Electrical Tenders
Electrical Tenders
North Central Railway - NCR Tender
Ireps
India
Closing Date28 Feb 2025
Tender AmountINR 25 Million (USD 288.5 K)
Tender Id: ELG-58-2425-PRAYAGRAJ DIVISION-ELECTRICAL/NORTH CENTRAL RLY | Description: Electrical Work In Connection With "provision Of 12m Wide Fob At Sonbhadra,
firozabad, Shikohabad, & Mainpuri Stations Under Amrit Bharat Station Scheme Of
prayagraj Division."electrical Work In Connection With "kanpur Anwarganj Cpa-
provision Of 12m Wide Fob At Kanpur Anwarganj Station Under Amrit Bharat
scheme Under Prayagraj Division."
Council Of Scientific And Industrial Research - CSIR Tender
Civil And Construction...+1Building Construction
Eprocure
India
Closing Date19 Feb 2025
Tender AmountINR 23.8 Million (USD 275.3 K)
Description: Repair And Renovation Of Staff Quarters Type-ii 45 Nos. (b-1 To B-21, B-22 To B-29 And B-40 To B-55) And Type-vi 03 Nos. (evi-1 To Evi-3) And Director Bungalow At Csir-iiim, Jammu (civil And Electrical Works)
Indian Army Tender
Machinery and Tools...+1Automobiles and Auto Parts
GEM
India
Closing Date25 Feb 2025
Tender AmountRefer Documents
Description: CATEGORY: CLUTCH MASTER CYLINDER 19 05 DIA , Release bearing
assy , 352 DIA CL Cover Assy 1 75 SPLINE SETCO , Pump
fuel transfer , Clutch Slave Cylinder , BRUSH ELECTRICAL
CONTACT SET , CE Bush , CROSS ASSY , Strainer Filter ,
Wiper Blade , Fuel Filter , Assy Drive Shaft , Lock Washer
Eastern Coalfields Limited - ECL Tender
Electrical Works...+1Electrical and Electronics
GEM
India
Closing Date15 Feb 2025
Tender AmountINR 666.1 K (USD 7.6 K)
Description: CATEGORY: Repair, Maintenance, and Installation of Plant/
Systems/Equipments (Version 2) - COAL MINES; Electrical
System or Installation, Providing and fixing of 01 nos 16 mtr
high mass Tower for lighting at SidhuKahnu Sarswati Bidya
Mandir School Lalmatia at ..
Metroselskabet I S - DENMARK Tender
Denmark
Closing Date6 Mar 2025
Tender AmountDKK 900 Million (USD 125.2 Million)
Details: Title: Cityringen Extension Nordhavn - Early Contractor Involvement
description: Metroselskabet Is Tendering For An Extension Of The Cityringen M4 Metro To Nordhavn (crnhe). Crnhe Will Consists Of Two Metro-stations From Orientkaj To Outer Nordhavn. Crnhe Is Planned As An Elevated Line. The Metro Line Will Be Crossing Skudeløbet In Nordhavn. The Extension Is Expected To Ready To Open In 2030. The Existing M4 Line In Nordhavn Is An Attractive And Function Part Of The Network, But The Crnhe Project Aims To Improve In Terms Of Sustainability, Passenger Experience And Operation. The Project Is Divided Into Two Major Contracts: Integrated Works Contract (iwc Contract) – This Contract Overall Covers Design, Civil Works, Permanent Way And Access Control And Is Procured By This Contract Notice. For Further Details On The Services And Works Included In The Contract See Below And For At Detailed Description Please Refer To: Scope Of Works, Doc Id.cr-ms-gen=nhe-cg-con-spe-000004. Transportation System Contract (ts-contractor) - All Other Transportation Systems. Besides The Two Major Contracts Metroselskabet Will Be Entering Into Contract With Different Consultants On Other Parts Of The Project, Such As Areas And Rights, Environmental Impact Assessment Consultancy Etc. The Iwc Contract Covers The Following Disciplines: Viaducts & Elevated Structures, Including Sub-structure Elevated Stations Temporary Works For Completion Of The Permanent Works. Architectural Finishes Sustainability & Carbon Initiatives Alignment & Permanent Way Noise Screens, Noise & Vibration Monitoring And Mitigation Geology & Hydrogeology Technical Buildings & Installations Electrical Works & Power Supply For Stations And Elevated Structures Mechanical Works For Stations And Elevated Structures Access Control Traction Power (3rd Rail) Interface To Scada Preparatory Works Technical Safety (jernbanesikkerhed) Technical Interfaces Finishing Works Worksites Identification & Planning For Utility Relocation Climate Protection Strategy Environmental Management Risk Management Interfaces