Printing Tenders

Printing Tenders

YANOG ELEMENTARY SCHOOL Tender

Machinery and Tools
Philippines
Details: Description Project Name: Procurement Of Office Supplies, Materials, And Equipment For Various School Operations Address: Yanog Elementary School, Kabankalan City, Negros Occidental Contact Information: +63 919 3620 604 / 117872@deped.gov.ph Request For Quotation Date: January 9, 2025 Quotation No.: 2025-01-002 Mode Of Procurement: Svp To All Eligible Service Providers: I. Please Quote Your Lowest Price Inclusive Of Vat On The Item/s Listed Below, Subject To The Terms And Conditions Of This Rfq, And Submit Your Quotation Duly Signed By Your Representative In An Envelope Not Later Than January 17, 2025, At Yanog Elementary School. For More Information, Kindly Send An E-mail At 117872@deped.gov.ph. Prospective Service Providers/suppliers Shall Be Responsible To Verify Details Of Items Described Below With The Bids And Awards Committee, Cellphone No. +63 919 3620 604 Signed Maria Asuncion L. Gatumbato Chair, Bids And Awards Committee Ii. Delivery Date For The Service/s Schedule Of Delivery Delivery Location Approved Budget For The Contract Price Offered For The Item/s 4th Week Of January 2025 Morning Yanog Es, Sitio Yanog, Brgy. Tampalon, Kabankalan City 114,941.00 Name Of Project: Procurement Of Office Supplies, Materials, And Equipment For Various School Operations This Is To Submit Our Price Quotations As Indicated Above Subject To The Terms And Conditions Of This Rfq. Service Provider's Name: Tin No.: Address: Telephone No.: Fax No.: E-mail Address: Service Provider's Authorized Representative: (signature Over Printed Name) Date Signed: Instruction: Indicate “comply” Or “not Comply” In The Space Provided Below. Unit Item Description Qty Unit Cost (abc) Total Cost (abc) Price Offered (per Unit) Total Price Offered Statement Of Compliance (state "comply" Or "not Comply") Pc Stapler With Remover, Heavy Duty, #35 2 350.00 700.00 Pc 12” Rotatable Long Arm Stapler, Heavy Duty 1 400.00 400.00 Pc Puncher With Ruler, Heavy Duty 2 220.00 440.00 Pc Tape Dispenser, For 24mm Tape 1 170.00 170.00 Pc Steel Rack Organizer, 5 Layer 3 1,800.00 5,400.00 Pc Office Chair, Swivel, Mesh 2 1,500.00 3,000.00 Pc Plastic Chair 10 500.00 5,000.00 Pc Storage Box, 50 Liters 4 400.00 1,600.00 Pc Extension Wire, 3-gang, 5 Meters 3 400.00 1,200.00 Ream A4-sized Bond Paper, Sub. 20 81 250.00 20,250.00 Ream Letter-sized Bond Paper, Sub. 20 24 235.00 5,640.00 Ream Legal-sized Bond Paper, Sub. 20 26 270.00 7,020.00 Bot Epson Ink Refill, #664, Black 40 320.00 12,800.00 Bot Epson Ink Refill, #664, Cyan 17 320.00 5,440.00 Bot Epson Ink Refill, #664, Magenta 17 320.00 5,440.00 Bot Epson Ink Refill, #664, Yellow 17 320.00 5,440.00 Pc Folder, Legal Size, White 60 8.00 480.00 Pc Folder, Legal Size, Green 30 8.00 240.00 Pc Folder, Expanded, Legal Size, Green 30 20.00 600.00 Pc Ballpen, Black 46 9.00 414.00 Pc Ballpen, Blue 46 9.00 414.00 Pc Ballpen, Red 12 9.00 108.00 Box Sign Pen, 0.7mm, Black 2 350.00 700.00 Box Fastener, Plastic Coated, Vinyl 5 50.00 250.00 Bot Glue, Multi-purpose, Transparent 5 60.00 300.00 Pc White Board Marker, Black/blue 3 35.00 105.00 Pc Record Book, 300-pages 5 110.00 550.00 Box Paper Clip, Vinyl, 50mm 5 25.00 125.00 Box Staple Wire #35 5 70.00 350.00 Roll Tape, Transparent, 1 Inch 9 30.00 270.00 Pack Sticker Paper, Long, Matte, 90gsm, 10s 5 50.00 250.00 Yard Plastic Cover #5 20 50.00 1,000.00 Pc File Document Organizer, Long 10 200.00 2,000.00 Pc Medal With Deped Logo 100 50.00 5,000.00 Pc Certificate Holder, A4 20 55.00 1,100.00 Roll Ribbon, 1 ½, Assorted Colors 10 200.00 2,000.00 Pack Vellum Paper, A4 10 50.00 500.00 Pack Photo Paper, Inkjet Copy, 180gsm, A4, Glossy, 20s 5 180.00 900.00 Pack Parchment Paper 10 50.00 500.00 Ream Laminating Film, A4, 125 Microns 1 1,000.00 1,000.00 Pc Stick Glue 50 5.00 250.00 Pack Push Pins 5 30.00 150.00 Yard Plain Fabric, For Backdrop 15 40.00 600.00 Pc Decorative Artificial Flowers 62 50.00 3,100.00 Pc Electric Fan, Stand Type, Heavy Duty 5 1,500.00 7,500.00 Bot Liquid Hand Soap, Anti-bac, 450ml 4 220.00 880.00 Bot Toilet Bowl Cleaner (multi-action), Toilet And Urinal, 1000ml 4 240.00 960.00 Tube Dishwashing Paste 2 55.00 110.00 Bot Disinfectant Spray, 170g 4 255.00 1,020.00 Pc Soft Tambo 3 120.00 360.00 Pc Bathroom Deodorant (albatross) 5 45.00 225.00 Pc Trash Bins, Plastic, Office Use 3 80.00 240.00 Roll Tissue Paper, 2-ply, 150 Pulls 9 50.00 450.00 *nothing Follows* Total 114,941.00 Items Description Statement Of Compliance (state “comply” Or “not Comply”) Other Requirements: Mayor’s Permit Philgeps Registration Bir Registration Free Delivery Notarized Omnibus Sworn Statement Iii. Terms And Conditions A. Submission Of Requirements 1. Quotations And Other Requirements Stated Below Shall Be Addressed To The Bids And Awards Committee (bac) Chairperson C/o Bac Secretariat At Yanog Elementary School, So. Yanog, Brgy. Tampalon, Kabankalan City. If Quotation Is Sealed, Please Indicate In The Envelope The Quotation Number And Name Of Service Provider/supplier. 2. In Addition, You Are Required To Submit The Following Necessary Documents: A. Present Valid Mayor’s Permit Or Official Receipt As Proof Of Renewal Upon Post-qualification; Or B. Present Valid Mayor’s Permit Prior To Payment C. Philgeps Registration Number D. Certificate Of Registration Issued By Bir Or Bir 2303 E. Notarized Omnibus Sworn Statement With The Submission Of Bid Documents (note: Service/provider Or Supplier Who Already Submitted Their Documents In The Previous Procurement Activities May No Longer Submit The Documents Mentioned Above.) B. Price Validity Price Should Be Valid Thirty (30) Calendar Days After The Deadline Of Submission Of Quotation. C. Ocular Inspection The Bac, If Necessary, May Order The Conduct Of An Ocular Inspection Prior To Award And/or Conduct Of The Event. D. Award The Provider Who Submitted The Lowest Calculated Responsive Quotation And Who Passed Post Qualification Conducted By The Bac And End-user Shall Be Awarded The Contract. In Case Of Tie Of Two Or More Bidders Whose Bids Are Determined And Declared As The Lowest Calculated And Responsive Bids (lcrb) Having Been Post-qualified, The Method To Be Used To Break The Tie Is “draw Lots” Which Is Non-discretionary And Non-discriminatory. In Case Of Non-appearance Of One Party, It Waives The Right To Participate In The Drawing Of Lots But Not In The Acceptance Of Award If Declared As Winner. E. Delivery Of Service Delivery Of Goods/s Shall Be On The Date Specified In The Request For Quotation (rfq) Or In The Purchase Order. In Case The Service/s Shall Be Moved By The End-user Within The Validity Period (30 Days) The Service Provider Is Responsible To Accommodate The Request. On The Other Hand, The Service Provider May Reject The Award If The New Schedule Is Beyond The Validity Period. F. Evaluation Of Quotations Quotation Shall Be Compared And Evaluated On The Basis Of The Following Criteria: 1. Price Quotation; 2. Compliance With Items & Description 3. Completeness Of Documents Submitted Note: (validation Of The Submitted Documents Is Done During Post-qualification) G. Instructions 1. The Service Provider Or Supplier Shall Be Responsible For The Source(s) Of Its Goods/services/equipment, Which It Shall Provide In Accordance With The Schedule, And Specifications Of The Rfq Or Contract. Failure Of The Provider To Comply With This Provision Shall Be Ground For Cancellation Of The Award Or Purchase Order/contract Issued To The Provider. 2. The Service Provider Or Supplier Who Accepted A Contract But Failed To Deliver The Required Goods/services/equipment Within The Time Called For In The Contract Shall Be Disqualified From Participating The Future Procurement Activities Of This Procuring Entity. This Is Without Prejudice To The Imposition Of Other Sanctions Prescribed Under R.a. 9184 And Its Revised Irr Against The Service Provider Or Supplier. 3. All Duties, Excise, And Other Taxes And Revenue Charges Shall Be Paid By The Provider. 4. All Transactions Are Subject To Withholding Of Credible Value Added Tax And/or Expanded Value Added Tax Per Revenue Regulation(s) Of The Bureau Of Internal Revenue. H. Liquidated Damages A Penalty Of One-tenth Of One Percent (0.001) Of The Total Value Of The Undelivered Goods/services/equipment Shall Be Charged As Liquidated Damages For Every Day Of Delay Of The Delivery Of The Purchased Goods. I. Warranty Supplier Warrants That All Goods/services/equipment To Be Provided Are Of Acceptable Industry Standard. J. Payment One Hundred Percent (100%) May Be Paid To The Provider’s Account Less Government Taxes After The Complete Delivery/ies; Based On The Actual Completed Delivery Of The Goods/services. The Bids And Awards Committee Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders.
Closing Soon17 Jan 2025
Tender AmountPHP 114.9 K (USD 1.9 K)

