Paint Tenders

Paint Tenders

University Of Georgia Tender

Paints and Enamels
Georgia
Closing Date24 Mar 2025
Tender AmountRefer Documents 
Description: Uga University Housing Interior Painting Agency Contract

City Of Maasin Southern Leyte Tender

Civil And Construction...+1Building Construction
Philippines
Closing Date18 Mar 2025
Tender AmountPHP 2.4 Million (USD 43.5 K)
Details: Description Construction Of Columns, Grade Beams, Roof Beams, Backfilling, Installation Of Chb Walls A& Plastering. Installation Of Doors And Windows Tiles At Pwd Cr, Septic Tank And Installation Of Plumbing Fixtures. Installation Of Roof And Trusses Including Paintings With 2 Coats Only.

Municipality Of Stassfurt Tender

Civil And Construction...+2Others, Building Construction
Germany
Closing Soon14 Mar 2025
Tender AmountRefer Documents 
Description: To the tender 'painting and floor covering work for the fire protection renovation of House II, Steinstraße 38 in Staßfurt'

Municipality Of Julita, Leyte Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date20 Mar 2025
Tender AmountPHP 13.3 Million (USD 232.5 K)
Details: Description Scope Of Works: A.i.i(8) Provision Of Temporary Bunkhouse B.5 Project Billboard/signboard B.7(1) Occupational Safety And Health Program B.9 Mobilization And Demobilization 100(1) Clearing & Grubbing (w/ Stripping) 1600(2) Pipeline Trench Excavation 1601(1) Fill And Backfill 801(6)removal Of Structures And Obstruction (existing Platform, Fence & Portion Of Pump House) 404 Reinforcing Steel Bar, Grade 40 (for Transformer Platform) 405 Structural Concrete Class A (for Transformer Platform) Spl2 Fencing (steel Matting) Spl3 Painting Works (fence & Pump House) Spl4 Doors And Window Vent (for Pump House 1602(4)c Upvc Polyvinyl Chloride Pipe (50mm Dia.) (for Expansion) Spl5 Filtration System Spl6electrical Works Spl7 Disinfection, Cleaning & Hydro Testing 605(3)a Informative Signs

Municipality Of Roseller T Lim, Zamboanga Sibugay Tender

Civil And Construction...+1Construction Material
Philippines
Closing Soon10 Mar 2025
Tender AmountPHP 65.6 K (USD 1.1 K)
Details: Description Republic Of The Philippines Province Of Zamboanga Sibugay Municipality Of Roseller T. Lim Barangay Calula Invitation To Bid Feb. 26, 2025 To All Interested Bidders: Notice Is Hereby Served That Sealed Bid Be Received For Public Bidding Under The Harmonious Procurement Process In The Office Of The Bids And Awards Committee On March 6, 2025 At Exactly 1:30 Pm For The Following Articles Stated Below; Items & Description Quantity Unit Paint Thinner 1 Gal Metal Primer 2 Gal Paint Brush 3” 3 Pcs Angle Bar ¼”x2”6m 18 Length Angle Bar ¼”x1-1/2”x6m 18 Length Welding Rod Ord. 15 Kg Cutting Disc 2 Boxes Pillow Block Bearing 4 Pcs Gi Pipe 1” Sched.40 1 Length Bamboo Poles 40 Pcs 10mm Steel Bar 6 Length Plastic Binder 3 Rolls Purpose: Construction Materials For The Improvement Of Multi-purpose Building (covered Court) Calula, R. T. Lim, Zamboanga Sibugay The Tender Document Forms Are Available In The Office Of The Bac/bac Secretariat Effective On February 27, 2025 During Office Hours. The Total Estimated Amount Of The Above Stated Supplies Equivalent To Sixty Five Thousand Six Hundred Thirty Pesos Only (php65,630.00). Please Be Reminded That The Bac Have The Right Rejected Any Or All Bids And Accept Only Those Bids Most Advantageous To The Lgu. Hon. Erlinda Lastimado Bac Chairman

City Of Maasin Southern Leyte Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date18 Mar 2025
Tender AmountPHP 1.9 Million (USD 34.8 K)
Details: Description Remove And Replace Damage Roofing And Purlins, Make Bleachers And Embankment. Installation Of Canopy And Louver. Painting Of Trusses, Purlins, Beam, Column, Canopy, Louver And Stage.

