Fabrication Tenders

Fabrication Tenders

DEPT OF THE AIR FORCE USA Tender

Energy, Oil and Gas...+2Solar Installation and Products, Electrical and Electronics
United States
Closing Date10 Aug 2027
Tender AmountRefer Documents 
Details: Advanced Research Announcement (ara) fa9451-21-s-0001 directed Energy Technology Experimentation Research (deter) air Force Research Laboratory/directed Energy Directorate naics Code: The Naics Code For This Acquisition Is 541715 For Research And Development In The Physical, Engineering, And Life Sciences (except Nanotechnology And Biotechnology), And The Small Business Size Standard Is 1,000 Employees federal Agency Name: Air Force Research Laboratory, Directed Energy, Phillips Research Site, Kirtland Afb Nm (afrl/rd) ara Title: Directed Energy Technology Experimentation Research Announcement (deter) ara Type: This Is An Open Ara With Calls; Initial Announcement ara Number: Fa9451-21-s-0001 program Summary: this Is An Open Ara Announcement Pursuant To The Authority Of 10 U.s.c. §4023 (formerly 10 U.s.c. §2373). Afrl/rd Is Interested In Receiving White Papers And Proposals Through A Two-step Process To Perform Research And Development (r&d), Modeling And Simulation (m&s), Design, Component/subsystem, Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Directed Energy Source Components (to Include Spares And Alternate Component Technologies), And/or Systems And Any Required Accessories, Materials, And Supplies For Laboratory Research And Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged. *note: Afrl/rd Reserves The Right To Collapse A White Paper/two-step Into A One-step If The Situation Warrants The White Paper Contains Sufficient Technical Detail To Do Full Technical Proposal Evaluation Instead Of White Paper Evaluation. *please See The Attached Deter Industry User Guide For Guidance On Definitions, Processes, Submission Requirements And Evaluation Criteria.* background: Afrl/rd Equips The Joint Warfighter With Next-generation Technologies, Advanced Concepts, And Weapon System Options Across All Operational Domains To Become More Agile And Increase The Commercialization Potential Of Directed Energy Investments To Ensure The National Defense. this Solicitation Intends To Use Acquisition Authorities Provided By 10 U.s.c. §4023 (formerly 10 U.s.c. §2373). This Authority Applies To Acquisition Of Items Related To “…ordnance, Signal, Chemical Activity, Transportation, Energy, Medical, Space-flight, And Aeronautical Supplies, Including Parts And Accessories, And Designs Thereof, That Are Necessary For Experimental Or Test Purposes In The Development Of The Best Supplies That Are Needed For The National Defense.” Consequently, White Papers And Proposals Should Address How The Proposed Effort Provides Benefits To The National Defense And A Strategy For Verifying Those Intended Benefits. the Proposed Solutions Should Be Innovative And Substantially Improve National Defense Capabilities Across The Domains Of Directed Energy. While The Government Describes Discrete Topic Areas Below, It Also Anticipates That Certain Comprehensive Technology Solutions And Prototypes May Require Multidiscipline Approaches That Address Two Or More Topic Areas. The Topic Areas Are Covered Under This Announcement, Which May Be Used In Any Combination. The Government Reserves The Right To Add, Delete Or Modify The Topic Areas As Necessary. communication Between Prospective Offerors And Government Representatives: Dialogue Between Prospective Offerors And Government Representatives Is Strongly Encouraged Throughout The Life Of This Ara. However, Communication Will Be Limited Once Full-proposals Are Submitted For Evaluation/review. Prospective Offerors Are Welcome To Request Sit-downs And Provide Demonstrations Of Their Capabilities. Discussions Shall Not Constitute A Commitment By The Government To Subsequently Fund Or Award Any Proposed Effort. No Guidance Related To Technical Approach Will Be Given. However, Questions Related To The Objectives Of The Effort Or Prior Similar Efforts May Be Answered. Offerors Are Advised That Only Contracting Officers Are Legally Authorized To Contractually Bind Or Otherwise Commit The Government. this Will Be A Hybrid Announcement: This Announcement Has An Open Request For White Papers As Described Below. Calls May Be Issued Under This Announcement For Discrete Requirements. Call Types Can Vary And May Include, But Are Not Limited To, One-step, Two-step, Open, Closed, Staggered, Limited Calls Or Any Combination Therein. Afrl/rd Reserves The Right To Collapse A White Paper/two-step Into A One-step If The Situation Warrants The White Paper Contains Sufficient Technical Detail To Do Full Technical Proposal Evaluation Instead Of White Paper Evaluation. open Announcement Request: Afrl/rd Kirtland Air Force Base Is Soliciting White Papers On The Research Effort Described In The Below Topic Areas Pursuant To The Authority Of 10 U.s.c. §4023 (formerly 10 U.s.c. §2373), Procurement For Experimental Purposes. open Announcement Submission: White Papers Must Be Submitted To Https://usg.valideval.com/teams/deter/signup. If It Is Determined That A Classified White Paper Is Required, Please Do Not Deliver Any Classified Portion Of The White Paper, But Rather Contact The Deter Org Mailbox For Specific Delivery Instructions. Further Instructions For White Paper Submission Can Be Found In The Deter Industry User Guide Attached To This Announcement. call Request: Calls, Other Than Limited Calls, Will Be Issued Under This Announcement Via The Government Point Of Entry (gpe) At Https://beta.sam.gov. Notification Of Calls May Be Announced On Other Platforms (i.e. Www.grants.gov) And Will Direct Offerors To The Gpe For Full Solicitation Details. call Submission: Submission Requirements For Calls Will Be Specified In The Solicitation Documentation Of Each Call. call Variations: Variations Of The Ara Call Process Are Available For Use. The Following Types Are Commonly Used, But Are Not Considered All Inclusive. one-step: The One-step Process Is Used To Request Full Technical And Cost Proposals From Each Offeror. The Proposals Are Reviewed In Accordance With The Solicitation Criteria And Typically All Of A Selected Proposal, Part Of A Selected Proposal, Or None Of The Proposals May Be Selected For Award. two-step: The Two-step Process Is Sometimes Used When A Large Number Of Proposals Are Anticipated. Potential Offerors Are Invited To Submit Brief Descriptive White Papers In Lieu Of Full Proposals. The Call Must State Whether An Unfavorable White Paper Review Will Bar The Offeror From Further Consideration. The Government May Retain Unselected White Papers For A Specific Period Of Time, Which Will Be Identified In The Solicitation. Full Proposals Are Requested From Those Offerors Selected In The White Paper Review Process. After Proposals Are Received, They Are Reviewed Consistent With The Process For One-step Aras. open Call: This Approach Allows For White Paper And/or Proposal Submittals At Any Time Within A Specified Period. Open Calls Will Be Updated No Less Frequently Than Annually. White Papers/proposals Are Reviewed When Received During The Period That The Ara Is Open. closed Call: This Approach Allows For White Paper And/or Proposal Submittals At A Specified Date And Time As Set Forth In The Ara. staggered-closed Call: The Staggered-closed Call States A Specified Date And Time For Receipt Of Proposals Or White Papers, But Also Allows