Architect Tenders
Architect Tenders
Abbeyfeale Community Council Tender
Civil And Construction...+3Others, Consultancy Services, Civil And Architectural Services
Ireland
Closing Date19 Mar 2025
Tender AmountEUR 50 K (USD 52.4 K)
Description: Ireland – Architectural Services For Buildings – Architect Led Integrated Consultant Team Consultancy Services For Preparation Of The Abbeyfeale Streetscape Enhancement Plan
VETERANS AFFAIRS, DEPARTMENT OF USA Tender
Civil And Construction...+3Building Construction, Consultancy Services, Civil And Architectural Services
United States
Closing Soon28 Feb 2025
Tender AmountRefer Documents
Details: Synopsis: introduction: in Accordance With Federal Acquisition Regulation (far) 10.002(b)(2), This Sources Sought Notice Is For Market Research And Information Purposes Only At This Time And Shall Not Be Construed As A Solicitation Or As An Obligation On The Part Of The Department Of Veterans Affairs (va). the Department Of Veterans Affairs, Veterans Health Administration (vha), Program Contracting Activity Central (pcac) Is Conducting A Market Survey And Is Seeking Potential Sources For Construct Radiation Oncology Building Design-build At The Jerry L. Pettis Memorial Veterans' Hospital Located In Loma Linda, California. project Description: design-build (db) Services Include Architect And Engineering (db A/e) Design Services, Site Preparation And Db Construction (db C) Services For A New Building Construction Of A Radiation Oncology Clinic At Va Loma Linda Main Campus. The Scope Of This Project Covers The Design And Construction Of A New Stand-alone Radiology Oncology Building, And Includes All Surveys Of The Property, Site Investigations, Existing Service And Utility Ties, Geotechnical Studies Describing Sub-surface Conditions, And Other Latent Or Concealed Physical Conditions At The Site To Be Completed By The Design-build (db) Firm.
the Db Firm Shall Furnish All Ae Design Services, Materials, Supplies, Equipment, Investigations And Project Supervision, And Construction Period Services Associated With This Contract. architect Engineer (a/e) Services Include Site Visits, Field Investigation, Studies, And User Interviews To Prepare Drawings, Specifications, And Cost Estimates For All Facets Of Work And Disciplines/trades To Facilitate A Construction Project To Complete Site Preparation And Implementation, Of The Following Equipment: Two (2) Linear Accelerators (linac), One (1) Computed Tomography (ct) Based Simulator, Various Computers And Monitors For Image Display, Dose Calculations, Medical Documentation, And Scheduling. Design Work Shall Include Special Requirements For Linac Vaults, Ct Simulator, Emergency Power, Exam Rooms, And Supplemental Spaces. Design Shall Meet Va Design Guides, Manuals, And All Design Criteria And Va Master Specifications At The Va Technical Information Library (til) (www.cfm.va.gov/til). Design Shall Follow All Current Applicable Codes, Including International Building Codes (ibc), National Fire Protection Association (nfpa), Occupational Safety And Health Administration (osha), The Joint Commission (tjc) And Facility Guidelines Institute (fgi), And Ncrp And Related Authorities For Radiation Protection And Vault Shielding. the Db Contractor Shall Furnish All Labor, Materials, Supervision, And Administration For The Construction Phase Of This Contract, And Coordination With The Equipment Manufacturer S Representative For Specifications And Construction Guidance Documents Specific To Each Respective Piece Of Equipment. The Contractor Will Be Required To Utilize A Qualified Medical Physicist To Provide Radiation Calculations, Testing, And Vault Certification. procurement Information:
the Proposed Project Will Be A Competitive, Firm-fixed-price Contract Utilizing The Design-build Approach Outlined In Far Part 36.3 Two-phase Design-build Selection Procedures. The Results And Analysis Of The Market Research Will Finalize The Determination Of The Procurement Method. The Type Of Socio-economic Set-aside, If Any, Will Depend Upon The Responses To This Notice And Any Other Information Gathered During The Market Research Process. this Project Is Planned For Advertising In May 2025. In Accordance With Vaar 836.204, The Magnitude Of Construction Is Between $20,000,000.00 And $50,000,000.00 (*lower End Of This Range). The North American Industry Classification System (naics) Code 236220 (size Standard $45 Million) Applies To This Procurement. The Duration Of The Project Is Currently Estimated At 780 Calendar Days From The Issuance Of A Notice To Proceed. capability Statement:
respondents Shall Provide A Capabilities Statement To Include The Following Information: section 1: Provide Company Name, Duns Number And Unique Entity Identifier (uei), Company Address, Point-of-contact Name, Phone Number And Email. section 2: Provide Company Business Size Based On Naics Code 236220. Also, Provide Business Type (i.e., Large Business, Small Business, Service-disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-owned Small Business, Hub Zone Small Business, Etc.). section 3: Provide A Statement Of Interest In The Project. section 4: Provide The Prime Contractor S Available Bonding Capacity In The Form Of A Letter Of Intent From Your Bonding Company With This Submission. *please Ensure That The Individual Bonding Capacity Meets The Minimum Vaar Magnitude Of Construction Listed Above ($20m). section 5: Provide The Type Of Work Your Company Has Performed In The Past In Support Of The Same Or Similar Requirement. This Section Is Important As It Will Help To Determine The Type Of Socio-economic Set-aside, If Any. Please Provide The Following In Your Response: provide A Maximum Of Three (3) Projects Completed Within The Last Ten Years (10) Years In Which The Offeror S Design-build Team Has Worked Together On Previous Design-build Contracts Similar In Size, Magnitude, Complexity, And Scope To This Project. Projects Must Demonstrate A Respondent S Design-build Experience As A Prime Construction Contractor Directly Responsible To The Owner And Managing Multiple Subcontractors.
note: If A Prime Contractor Does Not Have Design-build Experience, They Are Permitted To Provide Up To Three (3) Relevant Non-design-build Projects That Are Completed In Clinical, Hospital Or Other Medical Related Use Space Similar In Size, Magnitude, Complexity, And Scope To This Project. The Designer For The Team Can Also Provide Up To Three (3) Relevant Projects That Fall Under The Requested Criteria For The Project. A Maximum Total Of Six (6) Projects May Be Submitted. *all Submission Requirements For These Projects Remain The Same And Are Listed Above.
describe Your Self-performed** Effort (as Either A Prime Or Subcontractor) In The Project Samples. Describe Self-performed Work In Terms Of Dollar Value And Description. **self-performed Means Work Performed By The Offeror Themselves, Not Work Performed By Another Company For Them For Any Of The Project Examples Provided provide A Response To Each Of The Following Items:
describe Your Company S Experience Managing (prime) A Construction Project Of This Magnitude (~$20m)?
discuss Your Specific Experience With Previous Radiation Oncology Projects, Such As Linear Vaults, Shielding Of Nuclear Medicine And Other Radiological Oncology Spaces. (preferably Including The Construction Of Linear Accelerator Vaults). What Was The Dollar Value And Project Title, And What Was Your Role? it Is Requested That Interested Contractors Submit A Response (electronic Submission) Of No More Than Fifteen (15) Single Sided Pages, Single-spaced, 12-point Font Minimum That Addresses The Above Information. This Response Must Be Submitted As A Single Application-generated (not Scanned) Pdf Document That Is Less Than Or Equal To 7mb In Size. Please Note That Hard Copies Will Not Be Accepted. Responses Must Include The Sources Sought Number And Project Title In The Subject Line Of Their E-mail Response. Responses Shall Be Submitted Via Email To The Primary And Secondary Points Of Contact Listed Below By February 28, 2025 At 2:00 Pm Et. No Phone Calls Will Be Accepted. the Capabilities Statement Submitted In Response To This Sources Sought Shall Not Be Considered To Be A Bid Or Proposal. This Notice Is For Information And Planning Purposes Only And Is Neither To Be Construed As A Commitment By The Government Nor Will The Government Pay For Information Solicited. No Evaluation Letters And/or Results Will Be Issued To The Respondents. After Completing Its Analyses, The Government Will Determine Whether To Limit Competition Among The Small Business Categories Listed Above Or Proceed With Full And Open Competition As Other Than Small Business. at This Time No Solicitation Exists; Therefore, Please Do Not Request A Copy Of The Solicitation. If A Solicitation Is Released It Will Be Synopsized In Contract Opportunities At Https://sam.gov/. It Is The Potential Offeror's Responsibility To Monitor This Site For The Release Of Any Solicitation Or Synopsis. contracting Office Address: vha Program Contracting Activity Central (vha-pcac)
6100 Oak Tree Blvd. Suite 490
independence, Oh 44131 primary Point Of Contact:
bailey Donato
contract Specialist
bailey.donato@va.gov secondary Point Of Contact: jennifer Braaten
contracting Officer
jennifer.braaten@va.gov
DEPT OF THE NAVY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date6 Mar 2025
Tender AmountRefer Documents
Description: Indefinite Delivery/indefinite Quantity Contract For Architect-engineer Services For Civil/structural Engineering Projects In Japan
Municipality Of Malenovice Tender
Others
Czech Republic
Closing Date17 Mar 2025
Tender AmountCZK 27.3 Million (USD 1.1 Million)
Sewerage of the Municipality of Malenovice with the Mdčov System
Indian Army Tender
Other Consultancy Services...+1Consultancy Services
GEM
India
Closing Soon27 Feb 2025
Tender AmountINR 168 K (USD 1.9 K)
Description: CATEGORY: Hiring of Consultancy Services - Percentage based -
Technology Consultants; Architect - Data, Engineering
Design; Yes; Hybrid(As specified in scope of work)
DEPT OF THE ARMY USA Tender
Civil And Construction...+2Consultancy Services, Civil And Architectural Services
United States
Closing Date6 Mar 2025
Tender AmountRefer Documents
Details: Architect/engineering Services To Support The Federal Bureau Of Prisons Future Design Initiative For A New Medium-security Federal Correctional Institution (fci) And Minimum-security Federal Prison Camp (fpc). a Market Survey Is Being Conducted To Identify Firms Interested In This Requirement And Determine If There Are A Reasonable Number Of Interested Small Business Concerns To Set This Future Requirement Aside For Them. If Your Firm Is A Large Business, Small Business, Certified Hubzone, 8a, Woman-owned Small Business Or Service-disabled Veteran Owned Small Business (sdvosb) And You Are Interested In This Project Please Respond Appropriately. the Usace, Louisville District Has A Requirement For A New Single-award Task Order Contract (satoc) Indefinite Delivery / Indefinite Quantity (idiq) For Architect/engineer (a/e) Services. The Satoc Idiq Will Support The Federal Bureau Of Prisons (bop) Project Via The Preparation Of A Full Design Package To Be Used In The Advertisement And Award Of A Construction Project For A New Medium-security Fci And Minimum-security Fpc In The Mid-atlantic Region, To Include Kentucky, Tennessee, North Carolina, Virginia, West Virginia, And Maryland. Projects Have The Potential To Be Located In Remote Areas Away From Larger Metropolitan Areas. Aspects Of The Design Effort Will Be Awarded By Individual Firm-fixed Price Task Orders. The Maximum Cumulative Idiq Contract Will Not Exceed A Capacity Of $150,000,000. The Contract’s Ordering Period Will Consist Of A Ten-year Base Period With No Option Years. The Required A/e Services To Be Provided Under This Contract Will Be Multidisciplinary In Nature. the Project Will Construct A Medium-security Fci And Minimum-security Fpc On A 500-acre Site In Accordance With The Record Of Decision Signed By The Bop On October 28, 2024. Approximately 200 Acres Will Be Developed, With The Remaining Site Undisturbed. Locate The Development In The Center Of The Site To Maintain As Much Of The Natural Environment As Possible. The Project Shall Incorporate A Design That Balances The Mission Of The Fci And Fcp With The Surrounding Area; Ensure That Architectural Design Is Compatible With The Character Of The Mid-atlantic Region; Promote A Compact Development Plan; And Implement A Traffic Management Plan. Earthwork And Related Site Disturbance Is To Be Minimized By Developing The Site In A Compact, Campus-style Arrangement. The Project Will Include: medium-security Fci. Medium-security Fcis Have Strengthened Perimeters (often Double-fences With Electronic Detection Systems), Cell-type Housing, A Wide Variety Of Work And Treatment Programs, And An Even More Stringent Inmate-to-employee Ratio Than Low-security Institutions, Providing Even Greater Controls. The Proposed Fci Would Be Designed To House 1,152 Inmates. minimum-security Fpc. Also Known As A Satellite Work Camp; Characterized By Dormitory-style Housing, A High Inmate-to-employee Ratio, And The Absence Of Security Fences. These Institutions Are Work-and Program-oriented. The Proposed Fpc Would Be Designed To House 256 Inmates. visitors Center. recreational Facilities. training Center, Including An Outdoor Firing Range (1,033 Sf) And Staff Training Building (9,795 Sf). warehouse (35,295 Sf). garage/landscaping Building (7,028 Sf). central Utility Plant (13,100 Sf). supporting Facility Infrastructure Shall Be Provided, To Include: potable Water. Provide An Elevated 500,000-gallon Water Storage Tank Sufficient To Meet Daily Water Use And Fire Flow Requirements. Water Usage Estimates Can Be Provided Based On Current Physical Capacity Of Inmates For A Medium-security Institution And Prison Camp. Water Service Is To Be Provided By The Local Municipality. wastewater Management. Provide A Wastewater Screening Facility Connecting To Existing Sanitary Sewer Infrastructure, Including A Lift Station. provide Access Roads, Security Perimeter Road, Parking Lots And Delivery Loading Areas. Two Parallel, Chain Link And Razor Wire Fences Equipped With Security Sensors Would Be Placed Around The Perimeter Of The Fci. The Fence Would Be Approximately 12 Feet High. Site Lighting Shall Consist Of 100-feet High Mast Lighting Poles Placed Along The Security Perimeter Road Around The Correctional Facility, In The Parking Lots, And Around The Buildings. The Lighting Would Include Hooded Light-emitting Diode (led) Light Fixtures To Provide A Minimum Of 1.5-foot Candles Of Illumination. The Number And Mix Of Light Sources Used To Illuminate The Secure Compound Are Selected For The Ability To Relight The Facility Quickly In The Event Of A Power Outage. naics Code Is 541330- Engineering Services. All Interested Firms Are Asked To Provide Responses To This Market Survey. Each Firm Is Asked To Identify Its Size Status (large Business, Small Business, Certified Hubzone, 8a, Woman-owned Small Businesses Or Service-disabled Veteran Owned Business) As Part Of Its Response. Contractors Should Respond To This Survey By Email On 6 March 2025 By 2:00 Pm Eastern Time. responses Should Include: 1. Identification And Verification Of The Company’s Size Status To Include Small Business Status, If Applicable. 2. Contractor’s Unique Identifier Number And Cage Code(s). 3. Descriptions Of Experience – Interested Design Firms Must Provide No More Than Three (3) Example Projects With A Fully Complete Design And Construction Of The Design Being Substantially Complete (approximately 95 Percent Complete) Within The Past Fifteen (15) Years. Submitted Projects Should Be Examples Of Projects Where The Interested Firm Served As The Designer Of Record For The Project. Each Project Must Include The Name, Title, Project Role, E-mail Address, And Telephone Number Of At Least One Reference. References May Be Used To Verify Project Size, Scope, Dollar Value, Percentages, And Quality Of Performance. Example Projects Must Be Of Similar Size And Scope. Projects Similar In Scope To This Project Include: design Of Federal Correctional Facilities To Include Fci And Fpc, To Include Supporting Facilities Such As Visitors Centers, Recreational Facilities And Firing Ranges. projects Similar In Size To This Project Include: facilities With A Minimum Of 500,000 Sf Including Earthwork Of At Least 5,000,000 Cu Yd And All Site Utility And Supporting Infrastructure. based On The Information Above, For Each Project Submitted, Include: current Percentage Of Construction Complete And The Date When It Was Or Will Be Completed. scope Of The Project. size Of The Project. the Dollar Values Of The Design And Construction Contracts And Whether It Was Design-bid Build Or Design-build. the Aspects And Dollar Value Of The Design That Were Self-performed As The Designer Of Record. for Each Project, Identify Those Design Elements For Which Subcontractors Were Utilized. note: Total Submittal Package Shall Be No Longer Than 8 Pages. Please Only Include A Narrative Of The Requested Information; Additional Information Will Not Be Reviewed. email Responses To Brandon Gatz Brandon.h.gatz@usace.army.mil. If You Have Questions, Please Contact Brandon Gatz At Brandon.h.gatz@usace.army.mil . This Is Not A Request For Proposal And Does Not Constitute Any Commitment By The Government. Responses To This Sources Sought Notice Will Be Used By The Government To Make Appropriate Acquisition Planning Decisions. All Interested Sources Must Respond To Future Solicitation Announcements Separately From Responses To This Market Survey.