Civil Aviation Authority Of Bangladesh - CAAB Tender

Works
Civil And Construction...+2Paints and Enamels, Civil Works Others
Bangladesh
Closing Date18 Mar 2025
Tender AmountRefer Documents 
Description: R.m.o.m.t Works Shah Amanat International Airport, Chattogram During The Year 2024-2025 (s.h:- Denting Painting And Other Related Works For Cha-metro--tha-11-3134).

Civil Aviation Authority Of Bangladesh - CAAB Tender

Works
Civil And Construction...+1Road Construction
Bangladesh
Closing Date24 Mar 2025
Tender AmountRefer Documents 
Description: O & M Of Hazrat Shahjalal International Airport, Kurmitola, Dhaka During The Year 2024-2025 (s:h:-vvip Movement Related Works Repair And Maintenance Of Road From Gate No 08 Towards Gate No 09, Cleaning Debris. Installation Of Grating, Renewing Painting Of Boundary Wall, Kerb Stone, Road Marking At Different Area In/c. Other Allied Works) At Hsia, Kurmitola, Dhaka.

BARANGAY BARAG MOBO, MASBATE Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date19 Mar 2025
Tender AmountPHP 150 K (USD 2.6 K)
Description: Plastering Of Perimeter Fence, Installation Of Steel Grills & Painting @ Brgy. Plaza Barag Mobo, Masbate , General Engineering Services ,barangay Barag - Mobo, Masbate

