Manpower Tenders

Manpower Tenders

Punjab Mandi Board - DoA Tender

Services
Manpower Supply
Eprocure
corrigendum
Corrigendum : Closing Date Modified
location
India
Closing Soon27 Feb 2025
Tender AmountINR 4 Million (USD 46 K)
Description: Supply Of Manpower For The Year 2025 26 For Market Committee Mallanwala

Indian Space Research Organisation - ISRO Tender

Services
Manpower Supply
GEM
location
India
Closing Soon27 Feb 2025
Tender AmountRefer Documents 
Description: CATEGORY: Manpower Outsourcing Services - Minimum wage - Skilled; Not Required; Others , Manpower Outsourcing Services - Minimum wage - Semi-skilled; Not Required; Others , Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others

United India Insurance Company Limited - UIIC Tender

Services
Manpower Supply
GEM
location
India
Closing Date3 Mar 2025
Tender AmountRefer Documents 
Description: CATEGORY: Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others

Social Justice And Empowerment Department Tender

Services
Manpower Supply
GEM
location
India
Closing Date8 Mar 2025
Tender AmountINR 211.4 K (USD 2.4 K)
Description: CATEGORY: Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Admin

Province Of Ifugao Tender

Civil And Construction...+1Water Storage And Supply
location
Philippines
Closing Date4 Mar 2025
Tender AmountPHP 52 Million (USD 898.9 K)
Details: Description Republic Of The Philippines Cordillera Administrative Region Provincial Local Government Unit Of Ifugao Bids And Awards Committee 3rd Floor Peo Bldg., Capitol Compound Lagawe, Ifugao Email Ad.: Bacgoodsifugao13@gmail.com Publication No. 03-2025-c (first Publication) Request For Expression Of Interest Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Hydro Power Plant 1. The Plgu-ifugao, Through The Supplemental Budget No. 5 For The Contract Approved By The Sanggunian Panlalawigan For Cy 2024 Intends To Apply The Sum Of Fifty-two Million Pesos (php 52,000,000.00) Being The Approved Budget For The Contract (abc) To Payments Under The Contract For Publication No. 03-2025-c (first Publication). Bids Received In Excess Of The Abc Shall Be Automatically Rejected At The Opening Of The Financial Proposals. 2. The Plgu-ifugao Now Calls For The Submission Of Eligibility Documents For The Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Hydro Power Plant. Eligibility Documents Of Interested Consultants Must Be Duly Received By The Bac Secretariat On Or Before 1:00 P.m. Basing On The Bac Office - Wall Clock Of February 13, 2025 At The Bids And Awards Committee Office, 3rd Floor, Peo Bldg., Capitol, Lagawe, Ifugao. Opening Of Eligibility Documents Will Be On 2:00 P.m. Of February 13, 2025 At The Address Stated Above. Applications For Eligibility Will Be Evaluated Based On A Non-discretionary “pass/fail” Criterion. 3. Interested Bidders May Obtain Further Information From The Bids And Awards Committee (bac) Of The Provincial Government Of Ifugao And Inspect The Bidding Documents At The Address Given Below During 8:00 O’clock Am To 5:00 O’clock Pm. 4. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 06, 2025 To March 04, 2025 From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Fifty Thousand Pesos Only (php 50,000.00). 5. The Bac Shall Draw Up The Short List Of Consultants From Those Who Have Submitted Expression Of Interest, Including The Eligibility Documents, And Have Been Determined As Eligible In Accordance With The Provisions Of Republic Act 9184 (ra 9184), Otherwise Known As The “government Procurement Reform Act”, And Its Implementing Rules And Regulations (irr). The Short List Shall Consist Of Five (5) Prospective Bidders Who Will Be Entitled To Submit Bids. The Criteria And Rating System For Short Listing Are: Track Record/experience In Similar Feasibility And Detailed Engineering Design Undertakings For At Least 100 Hydro Power Plant World-wide And 20 Hydro-power Plant In The Philippines (20 Points) The Firm Must Have At Least Thirty (30) Years Of Experience In Conducting Feasibility Study With Complete Detailed Engineering Design, Detailed Bill Of Quantities And Detailed Cost Estimate Of A Hydro Power Project From The Submission And Opening Of Quotations (20 Points) • Completed Consulting Services Of Size, Complexity And Technical Specialty Comparable (similar/relevant) To The Job Under Consideration, Including Quality Of Performance. • Other Completed Consulting Services Related To The Job Under Consideration • Known Cases Of Prior Performance Including Quality Of Work Conforming To Obligation And Cost Of Services. Qualification Of Officer, Key Organic Personnel To Be Assigned To The Project (40 Points); And Job Capacity (20 Points): • Absorptive Capacity To Do Additional Works Other Than Those Currently Being Undertaken 6. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary “pass/fail” Criterion As Specified In The Irr Of Ra 9184. Bidding Is Open To All Interested Bidders, Whether Local Or Foreign, Subject To The Conditions For Eligibility Provided In The Irr Of Ra 9184. 7. The Bids Shall Be Evaluated Using The Quality-cost Based Evaluation/selection (qcbe/qcbs) Procedure. The Criteria And Rating System For The Evaluation Of Bids Shall Be Provided In The Instructions To Bidders. 8. The Weight Of The Technical Proposal Shall Be 80% And The Financial Proposal Shall Be 20%. 9. The Contract Shall Be Completed Within Two Hundred Fifty-five (255) Calendar Days, From The Date Of Contract Signing. 