Don Emilio Del Valle Memorial Hospital Tender
Civil And Construction...+1Building Construction
Philippines
Closing Date11 Mar 2025
Tender AmountPHP 65 Million (USD 1.1 Million)
Details: Description Subject : Design And Build Of Dedvmh Ob Building Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives The Purpose Of This Project Is To Repair And Expand The Existing Ob Building To Provide Patients And Healthcare Workers With A More Spacious And Comfortable Area By Improving Its Ventilation, Air Conditioning, Lighting And Ensuring That The Size, Layout, And Functions Of The Structure Meet Their Diverse Healthcare Needs. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor B. Second Floor C. Third Floor (expansion) D. Roof Deck All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Delivery Complex - Ob-gyne Emergency Department - Neonatal Intensive Care Unit (nicu) - Chief Of Medical Professional Staff (cmps) Office - Ob-gyne Wards / Recovery Rooms - Conference Room / Training Rooms - Offices - Open Space For Mechanical Outdoor Units And Equipment Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Ob-gyne Building. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To: Review And Confirm The Submitted Design Documents. Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule. Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From Foundation Up To Roof Deck (entire Building); Includes Slabs, Beams And Girders Of Up To Roof Deck D) Architectural Works I) Exterior Walls – All Exterior Wall At From Ground Floor Up To Roof Deck Including Plastering Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits From Ground Floor To Roof Deck Including Cable Tray Ii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iii) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers Iv) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. V) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Drainage System I) Electronics / Auxiliary Works - At Functional Areas: Nurse Call Systems, Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). E. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. F. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. G. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. H. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To: Medium-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 6-storey Building. Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 15 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 10 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 10 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 10 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Ob Building (shall Not Exceed Php 3,500,000.00 Plus 6% Of Excess Of Php 50,000,000.00) 5%-6% Of Abc Construction Of Dedvmh Ob Building 94%-95% Of Abc Total Abc Php 65,000,000.00 The Approved Budget For The Design-build Contract Is Sixty-five Million Pesos (php 65,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital – Ob Building. Detailed Architectural And Engineering Design Services Shall Not Exceed Three Million Five Hundred Thousand Pesos (php 3,500,000.00) Plus Six Percent (6%) Of Excess Of Fifty Million Pesos (php 50,000.000.00) (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (360) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 300 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons. Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In: Recognition And Avoidance Of Unsafe Conditions Workplace Safety And Health Requirements Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties. Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency. Plan Must Be In Writing For Employers With Greater Than 10 Employees All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Geotechnical Investigation Five (5) Sets Duly Signed And Seal Soil Analysis And Investigation Report In Hard Bound (refer To Geotechnical Investigation Specification And Parameters) 1.2 Structural Analysis And Design Five (5) Sets Duly Signed And Seal Structural Analysis And Design Report In Hard Bound Including The Executable E-files (staad/etabs,etc.) Five (5) Sets Duly Signed And Seal Structural Specifications In Hard Bound (refer To Structural Analysis And Design Specification And Parameters) 1.3 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors: Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling. Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain All Floors (except For Third Floor To Roof Deck) Shall Have Direct Access To Ramp Both Stairs Are For Service And Emergency Use External Window At Second Floor And Up Shall Be Of Awning Type. Provision Of Electrical Room Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.). Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building. Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair. Exits Terminate Directly At Open Space To The Outside Of The Building. General / Common Areas • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow And Infection Control, Particularly Important In Sensitive Areas Like The Delivery Complex And Nicu. - Planning Relationships: A. Adjacent To Staff’s Lounge B. Within The Delivery Complex And Nicu - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. • Staff’s Hallway - A Corridor Within The Delivery Complex And Nicu That Ensures A Minimum Clear Width Of 1.83 Meters To Facilitate Smooth, Unobstructed Movement Of Staff And Equipment, Enhancing Safety And Efficiency In High-traffic Medical Areas. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Auxiliary System: C. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: D. Provide At Least Six (6) Units Smoke Detector. • Patient’s Dressing/changing Rooms - Positioned Near The Entrance For Convenient Access, This Compact Room Accommodates Only One Bed Or Stretcher, Designed To Serve Both Ambulatory Patients And Those On Stretchers. With Separate Entrances To The Emergency Department And The Delivery Complex's Sterile Hallway, It Ensures Asepsis Despite Limited Space. - Planning Relationships: A. Next To Main Entrance B. Adjacent To Delivery Complex And Ob-gyne Emergency Department C. Close To Waiting Area And Comfort Room - Lighting System: D. For General Illumination, Provide At Least 250 Lux. - Power System: E. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: F. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: G. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (sterile-ground Floor, Delivery & Nicu Suite) - A Well-ventilated Passageway With Ambient Lighting And Centralized Air Conditioning, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. • Common Patient And Staff Hallway (non-sterile-second Floor, Ob Wards/recovery Rooms) - A Well-ventilated Passageway With Ambient Lighting, Ensuring A Controlled Environment That Supports Both Infection Control And Staff Efficiency. The Hallway, With A Clear Width Of 2.44 Meters, Facilitates Smooth Movement While Maintaining Asepsis And A Comfortable Atmosphere For Patients And Medical Personnel. Closed-circuit Television Cctv Shall Be Installed At The Hallway Of This Floor And At Least Two Views Or Angles Of Cctv Or More As Required With Central Monitor At Nurse Station. - Lighting System: A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Six (6) Units Smoke Detector. • Staff’s Lounge - This Room/space Is Designed To Include A Comfort Room, A Counter With A Sink, Space For Dining Tables, And Resting Facilities. It Offers A Relaxing And Functional Space For Staff To Unwind, Eat, And Refresh During Their Shifts. - Planning Relationships: A. Next To Staff’s Main Entrance B. Adjacent To Staff’s Lockers. - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide At Least One (1) Unit Orbit Fan. • Janitor’s Closet - This Room/space Is Designed To Keep Cleaning Materials With Mop Sink And As Storage For Janitor’s Cleaning Tools. - Planning Relationships: A. One Janitor’s Closet Located Close To Delivery/operating Room B. One Janitor’s Closet Located To Staff’s Lockers And Lounge. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. • Wheeled Stretcher’s Area - This Room/space Is Located Near The Main Entrance, This Area Is Designed To Accommodate At Least Two (2) Bed Stretchers, Ensuring Easy Access And Quick Deployment For Patients Arriving Via Stretcher. It Is Strategically Placed For Efficient Patient Handling And Smooth Transitions To Other Areas Of The Facility. - Planning Relationships: A. Located At The Entrance Of Delivery & Nicu Suite/complex - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Power System: C. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • All Gender / Pwd Toilet - This Restroom Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Patients, Relatives And Visitors. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Toilets/comfort Rooms - One Comfort Room For Both Male And Female Adult Ward While Separate Comfort Rooms For Stations, Offices And Service Rooms. - Planning Relationships: A. Equipped With Wall Mounted Intravenous (iv) Fluid Hook For Patient Rooms And Emergency Pull Chord With Corridor Lights Installed Above The Door. - Lighting System: B. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Access/exit Stairs - Stairs That Provide Essential Vertical Circulation For Movement Between Different Levels Of A Building, Typically Serving As Both An Access Point For Entry And An Exit For Egress. These Stairs Must Meet Safety Regulations, Including Proper Width, Handrails, Non-slip Treads, And Clear Signage For Easy Navigation. They Should Also Be Designed To Accommodate Emergency Evacuations And Ensure Accessibility Where Possible. - Planning Relationships: A. Exits Terminate Directly At An Open Space To The Outside Of The Building B. Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Access Ramps - Ramps Designed To Provide A Smooth, Accessible Pathway For Individuals With Mobility Challenges, Such As Wheelchair Users, To Enter Or Exit A Building. These Ramps Should Meet Accessibility Standards, Including Proper Slope (usually 1:12), Non-slip Surfaces, Handrails On Both Sides, And Clear Signage. They Are Essential For Ensuring Equal Access To All Areas Of A Building, In Compliance With Accessibility Laws Like The Amended Irr Of Bp 344. - Planning Relationships: A. A Ramp Shall Have A Minimum Clear Width Of 1.22 Meters (or 4 Feet) In One Direction (or 2.44 Meters Or 8 Feet In Two Opposite Directions). B. The Slope Of The Ramp Shall Not Be Steeper Than 1:12 Meters. - Lighting System: C. For General Illumination, Provide At Least 250 Lux. • Electrical/auxiliary Room - Due To Limited Space, This Room Is Designed With A Bi-folding Door That Provides At Least 1.60 Meters Of Clear Opening Width. Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed Away From Direct Patient Access To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. Ground Floor – Delivery Complex • Nurse Station W/ Sink, Inc. Supply Room And T&b - This Area Is Dedicated For The Nurses And Other Medical Staff Assigned To This Floor. It Shall House The Patient’s Charts, Patient’s Medications With Proper Compartmentalization, Nurse Call System Central Station, One Dedicated Comfort Room, Supply/medication Room And Ample Area For Doctors To Do Charting And Nurses’ Personal Belongings. This Station Should Be Located To Permit Visual Observation Of Patient (specifically Areas Such As Labor Room And High-risk Pregnancy Unit Room) And Movement Into The Suite. This Is Also Located Within The Sterile Area Of The Ob-gyne Complex, Is An Open Station, And Has Direct Access To The Hallways Common/centralized Air Conditioning. - Planning Relationships: A. Adjacent To Breastfeeding Room B. Close To Nicu, Ob-gyne Emergency Department - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. For General Illumination, Provide At Least 500 Lux. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least Two (2) Units Smoke Detector. - Security System: H. Provide At Least Two (2) Units Smoke Detector. Provide Closed – Circuit Television Cctv Shall Be Installed At The Lobby And Corridor Or Hallway Of This Floor With Central Monitor Located At The Reception Area And At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station. • Labor Room - This Area Is Dedicated For Maternity Patients To Be Monitored And Supervised During Labor And Delivery. Before Being Transferred To The Delivery Room, Patients Stay In The Labor Room For Assessment And Monitoring. Labor Rooms Should Have Adequate Lighting, Including Ambient Light And Focus Lights For Labor And Examination Tables. Labor Rooms Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. It Shall Also House One Dedicated Comfort Room And A Common Counter With Sink. - Planning Relationships: A. Adjacent To Delivery Room B. Close To Caesarian Delivery Room C. Close To Scrub-up And Sub-sterilizing Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning Unit System • Delivery Room - This Area Is Dedicated For Normal Spontaneous Delivery Services. It Shall Also House At Least Four (4) Delivery Beds And A Dedicated Newborn Resuscitation Area, A Place With A Flat Firm Surface And Heat Source, For Immediate Resuscitation And Stabilization Of Newborns Who Require Assistance At Birth. This Area Is Typically Equipped With Necessary Medical Equipment, Such As Oxygen, Suction Devices, And Other Resuscitation Tools, And Is Staffed By Trained Healthcare Professionals To Provide Emergency Care To Newborns In Critical Condition. The Delivery Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 750 Lux. - Power System: D. Provide At Least Five (5) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Outlet 15a, 2p, 240v, Single, Grounding Type, Tandem. Two (2) Units Ground Terminal, Duplex. Also, Allocate Two (2) Units Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Cesarian Delivery Room - This Area Is Specialized Operating Room Equipped For Performing Cesarean Sections, A Surgical Procedure Used To Deliver A Baby Through An Incision In The Mother's Abdomen And Uterus. This Room Is Designed To Accommodate The Surgical Team And Necessary Medical Equipment, Ensuring A Sterile Environment And Readiness For Any Complications That May Arise During The Delivery. It Is Typically Equipped With Operating Tables, Surgical Instruments, Anesthesia Equipment, And Monitoring Devices For Both The Mother And Baby. This Operating Room Shall Be Remote As Practicable From The Entrance To Provide Asepsis. To Observe Asepsis And Prevent Non-related Traffic In The Facility, The Delivery Room, Operating Room (c-section), Scrub-up Area, And The Sub-sterilization Room (considered As Clean/sterile Areas) Must Be Grouped Together Away From The General Administrative Service Which Are Considered As Common Areas. - Planning Relationships: A. Adjacent To Sub-sterilizing Room B. Adjacent To Scrub-up - Lighting System C. For General Illumination, Provide At Least 1000 Lux. - Power System: D. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: G. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • High-risk Pregnancy Unit - This Area Is Dedicated To The Care And Management Of Pregnant Women Who Have Been Identified As Having A Higher Risk For Complications During Pregnancy, Labor, Or Delivery. The Unit Provides Close Observation And Interventions To Ensure The Health And Safety Of Both The Mother And The Baby, Offering Specialized Care For Conditions Such As Gestational Diabetes, Hypertension, Multiple Pregnancies, Or Other Medical Concerns. It Shall Also House One Dedicated Comfort Room Should Have A Viewing Window That Is Directly Visible From The Nurse's Station To Facilitate Easy Monitoring. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Fourteen (14) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System Master Or Cable Antenna Television - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Septic Lr/dr (labor Room/delivery Room) - This Room/space With Septic Cases Physically Separated From Regular Cases To Avoid Infection. This Room Is Equipped To Handle Sterile Procedures While Minimizing The Risk Of Cross-contamination, With Enhanced Infection Control Measures In Place. It Is Typically Isolated To Prevent The Spread Of Infections And May Include Specialized Equipment For Both Maternal And Neonatal Care To Address Potential Complications Arising From The Infection. This Room Should Be Located In Close Proximity To The Doctor's Quarters Or On-call Room To Facilitate Immediate Intervention In Case Of Emergencies. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Sub-sterilizing Room C. Close To Cesarian Delivery Room - Lighting System D. For General Illumination, Provide At Least 1000 Lux. - Power System: E. Provide At Least Nine (9) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Nurse Call System - Provide At Least One (1) Unit Nurse Call System - Fire Alarm System: H. Provide At Least One (1) Unit Heat Detector. - Air Conditioning And Refrigeration System: I. Provide Air Conditioning System • Scrub-up Area - This Room/space Where Preoperative Hand Washing Is Performed Located Outside Of The Delivery/operating Room Installed Either In A Recessed Wall Or Other Open Space But Shall Be Kept Away From Main Traffic Flow. This Shall Be Located Within The Sterile Zone Of The Delivery Complex, And Shall House 3-station Scrub Sink, With Gooseneck Spout & Foot Control, Sensor Type, And Provision For Hand-dryer. - Planning Relationships: A. Close To Delivery Room B. Adjacent To Cesarian Delivery Room - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light And Hand Dyer. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Sub-sterilizing Room - This Room/space Where Medical Instruments And Equipment Are Cleaned And Partially Sterilized Before Being Sent To A Main Sterilization Area For Final Sterilization. This Room Typically Serves As An Intermediate Step In The Sterilization Process, Focusing On Decontaminating Items, Such As Surgical Instruments, To Reduce The Risk Of Infection. This Room Is Equipped With Sinks, Disinfectants, Ultrasonic Cleaners, And Possibly Other Equipment To Assist In The Preparation Of Items For Full Sterilization. It Should Be Accessible From The Delivery Room And Operating Room. Should Have A Utility Door That Provides Access Out From The Sterile Route, Ensuring A Controlled Flow Of Items Without Compromising The Sterile Environment. This Utility Door Should Lead To A Non-sterile Area, Allowing For The Safe And Efficient Movement Of Equipment And Materials, While Preventing Contamination From Entering The Sterile Zones. - Planning Relationships: A. Adjacent To Operating Room B. Adjacent To Scrub-up Area - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Telephone Outlet. - Fire Alarm System: G. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Sterile Instrument And Supply Storage - This Room/space Is Where Medical Supplies And Sterile Instruments Needed For Normal Spontaneous Delivery Are Kept. This Shall House A Counter With Sink And Drainboard, And Door With Vision Panel. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Clean-up Room - This Room/space Is Intended For The Sterilization Of Instruments In Accordance With Doh Guidelines On Cleaning, Disinfection, And Sterilization Of Reusable Medical Devices In Hospital Facilities In The Philippines (annex B Of Administrative Order No. 2012-0012). This Shall House Counter For Work, Sink With Double Compartment; Laundry; 350-400 Mm Deep. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station - Lighting System C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: F. Provide Least One (1) Orbit Fan. • Doctor’s On-call Room - This Room/space Is Where Doctors Can Rest And Recuperate While Being Available For Urgent Patient Needs Or Emergencies. It Shall 0house One Dedicated Toilet And Bath, Resting Facilities, And With Essential Features Such As Sound-proofing And Alert System That Notifies The Doctors Of Emergencies Or When They Are Needed Urgently. It Should Be Located In Close Proximity And Have Direct Access To The High-risk Pregnancy Unit, Septic Labor/delivery Room, Labor Room, And Nurse Station. - Planning Relationships: A. Located At Delivery Area/complex B. Adjacent To Nurse Supervisor’s Area/station C. Close To High-risk Pregnancy Unit, Septic Labor/delivery Room, And Labor Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Eight (8) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System Ground Floor – Ob-gyne Emergency Department • General Requirements - This Area Should Be Located In Ground Floor To Ensure Easy Access For Patients. It Shall Also Have Separate Entrance To The Emergency, And Corridors For Access By Patient Using Bed Or Stretcher And Equipment (2.44 Meters Or 8.00 Ft. Clear Width) And A Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. Of 4.00 Ft.). Due To Limited Space Available, This Whole Area Only House Small Independent Nurse Station With Counter And Sink, Observation Bay And Treatment Area With Sink Or Wall-hung Lavatory, Divided By Privacy Curtains/dividers, Equipment/supply Storage For Direct Access To Resuscitation Equipment, One Dedicated Comfort Rooms, And A Patient Dressing/changing Room With Separate Entrances To The Emergency Department And Onto Delivery Complex Sterile Hallway To Provide Asepsis. • Waiting Area - This Room/space Is Where Patients, Companions, And Visitors Can Wait Comfortably. However, This May Be Located Outside Of The Birthing Clinic If There Is No Sufficient Space Provided That There Should Be An Overhead Cover. The Waiting Area Can Also Be Situated Along A Corridor Provided That The Width Of Such Corridor Shall Not Decrease Lower Than 1.83 M In Width. It Should Be Well-ventilated And Equipped With Ample Lighting To Ensure A Comfortable And Inviting Environment For Patients And Visitors. This Shall Be In Close Proximity To Other Provided Common Areas Such As Comfort Rooms And Common Counter With Sink For Hygienic Activities. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide Least Two (2) Units Orbit Fan • Nurse Station With Sink - This Area Is Located To Permit Observation Of Patient And Control Access To Entrance, Waiting Area, And Treatment Area. This Area Should Also House A Working Table And A Separate Counter With Sink. - Planning Relationships: A. Located At Ob-gyne Emergency Department B. Close To Emergency Entrance C. Adjacent To Observation Bay And Examination/treatment Room - Lighting System D. For General Illumination, Provide At Least 500 Lux. - Power System: E. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Ground Fault Circuit Interrupter (gfci) Outlet. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: F. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: G. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: H. Provide At Least One (1) Unit Smoke Detector. - Security System: I. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: J. Provide Air Conditioning System • Observation Bay - This Room/space Is Designated Area Where Patients Can Be Closely Monitored After Initial Assessment. This Space Only Houses One (1) Observation Bed Or Recliner Due To Insufficient Space Available. It Is Adjacent To Examination/treatment Room And Should Be Divided By Privacy Curtains/dividers, And Should Be In Close Proximity To Comfort Room Available. - Lighting System A. For General Illumination, Provide At Least 750 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Allocate One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System • Examination And Treatment Area - This Room/space Where Pre- And Post-natal Check-up Is Conducted, It Is Designated Area With Clear Visibility From The Nurse Station, Efficient Equipment Placement, And Dedicated Spaces For Examination And Treatment. It Is Adjacent To Observation Bay And Should Be Divided By Privacy Curtains/dividers. This Shall Have A Sink Or A Wall-hung Lavatory And Should Be In Close Proximity To Comfort Room Available. This Space Shall Also Accommodate One (1) Procedural Bed, Similar To The Examination Bed But With Extra Support For Patients Undergoing Treatments And Space For Equipment. The Bed Should Be Adaptable For Minor Procedures Like Suturing, Drainage, Or Stabilization For Transport. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System • Equipment/supply Storage Room - This Room/space Is Essential For Maintaining Organized, Accessible, And Sterile Storage Of Medical Supplies, Instruments, And Other Necessary Materials. Due To Limited Space, Set-up Must Be Optimized To Ensure Essential Supplies Are Organized And Accessible. This Shall Also Be Temperature/humidity Controlled To Preserve The Quality Of Stored Sensitive Items. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Ventilation System: D. Provide At Least One (1) Unit Orbit Fan. Ground Floor – Neonatal Intensive Care Unit (nicu) • General Requirements - The Nicu, Located Adjacent To The Breastfeeding Room And On The Same Floor As The Delivery Complex, Should Be Designed To Maximize Limited Space. It Will Include An Independent Nurse Station With An Attached Comfort Room For Staff Convenience. The Layout Will Accommodate Supply Storage, With Vertical Solutions To Save Space, And Provide An Ample Area For Examination Table And Essential Equipment. Infection Control Measures Will Be In Place, Including Zoning For High-risk Cases, Handwashing Stations, And Access To Ppe. Nicu Shall Be Separate But Immediately Accessible From The Delivery Room/cesarian Operating Room. The Nicu Will Be Soundproofed To Minimize Noise And Create A Quiet, Conducive Environment For Neonates' Rest And Recovery. Due To Limited Space, The Nicu Will House Only Ten (10) Bassinets. The Design Will Focus On Maximizing Available Space While Ensuring Essential Equipment, Infection Control Measures, And Patient Comfort Are Maintained. This Shall Also Include A Viewing Glass Window For Family Members To Observe Their Newborns While Maintaining The Necessary Infection Control Protocols. This Window Will Be Strategically Positioned In A Way That Provides A Clear View Of The Ten (10) Bassinets And Ensures Privacy And Security. • Nurse Station W/ Sink, Including Supply Room And Toilet - The Nicu Design Will Include An Independent Nurse Station With A Sink For Hand Hygiene, Ensuring Staff Can Maintain Cleanliness And Efficiency While Monitoring Patients. It Will Also Feature A Separate Counter With A Sink And An Additional Counter Or Table For Work Tasks. Adjacent To The Nurse Station, A Comfort Room Will Provide Convenience For Staff During Long Shifts. The Layout Will Incorporate Supply Storage With Vertical Solutions To Optimize Space And Keep Essential Equipment Organized, Maximizing The Use Of Limited Space While Ensuring Facilities For Both Patient Care And Staff Comfort. - Planning Relationships: A. Adjacent To Breastfeeding Room - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: D. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Security System: G. Provide Closed – Circuit Television Cctv At Least Two Views Or Angles Of Cctv Shall Be Installed At The Wards With Central Monitor At Nurse Station - Air Conditioning And Refrigeration System: H. Provide Air Conditioning System • Breastfeeding Room Including Sink And Toilet - This Room, Located Adjacent To The Nicu, Will Be Designed With Its Own Counter And Sink For Hygiene And Convenience. It Will Include A Comfort Room For The Mother's Use And Ample Seating Space For Comfortable Breastfeeding. Additionally, The Room Will Feature A Foldable Diaper Changing Station, Maximizing Space While Providing Necessary Facilities. This Layout Ensures A Private And Functional Space For Mothers To Care For Their Newborns While Maintaining Proximity To The Nicu. - Planning Relationships: A. Adjacent To Nurse Station And Nicu - Lighting System B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning And Refrigeration System: E. Provide Air Conditioning System Ground Floor – Cmps (chief Of Medical Professional Staff’s Office) • Chief Of Medical Professional Staff’s Office - The Chief Of Medical Professional Staff’s Office Will Be Strategically Located Close To The Delivery Complex And Will Be Soundproofed (such As High-density Acoustic Panels, Insulated Walls) To Ensure Privacy And A Quiet Environment. The Office Will Include A Toilet And Bath, Archive Area, With A Hidden Access Door Connecting To The Office For Discreet Access. It Will Also Feature A Secretary And Receiving Area, A Conference Room With An Attached Comfort Room, And A Pantry For Staff Convenience. The Archives Area Will Be Situated Nearby For Easy Access To Important Documents, Ensuring A Functional And Efficient Workspace While Maintaining Privacy And Comfort. The Chief Of Medical Professional Staff’s Office Will Include A Corner With A Full-length Window, Offering A Panoramic View Of The Hospital's Vicinity. This Design Feature Will Enhance Natural Light, Provide A Sense Of Openness, And Allow The Chief To Observe The Surrounding Area. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots For Cmps Office, Two (2) Units For Secretary’s Area, Two (2) Units For Receiving Area, Six (6) Units For Conference Room And Two (2) Units For Lounge/pantry. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light, For Cmps Office, Secretary’s And Receiving Area, And Conference Room. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide Three (3) Units Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Four (4) Units Smoke Detector. - Air Conditioning And Refrigeration System: F. Provide Air Conditioning System Second Floor – Ob-gyne Wards / Recovery Rooms • Nurse Station With Sink, Including Supply Room, Medication Room, And Toilet - This Enclosed Area, Located On The Second Floor Intended For Wards, Recovery Rooms, And Other Service Rooms, Is Dedicated To Nurses And Medical Staff Assigned To This Floor. It Houses Patient Charts, Medications With Proper Compartmentalization, A Nurse Call System Central Station, A Dedicated Comfort Room, A Supply/medication Room, And Ample Space For Doctors To Do Charting And Nurses' Personal Belongings. The Station Allows For Visual Observation Of Key Patient Areas And Movement Into The Suite. It Is Centrally Located With Direct Access To The Common Hallways. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System - Provide One (1) Unit Paging System. - Nurse Call System – Provide One (1) Unit Nurse Call System. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Security System: F. Provide Closed – Circuit Television Cctv With At Least Two Views Or Angles Of Cctv Shall Be Installed With Central Monitor At Nurse Station. - Air Conditioning And Refrigeration System: G. Provide Air Conditioning System • Two (2) Private Rooms (1-bed Capacity) With Toilet And Bath - These Rooms Are Designed To Provide A Private, Comfortable Space For Patients, Each With A Single Bed, And Include An Attached Toilet And Bath For Patient Convenience And Privacy. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Semi-private Rooms (3-bed Capacity) With Shared Sink, Toilet And Bath - This Room Is Designed To Accommodate Three Patients, Offering A Semi-private Setting With A Shared Space For Comfort And Care. This Room Includes A One (1) Shared Sink, And Toilet And Bath. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Infirmary Room (1-bed Capacity) With Toilet And Bath - This Room Is Designed To Accommodate The Hospital Staff’s And/or Their Immediate Family Members. It Provides A Private Space With A Bed, Toilet, And Bath, Offering Comfort And Privacy While Supporting Basic Medical Needs During Their Stay. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Isolation Room (1-bed Capacity) With Sink, Ante Room, Toilet And Bath - This Room Is Designed To Accommodate A Single Patient In Isolation, Providing A Controlled Environment For Infectious Or High-risk Patients. It Includes A Bed, Ante Room With Sink Or Wall-hung Lavatory For Staff To Change And Prepare Before Entering, And An Attached Toilet And Bath For Patient Comfort And Hygiene. The Room Is Equipped To Prevent The Spread Of Infection, With Strict Access Control And Infection Control Measures In Place. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Teen Adolescent (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six Adolescent Patients, Featuring A Shared Sink, With Separate Shower And Toilet Facilities To Ensure Privacy And Hygiene. The Shared Sink Area Allows For Efficient Use Of Space While Maintaining Cleanliness, While The Separate Shower And Toilet Provide The Necessary Amenities For Patient Comfort And Convenience. The Design Creates A Supportive And Functional Environment For Young Patients, Offering Ease Of Access To Medical Care. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Gyne Ward (7-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Seven (7) Gynecological Patients. It Includes Shared Facilities Such As A Sink, Shower, And Toilet To Efficiently Serve The Needs Of Multiple Patients While Ensuring Hygiene And Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • One (1) Ob Ward (6-bed Capacity) With Shared Sink, Shower And Toilet - This Room Is Designed To Accommodate Up To Six (6) Obstetrics Patients, Featuring Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Help Optimize Space While Ensuring Patients Have Access To Essential Hygiene Facilities. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Ob Ward Extension (18-bed Capacity) With Shared Sink, Shower And Toilet - This Extension Is Designed To Accommodate Up To Eighteen (18) Obstetrics Patients, With Shared Sink, Shower, And Toilet Facilities. The Shared Amenities Ensure Efficient Use Of Space While Providing Essential Hygiene Facilities For All Patients. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Eighteen (18) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least Six (6) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Csb Care For Small Baby Room With Toilet - This Room Is Designed For Small Or Premature Babies, With Space For Four Beds, An Attached Toilet, Foldable Diaper Changing Station, And Resting Facilities For Caregivers. It Provides A Functional And Comfortable Environment For Both Babies And Families. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Hearing Screening Room - A Dedicated Space For Conducting Hearing Tests And Screenings, Typically For Newborns Or Young Children. The Room Is Equipped With Specialized Auditory Equipment And Soundproofing To Ensure Accurate Results. It Is Designed To Provide A Quiet, Controlled Environment For Hearing Assessments, With Comfortable Seating For Patients And Their Guardians. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Newborn Screening Room - The Room Is Equipped With The Necessary Medical Equipment For Blood Sampling, Physical Exams, And Diagnostic Tests. It Is Designed To Provide A Safe, Comfortable Environment For Newborns And Their Parents While Ensuring The Efficient And Accurate Collection Of Screening Samples. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Stock Room - A Storage Area For Medical Supplies And Equipment, Organized With Proper Shelving And Labeling For Easy Access And Inventory Control. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. • Department Chair’s Office Including Secretary And Receiving Area And Toilet - Located Adjacent To The Conference Room, This Office Includes A Work Room For The Chair, A Secretary And Receiving Area, And An Attached Toilet For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Conference Room - Located Adjacent To The Department Chair's Office, This Room Is Designed For Meetings And Presentations, Equipped With A Large Table, Seating, And Audiovisual Equipment For Effective Communication. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: E. Provide Air Conditioning System • Doctor’s Quarters With Shared Shower And Toilet - Due To Limited Space, This Room Accommodates Two Beds, With Shared Shower And Toilet Facilities, Providing Comfort And Privacy For Doctors During Their Shifts Or On-call Duties. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Two (2) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System • Affiliates Lounge With Toilet And Bath - A Designated Space For Hospital Affiliates To Relax, Equipped With Comfortable Seating And An Attached Toilet And Bath For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Standby / Emergency System: C. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Nurse Call System - Provide One (1) Unit Nurse Call Station With Pendant Switch Each For Normal And Emergency Power Supply. - Master Or Cable Antenna Television - Provide One (1) Unit For Outlet For Television. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: F. Provide Air Conditioning System Third Floor – Conference / Training Room, Office Rooms • Conference/training Room With Male And Female Toilets - A Room For Meetings Or Training, Featuring Separate Male And Female Toilets For Convenience. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Floor Mounted Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type, Universal Slot. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least Three (3) Units Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System • Office Room 1 (research And Petru) With Sink And Toilet - A Designated Office Space For Research And Petru Activities, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: G. Provide Air Conditioning System • Office Room 2 (qi/ps, Quality Improvement Patient Survey) With Sink And Toilet - A Dedicated Office For Quality Improvement And Patient Survey Activities, Featuring A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: F. Provide Air Conditioning System • Office Room 3 (osm, Office Of The Strategic Management) With Sink And Toilet - A Designated Office Space For The Office Of Strategic Management, Equipped With A Sink And An Attached Toilet For Convenience And Hygiene, And Access To A Shared Balcony For Relaxation And View Of The Hospital Grounds. - Lighting System A. For General Illumination, Provide At Least 500 Lux. - Power System: B. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, At Least One (1) Unit Of Outlet Each With Specifications Of 15a, 2p, And 240v, Single For Emergency Light. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System - Telephone System - Provide One (1) Unit Telephone Outlet. - Local Area Network System - Provide One (1) Unit Data Outlet. - Public Address Paging System – Provide One (1) Unit Paging System. - Air Conditioning System: E. Provide Air Conditioning System Roof Deck – Open Area • Open Areas For Mechanical Outdoor Units And Equipment - Designated Roof Deck Spaces For Housing Mechanical Units And Equipment, Ensuring Proper Ventilation And Easy Access For Maintenance. - Lighting System A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Xii. Geotechnical Investigation Specifications And Parameters A. Location Before The Conduct Of Sub-surface Soil Exploration Works, The Consultant/contractor Shall Coordinate With The Procuring Entity Technical Representative For Proper Coordination On The Location Of The Project. B. Scope Of Work The Consultant/contractor Shall Provide All The Labor, Instrument/equipment Materials And Supplies, Vehicles, Bunkhouses, Etc., Necessary To Perform Satisfactorily The Sub-surface Exploration Herein Required, Viz: 1. Field Works 2. Laboratory Testing 3. Soil Investigation And Preparation Of Report 4. Geotechnical Evaluation Report The Consultant/contractor Shall Be Held Solely Responsible For The Result Of This Boring/drilling Exploration And Other Activities Under This Terms Of Reference C. Detailed Exploration Requirements/specifications A. Field Works 1. Location And Number Three (3) Boreholes, At Different Location Shown On The Plan. 2. Depth Of Borings Twenty (20) Meters Depth Below Natural Ground Or Five (5) Meters In Bedrock/hard Strata. 3. Procedure In Sand, Clay And Silt Materials, The Boreholes Shall Be Advanced By The Wash Boring Method In Between Sampling Sections Using Side Discharged Chopping Bits. Whenever Necessary, N-size Casings Shall Be Utilized. The Washed Section Shall Be Cleaned Thoroughly Before Each Sampling Run Ensuring, However, That The Underlying Soil Is Not Disturbed. Sampling Shall Be Done At One Meter Interval From The River Bed To Hard Strata Using 5.0 Cm. Split Spoon Sampler. In A Soft Cohesive Layer, Undisturbed Samples Using Thin-walled Tube Samplers Shall Be Obtained Hydraulically. Core Drilling Shall Be Carried Out By A Diamond Rotary Drill Method In Gravelly Or Rock Formation. Core Samples Shall Be Undertaken Whenever Solid Formation Is Encountered. Cores Shall Be Placed In Core Boxes Arranged And Labeled In Accordance To Depth As Soon As These Are Extracted From The Boreholes. Drilling And Sampling Procedures Shall Comply In Accordance With Astm Standards. 4. Equipment A. Drilling Machine The Contractor Shall Utilize At Least Two (2) Drilling Machines And Set Them Up At The Project Site. The Drilling Machine Shall Be In Good Working Condition And Shall Be Of Such Capacity As To Maintain Satisfactory Progress Of Work. B. Bits The Contractor Shall Have An Ample Supply Of Different Types Of Bits To Adopt To Varying Conditions. Bottom Discharge And Stepped Bits Shall Also Be Available. C. Core Barrels Double Tube Swivel Type Core Barrels In Good Condition And Capable Of Obtaining Maximum Core Recovery Shall Be Used. D. Casing The Contractor Shall, At His Own Expense And Responsibility, Provide Casings As Required To Ensure The Stability Of The Borehole Walls. The Casing Shall Be At Least Of N-size And Shall Be In Good Condition. After A Hole Has Been Finished The Casings Shall Be Retrieved. 5. Handling And Core Of Samples The Contractor Shall Provide All The Materials, Equipment And Labor Necessary For Preserving Samples. B. Laboratory Testing The Preparation Of Samples For Testing Shall Be Made In Accordance With Aashto. The Following Tests Shall Be Made On Samples Obtained From Boring, Drilling. Standard Penetration Test The Test Shall Be Carried Out Through Ordinary Soil Encountered To The Depths Specified Above. Standard Penetration Test Shall Be Performed Using 5.0 Cm. (2.0 In.) Outside Diameter Split Spoon Sampler, Driven By A 63.6 Kg (140 Lbs.) Hammer Falling 76.0 Cm. (30 In.) At 1.50-meter Interval Or Closer If Necessary. Moisture-density Rotation This Test Method Determines The Relationship Between The Moisture Content And The Density Of Soils Compacted In A Mold. The Contractor Shall Conduct This Procedure According To Nd T 99 Or Nd T 180. Bearing Capacity Test The Test Method Covers Estimation Of The Bearing Capacity Of Soil In Place By Means Of Field Loading Tests. This Test Method Can Be Used As Part Of A Procedure For Soil Investigation For Foundation Design. It Gives Information On The Soil Only To A Depth Equal To About Two Diameters Of The Bearing Plate, And Takes Into Account Only Part Of The Effect Of Time. Sieve Analysis The Contractor Shall Conduct This Test In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Combines The Two Test Methods. Sieve Analyses Determine The Gradation Or Distribution Of Aggregate Particles Within A Given Sample In Order To Determine Compliance With Design And Production Standards. Accurate Determination Of Material Smaller Than No. 200 (75 Μm) Cannot Be Made With Aashto T 27 Alone. If Quantifying This Material Is Required, It Is Recommended That Aashto T 27 Be Used In Conjunction With Aashto T 11. Following Aashto T 11, The Sample Is Washed Through A No. 200 (75 Μm) Sieve. The Amount Of Material Passing This Sieve Is Determined By Comparing Dry Sample Masses Before And After The Washing Process. This Procedure Covers Sieve Analysis In Accordance With Aashto T 27 And Materials Finer Than No. 200 (75 Μm) In Accordance With Aashto T 11. The Procedure Includes Two Method Choices, A And B. Liquid Limit Liquid Limit Test Shall Be Performed On Material Passing The 0.425mm (#40) Sieve. Aashto T 89 & T 90 27. There Are Two Methods Approved By Aashto, Any Of The Two Methods Can Be Used By The Contractor. Blow Count Must Be Within 22-28 Blows. Liquid Limit Is A Calculation Based On Moisture Content And Number Of Blows To Closure. Soil Classification This Standard Classifies Soils From Any Geographic Location Into Categories Representing The Results Of Prescribed Laboratory Tests To Determine The Particle-size Characteristics, The Liquid Limit, And The Plasticity Index. There Should Be Assigned Group Name And Symbol(s) Along With The Descriptive Information. Practice D2488 Can Be Used To Describe A Soil To Aid In The Evaluation Of Its Significant Properties For Engineering Use. Engineering Behavior Of The Soils Must Be Seen. C. Soil Investigation And Preparation Of Report The Soil Investigation Report Must Be Done By An Accredited Geotechnical Engineer. D. Geotechnical And Evaluation Report The Contractor Shall Prepare The Geotechnical Report & Analysis In Three (3) Bound Copies In A Form And Substance To Be Submitted To Doh – Ro7, Osmeña Boulevard, Cebu City Within Fifteen (15) Calendar Days Upon Receipt Of The Notice To Proceed. The Final Report Shall Not Be Limited To The Following: A) Field Investigation And Methodology B) Borehole Drilling And Sampling C) Laboratory Testing D) Final Boring Logs (bl) E) Final Laboratory Tests Results (fltr) F) Borehole Location Plan G) Soil Profile Along Structures Showing Boring/drilling Logs H) Soil Liquefaction Investigation Report I) Soil Bearing Capacity J) Recommendation If Called For Such As Type Of Measure/structure Of Work E. Other Data To Be Submitted A. Boring Logs 1. Job, Boring, Hole Number, Date, Time, Boring/drilling, Foreman, Supervisor 2. Weather Condition 3. Depth Of Boring At Start Of Day 4. Water Level In Casing At Start Of Day 5. Method Of Penetration And Flushing System 6. Description Of Soil Strata Encountered 7. Depth Of Soil Boundaries 8. Size, Type And Depth Of Samples And Sample Number 9. Type And Depth Of In-situ Tests 10. Standard Penetration Tests Resistance, “n” Value 11. Recovery Ratios Of Samples 12. Detailed Notes On Boring/drilling Procedure, Casing Sizes And Resistance To Driving, Description Of Wash Water Or Spoil From Boring/drilling Tools 13. Depth Of Boring At End Of Day 14. Other Relevant Information Such Rqd, Percent Core Recovery, Angle Of Friction Etc. B. Photographs Photographs Showing The Borehole Drilling And Sampling At Each Proposed Sites Shall Be Taken By The Contractor And Incorporated In The Report. Photographs Shall Be Taken At Each Borehole Location Depicting The Following: 1. Equipment Used 2. Core Drilling Operation 3. Water Level Measurements 4. Performance Of Spt And Shelby Tube Sampling 5. All Cores In The Core Boxes, Spt And Shelby Tube Samples 6. Date Photographs Was Taken -end Of Geotechnical Investigation- Xiii. Structural Design And Analysis Specifications And Parameters A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Dpwh Blue Book 4. American Concrete Institute (aci) 5. American Society For Testing Materials (astm) 6. American Welding Society (aws) B. Design Criteria Shall Be Submitted First To The Procuring Entity For Concurrence Of The Following Minimum Design Requirements: 1. Design Loads (dead Load, Live Load, Wind Load, Seismic Load And Analysis Procedure, Load Combinations) 2. Materials (concrete, Reinforcing Steel Bars, Structural Steels) 3. Foundation (allowable Foundation Pressure) 4. Design References C. Minimum Design Input File In Structural Software And Required Reports 1. Job Information 2. Joint Coordinates 3. Material Definition/specification 4. Member Property 5. Support Definition 6. Load Definition (seismic/dead/live/wind/load Combinations) 7. Analysis Procedure 8. Analysis Result 9. Load List 10. Support Reaction List 11. Design Results (footing/ Column/ Beam) 12. Load Diagrams 13. Structural Plans -end Of Structural Design And Analysis- Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards. Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies. Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans. Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans. Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters. Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters. Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details. Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing. Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing. Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes. Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings. The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans. Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01. Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures. Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections. The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design. Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation. Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles. Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following: Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line Road Network And Curbs And Sidewalks Parking Spaces Reference Location Of Existing Trees Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides: The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments. The Inner Zone Shall Include The Wards. The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services. The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers. There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks. In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation. Covered Walkways Shall Be Provided For Access And Connection To All The Buildings. Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised. The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans. Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements. Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works. Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60. Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing. Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound. Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission. Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 3. Floors For Sterile Areas, Delivery & Nicu Complex, Floor Finish Shall Be Roll-form Anti-static Anti-bacterial Homogeneous Vinyl With Welded Joints. It Shall Cove Upwards To The Sides Of The Wall Up To A Minimum Of 200mm. From The Floor. If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design. Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections. The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern. The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works The Following Rooms Shall Have A Minimum Ceiling Height: A. Operating Room – 3000mm., To Accommodate The Ceiling-mounted Or Light B. Wards Of 4 Beds And Up – 3000mm., To Provide Better Natural Ventilation Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details. If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details. Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould. Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation. Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal. Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors. Toilets And Other Wet Areas Shall Have Steel Doors. Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers. Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines. Aluminum Frames Of Glass Doors Shall Be Powder-coated. Door Finish And Color Shall Be Approved First Before Application. Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope. All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines. Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details. All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details. Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344. Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines. Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall. Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These. Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor. Electrical Light Switches Shall Be Located By The Knob Side Of The Door. Electrical Switches And Outlets Shall Be Installed Plumb And Level. Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers. Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344. A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies. Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage. Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details. Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details. Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details. The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish. Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint. Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish. Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish. Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified. Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following: Gutter, Eaves, And Parapet Ceiling - Covelight, Special Connections And Design, Mouldings, Valances Stairs - Handrail, And Baluster Design Ramps - Handrail Design And Floor Pattern Doors, Windows And Gates - Grille Works, Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counter/nurse Station Counter Special Carpentry Works, E.g. Partitions, Cabinetry Building And Room Signages And Wayfinding Systems All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet” Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Private Wards, Including Bed Head Panel Fixtures And Outlets With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Nurse Station C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels. Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles. Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material. Vinyl Floor Tiles For Sterile Areas Of Delivery & Nicu Suite Shall Be Homogenous And Not Less 3mm. Thick. Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified. Aluminum T-runners Shall Be Powder Coated. Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings. Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House. The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa. The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp); For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant. For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements Provide Details Of The Following: 1. Fiberglass Pressure Tank (80g Minimum Capacity With Shallow Well Jet Pump Of At Least 1.5 Or 2 Hp) Located At Roof Deck 2. Stainless Steel Storage Tanks, Grade 304 Located At Roof Deck E. Summary Of Materials Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings) Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified) Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp) 300mm Dia. And Above, Reinforced Concrete Pipe (rcdp) Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888 Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified) Floor Drains/deck Drains; Cast Iron Brass (bps Certified) Gutter Drains; Cast Iron Dome Type Brass (bps Certified) Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Trench Grating; Galvanized/stainless Steel Iron Grates Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified) Water Closet-tank Type Push Button Flush Lavatory - (pedestal/counter Type) With C-spout Spray Faucet Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet Urinal-wall Hung Flush Valve Type Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse. An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building. Hazard Classification Shall Be Light Hazard Occupancy. Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M. Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing. All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System. Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller. Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes. Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary. Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways). Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards. Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System: Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Nurse Call System F. Master Or Cable Antenna Television Fire Alarm System Security System 5. Lightning Protection System The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following: Lighting Fixtures/luminaires Panelboard And Circuit Breakers Switchgear And Other Metering Devices Electrical And Hospital Equipment Installation And Termination Of Auxiliary And Other Special Devices And Equipment Power And Telephone Handholes (as May Be Required) Pedestal And Service Entrance To Bldg. Grounding System Layout Substation/power House And Electrical Room Transformer And Generator Mounting Others As May Be Required. C. Summary Of Materials General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3) Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied. Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure. Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40. Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size. Nurse Call System: 1. The Nurse Call System Shall Have The Following Control Panel, Bed Head Panel, Ancillary Call And Annunciating Equipment. 2. Wiring Shall Consist Of Data Cable And 24v Supply To Each Bed Head Unit. 3. Two Levels Of Call Will Be Provided By The System: Patient To Nurse. A Patient To Nurse Shall Be Actuated By Means Of The Wall-mounted Or Handset Mounted Call A) Push Button Of Bed Head Panel. B) Nurse To Nurse. Call Of Nurse To Nurse Shall Be Considered, As Emergency Call And Shall Be Instigated By Operation Of The Emergency Pull/push Switch Mounted On Call Units Of Bed Head Panel. C) Bedhead Panel Shall Be Of Different Type Depending On The Patient Bedroom Class And As May Be Required. Multiplexed Bedhead Panel Shall Be Available To Operate Sound Distribution System. D) Bathroom Shall Be Provided With Pull Cord Unit And Reset Unit. E) Room Indicator Lamp Shall Be Installed Above The Door Of Each Patient’s Bedroom Along The Corridor. F) Nurse Stations Shall Be Equipped With Indicator Unit To Provide Indication (audible And Visual) Of The Zone And Type Of Call. G) Emergency Indication Shall Be Included In Some Acute Areas But Arranged “for Staff Use Only” In The Event Of Urgent Assistance Being Required. H) The System Shall Be Of Solid State Switching With All Items Connected To Internal Printed Circuit Boards Readily Interchangeable For Maintenance Purpose. Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building. Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service. Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality. Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Nurse Station, Etc. Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities) Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards. Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government. The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals. In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities. Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun. Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain. Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System. Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials. Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc. Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible. Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology. Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals. All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security. Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms. Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank Use Of Waterless Urinals And Dual Flush Water Closets. Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets. Use Of Water-saving Shower Heads For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act. A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied. Waterless Urinals Must Be Provided For Male Toilets. There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint. Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used. Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop. Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing. Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality Harvest Natural Daylight If Applicable. Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained. Use Of Acoustic Privacy Partitions Is Required. Separate Entrances For Ambulances And Walk-in Patients. In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia. In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible. Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45. Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement Contractor’s Temporary Facility And Lay Down Yard. Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos Material Testing (rsb, Chb, Concrete, Steel) Safety Requirements (warning Signs, Hardhat, Etc.) As Built Plan Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction. All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative Soil Excavation And Soil Treatment Restoration Of Any Damaged Properties During The Construction Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. No Implementation Of The Project Without An Approved Plan And Other Related Documents. Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules. Shall Abide By The Medical Center Hospital House Rules Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives. Soil Investigation Concrete Strength Testing Reinforcing Bar Strength Testing Concrete Masonry Unit (cmu) Testing All Plumbing And Sanitary System Automatic Fire Sprinkler System Ventilation And Air Conditioning System All Electrical System And Other Tests That Necessary To Perform To Ensure The Quality Of The Project All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives. The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation. No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Nurse Call System 2. Telephone System 3. Paging System 4. Lan System 5. Fire Alarm System 6. Security System Cctv 7. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
Don Emilio Del Valle Memorial Hospital Tender
Food Products
Philippines
Closing Date11 Mar 2025
Tender AmountPHP 15 Million (USD 259.2 K)
Details: Description Subject : Design And Build Of Dedvmh Nutrition And Dietetics Service Facilities Location : Dedvmh Compound, Bood, Ubay, Bohol Terms Of Reference I. Background Don Emilio Del Valle Memorial Hospital (dedvmh) Is A Licensed Level 2 General Hospital Located In Ubay, Bohol With 200 Authorized Bed Capacity Which Aims To Provide Highly Specialized Quality Healthcare Services To All Where Human Dignity Is Valued And Respected By Competent And Committed Personnel. In Accordance With The Provisions Of And Related Issuances Of Doh Administrative Order No. 2019-0056 Increasing The Bed Capacity Of Dedvmh From 50 Beds To 300 Beds And R.a. No. 11223, Or The “universal Health Care Act”, The Hospital Shall Provide Promotive, Preventive, Diagnostic, Curative, And Palliative Care Services, And Research, Professional Teaching And Training Programs And Shall Be Fully Equipped With The State-of-the Art Equipment And Facilities, Complemented By Adequately Trained And Competent Human Resources For Health Appropriate For A Licensed And Accredited Tertiary General Hospital. Dedvmh Shall Strengthen Its Existing Basic Services, And Aim For The Improvement Of Its Service Capability And Capacity Serving As Referral Hospital In The Northeastern Section Of The Bohol Province, Complementing Local Health Systems And Providers Of Municipalities In The Area. In Order To Fulfill This Mandate, Dedvmh Is Upgrading Its Services To Become A Level Iii Hospital To Provide Better And Quality Healthcare Services Especially In The Northeastern Part Of Bohol, Its Catchment Areas And Nearby Provinces. The Increase In The Bed Capacity And Expansion Of Services And Capability Are Consistent With The Dedvmh’s Hospital Development Plan (hdp) And Philippine Health Facility Development Plan (phfdp) 2020-2040. Ii. Objectives As Food Preparation Is Part Of The Critical Functions In Delivering Quality Healthcare Service, It Is Important That Its Site Be Given Adequate Repair And Renovation. The Objective Is To Repair And Expand The Existing Dietary Area Resulting To A More Spacious, Comfortable And Hygienic Station For Its End-users To Work Around. The Improvement Is Expected To Evoke A Less Stressful Environment And Increased Productivity Among Workers. The Design Must Also Conform To The Standards Of Set By In Accordance To The Manual On Technical Guidelines For Hospitals Planning And Design (level 3) And Doh Green And Safe Health Facilities Manual To Develop Climate Smart Health Facilities That Address And Adapt To The Impacts On The Environment. The Winning Bidder Shall Design For This Project With The Approval Of The Medical Center Including The Approved Detailed Estimates, Bill Of Quantities, Technical Specifications, And Methodology Of Construction And Scope Of Works Of The Project. Iii. Conceptual Design The Design Concept Of The Project Was Governed By The Planning And Design Standards Of Level 3 Service Capability Hospital Facility As Prescribed By The Latest Requirements Of The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architecture Law (ra 9266), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra 5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. The As-built Plan And Proposed Schematic Lay-out/call-out Will Be Provided As Basis Reference In The Development Of Preliminary Conceptual Design Plans To Be Submitted As Part Of The Technical Proposal. However, It Is The Responsibility Of The Bidder To Verify Actual Site Conditions And Dimensions. The Preliminary Conceptual Design Plans And Perspectives Shall Be Included Construed Part Of The Technical Proposal As Follows: Preliminary Conceptual Design Plans Required Specified Degree Of Details 1. Schematic Floor Plans: A. Ground Floor All Schematic Plans Shall Be At Least A3 Size Paper And Shall Meet The Minimum Space Requirements And Planning/design Guidelines Of Level 3 Hospital For: - Existing Dietary Complex Expansion And Improvement - Into Nutrition And Dietetics Service Facilities Preliminary Conceptual Design Plans Required Specified Degree Of Details A. Aerial Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. B. Man’s Eye / Worm’s Eye Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. C. Front Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered. D. Rear Perspective View In Conformance With The Preliminary Conceptual Plans And At Least 3d Rendered. E. Left & Right-side Perspective View All Perspective / Plans Shall Be At Least A3 Size Paper In Colored Printed And Shall Conform With The Preliminary Conceptual Plans And At Least 3d Rendered F. Longitudinal And Transverse Section Plans At Least One Longitudinal And One Transverse Section Plans In At Least A3 Size Paper The Conceptualization Of The Design Including Its Specifications And Space Requirements Shall Complement And/or Supplement With The Existing Site Conditions And Specification Of The Existing Dietary Area At Ground Floor. Proponent’s Input, Suggestion And Recommendations With Regard To The Identification Of The Scope Or Physical Components And Structures, Specific Outputs And Requirements And Proposed Construction Methods Shall Be Considered. Iv. Performance Specifications And Parameters Site And Space Planning Were Governed By The Standards, Rules And Regulations On The Design Of Level 3 Hospitals As Prescribed By The Department Of Health And Other Concerned Agencies. Building Design Shall Conform To The Provisions Of The National Building Code Of The Philippines (pd 1096), Accessibility Law (bp 344), Architectural Law (ra 9266), Civil Engineering Law (ra 544), National Structural Code Of The Philippines, Electrical Engineering Law (ra 7920), Mechanical Engineering Law (ra5336), Plumbing Code (ra 1378, 1993-1994 Revisions), Fire Code (ra 9514) And Other Laws And Regulations Covering Environmental Concerns And Local Ordinances And Regulations. A. Pre-detailed Design 1. Engineering Surveys And Investigations 1.1 Surveys And Investigations Of The Site Includes Elevations And Contours (at 0.5m Interval), Soil Tests, Location, Dimension, Floor Elevations And Other Pertinent Data On Existing Buildings And Improvements (roads, Parking Areas, Mature Trees) And Existing Utility Lines (e.g. Water, Power, Telephone). 