City Government Iligan Tender

Civil And Construction...+2Civil Works Others, Construction Material
Philippines
Details: Description Invitation To Bid The Iligan City Government Bids And Awards Committee (bac), Through General Fund / Sb No. 1 Cy 2024, Intend To Apply The Sum Of P 1,738,341.01 Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Stage, Stalls And Comfort Rooms At Esplanade (construction Of Stalls), Brgy. Santiago, Iligan City With Project No. Cb(b)-25-001 (ceo-infra). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The Iligan City Government Bids And Awards Committee Now Invites For The Supply And Delivery Of Items Below-stated: Particulars Stage, Stalls And Comfort Rooms At Esplanade (construction Of Stalls), Brgy. Santiago, Iligan City •earthworks - Excavation For Footings,columns, And Beams - Gravel Bedding For Footings •concrete Work, Formwork & Scaffolding - Installation Of Formworks And Scaffoldings For Concreting - Concreting For Footings, Columns, Beams, And Slabs •slope Protection - Construction Of Grouted Riprap With Weep Holes On Slope •steel Reinforcement - Installation Of Steel Reinforcement Bars For Concrete Works •steel Works - Installation Of Pipe Posts W/ Base Plates, Roof Framing And Purlins •ceiling & Dry Wall - Installation Of Ceiling & Dry Wall Framing And Boards •steel Door & Windows - Fabrication & Installation Of Steel Doors & Windows •tinsmithry - Installation Of Roofing Sheets •painting - Painting For Steel Works, Ceiling & Dry Wall Boards •electrical - Installation Of Electrical Lines & Fixtures I. Project Billboard (q = 2.00 Sets) Includes 4' X 8' Tarpaulin, 8' X 8' Tarpaulin, 2"x 3"x 14" Coco Lumber, 2"x 3"x 10" Coco Lumber, 2"x 2"x 8" Coco Lumber, Assorted Sizes C.w. Nails. Ii. Occupational Safety And Health Program (q = 1.00 L.s.) Includes Safety Shoes, Safety Helmet, Safety Gloves, Specialized Ppe. Iii. Permits And Clearance (q = 1.00 L.s.) Includes Fire Safety Evaluation Fee, Brgy. Clearance For Construction Fee, Professional Fee, White Print (a-3) (5 Sets). Iv. Mobilization / Demobilization (q = 1.00 Lot) V. Earthworks (q = 36.00 Cu.m.) A.) Excavation (q = 33.00 Cu.m.) Includes Volume To Be Excavated. B.) Gravel Bedding (q = 3.00 Cu.m.) Includes Volume For Gravel Bedding: 1-1/2" Gravel Bedding (0.10m Thk.). Vi.concrete Work, Formwork &. Scaffolding (q = 25.71 Cu.m.) Includes Portland Cement Type 1astm C-150 Pns 07, Washed Sand, Washed Gravel, (for Formworks And Scaffoldings): 1.2mm Thk. X 1.0m Width Steel Deck, Steel Scaffolding (including Complete Accessories), Tek Screw, 1/4" X 4' X 8' Marine Plywood, 2" X 2" X 12' Coco Lumber, Assorted Sizes C.w. Nails. Vii. Slope Protection (q = 27.00 Cu.m.) Includes Grouted Riprap (class B), (for Weep Holes): 75mm Dia. Pvc Pipe Sch.40 (6m/length), Filter Cloth, Washed Gravel. Viii. Steel Reinforcement (q = 4,013.56 Kgs.) Includes 20 Mmø X 6000mm Dsb, Grade 40; 16 Mmø X 6000mm Dsb, Grade 40; 12 Mmø X 6000mm Dsb, Grade 40; 10 Mmø X 6000mm Dsb, Grade 40; #16 Gi Tie Wire. Ix. Steel Work (q = 39.00 Lengths) Includes 3" Dia. G.i. Pipe Sch.40 (6m/length), 50mm X 100mm X 1.2mm Rectangular Tube (6m/length), 50mm X 50mm X 1.2mm Square Tube (6m/length), 12mm Square Bar (6m/length), 50mm X 75mm X 1.2mm Thk. C Purlins (6m/length), 150mm X 150mm X 10mm Thk. Ms Base Plate, 10mm Dia.x 100mm Expansion Bolt W/ Washer, Welding Rod (6011), Grinding Disk, Cutting Disk. X. Ceiling & Dry Wall (q = 152.00 Sq.m.) Includes 1.2m X 2.4m X 3.5mm Thk. Hardilite Board, 4' X 8' X 4.5mm Thk. Hardiflex Board, 19mm X 50mm X 0.4mmthk Double Furring (5m/length), 4" X 2" X 0.5mm Thk Metal Studs (3m/length), Blind Rivets, Tex Screw. Xi.steel Doors & Windows (q = 9.00 Units) Includes (for Fabrication Of Doors And Windows): D1: 2800mm X 2525mm Aluminum Roll Up Door With Complete Accessories; D2: 2700mm X 2525mm Aluminum Roll Up Door With Complete Accessories; Wl: 2500mm X 500mm Aluminum Frame Metal Mesh Window. Xii.tinsmithry (q = 72.00 Ln.m) Includes 1.0m Width X 0.5mm Thk. Prepainted Rib-type Roofing, Tek Srew, Vulca Seal. Xiii.painting (q = 163.06 Sq.m) Includes Flat Latex Primer, Flat Latex Paint, Red Oxide Primer, Quick-drying Enamel Paint, Paint Thinner, Roller Paint Brush W/ Tray And Handle, Paint Brush (3-1/2"), Paint Brush (1"), Sand Paper (assorted Sizes). Xiv. Electrical (q = 1.00 Lot) Includes 3.5mm2 Thhn Stranded Copper Wire; Electrical Pvc 15mm; Junction Box 4x4"; Utility Box 2x4"; Batten Type 1-20w , 230v Led Tube Daylight; 2 Gang Convenience Outlet; Led Bulb 10w, 230v Daylight; Ceiling Lighting Receptacle 4"1/4 Dia. E27; Safety Breaker 30at 2 Pole 230v Bolt On Type; Kilowatt Hour Sub Meter; 2 Gang Switch ,230v; 30mm2 Thhn Stranded Copper Wire; Safety Breaker 100at 2pole 230v, Bolt On Type; Service Entrance Cap 25mm Dia.; Electrical Pvc 25mm. Approved Budget For The Contract (abc): P 1,738,341.01 Required Bid Security: 2% Of The Abc If Cash, Manager’s Check; Bank Draft/guarantee, Irrevocable Letter Of Credit Confirmed Or Authenticated By A Universal Or Commercial Bank; And 5% Of The Abc If Surety Bond Callable Upon Demand Issued By A Surety Or Insurance Company Duly Certified By The Insurance Commission As Authorized To Issue Such Security Delivery Period Is Within Ninety (90) Calendar Days From Receipt Of Notice To Proceed. Bidders Should Have Completed, Within Three (3) Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184, Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders May Obtain Further Information From Iligan City Government And Inspect The Bidding Documents During Office Hours From 8:00 A.m. – 12:00 P.m. And 1:00 P.m. – 5:00 P.m. At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. The Complete Schedule Of Activities Is Listed, As Follows: Activities Schedule 1. Issuance Of Bid Documents: January 7 – January 28, 2025 – 8:00 A.m. At Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City. 2. Pre-bid Conference: January 14, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 3. Submission Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City 4 . Opening Of Bids: January 28, 2025 – 9:30 A.m. At Casimero P. Cabigon Hall, 2nd Floor City Hall Main Bldg., Buhanginan Hills, Pala-o, Iligan City A Complete Set Of Bidding Documents Will Be Available To Prospective Bidders Upon Payment Of A Non-refundable Amount Of P 5,000.00 To The Iligan City Government Cashier, At The Bac Office, Room 205, Left Wing, 2nd Floor, Sp Bldg., Buhanginan Hills, Palao, Iligan City.the Iligan City Government Reserves The Right To Accept Or Reject Any Bid, To Annul The Bidding Process, And To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Furthermore, The City Government Of Iligan Assumes No Responsibility Whatsoever To Compensate Or Indemnify Bidders For Any Expense Or Loss Incurred In The Preparation And Submission Of The Eligibility Statements And Bids. Approved By: (signed)darwin J. Manubag, Phd. Bac Chairman Date Of Advertisement/posting: January 7, 2025 Place Of Posting/advertisement: City Hall/ibjt Bulletin Boards, Iligan Official Website, Phil-geps Itb No. 25-001 (ceo-infra)
Closing Date28 Jan 2025
Tender AmountPHP 1.7 Million (USD 29.7 K)

Department Of Agriculture Tender

Agriculture or Forestry Works
Corrigendum : Closing Date Modified
Philippines
Details: Description Invitation To Bid For The Rebidding Of Supply And Delivery Of Opv White Corn Seeds - Glutinous 1. The Department Of Agriculture - Regional Field Office 1 (da-rfo 1), Through The National Expenditure Program Fy 2025 Intends To Apply The Sum Of Two Million Seven Hundred Seventy-two Thousand Pesos (php2,772,000.00) With Project Identification Number Da-rfo-1-2025-goods-009-r Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Each Lot, To Wit: Project Title Abc (php) Rebidding Of Lot 1: Supply And Delivery Of Four Hundred (400) Bags Opv White Corn Seeds - Glutinous For Pangasinan 1,008,000.00 Rebidding Of Lot 2: Supply And Delivery Of One Hundred Fifty (150) Bags Opv White Corn Seeds - Glutinous For La Union 378,000.00 Rebidding Of Lot 3: Supply And Delivery Of Two Hundred Seventy-five (275) Bags Opv White Corn Seeds - Glutinous For Ilocos Sur 693,000.00 Rebidding Of Lot 4: Supply And Delivery Of Two Hundred Seventy-five (275) Bags Opv White Corn Seeds - Glutinous For Ilocos Norte 693,000.00 Total 2,772,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Bid Opening. 2. The Da-rfo 1 Now Invites Bids For The Early Procurement Activity (epa) Of The Above Procurement Project, In Accordance With The Provisions Under Appendix 31 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) No. 9184 For The Above-mentioned Procurement Project With The Following Details And Minimum Specifications, To Wit: Particulars/descriptions Opv White Corn Seed - Glutinous  Nsic Approved Variety  With Nsqcs Analysis Result Germination Rate: Not Less Than 90% Moisture Content: Maximum 14%  Seed Class: Certified  Should Be Harvested 3 Months Prior To Delivery  Packaging: 20 Kg/bag, Sack With Plastic Lining With 4" X 4" Da Rfo 1 Logo Sticker, Printed And Labelled "not For Sale"  Should Pass Germination Test Conducted By Bpi-nsqcs After The Time Of Delivery  Source Of Seeds From Bpi Accredited Corn Seed Growers Other Requirements I. During Bid Opening: A. Bpi Accreditation As Seed Grower Ii. During Post-qualification: A. Geotagged Photos Of Area To Be Planted/planted Drop Off Point/ Schedule Of Delivery No. Of Bags April 1-15, 2025 August 1-15, 2025 Total Prec, Sta. Barbara, Pangasinan 200 200 400 Iliarc, Bacnotan, La Union 50 100 150 Isrec, San Juan, Ilocos Sur 125 150 275 Inrec , Batac City, Ilocos Norte 125 150 275 Total 500 600 1,100 Bidders Should Have Completed, Within Two Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii. Instructions To Bidders. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using A Non-discretionary “pass/fail” Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act (ra) 9184. Bidding Is Restricted To Filipino Citizens/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty Percent (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183. 4. Prospective Bidders May Obtain Further Information From And Inspect The Bidding Documents At The Address Given Below During Office Hours From 8:00 Am To 5:00 Pm, Monday To Friday. Department Of Agriculture Regional Field Office 1 Aguila Rd., Sevilla, City Of San Fernando, La Union 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders From December 13- 2024 To January 7, 2025 From The Address Given And Websites Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Following Amounts: Project Title Bid Docs Fee Rebidding Of Lot 1: Supply And Delivery Of Four Hundred (400) Bags Opv White Corn Seeds - Glutinous For Pangasinan 5,000.00 Rebidding Of Lot 2: Supply And Delivery Of One Hundred Fifty (150) Bags Opv White Corn Seeds - Glutinous For La Union 500.00 Rebidding Of Lot 3: Supply And Delivery Of Two Hundred Seventy-five (275) Bags Opv White Corn Seeds - Glutinous For Ilocos Sur 1,000.00 Rebidding Of Lot 4: Supply And Delivery Of Two Hundred Seventy-five (275) Bags Opv White Corn Seeds - Glutinous For Ilocos Norte 1,000.00 The Procuring Entity Shall Allow The Bidder To Present Its Proof Of Payment For The Fees In Person, By Facsimile, Or Through Electronic Means. Note: For Lot Procurement, The Maximum Fee For The Bidding Documents For Each Lot Shall Be Based On Its Abc, In Accordance With The Guidelines Issued By The Gppb; Provided That The Total Fees For The Bidding Documents Of All Lots Shall Not Exceed The Maximum Fee Prescribed In The Guidelines For The Sum Of The Abc Of All Lots. 6. The Da-rfo 1 Will Hold A Pre-bid Conference On 20 December 2024, 2:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union, Which Shall Be Open To Prospective Bidders. 7. Bids Must Be Duly Received By The Bac Secretariat Through Manual Submission At The Office Address Indicated Above On Or Before 07 January 2025, 1:00 Pm. Late Bids Shall Not Be Accepted. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 14. 9. Bid Opening Shall Be On 07 January 2025, 1:00 Pm At Da-rfo 1, 5th Floor Conference Room, Aguila Road, Sevilla, City Of San Fernando, La Union. Bids Will Be Opened In The Presence Of The Bidders Or Their Authorized Representatives. 10. Additional Instructions To Bidders: A. The Bidders Or Their Duly Authorized Representatives May Attend The Bid Opening; B. In Case A Representative Will Be Attending The Bid Opening, A Special Power Of Attorney (spa), Secretary’s Certificate, Board Resolution Or Any Other Forms Of Authorization (notarized), As The Case May Be, Together With The Company-issued Identification Card Or Any Valid Id Must Be Presented Upon Submission Of The Bid Proposal At The Bac Secretariat. The Name/title Of The Project Must Be Indicated In The Authorization Or Spa. C. Each Bidder Shall Submit One Copy Of The First And Second Components Of Its Bid. Bidders Shall Submit Their Bids With Proper Index Tabbing Using The Forms Specified In The Bidding Documents In Two (2) Separate Sealed Bid Envelopes, And Which Shall Be Submitted Simultaneously; The First Component Which Is The Technical Eligibility Requirements Must Be Soft-bound, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Second Component Being The Financial Eligibility Requirements Can Be Fastened In A Folder, Marked With The Name Of The Contract And Its Ib No., Name And Address Of The Bidder, And Enclosed In An Envelope, Sealed With Signature And Marked With The Name Of The Contract, Name And Address Of The Bidder, Addressed To The Bids And Awards Committee (bac) Da Rfo-1 City Of San Fernando, La Union, The Specific Identification No. And The Warning “do Not Open Before…” The Date And Time For The Bid Opening. The Technical And Financial Requirement Each In Separate Envelopes, Shall Be Enclosed In A Mother Envelope With The Same Sealing And Markings. Non-compliance With Index Tabbings Shall Not Be A Ground For Outright Disqualification Or Declaration Of Ineligibility. The Improper Index Tabbings Must Be Duly Acknowledged By The Bidder/representative And Be Subject To The Bid Evaluation And Post-qualification Of The Technical Working Group (twg) As To Their Substance. D. All Documents In The Financial Requirements Envelope Must Be Duly Signed And/or Initialed By The Bidder/authorized Representative On Each And Every Page Thereof. E. The Award Of Contract For Procurement Projects Undertaken Through Epa May Be Made Only Upon The Following Conditions And Shall Be In Accordance With Item 7 Of Appendix 31 Of The 2016 Revised Irr Of Ra 9184: E.1. Approval And Effectivity Of The Funding Sources, To Wit: (i) General Appropriations Act; (ii) Corporate Budget; (iii) Appropriations Ordinance; Or (iv) Loan Agreement In The Case Of Faps; Or E.2. The Reenactment Of The Previous Year’s Budget Which Constitutes The Current Year’s Authorized Budget, When Authorized By The Constitution, Law Or Rules. 11. The Da-rfo 1 Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And Section 41 Of The 2016 Revised Irr Of Ra No. 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. For Further Information, Please Refer To: Dennis I. Tactac, Abe Chairperson, Bids And Awards Committee Department Of Agriculture - Regional Field Office 1 Aguila Road, Sevilla, City Of San Fernando, La Union Tel. No. :(072) 242/1045-46, Ext. 07 E-mail Add: Bacsec@ilocos.da.gov.ph 13. For Downloading Of Bidding Documents, You May Visit The Following Websites: Da-rfo 1 Website: Https://ilocos.da.gov.ph/ Philgeps Website: Https://www.philgeps.gov.ph/ December 12, 2024 Approved: (sgd.) Gilbert D. Rabara, Dvm Vice-chairperson, Bids And Awards Committee Invitation To Bid Identification No. Da-rfo 1-2025-goods-009-r
Closing Soon21 Jan 2025
Tender AmountPHP 2.7 Million (USD 47.4 K)