U S COAST GUARD USA Tender

Others
United States
Closing Soon10 Mar 2025
Tender AmountRefer Documents 
Description: This Will Be Awarded Based Off Lowest Price Technically Acceptable And Past Preformance. general Requirements scope  intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.  references  coast Guard Drawings  coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl_100_021, Rev F, Unit 2100 Structure – Inner Bottom – Fr 35 To Fr 44 (asc100210) coast Guard Drawing 750-wmsl_100_022, Rev L, Unit 2110 Structure Inner Bottom To 1st Pltf Fr 35 – 44 (asc100210) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications  surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References  None 3. Requirements  3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.  3.2 Materials. The Contractor Must Obtain All Of The Materials Required To Complete This Job With The Exception Of The Government-furnished Property Shown In Paragraph 1.2 Of Work Item.   3.3. Period Of Performance. The Period Of Performance Window For This Work Starts On 09 April 2025 And Ends On 01 July 2025.  3.4. Location. The Contractor Must Perform The Work While The Uscgc Midgett (wmsl 757) Is Alongside The Pier On 400 Sand Island Pkwy Honolulu, Hi 96819-4326.     12305_esd_1124_flt rec_12311_flt_418’ Wmsl (757 Cgc Midgett) (1124) item 1: Tanks (mp Fuel Service), Clean And Inspect 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Tank(s): table 1 – List Of Unpainted Tanks type Of Tank location capacity - 95% (gallons) tank Content Disposal (gallons) painted diesel Service 5-36-2-f 21,724 1143 n diesel Service 5-36-3-f 21,363 1124 n 1.2 Government-furnished Property. none. 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl_100_021, Rev F, Unit 2100 Structure – Inner Bottom – Fr 35 To Fr 44 (asc100210) coast Guard Drawing 750-wmsl_100_022, Rev L, Unit 2110 Structure Inner Bottom To 1st Pltf Fr 35 – 44 (asc100210) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References none. 3. Requirements 3.1 General. 3.1.1 Cir. none. 3.1.2 Tech Rep. none. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: tlis piping residual Tank Contents/fluids note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.2.1 Perform An Initial Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.2.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.3 Tank Opening. The Contractor Must Remove The Tank Manhole Cover(s) And Ventilate The Confined Spaces In Accordance With Sflc Std Spec 0000, Paragraphs 3.3.1.1 And 3.3.1.2. The Contractor Must Provide Fall Protection To Cover Tank Manhole Cover When Opened For Ventilation/work. warning do Not Use The Fuel Service Or Transfer Systems To Drain The Water From The Tank. Excessive Fuel Contamination Will Result. 3.4 Tank Content And Waste Disposal. The Contractor Must Dispose Of Residual Tank Contents Listed In Table 1 And Any Cleaning Fluids In Compliance With All Applicable Federal, State, And Local Laws, Ordinances And Regulations. Notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. Document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. Submit Chain Of Custody Record To The Cor Upon Completion Of Work. 3.5 Temporary Plugs. The Contractor Must Plug All Inlet And Outlet Piping In The Tank To Prevent Contaminants From Entering The Tank Or Piping System. Use Plugs With An Attached Lanyard, Ring Or Other System That Will Ensure Plugs Are Not Lost In The Pipe Openings. 3.5.1 Plug Log. The Contractor Must Keep A Written Record Of All Installed Plugs. Keep A Separate List For Each Tank. Maintain A Plug Accountability Log Posted Immediately Outside The Tank To Prevent Any Of The Installed Temporary Plugs From Being Lost Inside The Tank Or Left Behind Inside At Tank Closure. The Log Must Include The Type And Size Of Each Plug, Installation Date, And Removal Date. Submit This Log To The Cor After Completion Of Work Item Via A Cfr. 3.5.2 The Contractor Must Ensure That All Plugs Are Removed From Each Tank Upon Completion Of Work In The Tank. 3.6 Tank Cleaning. The Contractor Must Clean All Designated Tank Interior Surfaces Free Of All Foreign Materials, Such As Residual Fuel Or Water, Sediment, Sludge, Rust, Or Biological Growth, Taking Care Not To Damage The Coating System (if Applicable). 