Electronics Equipment Tenders

Ministry Of Transportation And Infrastructure Tender

Electronics Equipment...+1Electrical and Electronics
Canada
Closing Date25 Apr 2028
Tender AmountRefer Documents 
Supply Of Highway And Weather Cameras & Components

Gmina Rinsk Tender

Others...+2Electronics Equipment, Electrical and Electronics
Corrigendum : Closing Date Modified
Poland
Closing Date18 Jun 2025
Tender AmountRefer Documents 
Delivery of white cabbage, carrots, onions, red beets and apples to the Prison in Zamość Delivery of cucumbers to the Prison in Zamość Delivery of tomatoes to the Prison in Zamość Delivery of young potatoes to the Prison in Zamość

Gmina Chaykov Tender

Electronics Equipment...+2Electrical and Electronics, Solar Installation and Products
Corrigendum : Closing Date Modified
Poland
Closing Soon10 Jun 2025
Tender AmountRefer Documents 
1. The subject of the Order are construction works consisting in the extension and reconstruction of the District Road No. 1810 at ul. Wolska in Stanisławów Drugie (Nieporęt commune) in the scope of construction of a pavement and an exit road as well as raising a pedestrian crossing along with its lighting and adaptation of the road infrastructure as part of the task entitled "Reconstruction of Pedestrian Crossings on District Roads". 2. Within the scope of the Subject of the Order, it is necessary to perform the following works, consisting in: 1) Expansion (the scope is carried out on the basis of the Decision on the Road Investment Permit): A) Construction of a sidewalk made of concrete cubes, 6 cm thick, with a nominal width of 2.0 MI 2.5 m, limited by road curbs raised from the side of the roadway and the edge of the sidewalk from the side of the shoulder, B) Construction of an exit from concrete cubes, thickness 8 cm, roadway width 5 m, C) Construction of a pole stand as a construction of road lighting of the existing passage with the use of one pole Type Cc 6 M 60/144/3, Height 6 M, Column Diameter 60/144 On Ready Prefabricated Foundation. The project assumes the installation of the luminaire directly on the pole (without the extension arm). The designed lighting will be powered from the existing pole located in the shoulder on the northern side of the roadway using the Yakxs cable, and 2) Reconstruction (scope performed on the basis of a construction notification or performance of other construction works): A) Reconstruction of the roadway consisting in raising it over a length of 10 Mb. , Changing the surface from asphalt concrete to a surface made of concrete cobblestones, B) Renovation of the roadway made of asphalt concrete at a length of 12.5 Mb. From the designed elevation, C) Renovation of the sidewalk on the northern side of the roadway and construction of the sidewalk on the southern side, along with the construction of one individual exit, D) Construction of lighting for the planned pedestrian crossing in the form of two pole stands with LED luminaires, E) Execution of linear drainage O Total Length 2x10.0 Mb., 3. The detailed scope of Works to be Performed is determined by: 1) Construction Design of the Expansion of the District Road No. 1810w Ul. Wolska in Stanisławów Drugi in the scope of construction of the sidewalk and exit and lighting of the pedestrian crossing, 2) Executive construction design for the reconstruction of the district road No. 1810w Ul. Wolska in Stanisławów Drugi in the scope of raising the pedestrian crossing along with its lighting and adapting the road infrastructure, 3) Technical Specifications for the execution and acceptance of construction works, 4) Bill of Quantities, 5) Materials for Submission, 6) Temporary Traffic Organization Design, 7) Project Permanent Movement Organization. The above-mentioned Attachments are an Integral Part of the Swz. 4. In the event of discrepancies in the Appendices to the Swz, the following hierarchy of document validity is adopted: 1) Construction and Detailed Design/Technical Design, 2) Technical Specifications for Works Execution and Acceptance, 3) Bill of Quantities. 5. The works must be performed in accordance with the specification of execution and acceptance of works attached to the Tender Documentation. 6. In the event of circumstances beyond the Contractor's control making it impossible to carry out the Works and failure to comply with the deadlines for implementation in the normal and emergency mode, the Contractor shall secure and mark the area of damaged pavements until they are repaired. 7. The Contractor shall be obliged to secure and mark the front of the works in the right-of-way. 8. In the event of damage caused by the Contractor during the Works, the Contractor shall be obliged to repair the damage, and otherwise the Employer shall deduct from the invoice issued by the Contractor in the amount of the full value of the damage. 9. Construction works related to the reconstruction and extension of the District Road No. 1810w Ul. Wolska in Stanisławów Drugi within the indicated scope are covered by the decision on the permit for the implementation of a road investment and the notification of construction or performance of other construction works. 10. The Guarantee Period for the Works being the Subject of the Order and for the Materials Delivered and Built by the Contractor is at least 36 Months. Proposing an extended warranty period in the Offer will be additionally scored in accordance with the provisions of the Swz. 11. The Contractor shall grant a warranty for the completed construction works for a period not shorter than the warranty period. 12. Pursuant to Art. 95 Para. 1 of the Public Procurement Law, in order to ensure the correct performance of the subject of the contract, the contracting authority requires the contractor or subcontractor to employ, for the duration of the contract, persons performing activities indicated by the contracting authority within the scope of contract performance, who will perform activities actually related to the subject of the contract , i.e. - Excavator-Loader Operator, - Truck and Delivery Truck Driver, - Asphalt Mixer Operator, - Roller Operator, - Paver, - Network Electrician. 13. Performing the activities indicated in Sec. 12 It consists in performing work in the manner specified in Article 22 § 1 of the Act of June 26, 1974 - Labor Code (Journal of Laws of 2022, item 1510, as amended). The above requirement does not apply to the Contractor or Subcontractor himself (including partners in partnerships), who will personally carry out the above-mentioned activities on the basis of sole proprietorship (self-employment). Determination of employment is left to the Contractor by the Employer. Method of Verification of Employment of the above. Persons and powers of the Employer in the scope of controlling the Contractor's fulfillment of the requirements related to the employment of the above persons and sanctions for non-compliance with these requirements have been included in the draft provisions of the Agreement in the Appendix to the Swz. 14. If the Swz, Announcements Related to the Proceedings, and the Detailed Description of the Subject of the Order specify the Subject of the Order by indicating Trademarks, Patents or Origins, Sources or a Particular Process which characterizes the Products or Services provided by a specific Contractor, this is for the purpose of specifying only Technical Features or Properties of Specified Equipment, Devices and Materials to be Used for the Performance of the Subject of the Order. The Ordering Party allows the use of Equipment, Devices, Equivalent Materials in such cases, in accordance with Art. 99 Para. 5 of the Act.