Philippine Ports Authority Tender

Philippines
Details: Description Republic Of The Philippines Philippine Ports Authority Pmo-negros Occidental/bacolod/bb Request For Quotation No. 003-025 The Philippine Ports Authority’s Port Management Office Of Negros Occidental/bacolod/bb (pmo-nbb) Through Its Bids And Awards Committee, Intends To Procure "janitorial Supplies 1st Quarter Cy 2025” In Accordance With Section 52.1(b) (alternative Method Of Procurement - Shopping) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein, Subject To The Attached Annexes A And B (terms And Conditions), Provided As Part Of This Request For Quotation (rfq). Submit Your Quotation Duly Signed By Your Authorized Representative Not Later Than January 21, 2025, 12midnight At The Administrative Service Division, Pmo-nbb, Banago Port, Bacolod City. Quotations May Also Be Submitted Through Facsimile Or Email At The Address And Contact Numbers Indicated Below. A Copy Of Your 2025 Business/mayor's Permit And Philgeps Registration Number Is Also Required To Be Submitted Along With Your Signed Quotation/proposal. For Any Clarification, You May Contact Us At Telephone No. (034) 441-1402 Or Email Address At Pmonbb@ppa.com.ph. (signed) Reynaldo T. Hinaut Administrative Division Manager *in Case Of Recently Expired Mayor's/business Permit, It Shall Be Accepted Together With Its Official Receipt As Proof That The Bidder Has Applied For Renewal Within The Period Prescribed By The Concerned Local Government Unit, Provided That The Renewed Permit Shall Be Submitted After Award Of Contract But Before Payment In Accordance With Item 6.2 Of Government Procurement Policy Board (gppb) Resolution No. 09-2020. 2 In Case Of Unnotarized Omnibus Sworn Statement, It Shall Be Accepted, Provided That The Notarized Omnibus Sworn Statement Shall Be Submitted After Award Of Contract But Before Payment In Accordance With Item 6.3 Of Gppb Resolution No. 09-2020. 3 Manually Filed Tax Returns Or Filed Through The Epps 4failure To Submit The Required Documents On Time, Or A Finding Against The Veracity Thereof, Shall Disqualify The Supplier/service Provider For Award. In Case The Notice For The Submission Of Post-qualification Documents Is Sent Via The Bidder's Email, It Shall Be Considered As Received By The Bidder On The Date And Time The Email Was Sent, Whether The Bidder Acknowledged The Said Email. It Shall Be The Bidder's Responsibility To Check Its/his/her Email For The Purpose. Annex A Date: ________________ Name Of Company: ___________________________________ Address: ___________________________________________ Name Of Store/shop: _________________________________ Address: ___________________________________________ Tin: ___________________________________________________ Philgeps Registration Number: __________________________ Instructions: 1. Accomplish This Request For Quotation (rfq) Correctly And Accurately. 2. The Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Mandatory Provisions. 3. If A Different Form Is Used Other Than The Rfq, The Quotation Shall Contain All The Mandatory Provisions, Including Manifestation On The Agreement With The Terms And Conditions Below. 4. In Case A Prospective Supplier Or Service Provider Submits A Filled-out Rfq With A Supporting Document (i.e., Price Quotation In A Different Format), Both Documents Shall Be Considered Unless There Is Any Discrepancy. In This Case, Provisions In The Rfq Shall Prevail. 5. All Technical Specifications Are Mandatory. Failure To Comply With Any Of The Mandatory Requirements Will Disqualify Your Quotation. 6. Failure To Follow These Instructions Will Disqualify Your Entire Quotation. Sir/madam: After Having Carefully Read And Accepted The Terms And Conditions In The Request For Quotation, Hereunder Is Our Quotation For The Item/s As Follows: Technical Specification 1. Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate "0" If The Item Being Offered Is For Free. 2. Bidders Must State "comply" Or Any Equivalent Term In The Column "bidder's Statement Of Compliance'1 Against Each Of The Individual Parameters Of Each Specification. 3. Bidder Must Likewise Indicate In Their Offer A Certificate Of Warranty, To Cover Defects And Other Failures In Labor And Parts Supplies, Valid For A Period Of Thirty (30) Days After Acceptance Of Delivery Of The Completed Procurement Activity 1 Fabcon (500ml/bot), Antibacbaterial, Sunrise Fresh 20 Pack 2 Air Freshener - 380grams/bot. (lemon And Lavender Scent ) Eco -friendly Type 24 Bot 3 Bleach - (500ml/bot) , 99.9% Antibacterial Protection 24 Bot 4 Insect Spray (500 Ml) Odorless 12 Bot 5 Garbage Bag - 100pcs/pack Size: Small 500 Pc 6 Garbage Bag - 100pcs/pack Size: Medium 500 Pc 7 Garbage Bag - 100pcs/pack Size: Large 500 Pc 8 Garbage Bag - 100pcs/pack Size: Extra Large 500 Pc 9 Toilet Bowl Cleanner (1000ml), Kills 99.999% Of Germs 20 Bot 10 Detergent Powder (500g/sachet) 100 Pack/box,original Scent,vitality Decontamination 1 Box 11 Hand Soap - (antiback) 20 Gal 12 Broom Stick - Coconut Broomstick: Color : Brown. Condition : Fully Dried. Length : 100 - 130 Cm 10 Pc 13 Toilet Brush, - Material: Plastic,diameter. 3" (7.6 Cm) ; Handle Length. 14" (35.6 Cm) 5 Pc 14 Dishwashing Liquid, (1 Gal) Anti Bacterial 20 Gal 15 Water Dipper, Size: L11″ X W36” X H4.1”,material: Plastic 5 Pc 16 Pail,plain Color With Metal Handle, Plastic, 2.5 Gal Capacity 5 Pc 17 Soft Broom (whisk Broom) - Double Sewing Walis Tambo Regular Size, Quality: Tiger Grass 10 Pc 18 Scouring Pad With Sponge, Shape: Rectangular 5 Pc 19 Doormat - Breaded, Length: 58cm, Width: 36cm (assorted Color) High Absorbent 15 Pc 20 Rubber Mat - Rubberize, 58cm Length X 36cm Width, Heavy Duty / Good Quality 10 Pc 21 Bathroom Deodorizer - Net Wt. 100g, Descaling, Deodorization, Sterilization And Disinfection (lemon) 20 Pc 22 Disinfectant Spray (340g) 454ml, 24bot/box (lemon) 20 Bot 23 Oxalic ( Half Kilo Per Pack) 5 Kilos 24 Empty Transparent Soap Dispencer 500ml Capacity 5 Bot 25 Alcohol - (1gal) 70% Isoprophyl,appearance: Clear, Colorless Liquid, Odor: Alcohol-like 12 Gal 26 Glass Cleaner (500ml) Spray Odorless 20 Bot 27 Tornado Mop And Spin Dry Bucket Set ( 360 Rotating Mop Head) 5 Box 28 Window Cleaner" With Aluminum Telescopic Pole Adjustment, 5 Pc Abc: 70,000.00 Janitorial Supplies First Quarter Cy 2025 Financial Officer Approved Budget For The Contract Total Offered Quotation 70,000.00 In Words: _________________________________ __________________________________________ __________________________________________ In Figures: ________________________________ __________________________________________ Payment Details Payment Terms: Payment Shall Be Made Promptly, But In No Case Later Than Sixty (60) Days, Through Cheque, After Submission Of Billing Statement/invoice And Upon Fulfillment Of Other Obligations As Stipulated In The Contract As Well As Upon Inspection And Acceptance Of The Goods By The End-user, Subject To Other Payment Terms As Prescribed In This Rfq. Banking Institution: Account Number: Account Name: Branch Annex B Terms And Conditions 1. Bidders Shall Provide Correct And Accurate Information Required In This Form. 2. Price Quotation/s Must Be Valid For A Period Of Sixty (60) Calendar Days From The Date Of Submission Of Quotation. 3. Price Quotation/s, To Be Denominated In Philippine Peso Shall Include All Taxes, Duties And/ Or Levies Payable. 4. Quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. 5. Award Of Contract Shall Be Made To The Lowest Calculated And Responsive Quotation (for Goods And Infrastructure) Or The Highest Rated Offer (for Consulting Services) Which Complies With The Minimum Technical Specifications And Other Terms And Conditions Stated Herein. 6. Any Interlineations, Erasures Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. 7. The Item/s Shall Be Delivered According To The Requirements Specified In The Technical Specifications. 8. The Ppa Shall Have The Right To Inspect And/or To Test The Goods To Confirm Their Conformity To The Technical Specifications. 9. In Case Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Ppa Shall Adopt And Employ "draw Lots" As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. 10. Payment Shall Be Processed After Delivery And Upon The Submission Of The Required Supporting Documents, In Accordance With Existing Government Accounting Rules And Regulations. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Contractor's Account. 11. Payment Shall Be Made Promptly, But In No Case Later Than Sixty (60) Days, Through Land Bank's Lddap-ada/bank Transfer Facility After Submission Of Billing Statement/invoice And Upon Fulfillment Of Other Obligations As Stipulated In The Contract As Well As Upon Inspection And Acceptance Of The Goods By The End User, Subject To Other Payment Terms As Prescribed In This Rfq. 12. Liquidated Damages Equivalent To One Tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. The Ppa May Rescind The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Open To It. 13. In Compliance With Section 4.3 Of Appendix 33 Of The 2016 Revised Irr Of Ra No. 9184 And Consistent With Administrative Order No. 34, S. Of 2020, The Ppa Shall Publish In Its Official Website And Social Media Platform The Following Post-award Information: A) Project Name; B) Approved Budget For The Contract; C) Contract Period; D) Name Of The Winning Bidder And Its Official Business Address; E) Amount Of Contract Awarded; F) Date Of Award And Acceptance; G) Implementing Office/unit/division/bureau Of The Concerned Agency Or Instrumentality. Conforme: _______________________________ Signature Over Printed Name _______________________ Position/designation Office Telephone No. ___________ Fax/mobile No. _________________ Email Address: _______________
Closing Soon20 Jan 2025
Tender AmountPHP 70 K (USD 1.1 K)