For Proposals/white Papers After The Date And Time Set For Proposal Receipt. All Offerors Should Be Cautioned, However, That The Likelihood Of Funding Proposals Received After The Specified Date And Time Is Substantially Reduced. limited Call: This Approach Allows For Solicitation To A Limited Group Of Potential Offerors. Request For Proposals (rfp) Or Requests For White Papers Will Be Issued Directly To Potential Offerors Without A Requirement To Publish To The Gpe. the Government May Issue Solicitations That Combine One Or More Of The Above Approaches. open Announcement Modifications: Due To The Dynamically Evolving Nature Of Us Warfighter Directed Energy Needs, This Announcement Is Subject To Updates, Revisions, Or Additional Topic Areas. Therefore, Offerors Are Highly Encouraged To Continually Monitor Https://beta.sam.gov To Ensure They Receive The Latest Guidance For This Announcement. The Government Shall Provide Updates To This Announcement No Less Than Annually. Updates May Include Changes To: Topic Areas, Submission Requirements, Administrative Changes, Evaluation Criteria, Solicitation Methods, Etc. (not An Inclusive List). type Of Contract/instrument: The Air Force Reserves The Right To Award The Instrument Best Suited To The Nature Of The Research Proposed. Accordingly, The Government May Award Any Appropriate Contract/instrument Type Under The Authorities Below: federal Acquisition Regulation (far) 10 U.s.c. §4021 (formerly 10 U.s.c. §2371) "other Transaction For Research 10 U.s.c. §4022 (formerly 10 U.s.c. §2371b) "other Transaction For Prototype" 10 U.s.c. §4023 (formerly 10 U.s.c. §2373) "procurement For Experimental Purposes" 10 U.s.c. §4025 (formerly 10 U.s.c. §2374) "prize Competitions" dod Grant And Agreement Regulation (dodgars) the Government Anticipates That A Mix Of Contract/instrument Types Will Be Used Throughout The Life Of This Ara. Generally, Awards Under This Announcement Or Any Calls May Be Cost-plus-fixed Fee (completion And Term), Cost Contract, Firm Fixed Price, Other Transaction Authority, Etc. note: If Proposing A Federal Acquisition Regulation (far) Type Contract, The Far Clauses Will Be Referenced At The Call Level Or Within The Request For Proposal. The Far And Supplement Provisions And Clauses Are Incorporated By Reference. The Full Text Of These Provisions And Clauses Can Be Found At Https://www.acquisition.gov. if Proposing An Assistance Instrument (grants Or Cooperative Agreements) Then Articles And Guidance Found Under Dodgars, Code Of Federal Regulations (cfr) And Omb/dod Policy Shall Be Used And Followed As Appropriate. if Proposing An Other Transaction (ot) These Far References And Clauses Would Not Apply. The Terms And Conditions Of An Ot Agreement Should Be Developed And Negotiated On A Case-by-case Basis. estimated Program Cost: The Overarching Announcement Has An Unrestricted Ceiling. However, Individual Calls May Elect To Provide An Estimated Program Value Or Funding Profile For Planning Purposes. anticipated Number Of Awards: The Air Force Anticipates Awarding Multiple Awards For This Announcement. However, The Air Force Reserves The Right To Award Zero, One, Or More Agreements, Other Transactions, Or Contracts For All, Some Or None Of The Solicited Effort Based On The Offeror’s Ability To Perform Desired Work And Funding Availability. There Is No Limit On The Number Of Awards That May Be Made To An Individual Offeror. schedule: The Anticipated Period Of Performance Will Be Determined Through Dialogue Between Prospective Offerors And Government Representatives For Each Topic Area And Specified In Each Individual Award. deliverables: Hardware And Software Deliverables Will Be Specified Within A Separately Priced Line Items And Data Deliverables Will Be Specified On Individual Cdrl(s) In Any Resultant Contract Or An Ot Article. within Scope Award Modifications: Offerors Are Advised That Due To The Inherent Uncertainty Of Research And Development Efforts, Awards Resulting From This Announcement May Be Modified During Performance To Make Within Scope Changes, To Include But Not Limited To, Modifications Which Increase Overall Contract/award Ceiling Amount. system For Award Management (sam) Registration: Before The Government Can Issue An Award, An Offeror Must Be Registered In The System For Award Management (sam). If An Offeror Was Previously Registered In Central Contractor Registration (ccr), The Information Has Been Transferred To Sam. However, It Is In The Offeror’s Interest To Visit Sam And Ensure That All Of Their Data Is Up To Date From Sam And Other Databases To Avoid Delay In Award. Sam Replaced Ccr, Online Representations And Certifications Application (orca), And The Excluded Parties List System (epls). Sam Allows Firms Interested In Conducting Business With The Federal Government To Provide Basic Information On Business Capabilities And Financial Information. To Register, Visit Https://www.sam.gov. science & Technology (s&t) Program Protection: Offerors That Are Submitting Proposal Responses Only (not Required For Submission Of White Papers) Shall Submit As A Part Of The Proposal Submission 1.) A Completed Standard Form (sf 424), Research And Related Senior/key Person Profile (expanded) Form (see Attachments) For All Senior/key Personnel Proposed; And, 2.) A Completed Security Program Questionnaire (see Attachments). Offerors May Be Asked To Provide A Mitigation Plan For Any Identified S&t Protection Risks. The Government Reserves The Right To Determine An Offeror Unawardable On The Grounds Of Unacceptable S&t Protection Risk Based On Its Review Of The Sf 424 And Security Program Questionnaire. by Submitting A Proposal, The Offeror Certifies That It Is In Compliance With Section 223(a) Of The William M. (mac) Thornberry National Defense Authorization Act For Fiscal Year 2021 Which Requires That: (a) The Principal Investigator (pi) And Other Key Personnel Certify That The Current And Pending Support Provided On The Proposal Is Current, Accurate And Complete; (b) Agree To Update Such Disclosure At The Request Of The Agency Prior To The Award Of Support And At Any Subsequent Time The Agency Determines Appropriate During The Term Of The Award; And (c) The Pi And Other Key Personnel Have Been Made Aware Of The Requirements Under Section 223(a)(1) Of This Act. I Am Aware That Any False, Fictitious, Or Fraudulent Statements Or Claims May Subject Me To Criminal, Civil, Or Administrative Penalties. (u.s. Code, Title 218, Section 1001). announcement Period: The Overarching Announcement Has No End Date And Is Considered To Be In Effect Until Further Closed Or Rescinded. open Announcement Points Of Contact: address Technical Questions To The Deter Org Mailbox (afrl.deter.ara@us.af.mil) address Announcement Questions To The Deter Org Mailbox (afrl.deter.ara@us.af.mil) Attention Of: primary: Mr. Bill Sherrod, Afrl/rdk note: Call Points Of Contact Will Be Specified At The Call Level.   