Of This Contract/purchase Order.
- Contractually Invoked Drawings (i.e. Envelope Dimensions, Interface Dimensions With Mating Parts/equipment, Center Of Gravity, Weights, Piece Part Identification, Material, Etc.).
- Contractually Invoked Federal, Military, Or Commercial Specifications And/or Standards.
- Form, Fit, Function, Performance To Contract Requirements, Reliability, Maintainability, Interchangeability, Safety Of Personnel Or Equipment, Or Additional Cost To The Government.
6.1.13 Waiver - A Written Authorization To Accept An Item, Which During Manufacture, Or After Having Been Submitted For Government Inspection Or Acceptance, Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use As Is
or After Repair By An Approved Method.
6.1.14 Deviation - A Specific Written Authorization (granted Prior To The Manufacture Of An Item) To Depart From A Particular Requirement(s) Of An Item's Current Approved Configuration Documentation For A Specific Number Of Units Or A Specified Period Of
time, And To Accept An Item Which Is Found To Depart From Specified Requirements, But Nevertheless Is Considered Suitable For Use "as Is" Or After Repair By An Approved Method.
6.1.15 Critical Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving Safety.
6.1.16 Major Waiver/deviation - This Waiver/deviation Consists Of A Departure Involving:
- Performance
- Interchangeability, Reliability, Survivability, Maintainability, Or Durability Of The Item Or Its Repair Parts
- Health Or Safety
- Effective Use Or Operation
-
Closing Date21 Jan 2025
Tender AmountRefer Documents
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+2Others, Building Construction
United States
Details: Sources Sought Notice
sources Sought Notice
page 12 Of 12
sources Sought Notice
*= Required Field
sources Sought Notice
page 1 Of 12
this Announcement Is Not A Request For Proposal. The Government Will Not Pay Nor Reimburse Any Costs Associated With Responding To This Request. The Government Is Under No Obligation To Award A Contract As A Result Of This Announcement.
the Department Of Veterans Affairs Is Seeking A Qualified Architect-engineering (ae) Firm To Provide Schematics, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, As-built Documentation, And All Other Related Information For Project 528a5-24-504, Project Upgrade Buildings 7&8 Electric Room At The Canandaigua Vamc At 400 Fort Hill Ave, Canandaigua Ny 14424. This Project Will Expand The Existing Electrical Rooms On The Ground Floor Of Building 7 And 8, Into Adjacent Spaces And Replace Electrical Components.
this Requirement Is Being Procured In Accordance With The Brooks Act As Implemented In Far Subpart 36.6. Applicable Naics Code Is 541330 And Small Business Size Standard Of $25.5 Million. Magnitude Of Construction Is Between $5,000,000.00 And $10,000,000.00. This Is A 100% Service-disabled Veteran Owned Small Business Set Aside. The Anticipated Award Date Of The Proposed A-e Contract Is On Or Before May 20th, 2025 . Potential Contractors Must Be Registered In Sam (www.sam.gov ) And Are Visible/verified/certified As Sdvosb (or Vosb) In Veterans Small Business Certification (https://veterans.certify.sba.gov/ ) At Time Of Submission Of Their Qualifications In Order To Be Considered For An Award.
in Order To Assure Compliance With Vaar Clauses, 852.219-75 Va Notice Of Limitations On Subcontracting Certificate Of Compliance For Services And Construction (nov 2022) And 852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022), All Firms Submitting A Sf 330 For This Notice Are Required To Indicate What Percentage Of The Cost Of Contract Performance Will Be Expended On The Concerns Employees And In Which Discipline(s) And Percentage Of Cost Of Contract Performance To Be Expended (and In What Disciplines) By Any Other Consultant/subcontractor Or Otherwise Used Small Or Large Business Entity(s). Any Consultant/subcontractor Or Otherwise Business Entity(s) Used Must Be Identified By Name, Office Location And Size/type Of Business (i.e., Sdvosb, Vosb, 8(a), Small, Large, Etc.). Failure To Provide This Information Will Deem The Firm S Sf 330 Submittal As Nonresponsive And Preclude Further Evaluation
all A/e Firms Are Advised That In Accordance With Vaar 836.606-71 The Total Cost Of The Production And Delivery Of Designs, Plans, Drawings And Specifications Shall Not Exceed Six (6) Percent Of The Estimate Cost Of Construction. Other A-e Fees Are Not Included In The Six (6) Percent. Additionally, Far Clause 52.236-22 (c) - Design Within Funding Limitation, Will Be Applicable To This Procurement Action.
exsisting Conditions:
the Canandaigua Vamc Is Located At 400 Fort Hill Avenue, Canandaigua, Ny 14424. Building 7 And 8 Are Two Of The Main Campus Structures And Contains Sensitive Programming Including Clc S With In-patient Care. The Existing Electrical Rooms Are Insufficient In Size And Does Not Meet Current Codes/standards As Set By The Va. The Adjacent Spaces To These Electrical Rooms Consist Of Available Space For Expansion. All Electrical Equipment Shall Be Replaced Unless Otherwise Directed By The Va And All Building Services Shall Placed On Emergency Power. All Proposed Equipment Shall Meet Current Va Standards And Codes.
scope Of Service Required
1. Provide Investigative, Schematic, And Design Development Services, Production Of Construction Documents, Working Drawings, Specifications, And Cost Estimates, And Perform Construction Administration Including Shop Drawing And Submittal Review As Required To Complete The Work And As Per The Architect/engineer (a/e) Required Deliverables. The A/e Firm Shall Analyze The Existing Conditions And Working With The Medical Center Staff Develop Various Proposals To Meet The Project Intent. Develop Accepted Proposal Into A Final Design And Cost Estimate To Best Suit The Needs And Constraints Of The Government, While Incorporating Vamc Canandaigua Engineering Services, Va Network 2, Or Any Other Government Comments.
2. Provide For Necessary Design For Utility Connections, Alternative Power, Phasing, And Support For Building Operations Through Construction With Minimal Interruptions.
3. Perform Load Test On Existing Generator And Emergency Power System To Confirm Existing Supply Will Support Additional Loads.
4. Provide An Independent Analysis To Locate Any Underground Or Hidden Utilities For Inclusion In The Design If Applicable, To Confirm Viability Of Planned Excavations Or Demolitions Of To Support Design Objectives. Such Analysis May Include Ground Penetrating Radar, Review Of Existing Va Documentation Or Other Viable Options To Verify These Utilities.
5. Attend All Design Review Meetings And Make All Necessary Site Visits During Design Phases To Gather Information Necessary From The Existing Site Conditions, Building Plans, Utility Plans, Etc. To Provide A Complete Assessment Of The Proposed Work. The Proposal Shall Include An Identified Number Of Visits. The Va Shall Provide Access To Hardcopy/electronic Files. The A/e Firm Shall Perform All Searches Of The Files For Any Required Reference Materials To Support Design Efforts. Limited Digital Drawings Are Available.
6. Attend Pre-bid Job Walk And Provide All Engineering Responses To Questions Asked By Potential Bidders And Issue Addendum When Necessary.
7. All Work Shall Be In Accordance With All Applicable Codes In The Department Of Veteran Affairs (va) Design Manuals And Va Publications (master Construction Specifications, Construction Standards, National Fire Protection Association (nfpa), Underwriters Laboratory, International Building Code Ibc, National Electric Code (nec), Building Codes And Standards, And Va Information Security Handbook 6500.6, Etc.)
8. All Work Containing Hazardous Materials Shall Be In Accordance With New York State Code Rule 56 Regarding Asbestos And Other Hazardous Materials, Ahera Regulations 40 Cfr Part 763.86, 763,87, And Osha 1926.1101(k)(1).
9. All Submissions Shall Include Physical And Digital Submissions Of Drawings And Specifications.
10. All Drawings Shall Be Submitted At Architectural E1 (30 X 42 ) For Full Sized Sets And Architectural C (18 X 24 ) For Half Sized Sets. All Sets Shall Be Bound.
11. All Cad Submissions Shall Be Provided In Autocad 2017 Unless Discussed Otherwise. Revit Models Shall Also Be Submitted In Addition To Cad Documents If Created.
12. The Autodesk Build Construction Management Platform (autodesk Construction Cloud Acc) Will Be Used For Information Sharing And Project Management Through The Design And Construction Phases. This Software Is Provided By The Va At No Additional Cost To The A/e.
a. Platform Training Will Be Provided By The Va And Is Required By All Parties To Access.
b. The A/e Shall, Upon Award, Provide A Comprehensive List Of Project Staff Who Will Need Access To Acc Including:
i. Full Name
ii. Company Name
iii. Email Address
iv. Role/position On The Project
c. Completion Certificates Of Training By All Members Of The Team Shall Be Provided To The Cor Within 12 Calendar Days.
d. Additional Members Can Be Added At Any Time Upon Written Request To The Cor.
e. Acc Shall Be Used For All Digital Submissions, Official Project Correspondence, Submittals, Rfis, Schedules, Actionable Tasks, Photos, Surveys, Reports, Inspections, Etc.