2. Preliminary Conceptual Design Plans/perspective 2.1 Preparation Of The Following Drawings For Design Development Based On The As Built Plan And Schematic Lay-out/call-out Prepared By The Procuring Entity. Please Refer To Section Iii. Conceptual Design. B. Detailed Design Preparation Of Final Design Concept And Detailed Architecture And Engineering Design Shall Be In Accordance With The Schematic Plans For Hospital Building And Design Conceptualization Duly Approved By The Dedvmh. In Determining The Final Design Concept And Detailed Architecture And Engineering Design, The Implementing Unit Together With The Design And Build Contractor Shall Initiate The Coordination Meeting With The Concerned Stakeholders In The Following Schedule: First Session - The Design And Build Contractor Shall Present The First Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents Within Ten (10) Calendar Days From The Effectivity Of Notice To Proceed Second Session - The Design And Build Contractor Shall Present The First Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Twenty (20) Calendar Days From The Effectivity Of Notice To Proceed Third Session - The Design And Build Contractor Shall Present The Second Revision Of Schematic Plan And Design Concept For Deliberation, Consultation And Inputs By The Proponents, If There Any, Within Thirty (30) Calendar Days From The Effectivity Of Notice To Proceed Upon Approval Of The Final Schematic Plan And Design Concept, The Design And Build Contractor Shall Then Proceed For The Design Phase, Enumerated As Follows: 1. Preparation Of The Following Detailed Design Drawings Of Entire Building (see Doh Checklist Of Drawings Requirements) Based On The Design Development Drawings And Design Parameters Including Any Revisions And Refinements As Approved And Required By The Dedvmh: A. Detailed Architectural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). B. Detailed Structural Plans (refer To Checklist Of Drawings Requirements And Design Parameters). C. Detailed Electrical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). D. Detailed Storm Drain, Sanitary And Plumbing Plans (refer To Checklist Of Drawings Requirements And Design Parameters). E. Detailed Mechanical Plans (refer To Checklist Of Drawings Requirements And Design Parameters). F. Structural Computations, Including Soil Boring Test Results And Seismic Analysis And Electrical Design Computations. G. General Notes And Technical Specifications Describing Type And Quality Of Materials And Equipment To Be Used, Manner Of Construction And The General Conditions Under Which The Project Is To Be Constructed. H. Detailed Cost Estimates, Detailed Bill Of Qualities, Bill Of Quantities, And Program Of Works Including A Summary Sheet Indicating The Unit Prices Of Construction Materials, Labor Rates And Equipment Rentals. I. Summary Of Works J. All Design Output Shall Include The Following: Particulars Design Required Output Hard Copy Printed In Standard Size Paper 40 X 30 Printed And Hardbound Catalog For All Perspective Views, Architectural Finishes, Electrical Fixtures, Sanitary/plumbing Fixtures Utilizing Standard A4 Size Photo Paper Electronic Copy Electronic Copies In Standard Formats: - Designplansfile.pdf; - Designplanscadfile.dwg; - Design3dfile.skp/dwg/etc; - Powerpointpresentation.ppt; - 3d Animations (walkthrough.mp4/avi/mov/etc.) Design And Build Contractor Shall Compile All The Files And To Be Stored In 1tb External Drive Fourth And Final Session - The Design And Build Contractor Shall Submit The Completed Detailed Design Drawings Of The Entire Building, Within Sixty (60) Calendar Days From The Effectivity Of Notice To Proceed. C. Green Building 1. Design Development Shall Consider At Least Basic Requirements For Green Building Applied To Hospital Facilities In Building Component Systems Such As Architectural, Structural, Electrical, Mechanical, And Sanitary. D. 3d Animation And Walkthrough Presentations Designer Shall Prepare A 3d Walkthrough, That Is, Taking A Virtual Tour Of The Proposed Project/structure In Any Design Platform. It Shall Be Produced From Digital 3d Models That Have Been Visualized To A Photo-realistic Standard That Will Showcase All The Design Elements, Both Externally And Internally Of A Property Development And Its Spaces. Minimum Expected Output Shall Include But Not Limited To: - 3d Walkthrough Presentation That Will Show From The Main Entrance Of The Hospital Compound, Going Through The Site Where The Project Is To Be Located. From The Site, It Should Walk Through The Main Facade And Entrance Of The Ground Floor Of The Building Up To The Third Floor Showing All The Respective Floors, Its Lobbies, Hallways, Rooms And Other Support Facilities. - In Addition, The 3d Walkthrough Presentation Shall Include The Exterior Views / Facade Of The Building With Its Adjoining Structures. E. Pre-construction Pre-construction Meeting Shall Be Scheduled On The Next Day That The Completed Detailed Design Drawings Are Submitted. Key Stakeholders—including The Dedvmh, And The Design And Build Contractor (architects, Engineers, Consultants, And Contractor—must Attend). The Meeting Will Serve To: Review And Confirm The Submitted Design Documents. Ensure That The Designs Comply With The Project’s Specifications, Budget, And Schedule. Address Any Necessary Adjustments Or Clarifications Before Construction Commences. After The Pre-construction Meeting, The Design And Build Contractor Shall Finalize And Submit The Following Documents For The Approval Of Dedvmh: 1. Duly Signed Construction Schedule And S-curve 2. Duly Signed Manpower Schedule 3. Duly Signed Construction Methods 4. Duly Signed Pert Cpm And Ghannt Chart Showing Per Item Of Works Of Individual Projects 5. Log Book This Submission Should Encompass All Architectural, Structural, And Mepfs Plans, Specifications, And Any Amendments From The Meeting. These Documents Will Form The Basis For Construction. Upon The Dedvmh’s Approval Of The Submitted Construction Documents, A Notice To Commence Will Be Issued. Construction Activities May Only Begin Following The Issuance Of This Notice. F. Construction As A Rule, Contract Implementation Guidelines For Procurement Of Infrastructure Projects Shall Comply With Annex “e” And Guidelines For The Implementation Of Contracts For Design And Build Infrastructure Projects Shall Comply With Annex “g” Of Irr, Ra 9184. The Following Provisions Shall Supplement These Procedures: 1. Scope Of Works: Supply Of Materials, Labor, Tools And Equipment Necessary To Complete The Execution Of Architectural, Structural And Electrical And Mechanical Works. Includes All Other Necessary Works That Complete For The Fully Operational Building But Limited To The Following Work Items; A) Site Works - Provision Of Temporary Perimeter Fence - Demolition Of Existing Building/structure, Includes Hauling Of Debris Within The Hospital Compound - All Materials, Debris, Etc. Identified As Garbage As Directed By Hospital Management Shall Be Disposed Off-site - Excavation And Grading Provide Necessary Soil Protection On Excavated Portion. - Soil Poisoning And Termite Control B) Foundation Works - Foundation Of The Entire Building Includes Column Footings, Wall Footings And Other Sub-structures As Specified In The Approved Plan. C) Concrete Works - From New Foundation; Includes Slabs, Beams And Girders D) Architectural Works I) Exterior Walls – All Exterior Wall At Ground Floor Ii) Interior Walls – All Interior Wall At Functional Floors Complete With Wall Finishes Iii) Ceiling Works – All Functional Floors As Determined By Procuring Entity Iv) Floor Finish – All Functional Floors As Determined By Procuring Entity V) Doors And Windows– All Exterior Doors And Windows As Per Plan And Specifications Vi) Doors And Windows – All Functional Areas As Determined By Procuring Entity Vii) Painting Works – All Exterior Walls; Interior Walls At Functional Areas Viii) Façade And Signage E) Electrical Works I) Roughing-ins – All Necessary Roughing-ins Including Riser Conduits Including Ii) Cable Tray Iii) Panel Boards And Breakers – Main Breaker; Panel Boards From Ground Floor To Third Floor Iv) Wires And Cables – All Wires And Cables At Functional Floors Includes Installation Of Main Feeder Lines Tap To Existing Power House Including Connections To All Panel Board And Breakers V) Electrical Fixtures And Devices – All Fixtures And Wiring Devices At Functional Areas. Provision Of Usb Ready Outlets To Every Rooms. Vi) Application Of Electrical Connections/permits Shall Be Shouldered By The Contractor F) Mechanical Works I) Installation Of Automatic Fire Protection System At Functional Areas Ii) Installation Air Condition Units At Functional Areas As Determined By Professional Mechanical Engineer G) Plumbing And Sanitary Works I) Installation Of Plumbing And Sanitary System At Functional Areas, Includes; - Water Supply Pipelines - Waste Water Pipelines - Plumbing Fixtures And Accessories - Necessary Riser Pipes - Fiber Glass Pressure Tank - Provision Of Water Softener I) Electronics / Auxiliary Works - At Functional Areas: Public Address / Voice Evacuation Systems (paging Systems), Cctv, And Or Integrated Information And Communication Systems, Installation Of Fire Detection And Alarm System (fdas) At Functional Floors J) Other Works - At Dietary: Lpg Pipelines 1. No Works Shall Commence Unless The Contractor Has Submitted The Prescribed Documentary Requirements And The Dedvmh Has Given Written Approval. Work Execution Shall Be In Accordance With Reviewed And Approved Documents. The Contractor Shall Process The Approval Of Permit To Construct (ptc) Form Doh – Central Visayas Regional Office, Cebu City. In Addition To, The Contractor Shall Process The All-necessary Permits (i.e., Building Permit, Occupancy Permit And All Prerequisite Permits) Chargeable Against The Project. 2. The Contractor Shall Be Responsible For Obtaining All Necessary Information As To Risks, Contingencies And Other Circumstances Which May Affect The Works And Shall Prepare And Submit All Necessary Documents Specified By The Concerned Building Officials To Meet All Regulatory Approvals As Specified In The Contract Documents. 3. Any Errors, Omissions, Inconsistencies, Inadequacies Or Failure Submitted By The Contractor That Do Not Comply With The Requirements Shall Be Rectified, Resubmitted And Reviewed At The Contractor’s Cost. If The Contractor Wishes To Modify And Design Or Document Which Has Been Previously Submitted, Reviewed And Approved, The Contractor Shall Notify The Hospital Management And The Procuring Entity Within A Reasonable Period Of Time And Shall Shoulder The Cost Of Such Changes. 4. As A Rule, Changes In Design And Construction Requirements Shall Be Limited Only To Those That Have Not Been Anticipated In The Contract Documents Prior To Contract Signing And Approval. The Following Guidelines Shall Govern Approval For Change Or Variation Orders: A. Change Orders Resulting From Design Errors, Omissions Or Non-conformance With The Performance Specifications And Parameters And The Contract Documents By The Contractor Shall Be Implemented By The Contractor At No Additional Cost To The Procuring Entity. B. Provided That The Contractor Suffers Delay And/or Incurs Costs Due To Changes Or Errors In The Dedvmh Performance Specifications And Parameters, The Contractor Shall Be Entitled To Either One Of The Following: 1. An Extension Of Time For Any Such Delays Under Section 10 Of Annex “e” Of Irr (ra 9184); Or 2. Payment For Such Costs As Specified In The Contract Documents, Provided, That The Cumulative Amount Of The Variation Order Does Not Exceed Ten Percent (10%) Of The Original Project Cost. C. The Contract Documents Shall Include The Manner And Schedule Of Payment Specifying The Estimated Contract Amount And Installments In Which The Contract Will Be Paid. D. The Contractor Shall Be Entitled To Advance Payment Subject To The Provisions Of Section 4 Of Annex “e”, Irr (ra 9184). B. The Dedvmh Shall Define The Quality Control Procedures For The Design And Construction In Accordance With The Doh Guidelines And Shall Issue The Proper Certificates Of Acceptance For Sections Of The Works Or Whole Of The Works As Provided For In The Contract Documents. C. The Contractor Shall Provide All Necessary Equipment, Personnel, Instruments, Documents And Others To Carry Out Specified Tests. D. This Design And Build Projects Shall Have A Minimum Defects Liability Period Of One (1) Year After Contract Completion Or As Provided For In The Contract Documents. This Is Without Prejudice To The Liabilities Imposed Upon The Engineer/architect Who Drew Up The Plans And Specification For Building Sanctioned Under Section 1723 Of The New Civil Code Of The Philippines. E. The Contractor Shall Be Held Liable For Design And Structural Defects And/or Failure Of The Completed Project Within The Warranty Period Of 15 Years For Permanent Structures/buildings As Specified In Section 62.2.3.2 Of The Irr (ra 9184) V. Implementation Arrangement A. Reporting Protocol Contact Person I. Nelson A. Elle, Md, Dtmph, Mscih Office Of The Medical Center Chief Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Ii. Joan V. Kadusale, Cpa Supervising Administrative Officer Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iii. Leomel R. Labitad, Ce Engineer Iii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Iv. Allana Jane C. Dacoylo, Uap Architect Ii Don Emilio Del Valle Memorial Hospital Bood, Ubay, Bohol Vi. Elegibility Requirements A. Basic 1. The Eligibility Requirements For Design And Build Scheme Shall Comply With The Applicable Provisions Of Sections 23-24 Of Irr Of Ra 9184. 2. A Modified Set Of Requirements Integrating Eligibility Documents And Criteria For Infrastructure Project And Consulting Services Shall Be Adopted In Accordance With Annex G - Guidelines For The Procurement And Implementation Of Contracts For Design And Build Infrastructure Projects Of Irr Of Ra 9184. 3. Pcab Classification Under “general Building”; License Category B “medium A” 4. Contractor Must Have Similar Project In The Amount At Least Fifty Percent (50%) Of The Abc Within The Past Five (5) Years. 5. Similar Projects With The Following But Not Limited To: Low-rise Hospital Facility Project, Must Have Ongoing Or Completed Project At Least 2-storey Building. Supply And Installation Of Hvac System. B. Specialized 1. For Pre-design And Design Phase Of The Contract, The Bidder Shall Comply The Following Professionals To Be Assigned: I. Project Coordinator • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Hospital-related Project Management. • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Architect • The Architect Must Be A Registered And Licensed Architects (rla), With An Updated Professional Identification Card And Must Be A Member In Good Standing Of The Integrated And Accredited Professional Organization Of Architects (iapoa). • Should Have At Least 5 Years’ Experience In Hospital-related Project. Iii. Structural Engineer • Licensed Structural Engineer With At Least 5 Years’ Experience In Hospital-related Project Management. • Must Be A Member Of Accredited Structural Engineer Associations. Iv. Mechanical Engineer • Licensed Professional Mechanical Engineer With At Least 5 Years’ Experience In Hospital-related Project. V. Electrical Engineer • Licensed Professional Electrical Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vi. Sanitary Engineer • Licensed Sanitary Engineer With At Least 5 Years’ Experience In Hospital-related Project. Vii. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Viii. Administrative Support Staff 2. For The Construction Phase Of The Contract, The Contractor Shall Assign Technical Personnel With The Following Qualification: I. Project Manager • Licensed Architect Or Engineer With At Least 10 Years’ Experience In Medium Rise Hospital-related Project • Superb Oral And Written Communication Skills, Organization Skills And Excellent Administrative Abilities. Ii. Project Engineer (civil) • Licensed Civil Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iii. Project Engineer (mechanical) • Registered Mechanical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project Iv. Project Engineer (electrical) • Registered Electrical Engineer With At Least 5 Years’ Experience As Project Engineer In Medium Rise Hospital-related Project V. Cad Operator (at Least One For Architecture And One For Each Engineering Specialty) • At Least Bachelor’s Degree In Architecture, Engineering, And/or Industrial Technology Major In Drafting • Proficient In Autocad Software Vi. General Foreman (all Discipline) • With At Least 5 Years’ Experience As General Foreman In Medium Rise Project Vii. Skilled Workers (all Discipline) • With At Least 3 Years’ Experience In Medium Rise Project Viii. Administrative Support Staff Vii. Approved Budget Cost Project Description Approved Budget Cost Design Of Dedvmh Nutrition And Dietetics Service Facilities 5%-6% Of Abc Construction Of Dedvmh Nutrition And Dietetics Service Facilities 94%-95% Of Abc Total Abc Php 15,000,000.00 The Approved Budget For The Design-build Contract Is Fifteen Million Pesos (php 15,000,000.00) Which Is Identified As The Design And Build Of Don Emilio Del Valle Memorial Hospital Nutrition And Dietetics Service Facilities. Detailed Architectural And Engineering Design Services Shall Not Seven Percent (7%) Of The Approved Budget Cost (as Per Prboa Resolution No. 6 Series Of 2016 - Architect’s Guidelines For Standards Of Professional Practice Compliances On The Methods Of Compensation And Schedule Of Fees, Pursuant To Republic Act No.9266, Published In The Official Gazette, September 19, 2016 Issue) Of The Entire Building Inclusive Of Taxes And Duties. Proposals Exceeding The Approved Budget Shall Be Automatically Rejected. Viii. Estimated Duration Of Engagement The Duration Of The Contract Is Three Hundred Sixty (240) Calendar Days From The Design Phase Up To The Completion Of The Project From The Date Of Effectivity: I. Pre-design And Design Phase - 60 Calendar Days Ii. Construction Phase - 180 Calendar Days Ix. Minimum Requirements For Construction Safety And Health A. General Requirements No Contractor Or Subcontractor Shall Require Any Employee To Work In Surroundings Or Under Working Conditions That Are Unsanitary, Hazardous, Or Dangerous To His Health Or Safety. In Order To Meet This General Requirement, The Contractor Must: 1. Initiate And Maintain Programs (written Or Otherwise) To Comply With This General Requirement. 2. Provide Frequent And Regular Inspections Of The Job Sites By Competent Persons. Competent Person Means One Who Is Capable Of Identifying Existing And Predictable Hazards In The Surroundings Or Working Conditions Which Are Unsanitary, Hazardous, Or Dangerous To Employees, And Who Has Authorization To Prompt Corrective Measures To Eliminate Them. 3. Prohibit The Use Of Any Machinery, Tool, Material, Or Equipment That Is Not In Compliance With Applicable Requirements. 4. Permit Only Those Employees Adequately Trained To Operate Machinery Or Equipment. 5. Provide Training For All Employees In: Recognition And Avoidance Of Unsafe Conditions Workplace Safety And Health Requirements Applicable Hazards, Safe Handling, And Personal Protective Equipment Necessary For Handling Poisons, Caustics, Flammables, And Other Harmful Substances Relevant To Their Job Duties. Specific Hazards And Procedures For Entering Confined Spaces If Applicable 6. Provide Provisions For Medical Care And First Aid. 7. Develop An Effective Fire Protection And Prevention Plan. 8. Ensure Appropriate Housekeeping Measures Including Clear Walkways And Removal Of Combustible Scrap And Debris. 9. Require The Wearing Of Appropriate Personal Protective Equipment Such As Hard Hats, Safety Glasses, Steel Toe Shoes, Or Other Appropriate Protective Equipment In All Operations Where There Is An Exposure To Hazardous Conditions. 10. Develop An Emergency Action Plan Covering Designated Actions Employers And Employees Must Take To Ensure Employees Safety From Fire And Other Emergency. Plan Must Be In Writing For Employers With Greater Than 10 Employees All Employees Must Be Trained Upon Initial Assignment On The Parts Of The Plan The Employee Needs To Know In The Event Of An Emergency. 11. Provide Access To Hand Washing Facilities, Toilets, And An Adequate Supply Of Drinking Water. 12. Provide Safety And Health Signs That Are Clearly Visible To Construction Workers And Public. 13. Conduct Regular Safety Meetings. Source: Colorado State University Occupational Health And Safety Section Department Of Environmental Health Fort Collins, Colorado X. Design Technical Specifications And Requirements The Bidder Shall Submit The Following Design Deliverables In Accordance With The Design Specifications, Parameters And Drawing Checklist But Not Limited To The Following: Activity Reports And Documents Required 1. Pre-design Phase 1.1 Master Site Development Plans And Conceptual 3d Design Five (5) Sets Duly Signed And Seal Master Site Development Plans In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) Powerpoint Presentation And/or Walkthrough Presentation 2. Design Phase 2.1 Detailed Architecture And Engineering Designs/plans Including Applicable And/or Approved Revisions To The Satisfaction Of The Procuring Entity Five (5) Sets Duly Signed And Seal Detailed Architecture And Engineering Plans/drawing In Hard Copy (at Least 20 X 30 Paper Size In Desired Minimum Scale) And Softcopy (editable File.dwg And 3d Model.skp/cad/etc) (refer To Design Parameters And Drawing Checklists) 2.2 Construction Technical Specifications Five (5) Sets Duly Signed And Seal Construction Technical Specifications In Hard Bound Xi. Space Requirements General Floors: Ceiling Height Should Be At Least Three Meters Clear Height For 2nd Floor And Up. Ground Floor Lobby Must Be Of Higher Ceiling. Provision Of Utility Room Enough To House Trolley And Dirty Utilities With Floor Drain All Floors Shall Have Direct Access To Ramp Both Stairs Are For Service And Emergency Use External Window At Second Floor And Up Shall Be Of Awning Type. Provision Of Electrical Room Ramp For Wheelchair Access (with A Clear Width Of At Least 1.22 M. 4 Ft.). Minimum Of Two (2) Exits, Remote From Each Other, For Each Floor Of The Building. Exits Restricted To The Following Types: Door Leading Directly Outside The Building, Interior Stair, Ramp And Exterior Stair. Exits Terminate Directly At Open Space To The Outside Of The Building. Ground Floor – Nutrition And Dietetics Service Facilities • Hospital Staff Dining Room - This Area Is Where Hospital Staff Diners Take Their Meals. - Planning Relationships: A. Close To Serving And Food Assembly Area B. Close To Dishwashing Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Four (4) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least Two (2) Units Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Cooking And Baking Area - This Area Is Dedicated For Cooking And Baking Food, With High Pressure Gas Piping System. Equipment And Accessory Checklist: • Hood, Exhaust • Drainage Key Furniture/fixture Checklist: • Counter, 900mm High • Stainless Steel Grade 304 Sink, Single Compartment With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment With Drainboard; 350-400mm Deep • Shelves, Overhead • Drain, Trench Grating • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Thirteen (13) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Two (2) Units Ground Fault Circuit Interrupter. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light And Two (2) Units For Exhaust Fan With Specifications Of 15a, 2p, And 240v, Single. - Standby/emergency System: E. Provide And Install Adequate Life Safety And Critical Emergency Branch Circuit For Lighting And Utilization Equipment Connected To The Alternate Power Source. - Auxiliary System: F. Provide And Install The Following Auxiliary System: • Communication System Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: G. Provide At Least Three (3) Units Smoke Detector. - Gas Piping System: H. Provide High Pressure Gas Piping System. - Equipment And Accessories: I. Provide Hood, Exhaust J. Provide Range With Oven K. Provide Range With Broiler - Air Conditioning System: L. Provide Air Conditioning System. • Food Preparation Area W/ Special Diet Preparation Area - This Area Is Where Food Service Workers Prepare Food Vegetables, Slice And Cut Meat And Fish, Segregate Food, Set-up And Assemble Cooked Food, Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. This Is Also Where Dietitian Puts Tags On Prepared Trays For Pay Patients. This Also Includes Space For Special Diet Preparation Area Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stainless Steel Grade 304 Sink, Double Compartment, With Drainboard; 350-400mm Deep • Counter, Food Preparation; Stainless Steel Grade 304 • Counter, Tray Set-up; Stainless Steel Grade 304 • Shelves, Overhead • Drain, Trench Grating; Stainless Steel - Planning Relationships: A. Adjacent To Staff Dining B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least Seven (7) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: E. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector. - Air Conditioning System: G. Provide Air Conditioning System. • Blenderized And Tube Feeding Area - This Area Is Where Preparation Of Food And Equipment Needed For Blenderized And Tube Feeding. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304, With Cabinets Above And Shelves Below • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Special Diet Preparation Area B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Three (3) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least Three (3) Units Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Serving And Food Assembly Area - This Area Is Where Food Service Workers Set Up And Assemble Cooked Food, And Place Food Trays And Containers On Food Conveyors To Be Taken To Wards. Key Furniture/fixture Checklist: • Counter, Work; Stainless Steel Grade 304 • Stainless Steel Grade 304 Sink, Single Compartment, With Drainboard; 350-400mm Deep • Stool, Adjustable Height • Concealed Floor Drain - Planning Relationships: A. Adjacent To Staff Dining Room B. Close To Dietitian/nutritionist’s Office - Lighting System: C. For General Illumination, Provide At Least 500 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System. • Food Conveyor Parking - This Space Is For Transit Station For Food Tray Truck/conveyor. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide One (1) Unit Orbit Fan. • Cold Storage - This Area Is For Storage Of Poultry, Meat And Dairy Products Procured, Food That Easily Spoils (egg, Vegetables, Fruits), And Of Leftover Cooked Food That Are Still Edible Equipment And Accessory Checklist: • Refrigerator, 20 Cu. Ft. • Freezer, 20 Cu. Ft. • Chiller, 20 Cu. Ft., Reach-in Key Furniture/fixture Checklist: • Table; Stainless Steel Grade 304; 750 X 1200mm • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dry Storage Room B. Close To Receiving Area C. Adjacent To Dietitian’s Office - Lighting System: D. For General Illumination, Provide At Least 150 Lux. - Power System: E. Provide At Least Ten (10) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: F. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: G. Provide One (1) Unit Exhaust Fan. • Dry Storage - This Area Is For Storage Of Food Procured, Food Intended For The Next Two Meals, Of Excess Supplies For Future Use, And Of Food That Does Not Spoil Easily. Key Furniture/fixture Checklist: • Counter, Work • Shelves, 400 Mm Deep • Cabinet, Lockable - Planning Relationships: A. Adjacent To Cold Storage Room - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Three (3) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide One (1) Unit Orbit Fan. • Storage For Utensils/silverware - This Area Is For Storage Of Kitchen Utensils And Silverware Key Furniture/fixture Checklist: • Shelves, Open, 600mm Deep - Planning Relationships: A. Close To Dietitian’s Office - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least Two (2) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: D. Provide One (1) Unit Orbit Fan. • Delivery Receiving Area - This Area With Exhaust Fan Is Dedicated For Dietitian On Duty And Auditor Witness Weighing Of Food Delivered By Supplier, And Where Auditor Inspects And Checks Quality Of Food Items Purchased From The Market And Those Delivered By The Supplier. Key Furniture/fixture Checklist: • Counter, Stainless Steel • Sink, Single Compartment With Drainboard; 350-400mm Deep • Counter, Tiled • Shelves, Open • Concealed Floor Drain - Planning Relationships: A. Adjacent To Dietitian’s Office B. Close To Cold And Dry Storage Rooms - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dishwashing And Pots Washing Area - This Area Is For Washing Of Pots, Pans, Trays, Dishes And Other Kitchen Utensils, And Where Food Service Workers Perform Other Clean-up Activities. Equipment And Accessory Checklist: • Dishwashing Machine, Floor Unit • Wash Container, 380 Mm Dia. • Waste Bin With Black Lining Key Furniture/fixture Checklist: • Counter, Stainless Steel Grade 304 • Stainless Steel Sink Grade 304, Double Compartment With Drainboard • Grease Trap • Counter, With Upturned Edge • Shelves, Open • Table, Feeder, Stainless Steel 700 X 1200mm • Table, Work, Stainless Steel 700 X 2400mm • Concealed Floor Drain - Planning Relationships: A. Close To Food Preparation Area B. Close To Dietitian’s Office - Lighting System: C. For General Illumination, Provide At Least 250 Lux. - Power System: D. Provide At Least Six (6) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Parallel Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: E. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: F. Provide At Least Two (2) Units Orbit Fan. • Waste Holding Area - This Area Is For Food Service Workers Sort Garbage Accordingly, Pack Garbage And/or Place Sorted Garbage Into Proper Bins/container, And Where Garbage Generated For A Day Or Two Is Temporarily Stationed Prior To Being Collected For Transfer To The Waste Management Service. Equipment And Accessory Checklist: • Garbage Bin Containers • Faucet With Hose Bibb Key Furniture/fixture Checklist: • Floor Drain - Planning Relationships: A. Located In The Perimeter Of The Dietetics Area - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Provide At Least One (1) Unit Ground Fault Circuit Interrupter (gfci). Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector (ionization Type). - Ventilation System: E. Provide At Least One (1) Unit Orbit Fan. • Dietitian’s Office / Staff Office - This Room Area Is Where The Chief Dietitian Calls Meetings With Staff For The Preparation Of Monthly Menu, Where Chief Dietitian And Staffs Reads, Writes And Uses Telephone In His Work Station, Dietitian And Staff Receive Visitors, Dietitian And Staff Store, File And Retrieves Records. - Planning Relationships: A. Located In The Kitchen Where It Shall Give The Dietitian Extensive/elevated View Of Work Areas And Control Over Possible Pilferage Of Dietary Supplies And Equipment. - Lighting System: B. For General Illumination, Provide At Least 500 Lux. - Power System: C. Provide At Least Twelve (12) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Provide At Least One (1) Unit Ground Fault Circuit Interrupter Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. - Auxiliary System: D. Provide And Install The Following Auxiliary System: • Communication System Telephone System – Provide At Least One (1) Unit Telephone Outlet. Local Area Network System – Provide At Least One (1) Unit Data Outlet. Public Address Paging System – Provide At Least One (1) Unit Paging System - Fire Alarm System: E. Provide At Least Two (2) Units Smoke Detector (ionization Type). - Air Conditioning System: F. Provide Air Conditioning System • Staff’s Dressing, Lockers, Toilet And Bath - This Room/space Is Equipped With Secure Lockers, Private Dressing Rooms, And Accessible Toilets And Showers To Support Hygiene And Comfort For Male And Female Staff. This Space, With Its Own Separate Staff Entrance, Allows For Efficient Staff Flow. - Planning Relationships: A. Close To Dishwashing Area B. Adjacent To Food Assembly/tray Set-up Area - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Power System: D. Provide At Least One (1) Unit Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Storage/closet - This Area Is For Storing Cleaning Materials Such As Detergents, Disinfectants, Brushes, Mops, And Other Sanitation Tools Used In Dietary Operations. - Planning Relationships: A. Located Within Patients Dishwashing Area. - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Power System: C. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Lpg Storage Area - This Area Is Well-ventilated Space Designed For The Safe Storage Of Lpg Tanks Used In Kitchen Operations. The Area Will Be Located Away From Open Flames, Heat Sources, And High-traffic Zones To Ensure Safety. It Will Feature Non-combustible Walls, A Fire Extinguisher, Proper Signage, And Adequate Lighting. The Space Will Also Include Provisions For Leak Detection, An Accessible Emergency Shut-off Valve, And Ground-level Storage To Prevent Accidental Tipping Of Lpg Tanks. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Power System: B. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • All Gender / Pwd Toilet & Bath - This Area Is Designed To Be Inclusive, Complying With The Updates To The Amended Irr Of Bp 344. It Ensures Accessibility For All Genders And Persons With Disabilities (pwd), Featuring Wide Doors, Support Bars, Urinal And Spacious Layout To Meet The Latest Standards For Accessibility And Comfort. - Planning Relationships: A. Accessible To All Staffs. B. Minimum Of One (1) Toilet On Each Floor Accessible To Disabled. - Lighting System: C. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: D. Provide At Least One (1) Unit Smoke Detector. • Electrical Room - Located On The Ground Floor In The Staff Hallway, It Is Strategically Placed To Maintain Separation And Safety While Ensuring Easy Access For Maintenance And Operation. - Lighting System: A. For General Illumination, Provide At Least 250 Lux. - Fire Alarm System: B. Provide At Least One (1) Unit Smoke Detector. - Power System: C. Provide At Least One (1) Units Of Outlet With Specifications Of 15a, 2p, 240v, Duplex, Grounding Type And Universal Slots. Also, Provide At Least One (1) Unit Of Outlet For Emergency Light With Specifications Of 15a, 2p, And 240v, Single. • Common Toilet With Sink (female And Male Toilet Cubicle) - This Area, Featuring Separate Female And Male Toilet Cubicles, Will Serve Both The Dietitians/staff Office And The Hospital Staff Dining Room. It Will Be Designed For Accessibility And Include Standard Fixtures, Such As Sinks, Mirrors, And Hand Dryers Or Paper Towel Dispensers. The Space Will Prioritize Hygiene And Ease Of Maintenance With Durable, Easy-to-clean Surfaces, Adequate Lighting, And Ventilation. - Planning Relationships: A. In Between Dietitians/staff Office And Hospital Staff Dining - Lighting System: B. For General Illumination, Provide At Least 150 Lux. - Fire Alarm System: C. Provide At Least One (1) Unit Smoke Detector. Xiv. Design Parameters (architectural) A. Codes And Standards The Architectural Works Shall Be In Accordance With The Following Laws, Codes And Standards. Laws And Codes: 1. National Building Code Of The Philippines And Its Latest And Amended Irr 2. Ra 9266 Or Architecture Law And Its Latest And Amended Irr 3. Ra 4226 Or Hospital Licensing Act And Its Latest And Amended Irr 4. Bp 344 Or Accessibility Law And Its Latest And Amended Irr 5. Ao 35, S. 1994 Or Ao Pertaining To The Control Of Radiation Hazards 6. Ra 9514 Fire Code Of The Philippines 7. Existing Local Codes And Ordinances. 8. And Other Laws That Applies To The Projects Standards: 1. Bureau Of Product Standards (bps) 2 Underwriters Laboratory (ul) 2. Doh Technical Guidelines For Hospital & Health Facilities Planning And Design – Level 3 B. General Drawing Guidelines 1. General All Drawings Shall Be Computer-drafted. Drawings Shall Be Submitted Both In Printed And Electronic Copies. Keep The Same Orientation For All Plans. The North Orientation Shall Be Indicated In All Architectural Floor Plans. The Orientation Of The Architectural Plans Shall Be Consistent With All The Engineering Plans. Existing Buildings And New Works Shall Be Clearly Indicated And Labeled In The Site Plans. Detailed Plans Shall Have A Scale Not Smaller Than 1:50 Meters. Spot Detailed Plans, Elevations, And Sections Shall Have A Scale Not Smaller Than 1:10 Meters. Avoid Notes Such As ‘see Architectural Detail’ Or ‘see Structural’. Always Refer With A Callout To The Specific Detail Drawing And Sheet Number. 2. Site Plans The Site Plans Shall Have A Scale Not Smaller Than 1:500 Meters. 3. Floor Plans All Plans Shall Be 1:100 Meters. The Same Scale Shall Be Used For The Rest Of The Architectural, Structural, Sanitary, Plumbing, Electrical And Mechanical Plans, Except For Each Trade’s Site Plan, Detailed Plans And Spot Details. Elevation Callouts Shall Be Indicated On The Floor Plans And Shall Be Consistent With The Elevation Drawing. Section Line Callouts On The Floor Plans Shall Be Consistent With The Section Drawing. Floor Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Floor Finishes And Wall Finishes. Floor Elevations Shall Be Indicated In The Floor Plans. This Shall Be In Reference To The Natural Grade Line Or The Established Finished Floor Lines Of The Adjoining Existing Buildings. The Location Of Mechanical Equipment, E.g. Air Conditioning Shall Be Indicated In The Floor Plans. This Shall Be Consistent With The Mechanical And Electrical Plans. Door Callouts Shall Be Circles With The Proper Numbering, E.g. D-01. Window Callouts Shall Be Hexagons With The Proper Numbering, E.g. W-01. 4. Elevations And Sections Finish Floor Lines And Top Of Truss Lines Shall Be Consistent In All The Elevations, Sections And Structural Plans And Details. 5. Reflected Ceiling Plans Reflected Ceiling Plans Shall Be Indicated With Boxed Room Callout Numbers, Including The Callout For Ceiling Finishes And Lighting Fixtures. Ceiling Height Relative And In Reference To The Finish Floor Line Shall Be Indicated In The Reflected Ceiling Plans In Each Room With Boxed Dimensions. This Is To Ensure That The Ceiling Heights Of All Rooms Are Established Whether Or Not Reflected In The Sections. The Description And Location Of The Fixtures, E.g. Lighting, Smoke Detectors, Air Condition Vents, Exhaust Fans, In The Reflected Ceiling Plans Shall Be Consistent With The Electrical And Mechanical Plans. 6. Roof Plans Location Of All Downspouts Shall Be Indicated In The Roof Plans. 7. Doors And Windows Door And Window Schedules Shall Indicate The Type Of Door Or Window, The Number Of Sets, The Location/s Of The Door Or Window, The Materials And Accessories Included And Other Special Specifications, E.g. Color Or Finish. All Windows Above Ground Floor Should Be Of Awning With An 45 Deg. Opening Angle. 8. Details Provide A Minimum Of One (1) Bay Section Of A Scale Not Smaller Than 1:50 Meters For Each Major Building Preferably Cut Along The Area With Special Construction Design. Provide Spot Detail Plans, Elevations And Sections Of A Scale Not Smaller Than 1:10 Meters For Special Designs With Aesthetic Treatment And Ornamentation. Provide Detailed Plans Of A Scale Not Smaller Than 1:50 For All Areas Needing Tile Pattern, E.g. Lobby, Corridor, Entrance Walk, Showing The Position And Pattern Of Tiles. Centerline Location Of Plumbing Fixtures Shall Be Indicated In Detailed Plans With Lines Of Reference And Its Corresponding Dimensions. This Is To Indicate The Exact Locations Of The Plumbing/sanitary Roughing-ins. C. Site Works 1. The Master Site Development Plan Of The Hospital Shall Include The Following: Contour And Survey Of The Lot, Including Bearing And Distance Of The Property Line Road Network And Curbs And Sidewalks Parking Spaces Reference Location Of Existing Trees Reference Location And Footprint Of Existing Buildings, With The Corresponding Building Names And Dimensions, Including Distances Between Adjacent Buildings, And Distances Between Buildings And The Nearest Property Line Reference Location Of Utilities, E.g. Water Reservoirs, Septic Tank, Wastewater Treatment Plant, Powerhouse, Transformers, Waste Storage Area, Security Outposts 2. The Layout Of The Buildings On The Site Shall Be Zoned According To The Service It Provides: The Outer Zone Shall Include All Front-line Services, E.g. Emergency, Out-patient, X-ray, Laboratory And Other Ancillary Departments. The Inner Zone Shall Include The Wards. The Deep Zone Shall Include Services Like The Operating Room, Delivery Room, Nursery, Intensive Care Unit And Other Sensitive Hospital Services. The Service Zone Shall Include Non-medical Services But Are Essential To Hospital Operations, E.g. Staff Lounge And Lockers. There Shall Be A Separate Road Network And Entry/exit For The Public And The Service Vehicles, E.g. Ambulance, Waste Collection Vans, Delivery Trucks. In Limited Lot Areas, Buildings Should At Least Be Spaced Four (4) Meters Apart To Allow Natural Light And Ventilation. Covered Walkways Shall Be Provided For Access And Connection To All The Buildings. Ramps Shall Be Provided In All Main Entrances Of The Buildings And Other Access Openings To Walkways Leading To Other Buildings. D. Building Architectural Works 1. Floor Plans The Structural, Sanitary, Plumbing, Electrical And Mechanical Designs Are Required To Refer To The Architectural Plans And Specifications In Case Of Discrepancies. If An Engineering Design Will Have Any Possible Conflict Or Interference On The Architectural Design, The Latter May Be Adjusted Provided That The Aesthetic Value Will Not Be Compromised. The Architectural And Engineering Plans Shall Be Consistent All Throughout In Terms Of Dimensions And Locations Of Columns, Beams, Walls, Roof Line, Conduits, Ducts, Pipes, And Fixtures, Among Others. Column And Beam Grid Lines Shall Also Be Consistent In All The Architectural And Engineering Plans. Verify And Coordinate Floor Plans With The Mechanical, Electrical And Sanitary Design With Regard To The Requirements For Mechanical Rooms, Ahu Rooms, Electrical Rooms, Pipe Chase, And Other Engineering Requirements. Public Toilets Shall Have Provisions And Fixtures For Persons With Disability As Required By Bp 344. If Enough Space Allows, Toilets Specially Made And Designated For Persons With Disability Is Preferable. 2. Walls Exterior Walls Shall Be 200mm. Thick, While Interior Walls Shall Be 150mm. Thick. This Is Indicative Of The Finished Wall Thickness Including The Plastering And Tile Works. Used Soundproofed Wall Materials For Areas With Indicated “soundproofed”. Walls With An Stc Rating Of At Least 45-50 Is Recommended. In Areas Where High Confidentiality Or Privacy Is Required (e.g., Patient Rooms, Doctor’s Offices Near Noisy Zones), Consider An Stc Rating Of 55-60. Double Layer Of Drywall: Use Two Layers Of Drywall On Either Side Of A Metal Or Wood Stud Frame For Enhanced Soundproofing. Acoustic Insulation: Use High-density Insulation Like Mineral Wool Or Acoustic Fiberglass In Wall Cavities To Absorb Sound. Higher Mass: Increase The Wall's Mass With Materials Like Masonry Or High-density Concrete, Which Can Significantly Reduce Sound Transmission. Toilet Wall Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Wall Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Including The Top-most Tile Not Reaching The Ceiling Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 3. Floors If Floor Tiles In Two Adjacent Rooms With Different Material, Color Or Design Meet At The Door Opening, The Cut Shall Be Located Middle Of The Door Thickness When In A Closed Position. Provide Details In The Floor Pattern Design. Floors At The Openings Of Toilets For Persons With Disability Shall Be Sloping. Indicate In The Plans And Sections. The Size Of The Toilet Floor Tiles Shall Be 300mm. X 300mm. For Areas Of Six (6) Square Meters Or Below. Toilet Floor Tiles Shall Be 300mm. X 600mm. For Areas Above Six (6) Square Meters. Indicate The Tile Pattern. The Size Of The Pantry/lounge Floor Tiles Shall Be 600mm. X 600mm. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Offices And Wards Shall Be 600mm. X 600mm, Or Bigger Depending On The Proportion To The Size Of The Room. Indicate The Tile Pattern. The Size Of The Floor Tiles Of The Lobby And Corridor Shall Not Be Less Than 400mm. X 400mm. The Tile Size Of 600mm. X 600mm. Is Recommended For Bigger Areas. Indicate The Tile Pattern. Layout And Work On Wall And Floor Tiles Must Be Aligned, Plumb, Level, And Square. All Edges, Corners And Intersections Of Toilet Tiles, Shall Be Provided With Polyvinyl Chloride Tile Trims. Tile Color And Design Shall Be Approved First Before Installation. 4. Ceiling Works Ceiling Height For Areas With Special Aesthetic Treatment, E.g. Lobby, Major Conference Room, Auditorium, Executive Office, Shall Be Proportional To The Area Or Room Or As Required By The Designer. However, This Shall Not Be Lower Than 2700mm. Provide Details. If Acoustic Boards On Aluminum T-runners Would Be Used For The Ceiling, Layout Should Be On Center And Avoiding Cut Pieces. If The Remaining Perimeter Of The Ceiling Is Less Than 600mm. Wide, It Shall Be Designed Complimentary With Fiber Cement Boards On Light Gauge Metal Furring. Likewise With Acoustic Boards In Big Areas, E.g. Offices, And Wards, Shall Be Designed In A Way To Break The Redundancy. Provide Details. Soffit Of Exterior Beams And Slabs Shall Have Drip Moulds To Prevent Damage Due To Water Sipping Into The Eaves Or Ceiling. Section Details Shall Be Required To Show The Drip-mould. Acoustic Panels: Adding Absorptive Finishes, Such As Fabric-covered Acoustic Panels, Can Help To Dampen Internal Reflections And Improve Sound Quality Within Rooms, Although These Don’t Block Sound But Reduce Reverberation. Non-cove Light Placement: Instead Of Cove Lighting, Use Flush-mounted Lighting Directly In The Ceiling With Sealed Housings That Prevent Dust Buildup. Fixtures Should Be Durable, Non-reflective, And Easy To Clean Without Requiring Special Maintenance Procedures. 5. Doors And Windows Major Rooms That Require Security Shall Have Sturdy Doors E.g. Wood Panel, And Metal. Minor Rooms That Do Not Require Security Shall At Least Have Wood Flush Doors. Toilets And Other Wet Areas Shall Have Steel Doors. Heavy-use Doors, E.g. Operating Rooms, Delivery Rooms, Should Be Provided With Stainless Steel Kick Or Push Plates And Door Closers. Fire Escape Doors Should Be Provided With Panic Hardware And Door Closers, And Shall Conform With The Requirements Of The Fire Code Of The Philippines. Aluminum Frames Of Glass Doors Shall Be Powder-coated. Door Finish And Color Shall Be Approved First Before Application. Window Sills Shall Be Slightly Sloped Outwards To Prevent Damage To Windows And Paint Due To Water Seepage. Section Details Shall Be Required To Show This Slope. All Doors Of A High-occupancy Room Shall Swing Outwards And As Required By The Fire Code Of The Philippines. Door Jambs With No Moulding/casing Installed On Concrete Walls Shall Have Construction Grooves All Around. Provide Details. All Doors And Windows Shall Have Reinforced Concrete Lintel Beams. Provide Details. Door Seals And Frames: For Soundproofed Rooms, Also Use Solid-core Doors With Perimeter Seals To Prevent Sound From Leaking Through Door Frames. 6. Stairs, Ramps And Corridors Ramps For Persons With Disability Shall Have A Slope Not Higher Than 1:12. Handrails And Clearances Shall Conform With The Requirements Of Bp 344. Regular Stairs Shall Have Risers At 150mm. High And Treads At 300mm. Wide. Fire Stairs Could Have A Maximum Riser At 200mm. And Tread At 250mm. Handrails Shall Be 1100mm. High. Clearances Shall Conform With The Requirements Of The Fire Code Of The Philippines. Corridors Shall Have A Minimum Unobstructed Width Of 2450mm. This Shall Be Measured Clear From The Surface Of The Finished Wall And Not On-center Of The Rough Chb Wall. Corridors Shall Not Be Areas For Temporary Or Permanent Storage Of Stretchers, Wheelchairs, Trolleys, Food Carts, Oxygen Tanks Or Other Movable Hospital Equipment. Storage Or Parking Spaces Shall Be Provided For These. Corridors And Exit Doors Shall Conform With The Requirements Of The Fire Code Of The Philippines. 7. Fixtures And Accessories Three-way Electrical Light Switches Shall Be Provided At The Foot And The Top Of The Stairs Per Floor. Likewise, At Both Ends Of A Long Corridor. Electrical Light Switches Shall Be Located By The Knob Side Of The Door. Electrical Switches And Outlets Shall Be Installed Plumb And Level. Public Toilets Shall Always Be Provided With Heavy-duty Soap Dispensers And Electric Hand Dryers. Public Toilets Shall Always Be Provided With Stainless Steel Handrails In Conformity To The Requirements Of Bp 344. A Drainage Line Shall Be Provided For Window-type Air Conditioners. Likewise, Split-type Air Conditioners Located In The Interior Part Of The Building Shall Be Located Adjacent To Areas With Drainage Lines, E.g. Toilets, Downspouts, Balconies. Seal Gaps And Openings: Ensure All Joints, Gaps, And Penetrations (e.g., Electrical Outlets, Ducts) Are Sealed With Acoustical Caulk Or Gaskets To Prevent Sound Leakage. Sterile Area Lighting Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. 8. Roofing Works The Section Of The Roof Gutters Shall Be Designed, In Case Of A Clogged Downspout, So That The Overflow Of Water Will Be Directed Outside Of The Building And Not Towards The Eaves Or Interior Ceiling To Prevent Any Damage. Provide Details. Avoid Valley Or Inside Gutters In Roof Design. But In Cases Required In Aesthetic Design, Valley Or Inside Gutters Shall Be In Stainless Steel Or Concrete Gutters With Membrane-type Waterproofing, And The Section Shall Be Designed With A Capacity For Big Volume To Prevent Any Damage Due To Overflow. Provide Details. Parapets, Designed As A Roof Protection From The Winds, Must Be Designed To Satisfy The Preceding Parameters. Provide Details. The Slope Of The Roof Shall Not Be Less Than 30 Degrees. 