topic Areas 1. Directed Energy (de) Sources this Category Of Supplies Covers Research, Development And Testing For All Directed Energy Sources In The Near-term And Far-term In Support Of National Defense. This Area Covers The Design, Component/subsystem, Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Directed Energy Source Components (to Include Spares And Alternate Component Technologies), And/or Systems And Any Required Accessories, Materials, And Supplies For Laboratory Research And Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space. This Area Also Covers The Redesign, Refurbishment, Modification, And/or Upgrade Of Existing Sources, If Required, To Support Laboratory Experimentation, Field Or Flight Trials, And/or Demonstrations. examples Of Directed Energy Sources Include, But Are Not Limited To: a. Laser Sources b. High Power Electromagnetic (hpem) Sources 2. Acquisition Tracking Pointing (atp), Beam Control (bc) And Atmospheric Compensation (ac) Systems this Area Covers The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Any Hardware, Sensors, Control Electronics, And Software/firmware Required To Develop Atp, Bc And Ac Systems To Control The Propagation Of Directed Energy So As To Maximize Energy/irradiance On Target. This Area Also Includes Any Required Accessories, Materials, Supplies, And/or Services Necessary To Conduct Laboratory Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space. 3. De Weapon Systems this Area Covers The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of De Weapon Components And Systems, Diagnostics, Accessories, Materials, Supplies, And Services Necessary To Build/integrate Complete Weapon Systems For Laboratory Research, Experimentation And Field Trials In A Relevant Environment To Demonstrate System Capabilities. Systems May Also Be Hardened To Meet Specific Requirements Imposed For Operations In Any Domain To Include Ground/sea, Airborne, And/or Space. Systems Engineering Design/analysis And/or Trade Studies Are Relevant In Regards To Size, Weight, And Power (swap). specific Topics Of Interest Include The Following Areas: a. Feasibility Studies Of Innovative Hpem Applications b. Integration Of Disparate Technologies For The Fielding Of New Hpem Systems And Weapons c. Identification And Quantification Of Useful -hpem Effects d. Development Of Hpem Sources That Have A Role In Future Applications e. System Integration And Demonstration Of Future Hpem Capabilities f. Power Subsystems g. Thermal Management Subsystems h. Command And Control Subsystems i. Platform Integration j. Detection, Targeting And Tracking Subsystems k. Dotmlpf-p Studies And Experimentation l. Conops, Conemps, Ttp Development And Experimentation m. Performance Enhancement Technologies For Existing Systems 4. De Effects Testing provide Testing Of Materials, Components, Subsystems, And Systems To Determine The Vulnerability, Susceptibility, And Accessibility Of Potential De Targets To De Exposure. This Includes The Design, Component/subsystem Prototype Risk Reduction, Fabrication/purchase, Assembly, Integration, And Testing Of Unique De Components, Sources, And Systems And Any Required Diagnostic And/or Special Test Equipment/tooling And Materials Necessary To Conduct De-material Interaction Physics Experimentation To Establish The Efficacy Of De Waveforms To Support The Development Of De Weapons System Requirements And/or Assessment Of Proposed De Weapon Systems. Develop Survivability Requirements And Recommendations For Space Systems And Support Vulnerability Predictions. 5. Modeling, Simulation And Analysis (ms&a) this Area Covers The Development/procurement, Testing, Maintenance, Modification, Upgrade/reuse, And Execution Of Scientific Modeling, Simulation And Analysis Software And Requisite It Hardware Systems Necessary To Efficiently Execute Software To Support De Weapon System Design, Development, Testing, And Data Analysis Of Test Results. This Includes Campaign-level, Engagement-level, System, And Component-level Ms&a Codes To Create Test Scenarios, Assess Design Reference Mission Compliance, Provide Pre-test Predictions, And Conduct Post-test Assessment Of System Performance. In Addition, Sound Principles For Software Engineering And Development Must Be Employed For All Developed Software And Documentation. Robust Software Testing, Validation, And Verification Are Critical To Software Development Efforts. As Appropriate, Software Must Scale To Large Simulation Sizes And Be Portable To Massively Parallel Computer Architecture. Ms&a Software May Include Fast Running Engineering Codes And Detailed Physics Modeling Codes. examples Of Ms&a Sub-topic Areas Include, But Are Not Limited To: a. De System Performance Ms&a b. De System Effects Ms&a c. De System Target Assessment d. De System Biosafety And Biological Effects e. De Source And Component Virtual Design f. Satellite Signatures And Radiometric/photometric Assessments Of Space Objects. g. Assess Electro-optical Space Domain Awareness (sda) Systems And Architectures. h. Space System Functional Modeling And Response i. Conduct Space Domain Awareness In Non-traditional Orbits j. Quantify Safe Operating Conditions For Lasers Operating Through The Atmosphere And Space 6. Wargaming this Area Covers The Development/procurement, Testing, Maintenance, Modification, Upgrade/reuse, And Execution Of Wargaming And Scientific Modeling, Simulation And Analysis Software And Their Requisite It Hardware Systems Necessary To Efficiently Execute This Software To Support De Weapon System Design, Development, Testing, And Data Analysis Of Wargaming Results. This Includes Campaign-level, Engagement-level, System, And Component-level Wargaming Ms&a Codes To Create Test Scenarios, Assess Design Reference Mission Compliance, Provide Pre-test Predictions, And Conduct Post-test Assessment Of System Performance. In Addition, Sound Principles For Software Engineering And Development Must Be Employed For All Developed Software And Documentation. Robust Software Testing, Validation, And Verification Are Critical To Software Development Efforts. As Appropriate, Software Must Scale To Large Wargaming And Simulation Sizes And Be Portable To Massively Parallel Computer Architecture. Wargaming Ms&a Software May Include Fast Running Engineering Codes And Detailed Physics Modeling Codes. Additionally, The Wargaming Area Should Provide General Wargaming Support To Include De Wargame Planning, Table Top, Ms&a, And Field Execution, And Wargame Reporting. In Addition, Provide Required Hardware, Software/firmware, Accessories, Materials, Supplies, Infrastructure, Diagnostics, Targets, Safety Equipment, And Services Necessary To Conduct Wargame Research, Experiments, Field And/or Range Testing Of De Components, Subsystems, Systems And Demonstrations Under Operationally Relevant Conditions. 7. Innovative Space Domain Awareness provide Basic & Applied Research, Algorithms, Software/firmware, Materials, Supplies, And Services Necessary To Conduct Technology Maturation For Ground-based Surveillance Of Space Objects. Examples Include, But Are Not Limited To: a. Closely-spaced Object Detection And Characterization. b. Daytime Detection And Custody Of Satellites. c. Orbit Determination Techniques And Algorithms For Satellites Significantly Affected By Lunar And Solar Gravity. d. Rapid, On-demand Orbit Determination. e. Extremely Wide Field-of-view Image Exploitation For Satellite Discovery And Custody. f. Multi-phenomenology Sensor Integration (e.g. Optical, Radar, Passive Radiofrequency). g. Active Optical Techniques For Satellite Ranging And Characterization (e.g. Lidar, Ladar). h. Sharp Imaging Of Satellites Through The Atmosphere At Low Elevation Angles. i. Characterization Of Atmospheric Deep Turbulence For Image Restoration. j. Techniques, Algorithms, Architecture Designs, Etc. For Collaborative Autonomous Telescope Networks. k. Multispectral, Hyperspectral, And Polarimetric Characterization Of Space Objects. l. Techniques To Improve And Exploit Short- And Long-wave Infrared Characterization Of Space Objects. m. Machine Learning Algorithms To Advance The State-of-the-art In Areas Such As: • Point Spread Function Correction. • Space Object Image Classification Using Resolved Or Non-resolved Sensor Imagery. • Uncorrelated Track Association. • Space Object Feature Identification, Model Inference, And Attitude Regression. • Space Object Detection In Noisy Image Backgrounds. • Generation Of Realistic Space Scene Imagery / Discernment Of Real Vs. Synthetic. • Detection Of Subtle, Unique Image Artefacts Of Interest In A Large Dataset. 