13. Provide Design, Construction, And Post-construction Services As Listed Below.
a Full Scope Of Services Including The Deliverables Will Be Included In The Formal Solicitation After A Review Of The Sf330s.
Location
canandaigua Vamc. 400 Fort Hill Avenue Canandaigua, Ny 14424
cost Range
estimated Construction Cost Range: Between $5,000,000 And $10,000,000.
type Of Contract Contemplated
the Department Of Veterans Affairs Is Contemplating Awarding A Firm Fixed Price Contract.
design Completion Period: The Department Of Veterans Affairs Requires Design And Contract Support Services. The A/e Shall Deliver 100% Bid Documents In 220 Calendar Days From The Notice To Proceed (ntp).
selection Criteria Descriptions
the Selection Criteria Descriptions Are Provided Below.
professional Qualifications Necessary For Satisfactory Performance Of Required Services.
offerors Will Be Evaluated In Terms Of The Qualifications, Competence And Experience Of The Key Personnel And Technical Team Proposed To Accomplish This Work. Key Personnel Are Individuals Who Will Have Major Contract Or Project Management Responsibilities And/or Will Provide Unusual Or Unique Expertise. Provide A Balanced Licensed And Or Certified Workforce In The Following Disciplines Architecture, Structural, Mechanical, Electrical, Interior Design, Environmental Services And Fire Protection Engineering As Needed. The Designers Of Record Shall Perform And Direct The Design Within Their Respective Discipline And Shall Sign And Seal The Drawings. The Lead Designer In Each Discipline Must Be Registered But Does Not Have To Be Registered In The Particular State Where The Project Is Located.
submission Requirements: Provide Resumes For All Proposed Key Personnel. Resumes Are Limited To One Page Each And Should Cite Project Specific Experience And Indicate Proposed Role In This Contract. Provide Professional Registration, Certification, Licensure And/or Accreditation. Indicate Participation Of Key Personnel In Example Projects In The Sf-330 Part 1 Section G.
(2) Specialized Experience And Technical Competence
specialized Experience And Technical Competence Required For This Specific Project, Including, Where Appropriate, Experience In Energy Conservation, Pollution Prevention, Waste Reduction, And The Use Of Recovered Materials.
offerors Will Be Evaluated On Specialized Experience And Technical Competence In The Performance Of Services Similar To Those Anticipated Under This Contract With Regard To:
experience With Design Of Inpatient Medical Care Facilities.
experience With Design Of Multifunctional Offices.
experience With Specialized Hvac And Electrical Distribution Systems Design For Healthcare Facilities;
experience In Providing Post Construction Award Services (shop Drawing Review, As-built Drawing And Quality Assurance Plan (qap) Preparation, Construction Inspection Services, And Operating And Maintenance Manuals).
experience With Government Designs And Construction.
experience With Extensive Site Survey Skills
submission Requirements: Provide Up To Five (5) Projects Completed Or Substantially Completed Within The Past Five (5) Years That Best Illustrate Specialized Experience Of The Proposed Team In The Areas Outlined Above And The Scope Of Work Of The Project. Example Projects Shall Note Project S Square Footage. All Projects Provided In The Sf-330 Must Be Completed By The Office/branch/regional Office/individual Team Member Actually Proposed To Manage And/or Perform Work Under This Contract. To Enable Verification, Firms Should Include The Duns Number Along With Each Firm Name In The Sf-330 Part 1, Section F Item 25 Firms From Section C Involved In This Project, Block (1). Include A Contract Number Or Project Identification Number In Block 21. Include An E-mail Address, And Phone Number For The Point Of Contact In Block 23(c). Include In The Project Description The Contract Period Of Performance, Award Contract Value, Current Contract Value, A Summary Of The Work Performed That Demonstrates Relevance To Specialized Experience As Outlined Above. If The Contractor Served As A Subcontractor On A Project, Indicate The Value Of The Work They Provided Towards The Performance Of The Overall Project. If A Project Was Performed By A Joint Venture, And Not All Joint Venture Partners Are On The Team Proposed For This Contract, The Offeror/team Should Specifically Address The Work Performed By The Joint Venture Partner Offering/teaming On This Contract. Likewise, If The Offeror/team Member Worked As A Subcontractor On A Project, The Description Should Clearly Describe The Work Actually Performed By The Offeror/team Member And The Roles And Responsibilities Of Each On The Project, Rather Than The Work Performed On The Project As A Whole. If The Project Description Does Not Clearly Delineate The Work Performed By The Entity/entities Offering/teaming On This Contract, The Project Could Be Eliminated From Consideration.
note: If The Offeror Is A Joint Venture, Information Should Be Submitted As A Joint Venture; However, If There Is No Information For The Joint Venture, Information Should Be Submitted For Either Joint Venture Partner, Not To Exceed A Total Of Five (5) Projects For This Criterion. Projects Shall Be Submitted On The Sf-330. For Submittal Purposes, A Task Order On An Idiq Contract Is Considered A Project, As Is A Stand-alone Contract Award. Do Not List An Idiq Contract As An Example Of A Completed Project. Instead, List Relevant Completed Task Orders Or Stand-alone Contract Awards That Fit Within The Definition Above. Examples Of Project Work Submitted That Do Not Conform To This Requirement Will Not Be Evaluated.
failure To Provide Requested Data, Accessible Points Of Contact, Or Valid Phone Numbers Could Result In A Firm Being Rated Lower.
all Information For Criterion 1 Should Be Submitted In Part 1, Section F Of The Sf-330. The Government Will Not Consider Information Submitted In Addition To Part 1, Section F In Evaluating Criterion 1.
(3) Capacity
this Factor Evaluates The Ability Of The Firm, Given Their Current Projected Workload And The Availability Of Their Key Personnel, To Accomplish The Possible Myriad Of Design Projects In The Required Time.
submission Requirements: Describe The Firm S Ability To Concurrently Perform And Manage Multiple Projects In Different Locations To Meet Aggressive Schedules, Multiple Disciplines, And Control Costs And The Firm S Capacity To Accomplish Multiple Projects Simultaneously.
the General Workload And Staffing Capacity Of The Design Office Will Be Evaluated.
list Current Projects With A Design Fee Of Greater Than $20,000 Being Designed In The Firms Office.
ii. Indicate The Firms Present Workload And The Availability Of The Project Team (including Sub-consultants) For The Specified Contract Performance Period;
iii. Describe Experience In Successfully Delivering Projects Per Performance Schedule, Providing Timely Construction Support, And Successfully Completing Multiple Projects With Similar Delivery Dates
(4) Past Performance: Visn2 Will Evaluate Past Performance On Recent And Relevant Contracts With Government Agencies (emphasis On Va Work) And Private Industry In Terms Of Cost Control, Quality Of Work, Compliance With Performance Schedules And A Record Of Significant Claims Against The Firm.
i. Recent Is Defined As Performance Occurring Within Five (5) Years Of The Date Of This Sources Sought, Except Those Ongoing Projects Must Have Begun No Less Than One (1) Year Prior To The Issuance Of This Sources Sought.
ii. Relevancy Is Defined As Performance Of Work On Projects That Are Similar In Scope Within A Va Hospital Setting In Relation To The Type Of Projects Anticipated Under The Resultant Contracts.
respondents With No Previous Past Performance Shall State This When Addressing The Selection Criteria. Where There Is No Record Of Past Performance, The Proposal Will Be Evaluated Neither Favorably Nor Unfavorably. Superior Performance Ratings On Relevant Projects May Be Considered More Favorably In The Evaluation.
submission Requirements: Submit A Completed Cpars/acass Evaluation For Each Project Under Criterion 1. If There Is Not A Completed Cpars/acass Evaluation, The Past Performance Questionnaire (ppq) Included In This Notice Is Provided For The Offeror Or Its Team Members To Submit To The Client For Each Project The Offeror Includes Under Criterion 1. An Offeror Shall Not Submit A Ppq When A Completed Cpars/acass Is Available. If A Cpars/acass Evaluation Is Not Available, Ensure Correct Phone Numbers And Email Addresses Are Provided For The Client Point Of Contact. Completed Ppqs Should Be Submitted With Your Sf-330. If The Offeror Is Unable To Obtain A Completed Ppq From A Client For A Project(s) Before The Response Date Set Forth In This Notice, Offerors Should Complete And Submit With Their Responses The First Page Of The Ppq (attachment), Which Will Provide Contract And Client Information For The Respective Project(s). Offerors May Submit A Ppq Previously Submitted Under A Different Notice/rfp (legible Copies Are Acceptable) As Long As It Is On The Same Form As Posted With This Synopsis. Offerors Should Follow Up With Clients/references To Ensure Timely Submittal Of Questionnaires. If Requested By The Client, Questionnaires May Be Submitted Directly To The Government's Point Of Contact, Network Contracting Office 2 Attn: Amanda Baumler Via Email At Amanda.baumler@va.gov Prior To The Response Date. Offerors Shall Not Incorporate By Reference Into Their Response Ppqs Or Cpars Previously Submitted In Response To Other A/e Services Procurements. However, This Does Not Preclude The Government From Utilizing Previously Submitted Ppq Information In The Past Performance Evaluation.