3.6.1 The Contractor Must Accomplish All Requirements Of Sflc Std Spec 6310, 3.1.6.4 (surface Contaminant Removal) To Achieve The Cleanliness Requirements Of Sspc-sp 1, Including A Low-pressure (maximum 5,000 Psi) Fresh Water Wash Down Of The Surfaces. 3.6.2 Remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. Remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. Wipe The Interior Tank Structure Dry And Free Of All Cleaning Agents. 3.7 Inspection. The Contractor Must Visually Inspect All Tank Interior Surfaces, Including, But Not Limited To Bulkheads, Floor And Overhead Plating, Structural Members, Manhole Cover Surfaces, Fasteners And Gasket Seating Surfaces. Submit A Cfr Including The Following, As Applicable: tank Structural Condition. manhole And Cover Condition. ladder Condition (if Applicable). tank Level Indicator (tli) And/or Float Switch Condition. sounding/vent Tube And Striker Plate Condition. suction And Discharge Piping Condition. fastener Material And Condition. pit Measurements ultrasonic Thickness (ut) Measurements 3.8 Pit Measurement. The Contractor Must Measure50pitswithin Each Tank/location Listed In Table 1, In Accordance With Sflc Std Spec 0740, Paragraph 3.13 (evaluation Of Pitting Corrosion). The Results Of These Measurements Must Be Included In The Inspection Report, Showing Where Pit Measurements Were Taken And The Depth Of The Pit. 3.9 Ultrasonic Thickness (ut) Measurement. The Contractor Must Take Ut Measurements In The Surrounding Area Of Any Pit Measuring Greater Than 25% Of Plate Thickness. Ut Measurements Must Be Taken In The Four Quadrants At An Equal-distant Radius From The Pit Center Until Full Plate Thickness Is Measured. For Bidding Purposes, Assume 200 Ut Measurements Per Tank Listed In Table 1. Ut Measurements Must Be Conducted In Accordance With Sflc Std Spec 0740, Appendix C, Using Coast Guard Drawings 750-wmsl_100_21, 750-wmsl_100_22, 750-wmsl-100-36, And 750-wmsl-100_43 As Guidance. The Results Of These Measurements (original Thickness, Measured Thickness, And Any Observed Cracks) And The Locations Where They Were Taken Must Be Included In The Inspection Report. 3.10 Substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Small Corrosions (i.e. Pits < 25% Or Corrosions < 25%). The Contractor Must Repair Small Pin Holes, Shallow Pitted Substrates (with Remaining Plate Thicknesses Over 75% Of Required Plate Thicknesses), And Fair Corroded Substrates (with Remaining Cross Sections Over 75% Of Required Cross Section Areas), After Removing Coating, In Accordance With Sflc Std Spec 6310 And Manufacturers’ Instructions. procure 10 Kit(s) Of Epoxy Fairing Compound (e.g. Belzona 1111, 0.5 Gallon/5 Kg Kit Or Equivalent) To Conduct Repairs. turn Over All Unused Kits To The Cor. note “substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Corrosions (i.e. Pits < 25% Or Corrosions < 25%)” Is A Supplement Barrier Intending To Help Delay Penetration. 3.11 Surface Coating. For All Non-painted Tanks, The Contractor Must Apply A Coat Of Heavy Oil To All Tank Interior Surfaces, Following Final Tank Inspection And Just Prior To Tank Closing. If Surface Rust Developed On The Interior Tank Surfaces While The Tank Was Open, The Contractor Must Wipe The Surfaces Clean To A Condition Free Of Surface Rust Prior To Coating With System Fluid. note minimizing The Amount Of Time The Tanks Are Left Open Will Reduce The Surface Rust That Accumulates On Tank Interior Surfaces. 3.12 Tank Closing. The Contractor Must Ensure That The Tank(s) Remain Open For Approximately 24 Hours After Completion Of Any Authorized Repair And Preservation Procedures. Notify The Cor At Least 48 Hours Prior To Closing The Tank(s). After Satisfactory Inspection By The Coast Guard Inspector And Completion Of All Authorized Repairs, Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Close Tank Manhole Cover(s) Using New Gasket Material, Nuts And Grommets In Accordance With Coast Guard Drawing 750-wmsl-167-001, In The Presence Of The Coast Guard Inspector. Chase Threads On Studs To Ensure Even Installation Of The Access Covers. Submit A Cfr With The Completed Plug Log. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.13 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.13.1 Perform A Post-work Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.13.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.14 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Surfaces, And All Manhole Cover External Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310, Paragraph 3.1.13 (touch-ups And Minor Coating Repairs). Do Not Paint Any Manhole Cover Fasteners. 4. Notes this Section Is Not Applicable To This Work Item. general Requirements scope  intent. This Standard Specification Invokes General Requirements For Conducting Vessel Repairs Performed By Commercial Contractors At A Coast Guard Facility For Coast Guard Vessels.  references  coast Guard Drawings  coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl-100-36, Rev N, Unit 3110 Structure 1st Platform And Below Frs 65-77 (asc100311) coast Guard Drawing 750-wmsl_100_40, Rev M, Unit 3210 Structure – Inner Bot To 1st Platform – Fr 76 To Fr 88 (asc100321) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications  surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References  None 3. Requirements  3.1 General. The Contractor Must Conform To All Requirements Specified In Sflc Std Spec 0000 And In This Item, As Applicable, During The Performance Of This Availability. The Requirements Of This Wi Apply To All Work Under The Scope Of This Contract, Whether Explicitly Stated In All Following Work Items Or Not, And To All Other Work Subsequently Authorized By Changes, Modifications, Or Extensions To The Contract.  3.2 Materials. The Contractor Must Obtain All Of The Materials Required To Complete This Job With The Exception Of The Government-furnished Property Shown In Paragraph 1.2 Of Work Item.   3.3. Period Of Performance. The Period Of Performance Window For This Work Starts On 09 April 2025 And Ends On 01 July 2025.  3.4. Location. The Contractor Must Perform The Work While The Uscgc Midgett (wmsl 757) Is Alongside The Pier On 400 Sand Island Pkwy Honolulu, Hi 96819-4326.   12300_esd_1022_flt rec_12311_flt_418’ Wmsl (757 Cgc Midgett) (1124) item 1: Tanks (mp Fuel Storage And Overflow), Clean And Inspect 1. Scope 1.1 Intent. This Work Item Describes The Requirements For The Contractor To Clean And Inspect The Following Tank(s): table 1 – List Of Tanks type Of Tank location capacity - 95% (gallons) tank Content Disposal (gallons) painted fuel Oil Storage 5-76-2-f 4,902 258 n 1.2 Government-furnished Property. none. 2. References coast Guard Drawings coast Guard Drawing 418a-wmsl-801-001, Rev A, Booklet Of General Plans coast Guard Drawing 750-wmsl-085-024, Rev A, Tank Sounding And Moment Of Inertia Tables (asc085014h) (wmsl 757 Only) coast Guard Drawing 750-wmsl-100-36, Rev N, Unit 3110 Structure 1st Platform And Below Frs 65-77 (asc100311) coast Guard Drawing 750-wmsl_100_40, Rev M, Unit 3210 Structure – Inner Bot To 1st Platform – Fr 76 To Fr 88 (asc100321) coast Guard Drawing 750-wmsl-167-001, Rev J, Manhole List Installation And Fabrication Details Ship Wide (asc167001) coast Guard Publications surface Forces Logistics Center Standard Specification 0000 (sflc Std Spec 0000), 2022, General Requirements surface Forces Logistics Center Standard Specification 0740 (sflc Std Spec 0740), 2022, Welding And Allied Processes surface Forces Logistics Center Standard Specification 6310 (sflc Std Spec 6310), 2022, Requirements For Preservation Of Ship Structures other References none. 3. Requirements 3.1 General. 3.1.1 Cir. none. 3.1.2 Tech Rep. not Applicable. 3.1.3 Protective Measures. The Contractor Must Furnish And Install All Protective Measures In Accordance With Sflc Std Spec 0000, Paragraph 3.3.3 (vessel Component, Space, And Equipment Protection). 