10. The Plgu-ifugao Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 11. For Further Information, Please Refer To: The Bac Secretariat Bids And Awards Committee (bac) Office 3rd Floor Peo Building, Capitol Compound, Poblacion South, Lagawe, Ifugao Bacgoodsifugao13@gmail.com 0953-931-6730 Date Of Posting: February 06, 2025 Carmelita B. Buyuccan Bac Chairperson Annex 1 Item No. General Description Qty. Unit Of Issue Unit Cost Total Cost 1 Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Hydro Power Plant 1 Lot See Attached Terms Of Reference ***nothing Follows*** Total 52,000,000.00 Prepared By: Eleanor A. Oyami Bac-secretariat Certified Correct: Arundale Gum-u I. Bunnag Bac-secretariat On Goods & Infrastructure Republic Of The Philippines Cordillera Administrative Region Provincial Local Government Unit Of Ifugao Office Of The Provincial Governor Lagawe, Ifugao Terms Of Reference Project Title : Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Hydro Power Plant Budget Item Particulars And Cost: Particulars Cost Cost Of Consultancy For The Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Mini Hydro Power Plant 52,000,000.00 Fund Source: Cy 2024 Supplemental Budget No. 5 Prepared By: Reviewed By: Ericson T. Mammag Carmelita B. Buyuccan Provincial Engineer Provincial Project Development Coordinator Approved: Jerry U. Dalipog Provincial Governor   Table Of Contents Part I. Definition Of Terms ………………………………………………………………………………………. 03 Part Ii. Background ………………………………………………………………………………………………….. 04 1. General Background ...……………………………………………………………………………………04 Part Iii. Objective .………………………………………………………...……………………………………………05 Part Iv. Scope Of Work: ……………….………………………………........................................... 05 1. Field Survey ………………………………….……………………………………………………………… 05 2. Office Work ………………………………………………………………………………………………….. 05 Part V. Submission Of Output And Schedule …………………………………………………………06 1. Complete Package …………………………...................................................................06 2. Effectivity And End Of Consulting Services ………………………………………...……………06 Part Vi. Qualification Of Consultants …………………………………………………………….. .. 07 Criteria For Selection ……………………………………………………………………………………………..08 Part Vii. Source Of Fund…………………………….………………………………………………………………..08 Part Viii. Consultant’s Services Fee ………………………………………………………....................08 Approved Budget For The Contract……….………………………………..…...…………………………09 Advance Payment ………………………………………………………………………………………………….09 Progress Billing ………………………………………………………………………………………………………09 Part Ix. Data, Local Services And Personnel To Be Provided By Plgu For Critical Advisories…………………….…….................................................................................................09 Part X. Consultant’s Action Requiring Plgu’s Prior Approval ….……………………….10 Part Xi. Settling Of Disputes ……………………………………………………………………...................10 Part Xii. Consultant’s Liability ………………………………………………………………………………….10 Part Xiii. Annexes ………………………………………………………………………………………………………….10 1. Annex “a”- Criteria For Short Listing……..……………………………………………………10 2. Annex “b” - Certification Of Availability Of Fund .……………………………………….12 3. Annex “c”- Approved Budget For The Contract …………………………………………..13 Part Xiv. Forms ………………………………………………………………………………………………….…............... 1. Pf-1: Format Of Curriculum Vitae Of Consultants ………………………………………........14 2. Pf-2: Financial Proposal Form ………………………………………………………………….. ……..15 3. Pf-3: Form Of Contract Agreement ……………………………………………………………………16 4. Pf-4: Omnibus Sworn Statement Form ………………………………………………………………17   Part I Definition Of Terms For Purposes Of This Clause, The Bold Text Is Used To Identify The Defined Terms. 1. Denr – Department Of Environment And Natural Resources 2. Doe – Department Of Energy 3. Plgu - Provincial Local Government Unit Of Ifugao. 4. Sps - Special Project Section At The Provincial Governor’s Office. 5. Pgo - Provincial Governor’s Office. 6. Peo - Provincial Engineering Office. 7. Terms Of Reference (tor) - Refers To These Guidelines Governing The Delivery Of The Feasibility Study And Detailed Engineering Design Requirements Of The Construction Of Alimit Hydro Power Plant. 8. Consultant - Is The Consultancy Services Entity Represented By The Manager Whose Proposal Has Been Accepted By The Plgu And To Whom The Contract To Provide The Consultancy Services Was Awarded. 9. Consulting Services – Refers To Services For Infrastructure Projects Or Activities Of The Provincial Local Government Of Ifugao Requiring Adequate External Technical And Professional Expertise That Are Beyond The Capability And/or Capacity Of The Plgu To Undertake Such As Development Of Hydro Power Plants. 10. Contract - Is The Agreement Between Plgu And The Consultant To Execute And Provide The Feasibility Study And Detailed Engineering Design Requirements Of The Construction Of Alimit Hydro Power Plant. 11. Contract Price - Is The Consultant’s Fee Stated In The Letter Of Acceptance And Thereafter To Be Paid By The Plgu To The Consultant For The Provision Of The Consultancy Services In Accordance With This Contract. 12. Plgu’s Representative - Refers To The Local Chief Executive Or Provincial Governor. 13. Plgu Engineer - Refers To The Provincial Engineer. 