(5) Location: Location In The General Geographical Area Of The Project And Knowledge Of The Locality Of The Project; Provided, That Application Of This Criterion Leaves An Appropriate Number Of Qualified Firms, Given The Nature And Size Of The Project
iv. To Be Rated Acceptable For This Evaluation Factor, The A/e Firm Must Be Within 450 Miles From The Prime Contractor S Main Office Or Official Satellite Office To The Canandaigua Vamc At 400 Fort Hills Avenue. Canandaigua, Ny 14424.
v. This Distance Is Determined According To Http://maps.google.com/
vi. This Factor Evaluates The Distance The Ae Firm's Design Office Or Official Satellite Office(s) From The Location Of Work (va Medical Center). Please Provide The Address (es) And Distance Of Your Closest Office To The Address Listed In Iv. Above.
submission Requirements: Indicate Firms/teams Location, Including Main Offices, Branch Offices And Any Subconsultants Offices And Demonstrate How This Will Be Advantageous To The Government.
(6) Veteran Owned: The Extent To Which Potential Contractors Identify And Commit To The Use Of Service-disabled Veteran-owned Small Businesses, Veteran-owned Small Businesses, And Other Types Of Small Businesses As Subcontractors.
(7) Construction Period Services: Experience In Construction Period Services To Include Professional Field Inspections During The Construction Period, Review Of Construction Submittals, Support In Answering Requests For Information During The Construction Period, And Support Of Construction Contract Changes To Include Drafting Statements Of Work, And Cost Estimates Shall Be Included As An Evaluation Criterion When Construction Period Services Is Included In The Statement Of Work For A-e Services.
(8) Experience Specific Experience And Qualifications Of Personnel Proposed For Assignment To The Project And Their Record Of Working Together As A Team.
submission Requirements: Offerors Shall Submit Evidence Of Individuals Experience And Qualifications In Their Respective Fields. Additionally, Documentation Must Be Provided To Show These Individuals Have Worked Together As A Team On Previous Projects And Their Role. (completing Sections E, F, And G, On The Sf-330 Meets The Documentation Requirement). Furthermore, Offerors Shall Describe The Ability Of The Firm To Manage, Coordinate And Work Effectively With Team Members, Both Internal Staff And Consultants. Discuss The History Of Working Relationships With Team Members, Including Joint Venture Partners Where Applicable.
(9) Reputation Reputation And Standing Of The Firm And Its Principal Officials With Respect To Professional Performance, General Management, And Cooperativeness.
submission Requirements: Offerors Shall Provide Documentation (awards, Certificates, Publications, Commendations From Within The Community) As Evidence Of Reputation And Standing Of Its Firm.
(10) - Claims - Record Of Significant Claims Against The Firm Because Of Improper Or Incomplete Architectural And Engineering Services. Offerors With Substantiated Claims Against The Firm As A Result Of Improper Architectural And Engineering Services Provided In The Last Three (3) Years.
submission Requirements: Records And Any Other Documentation Of Substantiated Claims Highlighting Improper Or Incomplete Architectural Engineering Services Against The Firm Within The Last Three (3) Years. The Sf-330 Shall Contain A Statement Affirming That There Are No Records Of Significant Claims Because Of Improper Or Incomplete Architectural And Engineering Services.
please Note: The Ae Evaluation Board Must Be Provided With Complete And Accurate Information For All Ten (10) Evaluation Factors Above In Order To Rank As Qualified And Eligible Firms. Therefore, The Ae Firm Must Expand Upon, As It Deems Necessary, On Any Evaluation Factor Not Well Demonstrated Or Addressed With Part 1a To Part Ig And Part Ii Of The Sf330. The Ae Firm Shall Use Part Ih And/or Use Additional Sheets To Supplement/address All Evaluation Factors To Clearly Demonstrate Its Qualifications.
evaluation Scoring
evaluation Factors 1, 2, 3, 5, 8, 9 And 10 Will Be Evaluated Using The Following Adjectival Ratings As Follows:
outstanding: Proposal Meets Requirements And Indicates An Exceptional Approach And Understanding Of The Requirements. Strengths Far Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Very Low.
good: Proposal Meets Requirements And Indicates A Thorough Approach And Understanding Of The Requirements. Proposal Contains Strengths Which Outweigh Any Weaknesses. Risk Of Unsuccessful Performance Is Low.
acceptable: Proposal Meets Requirements And Indicates An Adequate Approach And Understanding Of The Requirements. Strengths And Weaknesses Are Offsetting Or Will Have Little Or No Impact On Contract Performance. Risk Of Unsuccessful Performance Is Moderate.
marginal: Proposal Does Not Clearly Meet Requirements And Has Not Demonstrated An Adequate Approach And Understanding Of The Requirements. The Proposal Has One Or More Weaknesses Which Are Not Offset By Strengths. Risk Of Unsuccessful Performance Is High.
unacceptable: Proposal Does Not Meet Requirements And Contains One Or More Deficiencies. Proposal Is Not Awardable. The Firm S Proposal Demonstrates A Misunderstanding Of The Requirement And The Approach Fails To Meet Performance Standards. The Firm S Proposal Has Major Omissions And Inadequate Details To Assure Evaluators That The Offeror Has An Understanding Of Requirement.
the Ratings Identified Below Were Used In The Evaluation Of Past Performance (criterion 4):
substantial Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A High Expectation That The Offeror Will Successfully Perform The Required Effort. No Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract.
satisfactory Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has A Reasonable Expectation That The Offeror Will Successfully Perform The Required Effort. Little Doubt Exists Based On The Offeror S Past Performance That They Could Satisfy The Requirements Of The Contract.
unknown Confidence (neutral): No Recent/relevant Performance Record Is Available Or The Offeror S Performance Record Is So Sparse That No Meaningful Confidence Assessment Rating Can Be Reasonably Assigned.
limited Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectation That The Offeror Will Be Able To Successfully Perform The Required Effort. Some Doubt Exists Based On Past Performance That They Could Satisfy The Terms And Conditions Of The Contract.
no Confidence: Based On The Offeror S Recent/relevant Performance Record, The Government Has Little Expectations That The Offeror Will Be Able To Successfully Perform The Required Effort. Significant Doubt Exists Based On The Offeror S Past Performance That They Can Satisfy The Requirements Of The Contract.
limitations
852.219-73 Va Notice To Total Set-aside For Verified Service-disabled Veteran-owned Small Businesses (nov 2022)
(a) Definition. For The Department Of Veterans Affairs, Service-disabled Veteran-owned Small Business Concern Or Sdvosb :
(1) Means A Small Business Concern -
(i) Not Less Than 51 Percent Of Which Is Owned By One Or More Service-disabled Veterans Or, In The Case Of Any Publicly Owned Business, Not Less Than 51 Percent Of The Stock Of Which Is Owned By One Or More Service-disabled Veterans Or Eligible Surviving Spouses (see Vaar802.101, Surviving Spouse Definition);
(ii) The Management And Daily Business Operations Of Which Are Controlled By One Or More Service-disabled Veterans (or Eligible Surviving Spouses) Or, In The Case Of A Service-disabled Veteran With Permanent And Severe Disability, The Spouse Or Permanent Caregiver Of Such Veteran;
(iii) The Business Meets Federal Small Business Size Standards For The Applicable North American Industry Classification System (naics) Code Identified In The Solicitation Document;
(iv) The Business Has Been Verified For Ownership And Control Pursuant To 38 Cfr Part 74 And Is Listed In Va's Vendor Information Pages (vip) Database At Https://www.vetbiz.va.gov/vip/; And
(v) The Business Will Comply With Vaar Subpart 819.70 And Small Business Administration (sba) Regulations Regarding Small Business Size And Government Contracting Programs At 13 Cfr Parts 121 And 125, Provided That Any Reference Therein To A Service-disabled Veteran-owned Small Business Concern Or Sdvo Sbc, Is To Be Construed To Apply To A Va Verified And Vip-listed Sdvosb, Unless Otherwise Stated In This Clause.
(2) The Term Service-disabled Veteran Means A Veteran, As Defined In 38 U.s.c. 101(2), With A Disability That Is Service-connected, As Defined In 38 U.s.c. 101(16).
(3) The Term Small Business Concern Has The Meaning Given That Term Under Section 3 Of The Small Business Act (15 U.s.c. 632).
(4) The Term Small Business Concern Owned And Controlled By Veterans With Service-connected Disabilities Has The Meaning Given The Term Small Business Concern Owned And Controlled By Service-disabled Veterans Under Section 3(q)(2) Of The Small Business Act (15 U.s.c. 632(q)(2)), Except That For A Va Contract The Firm Must Be Listed In The Vip Database (see Paragraph (a)(1)(iv) Of This Clause).
(b) General.
(1) Offers Are Solicited Only From Vip-listed Sdvosbs. Offers Received From Entities That Are Not Vip-listed Sdvosbs At The Time Of Offer Shall Not Be Considered.
(2) Any Award Resulting From This Solicitation Shall Be Made To A Vip-listed Sdvosb Who Is Eligible At The Time Of Submission Of Offer(s) And At The Time Of Award.