3.1.4 Interferences. The Contractor Must Handle All Interferences In Accordance With Sflc Std Spec 0000, Paragraph 3.3.5 (interferences). Known Interferences Include, But Are Not Limited To The Following: tlis piping residual Tank Contents/fluids note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.2 Operational Test, Initial. Prior To Commencement Of Work, The Contractor Must Witness Coast Guard Personnel Perform An Initial Operational Test Of All Items Or Shipboard Devices To Be Disturbed, Used, Repaired, Or Altered, To Demonstrate Existing Operational Condition. Submit A Cfr. 3.2.1 Perform An Initial Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.2.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.3 Tank Opening. The Contractor Must Remove The Tank Manhole Cover(s) And Ventilate The Confined Spaces In Accordance With Sflc Std Spec 0000, Paragraphs 3.3.1.1 And 3.3.1.2. The Contractor Must Provide Fall Protection To Cover Tank Manhole Cover When Opened For Ventilation/work. warning do Not Use The Fuel Service Or Transfer Systems To Drain Any Water From The Tank. Excessive Fuel Contamination Will Result. 3.4 Tank Content And Waste Disposal. The Contractor Must Dispose Of Residual Tank Contents Listed In Table 1 And Any Cleaning Fluids In Compliance With All Applicable Federal, State, And Local Laws, Ordinances And Regulations. Notify The Cor (in Writing) At Least 48 Hours Prior To Removal Of Wastes And Fluids. Document A Complete Chain Of Custody Record Of The Removed Tank Contents And Generated Wastes, From The Vessel To The Point Of Final Destination Or Delivery. Submit Chain Of Custody Record To The Cor Upon Completion Of Work. 3.5 Temporary Plugs. The Contractor Must Plug All Inlet And Outlet Piping In The Tank To Prevent Contaminants From Entering The Tank Or Piping System. Use Plugs With An Attached Lanyard, Ring Or Other System That Will Ensure Plugs Are Not Lost In The Pipe Openings. 3.5.1 Plug Log. The Contractor Must Keep A Written Record Of All Installed Plugs. Keep A Separate List For Each Tank. Maintain A Plug Accountability Log Posted Immediately Outside The Tank To Prevent Any Of The Installed Temporary Plugs From Being Lost Inside The Tank Or Left Behind Inside At Tank Closure. The Log Must Include The Type And Size Of Each Plug, Installation Date, And Removal Date. Submit This Log To The Cor After Completion Of Work Item Via A Cfr. 3.5.2 The Contractor Must Ensure That All Plugs Are Removed From Each Tank Upon Completion Of Work In The Tank. 3.6 Tank Cleaning. The Contractor Must Clean All Designated Tank Interior Surfaces Free Of All Foreign Materials, Such As Residual Fuel Or Water, Sediment, Sludge, Rust, Or Biological Growth, Taking Care Not To Damage The Coating System (if Applicable). 3.6.1 The Contractor Must Accomplish All Requirements Of Sflc Std Spec 6310, 3.1.6.4 (surface Contaminant Removal) To Achieve The Cleanliness Requirements Of Sspc-sp 1, Including A Low-pressure (maximum 5,000 Psi) Fresh Water Wash Down Of The Surfaces. 3.6.2 Remove Cleaning Media And Residues Continuously From The Tank During The Washing Process. Remove Any Residual Wash Media And Wipe Up Residual Moisture With Clean Lint-free Cloths. Wipe The Interior Tank Structure Dry And Free Of All Cleaning Agents. 3.7 Inspection. The Contractor, In The Presence Of The Coast Guard Inspector, Must Visually Inspect All Tank Interior Surfaces, Including, But Not Limited To Bulkheads, Floor And Overhead Plating, Structural Members, Manhole Cover Surfaces, Fasteners And Gasket Seating Surfaces. Submit A Cir Including The Following, As Applicable: tank Structural Condition. manhole And Cover Condition. ladder Condition (if Applicable). condition Of Tank Coating (if Applicable), Including Dimensions, Percentage, Location, And Type Of Coating Failure. tank Level Indicator (tli) And/or Float Switch Condition. sounding/vent Tube And Striker Plate Condition. suction And Discharge Piping Condition. fastener Material And Condition. pit Measurements ultrasonic Thickness (ut) Measurements 3.8 Pit Measurement. The Contractor Must Measure50pitswithin Each Tank/location Listed In Table 1, In Accordance With Sflc Std Spec 0740, Paragraph 3.13 (evaluation Of Pitting