14. Re – Renewable Energy Part Ii Background 1. General Background It Has Long Been The Dream Of The People Of Ifugao For A Stable Power Supply To Improve The Delivery Of Government Services, Spur Industrialization And Economic Progress. The Proposed Construction Of Alimit Hydro Power Plant Will Harness The Existing Natural Water Resources Of The Province To Generate Electric Power And Facilitate Or Contribute In The Energization Of The Remaining 4,824 Households Without Power Amongst Ifugao’s And Provide A Stable Power Supply To The Local Industries, Manufacturers, Government And Private Institutions And Generate Additional Income To Finance The Different Programs, Projects And Activities Of The Plgu. The Plgu Is About 90% Dependent On The National Tax Allocation Hence The Need To Increase The Local Revenue. The Feasibility Study And Detailed Engineering Design Requirement For The Processing Of The Requirement Of A Renewable Energy Project For Financing Is Very New To The Plgu Hence This Terms Of Reference To Engage Consultants Who Are Experts In The Preparation Of The Requirements. The Study Includes The Submission Of The Following: A. Feasibility Study Report – Detailed Cost Estimate, Economic And Financial Viability Analysis And Organizational Analysis. B. Detailed Engineering Design Of The Diversion Dam – Construction Drawings And Bill Of Quantities. C. Detailed Engineering Design Of The Penstock Civil Works – Construction Drawings And Bill Of Quantities Of The Surge Tank, Anchor Blocks And Saddle Supports. D. Detailed Engineering Design Of The Electro-mechanical And Hydro-mechanical Items – Compact Drawings Of Turbine And Generator Sets, Construction Drawings And Bill Of Quantities Of The Intake Gate, Trash Rack, Sluice Gate And Radial Gates. E. Detailed Engineering Design Of The Power House Building, Tail Race Channel And Switch Yard – Construction Drawings And Bill Of Quantities. F. Detailed Engineering Design Of The Electrical System With Single Line Diagram And Design Of Power Evacuation Arrangement And Transmission Line – Construction Drawings And Bill Of Quantities. G. Detailed Engineering Design Of Access Road. H. Terms Of Reference For Bidding For Various Contracts Of This Project. Part Iii Objective 1. The Primary Objective Of The Engagement Of The Consultant/s Is To Hasten The Preparation Of The Feasibility Study And Detailed Engineering Design Of The Construction Of Alimit Hydro Power Plant. 2. The Secondary Objective Is To Augment The Lack Of Expertise Amongst The Plgu Staff Re: Renewable Energy Project Development And Ensure That Proper Guidance Is Provided To Management On How To Proceed With The Financing And Construction Of The Project. Part Iv Scope Of Work 1. Field Survey – This Activity Will Be Conducted To Gather/confirm Information Needed In The Preparation Of Documents And Other Requirements Such As: A. Re-confirmation Of The Pre-fs Inventory And Documentation Of Social And Environmental Issues; B. Site Reconnaissance, Detailed Access Route Survey And Topographic Survey; C. Observation And Measurement Of River Flow And Available Head; D. Rock/soil Sampling And Geologic Assessment; E. Evaluation Of Hydropower Layout; And F. Evaluation Of Transmission Line Route And Accessibility. The Following Activities Are: A. Travel And Courtesy Call To The Governor With Plgu Officials; B. Meeting And Consultation With The Municipal And Barangay Officials And Project Affected Person; C. Field Works; D. Finalize Measurement And Wrapping Up All Surveys; E. Travel And Feedback To The Governor With Plgu Officials. 2. Office Work – This Activity Is The Preparation And Packaging Of The Requirement For The Feasibility Study And Detailed Engineering Design: A. Project Proposal – Two To Three Paragraphs Describing The Proposed Construction Of Alimit Hydro Power Plant; B. Summary And Salient Features – The Summary Describes The Characteristics Of The River Source, Discharge, The Available Head, The Projected Hydro Power Plant Capacity, The Project Components (diversion Dam, Power Tunnel, Surge Tank, Penstock, Power House, Turbine, Generator, Out-door Switch Yard And Power Evacuation Line). The Salient Features Contains The Location Of The Project (latitude/longitude), Access Road, Hydrology, Surge Shaft, Penstock, Power House, Turbine And Generator, Power Evacuation Arrangement And Average Annual Generation; C. Geology – The Rock Profile (type, Characteristics, Bearing Capacity) And Hazard Study Especially Earthquake Along The Dam Axis Or Diversion Weir And Locations Of Structures; D. Hydrology – Describe The River System, Catchment Area, Rainfall And Design River Discharge; E. Detailed Engineering Design (ded) Of Diversion Dam, Penstock System, Electro-mechanical, Hydro-mechanical System, Power House Building (tail Race Channel & Switch Yard), Electrical System And Access Road; F. Estimated Annual Power Generation – Based On Records For At Least Not Less Than 30 Years From January To December; G. Location Sketch – Showing The Different Components Of Hydro Power Plant Overlayed In Google And Topographic Map; H. Social And Environmental Impact Assessment – Describes The Social And Environmental Issues And Mitigating Measures, Social Acceptability And Right Of Way (row) Status. Included Is The Social And Environmental Management Plan; I. Cost Estimate, Economic And Financial Analysis – Contains The Following As Maybe Applicable: Pre-engineering Cost, Pre-development And Pre-installation Cost, Main Diversion Dam, Power Tunnelling And Civil Works, Surge Shaft, Penstock Civil Works, Power House, Switch Yard, Electrical And Mechanical Packages, Transmission Line, Access Roads, Social Development Expenses, Administrative And Project Management Expenses, Consultancy Fees, Contingency And Taxes. The Economic And