(3) The Requirements In This Clause Apply To Any Contract, Order Or Subcontract Where The Firm Receives A Benefit Or Preference From Its Designation As An Sdvosb, Including Set-asides, Sole Source Awards, And Evaluation Preferences.
(c) Representation. Pursuant To 38 U.s.c. 8127(e), Only Vip-listed Sdvosbs Are Considered Eligible To Receive Award Of A Resulting Contract. By Submitting An Offer, The Prospective Contractor Represents That It Is An Eligible Sdvosb As Defined In This Clause, 38 Cfr Part 74, And Vaar Subpart 819.70.
(d) Agreement. When Awarded A Contract Action, Including Orders Under Multiple-award Contracts, An Sdvosb Agrees That In The Performance Of The Contract, The Sdvosb Shall Comply With Requirements In Vaar Subpart 819.70 And Sba Regulations On Small Business Size And Government Contracting Programs At 13 Cfr Part 121 And Part 125, Including The Non-manufacturer Rule And Limitations On Subcontracting Requirements In 13 Cfr 121.406(b) And 13 Cfr 125.6. Unless Otherwise Stated In This Clause, A Requirement In 13 Cfr Parts 121 And 125 That Applies To An Sdvo Sbc, Is To Be Construed To Also Apply To A Vip-listed Sdvosb. For The Purpose Of Limitations On Subcontracting, Only Vip-listed Sdvosbs (including Independent Contractors) Shall Be Considered Eligible And/or Similarly Situated (i.e., A Firm That Has The Same Small Business Program Status As The Prime Contractor). An Otherwise Eligible Firm Further Agrees To Comply With The Required Certification Requirements In This Solicitation (see 852.219-75 Or 852.219-76 As Applicable). These Requirements Are Summarized As Follows:
(1) Services. In The Case Of A Contract For Services (except Construction), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance To Firms That Are Not Vip-listed Sdvosbs (excluding Direct Costs To The Extent They Are Not The Principal Purpose Of The Acquisition And The Sdvosb/vosb Does Not Provide The Service, Such As Airline Travel, Cloud Computing Services, Or Mass Media Purchases). When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Service Portion Of The Contract
(2) Supplies/products.
(i) In The Case Of A Contract For Supplies Or Products (other Than From A Non-manufacturer Of Such Supplies), The Sdvosb Prime Contractor Will Not Pay More Than 50% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs. When A Contract Includes Both Supply And Services, The 50 Percent Limitation Shall Apply Only To The Supply Portion Of The Contract.
(ii) In The Case Of A Contract For Supplies From A Non-manufacturer, The Sdvosb Prime Contractor Will Supply The Product Of A Domestic Small Business Manufacturer Or Processor, Unless A Waiver As Described In 13 Cfr 121.406(b)(5) Has Been Granted. Refer To 13 Crf 125.6(a)(2)(ii) For Guidance Pertaining To Multiple Item Procurements.
(3) General Construction. In The Case Of A Contract For General Construction, The Sdvosb Prime Contractor Will Not Pay More Than 85% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, To Firms That Are Not Vip-listed Sdvosbs.
(4) Special Trade Construction Contractors. In The Case Of A Contract For Special Trade Contractors, No More Than 75% Of The Amount Paid By The Government To The Prime For Contract Performance, Excluding The Cost Of Materials, May Be Paid To Firms That Are Not Vip-listed Sdvosbs.
(5) Subcontracting. An Sdvosb Must Meet The Naics Size Standard Assigned By The Prime Contractor And Be Listed In Vip To Count As Similarly Situated. Any Work That A First Tier Vip-listed Sdvosb Subcontractor Further Subcontracts Will Count Towards The Percent Of Subcontract Amount That Cannot Be Exceeded. For Supply Or Construction Contracts, The Cost Of Materials Is Excluded And Not Considered To Be Subcontracted. When A Contract Includes Both Services And Supplies, The 50 Percent Limitation Shall Apply Only To The Portion Of The Contract With The Preponderance Of The Expenditure Upon Which The Assigned Naics Is Based. For Information And More Specific Requirements, Refer To 13 Cfr 125.6.
(e) Required Limitations On Subcontracting Compliance Measurement Period. An Sdvosb Shall Comply With The Limitations On Subcontracting As Follows:
_x_by The End Of The Base Term Of The Contract Or Order, And Then By The End Of Each Subsequent Option Period; Or
__by The End Of The Performance Period For Each Order Issued Under The Contract.
(f) Joint Ventures. A Joint Venture May Be Considered Eligible As An Sdvosb If The Joint Venture Is Listed In Vip And Complies With The Requirements In 13 Cfr 125.18(b), Provided That Any Requirement Therein That Applies To An Sdvo Sbc Is To Be Construed To Apply To A Vip-listed Sdvosb. A Joint Venture Agrees That, In The Performance Of The Contract, The Applicable Percentage Specified In Paragraph (d) Of This Clause Will Be Performed By The Aggregate Of The Joint Venture Participants.
(g) Precedence. The Va Veterans First Contracting Program, As Defined In Vaar 802.101, Subpart 819.70, And This Clause, Takes Precedence Over Any Inconsistencies Between The Requirements Of The Sba Program For Sdvo Sbcs, And The Va Veterans First Contracting Program.
(h) Misrepresentation. Pursuant To 38 U.s.c. 8127(g), Any Business Concern, Including All Its Principals, That Is Determined By Va To Have Willfully And Intentionally Misrepresented A Company's Sdvosb Status Is Subject To Debarment From Contracting With The Department For A Period Of Not Less Than Five Years (see Vaar 809.406-2 Causes For Debarment).
submission Requirements:
unless Paper Offers Are Specifically Authorized In An Individual Solicitation, All Responses To Solicitations Must Be Submitted Electronically As Described Below. Responses Submitted In A Paper Form Are Unacceptable. Failure To Comply With This Requirement May Jeopardize The Possibility Of Receiving An Award Due To Noncompliance With The Submission Requirements.
email Submission Requirements Interested Firms Having The Capabilities To Perform This Work Must Submit: One (1) Electronic Sf 330, Including Parts I And Ii, And Attachments (if Any) To Amanda.baumler@va.gov No Later Than 10am, Eastern Standard Time (est) On Tuesday, January 21st 2025 Submittals Received After The Date And Time Identified Will Not Be Considered. The Submittal Will Be Date And Time Stamped By The Microsoft Email System And Will Be The Official Record Of Receipt For The Submission. All Sf 330 Submissions Shall Be Clearly Indicated In Subject Line, Displaying The Solicitation Number And Project Number And Title (abbreviated And Shortened Is Okay). Submission Is To Be No More Than A Total Of Fifty (50) Pages; Size Of Emails Is Not To Exceed 10 Megabytes (mb). If More Than One Email Is Sent, Please Number Emails In Subject Line As 1 Of 2, 2 Of 2 Etc.
all Sf 330 Submissions Must Include The Following Information Either On The Sf 330 Or By Accompanying Document:
1. Cover Page With Solicitation Number, Project Number And Title
2. Table Of Contents
3. Copy Of Valid State Registration For Each Lead Designer
4. Copy Of Current Https://veterans.certify.sba.gov/ Sdvosb/vosb Certification
5. Duns Number
6. Cage Code
7. Tax Id Number
8. Email Address And Phone Number (including The Area Code) Of The Primary Point Of Contact.
Closing Date21 Jan 2025
Tender AmountRefer Documents
EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Tender
Others
United States
Details: This Is A Combined Synopsis/solicitation For Commercial Products And Commercial Services Prepared In Accordance With The Format In Federal Acquisition Regulation Part 12, Subpart 12.6, As Supplemented With Additional Information Included In This Notice. This Announcement Constitutes The Only Solicitation. Quotations Are Being Requested And A Written Solicitation Will Not Be Issued. The Contracting Officer Is Utilizing Policies And Procedures Prescribed In Part 12, Acquisition Of Commercial Products And Commercial Services. Solicitation Number Rfq 45310025q0008 Is Issued As A Request For Quotation (rfq). The Solicitation Document And Incorporated Provisions And Clauses Are Those In Effect Through Federal Acquisition Circular 2025-01 Effective On November 12, 2024. Convention Centers, Hotels, And Other Full Service Facilities That Can Satisfy The Requirements Listed Below Are Encouraged To Submit A Quotation. Quotations From Third-party Entities Will Not Be Considered. This Solicitation Is Considered An Unrestricted Procurement.
the U.s. Equal Employment Opportunity Commission Office Of Field Programs, State, Local And Tribal Programs Has A Requirement For A Contractor To Provide Meeting Facilities, Rental Of Audio Visual Equipment/support Services, Food And Beverages, Business Services And Lodging To Conduct A Four-day Joint Fepa-tero Conference. The United States Equal Employment Opportunity Commission (eeoc) Is Conducting A Joint Training Conference For Fair Employment Practices Agencies (fepas) And Tribal Employment Rights Offices (teros).