8. Experiments, Testing And Demonstrations provide General And Specialized Test Support To Include De Test Planning, Laboratory And Field Demonstration, And Reporting. Provide Required Hardware, Software/firmware, Accessories, Materials, Supplies, Infrastructure, Diagnostics, Targets, Safety Equipment, And Services Necessary To Conduct Testing Of De Components, Subsystems, Systems, And Demonstrations Under Operationally Relevant Conditions. 9. Laboratory Materials, Supplies And Services In Support Of Experimentation provide Required Ancillary Support Systems, Equipment, Materials, Supplies, Infrastructure, And Services Necessary To Support The Development, Operation, Maintenance, And Testing Required To Evaluate De Through Experimentation In The Laboratory And Field During Trials Or Flight/range Testing. Examples Include, But Are Not Limited To: a. Clean Rooms, Anechoic Chambers And Necessary Equipment, Materials, Supplies And/or Services To Support All Aspects Of De Source Development, Laboratory Experimentation, And Field Trials. b. Diagnostic And/or Special Test Equipment/tooling Required For: • Quality Assurance Of Components Used In The Fabrication Of De Sources • Damage Assessments And Root Cause Analysis Of Component, Subsystem And System Failures • Characterization Of Target Physical, Chemical, And Electromagnetic Properties • Fabrication, Assembly, Integration, Testing, Operation And Maintenance Of De Sources • Direct/indirect Measurements Of De Source Performance c. Power Systems Required To Operate The Source And Any Required Ancillary Equipment Or Services Necessary To Install, Operate And/or Maintain These Systems d. Unique Chemicals To Operate, Clean, And/or Maintain Direct Energy Systems And/or Laboratory Facilities Used For Directed Energy Experimentation As Well As Any Required Materials, Accessories Or Services Required For Safe Storage, Use, Operations, And Proper Disposal Of Any Hazardous Materials e. Thermal Management Components And Systems, To Include System-level And Facility-level Systems, Necessary To Support Safe Operations Of De Sources. This Includes Materials, Supplies, Accessories, Services And/or Any Support Required For Safe Operations And Maintenance Of The System As Well As Proper Disposal Of Hazardous Materials/waste. f. Any Required Safety Related Items Necessary To Fabricate, Assemble, Integrate, Test, Operate And Maintain Directed Energy Sources. g. Transportation: This Area Covers All Transportation, To And From, Various Research Facilities And Sites To Conduct Field And/or Flight Experimentation, Testing And/or Trials Of Directed Energy Components, Sub-systems And Systems And Demonstrations. This Includes Such Items As Associated Support/handling Equipment, Special Test Equipment/tooling, Spares, And Diagnostic/testing Equipment. Specialized Transportation Requirements May Include: Design, Fabrication And/or Purchase Of Specialized Packaging, Crating, Enclosures, Trailers, And/or Vehicles From Which The Transported Item(s) Will Be Operated/maintained To Conduct Experimentation, Testing And/or Trials Outside Of Traditional Laboratory Spaces. Additionally, This Area Covers Aspects Of Safe Transportation To And From Remote Field Locations, Department Of Defense Test Ranges, And Installations In Support Of Field And/or Flight Experimentation, Testing And/or Trials. ***updates As Of 09 Dec 2021*** a) Deter Industry User Guide, Amendment 02 Updateto Section 2.b., White Papers Shall Be Submitted Using The Following Link Https://usg.valideval.com/teams/deter/signuppapers Update To Section 2.c.2. b) Deter White Paper Cover Sheet, Attachment 1, Amendment 1 ***updates As Of 06 Jan 2022*** Corrects The Valid Eval Web Address In The Open Announcement Description Above From: Https://usg.valideval.com/teams/deter/signuppapers To: Https://usg.valideval.com/teams/deter/signup ***updates As Of 11 Aug 2022*** a.) Update Statute Renumbering Throughout Deter Ara And Industry Guide 10 U.s.c. §4021 (formerly 10 U.s.c. §2371) "other Transaction For Research 10 U.s.c. §4022 (formerly 10 U.s.c. §2371b) "other Transaction For Prototype" 10 U.s.c. §4023 (formerly 10 U.s.c. §2373) "procurement For Experimental Purposes" 10 U.s.c. §4025 (formerly 10 U.s.c. §2374) "prize Competitions" b.) Update Deter Contracting Points Of Contact primary: Mr. Bill Sherrod, Afrl/rdk c.) Include Requirement For Science & Technology (s&t) Program Protection all Proposal Responses (not Required For White Paper Submission) Are Required To Submit The Following With All Responses: 1.) A Sf424 (research And Related Senior/key Person Profile)(see Attachments), And 2.) Completed Program Security Questionnaire (see Attachments) d.) Request For 500 Word Abstract On White Paper Submissions offerors Shall Include A Short 500 Word Abstract As A Part Of The White Paper Narrative That Broadly Describes The Fundamental Intent Of The Proposed Effort Along With The Intended Approach. e.) Duplicate White Paper Submissions offerors Advised That Duplicate White Paper Submissions Within The Same 12 Month Timeframe Will Not Be Separately Evaluated. Please Do Not Submit Duplicate White Paper Submissions Within The Same 12 Month Period. ***updates As Of 08 Oct 2024*** a.) Summary Of Awards: below Is A Summary Of All Awards Made From Inception (8 Feb 2021) To Date (08 Oct 2024), Under The Deter Ara: 1.) Calls: 15 Calls Have Been Issued Or Are In Progress 13 Awards Have Been Issued Or Are In Progress, With A Combined Value Of $188m 2.) White Paper Open Announcement: 193 White Papers Have Been Received 32 Awards Have Been Issued Or Are In Progress, With A Combined Value Of $165m b.) Updated Evaluation Rubric: slight Changes Have Been Made To The Evaluation Rubric, Which Can Be Found Under The Attached "valid Eval Rubric (version 2.0)". The Updated Evaluation Rubric Will Be Used For All White Paper And Proposal Evaluations Effective Immediately. c.) Afrl Directed Energy -- Virtual Industry Day: date: Wednesday, 6 Nov 2024 location: Virtual Only (tentative Platform: Microsoft Teams Conference) schedule: 0900-1000 Rdl Laser Division Q&a Session 1000-1100 Rds Space Electro-optics Q&a Session 1300-1400 Rdh High Power Electro-magnetics Q&a Session 1400-1500 Rdm Modeling, Simulation & Wargaming Q&a Session discussion Level: Controlled Unclassified Information (cui). Participants Are Required To Have A Current And Active Dd Form 2345 To Access Or Participate In Any Virtual Q&a Session registered Participants May Attend One, Some Or All Of The Q&a Sessions registration Link: Https://forms.osi.apps.mil/r/h8zzpzdnht registration Closes Wednesday, 30 Oct 24 At 1700 Mt. After The Registration Form Is Submitted, Afrl Will Verify The Status Of The Dd Form 2345 And Will Send A Confirmation Email That The Registration Is Complete. A Subsequent Email Will Be Sent No Later Than 4 Nov 2024 With The Links To The Q&a Session.