Financial Analysis Considers The Capital Cost Against The Potential Value Of The Electricity Generated Per Annum To Determine The Payback Period, Rate Of Investment (roi) Or Determination Of The Economic Internal Rate Of Return As Maybe Appropriate; J. Organizational Analysis – What Is The Appropriate Organizational Structure To Efficiently Manage The Hydro Power Plant; K. Construction Schedule – To Be Presented In A Bar Chart From Survey And Site Investigation, Design And Preparation Of Detailed Engineering Design (ded), Approval Of Ded And Securing Statutory Clearances, Construction Of The Different Structures And Facilities, Designing-manufacturing-testing-acceptance Of Electrical And Mechanical (e&m) Equipment, Commissioning, Test Run Of The Project, And Commercial Operation Declaration; L. Terms Of Reference For Bidding For Various Contracts Of The Project Including The Technical Specifications (main Diversion Dam, Power Tunnelling And Civil Works, Surge Shaft, Penstock Civil Works, Power House, Switch Yard, Electrical And Mechanical Packages, Transmission Line And Access Roads) – The Prospective Source Of Materials And Specifications. Part V Submission Of Output And Schedule 1. Complete Package Of The Feasibility Study To Be Submitted In Hard Copies (3 Copies) And Electronic Copy Saved In Active And Pdf File. 2. Effectivity And End Of Consultancy Services The Consultancy Services Shall Be Effective Upon Signing And Notarization Of The Consultancy Services Contract. The Submission Of Final Output Is After 255 Calendar Days From Contract Signing And Terminates Upon The Issuance Of The Certificate Of Completion And Acceptance By The Implementing Agency Through A Group Of Reviewers (legal, Technical, Financial, Administrative, Sangguniang Panlalawigan-sp). The Review, Compliance And Acceptance Period Will Take Another 30 Calendar Days. Part Vi Qualification Of Consultant/s Consultant/s May Be Any Natural Or Juridical, Local Individual Or Company With Valid Business Permit And Other Documentary Requirements As Specified In The Revised Implementing Rules And Regulations Of Ra 9184 Which Shall Be Defined In The Bidding Documents For The Project. Valid Joint Venture Agreement (jva), In Case A Joint Venture Is Already In Existence. In The Absence Of A Jva, Duly Notarized Statements From All The Potential Joint Venture Partners Stating That They Will Enter Into And Abide By The Provisions Of The Jva In The Instance That The Bid Is Successful, Shall Be Included In The Bid. Failure To Enter Into A Joint Venture In The Event Of A Contract Award Shall Ground For The Forfeiture Of The Bid Security. Each Partner Of The Joint Venture Shall Submit The Philgeps Certificate Of Registration In Accordance With Section 8.5.2 Of This Irr. The Submission Of Technical And Financial Documents By Any Of The Joint Venture Partners Constitutes Compliance. Participating Bidder Must Possess The Necessary Technical Capabilities In Terms Of The Following: A. Track Record/experience In Similar Feasibility And Detailed Engineering Design Undertakings For At Least 100 Hydro Power Plant World-wide And 20 Hydro-power Plant In The Philippines; B. The Firm Must Have At Least Thirty (30) Years Of Experience In Conducting Feasibility Study With Complete Detailed Engineering Design, Detailed Bill Of Quantities And Detailed Cost Estimate Of A Hydro Power Project From The Submission And Opening Of Quotations; C. Work Program Containing The Minimum Requirements Of The Project Including The Manpower And Man-days For The Conduct Of Study; D. Curriculum Vitae Of The Management And Technical Personnel; E. List Of Third-party Consultants With Corresponding Service Contract/agreement Showing Their Respective Qualifications. Professional Staff - The Consultant/s Shall In The Delivery Of The Foregoing Services Must Employ The Following Professionals Specified Below: Qualifications And Work Experiences Of Consultant’s Study Team Designation Profession Experience 1 Team Leader Degree In Electrical Or Mechanical Engineer Or Hydro Power Engineering Related Courses At Least 20 Years Relevant Experience 2 Hydrologist Degree Or Diploma And Experienced In Water Resource Engineering At Least 10 Years Relevant Experience 3 Surveyor/ Topographer Geodetic Engineer At Least 3 Years Relevant Experience 4 Civil Engineer Degree In Civil Engineering At Least 10 Years Relevant Experience 5 Geologist Degree In Geology/geotechnical Engineer At Least 10 Years Relevant Experience 6 Mechanical Engineer Degree In Mechanical Engineering At Least 10 Years Relevant Experience 7 Electrical Engineer Degree In Electrical Engineering At Least 10 Years Relevant Experience 8 Driver Experience In Off-road Driving At Least 3 Years Relevant Experience 9 Administrative Staff/survey Crew Degree Holder With Experience In Liaising, Proposal Packaging, Experience In Surveying At Least 1 Year Relevant Experience 10 Environmental Impact Assessment (eia) Preparer Degree In Social Or Environmental Science At Least 3 Years Relevant Experience 11 Social Impact Assessment (sia) Preparer Degree In Social Or Environmental Science At Least 3 Years Relevant Experience 12 Financial Analyst Degree In Commerce Or Economics At Least 10 Years Relevant Experience Criteria For Selection 1. Prospective Consulting Firm Will Be Shortlisted Based On The Criteria Shown In Annex A (“criteria For Shortlisting”) And As Summarized Below: 1.1. Track Record/experience In Similar Feasibility And Detailed Engineering Design