Tenders of Bgis Pwgsc Rp1

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Closing Date13 Aug 2025
Tender AmountRefer Documents 
Déplacement Des Bouches D’aération Du Toit Au Chenil-secteur Quarantaine

Bgis Pwgsc Rp1 Tender

Others
Canada
Closing Soon18 Jul 2025
Tender AmountRefer Documents 
Correctifs Sur Système De Protection Contre La Foudre

Bgis Pwgsc Rp1 Tender

Software and IT Solutions
Canada
Closing Soon18 Jul 2025
Tender AmountRefer Documents 
Remplacement Du Système Automatisé De Contrôle De L'éclairage Campus

Bgis Pwgsc Rp1 Tender

Others
Canada
Closing Date4 Aug 2025
Tender AmountRefer Documents 
Fire Damper Deficiencies - Construction Services

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Civil Works Others
Canada
Closing Soon18 Jul 2025
Tender AmountRefer Documents 
Investigate And Repair Water Infiltration And Damage

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Building Construction
Canada
Closing Soon15 Jul 2025
Tender AmountRefer Documents 
Consultant - Replace Main Entrance Doors

Bgis Pwgsc Rp1 Tender

Environmental Service
Canada
Closing Soon15 Jul 2025
Tender AmountRefer Documents 
Development Of Written Instructions That Set-out The Operation, Inspection, Cleaning, Maintenance, Testing And Verification Requirements Of Hvac Systems, And The Calibration Procedures For All Sensors, Probes And Gauges On Which The Systems Depend For Efficient Operation. Hvac Sops For Systems Containing Halocarbon Shall Include Specific Procedures That Seek To Prevent The Inadvertent Release Of Halocarbon. The Consultant Shall Use The Detail Scope Of Work Template Provided By The Project Manager For Developing And Creating The Sop. The Developed Sop To Include A Standardize Word Compatible File Template Which Is To Be Used And Updated For The Future For Any Added Equipment. The Consultant Shall Use The Scope Of Work And Checklist Template Provided By The Project Manager For Developing And Creating The Sop, As Well As Providing The Sequence Of Operations Of Each Of The Hvac And Mechanical Systems In The Building, As Applicable. To Develop The Required Sop, The Consultant Shall:1.review And Verify The Cmms Inventory Ensuring All Equipment Within The Building That Forms Part Of The Sop Is Captured, If Not The Consultant Is To Notify The Project Manager In Order To Have A Cmms Completed And Submitted Updating The Overall Inventory List; 2.use The Scope Of Work And Checklist Template Provided By The Project Manager For Developing And Creating The Sop. 3. Take Into Account Csa Guideline Z204-94, Entitled Guideline For Managing Air Quality In Office Buildings, And Follow The Instructions' Requirements Per Section 2.24 Of Div Iii Of The Canadian Occupational Health And Safety Regulations. All Work Must Be Completed By November 28, 2025.

Bgis Pwgsc Rp1 Tender

Others
Canada
Closing Date1 Aug 2025
Tender AmountRefer Documents 
Landscaping And Grounds Care Services For Lower Mainland Pspc Sites - Fmz02

Bgis Pwgsc Rp1 Tender

Civil And Construction...+1Others
Canada
Closing Date22 Jul 2025
Tender AmountRefer Documents 
Install Catwalks To Access Heating-cooling Valve

Bgis Pwgsc Rp1 Tender

Energy, Oil and Gas...+2Electrical and Electronics, Electrical Works
Canada
Closing Soon14 Jul 2025
Tender AmountRefer Documents 
Consultant - Installation Of 2- Level 3 Ev Fast Chargers
21-30 of 71 active Tenders