MUNICIPALITY OF CALANASAN Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Soon2 Dec 2024
Tender AmountPHP 499.9 K (USD 8.4 K)
Details: Description B.5 Project Billboard/signboard 1.00 Each B.7 Occupational Safety And Health Program 360.00 Man-days 101 Removal Of Structures And Obstructions 1.00 Lot 402(a) Carpentry Works 550.00 Bd.ft 1014(1)b1 Prepainted Metal Sheets 99.00 Sq.m 1013(2) Fabricated Metal Roofing Accessory 11.00 Ln.m 1010(2)b Doors 6.30 Sq.m 1009(1a) Jalousie Windows 1.00 L.s. 1003 (1) Ceiling (fiber Cement Board) 83.00 Sq.m. 1032(1)a Painting Works 333.70 Sq.m 1103(1) Lighting Fixtures And Lamps 1.00 Ls

Cagayan De Oro City Tender

Philippines
Closing Soon5 Dec 2024
Tender AmountPHP 155 K (USD 2.6 K)
Details: Description Item: 1 Lot General Body Repair And Repainting Scope Of Work: Body/cab: General Body Repair, Patch & Weld All Rotten Portion Replace Passenger Cab Flooring, Repair Passenger Seat, Repair Chassis (to Include Other Related Works That May Be Needed) Painting: General Repainting (to Original Color/white) Including Under Chassis Plus Coating (rubberized) Electricals: Remove & Replace/electrical Rehabilation ( To Include Other Related Works That May Be Needed) Replace Corner Lamp, Tail Light Assy, Head Light Bulb, Signal Light Socket & Fabricate Rear Plate Mount W/light Purpose: For General Body Repair & Repainting; Mit L300 Pet; Shj-530. (oj#050-ver-10-2024) Abc: Php155,000.00 Delivery Schedule: 10 Calendar Days

City Of Pass Christian Tender

Civil And Construction...+1Building Construction
United States
Closing Date17 Dec 2024
Tender AmountRefer Documents 
Details: Bids Are Invited For The Construction Of New Pre-engineered Metal Building To Be Used For The City’s Beautification Department Including: Restrooms, Office Space, Meeting/kitchen Space; Laundry Room, Storage, Mechanical/electrical; Site Preparation (i.e., Clearing And Grubbing, Excavation, Backfill), Site Utilities Including A Duplex Grinder Pump Station And Installation Of Water And Sewer Services By Hdd Methods; Excavation/fill, Cast-in-place Concrete Building Foundation, Structural Steel, Miscellaneous Steel (lintels, Weld Plates, Fabricated Supports, Etc.), Wood Wall Framing, Suspended Ceiling; Gypsum Board, Vinyl Tile Flooring; Door Hardware, Windows, R-panel Insulated Roofing, Metal Trim, Metal Soffit Panels (solid And Perforated), Interior Paint, Concrete Handicapped Parking With Legends, And Compacted Limestone Access Drive/parking.

Paranaque City Government Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Date12 Dec 2024
Tender AmountPHP 8.6 Million (USD 147.2 K)
Details: Description Scope Of Work: I. Satellite Bdrrmo Office 1. Demolition 2. Excavation 3. Masonry Works 4. Concreting 5. Carpentry 6. Hardware 7. Fabricated Materials 8. Formworks & Scaffoldings 9. Installation Of Steel Stair 10. Rental Of Equipment 11. Gravel Bedding 12. Installation Of Concrete Mouldings (ls.) 13. Water Proofing (l.s.) 14. Floor Tiles (32.80 M²) 15. Tilesworks 16. Catch Basin 17. Plumbing 18. Painting 19. Installation Of Stainless Marker 20. Electrical Ii. Fencing At Satellite 1. Demolition 2. Excavation 3. Masonry Works 4. Concreting 5. Steel Works 6. Formworks 7. Rental Of Equipment 8. Gravel Bedding 9. Inst. Of Concrete Mouldings 10. Inst. Of Decorative Blocks 11. Painting 12. Electrical

National Food Authority Tender

Philippines
Closing Date17 Dec 2024
Tender AmountPHP 6.6 Million (USD 112.5 K)
Details: Description Scope Of Works: The Works Covered Under This Project Include: 1. Mobilization 2. Fabrication, Painting, And Installation Of Main Steel Sliding Gates, Including The Installation Of Roller Guides And Gliding Trolleys (see Drawings And Plans On Sheet No. A/6). 3. Dismantling, Repainting, And Repairing Of Damaged Steel Sliding Gates To Be Converted Into Secondary Screen Sliding Gates, Including The Replacement Of Roller Guides And Gliding Trolleys, As Well As The Provision Of A Pedestrian Door For Each Secondary Screen Sliding Gate. (see Drawings And Plans On Sheet No. A/6). 4. Installation Of Aluminum Expanded Wire A Mesh With A Frame On The Secondary Steel Sliding Gates. 5. Installation Of Aluminum Expanded Wire Mesh With A Frame On The Inner And Outer Sides Of Steel Louvers. 6. Installation Of Aluminum Expanded Wire Mesh With An Aluminum Frame At The Ridge Vent. 7. Replacement Of The Entire Skylight Roofing (with The Same Corrugation As The Main Roofing) And Selective Replacement Of Damaged Sections Of The Main Roofing. (see Drawings And Plans On Sheet No. A/4) 8. Replacement Of Damaged Purlins And Damaged G.i. Pre-painted Siding Sheet Walls. 9. Replacement Of The Entire Insulation With Double Bubble, Double Foil Insulation. 10. Provision Of Ridge Vent Roofing With Insulation Installed. 11. Replacement Of Dilapidated/damaged Side And Center Gutters With Stainless Steel Gutters. 12. Replacement Of The Entire Siding Downspouts And Installation Of Additional Center Gutter Downspouts With Steel Brackets And Hangers, Including Tapping The Downspouts Into The Existing Drainage. 13. Declogging Of Inside And Outside Drainage, Repair/build-up Of The Damaged Concrete Walls, Columns, And Beams. 14. Replacement Of Damaged Canopy Flashing, Siding Cover, Insulation, And Purlins; Installation Of Stainless Steel Gutters With Downspouts; And Replacement Of The Damaged Cover Sheet For The Roller Guide. 15. Repair Of Roof Leaks. 16. Repainting Of Exterior And Interior Concrete Walls, Columns, And Beams, Including Metal Surfaces Such As Steel Columns, Trusses, Struts, Purlins, Cross Bracing, Steel Frames, And G.i. Wall Sheets. 17. Repainting Of The Roof Sheets (off-white). 18. Painting Of The Entire Flooring, Including Pile Locator Markings Inside The Warehouse (pile Locator Layout As Per The Approval Of The End-user). 19. Repair Of Floor Cracks Using Concrete Bonding Agent, Concrete Repair Mortar And Epoxy Injection Resin. 20. Replacement Of Electrical Lighting And Outlets, Repair Of The Power Supply, And Replacement Of Damaged Circuit Breakers In The Warehouse. 21. Provision Of An Acrylic Nfa Logo With Backlighting. 22. Installation Of Heavy-duty Solar Led Flood Lights And Street Lighting. (see Drawings And Plans On Sheet No. A/5). 23. Supply, Delivery, Installation, Testing And Commissioning Of 1 Lot Cctv Surveillance System. The Security Surveillance System Shall Cover All Critical Areas, Both Indoor And Outdoor (see Drawings And Plans On Sheet No. A/8). 24. Supply, Delivery, Installation, Testing, And Commissioning Of Two (2) Units Of High-volume, Low-speed (hvls) Industrial Ceiling Fans. 25. Provision Of A Warehouse Supervisor’s Office And Installation Of A Split-type Air Conditioning Unit (see Drawings And Plans On Sheet No. A/7). 26. Demobilization. For Other Details, See The Complete Set Of Plans (sheet Nos. A/1toa/8).