Undertakings For At Least 100 Hydro Power Plant World-wide And 20 Hydro-power Plant In The Philippines; 1.2. The Firm Must Have At Least Thirty (30) Years Of Experience In Conducting Feasibility Study With Complete Detailed Engineering Design, Detailed Bill Of Quantities And Detailed Cost Estimate Of A Hydro Power Project From The Submission And Opening Of Quotations; 1.3. Qualification Of Officer, Key Organic Personnel Who May Be Assigned To The Project (in Case Of Nominated Personnel Who Are Not Officers Or Organic Staff, A Notarized Letter Of Commitment For Each Personnel Should Be Submitted); And 1.4. Job Capacity 2. The Consulting Firm Shall Be Selected Using The Quality-cost Based Selection/evaluation (qcbs/qcbe) Procedure Under Republic Act (ra) No. 9184, Rules And Regulation (irr) And Based On The Following Criteria: 2.1. Technical Proposal : 80% 2.2. Financial Proposal : 20% Part Vii Source Of Fund Funds For The Preparation Of The Feasibility Study And Detailed Engineering Design Of The Construction Of Alimit Hydro Power Plant Will Be Sourced From The Cy 2024 General Fund-other Development Fund With Certificate Of Fund Availability In Annex “b”. Part Viii Consultancy Services Fee 1. The Fee For The Consultancy Service Is Inclusive Of Remuneration Cost (basic Salary, Social Charge, Overhead, Management Fee), Reimbursable Cost, Miscellaneous, Contingency, And Taxes Shall Be The Basis In Establishing The Approved Budget For The Contract (abc). Approved Budget For The Contract (abc) The Approved Budget For The Contract (abc) Is Fifty Two Million Pesos (php 52,000,000.00) With Details In Annex “c”. No. Item Cost I Remuneration Costs 33,270,813.02 Ii Reimbursable Costs 9,219,600.00 Iii Miscellaneous Expenses 1,168,486.36 Iv Sub-total (i+ii+iii) 43,658,899.38 V Vat (12% Of Remuneration) 3,992,497.56 Vi Contingency (9.96% Of Iv) 4,348,603.06 Vii Grand Total ( Iv+v+vi) 52,000,000.00 2. In All Billing Transactions, The Fee Shall Be Deposited Directly To The Consultant’s Bank Account. In This Connection, The Consultant Shall Provide The Name Of The Bank, Account Name, And Account Number. Advance Payment: I. The Consultant Shall Be Entitled To Fifteen Percent (15%) Advance Payment Upon The Effectivity Of Its Contract And Submission Of Inception Report Which Shall Be Released In Lumpsum Amount; Ii. The Advance Payment Shall Be Recouped By Deducting In Every Progress Billing Using The Same Percentage Of The Progress Billing For The Deduction. Progress Billing: I) Consultant’s Progress Billing Shall Be Administered Thrice: I) 20% Of The Contract Upon Submission Of The Inception Report; Ii) 40% Upon Submission Of The Draft Feasibility Study And Detailed Engineering Design; And Iii) The Last Billing Shall Be Processed Upon Submission Of The Packaged Feasibility Study And Detailed Engineering Design Or 100% Physical Progress With Issued Certificate Of Completion And Acceptance. Ii) Billing For The Reimbursable Items Will Be Part Of The Progress Billing Supported By Official Receipts/documents. In The Absence Of Official Receipts/documents, The Firm May Also Be Allowed To Submit A Certification Of Actual Disbursements Made Under Oath. Part Ix Data, Local Services And Personnel To Be Provided By The Plgu For Critical Advisories 1. Plgu Warrants The Availability Of Funds; 2. Plgu Shall Provide All Contract Documents To The Consulting Firm; 3. Plgu Shall Provide Focal Persons From Plo For Legal Review, Peo For Technical Review, Ppdo For Project Development And Pre-fs Evaluation Review, Pto With Sanguniang Panlalawigan (sp) For The Financial Viability Review And Administrator’s Office For The Hydro Power Organizational Structure Review Of The Project In The Contract. Part X Consultant’s Action Requiring Plgu’s Prior Approval Replacement Of Technical Personnel By The Consultant Must Have The Prior Approval Of Plgu. Plgu Will Approve The Replacement, If The Qualifications Of The Replacement Professional Equals Or Surpasses That Of The Professional Staff To Be Replaced. Part Xi Settling Of Disputes Any Dispute Arising From The Delivery Of The Contract For The Consultancy Services Shall Be Settled Amicably By Both Parties. During The Entire Negotiations, The Plgu Shall Be Represented By The Plgu Legal Officer While The Consultant Shall Be Represented By The General Manager/project Manager. Should The Two Parties Fail To Settle Their Dispute Amicably, The Dispute Shall Be Settled By The Appropriate Entity Referred To In The Bidding Documents Or The Appropriate Courts As Agreed By The Contracting Party. Part Xii Consultant’s Liability The Consultant’s Liability Under This Contract Shall Be Provided/governed By Applicable Laws Of The Republic Of The Philippines (i.e. Ra 9184). Part Xiii Annexes Annex “a” Criteria For Shortlisting Rating Factor Points/weight Track Record/experience In Similar Feasibility And Detailed Engineering Design Undertakings For At Least 100 Hydro Power Plant World-wide And 20 Hydro-power Plant In The Philippines 20 The Firm Must Have At Least Thirty (30) Years Of Experience In Conducting Feasibility Study With Complete Detailed Engineering Design, Detailed Bill Of Quantities And Detailed Cost Estimate Of A Hydro Power Project From The Submission And Opening Of Quotations • Completed Consulting Services Of Size, Complexity And Technical Specialty Comparable (similar/relevant) To The Job Under Consideration, Including Quality Of Performance. • Other Completed Consulting Services Related To The Job Under Consideration • Known Cases Of Prior Performance Including Quality Of Work Conforming To Obligation And Cost Of Services. 