Research Institute For Tropical Medicine, Doh Tender

Healthcare and Medicine
Corrigendum : Tender Amount Updated
Philippines
Details: Description Request For Quotation Mode Of Procurement: Small Value Procurement Date: _____________ Pr No.: _____________ Rfq No.: _____________ Company/business Name: Complete Office Address: Business/mayor’s Permit No: Tin: The Research Institute For Tropical Medicine – Department Of Health, Through Its Bids And Awards Committee (bac), Intends To Procure The Below Mentioned Items Through The Above-mentioned Mode Of Procurement Based On The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184. Please Quote Your Best Offer For The Item/s Described Herein, Subject To The Terms And Conditions Provided On This Request For Quotation (rfq). Submit Your Quotation Duly Signed By You, Or Your Duly Authorized Representative Within Five (5) Days Which Shall Be Addressed To The Ritm Bids And Awards Committee. A)the Following Documents Are Required To Be Submitted Along With Your Formal Quotation: Documentary Requirement Remarks Valid And Current Mayor’s/business Permit In Case Not Yet Available, You May Submit Your Expired Mayor’s Or Business Permit With The Official Receipt Of Renewal Application. However, A Copy Of The Latest Mayor’s Or Business Permit Shall Be Required To Be Submitted After Award Of Contract But Before Payment. Valid And Current Certificate Of Platinum Membership With Valid Annex “a” May Be Submitted In Lieu Of The Mayor’s/business Permit Philgeps Registration/membership Bir Form 2303 Company Name Registered In Sec/dti/cda Must Be The Same Registered Name In Bir Form 2303. B)the Following Documents Shall Be Submitted By The Bidder Before The Issuance Of Notice Of Award: Documentary Requirement Remarks Duly Notarized Revised Omnibus Sworn Statement (10 Provisions) With Latest Rules On Notarial Practice Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 Note: Othe Pr # Shall Be Reflected In The Omnibus Sworn Statement Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Omnibus Sworn Statement Shall Be The Same/after The Issuance And Notarial Date Of The Authority Of The Signatory. Othe Authorized Representative Declared In The Omnibus Sworn Statement Shall Be In Congruent With The Submitted Authority Of The Signatory. Authority Of The Signatory Applicable For: Np-svp With Abcs Above P50,000.00 And Np-ec With Abcs Above P500,000.00 for Sole Proprietorship – Duly Notarized Special Power Of Attorney, If Signatory Is Other Than The Owner for Corporation – Duly Notarized Secretary’s Certificate for Partnership, Cooperative, Or Joint Venture – Duly Notarized Board/partnership Resolution, Whichever Is Applicable Note: Othe Pr # Shall Be Reflected In The Authority Of The Signatory Oone (1) Original Copy Must Be Submitted Othe Issuance And Notarial Date Of The Authority Of The Signatory Shall Be The Same/shall Come First Before The Issuance And Notarial Date Of The Omnibus Sworn Statement. Note: Incomplete Submission Of The Required Documents Will Be A Ground For Disqualification. For Any Clarification, You May Contact Us At The Contact Information Provided: Mae Marie E. Hernandez Bac Secretariat Head (632) 8807-2628 To 32 Loc. 210 And/or 240 E-mail Address: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph Website: Www.ritm.gov.ph Instructions: Note: Failure To Follow These Instructions Will Disqualify Your Entire Quotation. (1)do Not Alter The Contents Of This Form In Any Way. (2)the Use Of This Rfq Is Highly Encouraged To Minimize Errors Or Omissions Of The Required Mandatory Provisions. If Another Form Is Used Other Than The Latest Rfq, The Quotation Shall Contain All The Mandatory Requirements/provisions Including Manifestation On The Agreement With The Terms And Conditions Below. (3)all Technical Specifications Must Be Complied With. Failure To Comply With The Mandatory Requirements Shall Render The Quotation Ineligible/disqualified. (4)quotations May Be Submitted Through Electronic Mail At: Procurement@ritm.gov.ph / Procurement_02@ritm.gov.ph. (5)quotations, Including Documentary Requirements, Received After The Deadline Shall Not Be Accepted. For Quotations Submitted Via Electronic Mail, The Date And Time Of Receipt Indicated In The Email Shall Be Considered. Terms And Conditions: bidders Shall Provide Correct And Accurate Information Required In This Form. any Interlineations, Erasures, Or Overwriting Shall Be Valid Only If They Are Signed Or Initialed By You Or Any Of Your Duly Authorized Representative/s. price Quotation/s, To Be Denominated In Philippine Peso, Shall Include All Taxes, Duties, And/or Levies Payable – If Applicable. quotations Exceeding The Approved Budget For The Contract Shall Be Rejected. in Case Of Two Or More Bidders Are Determined To Have Submitted The Lowest Calculated Quotation/lowest Calculated And Responsive Quotation, The Ritm-bac Shall Adopt And Employ “draw Lots” As The Tie-breaking Method To Finally Determine The Single Winning Provider In Accordance With Gppb Circular 06-2005. award Of Contract Shall Be Made To The Lowest Quotation Which Complies With The Technical Specifications, Requirements And Other Terms And Conditions Stated Herein. payment Shall Be Made After Delivery And Upon The Submission Of The Required Supporting Documents, I.e., Order Slip And/or Billing Statement, By The Supplier, Contractor, Or Consultant. Our Government Servicing Bank, I.e., The Land Bank Of The Philippines, Shall Credit The Amount Due To The Identified Bank Account Of The Supplier, Contractor, Or Consultant Not Earlier Than Twenty-four (24) Hours, But Not Later Than Forty-eight (48) Hours, Upon Receipt Of Our Advice. Please Note That The Corresponding Bank Transfer Fee, If Any, Shall Be Chargeable To The Account Of The Supplier, Contractor, Or Consultant. liquidated Damages Equivalent To One-tenth Of One Percent (0.1%) Of The Value Of The Goods Not Delivered Within The Prescribed Delivery Period Shall Be Imposed Per Day Of Delay. Ritm May Terminate The Contract Once The Cumulative Amount Of Liquidated Damages Reaches Ten Percent (10%) Of The Amount Of The Contract, Without Prejudice To Other Courses Of Action And Remedies Available To The Procuring Entity. Technical Offer/proposal: After Having Carefully Read And Accepted The Instructions And Terms And Conditions, I/we Submit Our Technical Proposals/quotations For The Item/s As Follows: Item # Qty/ Unit Item Description Supplier’s Compliance (indicate Brand And/or Model, Including Complete Specifications To Be Offered - Applicable) 1 25/cartridge Differentiation Disk, Optochin / Ethyl Hydrocupreine Hydrochloride, 6-mm Disk, Sterile, 50 Disk/cartridge Or Vial *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. 2 6/box Supplement, Bordetella Selective, 20 Mg Cephalexin, Dehydrated Powder, 2 Ml/vial, 10 Vials/box General Requirements: Material Safety Data Sheet Certificates To Be Submitted Upon Delivery: Certificate Of Analysis 3 9/box Supplement, Campylobacter (ccda) Selective Supplement, Dehydrated, Compatible With Campylobacter Blood-free Selective Agar Base, 10 Vials/box, Box Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. 4 2/pack Supplement, Anthracis Selective Supplement, Same Brand As Plet Agar, 5 Ampules/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet 5 1/pack Supplement, Clostridium Difficile (same Brand As Agar Base), 5 Vials/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet 6 1/pack Supplement, Shahidi Ferguson Perfringens Selective Supplement, Same Brand As Agar Base, 5 Vials/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet Financial Offer/proposal: Please Quote Your Best Offer For The Item/s Below. Please Do Not Leave Any Blank Items. Indicate “0” If Item Being Offered Is For Free: Item # Qty/ Unit Item Description Abc Price Proposal Unit Cost Price Proposal Total Cost 1 25/cartridge Differentiation Disk, Optochin / Ethyl Hydrocupreine Hydrochloride, 6-mm Disk, Sterile, 50 Disk/cartridge Or Vial *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. 31,500.00 2 6/box Supplement, Bordetella Selective, 20 Mg Cephalexin, Dehydrated Powder, 2 Ml/vial, 10 Vials/box General Requirements: Material Safety Data Sheet Certificates To Be Submitted Upon Delivery: Certificate Of Analysis 36,300.00 3 9/box Supplement, Campylobacter (ccda) Selective Supplement, Dehydrated, Compatible With Campylobacter Blood-free Selective Agar Base, 10 Vials/box, Box Expiration Date: Shall Not Be Less Than Two (2) Years From The Date Of The Actual Delivery *item Should Have Passed The Evaluation Result, Quality Assessment, And Quality Validation/verification Of The End-user Or Should Have Met The Acceptability Criteria Necessary For Laboratory Inter-comparability Of Results, Whichever Is Applicable. 79,200.00 4 2/pack Supplement, Anthracis Selective Supplement, Same Brand As Plet Agar, 5 Ampules/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet 4,600.00 5 1/pack Supplement, Clostridium Difficile (same Brand As Agar Base), 5 Vials/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet 7,500.00 6 1/pack Supplement, Shahidi Ferguson Perfringens Selective Supplement, Same Brand As Agar Base, 5 Vials/pack Expiration Date: Shall Not Be Less Than Three (3) Years From The Date Of The Actual Delivery General Requirements: Material Safety Data Sheet 7,000.00 Delivery Period: Thirty(30) Calendar Days Total Offered Quotation In Words: ______________ In Figures: ______________ Price Validity: ________________ Payment Terms: Thirty (30) Calendar Days Payment Details: Banking Institution: _________________________________________________ Account Number: __________________________________________________ Account Name: _________________________________________________ Branch: _________________________________________________ Note: Only The Actual Amount Of The Accepted Items Shall Be Paid. ___________________________ Signature Over Printed Name Of Authorized Representative ___________________________ Position/designation ___________________________ Office Telephone/fax/mobile Nos. ___________________________ Email Address/es
Closing Soon20 Jan 2025
Tender AmountPHP 166.1 K (USD 2.8 K)