Municipality Of Castillejos, Zambales Tender

Civil And Construction...+1Civil Works Others
Philippines
Closing Soon3 Dec 2024
Tender AmountPHP 998.3 K (USD 16.9 K)
Details: Description Project Billboard/signboard, Occupational Safety And Health Program, Structure Excavation (common Soil), Gravel Bedding, Structural Concrete For Footing And Slab On Fill (class A, 28 Days), Reinforcing Steel Of Reinforced Concrete For One-storey, Grade 40, Formworks And Falseworks, 4.5mm Fiber Cement Board On Metal Frame Ceiling, 6.25mm Marine Plywood On Metal Frame Single Wall Partition, Jalousie Windows (glass), Wooden Flush Door, Fabricated Metal Roofing Accessory (ridge/hip Roll), Prepainted Metal Sheets (rib Type, Long Span), Cement Plaster Finish, Painting Works (steel), 100mm Chb Non Loading Bearing (including Reinforcing Steel), Steel Works, Conduits, Boxes & Fittings, (conduit Works/conduit Rough-in), Wires And Wiring Devices, Panelboard With Main & Branches Breakers, And Lighting Fixtures And Lamps.

National Research Council Canada Tender

Software and IT Solutions
Canada
Closing Date13 Dec 2024
Tender AmountRefer Documents 
Details: The National Research Council’s (nrc) Clean Energy Innovation (cei) Mississauga Branch Has A Requirement For A New Simultaneous Thermal Analysis Instrument To Amplify Its Thermal Analytical Characterization Capabilities, With An Emphasis On Thermogravimetric Analysis (tga) And Differential Scanning Calorimetry (dsc) In Custom Gaseous Atmospheres Relevant For Co2 Capture And Energy Storage Applications. At The Cei-mississauga Branch We Are Establishing An Advanced Materials Characterization Laboratory That Includes A Suite Of Analytical Techniques To Facilitate The Characterization Of Materials Including Those Fabricated As Part Of Our Materials Acceleration Platforms (maps) Initiative. To Expand Our Facility’s Maps Capabilities, It Is Essential That This Instrument Be Capable Of High-throughput Experimentation And Unattended Operation. Data Generated By Its Software Should Be Accessible In Real-time By External Software Interfaces, Allowing Users To Access The Data Via E.g. Python Scripts To Populate Centralized Databases.