20 Qualification Of Officer, Key Organic Personnel Who May Be Assigned To The Project 40 Job Capacity • Absorptive Capacity To Do Additional Works Other Than Those Currently Being Undertaken 20 Note: Similar Projects Refer To Contracts With Scope Of Works Covering The Conduct Of Feasibility Study Or Comprehensive Feasibility Study Of Hydropower Plant. Relevant Projects Are Fs, Detailed Engineering, Or Advisory Services Conducted For Water Resource-related And Power Facilities Related Projects; Detailed Engineering, Advisory Services, Or Components Of An Fs (demand Forecast, Economic, Financial) For Hydropower Project And Construction, Supervision, Civil Works Or Operation And Maintenance Of Projects Pertaining To Hydropower Project. Annex “b” Certificate Of Availability Of Fund Republic Of The Philppines Provincial Local Government Of Ifugao Lagawe, Ifugao Date: Certification To Whom It May Concern: This Is To Certify That The Amount Of Fifty Two Million Pesos (php 52,000,000.00 ) Philippine Currency Is Available For Expenditure For Preparation Of Feasibility Study And Detailed Engineering Design For The Proposed Alimit Hydro Power Plant . Payment For The Label Feasibility Study And Detailed Engineering Design Of The Construction Of Alimit Hydro Power Plant. At Barangay Alimit , Municipality Of Mayoyao , Province Of Ifugao. Charge To: 2024 Supplemental Budget No. 5 Appropriation Available: Allotment Available: Funds Available: Virgilio T. Marquez Charles P. Baguilat Martha U. Ballangi Provincial Budget Officer Provincial Accountant Oic. Provincial Treasurer Approved By: Jerry U. Dalipog Provincial Governor Annex “c” Approved Budget For The Contract Position Number Of Personnel Man-days Billing Rate Total Cost I. Remuneration Costs 1 Team Leader / Hydro Specialist 1 855 6,674.15 5,706,398.64 2 Hydrologist 2 500 6,663.33 3,331,665.00 3 Surveyor / Topographer 2 800 3,601.71 2,881,364.73 4 Civil Engineer 2 1,400 4,140.00 5,796,000.00 5 Geologist 2 500 3,857.73 1,928,863.64 6 Mechanical Engineer 2 800 4,140.00 3,312,000.00 7 Electrical Engineer 2 800 4,140.00 3,312,000.00 8 Environmental Impact Assessment (eia) Preparer 2 480 2,666.91 1,280,118.11 9 Social Impact Assessment (sia) Preparer 1 480 2,666.91 1,280,118.11 10 Financial Analyst 2 320 2,666.91 853,412.07 11 Driver 2 180 1,018.18 183,272.73 12 Administrative Staff (ao 2)/survey Crew 2 & 20 2,580.00 1,320.00 3,405,600.00 Sub-total 33,270,813.02 Ii. Reimbursable Costs Description Unit Quantity Unit Price Total Cost 13 Per Diem – Php 2,000 Per Man-day Man-days 3,510 2,000.00 7,020,000.00 14 Fuel For Vehicles Ls 180 90,000.00 15 Office Rental And Office Supplies Ls 900,000.00 16 Cost Of Tools And Equipment Or Rental Ls 270 1,209,600.00 Sub-total 9,219,600.00 Iii. Miscellaneous Description Unit Quantity Unit Price Total Cost 17 Cost Of Meetings/consultations/investigations/research Ls 1,168,486.36 Sub-total 1,168,486.36 Part Xiv Forms Pf-1. Format Of Curriculum Vitae (cv) For Proposed Consultancy Proposed Position: ________ Name Of Firm: Name Of Staff: Profession: Date Of Birth: ________________ Years With Firm/entity: ______ Nationality: Membership In Professional Societies: Detailed Tasks Assigned: Key Qualifications: [give An Outline Of Staff Member’s Experience And Training Most Pertinent To Tasks At Hand. Describe Degree Of Responsibility Held By Staff Member On Relevant Previous Projects And Give Dates And Locations.] Education: [summarize College/university And Other Specialized Education Of Staff Members, Giving Names Of Schools, Dates Attended, And Degrees Obtained.] Employment Record: [starting With Present Position, List In Reverse Order Every Employment Held. List All Positions Held By Staff Member Since Graduation, Giving Dates, Names Of Employing Organizations, Titles Of Positions Held, And Locations Of Projects. For Experience In Last Ten Years, Also Give Types Of Activities Performed And Client References, Where Appropriate.] Languages: [for Each Language, Indicate Proficiency: Excellent, Good, Fair, Or Poor In Speaking, Reading, And Writing.] Certification: I, The Undersigned, Certify To The Best Of My Knowledge And Belief, These Data Correctly Describe Me, My Qualifications, And My Experience. Date: [signature Of Staff Member Of The Firm] (day/month/year) ___________________________________________________________ (full Name Of Staff Member) Pf-2. Financial Proposal Submission Form [date] The Chairperson Bids And Awards Committee Provincial Local Government Unit Of Ifugao Poblacion South, Lagawe, Ifugao Madam: We, The Undersigned, Offer To Provide The Consulting Services For The Construction Of Alimit Hydro Power Plant In Accordance With Your Terms Of Reference (tor) Dated (insert Date). Our Financial Proposal Is For The Sum Of [amount In Words And Figures]. This Amount Is Inclusive Of The Basic Salaries, Social Charges, Overhead, Management Fee, Reimbursable Cost (per Diems, Transportation Expenses, Office Rental And Supplies, Cost Of Tools And Equipment), Miscellaneous, Contingencies, And Tax Expenses. Our Financial Proposal Shall Be Binding Upon Us Subject To The Modifications Resulting From Contract Negotiations, Up To The Date Of Award. In Accordance With Clause 4 Of The Omnibus Sworn Statement, We Acknowledge And Accept Plgu’s Right To Inspect And Audit All Records Relating To Our Proposal Irrespective Of Whether We Enter