Spain Tender Results

Spain Tender Results

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 73.2 K (USD 76.7 K)
Order No. 13 framework agreement technical assistance service for quality control, quantitative, qualitative, geometric and safety management during the execution of works to renovate and modify the functionality of level crossings located at kilometre points 320/975, 325/248, 326/428, 331/350 and 344/692. Guadalmez – Castuera section. Line 520 Ciudad Real – Badajoz.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 1.6 Million (USD 1.7 Million)
Supply of track devices for the replacement of type "A" switches and renewal of track material at the Pizarra and Aljaima stations

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date19 Dec 2024
Contract AmountEUR 3.1 Million (USD 3.2 Million)
Execution of works for the construction projects for the elimination of level crossings at PPKK 386/169, 386/644, 386/975, 387/316 and 388/492 on Line 800 León – A Coruña. Municipal District of Sarria (Lugo).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 51.4 K (USD 53.3 K)
Second Request against Framework Agreement for the pest control service in ADIF premises and spaces within the scope of the Central Circulation Subdirectorate

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 761 K (USD 788.8 K)
Services for the transfer and adaptation of the Córdoba Central Traffic Control (CTC) equipment to adapt the Córdoba Traffic Regulation Centre.

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountEUR 5.2 Million (USD 5.3 Million)
Execution of works for the construction project to remove level crossings at PP.KK. 376/350 and 376/537 on the Venta de Baños to Santander Line, in the municipality of Alar del Rey (Palencia).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountRefer Documents 
Lot 1: Inspection service at ADIF fuel facilities by OCA 2025-2029, central area

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountRefer Documents 
Lot 2: Inspection service at ADIF fuel facilities by OCA 2025-2029, southern zone

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountRefer Documents 
Lot 3: Supply of equipment for the extension of sidings to 750 metres of useful length at the stations of Arcos de Jalón (Soria) and Sigüenza (Guadalajara).

Administrador De Infraestructuras Ferroviarias Spainish Railway Infrastructure Administrator ADIF Tender Result

Result Stage: Awarded  (AOC Available)
Spain
Contract Date18 Dec 2024
Contract AmountRefer Documents 
Lot 1: Supply of equipment for the extension of sidings to 750 metres of useful length at the stations of Paracuellos-Sabiñán, Morés and Épila (Zaragoza)
1-10 of 10000 active Tender Results