the Government Anticipates With A Minimum Of 225 Attendees And An Anticipated Maximum Of 250 Attendees. To Be Eligible For Consideration, The Contractor’s Proposed Facility For The Seminar Must Be Located In Downtown Phoenix, Arizona.
the Government Contemplates The Award Of A Firm-fixed Price (ffp) Contract.
the Quotation Package Shall Include The Following Line Items In A Written Quotation:
(fy 2025): Contract Line Item Number: Clin 0001, Rental Of Conference Space – Quantity 4 Days Each (see Below List Of Conference Space Requirements), Unit Price $ , Total Clin 0001 $ ;
clin 0002, Food And Beverage Services (see Below List Of Food And Beverage Requirements, Unit Price $ Per Person Rate Per Day, Unit Price
$ , Total For Clin 0002, $ .
clin 0003, Rental Of Audio Visual Equipment And Technical Support – Quantity 4 Days Each (see Below List Of Audio Visual Requirements), Unit Price $ , Total For Clin 0003 $ ;
clin 0004, Business Services Expenses – 4 Days (see Below List Of Business Services Requirements), Unit Price $ ____,
total For Base Period Clin 0004 $ . Total Price For Clins 0001 Through 0004: $
the Preferred Dates For Consideration In Order Of Preference June 1-june 5, 2025 (1st Choice), June 8-june 12, 2025, (2nd Choice), And July 13-july 17, 2025 (3rd Choice).
please Indicate Availability For Each Date In The Technical Portion Of The Quotation. No Other Dates Or Combination Of Dates Will Be Considered By The Government.
the Conference Provides For Meeting Space For Training Sessions, Along With Food And Beverage Service For Buffet Breakfast, Buffet Lunch, And Morning And Afternoon Breaks. Registration Starts Monday From 8:30am To 4:30pm Et. The Conference Starts Tuesday And Wednesday 7:30 Am To 6:00 Pm Et, Thursday, 7:30am To 1:30pm Et.
a Contract Will Be Awarded To The Responsible Quoter Whose Quotation Represents The Best Value To The Government. The Prospective Contractor Must Be Registered In The System For Award Management (sam) Database At The Time The Quotation Is Submitted. Registration Is Free And Can Be Completed On-line At Http://www.sam.gov. Each Quotation Must Clearly Indicate The Capability Of The Quoter To Meet The Requirements Specified In This Combined Synopsis/solicitation.
general Requirements: The Following Requirements For The Training Facility Are Specified In Terms Of Minimum Requirements. Accessibility: Americans With Disabilities Act (ada) Requirements: All Facilities, Including Training Rooms And Rest Rooms And Audio-visual Equipment, Must Be Fully Accessible To Individuals With Disabilities In Compliance With The Americans With Disabilities Act Amendments Act. Accommodations For Disabled Individuals May Include, But Are Not Limited To, Accessible Parking Spaces, Elevators, Adequate Sound Systems, Wide Aisles And Wheelchair Ramps. A Site Visit May Be Conducted By The Disability Business And Technical Assistance Centers (dbtac) Prior To The Award Of The Contract. Parking: There Must Be Adequate Free Or Low Cost On-site Parking For All Participants. Confirmation Policy: The Eeoc Anticipates The Need For Sleeping Rooms On Sunday Through Thursday. Eeoc Will Require The Hotel Contact Person To Provide A Listing Of Registered Participants With Reserved Sleeping Rooms Prior To The Lodging Date To Verify The Rooming List As It Develops. Amendments And/or Substitutions May Be Necessary.
description Of Facility And Minimum Requirements
the Following Requirements For Lodging And Conference Space Are Minimum Requirements:
Lodging: Guest Rooms Shall Be Located Onsite. The Facility Shall Be Centrally
Located Within No More Than Three Blocks Walking Distance Of Area Retail,
Restaurants, And Attractions. The Contractor Shall Provide A List Of All Local
Restaurants Within A Ten-minute Walk From The Contractor’s Facility.
lodging Payment Arrangements: Participants Will Contact The Hotel Individually To Obtain Room Scheduling And Shall Be Responsible For Payment Of Individual Guest Rooms And All Incidental Charges Upon Checkout. Payment Amount For Lodging Cannot Exceed, On A Daily Basis, The Maximum Per Diem Rate In Effect In Accordance With The Federal Travel Regulations Including Taxes, Gratuities, And Other Costs. Charges For Incidental Expenses Such As Telephone Charges And Room Service Will Be The Responsibility Of Individual Guests.
local Transportation: The Contractor Shall Also Provide A List Of Options For
commuting From And To All Airports And Railroad Stations (if Applicable) Within The
area. If The Contract Facility Provides Shuttle Service, Contractor Shall Indicate If
the Service Is Free Or What The Fee Is For The Service. Also, Indicate If The Shuttle
service Is Wheelchair Accessible.
room Rate: The Contractor Shall Provide The Sleeping Rooms For Eeoc Staff And Presenters At Or Below The Federal Government’s Domestic Per Diem Rate Which Is Available On-line At Http:/www.gsa.gov. The Facility Will Not Require Advance Payment From Conference Participants Covering The First Night Of Lodging. Guest Rooms Shall Be Located Within The Same Building As The Meeting Rooms.
guest Rooms: Individual Travelers Will Schedule And Pay For Their Guest Room Nights. The Schedule And Range Of Guest Rooms Anticipated For This Conference Are As Follows:
sunday, 35 Sleeping Rooms
monday, 250 Sleeping Rooms
tuesday, 250 Sleeping Rooms
wednesday, 250 Sleeping Rooms
thursday, 65 Sleeping Rooms
friday, 0 Sleeping Rooms
clin 0001 – Conference Space – Meeting Facilities: All Meeting Rooms Shall Be Wheelchair Accessible. The Meeting Facility Shall Be Available For Consecutive Nights And Consecutive Days As Specified Below:
conference Will Be Held Monday Through Thursday On The Dates Provided Previously.
the Following Meeting Spaces/rooms Shall Be Available Throughout The Conference:
registration Area: Registration Area Shall Be Near The Main Plenary Room(s) And Will Include Two Skirted Eight-foot Tables, Configured As Follows: Two Tables Next To Each Other To Accommodate Training Materials. The Facility Shall Provide Signage Identifying The Conference Location Within The Hotel. Set Up Shall Be Completed By 12:00 P.m. Et On Monday. The Registration Area Must Remain Set Up And Available Throughout The Duration Of The Conference.
secured Office/working Room: A Secure Office Or Working Room Is Needed Where Conference Materials Can Be Assembled, Sorted, And Stored. This Will Also Be Used As A Work Area For Staff. The Room Must Include At Least Two Six-foot Tables And Trash Receptacles. Telecommunication Requirements Include Electrical Outlets And Internet Access.
two Plenary Meeting Rooms: Large Plenary Meeting Room Shall Accommodate Up To 250 People Set In Classroom Style With No More Than Two People Per Six-foot Tables Or 3 People Per Eight-foot Tables Which Are Covered And Skirted. Spacing Between Rows Of Seating Shall Be
sufficient For Easy Wheelchair Access. Two Six-foot, Covered And Skirted Head Tables On A Stage With Four Moveable Chairs And Podium With Microphone. The Stage Shall Have Steps With A Handrail On One Side And Shall Be Wheelchair Accessible With A Low To Moderate Incline. The Tables Shall Include Writing Paper, Pens, And Water With Glasses For The Participants At The Start Of The Morning And Refreshed For The Afternoon Sessions. There Shall Be Sufficient Space At The Back Of The Room To Place Additional Chairs, If Needed. Room Will Be Available Between 7:30 Am – 6:00 Pm Et On Tuesday And Wednesday, And 7:30 Am – 1:30 Pm Et On Thursday.
medium Plenary Meeting Room Shall Accommodate Up To 100 People Set In Classroom Style With No More Than Two People Per Six-foot Tables Or 3 People Per Eight-foot Tables Which Are Covered And Skirted. Spacing Between Rows Of Seating Shall Be Sufficient For Easy Wheelchair Access.
two Six-foot, Covered And Skirted Head Tables On A Stage With Four Moveable Chairs And Podium With Microphone. The Stage Shall Have Steps With A Handrail On One Side And Shall Be Wheelchair Accessible With A Low To Moderate Incline. The Tables Shall Include Writing Paper, Pens, And Water With Glasses For The Participants At The Start Of The Morning And Refreshed For The Afternoon Sessions. There Shall Be Sufficient Space At The Back Of The Room To Place Additional Chairs, If Needed. Room Will Be Available Between 7:30 Am – 6:00 Pm Et On Tuesday And Wednesday, And 7:30 Am – 1:30 Pm Et On Thursday.
breakout Rooms: Four Breakout Rooms To Accommodate At Least 65 People Each, Set In Classroom Style With No More Than Two People Per Six-foot Table Or 3 People Per Eight-foot Table Which Are Covered And Skirted Or Round Tables Of 6-8 People Per Table. Each Table Shall Contain Writing Paper, Pens, Ice Water With Glasses, Candy Or Mints For Participants. Tables Shall Be Refreshed For Afternoon Sessions. All Chairs Shall Be In Working Order, Free From Soil And Able To Move Easily. There Shall Be Enough Space Between Tables To Maneuver A Wheelchair. The Hotel May Provide The Large Plenary Meeting Room And Medium Plenary Meeting Room As Two Of The Four Breakout Rooms. All Breakout Rooms Will Be Available 7:30 Am – 6:00 Pm Et On Tuesday And Wednesday, And 7:30 Am – 1:30 Pm Et On Thursday.