9. Painting Painted Ceiling Shall Be In Flat Latex Finish, While Cornices And Mouldings Shall Be In Gloss Enamel Finish. Painted Interior Wall Shall Be At Least In Semi-gloss Latex Finish For Ordinary Rooms, E.g. Offices, Unless Specified To A Higher Type Of Paint. Patient-related Rooms, E.g. Emergency Rooms, Out-patient Departments And Wards, Shall Be In Anti-bacterial And Odor-absorbent Paint Finish. Special Rooms, E.g. Operating Rooms, Delivery Rooms, And Laboratories Shall Also Be In Anti-bacterial And Odor-absorbent Paint Finish. Painted Exterior Wall Shall Be At Least In Moisture-resistant/water-repellent Solvent-based Paint Finish, Textured Or Smooth, Unless Otherwise Specified. Paint Color And Shade Shall Be Approved First Before Application. D. Specific Requirements 1. Provide Spot Detail Plans And Sections Of The Following: Gutter, Eaves, And Parapet Ceiling - Covelight, Special Connections And Design, Mouldings, Valances Stairs - Handrail, And Baluster Design Ramps - Handrail Design And Floor Pattern Doors, Windows And Gates - Grille Works, Special Architectural Treatment And Design, E.g. Façade Design, Special Window And Door, Counters Special Carpentry Works, E.g. Partitions, Cabinetry Building And Room Signages And Wayfinding Systems All Pwd Toilets Shall Be Labelled “all Gender / Pwd Toilet” Other Details As May Be Required 2. Provide Room Data Sheets, Including Detail Floor Plan, Ceiling Plan And Sections Of The Following Rooms, In Coordination With The Requirements Of The Electrical, Sanitary And Mechanical Designs: A. Cooking Area, Including Furniture And Equipment With Specific Dimensions Of The Location Of Fixtures And Accessories, And In Coordination With The Requirements Of The Electrical And Mechanical Engineering Design. B. Hospital Staff Dining C. D. (all Blanks Shall Be Filled As Required By Or Applicable To The Project.) E. Summary Of Materials Materials To Be Used Shall Be Fire-resistant, Non-toxic, Moisture-resistant And Termite-resistant, E.g. Fiber Cement Board, Light-gauge Steel Frame, Polyvinyl Chloride Ceiling Panels. Wet Areas, E.g. Toilets, And Pantry/lounge Shall Use Non-skid/non-slip Vitrified Ceramic Floor Tiles. Heavy Traffic Areas, E.g. Lobby, And Corridor Shall Use Heavy-duty Seamless Granite Floor Tiles Or A Higher Type Of Floor Material. Ramps And Stairs Shall Use Non-skid/non-slip Floor Tiles, Materials As Specified. Aluminum T-runners Shall Be Powder Coated. Metal Rod Hangers With Adjustable Clips, And Not Galvanized Iron Wires, Shall Be Used To Support And Suspend The Aluminum T-runners And Light Gauge Metal Furrings. Roofing Sheets Shall Be Ga.# 24 Aluminum-coated, Pre-painted, And Pre-formed. F. Drawing Requirements: See Attached Doh Checklist Of Drawings. -end Of Architectural Design Parameters- Xv. Design Parameters (structural/civil Works) A. Codes And Standards The Civil/structural Design Shall Be In Accordance With The Following Codes And Standards Codes 1. National Structural Code Of The Philippines (nscp) 2010 2. National Building Code Of The Philippines And Its Revised Irr 3. Accessibility Law 4. Local Codes And Ordinances Standards 7. Bureau Of Product Standards (bps) 8. Philippine National Standards (pns) 9. Dpwh Blue Book 10. American Concrete Institute (aci) 11. American Society For Testing Materials (astm) 12. American Welding Society (aws) B. Site Works Based On The Master Site Development Plan Of The Hospital, Provide Where Applicable Complete Design And Details Of Hospital Road (concrete With Curb And Gutter, Including Drainage) Network, Walkways, Parking Areas And Fencing. 1. The Main Hospital Road Shall Be Capable Of Two-way Traffic (at Least 6mts. Width) With A Minimum Thickness Of 150mm (8 Inches). Concrete Strength Should Be At Least 3000psi. Interior Roads (leading To Support Facilities) Shall Be Designed To Accommodate Delivery Vehicles, And Fire Trucks In Case Of Emergency. 2. Walkway Should Be At Least 100mm Thk. With Concrete Strength Of 2500psi. Ramps Should Be Provided, Instead Of Steps, For Any Change In Elevations. 3. Parking Area Slabs Should Be At Least 150mm Thk. With Concrete Strength Of 3000psi. 4. Fences Should Be Seen Through In Front Of The Hospital While The Tree (3) Other Sides Should Be Concrete Hollow Blocks With Minimum Height Of 2 Meters And To Be Provided With Perimeter Lighting. See-through Fence Design Will Be Made Of 32mm Square Bars Spaced At 100mm On Center And Provided With Three (3) Concrete Hollow Blocks (45mm High) Zocalo Walls. C. Buildings 1. The Hospital Buildings Should Be Designed Using A Seismic Importance Factor Of 1.5 For The Immediate Occupancy Category. Buildings Should Be Designed In Accordance With Nscp Requirements Up To Magnitude 7 For Those Near Seismic Source Type A. Seismic Gaps Between Buildings (old And New) Should Be Properly Observed. 2. The Hospital Buildings Should Be Designed Also Using Wind Importance Factor Of 1.15 (especially For Design Of Trusses/roofing System). Concrete Gutters And Parapet Walls Should Be Provided As Additional Protection To The Roofing System During Strong Typhoons. Wind Velocity Of 300-350 Kph Shall Be Considered Upon The Recommendation Of Structural Engineer 3. The Structural Designer Should Verify With Philippine Volcanology And Seismology (phivolcs) The Distance Of The Proposed Hospital To Nearest Active Fault Lines And With The Denr For Geo-hazard Mapping. 4. Soil Investigation (at Least Three Boreholes) Should Be Conducted To Determine Soil Bearing Capacity And Recommended Foundation Design (applicable Even For One Storey Structure). 5. The Structural Designer Is Encouraged To Use Fire-resistive And Non-toxic Materials. D. Details – The Following Shall Be Provided: 1. Connection Details Of Beams And Columns Following The Requirements Of Nscp On Confined Areas. 2. Connection Of Trusses To Beams And Columns. 3. Splicing Details Of Reinforcing Bars On Columns And Beams And The Required Bar Cut-off Points. 4. Details For Connection Of New Construction & Old Construction Structural Members Such As Expansions Joints For Thermal Expansion/contraction. 5. Include Thermal Expansion/contraction Prevention Methodologies Specifically On Soft Joints Areas Between Structural And Architectural Members. E. Summary Of Materials 1. Concrete Shall Be Portland Cement And Conforming To Astm Specification C150, Type I To Type Ii 2. Coarse Aggregates Shall Consist Of Washed Gravel, Crushed Stone Or Rock Or A Combination Thereof Conforming To Astm C33 3. Concrete Hollow Blocks Shall Be A Standard Product Of Recognized Manufacturer Conforming To Pns 16 With At Least 350psi Strength. 4. Reinforcing Bars Shall Conform With Pns Grade 60 For 16mm Dia. And Above And Pns Grade 40 For 12mm Dia And Below. 5. Structural Steel Shall Conform With Astm A36/a6m 6. Bolts And Studs Shall Conform With Astm A 325 7. Welding Electrodes Shall Be E60 Or E 70 And Conform With Aws F. Drawing Requirements: See Attached Checklist -end Of Structural/civil Works Design Parameters- Xvi. Design Parameters (sanitary/plumbing Works) A. Codes And Standards The Sanitary/plumbing Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. National Plumbing Code Of The Philippines (npcp) 4. Sanitation Code Of The Philippines 5. Existing Local Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards For Drinking-water 3. Underwriters Laboratory (ul) 4. Doh National \ Laboratory (nrl) 5. Doh Health Care Waste Management Manual 6. National Water Resources Board (nwrb) 7. National Plumbers Association Of The Philippines (nampap) 8. Philippine Society Of Sanitary Engineers, Inc. (psse) B. Site Works Based On The Master Site Development Of The Hospital, The Site Works Shall Provide Complete Layout Of The Following: 1. Storm Drainage Network, Indicating Drainage Manholes And Pipe Culvert; 2. Sewerage Pipe Network, Indicating Sewage Manholes, Sewage Pipes And The Location Of The Proposed Sewage Treatment Plant; And 3. Water Supply Network, Indicating The Location Of Water Service Entrance, Cisterns, Elevated Water Tank And Proposed Pump House. The Storm Drainage Network Shall Accommodate The Magnitude Of Peak Rates Of Surface Run-off Including Drainage Coming From The Buildings. The System Shall Be Capable Of Handling The Design Flows Routing To The Designated Outfall; For Rainfall Calculation And Sizing Of Drainage Pipes, Refer To Table-d2, Appendix-d, National Plumbing Code Of The Philippines And Current Rainfall Record From Pagasa. The Sewerage Pipe Network Design Shall Accommodate All Sewage Coming From All The Facilities, Conveyed By Gravitational Flow Leading To The Sewage Treatment Plant; Per Capita Wastewater Demand: 100-130 Gal/capita/day Per Bed C. Building Facilities Sanitary/plumbing System 1. Sewer Line And Vent System Provide Complete Sewer Line And Vent System From All (domestic) Plumbing Fixtures And Floor Drains, Laid By Gravity Flow Leading To The Sewage Treatment Plant (stp); For Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp 2. Wastewater Line And Vent System For All Wash Areas Dealing And Generating With Oil/grease, Provide Separate Wasteline And Vent System And Solely Tap To The Proposed Grease Trap And Then Connect Its Effluent To The Sewage Treatment Plant. For Estimated Demand Weight Of Fixtures In Fixture Units; Refer To Appendix A, Table A-2, Npcp Waterline System Provide Complete Cold Water Supply Pipes To All Plumbing Fixtures. From The Main Water Source, The Water Shall Be Pumped To The Elevated Water Tank (ewt) And Conveyed To The Fixtures By Gravity System And Or Distributed To Fixtures By Transfer Pumped With Constant Pressure Through A Pneumatic Storage Tank, Whichever Is Feasible. 4. Storm Drainage System Complete Storm Drainage System Shall Be Provided For All Roofs, Canopies, Concrete Ledges And Balconies Including Condensate Drains Laid For Gravity Flow Connected To A Leader/pipe Line Leading To The Natural Ground Level Storm Drainage Network. D. Specific Requirements Provide Details Of The Following: 1. Grease Trap (for Dietary) 2. Provision Of Water Softener 3. Fiberglass Pressure Tank E. Summary Of Materials Sewer And Vent Pipes; Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings) Storm Drainage Pipes; Downspouts, Unplasticized Polyvinyl Chloride (upvc) Extra Series 1000 (conforming To Iso 3633 Astm D2729 Including Trims And Fittings, Bps Certified) Drainage Pipes; 250mm Dia. And Below, Non-reinforced Concrete Pipe (nrcdp) 300mm Dia. And Above, Reinforced Concrete Pipe (rcdp) Drainage Manholes; Street Inlet, Curb Inlet, Traffic Type Reinforced Concrete Area Drain/catch Basin, Reinforced Load Bearing Chb Sewage Manholes; Traffic Type Reinforced Concrete With Standard Steel Brass Cover Wastewater Pipeline; Extra Heavy (xh) Single Hub, Hub Less Cast Iron Pipes And Fittings (cip) Conforming To Astm Standard 888 Cleanouts; Cast Iron Brass With Countersunk Plug (bps Certified) Floor Drains/deck Drains; Cast Iron Brass (bps Certified) Gutter Drains; Cast Iron Dome Type Brass (bps Certified) Cold Waterline Pipes; For Buildings, Polypropylene Pn10 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Hot Waterline System; For Buildings, Polypropylene Pn20 Fusion Weld Pipes Including Trims And Fittings (bps Certified) Trench Grating; Galvanized/stainless Steel Iron Grates Plumbing Fixtures Including Trims, Fittings And Accessories; (bps Certified) Water Closet-tank Type Push Button Flush Lavatory - (pedestal/counter Type) With C-spout Spray Faucet Kitchen Sink-ga#16 Stainless Steel Seamless Bowl With Gooseneck Faucet Urinal-wall Hung Flush Valve Type Plumbing Fixtures At Sterile Areas; A. Scrub-up Sink-ga#16 Stainless Steel (single/double Bowl) Compartment With Knee Operated And Or Censor Controlled Spay Faucet B. Surgical Soap Dispenser-ga#16 Stainless Steel Foot Operated C. Laboratory Sink-ga# 16 Stainless Steel Deep Seated Seamless Bowl Compartment With C-spout Spray Faucet F. Drawing Requirements: See Attached Doh Checklist Standards Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096) -end Of Sanitary/plumbing Works Design Parameters- Xvii. Design Parameters (mechanical Works) A. Codes And Standards The Mechanical Design Shall Be In Accordance With The Following Codes And Standards. Codes: 1. National Building Code Of The Philippines And Its New Irr 2. Fire Code Of The Philippines 3. Mechanical Engineering Code Of The Philippines (me Code) 4. Existing Local Government Codes And Ordinances. Standards: 1. Bureau Of Product Standards (bps) 2. Philippine National Standards (pns) 3. Underwriters Laboratory (ul) And Factory Mutual (fm) 4. International Electrotechnical Commission (iec) 1988 5. National Fire Protection Association (nfpa) 6. National Fire Protection Association (nfpa) 99 Standard For Health Care Facilities. 7. American Society Of Heating, Refrigeration And Air Conditioning Engineers (ashrae). 8. Center For Disease Control And Prevention (cdc) Manual. B. Automatic Fire Sprinkler System The Automatic Fire Sprinkler System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. Site Development Plan And Vicinity Map, Indicating The Location Of The Buildings, Firewater Reserve Tank, Firewater Line, Yard Loop And Private Fire Hydrant. 2. General Notes, Legends And Symbols Including Schematic Diagram Of The Fire Sprinkler System And Schematic Diagram Of Alarm Monitoring System. 3. Floor Layout And Isometric Layout Of The Automatic Fire Sprinkler System Indicating Pipe Sizes And The Location Of The Pipes, Valves, Sprinkler Heads, Riser Nipples, Fire Hose Cabinets, Sprinkler Main Riser, Drain Pipes, Cross Mains, Branch Lines, Inspector’s Test Connections, Hangers And Sway Braces. 4. Equipment Schedule, Detail Drawings, Fire Pump And Jockey Pump Layout. 5. Architectural, Structural, Electrical And Plumbing Drawings Of The Firewater Tank And Pumphouse. An Automatic Fire Sprinkler Shall Be Provided In All Hospital Building Except For Those Fire Resistive One-storey Hospital Building. Hazard Classification Shall Be Light Hazard Occupancy. Area Of Coverage Shall Be 146 Square Meters And Water Density Shall Be 4.07 Lps/sq. M. Protection Area Per Sprinkler Head Shall Be 20 Square Meters At 2.2 Meters Minimum Distance Between Sprinklers And 4.2 Meters Maximum Spacing. All Floor Control Valves Shall Be Equipped With Supervisory Switch, Water Flow Detector And Drain System. Water Supply Shall Be Horizontal Split Case Centrifugal Fire Pump With Diesel Engine Or Ac Motor And A Vertical In-line Jockey Pump With Controller. Firewater Reserve Tank Shall Be Ground Level Monolithic Concrete Tank Sized For A Minimum Of 30 Minutes. Hydraulic Calculations Report Shall Be Based On Npfa-13 Format. C. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Operating Rooms, Delivery Rooms, Offices And Other Areas Where Conditioned Air Is Necessary. Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. Centralized Air Conditioning Will Be Used As Indicated On Space Requirements (e.g. Sterile Hallways). Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, As Mentioned On Space Requirements. D. Specific Requirements Provide Details Of The Following: 1. Lpg Pipeline 2. Kitchenhood And Smokestack E. Summary Of Materials 1. Automatic Fire Sprinkler System A. The Fire Pump Shall Be Ul Listed/fm Approved, Diesel Engine Or Electric Motor Driven, Designed Specifically Intended For An Automatic Water Sprinkler Protection System. B. The Jockey Pump Shall Be Ul Listed/fm Approved, Electric Motor Driven, 220v, 3-phase, 60 Hertz, And Electric Power Connection. C. Sprinkler Head Shall Be Ul Listed/fm Approved, Pendant, Upright Or Sidewall Unit, 83 Lpm Flow Capacity Per Head And Temperature Fusing At 57.5° C To 74°c. D. The Alarm Assembly Shall Be Ul Listed/fm Approved, Constructed And Installed That Any Flow Of Water From The Sprinkler System Equal To Or Greater Than That From The Single Automatic Head Shall Result In An Audible And Visual Sign In The Vicinity Of The Building. E. Alarm And Supervision System Of The Automatic Water Sprinkler Shall Include The Monitoring Water Flow Switch At Each Floor Of The Building, Fire Pump And Jockey Pump Running Condition And Power Supplies, Level Of Water In The Reservoir And Control Valves. F. Pipes Shall Be B.i. Schedule 40. Screw Fittings Shall Be Used For Inside Piping. 2. Air Conditioning And Refrigeration System A. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. B. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. C. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethelene Film, Which Shall Be Overlapped Not Less Than 50mm. D. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. E. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Mechanical Works Design Parameters- Xviii. Design Parameters (electrical/auxiliary Works) A. Codes And Standards The Electrical System Design Parameters Shall Be In Accordance With The Following Codes And Standards. Codes: 1. Philippine Electrical Code 2. National Electrical Code 3. Fire Code Of The Philippines 4. National Building Code Of The Philippines And Its New Irr 5. Existing Local Codes And Ordinances Standards: 1. Bureau Of Product Standards (bps) 2. Underwriters Laboratory (ul) 3. National Fire Protection Association 4. International Electrotechnical Commission (iec) 5. Illumination Engineering Society (ies) 6. National Electrical Manufacturer’s Association (nema) 7. Doh Manual On Technical Guidelines For Hospital And Health Facilities Planning And Design B. Building Facilities Electrical System 1. Lighting System Provide And Install Adequate Normal Branch Circuits For Lighting System To All Areas Using The Standard Lighting Design Analysis. Utilize The Standard Illumination Requirements Per Area Of Concern Using The Preferred Particular Type Of Luminaires. 2. Power System Provide And Install Adequate Normal Branch Circuits For The Power System. 3. Standby/emergency System Provide And Install Adequate Life Safety And Critical Emergency Branch Circuits For Lighting Or Utilization Equipment Connected To The Alternate Power Source. 4. Auxiliary System Provide And Install The Following Auxiliary System: Communication System A. Telephone System B. Local Area Network System C. Public Address Paging System D. Private Branch Exchange (pabx) E. Master Or Cable Antenna Television Fire Alarm System Security System 5. Lightning Protection System The Building Lightning Protection System Shall Include Roof-mounted Air Terminals Grounding Conductors, Ground Rods, Conduits, Clamps, And Auxiliary Equipment As Required For A Complete And Operational Lightning Protection System. 6. Provide Details Of The Following: Lighting Fixtures/luminaires Panelboard And Circuit Breakers Switchgear And Other Metering Devices Electrical And Hospital Equipment Installation And Termination Of Auxiliary And Other Special Devices And Equipment Power And Telephone Handholes (as May Be Required) Pedestal And Service Entrance To Bldg. Grounding System Layout Substation/power House And Electrical Room Transformer And Generator Mounting Others As May Be Required. C. Summary Of Materials General Lighting Luminaries: Fixtures Type Shall Be As Indicated On The Lighting Layout Plan. 1. Fluorescent Lamp Shall Be Linear, Circular Or Self-ballasted Compact Fluorescent Lamps. 2. Fluorescent Lamps Shall Be Cool Or Warm White And 3. Lamp Holders Shall Be Made Of Thermosetting Plastic. 4. Fluorescent Ballast: Magnetic Or Electronic Type With High Power Factor Or High Frequency Energy Saving Type. 5. Fluorescent Fixture Housing Shall Be Steel Sheet With High Reflectance Powder Coat Paint Finish. 6. Downlights And Pin Lights Shall Be Of Heavy Gauge Spun Aluminum Equipped With Lamp As Indicated On The Drawings. 7. Other Special Lighting Requirements Shall Be As Approved By The Implementing Agency. 8. Sterile Areas/zones Lighting Specifications: A. Type: Use Sealed, Recessed, Or Surface-mounted Led Fixtures That Are Flush With The Ceiling Surface To Prevent Dust Accumulation. B. Lux Level: Aim For 300-500 Lux For General Sterile Areas; 1000 Lux Or More May Be Needed In Surgical Suites Or Examination Zones Or As Specified On Manual Of Technical Guidelines For Hospital Planning And Design (level 3) Wiring Devices: Wiring Devices Shall Be Non-automatic Control Devices, The Contact Is Guaranteed By The Pressure Of The Special Spiral Springs. 1. Switches Shall Be Of 15a, 250v Or 300v Except As Otherwise Noted And Approved. Terminals Shall Be Screw-type Or Quick-connected Type. 2. General Use Receptacle Shall Be 15a, 240v Grounding Type Unless Otherwise Indicated On The Drawings. 3. Special Purpose Receptacles Shall Be As Called For On The Drawings. 4. Matching Plugs Shall Be Supplied. Panelboards And Circuit Breakers: The Panelboard And Circuit Breakers Shall Be Equipped With Molded-case Circuit Breakers And Shall Be The Type As Indicated In The Panelboard Schedule And Details. 1. Provide Molded-case Circuit Breakers Of Frame, Trip Rating And Interrupting Capacity As Shown On The Drawings. The Circuit Breakers Shall Be Quick-make, Quick Break, Thermal-magnetic, Trip-indicating And Shall Have Common Trip On All Multiple Breakers With Internal Trip Mechanism. 2. All Current-carrying Parts Of The Panelboards Shall Be Plated. Provide Solid Neutral (s/n) Assembly When Required. The Assembly Shall Be Isolated From The Enclosure. Electrical Conduits, Boxes And Fittings: All Conduits, Boxes And Fittings Shall Be Standard Rigid Steel, Zinc Coated Or Galvanized. 1. Rigid Steel Conduits (rsc) 2. Rigid Metal Conduits (rmc) 3. Intermediate Metal Conduits (imc) 4. Electrical Metallic Tubing (emt) 5. Unplasticized Polyvinyl Chloride (upvc) If Required Shall Be Schedule 40. Conductors: Wires And Cables Shall Be Of The Approved Type And Unless Specified Or Indicated Otherwise, All Power And Lighting Conductors Shall Be Insulated For 600 Volts. 1. The Conductors Used In The Wiring System Shall Be Of Soft-annealed Copper Having A Conductivity Of Not Less Than 98% Of That Of Pure Copper And Insulated For 60° C Temperatures. 2. All Conduits Of Convenience Outlets And Wire-ways For Lighting Branch Circuit Home-runs Shall Be Wired With A Minimum Of 3.5 Mm Square In Size. Master Antenna Television (matv) And Cable Television (catv) System: 1. Two Sources Of Tv Signals Shall Be Provided To The Building. One (1) Shall Be From A Master Antenna Installed At The Roof Or Within A Suitable Area Of The Building And The Other Will Be From A Commercial Cable Television Service. 2. The Master Antenna System Shall Consist Of Fm, Vhf And Uhf Antennas, Combiner, Distribution Amplifier, Coaxial Cables, Splitters, Tap-offs And Tv Outlets. 3. There Shall Be Individual Trunking For Master Antenna And Cable Television Rising In The Building. Structured Cabling & Telephone System: 1. A Minimum Provision For Estimated 500 Mixed Pabx Extension And Direct Telephone Lines Shall Be Required For Tertiary Hospitals. 2. Final Details Of The System Shall Follow Specific Requirements, Quantity And Type Of Service. Fire Detection And Alarm System: 1. The Fire Detection And Alarm System Shall Be Of Multiplex, Microprocessor- Controlled Addressable Or Zonal Conventional Fire Detection, Alarm And Communication System. 2. The System Shall Consist Of Full Integration Automatic Fire Detection, Voice Alarm Communication And Fire Fighters Telephone System. 3. The System Shall Consist Of Control Station, Mimic Panel Initiating And Indicating Devices, Control Modules And System Of Wirings. 4. Actuation Of The Protective Signaling System Shall Occur By Manual Pull Station, Automatic Smoke Or Heat Detector, Sprinkler Flow Switch And Tamper Switch. 5. The System Shall Be Able To Monitors The Status Of Flow Switches And Supervisory Switches Installed At The Sprinkler System Risers. These Monitoring Points Are Also Addressable Or The Conventional Zonal In The Same Way As The Detectors Are Making Them Easily Recognizable At The Control Panel. 