Into A Contract With Plgu As A Result Of This Proposal. We Confirm That We Have Read, Understood And Accepted The Contents Of The Terms Of Reference (tor), The Provisions Relating To The Eligibility Of Consultant’s Technical Staff And The Applicable Guidelines Of The Procurement Rules Of The Plgu, Any And All Supplemental Bulletins Issued And Other Attachments And Inclusions In The Terms Of Reference (tor) Sent To Us. We Understand That Our Financial Proposal Is Fixed Which Shall Not Be Adjusted Regardless Of Whether The Contract Actual Duration Of The Consultancy Contract Package Varies From The Original Contract Duration And That You Are Not Bound To Accept Any Proposal You Receive. Yours Sincerely, Authorized Signature : Name And Title Of Signatory : Name Of Firm : Address : Pf 3. Form Of Contract Agreement This Agreement, Made This _______ Day Of _____________, 2024 Between The Provincial Local Government Unit Of Ifugao (plgu) Hereinafter Called The “entity” And ____________________________ Hereinafter Called The “consultant”. Whereas, The Entity Is Desirous That The Consultant Execute The Consultancy Services Provided In The Tor Hereinafter Called “the Services” And The Entity Has Accepted The Price Proposal For _______________________________________________________________ (php ____________________ ) By The Consultant For The Execution Of The Consultancy Services For The Topographic Survey And Pre-feasibility Study Of The Construction Of Alimit Hydro Power Plant. Now This Agreement Witnesseth As Follows: 1. In This Agreement, Words And Expressions Shall Have The Same Meanings As Are Respectively Assigned To Them In The Terms Of Reference (tor) Hereinafter Referred To. 2. The Following Documents Shall Be Attached, Deemed To Form, And Be Read And Construed As Part Of This Agreement, To Wit: (a) Terms Of Reference (tor); (b) Annexes; (c) Forms; (d) Financial Proposal; (e) Bids And Awards Committee (bac) Resolution Of Award Of Contract And The Consultant’s Conforme Thereto. 3. In Consideration Of The Payments To Be Made By Plgu To The Consultant As Hereinafter Mentioned, The Consultant Hereby Covenants With Plgu To Execute And Complete The Consulting Services In Conformity With The Provisions Of This Contract In All Respects. 4. Plgu Hereby Covenants To Pay The Consultant In Consideration Of The Execution And Completion Of The Consultancy Services For The Feasibility Study And Detailed Engineering Design Of The Construction Of Alimit Hydro Power Plant, The Contract Price Or Such Other Sum As May Become Payable Under The Provisions Of This Contract At The Time And In The Manner Prescribed By This Contract. In Witness Whereof The Parties Thereto Have Caused This Agreement To Be Executed The Day And Year First Before Written. Binding Signature Of Owner (plgu) Binding Signature Of Consultant _______________________________________ ____________________________ [addendum Showing The Corrections, If Any, Made During The Proposal Evaluation Should Be Attached With This Agreement] P F 4. Omnibus Sworn Statement Republic Of The Philippines ) City/municipality Of Lagawe) S.s. Affidavit I, ___________________________, Of Legal Age, Married, Filipino, And Residing At _________________________________________________, After Having Been Duly Sworn In Accordance With Law, Do Hereby Depose And State That: 1. I Am The Owner And Sole Proprietor Of __________________________________ With Office Address At _____________________________________________; As The Owner And Sole Proprietor Of _______________________________, I Have Full Power And Authority To Do, Execute And Perform Any And All Acts Necessary To Represent It In The Proposal For The Consultancy Services For The Feasibility Study And Detailed Engineering Design Of The Construction Of Alimit Hydro Power Plant For The Project/s Of Ifugao Plgu. 2._________________________________ Is Not “blacklisted” Or Barred From Bidding By The Government Of The Philippines Or Any Of Its Agencies, Offices, Corporations, Or Local Government Units, Foreign Government/foreign Or International Financing Institution Whose Blacklisting Rules Have Been Recognized By The Government Procurement Policy Board; 3. ___________________________________ Is Authorizing The Head Of The Procuring Entity Or Its Duly Authorized Representative(s) To Verify All The Documents Submitted; 5. I Am Not Related To The Local Chief Executive (lce) Of Plgu, Members Of The Bac Including The Technical Working Group (twg), The Technical Professionals Who Assisted/drafted The Tor, And The Bac Secretariat By Consanguinity Or Affinity Up To The Third Civil Degree; 6. _____________________________________ Complies With Existing Labor Laws And Standards; And 7. _____________________________________ Is Aware Of And Has Undertaken The Following Responsibilities Of The Service Provider: (a) Carefully Examined The Terms Of Reference (tor); (b) Acknowledge All Conditions, Local Or Otherwise, Affecting The Implementation Of The Service Contract; (c) Made An Estimate Of The Facilities Available And Needed For The Service Contract, If Any; And (d) Inquire Or Secure Supplemental Bulletin(s) Issued For The Consultancy Services For The Feasibility Study And Detailed Engineering Of The Construction Of Alimit Hydro Power Plant. In Witness Whereof, I Have Hereunto Set My Hand This __ Day Of _________________, 20__ At Lagawe, Ifugao, Philippines. __________________________________________________________ [consultant’s Name And Signature]