small Group Meeting Room: This Meeting Room Shall Accommodate Up To 30 People Set In A U-shape Style With Tables That Are Covered And Skirted. The Tables Shall Include Writing Paper, Pens, And Water With Glasses For The Participants At The Start Of The Morning And Refreshed For The Afternoon Sessions. There Shall Be Sufficient Space At The Back Of The Room To Place Additional Chairs, If Needed. Room Will Be Available 8:00 Am – 7:00 Pm Et On Monday; 7:30 Am – 6:00 Pm Et On Tuesday And Wednesday; And 7:30 Am – 6:30 Pm Et On Thursday.
all Meeting Rooms Must Have A Suitable Sound System So All Participants May Hear And Ask Questions Of The Speakers. Both Meeting Rooms Should Be Arranged Classroom Style With Chairs And Tables For Writing And Handouts. All Chairs And Tables Shall Be In Acceptable Condition (the Furniture Is Not Broken, Soiled, Rusted Or Damaged In Any Way That Would Injure The Individual Or Damage Clothing). Aisle Space, Including The Space Between Tables And Desk, Need To Be Accessible For Persons In A Wheelchair. Walls Should Be Constructed In Such A Manner That They Confine Inside Sound And Reduce Or Prevent The Transmission Of Extraneous Sound. Both Rooms (including Luncheon Area) Should Be Equipped With A Working Sound System Which May Be Controlled By The Speaker And Which Projects Equally To All Areas Of The Room. Rooms Should Be Configured To Allow Every Participant A Clear View Of The Speaker And All Visual Aids. Each
participant Should Have A Clear View Of At Least One Of The Projection Screens In Use. Rooms Should Be Well Lit To Accommodate Extensive Reading And Writing And All Lighting Should Be Uniform And Should Not Produce A Glare. Heating And Air Conditioning Should Provide A Comfortable Level Of Air Quality And Room Temperature When Rooms Are At The Maximum Capacity. Rooms Should Be Refreshed After Each Session And Debris Removed.
clin 0002 – Food And Beverage Service: Buffet Breakfast To Be Served On Tuesday, Wednesday, And Thursday Between [approximate Time Of Service: 7:30 A.m. And 9:00 A.m. Et] And To Include A Protein (such As Eggs And/or Meat), A Potato Dish, Assorted Pastries, Breakfast Breads, Bagels And Cream Cheese, Sliced Fresh Fruit And Yogurt, Freshly Brewed Coffee, Decaffeinated Coffee, Tea, Hot Water And Assorted Fruit Juices.
morning Break To Be Served On Tuesday, Wednesday And Thursday Between [approximate Time Of Service: Tbd] And Shall Include, At A Minimum Refresher Of Coffee, Tea And Water.
buffet Luncheon To Be Served On Tuesday And Wednesday Between [approximate Time Of Service: 11:45 A.m. And 1:15 P.m. Et]. Buffet Shall Be Set Up Outside The Large Plenary Meeting Room And Individuals Will Be Permitted To Bring Food Back Into The Large Plenary Meeting Room For Consumption. Typical Lunch Must Consist Of Chicken Or Comparable Entree, Seasonal Vegetables (an Offering Sufficient To Serve As Main Meal For Vegetarians And Vegans), A Starch, Bread Or Rolls/butter, Dessert, Juices, Coffee, Decaffeinated Coffee And Iced Tea. Please Provide Recommended Lunch Buffet Menus, With Prices Per Person Served With Regular And Decaffeinated Coffee, Water And Tea (iced Or Hot).
afternoon Break Is To Be Served On Tuesday And Wednesday Between [approximate Time Of Service: Tbd] To Include Assorted Drinks, Bottled Water, Herbal Teas Along With A Snack That May Consist Of Cookies And/or Brownies, Whole Fruit, Or Chips. Provide Recommended List Of Beverages And Snacks And Their Related Prices.
small Group Food And Beverage – Only Needed On Monday And Thursday Afternoon [approximate Time Of Service: Tbd]. The Estimated Number Of People Receiving This Service Is Up To 30 People And Is Subject To Change.
small Group Breakfast To Be Served On Monday Between [approximate Time Of Service: 7:30
a.m. And 9:00 A.m. Et] And To Include A Protein (such As Eggs And/or Meat), A Potato Dish, Assorted Pastries, Breakfast Breads, Bagels And Cream Cheese, Sliced Fresh Fruit And Yogurt, Freshly Brewed Coffee, Decaffeinated Coffee, Tea, Hot Water And Assorted Fruit Juices. Please Provide Recommended Breakfast Menus, With Prices Per Person Served.
small Group Luncheon To Be Served On Monday Between [approximate Time Of Service: 11:45
a.m. And 1:15 P.m. Et]. Typical Lunch Must Consist Of Chicken Or Comparable Entree, Seasonal Vegetables (an Offering Sufficient To Serve As Main Meal For Vegetarians And Vegans), A Starch, Bread Or Rolls/butter, Dessert, Brewed Coffee, Decaffeinated Coffee, Juices And Iced Tea. Please Provide Recommended Lunch Menus, With Prices Per Person Served.
small Group Afternoon Break Is To Be Served On Monday [approximate Time Of Service: Tbd Et] To Include Assorted Drinks, Bottled Water, Herbal Teas Along With A Snack That May Consist Of Cookies And/or Brownies, Whole Fruit, Or Chips. Provide Recommended List Of Beverages And Snacks And Their Related Prices.
small Group Afternoon Break Is To Be Served On Thursday [approximate Time Of Service: Tbd Et] To Include Assorted Drinks, Bottled Water, Herbal Teas Along With A Snack That May Consist Of Cookies And/or Brownies, Whole Fruit, Or Chips And A Hot Or Cold Food Item. Provide Recommended List Of Beverages, Snacks And Hot Or Cold Food Item And Their Related Prices.
quoter Should Also Submit An All-day Food And Drink Package With A Per Person Rate Per Day. All Food And Beverage (f&b) Services Need To Be Located In Areas Accessible To Individuals With Disabilities. The Luncheon Should Be Arranged So That All Individuals Can Be Seated And Served Sufficiently.
pricing For Food And Beverages Shall Include The Price For The Item(s), Plus The Gratuity (service Charge), And A Statement From The Contractor Indicating Whether The U.s. Government Is Exempt From State Tax, If Applicable. The Eeoc Is A Tax Exempt Federal Agency; Please Do Not Include Any Sales Tax In Quotations For Which The Federal Government Is Exempt.
the Contracting Officer Representative (cor) Will Contact The Contractor Within 72 Hours Of The Event To Confirm The Number Of Participants. The Contractor Shall Provide Food And Beverage For A Minimum Of 250 Participants Each Day. The Contractor Shall Invoice The Eeoc At The Agreed Upon Rates For Meeting Room Rental, Audio Visual Equipment, Food And Beverages, And Business Services. Charges For Food And Beverage Service Shall Be Reflected On The Invoice As The Cost Incurred Per Person.
clin 0003 – Rental Of Audio Visual Equipment And Technical Support: The Following Services And Audiovisual Equipment Will Be Required:
large Plenary Meeting Room – Needed On Tuesday, Wednesday And Thursday.
podium With Wired Microphone; Laptop Computer With Internet Connection [1 Each]
hand-held Cordless Microphone [2 Each]
table Top Microphone For Table Next To Podium [3 Each]
mixer With Sufficient Tracks To Amplify Speech And Sound Audible To Entire Audience Gathered In The Meeting Room.
projection Package Linked To Podium Laptop Computer.
projection Screens Appropriate For Size Of Meeting Room [2 Each]
av Package (movable Cart, Power Cord And Power Strip)
technical Assistance In Setting Up All Equipment, Including Splitters In Order To Assure That All Registrants Can Hear And See All Presentations.
equipment And Av Package Including A Technician To Enable Live Streaming Of Plenary Speaker(s) To Audience Participating Remotely.
av Technician To Monitor And Maintain Speech And Sound At Audible Levels During Meetings Held In Meeting Space.
medium Plenary Meeting Room – Needed On Tuesday, Wednesday And Thursday.
podium With Wired Microphone; Laptop Computer With Internet Connection [1 Each]
hand-held Cordless Microphone [2 Each]
table Top Microphone For Table Next To Podium [3 Each]
mixer With Sufficient Tracks To Amplify Speech And Sound Audible To Entire Audience Gathered In The Meeting Room.
projection Package Linked To Podium Laptop Computer.
projection Screens Appropriate For Size Of Meeting Room [2 Each]
av Package (movable Cart, Power Cord And Power Strip)
technical Assistance In Setting Up All Equipment, Including Splitters In Order To Assure That All Registrants Can Hear And See All Presentations.