DEPT OF THE NAVY USA Tender

Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|0001|1hm 4730 016997794 X2 Ell 90 Lr Bw.sch 80|||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||| inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| small Business Program Representations (feb 2024)|4||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332919|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Daysafter The Closing Date As Indicated On The Quotation. Please Specify (if Otherthan 60 Days) ______________ Days. If You Are Submitting Your Quote Via Emailor Neco, Please Specify The Number Of Days Pricing Is Valid. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means. (i.e. Fax Or E-mail Your Post Award P.o.c Listed Above) A Dedicated Roti Fax Has Been Added For Your Submittal Convenience. Fax Number (717) 605-8054. \ 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 2.2 Not Releasable To Foreign Nationals (noforn) Distribution Statement - Drawings, Specification, Or Related Technical Documents As Cited In The Irpod Are Subject To Special Export Controls And Each Transmittal To Foreign Govern Ments Or Foreign Nationals May be Made Only With Prior Approval Of The Naval Sea Systems Command. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. 6.2 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.3 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. date Of First Submission=eoc submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired. the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev). date Of First Submission=045 Dac submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
Closing Soon21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Contact Information|4|tbd|tbd|tbd|tbd| item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo)|n/a|tbd|n00104|tbd|tbd|see Schedule|tbd|n/a|n/a|n/a|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| equal Opportunity (sep 2016)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|334513, 750||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334513|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| a Material Irpod Is Available At The Bpmi Site. Vendor Review Of The Irpod Is Mandatory. unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. Please Specify (if Other Than 60 Days) ______________ Days. If You Are Submitting Your Quote Via Email Or Neco, Please Specify The number Of Days Pricing Is Valid. All Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders And Modifications) Related To The Instant Procurement Are Considered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. the Following Applies If Reports Of Test And Inspection (roti) Are Required: the Recommended Method For Roti Submittals Is Via Wawf Or An Alternative High Quality Electronic Means (ie: Fax Or Email Your Post Award Poc Listed Above). A Dedicated Roti Fax Has Been Added For Your Submittal Convenience. \ 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. mark The Packaging Label With Nomenclature Cited On Irpod. Use Vendor's Carrying Case. Apply A Delicate Instrument Marking To All Levels Of Packaging, Including The Gage Carrying Case. The Carring Case Must Be An Impact Resistant, Waterproof Carry Case. The Case shall Be Equipped With Cut Or Molded Foam Cushioning To Provide The Best Gage Protection Possible From Shock And Vibration (equivalent To To Pelican Products, Inc. 1500 Case Or Bettera), A Copy Of The Certified Test Results And The Gage Warranty Conditions Shall be Provided In Case. date Of First Submission=eoc submit To Navsup-wss, Code N9433 For Review, A Complete Package Of All Applicable Vendor Certified Reports Of Test And Inspection Per Di-qcic-8872(latest Rev) See (individual Repair Parts Ordering Data) Irpod For Individual Documentsrequired. the Package Will Be Submitted Per The Contract Delivery Schedule, And Authorization To Ship Material Must Be Obtained From The Pco. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8872s Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Roti Package To Be Iaw Did Di-qcic-8872(latest Rev).
Closing Soon16 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|iso9001| inspection Of Supplies--fixed-price (aug 1996)|2||| time Of Delivery (june 1997)|20|0001aa|5|455|||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|tbd|tbd|tbd|n00104|tbd|tbd|w25g1u|tbd|||tbd|||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportunity For Veterans (jun 2020)|4||||| warranty Of Data--basic (mar 2014)|2||| equal Opportunity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| list Of Award Attachments|5||||x|| list Of Solicitation Attachments|5|||||| alternate A, Annual Representations And Certifications (oct 2024)|13|x|x|x|||x|x||||||| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|332991|1,250 Employees|||||||||||| type Of Contract (apr 1984)|1|firm Fixed Price| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| amendment To Extend Solicitation Through 13 February 2025. the Complete Rfp Package Must Be Signed And Returned Prior To The Closing Date. Emailed Proposals Are Acceptable. Neco Quotes Will Not Be Accepted And Will Be Determined Non-responsive. see Attached Irpod Revision 20230927144530, Dated 03/19/2024, For Technical Data Requirements. Notwithstanding The Inspection Terms In The Irpod, Government Source Inspection (gsi) Is Required. 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 3. Requirements 3.1 ;the Subject Item Must Be Manufactured In Accordance With The Procurement irpod. Procurement Irpod Can Be Obtained From Contracting Officer.; 3.2 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. the Packaging Label Shall Be Marked With The Nomenclature As Cited On Irpod. date Of First Submission=eoc submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock number And Item Nomenclature Specified In The Schedule Of Supply/services. di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev). date Of First Submission=045 Dac submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
Closing Date13 Feb 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement (navicp Review Feb 1991)(feb 1999)|1|mil-i-45208| inspection Of Supplies--fixed-price (aug 1996)|2||| inspection And Acceptance - Short Version|8|x||x|||||| stop-work Order (aug 1989)|1|| general Information-fob-destination|1|b| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Reports (combo) |n/a|tbd|n00104|tbd|tbd|see Schedule |tbd|n/a|n/a|n/a|||||| inspection System Program Plans, Or Premanufacturing Or Test Procedures|1|45| contractor Purchasing System Administration-basic (may 2014)|1|| federal Acquisition Supply Chain Security Act Orders-prohibition (dec 2023)|12||||||||||||| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| small Business Program Representations (feb 2024)|4|||x|| buy American-balance Of Payments Program Certificate-basic (feb 2024)|1|| annual Representations And Certifications (may 2024)|13|334513|750|||||||||||| notice Of Priority Rating For National Defense, Emergency Perpardeness, And Enrgy Progam Use (april 2008))|2||x| unless Otherwise Specified, Pricing For This Quotation Is Valid For 60 Days After The Closing Date As Indicated On The Quotation. please Specify (if Other Than 60 Days) ______________ Days.if You Are Submitting Your Quote Via Email Or Neco,please Specify The Number Of Days Pricing Is Valid. a Material Irpod Is Available At The Bpmi Website. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders,delivery Orders And Modifications) Related To The Instant Procurement Areconsidered To Be 'issued' By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, Or sent By Other Electronic Commercemethods, Such As Email. The Government's Acceptance Of The Contractor's Proposal Constitutes Bilateral Agreement To 'issue' Contractual Documents As Detailed Herein. \ 1. Scope 1.1 In The Event Of A Conflict Between Section "c" And Section "d" Of The Contract/purchase Order, Section "c" Will Take Precedence. 2. Applicable Documents 2.1 Applicable Documents; technical Documents Associated To This Solicitation Or Award Such As; Irpod, Drawings,technical Data, Strs, As Well As Certain Military Specifications, And Commercial Item Descriptions (cid) Etc. May Be Obtained At (https://logistics.unnpp.gov/ecommerce) These Documents, At The Required Revision Levels That Are Associated To Either This Solicitation Or Award, Become A Part Of This Solicitation Or Award Unless Changed By An Admendment To The Solicitation Or Modification To the Award. this Website Requires A Password And Pre-registration. To Obtain Instruction On How To Register And Obtain A Password Contact The Bpmi Website Administrator. 3. Requirements 3.1 Navsup Wss-mech Code N94 Additional Technical Documentation order Of Precedence And Effective Issues Of Cited Documentation Dated: July 2004 a. Order Of Precedence For Document Conflict Resolution: The Technical And Quality Requirements Applicable To Manufacture Of The Material Being Purchased Under This Order Are Contained Or Invoked In One Or More Of The Documents Listed Below. In The Event Of any Inconsistencies Between Any Provisions Of This Order, The Order Or Precedence Shall Be As Follows: 1. Amendments To The Purchase Order/contract 2. Schedule Of Supplies Of The Purchase Order/contract. 3. Terms And Conditions Of The Purchase Order/contract. 4. Individual Repair Part Ordering Data (irpod); Or Master Procurement Specification, As Applicable. 5. Any Invoked Standard Technical Requirements (strs). 6. Drawings Referenced In The Irpod, Or Master Procurement Specification , As Applicable. 7. Specifications Referenced In The Irpod, Master Procurement Specifications Or Drawing(s), As Applicable. b. Effective Issues Of Cited Drawings, Specifications, Standards And Other Documents: 1. The Contractor Shall Comply With The Specified Revisions Of The Documents (i.e. Drawings,specifications,standards And Other Documents) Cited In The Irpod And/or Procurement Specification Contained Herein. The Contractor Shall Obtain Written Approval for The Contracting Officer To Use Document Revisions Other Than Those Specified. When A Later Drawing Revision Is Submitted For Approval, Two Full Size Clear Legible Prints Shall Be Provided. 2. Where Documents Are Referred To Only By The Basic Identification Name Or Number And No Specific Revision Thereto, The Contractor Use Of Any Issue Of The Document Except All Such Revisions Shall Be Dated 1 November 1969 Or Later. c. Use Of Document Revisions In Their Entirety: 1. Contractors Shall Use Revisions To Each Cited Or Referenced Document In Its Entirety Unless The Contractor Obtains Contracting Officer Approval To Do Otherwise (i.e. The Contractor Shall Not Use Portions Of Different Revisions Of A Document). d. Vendor Waiver/deviations On Critical Contracts. 1. Compliance With The Delivery Date And Technical Requirements Of Navsup Wss Critical Repair Part Material Contracts Is Expected. 2. As The Cautionary Note Contained In The Contract States, Seller Intended Use Of Any Material Which Is Not In Full Compliance With The Specified Contract Technical Requirements, Should Be Identified As An Exception In Advance Either At The Time The Quotation is Submitted Or Prior To Manufacture. 3. Requests For Delivery Date Extensions And Waivers/deviations Should Be Accompanied By An Explanation Of The Cause For The Delay, Or The Reason For The Requested Non-conformance With An Offer Of Consideration In The Event The Contracting Officer Concurs With your Request. 4. Requests For Waivers/deviations Should Provide Justification For The Requested Change Including An Evaluation Which Demonstrates That Proposed Non-conformance Will Not Affect The Quality, Form, Fit, Or Function Of The Part. Where A Proposed Alternate Or replacement Item Is Offered, Supporting Technical Data (catalog Page, Drawing (s), Etc.) That Fully Describe The Proposed Item Shall Be Provided For Technical Evaluation. 5. Requests Which Do Not Contain The Above Information Will Be Returned And Will Not Be Submitted To Technical/engineering Review Until Sufficient Justification Is Provided. 6. Requests For Waivers/deviations Shall Be Presented To The Government Quality Assurance Representative (qar) For Comment. The Qar Shall Forward The Request, With Their Comments, Directly To The Post Award Pco Identified In The Contract/purchase Order Within five Working Days After Receipt. e. Exclusion Of Mercury 1. Mercury Or Mercury Containing Compounds Shall Not Be Intentionally Added To Or Come In Direct Contact With Hardware Or Supplies Under This Contract. 4. Quality Assurance 4.1 The Quality Assurance Requirements Are Located In The Individual Repair Part Ordering Data (irpod). the Contractor Shall Provide And Maintain An Inspection System Acceptable To The Government Covering The Supplies Herein. records Of All Inspection Work By The Contractor Shall Be Kept Complete And Available To The Government During The Performance Of This Contract And For Such Longer Periods As May Be Specified Elsewhere In The Contract. 5. Packaging 5.1 When The Cleanliness Control Requirements Of One Or More Of The Following Documents Are Invoked: Mil-std-767, Mil-std-2041, Refueling Clean, Or Reactor Plant Clean, The Following Clarification Of Requirements For Mil-prf-23199 Packaging Of Repair Parts applies. (1). The Following Summary Clarifies The Packaging Requirements Of Mil-prf-23199 Pertaining To The Use Of Mil-dtl-24466 Green Poly Bags. The Supplier Remains Responsible For Meeting All Contract Requirements. Suppliers Who Are Unsure Of The Packaging, Packing, and Marking. requirements For A Particular Part Should Request Clarification By Contacting The Navsup-wss Contracting Poc. (a). Paragraph 3.4.2 Of Mil-prf-23199 Discusses Level B Packaging And Refers To Paragraph 3.3.1 For The Method Of Packaging. Paragraph 3.3.1 Provides Several Methods Of Packaging. Packaging In Heat Sealed Envelopes Is Covered In Paragraph 3.3.1.1 Which States, "components Which Are Subject To Cleanliness Controls (see 6.2) Or As Specified (see 6.1) Shall Be Packaged In Heat Sealed Envelopes (see 3.2.2.5 And 3.2.2.5.1)". (2). The Following Conditions Must Be Satisfied In Order For Mil-dtl-24466 Bags To Apply: (a). Paragraph 6.2 Of Mil-prf-23199 Defines Cleanliness Controls As Any Reference To (or Application Of) The Cleanliness Control Requirements Of One Or More Of The Following Documents: Mil-std-767, Mil-std-2041, Refueling Clean, Reactor Plant Clean, Or Other requirements Identified Within The Irpod. the Repair Part Must Have Cleaning Requirements Of One Of The Aformentioned Methods. (b). Paragraph 6.1 Contains Ordering Data Options. Paragraph 6.1(k)2. Provides An Option To Specify The Method Of Packaging To Be Used When Packaging Is Other Than In Accordance With Paragraph 3.3.1.1 Only. If A Contract Specifies Any Additional Requirements for The Use Of Green Poly Bags, Then They Are Required And Take Precedence. (4). The Use Of Fire Retardant Packaging Material Is No Longer Required In Any Navsup-wss N94 Contract. mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes 6.1 1. Nuclear Reactor Publications Assigned Navsea Document And Identification Numbers That Are Not Available From Bpmi E-commerce Web Site Must Be Requested From: contracting Officer navsup Wss-mech code N943 5450 Carlisle Pike p.o. Box 2020 mechanicsburg, Pa. 17055-0788 requests For "official Use Only" And "noforn" (not Releasable To Foreign Natio Nals) Documents Must Identify The Quotation Number On Pre-award Procurement Actions. Requests Must Be Submitted To The Pco For Certification Of "need-to-know" For The Document. On post-award Actions, The Request Must Identify The Government Contract Number, And Be Submitted Via The Defense Contract Management Agency (dcma) For Certification Of "need-to-know" For The Document. 