Corrosion). The Results Of These Measurements Must Be Included In The Inspection Report, Showing Where Pit Measurements Were Taken And The Depth Of The Pit. 3.9 Ultrasonic Thickness (ut) Measurement. The Contractor Must Take Ut Measurements In The Surrounding Area Of Any Pit Measuring Greater Than 25% Of Plate Thickness. Ut Measurements Must Be Taken In The Four Quadrants At An Equal-distant Radius From The Pit Center Until Full Plate Thickness Is Measured. For Bidding Purposes, Assume 200 Ut Measurements Per Tank Listed In Table 1. Ut Measurements Must Be Conducted In Accordance With Sflc Std Spec 0740, Appendix C, Using Coast Guard Drawings In Section 2 As Guidance. The Results Of These Measurements (original Thickness, Measured Thickness, And Any Observed Cracks) And The Locations Where They Were Taken Must Be Included In The Inspection Report. 3.10 Substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Small Corrosions (i.e. Pits < 25% Or Corrosions < 25%). The Contractor Must Repair Small Pin Holes, Shallow Pitted Substrates (with Remaining Plate Thicknesses Over 75% Of Required Plate Thicknesses), And Fair Corroded Substrates (with Remaining Cross Sections Over 75% Of Required Cross Section Areas), After Removing Coating (if Applicable), In Accordance With Sflc Std Spec 6310 And Manufacturers’ Instructions. procure 1 Kit(s) Of Epoxy Fairing Compound (e.g. Belzona 1111, 0.5 Gallon/5 Kg Kit Or Equivalent) To Conduct Repairs. turn Over All Unused Kits To The Cor. note “substrate Fairing And Repair By Filling Epoxy For Shallow Pits And Corrosions (i.e. Pits < 25% Or Corrosions < 25%)” Is A Supplement Barrier Intending To Help Delay Penetration. 3.11 Surface Coating. For All Non-painted Tanks, The Contractor Must Apply A Coat Of Heavy Oil To All Tank Interior Surfaces, Following Final Tank Inspection And Just Prior To Tank Closing. If Surface Rust Developed On The Interior Tank Surfaces While The Tank Was Open, The Contractor Must Wipe The Surfaces Clean To A Condition Free Of Surface Rust Prior To Coating With System Fluid. note minimizing The Amount Of Time The Tanks Are Left Open Will Reduce The Surface Rust That Accumulates On Tank Interior Surfaces. 3.12 Tank Closing. The Contractor Must Ensure That The Tank(s) Remain Open For Approximately 24 Hours After Completion Of Any Authorized Repair And Preservation Procedures. Notify The Cor At Least 48 Hours Prior To Closing The Tank(s). After Satisfactory Inspection By The Coast Guard Inspector And Completion Of All Authorized Repairs, Remove All Installed Temporary Plugs And Document Removal Via Signature On The Plug Log By The Coast Guard Inspector And Contractor Prior To Tank Closing. Close Tank Manhole Cover(s) Using New Gasket Material, Nuts And Grommets In Accordance With Coast Guard Drawing 750-wmsl-167-001, In The Presence Of The Coast Guard Inspector. Chase Threads On Studs To Ensure Even Installation Of The Access Covers. Submit A Cfr With The Completed Plug Log. note coast Guard Personnel Will Operate All Shipboard Machinery And Equipment. 3.13 Operational Test, Post Repairs. After Completion Of Work, The Contractor Must Thoroughly Test, In The Presence Of The Coast Guard Inspector And Demonstrate All Items Or Shipboard Devices That Have Been Disturbed, Used, Repaired, Altered, Or Installed To Be In Satisfactory Operating Condition. Submit A Cfr. 3.13.1 Perform A Post-work Operational Test Of Each Tank Tlis To Demonstrate That Each Radar Head/sensor Is Functional (i.e., Digital Readout Is Displayed). 3.13.2 Ensure That There Is Interface/communication Between The Tli Sensor And The Machinery Control And Monitoring System (i.e. Digital Readout At The Tli Is Identical To That Displayed). 3.14 Touch-up Preservation. The Contractor Must Prepare And Coat All New And Disturbed Surfaces, And All Manhole Cover External Surfaces To Match Existing Adjacent Surfaces In Accordance With Sflc Std Spec 6310, Paragraph 3.1.13 (touch-ups And Minor Coating Repairs). Do Not Paint Any Manhole Cover Fasteners. 4. Notes this Section Is Not Applicable To This Work Item.
2501-2510 of 4899 active Tenders