av Technician To Monitor And Maintain Speech And Sound At Audible Levels During Meetings Held In Meeting Space.
breakout Room(s) – Needed On Tuesday, Wednesday And Thursday. If Hotel Only Provides Two Additional Breakout Rooms, Hotel Will Allow For Large Plenary And Medium Plenary Rooms To Be Repurposed For The Use Of Serving As Breakout Rooms.
requirements For Room:
podium With A Hand-held Wireless Microphone That Can Attach To The Podium. [1 Each]
projection Screen Appropriate For Size Of Meeting Room [1 Each]
av Package (movable Cart, Power Strip And Cord).
small Group Meeting Room – Needed On Monday And Thursday. Requirements For Room:
projection Screen Appropriate For Size Of Meeting Room [1 Each]
projection And Av Package To Allow For Laptop To Be Connected And Projected On To Screen.
the Contractor Must Submit A Detailed Pricelist For The Audio-visual Equipment And Technical Support, Including High Speed Wireless (wi-fi) Internet Access, And Electrical
connections. Also, Include The Price For The Items, Inclusive Of An Hourly Rate And The Number Of Labor Hours With Breaks Included In A Day Rate For Audio Visual Support Services (if Needed), Plus The Gratuity/service Charge.
clin 0004 – Business Services. Wi-fi Access For Presenters In Meeting Spaces: High Speed Wi-fi Connectivity For Presenters In All Meeting Spaces (large Plenary, Medium Plenary, Breakout Rooms, Small Group Meeting Room, Secured Office/working Room).
business Center: Business Office Support (copying, Faxing, Etc.) May Be Required Throughout The Conference. Hotel Must Provide A Pricing List For Copying, Faxing, Shipping, And Receiving Charges For The Hotel To Include Any Surcharges And Taxes.
receipt And Storing Of Materials: The Hotel Shall Have Procedures And Facilities In Place To Receive And Store All Conference Materials Shipped In Overnight Mail. Charges For This Service Shall Be Included In The Business Center Charges.
pre-conference Meeting And Conditions: A Pre-conference Meeting Either Via Telephone, Zoom/teams, Or In-person To Be Held At The Contractor’s Facility To Discuss The Objectives Of The Conference, Meet Staff Responsible For Implementing The Contract And Address Any Questions Regarding Elements Of The Statement Of Work, Within A Mutually Agreed Upon Time Prior To The Start Of The Conference.
signage: Signs And Floor Plans Directing Participants To The Meeting Rooms Shall Be Provided By The Facility. This Shall Include A Daily Electronic Announcement Board, Announcing The 2025 Joint Eeoc-fepa-tero Training Conference. The Electronic Board Shall Easily Be Visible To Participants And Identify Meeting Room Locations.
other: It Is Anticipated That Some Additional And/or Miscellaneous Expenses Might Be Incurred During The Conference Such As Service And Set Up Charges, Electrical Hook-up Fees, And Other Necessary But Unpredictable Expenses Which May Arise During The Conference. All Anticipated Charges For Additional Work Or Deliveries Of Requirements Outside Of Those Stated In The Government Contract Must Be Approved By The Cor And Communicated To The Government’s Contracting Officer In Writing Prior To Acceptance Of The Related Invoice And Payment Processing.
the Facility Shall Agree To Allow The Eeoc To Bring In Audio-visual And Other Equipment And Connect These To The Facility’s Audio Visual/public Address System, As Necessary.
Reporting Requirements
pre-award Reporting: In Their Quotation, The Quoter Must Submit A Detailed Breakdown Of All Cost To Include Lodging Rates, Meeting Space, Food And Beverage, Av Equipment, Labor And Service Costs, And Any Other Miscellaneous Charges, Which Are Necessary For The Success Of The Conference.
Prior To Conference Reporting: The Contractor Will Provide The Designated Eeoc
contact With Online Access To Hotel Reports With Information About Confirmed Room Reservations Or An Electronic List Of All Hotel Confirmation Numbers For All Participants, Staff And Presenters On A Weekly Basis Prior To The Conference.
during Conference Reporting: In Addition To Pre-conference Meeting, There Will Be A Daily Reconciliation Of All Charges Incurred With The Eeoc Designated Representative. The Charges Will Include Food And Beverage, Av Equipment And Labor, Telecommunication And Business Center Charges.
post Conference: The Contractor Shall Submit A Final Invoice Covering All Charges Within Five (5) Business Days After The Completion Of The Conference. The Contractor Shall Submit A Detailed Report With The Invoice That Consist Of The Following: Room Usage By Date And Attendee, Detailed Av Charges By Meeting Room And A Detailed Breakdown By Day For All Food And Beverage Charges And A Grand Total By Category For Reconciliations Of The Event.
Period Of Performance
period Of Performance-the Base Period Is From Date Of Award Through Execution Of The Fy 2025 Joint Fepa-tero Conference.
contract Administration-inspection And Acceptance
the Contracting Officer’s Representative (cor) Under The Resulting Contract Shall Be Designated At The Time Of The Contract Award.
method Of Payment: The Preferred Payment Method Is Payment By Government-wide Commercial Purchase Card. The Contractor Is To Apply Charges To Government Purchase Card Only After Final Invoice Has Been Accepted And Reconciled By The Cor.
cancellation: Should Eeoc Elect To Cancel This Contract, Eeoc Will Provide A Written Notification To The Contractor No Later Than Sixty (60) Calendar Days Prior To The Scheduled Event. By Receipt Of This Cancellation Notice, The Contractor Agrees To Release Eeoc From Any Cancellation Penalties Or Charges. If There Is A Cancellation Within Sixty (60) Calendar Days Of The Scheduled Event Date, Paragraph (l) Termination For The Government’s Convenience Or (m) Termination For Cause Of Far Clause 52.212-4, Contract Terms And Conditions - Commercial Items Will Govern.
submission Of Quotation: All Interested Parties Shall Submit With Their Quotation A Detailed Breakdown Of All Costs To Include Conference Space, Rental Of Audiovisual Equipment And Technical Support, Food And Beverage Service, Business Services, And Any Other Miscellaneous Services And Equipment Which Are Necessary For The Success Of The Seminar. In Addition, A Price Quotation Utilizing Attachment 1, Quotation Response Form, Shall Be Included. Quotations Shall Be Submitted In Three (3) Separate Volumes As Follows: Volume 1 - Technical Capability; Volume 2 - Past Performance; And Volume 3 - Price. Pricing Must Be Submitted Using The Line Item Structure In The Above Schedule Of Supplies And Services Of This Rfq. A Separate Attachment May Be Included In Volume 3 For Pricing Information On Menu Items, Transportation, Parking, Applicable Tax Rates, And Sleeping Room Rates. Your Quotation In Response To Rfq 45310025q0008 Is Due January 17th, 2025 At 12:00 P.m. Et. Quotations Will Be Accepted Via E- Mail. If Electronic Copy Of The Quotation May Be Submitted Via E-mail, Addressed To Melisza.coates@eeoc.gov.
questions: Questions Regarding This Request For Quotation Should Be Submitted To Melisza Coates, Contract Specialist Via E-mail At Melisza.coates@eeoc.gov. Telephone Inquiries Or Responses Are Not Acceptable. The Deadline For Submission Of Questions Regarding 45310025q0008 Is January 10, 2025, 12:00 P.m. Et. Any Questions Received After The Above Mentioned Date And Time Will Not Be Considered. The Government Will Not Reimburse Interested Parties For Any Cost Associated With Responding To This Business Opportunity. All Responsible Sources May Submit A Quotation Which Shall Be Considered By The Agency. The Anticipated Contract Award Date Is On Or Before February 28, 2025.
basis For Award: The Government Intends To Award A Firm Fixed-price Contract To The Responsible Quoter Whose Quotation Is Responsive To The Solicitation And Is Determined To Be The Best Value To The Government, Using The Tradeoff Approach. Selection Of The Best Value To The
government Will Be Achieved Through A Process Of Evaluating The Strengths And Weaknesses Of Each Quoter’s Quotation Against The Below Described Evaluation Criteria. In Determining The Best Value To The Government, The Technical Capability And Past Performance Evaluation Criteria, When Combined, Are More Important Than The Evaluated Price. The Government Is More Concerned About Obtaining A Superior Technical Capability Quotation Than Making An Award At The Lowest Evaluated Price. However, The Government Will Not Make An Award At A Price Premium It Considers Disproportionate To The Benefits Associated With The Evaluated Superiority Of One Technical And Management Quotation Over Another. Thus, To The Extent That Quoter’s Technical And Past Performance Quotations Are Evaluated As Close Or Similar In Merit, The Evaluated Price Is More Likely To Be A Determining Factor.
evaluation Factors For Award: The Following Factors Shall Be Used To Evaluate Quotations. These Factors Are Listed In Their Relative Order Of Importance: Technical Capability, Past Performance, And Price.