Department Of Public Works And Highways - DPWH Tender

Civil And Construction...+1Road Construction
location
Philippines
Closing Soon26 Feb 2025
Tender AmountPHP 49 Million (USD 847 K)
Details: Description Ib: 25df0116-25df0117 Page 1 Of 3 Website: Www.dpwh.gov.ph Tel. No(s).: (046) 404 5474 Republic Of The Philippines Department Of Public Works And Highways Office Of The District Engineer Cavite 1 St District Engineering Office Brgy. De Ocampo, Trece Martires City Invitation To Bid 1. The Department Of Public Works And Highways (dpwh), Cavite 1 St District Engineering Office, Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: 1. Name Of Contract : Convergence And Special Support Program Sustainable Infrastructure Projects Alleviating Gaps (sipag) Sipag - Access Roads And/or Bridges From The National Road/s Leading To Major/ Strategic Public Buildings/ Facilities Construction Of Road Connecting To Navarro Bridge, Imus City, Cavite Contract Id No. : 25df0116 Contract Location : Imus City, Cavite Scope Of Works : Construction Of Road With Rcpc And Stone Masonry (riprap) Net Length : 2.69 Lane Km. Road With 360 M. Rcpc And 213.50 M. Stone Masonry (riprap) Approved Budget For The Contract : ₱ 49,000,000.00 Source Of Funds : Fy 2025 Gaa For Dpwh Infra Program Contract Duration : 198 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱ 25,000.00 2. Name Of Contract : Organizational Outcome 2 : Protect Lives And Properties Against Major Floods Flood Management Program Construction/ Rehabilitation Of Flood Mitigation Facilities Within Major River Basins And Principal Rivers Construction Of Revetment Along Ilang-ilang River, Barangay San Francisco, General Trias, Cavite Contract Id No. : 25df0117 Contract Location : General Trias City, Cavite Scope Of Works : Construction Of Revetment Net Length : 414.40 Lm Revetment Approved Budget For The Contract : ₱ 96,500,000.00 Source Of Funds : Fy 2025 Gaa For Dpwh Infra Program Contract Duration : 277 C.d. Size Range : Medium A License Category : B Cost Of Bidding Documents : ₱ 50,000.00 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. 2. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category And Classification As Indicated On The Above Table. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Section Ii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5 Th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 8:00 Am To 5:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 3. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 4. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways (dpwh), Cavite 1 St District Engineering Office, And Inspect The Bidding Documents At The Address Given Below During Weekdays From 8am – 5pm. 5. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On February 5 - 26, 2025 @ 8am-5pm From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents (amount Indicated On The Above Table). It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 6. The Department Of Public Works And Highways (dpwh), Cavite 1 Ib: 25df0116-25df0117 Page 2 Of 3 St District Engineering Office, Will Hold A Prebid Conference On February 12, 2025 @ 10:00 A.m. At Bidding Room, Dpwh Cavite 1 St District Engineering Office, Which Shall Be Open To Prospective Bidders. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 7. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_cavite1@dpwh.gov.ph For Electronic Submission On Or Before February 26, 2025 @ 10:00 A.m. 8. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 15. 9. Bid Opening Shall Be On February 26, 2025 @ 10:00 A.m. At Bidding Room, Dpwh Cavite 1 St District Engineering Office Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 10. If At The Time Of The Post – Qualification Procedure, The Bac Verifies That Any Of The Deficiencies Is Due To The Contractor’s Fault Or Negligence Pursuant To 34.3(b) (ii) Of The 2016 Revised Implementing Rules And Regulations Of Republic Act No. 9184 (2016 Rirr Of Ra 9184), The Procuring Entity Shall Disqualify The Contractor From The Award Without Any Right To Reimburse Fees And Incidental Cost Paid For The Procurement Of Infrastructure Contract Subject To Be Bid. 11. The Department Of Public Works And Highways (dpwh), Cavite 1 St District Engineering Office, Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Sections 35.6 And 41 Of The 2016 Revised Implementing Rules And Regulations (irr) Of Ra 9184, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 12. Strict Implementation R.a. No. 6685 Which Was Approved On December 12, 1998 That Provides: “all Private Contractors, Including Subcontractors, To Whom Awards Are Made For The Undertaking Of National And Local Public Works Funded By Either National Government Or Any Local Government Unit Including Foreign Assisted Projects Must Hire At Least Fifty Percent (50%) Of The Unskilled And Thirty Percent (30%) Of The Skilled Labor Requirements From The Unemployed Bona Fide And Actual Residents In The Province, City And Municipality Who Are Ready, Willing And Able As Determined By The Governor, City Mayor Or Municipal Mayor Concerned Where The Projects Are To Be Undertaken: Provided, That The Labor Used Or To Be Used For The Manufacture Of Prefabricated Construction Materials And Other Materials Premade Outside The Place Of Project Implementation And Skilled Manpower Utilizes Or To Be Utilized For The Preparation Of Engineering Designs And Project Plans And Layouts Shall Be Exempted From The Labor Requirements Shall Be Based On The Maximum Number Of Locally Available Labor Resources Which Fact Shall Be Certified By The Municipal, City, Provincial Or District Engineer As Sufficient Compliance With The Labor Requirements Under This Act.” 13. Requiring An Accredited Project Engineer To Be Assigned To The Project As Per D.o. 156 Series Of 2023 For Interested Bidders. 14. For Further Information, Please Refer To: Adonis B. Angelia Bac Chairperson Dpwh, Cavite 1 St Deo, Brgy. De Ocampo Trece Martires City, Cavite Telephone No. (046) 404-5474 Reynante B. Salazar, Sr. Bac Secretariat Head Dpwh, Cavite 1 Ib: 25df0116-25df0117 Page 3 Of 3 St Deo, Brgy. De Ocampo Trece Martires City, Cavite Telephone No. (046) 404-5474 Department Of Public Works And Highways Cavite 1 St District Engineering Office Brgy. De Ocampo, Trece Martires City, Cavite 15. You May Visit The Following Websites: For Downloading Of Bidding Documents At Www.dpwh.gov.ph. For Online Bid Submission At Electronicbids_cavite1@dpwh.gov.ph. February 5, 2025 Approved By: Adonis B. Angelia Bac Chairperson Noted By: Rolando F. Valdez District Engineer

Ministry Of Manpower ministry Headquarter Tender

Civil And Construction...+2Others, Building Construction
location
Singapore
Closing Date3 Mar 2025
Tender AmountRefer Documents 
Purchaser Name: Ministry Of Manpower ministry Headquarter | Supply And Installation Of Building Access System (bas) Loading

North Eastern Electric Power Corporation Limited - NEEPCO Tender

Services
Manpower Supply
location
India
Closing Date7 Mar 2025
Tender AmountINR 4.9 Million (USD 57.6 K)
Description: Engagement Of Manpower On Daily Wage Basis For Daily Maintenance Of Power House Canteen, Guest House, Hodge, Helpers For Fire Fighting System And Daily Maintenance Of

Municipality Of Guagua, Pampanga Tender

Solid Waste Management
Philippines
Closing Soon26 Feb 2025
Tender AmountPHP 5.9 Million (USD 103.5 K)
Details: Description Scope Of Service Coverage: Cost Of Services Shall Cover The Tipping, Hauling And Disposal Of The Waste From The Municipality' S Mrf To The Sanitary Landfill, Including Provision For The Necessary Manpower And Hauling Equipment, Tools, Materials And Transport Fees That May Be Required For The Efficient Delivery And Disposal To The Sanitary Landfill. Refer To Terms Of Reference Under Section Vii. Technical Specifications

Punjab Mandi Board - DoA Tender

Services
Manpower Supply
Eprocure
Corrigendum : Closing Date Modified
India
Closing Soon27 Feb 2025
Tender AmountINR 3.6 Million (USD 41.4 K)
Description: Supply Of Manpower For The Year 2025 26 For Market Committee Talwandi Bhai
2271-2280 of 2679 active Tenders