6. Occupant Notification Shall Be Accomplished Automatically. Notification Will Be General, Audible Alarm Type Complying With Appropriate Section Of Nfpa. 7. The System Shall Be Installed With Provisions For Future Connection To The Nearest Fire Services Station In The Locality. Security System: 1. The Security System Shall Include Intrusion Detection And Alarm, Cctv, Access Control Or As Maybe Required. Ventilation And Air Conditioning System The Ventilation And Air Conditioning System Shall Be Composed Of Complete Plans And Drawings Of The Following: 1. General Notes, Legends And Symbols Including Schematic Diagram Of The Ventilation And Air Conditioning System. 2. Floor Layout Of The Ventilation And Air Conditioning System Indicating The Capacity And Location Of The Air Conditioners And Fans. 3. Duct Layout Indicating Duct Sizes, Route And Location Of The Dampers, Diffusers, Return Air Register, Hangers And Sway Braces. 4. Refrigerant Piping Layout Indicating Pipe Sizes, Location Of Valves, Hangers And Sway Braces. 5. Equipment Schedule And Details Drawings Of Air Conditioners And Ventilating System. A) Air Conditioning System Shall Be Provided In All Patient’s Private Rooms, Radiologic And Imaging Area, Operating Rooms, Delivery Rooms, Laboratories, Critical Care Areas, Offices And Other Areas Where Conditioned Air Is Necessary. B) Cooling Load Calculations Report Shall Be Manual Or Computer Generated, Hourly Analysis Program Which Includes Heat Transmission Coefficients, Solar Heat Gain Factors And Corrected Cooling Load Temperature Difference Calculations. C) Split Type Air Conditioners Will Be Used At Areas With Larger Capacities. D) Window Type Air Conditioners Shall Be Used In Areas With Exterior Wall Exposure. E) Centralized Air Conditioning Will Be Used Only If Feasible. F) Design Of All Critical Areas Shall Be Laminar Or Positive Pressure, Wherein The Supply Air Is 10% More Than Exhaust Air. G) All Infectious Isolation Rooms, Such As Tb And Sars, Shall Be Negative Pressure, Wherein The Exhaust Air Is More Than 10% Of The Supply Air. H) Maintain An Air Change Rate Greater Than Or Equal To 12 Air Changes Per Hour Or 145 Liters Per Second Per Patient. I) Ceiling Cassette Type Exhaust Fans With Integral Air Diffuser Shall Be Provided In All Toilets. J) Ceiling Fans, Orbit Type With 360° Oscillation Shall Be Provided In All Non-air-conditioned Rooms, Such As Patient Wards, Work Areas, Etc. Air Conditioning And Refrigeration System 1. Refrigerant Pipes Shall Be Copper Tubing, Type L Or K Black Steel Pipe, Schedule 40 For Size Of 100mm Diameter And Smaller. Pipe Over 100mm Shall Be Black Steel Pipe Schedule 40. 2. Black Steel Pipes Shall Be Standard Seamless, Lap-welded, Or Electric Resistant Welded For Size Of 50mm Diameter And Larger, Screw Type For Size 38mm Diameter And Smaller, Fittings For Copper Tubing Shall Be Cast Bronze Fitting Designed Expressly For Brazing. 3. Pipe Insulation Shall Be Performed Fiberglass Or Its Equivalent. The Insulating Materials Shall Be Covered With 100mm X. 13mm Thick Polyethylene Film, Which Shall Be Overlapped Not Less Than 50mm. 4. Ducts Shall Be Galvanized Sheet Steel Of Standard Gauges. 5. Ductwork Insulation Materials Shall Be Rigid Board Made Of Styropor Or Equivalent 25mm Thick For Ground And Top Floor, 13mm Thick For Intermediate Floor. -end Of Electrical Works Design Parameters- Xix. Design Parameters (green And Safe Health Facilities) Codes And Standards Green And Safe Health Facilities Shall Be In Accordance With The Following Laws, Codes And Standards. Global Initiatives & Developments: 1. World Health Assembly Resolution On Universal Health Care (2019) 2. World Health Resolution On Climate Change And Health (2008) 3. Un Resolution On Sustainable Development Goals (2015) 4. Global Action On Patients’ Safety Laws And Codes: 1. Sanitation Code Of The Philippines Irr Of Chapter Xvii 2. The Local Government Code Of 1991 3. Clean Water Act Of 2004 4. National Building Code Of The Philippines (pd 1096) 5. General Appropriation Act Fiscal Year 2021 (ra 11518) 6. Occupational Safety And Health (ra 11058) 7. Safe Hospital Initiative (2011) 8. Universal Health Care Act (ra 11285) 9. Implementing Rules And Regulations Of Accessibility Law (ra 344) 10. Ecological Solid Waste Management Act Of 2000 (ra 9003) 11. Climate Change Act Of 2009 (ra 9729) 12. Other Related Standards A. Guidelines The Green And Safe Hf Initiative Represents A Climate Smart Paradigm Shift, Away From Traditional Disaster Response To One That Proactively Seeks To Minimize The Health Impact Of Disasters And Emergencies Through Climate Adaptation And Mitigation Measures (including Climate-proofing And Reduction Of The Environmental Footprint), And Preparedness. Consequently, It Is Essential That This Green Manual Is Incorporated Into The Hospital And Hf Development Agenda That Are Backed With Earmarked Resources In The National Budget, And That Has Governance And Support From The Highest Levels Of Government. The Department Of Health Shall, As Much As Possible, Promote The Greening Of Hospitals And Health Facilities, Including The Improvement Of Energy And Water Efficiency And Conservation, Sustainable Cooling Systems, And Sustainable Healthcare Waste Management In Hospitals. In Line With Its Continuing Efforts In Green And Safe Hfs, The Doh Shall Encourage National And Local Government Hospitals And Other Hfs To Seek Green Certifications From Green Building Rating System/s For Their New Construction Or Expansion, Repair And Renovation Projects. B. Criteria And Compliance System For Outstanding Green And Safe (climate Smart) Health Facilities. Criterion Compliance 1. Governance – Leadership And Management, Trainings, Proper Implementation, Commitment 2. Energy Efficiency – Reduction Of Energy Consumption, Use Of Renewable And Clean Energies 3. Water Efficiency, Sanitation And Hygiene – Adequate Water, Water Reuse/recycling, Water Conservation, Rainwater Harvesting. Safe Drinking Water, Proper Use And Maintenance Of Sanitary Toilet Facilities 4. Health Care Waste Management Waste – Segregation, Collection, Storage, Transport, Treatment, Proper Waste Disposal, Recycling 5. Environmentally Resilient Health Facility – Structural Member, Non-structural Member, Emergency And Disaster Preparedness Plan 6. Site Sustainability – Healing Gardens Within, Fresh Air, Herbal Plants, Accessibility, Existence Of Alternative Routes 7. Material Sustainability – Use Of Sustainable Materials, Procurement Of Sustainable And Recyclable Products, Less Use Of Hazardous And Toxic Substances 8. Indoor Environmental Quality – Lighting, Ventilation, Interior Design, Air Quality Management C. Energy Efficiency Orientate Building & Façade Design To Mitigate Heat Gain. The East And West Facades Receive The Greatest Solar Radiation, And Should Be Designed To Avoid Direct Sun. Use Of Glass/glazing With A Lower U-value And Shading Coefficient Reduce Solar Heat Gain. Allow Provision For Easy Access For Maintenance And Cleaning Especially For Curtain Wall System. Consider Lifespan, Durability And Life Cycle-costing When Selecting Façade Materials. Install And Use Energy-efficient Lighting Fixtures I.e. Led, Cfl, Slim Type Fluorescent, Etc. Skylights (if Applicable) And Windows To Maximize Natural Lighting And Ventilation On Selected Areas. Utilizing Daylight As Possible. Use Of Appliance With Inverter Technology With Variable Frequency Drive Technology. Window And Door Assemblies Shall Have Complete Gaskets, Weather Stripping, Door Bottom Sweeps And Seals. All Operable Windows Shall Be Provided With Safety Features For Protection Against Strong Winds, Water Penetration And Protection For Building Occupants Including Child Safety And Security. Specific Air Exchange Rates Are Usually Attained Through Artificial Ventilation. Adequate Ventilation Throughout The Facility Contributes To Maintaining A Hygienic Environment. Presence Of Functional Windows And Doors, That Allow At Least 6-8 Air Changes Per Hour For Natural Ventilation. For Airborne Infection Isolation Room/s And Er/triage Areas, Greater Or More Than 12 Air Changes Per Hour Is Recommended, While Up To 15 Air Changes Per Hour May Be Recommended For Operating Procedure, Or Delivery Rooms. Light-colored Building Envelopes Is Also Recommended To Reduce Heat Transfer From The Outside To Inside Of The Building By Having Surfaces With High Solar Reflectance Index (sri). D. Water Efficiency, Sanitation And Hygiene Optimize Water Conservation Through Installation Of Rainwater Harvesting Cistern Tank Use Of Waterless Urinals And Dual Flush Water Closets. Use Of Low-flow & Water Efficient Faucet And Hand-held Bidets. Use Of Water-saving Shower Heads For Hospitals, There Must Be At Least One Water Closet For Every Eight Patients In Compliance With Ra 4226 – Hospital Licensure Act. A Separate Toilet For Male And Female Is Preferred, And Shall Be Pwd Accessible. And, A Separate Toilet For The Staff, With A Provision Of One Toilet For Every Fifteen Personnel Shall Be Applied. Waterless Urinals Must Be Provided For Male Toilets. There Should Be Sufficient And Functional Hand-washing Facilities. E. Environmentally Resilient Health Facility Ground Floor Must Be Above Ground Line And Anticipated Flood Level. F. Material Sustainability Building Materials, If Applicable, Must Be Locally Sourced To Minimize Carbon Footprint. Rapidly Renewable And Sustainable Materials Are Also Recommended. Refer To Sec. 16.3.4 Of Doh Green And Safe Health Facilities Manual For List Of Sustainable Construction Materials That Can Be Used. Use Of Materials (specifically Wet-applied Materials) That Are Low In Vocs (volatile Organic Compounds) G. Site Sustainability Adopt The Development Controls Indicated In The National Building Code Of The Philippines To Establish The Extent Of The Health Facility Site Can Develop. Biophilic Design Is Recommended To Help Reduce Stress, Improve Cognitive Function And Creativity, Improve Patients’ Well-being And Expedite Healing. Porous Pavement Is Recommended At The Site Development To Alleviate Flooding. Landscape Swales Is Also One Solution. H. Indoor Environmental Quality Harvest Natural Daylight If Applicable. Acoustic Quality, Especially In Areas/rooms That Needs To Be Soundproofed, Shall Be Maintained. Use Of Acoustic Privacy Partitions Is Required. Separate Entrances For Ambulances And Walk-in Patients. In Procedure Rooms With Windowless Areas, Backlit Photomurals Or Artificially Illuminated Glass Artwork Can Alleviate Feeling Of Claustrophobia. In Wards And Recovery Rooms, Provide Windows And Natural Illumination As Much As Possible. Provide Acoustic Privacy In Patient Rooms, Offices, And Examination Rooms With Partitions Of Sound Transmission Class (stc) Of 45. Noise Level In The Operational Rooms Must Follow The Minimum Noise Standards In Accordance To The Doh Manual Of The Technical Guidelines For Hospital Planning And Design (level 3) Drawing Requirements: See Doh Standard Checklist Based On Revised Irr Of The National Building Code Of The Philippines (pd 1096). Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation. -end Of Green And Safe Health Facilities Design Parameters- Xx. Build Aspect Furnish Labour, Materials, Equipment, Paint, Tools And Other Facilities To Complete The Entire Building Including Architectural, Structural/ Civil, Electrical, Mechanical, Sanitary, Communication, Fire Protection, And Other Related Works To Complete The Scope As Specified And/or As Shown On Drawings And Plans 1. General Requirement Contractor’s Temporary Facility And Lay Down Yard. Communication And Transmittal, Reproduction, Tarpaulin/billboard And Photos Material Testing (rsb, Chb, Concrete, Steel) Safety Requirements (warning Signs, Hardhat, Etc.) As Built Plan Demolition, Clearing Work, Permits And Licenses 2. Other Items Of Work Demolition Of Existing Structures In Affected Areas Or Where The Proposed Project Shall Be Situated, Clearing And Disposal Of All Debris Generated During Construction. All Serviceable Materials Shall Be Turn Over To Doh-dedvmh Through Its Representative Soil Excavation And Soil Treatment Restoration Of Any Damaged Properties During The Construction Permit Fees, And Other Necessary Documents For The Project Shall Be Shouldered By The Contractor Temporary Facilities Shall Be Provided During The Construction Period, To Be Constructed Within The Hospital Compound, Which Shall Serve As The Field Office, Storage Of Materials And Bunkhouse For The Workers. No Implementation Of The Project Without An Approved Plan And Other Related Documents. Strict Implementation Of (dole Guidelines And Other Standards Applicable) Health And Safety Rules. Shall Abide By The Medical Center Hospital House Rules Conduct Weekly Progress And Coordinative Report To The Agency Or Its Representative Other Items Of Work Not Mentioned Herewith But It Is Very Necessary For Execution And Completion Or Works Shall Be Included And Charge To The Contractor 3. Pre-installation Requirements All Tests To Be Conducted Shall Be Witnessed By The Hospital Representatives. Soil Investigation Concrete Strength Testing Reinforcing Bar Strength Testing Concrete Masonry Unit (cmu) Testing All Plumbing And Sanitary System Automatic Fire Sprinkler System Ventilation And Air Conditioning System All Electrical System And Other Tests That Necessary To Perform To Ensure The Quality Of The Project All Certifications And Reports Under Post-installation Requirement Shall Be Submitted To The Hospital Representatives. The Contractor Shall Submit A Sample Of Materials For Approval Of The Medical Center Chief Prior To Installation. No Implementation Or Execution Of Work In Any Discipline Without The Approval Of Medical Center Chief Or Through Its Representative Any Request For Inspection, Approval, Concrete Pouring, Testing And Commissioning Must Be Address To Medical Center Chief Or Must Adhere To The Reporting Protocol As Mentioned Above. -end Of Build Aspect- Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Drawings (as Applicable) A – 1 (a…n) Perspective, Site Development Plan, Vicinity Map/location Plan (2.00 Kms. Radius) Table Of Contents A – 2 (a…n) Floor Plans (scale 1:100m Minimum) Including Furniture Layout When Necessary A – 3 (a…n) Four (4) Elevations (scale 1:100m Minimum) A – 4 (a…n) Two (2) Sections (scale 1:100m Minimum) Including Spot Details When Necessary A – 5 (a…n) Roof Plan/s Showing Downspouts (scale 1:100m Minimum), Including Detail Of Gutter, Downspout, Etc. A – 6 (a…n) Reflected Ceiling Plan/s (scale 1:100m Minimum), Including Details A – 7 (a…n) Details Of Stairs, Fire Escapes/exits, Accessible Ramps, Etc. (scale 1:50m), Including Details Of Railings, Treads, Risers, Etc., In The Form Of Plans, Elevation/section A – 8 (a…n) Details Of Toilets (1:50 M) Including Accessible Toilets In The Form Of Plans, Elevation/section A – 9 (a…n) Details Of Specialized Design Features (scale 1:50 M) Such As Partitions, Cabinets, Etc. And Accessible Design Features A – 10 (a…n) Detail Of Typical Bay Section From Ground To Roof (scale 1:50 M) A – 11 (a…n) Details Of Special Elevations/section Rooms (1:50m) In Form Of Plans, A – 12 (a…n) Schedule Of Doors, Gates, Emergency Exits, Etc. (scale 1:50 M), Including Specifications For Materials And Hardware A – 13 (a…n) Schedule Of Windows (scale 1:50 M), Including Specifications For Materials And Hardware A – 14 (a…n) Schedule Of Finishes For Interior And Exterior Floors, Walls, Ceilings Architectural Technical Specifications Architectural Scope Of Works Architectural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 1 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Architectural Interior Design Drawings (as Applicable) Aid – 1 (a…n) Floor Plans Showing Layout Of Floor Finishes (scale 1:100m Minimum) Aid – 2 (a…n) Floor Plans Showing Layout Of Furniture/finishing Partitions, Cabinets, Etc. (scale 1:100m Minimum) Aid – 3 (a…n) Interior Elevations And Sections Showing Wall Patterns, Ceiling Sections, Etc. (scale 1:100m Minimum) Aid – 4 (a…n) Details Of Partitions, Cabinets, Furniture, Ceiling And Other Interior Design Features (scale 1:100m Minimum) Aid – 5 (a…n) Architectural Interior Perspective/s Architectural Interior Design Technical Specifications Architectural Interior Design Scope Of Works Architectural Interior Design Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 2 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Structural Drawings (as Applicable) S – 1 (a…n) General Notes And Construction Standards S – 2 (a…n) Site Development Plan S – 3 (a…n) Foundation Plan/s (scale 1:100m Minimum) S – 4 (a…n) Floor Framing Plan/s (scale 1:100m Minimum) S – 5 (a…n) Roof Framing Plan (scale 1:100m Minimum) S – 6 (a…n) Schedule And Detail Of Footings And Columns S – 7 (a…n) Schedule And Detail Of Beams And Floor Slabs S – 8 (a…n) Detail Of Trusses S – 9 (a…n) Details Of Stairs, Ramps, Fire Exits S – 10 (a…n) Other Spot Details Structural Analysis And Design (for 2 Storey Building And Higher) Boring And Land Test Results (for 3 Storey Building And Higher) Seismic Analysis Structural Technical Specifications Structural Scope Of Works Structural Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 3 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Electrical Drawings (as Applicable) E – 1 (a…n) General Notes And Legends E – 2 (a…n) Location And Site Plan E – 3 (a…n) Lighting Layout (scale 1:100m Minimum) Including Details E – 4 (a…n) Power Layout (scale 1:100m Minimum) Including Details E – 5 (a…n) Auxiliary System Layout (scale 1:100m Minimum) Including E – 6 (a…n) Schedule And Detail Of Loads E – 7 (a…n) Riser Diagram E – 8 (a…n) Other Detail Electrical Computation Design Analysis Electrical Technical Specifications Electrical Scope Of Works Electrical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 4 Of 6 Electronics/auxiliary System Ready For Integrated Communications 1. Telephone System 2. Paging System 3. Lan System 4. Fire Alarm System 5. Security System Cctv 6. Integrated Communications And Systems Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Plumbing/sanitary Drawings (as Applicable) P – 1 (a…n) General Notes And Legends P – 2 (a…n) Location And Site Plan P – 3 (a…n) Storm Drainage Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Main Drainage Line P – 4 (a…n) Waterline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line From Main Water Source When Applicable P – 5 (a…n) Sewerline Layout (scale 1:100m Minimum) Including Actual Length Of Tapping Line To Septic Tank Or Existing Sewerline P – 6 (a…n) Isometric Layout, Showing Waterline, Sewerline And Drainage Line P – 7 (a…n) Detail Of Connections, Catch Basins, Downspouts, Etc. P – 8 (a…n) Detail Of Septic Tank/sewer Treatment Plant Design Analysis Sanitary Technical Specifications Sanitary Scope Of Works Sanitary Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 5 Of 6 Checklist Of Drawing Requirements In The Preparation/evaluation/approval Of Detailed Architectural And Engineering Plans And Other Documents For Infrastructure Project Implementation Reference: Revised Implementing Rules And Regulations Of The National Building Code Of The Philippines (pd 1096) Project : Location : Sheet Number Sheet Contents Remarks* Mechanical Drawings (as Applicable) M – 1 (a…n) General Notes And Legends, Site Development Plan, Location Plans M – 2 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Showing Ventilation And Air Conditioning Systems And Other Installations M – 3 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Gas Pipeline System And Details M – 4 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Air-conditioning Systems And Details M – 5 (a…n) Floor Plans/isometric Drawings (scale 1:100m Minimum) Of Fire Suppression Systems, Fire Sprinkler System, Wet Stand Pipe, Dry Standpipe And Other Installation M – 6 (a…n) Details Water Tank, Flow Diagram (scale 1:50m) M – 7 (a…n) Details Of Firewater Supply Sytem (scale 1:50m) M – 8 (a…n) Detail Of Elevators, Escalators, Dumbwaiters, Etc. (scale 1:50m) M – 9 (a…n) Detail Of Other Machinery/equipment (scale 1:50) M – 10 (a…n) Longitudinal And Transverse Section Of Building (scale 1:100m) Showing Manner Of Support Of Machines/equipment Mechanical Technical Specifications Mechanical Scope Of Works Mechanical Bill Of Quantities * To Be Marked As Either Complying Or Non-complying/complete Or Incomplete By The Evaluator Or To Be Filled With Supporting Comments (use Additional Sheets If Necessary) Evaluated By: ____________________________________________________________ Page 6 Of 6 General Guidelines • All Construction Works Shall Be Undertaken By Contractor In Accordance With Existing Laws And All Other Applicable Rules And Regulations. • The Contractor Shall Be Responsible In Setting Out Reference Lines, Elevations (lines And Grades) Prior And During The Execution Of The Works. All References Shall Be Maintained And Protected By The Contractor At His Own Expense. Disturbed References Shall Be Restored To Its Original Position Without Extra Cost To Devmh. • The Contractor Shall Carry Out The Works Properly And In Accordance With This Contract. The Contractor Shall Provide All Supervision, Labor, Materials, Plant And Equipment, Which May Be Required. • The Contractor Shall Commence Execution Of The Works On The Start Date And Shall Carry Out The Works In Accordance With The Approved Pert/cpm Network Diagram Submitted By The Contractor, As Updated With The Approval Of The Procuring Entity’s Representative, And Shall Complete The Works By The Intended Completion Date. • The Contractor Shall Be Responsible For The Safety Of All Activities On The Site. • During On-going Construction And Before The Turn-over Of The Project, Engineering & Facilities Management Staff, End-users, Twg And Bac Shall Inspect The Works Undertaken By Contractor. Hospital Engineers And End-users Discover Any Deviations By Contractor From The Approved Construction Plans, Contractor Shall Be Required To Rectify All Such Deviations, Within Such Period Required By Client. • Contractor Shall Have Full Responsibility For Any And All Damages To Existing Hospital Facilities, Utilities, And/or Any Portion Of The Hospital’s Common Area, Due To The Works Undertaken By Contractor, Whether Accidental Or Intentional. • No Variation Order Shall Be Undertaken Unless Verified By Hospital Engineer And Approved By Executive Committee. • Contractor Shall Not Cover Or Block Stub-outs (cleanouts, Water Source, Exhaust, Sewer, Drainage, Etc.) When Not Utilized. Said Stub-outs Shall At All Times Be Free Of Obstructions And Easily Accessible. • Contractor Shall Secure A Utility Tapping Permit Prior To Tapping From Utility Provision. • Electricity And Water Consumed During Construction Shall Be Charged To Contractor. • End-users Reserves The Right To Inspect The Works At Any Time. • Contractor Shall Insure And Hold Client, Its Affiliates, Officers, Directors, Stockholders, Employees, Agents, And/or Representatives, Free And Harmless From And Against Any Injury, Losses, Claims, Damages, Liabilities, Expenses, And/or Costs Of Litigation, Resulting From Or Arising Out Of The Works Undertaken By Contractor. • In Event Of Force Majeure, The Contractor Shall Rectify, Replace Or Build The Unfinished Projects When It Is Not Yet Completed And Accepted W/o Additional Cost For The Procuring Entity. • Contractor Shall Comply With The Construction House Rules Of This Hospital.
Bihar Livestock Development Agency Tender
Automobiles and Auto Parts...+1Civil And Architectural Services
India
Closing Soon28 Feb 2025
Tender AmountRefer Documents
Description: Request For Proposal From Reputed Registered Architects And Firms To Empanel Architects/Firms/Consultants For Providing Comprenhensive Architectural And Various Engineering Services To The Projects To Be Taken Under Different Directorates Of The Department
31-40 of 400 active Tenders