factor I – Technical Capability:
contract Requirements
quotations Will Be Evaluated On The Quoter’s Ability To Provide All The Contract Requirements Regarding Meeting Space, Food And Beverage, Audio-visual Equipment And Technical Support, Lodging, And Secured Storage. Quotations Must Address The Quoter’s Ability To Meet Ada Requirements For Accessibility As It Relates To Meeting Space, Lodging And Parking. Quotations Will Be Evaluated On The Quality Of The Customer Services Provided, The Layout Design And Quality Of The Facilities As Reflected By The Physical Layout And Atmosphere Of Meeting Space, Amenities Such As Free Wi-fi In The Conference Space, And Upkeep Of The Facilities.
location. Quotations Will Be Evaluated On The Ability Of The Quoter To Provide A Facility In Downtown Phoenix, Arizona With Adequate Low Cost Or Free On-site Parking For Participants And Presenters.
availability Of Dates. Quoters Will Be Evaluated On The Ability Of The Quoter To Provide The Required Services On The Dates Requested. Additional Consideration Will Be Given To Quoters Who Can Provide The Required Services On The Preferred (1st Choice) Dates.
availability Of Government Rates: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Lodging At Or Below The Government Rate Or Market Value For All Conference Participants And Presenters.
meeting Space: Quotations Will Be Evaluated On The Ability Of The Quoter To Provide The Required Meeting Spaces Within The Statement Of Work.
factor Ii – Past Performance:
the Quoter Must Provide References For A Minimum Of Three (3) Government Or Non-government Contracts Which Provide The Same Or Similar Services; Contract Must Have Been Awarded Within The Past (3) Years. The Information For Each Reference Shall Include The Following:
name And Address Of Government Agency And Other Non-government Client;
name, Title, Email And Telephone Number Of Contracting Officer Or Other Point Of Contact;
name, Title, Email And Telephone Number Of Client’s Program Manager, If Applicable;
contract Number, Period Of Performance, And Total Dollar Value Of Contract; And
description Of Services Provided.
list Any Problems Encountered On Each Contract And The Contractor’s Corrective Actions.
eeoc Will Evaluate Past Performance Based On Timeliness, Customer Service And Corrective Actions Taken (if Necessary). A Quoter Without A Record Of Relevant Past Performance Or For Whom Information On Past Performance Is Not Available Will Not Be Evaluated Favorably Or Unfavorably On Past Performance.
factor Iii – Price:
the Price Quotation Will Be Evaluated Against The Independent Government Price Estimate. Evaluation Of Quotations Will Consider The Following Pricing Information: Pricing Provided For All Line Items Listed In The Schedule Of Supplies And Services Of This Solicitation In The Units And Format Provided.
supplemental Agreements – If Any Hotel Submitting A Quotation Has Any Supplemental Agreements, Those Agreements Must Be Submitted With Their Quotation. If The Hotel Requires Signature Of A Supplemental Agreement That Was Not Submitted With The Quotation, The Quotation Will Be Rejected.
site Visits: The Eeoc Reserves The Right To Conduct A Site Visit Of All Quoters Who Are Rated To Be Technically Acceptable. The Site Visit Will Review And Evaluate The Same Technical Items Identified In The Technical Capabilities Portion Of The Technical Evaluation Factors.
notice: The Government Intends To Evaluate Quotations And Make Award Without Discussions (except Clarifications As Described In Far 15.306(a)). Therefore, The Quoter’s Initial Quote Should Contain The Vendor’s Best Terms From A Price And Technical Standpoint. The Government Reserves The Right To Conduct Discussions, If The Contracting Officer Later Determines Them To Be Necessary. The Government Also Reserves The Right To Conduct A Site Visit Prior To Award.
applicable Provisions And Clauses: The Provisions At 52.212-1, Instructions To Offerors – Commercial Products And Commercial Services Applies To This Acquisition. 52.212-2, Evaluation-commercial Products And Commercial Services, The Vendor Shall Include A Completed Copy Of The Provisions At 52.212-3, Offeror Representations And Certifications - Commercial Products And Commercial Services With Your Quote. The Clause 52.212-4, Contract Terms And Conditions-commercial Products And Commercial Services And Clause 52.212-5 Contract Terms And Conditions Required To Implement Statues Or Executive Order-commercial Products And Commercial Services, Clause 52.203.6, Restrictions On Subcontractor Sales To The Government, Clause 52.203-19, Prohibition On Requiring Certain Internal Confidentiality Agreement Or Statement, Clause 52.204-23, Prohibition On Contracting For Hardware, Software And Services Developed Or Provided By Kaspersky Lab Covered Entities, Clause 52.204-25, Prohibition On Contracting For Certain Telecommunications And Video Surveillance Services Or Equipment, Clause 52.204-10 Reporting Executive Compensation And First –tier Subcontract Awards, Clause 52.209-6, Protecting The Government’s Interest When Subcontracting With Contractor’s Debarred, Suspended, Or Proposed For Debarment, Clause 52.209.10, Prohibition On Contracting With Inverted Domestic Corporations, Clause 52.222- 3 Convict Labor, Clause 52.222-19 Child Labor – Cooperation With Authorities And Remedies, Clause 52.222-21, Prohibition Of Segregated Facilities, Clause 52.222-26 Equal Opportunity, Clause 52.222-35 Equal Opportunity For Veterans, Clause 52.222-36 Equal Opportunity For Workers With Disabilities, Clause 52.222-37 Employment Reports On Veterans, Clause 52.222-40, Notification Of Employee Rights Under The National Labor Relations Act, Clause 52.222-41, Service Contract Labor Standards, Clause 52.222- 50 Combating Trafficking In Persons, Clause 52.222-52, Exemption From Application Of The Service Contract Labor Standard To Contracts For Certain Services-certification, Clause 52.226-8 Encouraging Contractor Policies To Ban Texting Messaging While Driving, Clause 52.225-13 Restrictions On Certain Foreign Purchases, Clause 52.232-33, Payment By Electronic Funds Transfer – System For Award Management Are Incorporated By Reference, Clause 52.232-40, Providing Accelerated Payments To Small Business Subcontractors. Clause 52.233-3 Protest After Award And Clause 52.233-4 Applicable Law For Breach Of Contract Claim.
to Obtain The Above Provision/clauses In Full Text, Please Visit Https://www.acquisition.gov/far. Method Of Payment: Electronic Funds Transfer.
rev. 004_10-01-2018
Closing Date17 Jan 2025
Tender AmountRefer Documents
Castillo De Locub N Town Hall Tender
Software and IT Solutions
Spain
Tender Id: SOFTWARE COMERCIO | Contracting of the Development Service of Digital Platforms for Commerce, within the framework of the “Shopping Center of the Sierra Sur de Jaén” project, promoted by the Castillo de Locubín City Council.
Closing Date2 Nov 2025
Tender AmountEUR 69.3 K (USD 71.2 K)
DMT Jelinek sro Tender
Civil And Construction...+2Civil Works Others, Excavation
Czech Republic
Details: The subject of the delivery is the delivery of 2 pcs of CNC lathes with accessories for the company Dmt Jelinek Sro with the possibility of partial fulfillment. Definition of Partial Fulfillments: Partial Fulfillment A: Cnc Lathe With Accessories (larger machine) Partial Fulfillment B: Cnc Lathe With Accessories (smaller machine) Delivery of Technology Means Delivery of All Required Elements of Equipment, Including Installation of Technology itself. Transporting the Technology to the Place of Designation, Installation or Assembly, Its Involvement, Including All Possible Assembly Work Necessary for the Proper Completion of the Delivery, and Furthermore, All Activities Related to the Delivery, Including Personnel Training. • Supplier Must Guarantee Warranty Service Support. • The Supplier Must Provide Training Related to the Operation of the Technology. The Equipment Supplied Must Be New, Unused, First Class Quality, Wrapped In Original Packaging. As part of fulfilling the subject of the contract, the selected supplier will be obliged to carry out and include in the bid price all other activities related to the implementation of the contract. If specific trade names are mentioned in the tender documentation or their annexes, this is only a definition of the required standard, and the contracting authority also allows other technically and qualitatively comparable solutions. The Technical Specification of the Required Technology is given in Appendix No. 2 For Partial Fulfillment of Parts A, B of this Call for Tenders. For the Specification of Technical Modifications of Individual Elements of Technology/Software of the Machine From Each Partial Fulfillment, Technical Drawing Documentation is Part of the Appendices - Appendix No. 5 A Annex No. 6. The Contractor undertakes to hand over the relevant premises, which are to be the place of operation of the machine, in a condition suitable for putting the machine into operation. The Seller will ensure the transportation of the machines to the customer's place, the removal of the machine from the means of transport, its transfer to the place of operation and installation at its own expense. The Principal shall provide the Seller with the cooperation necessary to put the machine into operation. The Seller will send the documents for this cooperation to the Buyer within 10 days of concluding the contract. Without undue delay after the delivery of these documents, the client will prepare the place of operation for anchoring the machine and putting it into operation in accordance with these documents. The implementation of the anchoring of the machine and the construction of the foundations for the machine shall be agreed by the seller before the delivery of the machine.
Closing Soon9 Jan 2025
Tender AmountCZK 9.5 Million (USD 387.9 K)
5191-5200 of 5204 active Tenders