2. Commercial Specifications, Standards And Descriptions - These Specifications, Standards And Descriptions Are Not Available From Government Sources. They May Be Obtained From The Publishers Or Societies Of The Applicable Documents. 6.2 In Accordance With Dodi 5230.24 All Documents And Drawings Provided By The U.s. Navy To Prospective Contractors Must Include A "distribution Statement" To Inform The Contractor Of The Limits Of Distribution, And The Safeguarding Of The Information contained On Those Documents And Drawings. There Are 6 (six) Separate Distribution Statement Codes Used For Non-classified Documents And Drawings. The Definition For Each Is As Follows: a... Approved For Public Release; Distribution Is Unlimited. b... Distribution Authorized To Us Governments Agencies Only. c... Distribution Authorized To Us Government Agencies And Their Contractors. d... Distribution Authorized To Dod And Dod Contractors Only. e... Distribution Authorized To Dod Components Only. f... Further Distribution Only As Directed By Commander, Naval Sea Systems Command, Code 09t. 6.3 Information Regarding Abbreviations, Symbols And Codes Appearing On Dd Form 1423 - The Following Information Is Provided To Assist In Understanding The Intent Of The Requirement To Provide A Deliverable Item To The Government. The Explanation Of abbreviation, Symbols And Codes Found In A Block Follows The Block Number As They Appear On The Dd Form 1423. block A: Is The Actual Contract Line Item No. block B: Is The Actual Collective Physical List Of The Deliverable Item(s) Which Are Part Of The Total Requirement Of The Contract/purchase Order. block C: Is The Category Of Data Required, Tdp Is Defined In Mil-t-31000. Tm Is Defined In Part 1x, Section B Of Dodi 5000.2. Navsup-wss Has Reasoned That Most Dd Form 1423's Included In Our Solicitations Meet The Requirement Of Tdp As Navsup-wss Does Not Regularly Purchase Only Technical Manuals Without Purchasing Hardware And Related Tdp Software. Therefore, Most Navsup-wss Dd Form 1423 Category Code Will Be Tdp. block D: Is The Name Of The Parent System, Next Higher Assembly, Or The Item Being Purchased. block E: Is The Purchase Request Number, Request For Proposal Number, Invitation For Bid Number Or Another Number For Tracking And Monitoring Purposes. block F: Is The Successful Offerors Name And Or Cage Code. block G: Is The Name Of The Individual And Or The Code/activity Of The Individual Who Prepared The Dd Form 1423 And Included The Requirement In The Technical Data Package (tdp). block H: Self Explanatory. block I: Is The Name And Signature Of The Individual Who Approved The Content And The Need For Inclusion Of The Dd Form 1423 In The Tdp. block J: Self Explanatory. block 1: Is The Exhibit Line Item Number (elin). block 2: Is The Title Of The Data Item Cited In Block 4. block 3: Is The Subtitle Of The Data Item Cited In Block 4 And Is Used If The Title Requires Clarification. block 4: Is The Actual Data Item Description (did) Number Or The Actual Technical Manual Contract Requirements Number. In The Event The Dd Form 1423 Is Requiring A Technical Manual The Numbered Tmcr Will Be An Attachment To The Contract/purchase Order. block 5: Is The Section And Paragraph Area, Where The Requirement Statement For The Dd Form 1423 Will Be Found. block 6: Is The Activity That Will Inform The Contractor Of Approval, Conditional Approval Or Disapproval Of The Deliverable Item. block 7: Is A Code Which Designates Authority For Inspection And Acceptance Of The Deliverable Item. The Definition Of The Codes Is As Follows: Dd Form 250 Code Inspection Acceptance Ss (1) (2) Dd (3) (4) Sd (1) (4) Ds (3) (5) Lt (6) (7) No (8) (8) Xx (9) (9) (1) Inspection At Source. (2) Acceptance At Source. (3) No Inspection Performed At Source. Final Inspection Performance At Destination. (4) Acceptance At Destination. (5) Acceptance At Source. Acceptance Based On Written Approval From The Contract Officer. (6) Letter Of Transmittal Only. Lt Should Not Be Used When Inspection Is Required. The Data Is Sent By The Contractor Directly To The Personnel Listed In Block 14 Of The Dd Form 1423. Lt Is Used When The Contracting Agency Does Not Desire To Have A Dd Form 250 For Each And Every Piece Of Data Developed By The Contractor. The Only Other Authorized Use Of Lt Is The Special Case Where The Contracting Agency Does Not Desire To Have Separate Dd Forms 250 But Desires To Have A Government Quality Assurance Representative Perform Inspection. The Government Quality Assurance Representative Shall Be Listed On The Distribution In Block 14 And Requested To Provide Comments Via The Quality Assurance Letter Of Inspection. Use Of The Symbol Lt Is Not Authorized For Data Comprising Final Delivery Of Technical Data Package Of For Technical Manuals. (lt May, However, Be Used For Delivery Of Preliminary Tdp's Or Tm's). (7) As Specified In Block 8 Of The Dd Form 1423. (8) No Inspection Or Acceptance Required. No Dd Form 250 Or Letter Of Transmittal Required. Use Of The Symbol No Is Not Authorized For Data Comprising Technical Data Packages Or For Technical Manuals. (9) Inspection And Acceptance Requirements Specified Elsewhere In The Contract. block 8: Is The Approval Code - Items Of Critical Data Requiring Specific Advanced Written Approval Prior To Distribution Of The Final Data Item Will Be Identified By Placing An "a" In This Field. This Data Item Requires Submission Of A Preliminary Draft Prior To Publication Of A Final Document. When A Preliminary Draft Is Required, Block 16 Of The Dd Form 1423 Will Show Length Of Time Required For Government Approval/disapproval And Subsequent Turn-around Time For The Contractor To Resubmit The Data After Government Approval/disapproval Has Been Issued. Block 16 Will Also Indicate The Extent Of The Approval Requirements, E.g., Approval Of Technical Content And/or Format. block 9: Is The Distribution Statement Code Which Explains How The Government Can Circulate The Deliverable Item. The Definition Of Codes A, B, C, D, E, Or F Is As Follows: A. Distribution Of The Item Is Unrestricted. B. Distribution Of The Item Is Limited To Agencies Only. C. Distribution Of The Item Is Limited To Contractors With A Cage Code And Have A Dd Form 2345 On File With The Dla Logistics Information Services (dlis) Battle Creek, Mich. Or Government Activities. D. Distribution Of The Item Is Limited To Dod Activities And Dod Contractors Only. E. Distribution Of The Item Is Limited To Dod Components Only. F. Distribution Of The Item Is Restricted From Foreign Nations And Foreign Nationals. block 10: Is The Frequency Which The Deliverable Item Is Expected To Be Delivered To The Government. The Abbreviations And Their Meaning. Annly Annually Asgen As Generated Asreq As Required Bi-mo Every Two Months Bi-we Every Two Weeks Daily Daily Dfdel Deferred Delivery Mthly Monthly One/r One Time With Revisions Qrtly Quarterly Semia Every Six Months Wekly Weekly Xtime Number Of Times To Be Submitted (1time, 2times...9times) Use Of These Codes Requires Further Explanation In Block 16 To Provide The Contractor With Guidance Necessary To Accurately Price The Deliverable Data Item. Other Abbreviations Not Appearing On The Above List May On Occasion Be Used In Block 10 Of The Dd Form 1423. When Other Abbreviations Are Used They Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 11: Is The Last Calendar Date, Expressed In Year/month/day Format, The Deliverable Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423 For An Item With A Block 10 Entry Indication A Single Delivery. If The Item Is To Be Submitted Multiple Times, The Number Stated Is The Number Of Calendar Days After The Frequency Cited In Block 10 The Item Is To Be Received By The Requiring Office Cited In Block 6 Of The Dd Form 1423. On Occasion The Deliverable Item Will Be Required To Be Submitted Prior To The End Of The Frequency Cited In Block 6. In That Event The Requirement Will Be Fully Explained In Block 16 Of The Dd Form 1423. block 12: Is The Date Of First Submission Of The Deliverable Item To The Requiring Office (block 4) Expressed In Year/month/day Format. The Abbreviations And Their Meaning Are As Follows: Asgen As Generated Asreq As Required Dac Days After Contract Date Dfdel Deferred Delivery Eoc End Of Contract Eom End Of Month Eoq End Of Quarter Specific Instructions For These Requirements Will Be Provided In Block 16. If The Deliverable Item Is Constrained By A Specific Event Or Milestone The Constraint Will Be Fully Explained In Block 16 Of The Dd Form 1423. "as Generated", "as Required", And "deferred Delivery" Will Always Be Fully Explained In Block 16. block 13: Is The Date Of Subsequent Submission Of The Deliverable Item, After The Initial Submission. Subsequent Submission Is Only Used To Indicate The Specific Time Period. The Data Is Required When Block 10 Of The Dd Form 1423 Indicates Multiple Delivery Is Required. This Does Not Apply To Resubmission Of A Deliverable Item That Has Been Reviewed By The Requiring Office And Determined To Be Only Conditionally Acceptable Or Unacceptable. block 14a: Will Contain The Activity Name(s) Where The Deliverable Item Is To Be Sent. If The Activity Is Other Than Dcma Or Navsup-wss The Full Name, Address (including Code) Will Be Specified. That Specific Information Will Be Located In Block 16 Of The Dd Form 1423. block 14b: Is The Number Of Copies Of Draft And Or Final Copies To Be Submitted. When Final "repro" Copies Are To Be Submitted Block 16 Will Clarify The Type Of Repro Copies Required. (e.g., Vellum, Negative, Etc.) block 15: Is The Total Of Each Type Of Copies To Be Submitted As Required By Block 14. block 16: Is The Block Used To Provide Additional Or Clarifying Information Blocks 1 Through 15. This Block Is Also The Only Area Used To Tailor The Document Listed In Block 4. Only Deletions To The Minimum Requirements Stated In The Document In Block 4 Are Allowed. Block 16 May Also Be Used To Specify The Medium For Delivery Of The Data. block 17: Is The Block Where The Bidder Or Offeror Is To Enter The Appropriate Price Group. The Price Groups Are Defined As Follows: A. Group I - Data Which The Contractor Prepares To Satisfy The Government's Requirements. The Contractor Does Not Need This Type Of Data To Perform The Rest Of The Contract. Price Would Be Based On Identifiable Direct Costs, Overhead, General And Administrative (g&a) And Profit. B. Group Ii - Data Essential To Contract Performance Which Must Be Reworked Or Amended To Conform To Government Requirements. The Price For Data In This Group Would Be Based On The Direct Cost To Convert The Original Data To Meet Government Needs And To Deliver It, Plus Allocable Overhead, G&a And Profit. C. Group Iii - Data Which The Contractor Must Develop For His Own Use And Which Requires No Substantial Change To Conform To Government Requirements Regarding Depth Of Content, Format, Frequency Of Submittal, Preparation, And Quality Of Data. Only The Costs Of Reproducing, Handling And Delivery, Plus Overhead, G&a And Profit, Are Considered In Pricing Data In This Group. D. Group Iv - Data Which The Contractor Has Developed As Part Of His Commercial Business. Not Much Of This Data Is Required And The Cost Is Insignificant. The Item Should Normally Be Coded "no Charge." An Example Is A Brochure Or Brief Manual Developed For Commercial Application Which Will Be Acquired In Small Quantities, And The Added Cost Is Too Small To Justify The Expense Of Computing The Charge That Otherwise Would Go With The Acquisition. block 18: Enter The Total Estimated Price Equal To That Portion Of The Total Price Which Is Estimated To Be Attributable To The Production Or Development For The Government Of That Item Of Data. The Entry "n/c" For "no Charge" Is Acceptable. the Packaging Label Shall Be Marked With The Nomenclature Cited On The Irpod. date Of First Submission=eoc submit At The Time Of Material Delivery A Certificate Of Compliance Per Di-misc-81356 To Navsup-wss Code N9433. A Separate Certificate Of Compliance Shall Be Prepared And Submitted For Each Unique Combination Of Contract/purchase Order Number, National Stock number And Item Nomenclature Specified In The Schedule Of Supply/services. di-misc-a81356 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control number - Certification Package To Be Iaw Did Di-misc-81356(latest Rev). date Of First Submission=045 Dac submit For Approval One Package (iaw Di-qcic-8871) Of All Applicable Procedure, Drawing And Other Pre-manufacturing Submittals, Listed On The Individual Repair Part Ordering Data (irpod) Document(s) And Detailed In The Cited Specification, Within 45 Days After contract Award To The Contracting Officer (navsup-wss Code N9433). See Irpod For Individual Documents Required. a Separate Package Will Be Prepared And Submitted For Each Unique Combination Of Contract Number, National Stock Number, And Item Nomenclature Specified In The Schedule Of Supplies/services. di-qcic-a8871 Cited In Block 4 Is A Unique Navsup-wss Dd1423 Sequence Control Number - Procedure Package To Be Iaw Did Di-qcic-8871(latest Rev).
Closing Soon21 Jan 2025
Tender AmountRefer Documents 