With City Development, Østlig Ringvej. Construction Programming Construction Budgeting The Iwc Might Also Be Asked To Do Some Early Works, Such As Diversion Of Utilities And Public Road Diversions, Certain Utility Diversions, Demolition Or Other Tasks Identified As Part Of The Collaboration Phase. Crnhe Is One Of The First Larger Projects Where Metroselskabet´s Ambitions Of Reducing The Climate Impact By 50% Will Be A Significant Factor Impacting The Solution Of The Project. And Metroselskabet Would Like To Benefit From The Contractor´s Knowledge And Experiences With The Construction Industry. Metroselskabet Has Assessed That To Achieve The Reduction Of The Climate Footprint It Is Necessary For Metroselskabet And The Contractor To Work Very Closely Together By Bringing In The Contractor And His Design Team (integrated Works Contractor) At A Very Early Stage Of The Project. Thus, Metroselskabet Has Decided To Procure The Crnhe As An Early Contractor Involvement (eci) Project. After The Designing Of The Metro Line, Metroselskabet Will Enter Into A Design And Build Contract (based On Abt18) With The Integrated Works Contractor (iwc) The Project Is Divided Into Two Main Phases With Underlying Stages And Gate Stages: Phase 1: Collaboration Phase – A Phase Where The Project Will Be Designed And Developed In Close Collaboration Between Metroselskabet, The Integrated Works Contractor. The Collaboration Phase Is Contractually Regulated By A Collaboration Agreement, Collaboration Terms And Conditions, Doc. Id. Cr-ms-gen=nhe-cg-con-spe-000002-att14 And A Conditional Design And Build Contract (abt18). Doc. Id Cr-ms-gen=nhe-cg-con-spe-000002. The Collaboration Agreement Can Be Terminated By The Integrated Works Contractor And/or Metroselskabet At Convenience. The Conditioned Abt18 Contract Will Enter Into Force If The Pre-requisites, Are Met. Please Refer To The Design And Build Contract, Doc Id: Cr-ms-gen=nhe-cg-con-spe-000002, Section 1.1. In The Collaboration Phase The Integrated Works Contractor Is Liable For The Design As Well As The Time Schedule, Pricing And Constructability Of The Project. Also, The Contractor Should Focus On Ensuring A Close Collaboration With The Transportation System Contractor, Eia Consultant, The Areas And Rights Consultant And Possible Early Works Contractors. The Engineers And The Architects Of The Integrated Works Contractor Are Expected To Focus On The Development Of The Design, Reducing Carbon Emissions And Improving Passenger Experience. Phase 2: Construction Phase – After Signing The Abt18 Contract, The Project Moves Into The Construction Phase. The Construction Consists Of A Detailed Design Stage And A Construction Stage. In The Construction Phase The Integrated Works Contractor Is Expected (among Other Things) To Keep Focus On Collaborating Closely With Metroselskabet And The Transportation System Contractor, Reducing The Carbon Footprint, Time, Costs And Quality During Construction The Applicant Should Apply For Prequalification With A Design Team - Both Architects And Engineering Discipline Consultants. Metroselskabet Will Focus On The Architectural Appearance And Materiality Proposed For The Two New Stations. The Architecture Should Comply With The Ambition Of Significantly Reducing The Carbon Footprint. Metroselskabet Would Like To Be Challenged By The Architects Of The Two New Stations And The Possibility For Development Under/over The Viaduct. The Applicant Is Encouraged To Include An Architect With Substantial Experience With Similar Complex And Onerous Functional Type Projects, Yet Providing Creative And Innovative Architectural Solutions, While Maintaining High Level Of Functional Clarity In The Design.
Joint Stock Company Kazakhstan Electricity Grid Operating Company KEGOC Tender
Kazakhstan
Closing Soon12 Feb 2025
Tender AmountKZT 7.1 Million (USD 13.7 K)
Description: "Fire-prevention plowing of power transmission lines of electrical grid facilities of the branch of JSC "kegos" "aktyubinsk MES" (non-core activity)".
11-20 of 9400 active Tenders