Tenders of Andhra Pradesh Power Generation Corporation Limited
Tenders of Andhra Pradesh Power Generation Corporation Limited
Sorry!
No Active
Tenders of Andhra Pradesh Power Generation Corporation Limited
foundCheck archived
Tenders of Andhra Pradesh Power Generation Corporation Limited
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
India
Closing Date6 Apr 2020
Tender AmountINR 999 K (USD 12.1 K)
Breakdown And Running Maintenance Works For Aluminum Sheet And Insulation For Ducts All Elevations Of Primary Air Cold And Hot Hot Secondary Air And Flue Gas As And When Required During The Period From 01.04.2020 To 31.03.2021 For Unit I Boiler Including T And P And Consumables
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
India
Closing Date3 Apr 2020
Tender AmountINR 605.3 K (USD 7.3 K)
Transformer Oil Filtration , Replacement Of Transformer Oil Of 1 No 400kva, 6.6kv/433v Power Transformer At S/r-i/ii/iii &replacement Of Failed 433v/415v 3-phase 4-wire Lighting Distribution/welding /sm Transformers Of Different Capacities ,laying Different Types Of Power Cable In Marshaling Yard, Conveyor Galleries, Various Locations As And When Required In Em/chpdivison/dr.nttps During 2020-21
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
India
Closing Date27 Mar 2020
Tender AmountINR 553.9 K (USD 6.7 K)
Re Railment Charges Of Derailed Load, Empty Coal Wagons, Break Van And Locos On Wagon Tipplers 1, 2, 3, 4, 5 & 6 Rail Tables, Out Haul And Inhaul Sides, Marshalling Yard, Different Numbers Of Road Points And Bobr Coal Wagons At 6 A B Track Hopers In Operation Division Chp Stage I,ii,iii And Iv Dr.nttps For The Year 2020-21
Andhra Pradesh Power Generation Corporation Limited - APGENCO Tender
India
Closing Date9 Dec 2019
Tender AmountINR 769.8 K (USD 9.3 K) This is an estimated amount, exact amount may vary.
Drnttps Providing And Engaging Of 3no Poclains On Hire Basis With Engine Capacity Of 136hp And Bucket Capacity 0.91cum For Loading The Pond Ash In To The Vehicles At Stage-iii Ash Pond For The Period From 13.12.2019 To 31.12.2019 Or Actual Date Of Commencement Of Work For 12hrs Per Day