City Of Dumaguete Tender

Civil And Construction...+1Civil Works Others
Corrigendum : Closing Date Modified
Philippines
Closing Date10 Dec 2024
Tender AmountPHP 93.4 Million (USD 1.5 Million)
Details: Description Republic Of The Philippines City Of Dumaguete Bids And Awards Committee Invitation To Bid For The Job Order: Construction Of Socialized Housing For “banilad Plainsview Housing” Located In Barangay Banilad The City Of Dumaguete Thru Its Bids And Awards Committee (bac), Invites All Interested Manufacturers, Suppliers, Dealers And/or Distributors To Apply For Eligibility And To Submit Bids For The Supply Of: Job Order:, P93,425,506.47 Scope Of Works: 1. Item #1 Facilities For The Engineer A. 1 Construction Of Field Office For The Engineer. A. 2 Provision Of Furnitures, Fixtures, Equipment And Appliances For The Field Office. A. 3 Provision Of Progress Photographs. 2. Item #2 Other General Requirements B.1 Permits And Clearances B.2 Provisions For Project Billboards/signages B.3 Occupational Safety And Health Programs B.4 Mobilization/demobilization 3. Earth Works (for 2 Buildings) A. Excavation Works Column Footings And Wall Footings B. Excavation Works For Cisterns, Septic Tanks, Grease Traps And Catch Basins C. Embankment (ballastro Fill For Ground Floor Slab) 4. Reinforced Concrete Works (for 2 Buildings) A. Construction Of Column Footings With Gravel Bedding (0.10m. Thk.) B. Construction Of Grade Beams C. Construction Of Concrete Columns (all Floor) D. Construction Of 2nd Floor Beams E. Construction Of 3rd Floor Beams F. Construction Of 4th Floor Beams G. Construction Of Roof Beams H. Construction Of Cantilever Beams I. Construction Of Wall Footings J. Construction Of Ground Floor Slabs K. Construction Of Concrete Parkings And Pathways L. Construction Of Concrete Flooring/slab With Steel Deck At 2nd, 3rd And 4th Floors M. Construction Of Concrete Stairs And Landing (4 Units) N. Construction Of Concrete Gutter With Waterproofing O. Construction Of Concrete Windom Jambs P. Construction Of Concrete Mouldings Q. Construction Of Ramp At Ground Floor R. Construction Of Storage Water Tank (cisterns) 2 Units S. Construction Of Roof Deck And Water Tank Platforms 5. Formworks And Scaffoldings (for 2 Buildings) A. Installation/removal/transfer Of Formworks And Falseworks 6. Masonry Works (for 2 Buildings) A. Installation Of 4” Chb Walls And Partitions With Plain Cement Finish (both Sides) For All Floors Combined B. Installation Of Kitchen Sink With Plain Cement Finish For All Floors C. Installation Of Plant Boxes With Plain Cement Finish For All Floors D. Construction Of Septic Vault (4 Units), Grease Trap And Catch Basin. 7. Carpentry Works: (for 2 Buildings) A. Installation Of Ceiling Framing And Ceiling Boards At 4th Floor B. Installation Of Wooden And Pvc Doors Including Door Jambs For All Floors-ground, 2nd, 3rd And 4th C. Installation Of Wooden And Pvc Doors Accessories For All Floors – Ground, 2nd, 3rd And 4th 8. Glass Works: (for 2 Buildings) A. Installation Of Glass Jalousie Windows With Aluminum Frames For All Floors. 9. Steel Works (for 2 Buildings) A. Fabrication And Installation Of Steel Trusses (14 Units) B. Fabrication And Installation Of Steel Girts C. Fabrication And Installation Of Steel Railings At Stairs And Hallway 10. Roofing Works (for 2 Buildings) A. Installation Of Long Span Rib Type Roofing Pre-painted At 4th Floor B. Installation Of Plain Gi Shts Ridge Rolls At 4th Floor 11. Tiling Works (for Two Buildings) A. Installation Of Floor And Wall Tiles At Comfort Rooms For Ground, 2nd, 3rd And 4th B. Installation Of Tiles At Kitchen Sink For Ground, 2nd, 3rd And 4th Floors 12. Painting Works (for 2 Buildings) A. Painting Of Concrete Columns For All The Floors B. Painting Of Concrete Beams For All The Floors C. Painting Of Roof Beams For 4th Floor D. Painting Of Interior And Exterior Wall Of The Entire Building E. Painting Of Ceiling For Ground, 2nd, 3rd And 4th Floors F. Painting Of Concrete Stairs And Landing G. Painting Of Roof Framing And Steel Railings H. Painting Of Concrete Gutter I. Painting Of Wood Works – Wooden Jambs And Wooden Doors 13. Plumbing Works (for 2 Buildings) A. Installation Of Plumbing Rough – Ins For Wasteline And Waterline (ppr Pipes And Accessories) B. Installation Of Plumbing Fixtures For Wasteline And Waterline C. Installation Of Overhead Water Tanks Pvc (4 – Units – 2000 Gals) With 2 Hp Electric Motor Pumps With Accessories – 2 Units D. Plumbing Works For Water Storage Tank (cistern) E. Installation Of 96 Units Water Meter (sub Meter) For Individual Units And 2 Units Water Meter For The Two (2) Buildings F. Installation Of Downsprouts With Catch Basins At The Ground Level. G. Installation Of Fire Hose Cabinets With Hose Racks (8 Units) H. Installation Of Fire Extinguishers – 8 Units I. Installation Of Brass Siamese Twin Connectors – 2 Units J. Installation Of Smoke Detectors And Sprinkler System 14. Electrical Works (for 2 Buildings) A. Lay-out Of Flexible Tubes, Utility Boxes And Panel Boards B. Installation Of Electrical Rough-ins C. Installation Of Electrical Fixtures D. Installation Of 96 Units Kwh Meter (sub Meter) For Individual Units And 2 Units Kwh Meter For The Two (2) Buildings (common Areas) And One (1) Unit Main 3 – Phase Metering E. Installation Of Fire Alarm Bell For Every Floor For The Two (2) Buildings. F. Energize G. Fdas (fire Safety Provisions) H. Installation Of 3-75 Kva I – Phase Distribution Transformer For The Entire Two (2) Buildings. Terms Of Reference For Abovementioned Project, To Wit; 1. It Is So Required That The Contractor Who Is The Winning Bidder Must Implement The Project Duly Awarded To Them And Not To Be Performed By A Sub-contractor. It Has Been Observed That The Main Contractor After Winning The Bid Will Hire A Sub-contractor And Do The Assigned Tasks For Them. This Act Must Be Regulated And Discouraged. 2. The Contractor Who Participates In Bidding And Will Win The Bid Must Own The Equipment To Be Used For The Project So As Not To Hamper/delay The Project Implementation And Completion. However, Should Lease Of Equipment Be Necessary, The Lease Contract Must Provide That The Equipment Be At The Work Site For The Duration Of The Construction Activity. 3. Since Occupational Safety And Health Program Is A Pay Item In The Contracted Projects The Contractor Must Ensure Safety Above All In All Site Activities And Wearing Of Ppe’s – Personal Protective Equipment For The Workers On Field Must Be Adhered To Carried Out. Purpose: Construction Of Socialized Housing For “banilad Plainsview Housing” Located In Barangay Banilad Approved Budget For The Contract: Php93,425,506.47 Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening. The City Of Dumaguete Now Invites Bids For Job Order: Construction Of Socialized Housing For “banilad Plainsview Housing” Located In Barangay Banilad. Bidders Should Have Completed And/or Accepted, Within 3 Years From The Date Of Submission And Receipt Of Bids, A Contract Similar To The Project. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly Section Ii, Instruction To Bidders. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criteria As Specified In The Implementing Rules And Regulations Part A (irr-a) Of Republic Act 9184 (r.a. 9184), Otherwise Known As The “government Procurement Reform Act”. Bidding Is Restricted To Filipino Citizen/sole Proprietorships, Partnerships, Or Organizations With At Least Sixty (60%) Interest Or Outstanding Capital Stock Belonging To Citizens Of The Philippines, And To Citizens Or Organizations Of A Country The Laws Or Regulations Of Which Grant Similar Rights Or Privileges To Filipino Citizens, Pursuant To Ra 5183 And Subject To Commonwealth Act 138. Interested Bidders Must Secure Eligibility Requirements And Bid Documents From The Secretariat, Bids And Awards Committee, Office On General Services, City Hall Compound, Dumaguete City. For More Information, Contact The Bids And Awards Committee Secretariat, Office Of General Services, City Hall Compound, Dumaguete City, Tel. No. 22-524-29/225-3956/225-5871. A Complete Set Of Bidding Documents May Be Purchase By Interested Bidders From November 07, 2024 To November 28, 2024 From Address Above And Upon Payment Of A Nonrefundable Fee For The Bidding Documents In The Amount Of P50,000.00. The Schedule Of Activities Is As Follows: 1. Issuance Of Bid Documents November 07, 2024 2. Pre-bid Conference November 14, 2024 10:00 A.m. 3. Submission And Opening Of Bids November 28, 2024, 10:00 A.m. Sealed Bids/proposals Will Be Received At The Office Of General Services, City Hall Compound, Dumaguete City Not Later Than November 28, 2024 And Bid Opening Shall Be On Thursday, November 28, 2024 At 10:00 (ten O’clock) In The Morning At The Office On General Services, City Hall Compound, Bids Will Be Opened In The Presence Of The Bidders Or Representatives Who Choose To Attend. Late Bids Shall Not Be Accepted. Prospective Bidders Must Not Be Related To The Head Of The Procuring Entity Or Any Member Of The Bids And Awards Committee Or Its Secretariat Either By Consanguinity Or Affinity Up To The Third Civil Degree. All Bids Shall Be Accompanied By A Bid Security Payable To The City Of Dumaguete In Any Of The Acceptable Forms And In The Amount Stated In Sec. 27 Of Ra 9184. The Same Shall Guarantee That, After Receipt Of The Notice Of Award, The Winning Bidder Shall Enter Into Contract With The City Of Dumaguete Within Ten (10) Calendar Days. Copies Of This Invitation Are Posted At The Gso Bulletin Board, Dumaguete Public Market Complex, Province Of Negros Oriental General Services Office Bulletin Board, Philgeps And Dumaguete City Engineer's Office Bulletin Board. The Bids And Awards Committee Reserves The Right To 1) Reject Any Or All Bids, 2) Waive Any Defects Or Informalities Therein, 3) Or Accept Any Bids/ Or Offer/s Which It May Consider To Be Most Advantageous And Beneficial To The Government 4) To Reject All Bids At Any Time Prior To Contract Award, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. Dumaguete City, November 06, 2024 Atty. Camelo D. Pidor, Jr. Chairman