Procurement Services Branch Tender

Electronics Equipment...+1Electrical and Electronics
Canada
Closing Date25 Apr 2028
Tender AmountRefer Documents 
Supply Of Highway And Weather Cameras & Components

JUROMINSKI POVIAT Tender

Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Poland
Closing Soon16 Jun 2025
Tender AmountRefer Documents 
The subject of the proceedings is the supply of photocopy paper for the Provincial Police Headquarters in Gdańsk, Cbśp, Bswp, Cbzc and units of the Pomeranian Garrison. The purchase will be carried out for 12 months from the date of conclusion of the contract. If, after 12 months, the value of the delivered deliveries of the subject of the agreement is lower than the value of the contractual remuneration, the Ordering Party allows for the possibility of extending the agreement in the form of a written annex. The Agreement is subject to extension until the date of exhaustion of the value of the Contract Remuneration, not longer than 6 months beyond its validity period. Deliveries will be carried out successively, according to the needs of the Ordering Party. Draft provisions of the Agreement, Detailed Description and Method of Order Execution - Appendix No. 5 to the Swz. All Requirements specified in the Documents indicated above are Minimum Requirements and their fulfillment is mandatory. Failure to comply with the above of the Minimum Requirements will result in the Bid being rejected as inconsistent with the Contract Conditions pursuant to Art. 226 Sec. 1 Item 5 of the Public Procurement Law. The subject of the Order is not included in the list of Appendix No. 15 to the Act of August 9, 2019 (Journal of Laws 2019, item 1751) on the Mandatory Split Payment Mechanism.

305th Contracting Office, Afp Procurement Service Tender

Electronics Equipment...+1Electrical and Electronics
Corrigendum : Tender Amount Updated
Philippines
Closing Soon13 Jun 2025
Tender AmountPHP 245.3 K (USD 4.4 K)
Repair And Maintenance Other Machinery , General Repair And Maintenance Services ,305th Contracting Office, Afp Procurement Service

Gmina Labiszyn Tender

Electronics Equipment...+1Electrical and Electronics
Corrigendum : Closing Date Modified
Poland
Closing Soon12 Jun 2025
Tender AmountRefer Documents 
The subject of the order is the construction of a forest oasis - a complex consisting of a playground, an outdoor gym and a relaxation zone. The project assumes the construction of a safe, integrated into the surrounding nature, open playground on the indicated property, together with an outdoor gym and a place to relax, which is intended to become a place of rest, sport and recreation for young and old. Location of the Task: Gniezno - Surroundings Ul. Wrzesińska - Plot No. 5244/1, Obr. 0001 Gniezno A detailed description of the subject of the Order was specified in the Technical Specification, the Agreement (constituting Appendix No. 10) and in: A) Technical Design B) Technical Specification for the Execution and Acceptance of Construction Works C) Bill of Quantities The material scope of the Order includes in particular: Execution of Construction Works Including : A) Preparatory Works; B) Hardening of the Parking Square (concrete cubes); C) Execution of steps made of concrete cubes; D) Execution of sand and loam gravel surface on a natural foundation E) Execution of sand surface - playgrounds and gym F) Delivery and assembly of small architecture objects - Relaxation zone, outdoor gym, playground for younger children, playground for middle and older children G) Certification of All Devices

Public Authority CPO LT Tender

Electronics Equipment...+2Publishing and Printing, Electrical and Electronics
Lithuania
Closing Date10 Jul 2029
Tender AmountRefer Documents 
Printing And Office Equipment Orders Via Cpo Lt Electronic Catalogue

Limpopo Health Tender

Electronics Equipment...+1Electrical and Electronics
South Africa
Closing Date14 Dec 2031
Tender AmountRefer Documents 
Rendering Of Event Management Services

Province Of Aurora Tender

Electronics Equipment...+2Machinery and Tools, Electrical and Electronics
Corrigendum : Tender Amount Updated
Philippines
Closing Soon13 Jun 2025
Tender AmountPHP 109.1 K (USD 1.9 K)
Supply And Delivery Of Catering Services , Catering Services ,province Of Aurora
8021-8030 of 8377 active Tenders