DEPT OF THE NAVY USA Tender

Others
Corrigendum : Closing Date Modified
United States
Description: Item Unique Identification And Valuation (jan 2023)|19|||||||||||||||||||| higher-level Contract Quality Requirement|8|x|||||||| time Of Delivery (june 1997)|20||||||||||||||||||||| stop-work Order (aug 1989)|1|| wide Area Workflow Payment Instructions (jan 2023)|16|invoice And Receiving Report (combo) Type||cognizant Dfas|n00383|cognizant Dcma|cognizant Dcma|see Schedule|source||||||||| navy Use Of Abilityone Support Contractor - Release Of Offeror Information (3-18))|1|| value Engineering (jun 2020)|3|||| equal Opportunity (sep 2016)|2||| integrity Of Unit Prices (nov 2021)|1|| equal Opportuity For Workers With Disabilities (jun 2020)|2||| transportation Of Supplies By Sea (oct 2024)|2||| buy American-free Trade Agreements-balance Of Payments Program-basic (feb 2024)|11|||||||||||| limitation Of Liability--high-value Items (feb 1997)|1|| limitations On Pass-through Charges (jun 2020)|1|| notice Of Total Small Business Set-aside (oct 2020)(deviation 2020-o0008)|1|| alternate A, Annual Representations And Certifications (oct 2024)|13|||||||||||||| buy American-free Trade Agreements-balance Of Payments Program Certificate-basic (feb 2024))|5|||||| buy American--balance Of Payments Program (feb 2024)|1|| royalty Information (apr 1984)|1|| annual Representations And Certifications (may 2024)|12|336413|1250||||||||||| facsimile Proposals (oct 1997)|1|| notice Of Priority Rating For National Defense, Emergency Preparedness, Andenergy Program Use (apr 2008))|2||x| this Solicitation Will Be Using Competitive Procedures. this Solicitation Is For Made New Manufacture Spare Parts. this Requirement Will Be Awarded To The Offeror Based On The Following Evaluation Criteria Submitted Via Quote. offers Submitted Will Be Evaluated Based On The Following Criteria: Lead Time, Price, Past Performance And Capacity. the Closing Date For This Solicitation Is Listed On Page 1. the Quotes May Be E-mailed To The Below Address And Must Be Received On Or Before 2:00 Pm Est Of The Closing Date. the Offeror Shall Submit One Unit Price Per Clin And The Unit Price Should Be Firm Fixed Price. Tiered Pricing Will Not Be Accepted Or Evaluated. all Contractual Documents (i.e. Contracts, Purchase Orders, Task Orders, Delivery Orders, And Modifications) Related To The Instant Procurement Are Considered To Be ?issued? By The Government When Copies Are Either Deposited In The Mail, Transmitted By Facsimile, or Sent By Other Electronic Commerce Methods, Such As E-mail. The Government?s Acceptance Of The Contractor?s Proposal Constitutes Bilateral Agreement To Issue Contractual Documents As Detailed Herein. \ 1. Scope 1.1 . Markings Shall Be In Accordance With Mil-std-130. 1.2 Pre-award / Post Award Requirements: due To The Critical Use Of This Item And Its Quality History, A Pre-award Survey And Post-award Conference May Be Required For All New Manufacturers. For All Previous Sources, A Post-award Conference May Be Recommended. 1.3 The Components Being Acquired Under This Solicitation Have Been Classified As Flight Critical Requiring Engineering Source Approval By The Naval Air Systems Command. Only Those Companies Who Have Submitted Requests For Source Approval And Been Approved will Be Eligible For Award Under This Solicitation. Any Company Not Previously Approved May Submit A Source Approval Request To The Contracting Officer, Naval Inventory Control Point, (see Block 10 Of The sf33 For Name And Code). The Source Approval Request Shall Contain The Following Documentation And Shall Be Submitted By The Closing Date Of This Solicitation: (a) Copy Of Complete Configuration Drawings For A Similar Item(s) Which Your Company Has Produced Within The Past Three Years, Including Test Procedures For Which Your Company (1) Has Been Qualified To Manufacture And (2) Which Is Similar, I.e., Requires The same Materials, Manufacturing Processes, Inspections, Tolerances And Similar Application As The Item(s) For Which You Are Seeking Approval. (b) Copy Of The Complete Process/operation Sheets Used To Manufacuture The Similar Item, Including But Not Limited To, Detailed Shop Sketches. These Plans Must Note Those Operations And Processes Performed By Subcontractors/ Vendors. (c) Complete Copies Of Purchase Orders, Shipping Documents, Etc. That Document Delivery Of Production Quantities Of The Part To The Original Equipment Manufacturer Or Military Service. Provide The Most Recent Copies Of The Documents. (d) A Detailed Comparative Analysis Of The Differences/similarities Between The Similar Part And The Part(s) For Which You Are Seeking Approval. This Analysis Should Include Materials, Configuration, Tolerances, Process Requirements, Dimensions, Castings, forgings, Etc. (e) Copy Of Inspection Method Sheets Used In The Manufacturing And At Final Inspection. These Sheets Should Include Actual Tolerance, Print Requirements, Inspection Devices, Sources Performing The Operation And Level Of Inspection. Critical Characteristics should Be Discernible From All Other Characteristics. the Above Requirements Are A Subset Of Requirements Specified In The Aso source Approval Information Brochure Dated January 1995. The Submission Of This Data Subset Is Contingent Upon And In Consideration Of The Submitting Contractor Meeting All Other Requirements Specified In This Solicitation To Include A Bilateral Agreement With mda Which Includes Availability Of Complete Data, Mrb Disposition, Etc. Any Company Not Having Such Agreement, But Desiring To Seek Engineering Source Approval, Will Be Required To Submit Data Meeting All Requirements Of The Aso/navicp Source Approval brochure. 1.4 Sampling Rates (aqls) Indicated Below Shall Be Used In Accordance With ansi Z1.4 For Single Sampling And A General Inspection Level Of Ii. 1.5 In Addition To The 100% Pco Mandatory, Critical And Major Characteristics, attributes For Plating, Hardness And Non-destructive Testing Will Be Inspected one Hundred Percent. 1.6 Contractor Shall Develop A System For Identification Of Individual piece Parts For Traceability Purposes. Markings Shall Not Be Permanent. 1.7 An Aql Of 1.5 Will Be Used For Class 3 Threads And Dimensions, And geometric Feature Controls With A Tolerance Range Of .010 Or Less. 1.8 For Minor Characteristics, A Sampling Rate Determined By The Contractor and Subject To Qar Approval Will Be Used. 1.9 The Material Covered In This Contract/purchase Order Will Be Used In A crucial Shipboard System Enabling The Launch And/or Recovery Of Aircraft. The Use Of Incorrect Or Defective Material Would Create A High Probability Of Failure Resulting In A Serious Personnel Injury, Loss Of Life, Loss Of Vital shipboard Systems Or Loss Of Aircraft. Therefore,the Material Has Been designated As Critical Material And Special Control Procedures Are Invoked to Ensure Receipt Of Correct Material. 1.10 Articles To Be Furnished Hereunder Shall Be Manufactured, Tested And Inspected In Accordance With ;nawc Lakehurst; Drawing Number ( ;80020; ) ;616712-2; , Revision ;t; And All Details And Specifications Referenced Therein. 1.11 Unless Expressly Provided For Elsewhere In This Clause, Equipment Such As Fixtures, Jigs, Dies, Patterns, Mylars, Special Tooling, Test Equipment, Or Any Other Manufacturing Aid Required For The Manufacture And/or Testing Of The Subject Item(s) Will Not be Provided By The Government Or Any Other Source And Is The Sole Responsibility Of The Contractor. The Foregoing Applies Notwithstanding Any Reference To Such Equipment Or The Furnishing Thereof That May Be Contained In Any Drawing Or Referenced specification. 1.12 If Mil-std-454 Is Referenced In The Drawings Or In The Specification, The Contractor Is Expected To Show Compliance With Ipc/eiaj-std-001c. 2. Applicable Documents drawing Data=a409078 |80020| L| |a| | | | drawing Data=c414463 |80020| M| |c| | | | drawing Data=mpr 1221 |80020| T| |d| | | | drawing Data=mpr 1293 |80020| | |d| | | | drawing Data=naec-eng-6518 |80020|bp| |d| | | | drawing Data=418607 |80020| D| |d| | | | drawing Data=418689 |80020| E| |d| | | | drawing Data=419159 |80020| E| |d| | | | drawing Data=419963 |80020| E| |d| | | | drawing Data=419964 |80020| E| |d| | | | drawing Data=420049 |80020| H| |d| | | | drawing Data=513065 |80020| C| |d| | | | drawing Data=514511 |80020| F| |d| | | | drawing Data=514512 |80020| E| |d| | | | drawing Data=514513 |80020| D| |d| | | | drawing Data=514515 |80020| J| |d| | | | drawing Data=514858 |80020| B| |d| | | | drawing Data=615940 |80020| N| |d| | | | drawing Data=616711 |80020| K| |d| | | | drawing Data=616958 |80020| M| |d| | | | drawing Data=619947 |80020| N| |d| | | | 3. Requirements - Not Applicable 4. Quality Assurance quality Assurance Requirements: 1. The Contractor Shall Perform Quality Conformance And Lot Sampling Inspection For All Associated Features That Are Present In The Drawings And Specifications: A. Features/attributes/requirements Classified As Critical And Major On The Drawing(s) Or Within The Technical Specification Shall Be Inspected And Shall Have The Actual Dimensions Documented 100%; B. Attributes For Plating, Hardness, And Non-destructive Testing Shall Be Inspected 100%; C. Class 3 Threads, Dimensions, And Geometric Feature Controls With A Tolerance Range Of .010 Or Less Shall Be Inspected Using An Aql Of 1.5 And The General Inspection Level Ii As Defined By Ansi Z1.4. D. Minor Characteristics: Sampling Shall Be Inspected Using An Aql Of 4.0 And The General Inspection Level Ii As Defined By Ansi Z1.4. 2. First Article Testing: N/a 3. Production Lot Special Tests: A. Each Valve, P/n 616712-2, Shall Be Shipped To Lakehurst For Acceptance Inspection And Testing As Cited On Drawing616712. 4. For Purposes Of This Tdr, The Term Ndt Shall Refer To The Following Methods: Mt - Magnetic Particle Testing, Pt - Penetrant Inspection, Ut - Ultrasonic Testing, Rt - Radiographic Testing, And Vt - Visual Testing. 5. Companies Performing Ndt Shall Be Nadcap Accredited, Or A Laboratory Accredited By One Of The Organizations Listed Below As Satisfying Iso 17025 (general Requirements For The Competence Of Testing And Calibration Laboratories). Ndt Certificates Shall Be Bear the Symbols Of Accreditation And The Accreditation Body: A. American Association For Laboratory Accreditation (a2la) B. Ansi National Accreditation Board (anab) C. International Accreditation Service, Inc (ias) D. National Voluntary Laboratory Accreditation Program (nvlap) E. Perry Johnson Laboratory Accreditation, Inc (pjla) F. Canadian Association For Laboratory Accreditation Inc. (cala) G. Standards Council Of Canada (scc) 4.1 Review Documentation As Provided Under Dd 1423 Requirements. 4.2 Critical Manufacturing Processes ( ;applies; ) Heat Treat ( ; ; ) Welding ( ;applies; ) Cadmium Plating ( ; ; ) Engineering Chrome Plating ( ; ; ) Nickel Chrome Plating ( ; ; ) Casting(s) ( ; ; ) Forging(s) ( ;applies; ) Mpr (material Processing Requirements) 4.3 Production Lot Sample Test Requirements: The Tests To Be Performed Under The Production Lot Sample Testing Provisions Of The Contract Are As Follows: 4.3.1 Workmanship production Lot Samples Shall Be Inspected To Determine The General Workmanship. 4.3.2 Dimension Check production Lot Samples Shall Be Inspected To Determine Compliance With Applicable Drawings And/or Specifications. ;applies; 4.3.3 Form: ;applies; 4.3.4 Fit: ;n/a; 4.3.5 Function: ;n/a; 4.3.6 Requirements Of: ;nawc Drawing Package; 4.4 In Addition To The Above Tests, The Production Lot Samples To Be Delivered Hereunder Shall Also Be Subjected To Those Tests Which Will Demonstrate That The Samples Comply With The Contract Requirements. 4.5 The Contractor Will Be Responsible For Providing The Necessary Parts And Repair Of The Production Lot Sample During Testing. 4.6 The Cost Of The Government Testing Effort Set Forth In This Solicitation Is Estimated To Be $ ;tbd; For Each Lot Of Production Lot Testing. This Cost Factor Will Be Added, For Solicitation Purposes, To The Price Of All Offerors For Whom The Government will Require Such Testing. 4.7 Disposition Of Test Samples 4.7.1 ; ; Samples Will Not Be Returned To The Contractor As They Will Be Destroyed During Testing. 4.7.2 ;applies; Unless Otherwise Provided For In The Contract, Samples Shall Be Returned To The Contractor And May Be Considered As Production Items Under The Contract Provided The Samples Can Be Refurbished To Ready For Issue Condition And Provided The samples Have Inspection Approval Of The Cognizant Dcmc Qar. Samples May Be Shipped As Production Items Only After All Other Units Required Under The Contract Have Been Produced And Are Ready For Shipment. 