Offizielle Bezeichnung RMD Rhein Main Deponie GmbH Tender

Civil And Construction...+1Civil Works Others
Germany
Closing Date24 Feb 2025
Tender AmountRefer Documents 
Public tender Vob/a Conversion of the operational areas of the slag processing plant on the landfill site of the Wicker landfill. Demolition of asphalt surfaces and reinforced concrete structures. Earthworks with reprofiling of approx. 8,000m ... More conversion of the operational areas of the slag processing plant on the landfill site of the Wicker landfill. Demolition of asphalt surfaces and reinforced concrete structures. Earthworks with reprofiling of approx. 8,000m³ of soil and construction waste mixtures. Reinforced concrete work for foundations, floor slabs and retention basins with approx. 850 m³ of concrete, asphalt work on approx. 9,500m², landfill sealing work with plastic sealing membrane on approx. 2,500m².

Offizielle Bezeichnung RMD Rhein Main Deponie GmbH Tender

Civil And Construction...+2Others, Construction Material
Germany
Closing Date28 Feb 2025
Tender AmountRefer Documents 
Restricted invitation to tender with competitive tender (service) Third-party testing for mineral and plastic components Savag landfill Büttelborn Third-party testing for mineral and plastic components during the construction of the surface sealing system at the Flörsheim-Wicker landfill in accordance with "national quality standard 9-1" and G ... Multiple third-party testing for mineral and plastic components during the construction of the surface sealing system at the Flörsheim-Wicker landfill in accordance with "national quality standard 9-1" and BAM guidelines for third-party testing bodies in landfill construction for the following construction services: Construction of a surface sealing system on an area of 4 hectares on predominantly 20% inclined slopes. Installation of mineral sealing layers with old foundry sand and sealing clays that are available on site and need to be processed. Delivery and installation of a BAM-approved drainage mat (plastic drainage element), application of recultivated soil that is available on site. Expansion of 3 gas wells.