Department Of Public Works And Highways - DPWH Tender

Philippines
Closing Date20 Dec 2024
Tender AmountPHP 4.9 Million (USD 83.8 K)
Details: Description Invitation To Bid For 25ka0049 Construction (completion) Of Multi-purpose Building,brgy. Halapitan, San Fernando, Bukidnon Barangay Halapitan, San Fernando, Bukidnon 2nd Ld 1. The Department Of Public Works And Highways – Bukidnon 1st District Engineering Office, Malaybalay City, Through The Gaa 2025 Intends To Apply The Sum Of Php 4,950,000.00 Being The Approved Budget For The Contract (abc) To Payments Under The Contract 25ka0049 Construction (completion) Of Multi-purpose Building,brgy. Halapitan, San Fernando, Bukidnon Barangay Halapitan, San Fernando, Bukidnon 2nd Ld. Bids Received In Excess Of The Abc Shall Be Automatically Rejected At Bid Opening 2. The Department Of Public Works And Highways – Bukidnon 1st District Engineering Office, Malaybalay City Through Its Bids And Awards Committee Now Invites Bids For The Hereunder Works: Contract Id : 25ka0049 Contract Name : Construction (completion) Of Multi-purpose Building,brgy. Halapitan, San Fernando, Bukidnon Contract Location : Barangay Halapitan, San Fernando, Bukidnon 2nd Ld Scope Of Work : Construction Of Multi Purpose Building(stage) Scope : A.) Construction Of Septic Vauilt B .)installation Of Aluminum Glass Sliding Windows; C .)installation Of Aluminum Glass Fixed Windows; D.)installation Of Aluminum Glass Awning Windows; E.)installation Of Fire Exit Steel Doors & Aluminum Framed Glass Swing Door; F.)installation Of Solid Door Panels & Flush Door Panels; G.) Fabrication And Installation Of Fascia Frame Board, And Railings; H.) Installation Of Ceiling Cement Board, I.) Installation Of Canopy, Pre-painted Roofing, Flashing And Gutters,; J.) Installation Of Glazed Tiles, Unglazed Tiles With Tile Trims; K.) Painting Works; L.) Straight To Finish Floorings; Fabrication Of Railings; M.) Electrical Such As Lightings; N.)installation Of Sewer Lines, Downspout, Plumbing & Plumbing Fixtures & Water Lines; O.)installation Of Exhaust Fans And Fire Extinguisher, O.) Application On The Perimeter Of The Building After Construction Is Complete. Complete As Per Approved Pow, Plans, And Specifications. Approved Budget For The Contract (abc) : Php 4,950,000.00 Source Of Fund : Cssp-basic Infrastructure Program (gaa 2024) Contract Duration : 140 Cd Bid Documents Fee In Php : Php5,000.00 3. Prospective Bidders Should Be (1) Registered With And Classified By The Philippine Contractors Accreditation Board (pcab) With Pcab License Category Of C & D For Small B. The Description Of An Eligible Bidder Is Contained In The Bidding Documents, Particularly, In Annex Ii-1.1 B Section Ii And Iii Of Bidding Documents. Contractors/applicants Who Wish To Participate In This Bidding Are Encouraged To Enroll In The Dpwh Civil Works Application (cwa) At The Dpwh Procurement Service (prs), 5th Floor, Dpwh Bldg., Bonifacio Drive, Port Area, Manila, While Those Already Enrolled Shall Keep Their Records Current And Updated. The Contractor’s Eligibility To Bid On The Project Will Be Determined Using The Dpwh Contractor Profile Eligibility Process (cpep) And Subject To Further Post-qualification. Information On Registration Can Be Obtained From The Prs During Working Weekdays From 7:00 Am To 4:00 Pm Or At The Dpwh Website Www.dpwh.gov.ph. 4. Bidding Will Be Conducted Through Open Competitive Bidding Procedures Using Non-discretionary Pass/fail Criterion As Specified In The 2016 Revised Implementing Rules And Regulations (irr) Of Republic Act 9184 (ra 9184), Otherwise Known As The "“government Procurement Reform Act”. The Contract Shall Be Awarded To The Lowest Calculated Responsive Bidder (lcrb) Who Was Determined As Such During Post-qualification. 5. Interested Bidders May Obtain Further Information From The Department Of Public Works And Highways – Bukidnon 1st District Engineering Office, Malaybalay City And Inspect The Bidding Documents At Capitol Compound, Malaybalay City During Weekdays From 8:00 Am – 5:00 Pm. 6. A Complete Set Of Bidding Documents May Be Acquired By Interested Bidders On November 27, 2024, From The Address Below And Upon Payment Of The Applicable Fee For The Bidding Documents, Pursuant To The Latest Guidelines Issued By The Gppb, In The Amount Of Php5,000.00. 7. It May Also Be Downloaded Free Of Charge From The Website Of The Philippine Government Electronic Procurement System (philgeps), And The Website Of The Procuring Entity, Provided That Bidders Shall Pay The Applicable Fee For The Bidding Documents Not Later Than The Submission Of Their Bids. 8. The Department Of Public Works And Highways – Bukidnon 1st District Engineering Office, Malaybalay City Will Hold A Pre-bid Conference On December 04, 2024, 10:00 Am Via Zoom With Meeting Id: 923 1132 1070 And Passcode: Dpwh2024 And The Bidder May View Through Live Streaming (youtube Channel) Dpwh Bukidnon 1st Deo Procurement Ls, Which Shall Be Open To Prospective Bidders. 9. Bid Submission Maybe Done Manually Or Electronically/online. However, Bidders Should Only Select One Mode Of Submission, Either Manual Or Electronic. Similar To Manual Submission, The Guidelines For The Preparation And Submission Of An Electronic Bid Are Contained In The Bds. 10. Bids Must Be Duly Received By The Bac Secretariat At The Address Below For Manual Submission Or At Electronicbids_bukidnon1@dpwh.gov.ph For Electronic Submission On Or Before December 20 2024 Until 10:00 Am. All Bids Must Be Accompanied By A Bid Security In Any Of The Acceptable Forms And In The Amount Stated In Itb Clause 18. 11. Bid Opening Shall Be On December 20, 2024, 10:00 Am At Conference Room, Dpwh-bukidnon 1st Deo. Bids Will Be Opened In The Presence Of The Bidders’ Representatives Who Choose To Attend At The Address Below. Late Bids Shall Not Be Accepted. 12. The Department Of Public Works And Highways – Bukidnon 1st District Engineering Office, Malaybalay City Reserves The Right To Reject Any And All Bids, Declare A Failure Of Bidding, Or Not Award The Contract At Any Time Prior To Contract Award In Accordance With Section 41 Of Ra 9184 And Its Irr, Without Thereby Incurring Any Liability To The Affected Bidder Or Bidders. 13. For Further Information, Please Refer To: Rosmendo C. Bongocan, Jr. Engineer Iii Head, Procurement Unit Telefax No. (088) 813-2087 Cellphone No.09178765473 Bongocan.rosmendo_jr@dpwh.gov.ph 14. You May Visit The Following Websites: For Downloading Of Bidding Documents: Www.dpwh.gov.ph And Philgeps Website For Online Bid Submission: Electronicbids_bukidnon1@dpwh.gov.ph Approved By: Sarah Jane B. Lagrama Bac Chairperson Date Of Publication: November 27, 2024
1401-1410 of 1600 active Tenders