4.7.3 ; ; Samples Shall Be Returned To The Contractor But Shall Not Be Considered As Production Due. 4.8 Production Lot Samples Testing Criteria 4.8.1 (a) The Production Lot Samples Shall Be ;100%, All Units; ; Selected At Random By The Cognizant Government Inspector. All Transportation Charges Will Be Prepaid By The Contractor And Will Be Shipped To: ;contact For Shipping Address: jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834 e-mail: Jose.g.torraca.civ@us.navy.mil Or drew Flast / Drew.s.flast.civ@us.navy.mil; ; the Samples Shall Be Identified By Contract Number And Lot Number And Shall Be Clearly Marked As Follows: production Lot Samples not Rfi Material do Not Take Up In Stock (b) Fourteen (14) Days Prior To The Shipment Of The Production Lot Samples, The Contractor Shall Notify The Designated Test Facility, In Writing, Of The Anticipated Shipping Date, With An Information Copy To The Pco, Naval Inventory Control Point, Attn: (see block 10.a Of The Sf33 For Name And Code), With Duplicate Copies To Navicp Code ;pco; ; And To The Designated Testing Facility. The Envelope Shall Be Clearly Marked "do Not Open In Mailroom". (c) Such Samples Shall Be Delivered To The Testing Facility In Sufficient Time Prior To The Delivery Date Of The Production Articles To Allow A 165 Day Period For Testing By The Laboratory And Written Notification By The Contracting Officer Of The Approval, conditional Approval, Or Disapproval Of The Samples. In The Event The Contractor Does Not Receive Written Notification Or Approval, Conditional Approval Or Disapproval Or The Samples For A Particular Production Lot Within The Above Stated Time Frame, The contract Delivery Schedule Shall Be Equitably Adjusted As Necessary. Within 120 Days Of The Receipt Of The Samples, The Testing Facility Shall Notify The Contracting Officer, Naval Inventory Control Point, Attn: (see Block 10 Of The Sf33 For Name And Code) Of the Results Of The Testing, Together With A Recommendation For Approval Or Disapproval. (d) If The Contractor Fails To Deliver Any Production Lot Samples For Testing Within The Time Or Times Specified, Or If The Contracting Officer Disapproves Any Production Lot Samples, The Contractor Shall Be Deemed To Have Failed To Make Delivery Within The meaning Of The Default Clause Of This Contract, And This Contract Shall Be Subject To Termination For Default. (e) In Order For A Production Lot To Be Acceptable, All Samples Representative Of The Lot Must Pass All Of The Contract Requirements. In The Event A Sample Fails To Pass Such Requirements, The Lot Will Be Rejected. In Such Event, The Government May, At Its option And At No Additional Cost To The Government, (i) Terminate All Or Any Portion Of This Contract For Default, (ii) Require The Manufacture Of A New Production Lot, Or A Rework Of The Rejected Production Lot If The Means And Procedures Proposed By The contractor For Rework Are Acceptable To The Government, Or (iii) Require The Submission Of Additional Samples For Test. The Foregoing Procedures Shall Apply To New Or Reworked Production Lots In The Same Way As They Did To The Original Production Lot. (f) For Each Additional Sample Or Each Resubmission Of A Modified Sample Which The Contractor Is Required To Submit For Approval Hereunder As A Result Of The Failure Of A Previous Sample To Conform To The Requirements Of The Specifications, The Contractor shall Pay To The Government The Costs Of Reinspection, Shipping, Examination And Retesting By The Government, And The Contractor And His Sureties (if Any) Shall Be Liable For The Amount Of Such Costs. (g) All Transportation Charges Incurred In The Submission And Return Of Any Production Lot Shall Be Borne By The Contractor. (h) Nothing Contained In The Foregoing Provisions Of This Clause, And No Action Of The Government In Accordance Herewith, Shall In Any Way Prejudice The Right Of The Government Under The Clause Of This Contract Entitled Default. 4.9 Alternate Offers - Waiver Of Production Lot Testing Approval Requirements (a) Unless Otherwise Specified In Section E Of This Solicitation, The Naval Inventory Control Point Reserves The Right To Waive The Production Lot Testing Approval Requirements Specified Herein For Offerors Who Have Previously Furnished Identical Production articles Accepted By The Government Or The Original Equipment Manufacturer/prime Manufacturer. An Offeror Requesting Waiver Of Production Lot Testing Approval Requirements Shall Submit Evidence With Its Offer Establishing That: (i) The Last Production Unit Was Delivered Within Three (3) Years Of The Issue Date Of This Solicitation And (ii) The Production Location To Be Used For This Requirement Is The Same As Used For The Previous Production Run. additionally, The Offeror Shall Submit A Certification To Be Executed By The Officer Or Employee Responsible For The Offer, Stating That: (i) The Articles To Be Provided Will Be Produced Using The Same Facilities, Processes, Sequence Of Operations And Approved Subcontractors As Those Previously Delivered And Accepted By The Government Or Original Equipment Manufacturer/prime Manufacturer, and (ii) The Previous Production Units Were Manufactured Without Material Review Board Disposition Or Waiver/deviation Request Or Rejection Of Pre-production Samples For Cause. (note: This Certification Concerns A Matter Within The Jurisdiction Of An Agency Of The United States And The Making Of A False, Fictitious, Or Fraudulent Certification May Render The Maker Subject To Prosecution Under Title 18, United States Code, Section 1001.) (b) In The Event Waiver Of The Production Lot Testing Approval Requirements Is Granted, The Delivery Schedule For The Production Units Shall Be One Hundred And Sixty-five (165) Days Earlier Than That Which Is Desired Had The Waiver Not Been Granted. If The offeror Is Unable To Meet The Desired Schedule, He Shall Insert Below The Alternate Delivery Schedule He Offers The Government. Offeror's Alternative Proposed Delivery Schedule (based On Waiver Of Production Lot Testing Approval Requirements) within Days: item No. ______________ Quantity:_______ After Date Of Contract:______________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (pco) Mandatory Inspection Is Required And Shall Be Accomplished At Source Under The Surveillance And Final Approval Of The Cognizant Dcmao Quality Assurance Representative (qar). during Production, Mandatory Inspection Is Required To Be Accomplished By The Contractor As Follows: A. Level Of Inspection (loi). 1. Critical Characteristics: 100% Inspection Shall Apply. 2. Major And Minor Characteristics: Loi Shall Be In Accordance With A Sampling Plan Acceptable To The Qar. B. Critical Characteristics: ;jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834 e-mail: Jose.g.torraca.civ@us.navy.mil; C. Major And Minor Characteristics 1. Shall Be Defined By The Contractor Subject To Qar Concurrence, Unless Defined On Applicable Drawings And Associated Specifications. 4.11 Special Inspection Requirements ( ;applies; ) Magnetic Particle Inspection ( ;applies; ) Surface Inspection ( ; ; ) Penetrant Inspection ( ; ; ) Radiographic Inspection ( ; ; ) Ultrsonic Inspection ( ;applies; ) High Shock Test ( ;applies; ) Mechanical Vibration Test 4.12 Final Inspection Requirement:due To The Critical Nature Of This Item, Representatives Of The Buying office/and The Cognizant Field Activity, Nawc Lakehurst, Shall Be Notified By The Successful Contractor At Least 14 Days Prior To Presentation To The Dcm Qar Of The Items For Final Inspection So That They May Have The Option Of witnessing The Final Inspection. The Contractor Shall Notify By Email Or telefax Pco And Nawc Lakehurst Qa ;jose Torraca Nawcadlke Qa Rep / Tel: (732)-323-2834 e-mail: Jose.g.torraca.civ@us.navy.mil; To Arrange For The Final Inspection.the Authority Of The Qar Shall Not Be Abrogated. If The Notification Is Not Given To Both Sites Then The Qar Shall Not Accept The Units. 5. Packaging- Mil-std 2073 Packaging Applies As Found Elsewhere In The Schedule 6. Notes - Not Applicable this Is A Alre Critical Application Item. For Drawing Updates, See Attached Nawc Lke Drawing Update Sheet. navsup Reference Only: Procurement Tdr (24-10123): the Components Being Acquired Under This Solicitation Have Been Classified As "critical" Requiring Engineering Source Approval By Naval Air Systems Command Only Those Companies Who Have Submitted And Been Approved Will Be Eligible For Award Under This solicitation Any Company May Submit A Source Approval Request As Outlined In This Solicitation. all Records Pertaining To Alre Csi/cai Manufacture And Inspection/test Shall Be Provided To The Alre Cognizant Technical Authority. All Records Shall Be Maintained By Lke Qa And By The Manufacturer For A Period Of Seven Years. date Of First Submission=asreq 16. Remarks: (block 12) Date Of First Submission: Concurrently With Delivery Of Plt Items. Inspection/certification Data Needed To Substantiate The Quality Ofthe Production Lot Test Units Shall Be Included In Production Lot Test Unit Pa Ckaging. The Outside Of The Package That Contains The Data Shall Be Clearly Ma Rked "inspection/certification Data included". data Requirements: a. Copies Of All Approved Requests For Variations. b. Dimensional Inspection Per Drawings 616712, 616958, 616711, 514513, 514512, 514511, 419964, 514858, 619947, 615940, 419159, 420049, 418607, 419963, 418689, C414463, And A409078. c. Dimensional Inspection In Accordance With Naec-eng-6518 Per Drawing 616712. d. Finish In Accordance With Mpr 1221-31 Per Drawing 616712. e. Part Identification Per Drawings 616712, 616711, 514858, 514515, 619947, 615940, 418689, And A409078. f. Hydrostatic Test Per Drawings 616712, 616958. g. Shock Test Per Drawing A409078. h. Material Properties Per Drawings 616712, 616958, 514512, 514511, 616711, 514513, 419964, 419963, 514858, 514515, 615940, 420049, 418689, 419159, 418607, C414463, And A409078. i. Preserve And Package In Accordance With Mpr 1293 Per Drawing 616958. j. Magnetic Particle Inspection Per Drawings 616711, 514513, 514512,514511, 419963, 418689, And C414463 (prior To Coating). k. Nitride Per Drawing 616711. l. Heat Treat Per Drawings 514513, 514511, 419963, 419159, And 418689. m. Carburize Per Drawings 514512 And 615940. n. Proof Of Shock And Vibration Tests Per Drawing A409078. o. Zinc Plate Per Drawing C414463. p. Cadmium Plate Per Drawing A409078. q. Assembly Per Drawing 616712. r. 100% Inspect, And Record The Readings For The Pitch And Functional Diameters; And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed-std-h28/20 Per Drawings A409078, 616958, 616711, 514511, 514512, 514513, 419963, 419964, c414463. date Of First Submission=asreq 16. Remarks: (block 12) Date Of First Submission: Concurrently With Final Inspection. data Requirements: a. Copies Of All Approved Requests For Variations. b. Dimensional Inspection Per Drawings 616712, 616958, 616711, 514513, 514512, 514511, 419964, 514858, 619947, 615940, 419159, 420049, 418607, 419963, 418689, C414463, And A409078. c. Dimensional Inspection In Accordance With Naec-eng-6518 Per Drawing 616712. d. Finish In Accordance With Mpr 1221-31 Per Drawing 616712. e. Part Identification Per Drawings 616712, 616711, 514858, 514515, 619947, 615940, 418689, And A409078. f. Hydrostatic Test Per Drawings 616712, 616958. g. Shock Test Per Drawing A409078. h. Material Properties Per Drawings 616712, 616958, 514512, 514511, 616711, 514513, 419964, 419963, 514858, 514515, 615940, 420049, 418689, 419159, 418607, C414463, And A409078. i. Preserve And Package In Accordance With Mpr 1293 Per Drawing 616958. j. Magnetic Particle Inspection Per Drawings 616711, 514513, 514512,514511, 419963, 418689, And C414463 (prior To Coating). k. Nitride Per Drawing 616711. l. Heat Treat Per Drawings 514513, 514511, 419963, 419159, And 418689. m. Carburize Per Drawings 514512 And 615940. n. Proof Of Shock And Vibration Tests Per Drawing A409078. o. Zinc Plate Per Drawing C414463. p. Cadmium Plate Per Drawing A409078. q. Assembly Per Drawing 616712. r. 100% Inspect, And Record The Readings For The Pitch And Functional Diameters; And Document That The Inspection Results Are Acceptable And Are Iaw System 22 Of Fed-std-h28/20 Per Drawings A409078, 616958, 616711, 514511, 514512, 514513, 419963, 419964, C414463.
Closing Date31 Jan 2025
Tender AmountRefer Documents 
4861-4870 of 4927 active Tenders